828
State Preservation and Local Initiated Projects FY 2014 - 2017 Indiana Department of Transportation (INDOT) SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL CATEGORY PROGRAM PHASE FEDERAL MATCH Estimated Cost left to Complete Project* 2014 2015 2016 2017 STIP NAME Adams County Indiana Department of Transportation 0810233 SR 218 Bridge Deck Overlay Bridge over the Wabash River, 0.73 miles E of SR 116 Fort Wayne 0 BR Bridge Construction CN $0.00 $0.00 $0.00 $0.00 Init. Bridge Consulting PE $72,000.00 $18,000.00 $90,000.00 Indiana Department of Transportation 1173148 US 224 Environmental Mitigation From 0.87 miles E to 1.2 miles E of US 27 Fort Wayne .809 On Federal Aid Statewide ROW RW $0.00 $0.00 ($80,000.00) $80,000.00 M 08 Comments: MODIFY STIP to move RW funding in the amount of $80K from FY 2014 into FY 2015. Modify the 2014-2017 STIP. NOT IN MPO. Indiana Department of Transportation 1173148 US 224 Environmental Mitigation From 0.87 miles E to 1.2 miles E of US 27 Fort Wayne .809 STP Statewide ROW RW $64,000.00 $16,000.00 $80,000.00 Init. Statewide Construction CN $314,400.00 $78,600.00 $393,000.00 Indiana Department of Transportation 9904180 US 224 Pavement Replacement From 0.87 miles E to 1.27 miles E of US 27. Fort Wayne .809 STP Statewide ROW RW $1,373,120.00 $343,280.00 $1,682,000.00 $34,400.00 Init. Road Consulting PE $31,480.00 $7,870.00 $39,350.00 Statewide Construction CN $2,869,600.00 $717,400.00 $3,587,000.00 Adams County 0810406 IR 1005 Bike/Pedestrian Facilities Adams Co BP, Geneva to Berne, Priority 1 Fort Wayne 1.2 Off Federal Aid 100% Local Funds CN $0.00 $95,630.00 $95,630.00 Init. Local Trans Enhancement Program CN $382,520.00 $0.00 $382,520.00 Local Trans Enhancement Program PE $53,120.00 $0.00 $53,120.00 100% Local Funds PE $0.00 $13,280.00 $13,280.00 Adams County 0810406 IR 1005 Bike/Pedestrian Facilities Adams Co BP, Geneva to Berne, Priority 1 Fort Wayne 1.2 Off Federal Aid 100% Local Funds CN $0.00 $108,910.00 $108,910.00 A 01 Local Transportation Alternatives CN $435,640.00 $0.00 $435,640.00 Adams County 0810406 IR 1005 Bike/Pedestrian Facilities Adams Co BP, Geneva to Berne, Priority 1 Fort Wayne 1.2 Off Federal Aid 100% Local Funds RW $0.00 $7,090.00 $7,090.00 A 10 Local Trans Enhancement Program RW $28,360.00 $0.00 $28,360.00 Comments: Add Right of Way to STIP. Indiana Department of Transportation 0101512 US 27 Small Structure Replacement Small Structure Over Habegger Ditch, from 1.2 miles N of SR 218 Fort Wayne 0 NHS Bridge Construction CN $447,600.00 $111,900.00 $559,500.00 M 01 *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not fiscally constrained and is for information purposes. Page 1 of 828 Report Created:6/30/2015 3:35:29PM

Indiana Department of Transportation (INDOT) · Waters Edge Dr. Fort Wayne .45 STP 100% Local Funds Init. PE $0.00 $34,800.00 $34,800.00 Group III Program CN $1,074,031.00 $0.00 $0.00

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Adams County

    Indiana Department

    of Transportation

    0810233 SR 218 Bridge Deck Overlay Bridge over the Wabash River,

    0.73 miles E of SR 116

    Fort Wayne 0 BR Bridge

    Construction

    CN $0.00 $0.00 $0.00 $0.00 Init.

    Bridge Consulting PE $72,000.00 $18,000.00 $90,000.00

    Indiana Department

    of Transportation

    1173148 US 224 Environmental

    Mitigation

    From 0.87 miles E to 1.2 miles E

    of US 27

    Fort Wayne .809 On Federal Aid Statewide ROW RW $0.00 $0.00 ($80,000.00) $80,000.00M 08

    Comments: MODIFY STIP to move RW funding in the amount of $80K from FY 2014 into FY 2015. Modify the 2014-2017 STIP. NOT IN MPO.

    Indiana Department

    of Transportation

    1173148 US 224 Environmental

    Mitigation

    From 0.87 miles E to 1.2 miles E

    of US 27

    Fort Wayne .809 STP Statewide ROW RW $64,000.00 $16,000.00 $80,000.00 Init.

    Statewide

    Construction

    CN $314,400.00 $78,600.00 $393,000.00

    Indiana Department

    of Transportation

    9904180 US 224 Pavement

    Replacement

    From 0.87 miles E to 1.27 miles

    E of US 27.

    Fort Wayne .809 STP Statewide ROW RW $1,373,120.00 $343,280.00 $1,682,000.00 $34,400.00 Init.

    Road Consulting PE $31,480.00 $7,870.00 $39,350.00

    Statewide

    Construction

    CN $2,869,600.00 $717,400.00 $3,587,000.00

    Adams County 0810406 IR 1005 Bike/Pedestrian

    Facilities

    Adams Co BP, Geneva to

    Berne, Priority 1

    Fort Wayne 1.2 Off Federal Aid 100% Local

    Funds

    CN $0.00 $95,630.00 $95,630.00Init.

    Local Trans

    Enhancement

    Program

    CN $382,520.00 $0.00 $382,520.00

    Local Trans

    Enhancement

    Program

    PE $53,120.00 $0.00 $53,120.00

    100% Local

    Funds

    PE $0.00 $13,280.00 $13,280.00

    Adams County 0810406 IR 1005 Bike/Pedestrian

    Facilities

    Adams Co BP, Geneva to

    Berne, Priority 1

    Fort Wayne 1.2 Off Federal Aid 100% Local

    Funds

    CN $0.00 $108,910.00 $108,910.00 A 01

    Local

    Transportation

    Alternatives

    CN $435,640.00 $0.00 $435,640.00

    Adams County 0810406 IR 1005 Bike/Pedestrian

    Facilities

    Adams Co BP, Geneva to

    Berne, Priority 1

    Fort Wayne 1.2 Off Federal Aid 100% Local

    Funds

    RW $0.00 $7,090.00 $7,090.00 A 10

    Local Trans

    Enhancement

    Program

    RW $28,360.00 $0.00 $28,360.00

    Comments: Add Right of Way to STIP.

    Indiana Department

    of Transportation

    0101512 US 27 Small Structure

    Replacement

    Small Structure Over Habegger

    Ditch, from 1.2 miles N of SR

    218

    Fort Wayne 0 NHS Bridge

    Construction

    CN $447,600.00 $111,900.00 $559,500.00 M 01

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 1 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Comments: Submitted modification for moving FY 2016 CN $559,500 to FY 2017 in the 2014-2017 STIP. The FY 15 CN funding for Utilities remains in the 2014-2017 STIP for this des.

    Indiana Department

    of Transportation

    0101512 US 27 Small Structure

    Replacement

    Small Structure Over Habegger

    Ditch, from 1.2 miles N of SR

    218

    Fort Wayne 0 NHS Bridge

    Construction

    CN $502,400.00 $125,600.00 $598,000.00 $30,000.00A 01

    Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00

    Bridge Consulting PE $0.00 $0.00 $0.00

    Indiana Department

    of Transportation

    0101513 US 27 Small Structure

    Replacement

    Small Structure Over Wittmer

    #1 Ditch, 1.0 mile N of SR 218.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $524,320.00 $131,080.00 $655,400.00 M 01

    Comments: Submitted modification for moving FY 2016 CN $655,400 to FY 2017 in the 2014-2017 STIP. The FY 15 CN for Utilities remains in FY 2015 in the 2014-2017 STIP fro this des.

    Indiana Department

    of Transportation

    0101513 US 27 Small Structure

    Replacement

    Small Structure Over Wittmer

    #1 Ditch, 1.0 mile N of SR 218.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $218,400.00 $54,600.00 $243,000.00 $30,000.00A 01

    Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00

    Bridge Consulting PE $0.00 $0.00 $0.00

    Indiana Department

    of Transportation

    1006144 US 27 Small Structure Pipe

    Lining

    3.62 Miles North of US 224 (

    Over Branch of St. Marys

    River)

    Fort Wayne 0 NHS Bridge

    Construction

    CN $41,600.00 $10,400.00 $0.00 $52,000.00$0.00Init.

    Indiana Department

    of Transportation

    1006160 SR 218 Bridge Deck Overlay Bridge Over Little Blue Creek,

    6.70 Miles East of US 27.

    Fort Wayne .088 BR Bridge Consulting PE $48,000.00 $12,000.00 $45,000.00 $15,000.00Init.

    Bridge

    Construction

    CN $355,200.00 $88,800.00 $444,000.00

    Adams County 0901261 IR 1004 Bridge Deck Overlay Winchester Rd Brg #41 over

    Holthouse Ditch

    Fort Wayne .13 On Federal Aid Local Bridge

    Program

    CN $483,200.00 $0.00 $483,200.00 A 01

    100% Local

    Funds

    CN $0.00 $120,800.00 $120,800.00

    Indiana Department

    of Transportation

    1296169 US 224 Small Structure

    Replacement

    Small Structure Over Kohne

    Ditch #1; 0.35 Miles West of US

    27/US 33.

    Fort Wayne 0 BR Bridge Consulting PE $84,000.00 $21,000.00 $80,000.00 $25,000.00Init.

    Bridge

    Construction

    CN $524,000.00 $131,000.00 $655,000.00

    Bridge ROW RW $16,000.00 $4,000.00 $13,000.00 $7,000.00

    Decatur 1173223 ST 1001 Road Rehabilitation

    (3R/4R Standards)

    E. Monroe Street (CR 600N):

    From Piqua Rd to 400' E of

    Waters Edge Dr.

    Fort Wayne .45 STP 100% Local

    Funds

    PE $0.00 $34,800.00 $34,800.00Init.

    Group III Program CN $1,074,031.00 $0.00 $1,074,031.00 $0.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 2 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Decatur 1173223 ST 1001 Road Rehabilitation

    (3R/4R Standards)

    E. Monroe Street (CR 600N):

    From Piqua Rd to 400' E of

    Waters Edge Dr.

    Fort Wayne .45 STP 100% Local

    Funds

    CN $0.00 $268,508.00 $268,508.00 $0.00Init.

    Group III Program PE $139,200.00 $0.00 $139,200.00

    Decatur 1173223 ST 1001 Road Rehabilitation

    (3R/4R Standards)

    E. Monroe Street (CR 600N):

    From Piqua Rd to 400' E of

    Waters Edge Dr.

    Fort Wayne .45 On Federal Aid 100% Local

    Funds

    RW $0.00 $31,989.00 $31,989.00 A 07

    Group III Program RW $127,955.00 $0.00 $127,955.00

    Comments: Adding ROW phase to project for FY 2014. Funds moved from CN in '15.

    Adams County 1173218 IR 1005 Bike/Pedestrian

    Facilities

    Adams Co BP: from the

    Wabash River to CR 850S

    Fort Wayne .32 Off Federal Aid Local

    Transportation

    Alternatives

    RW $97,760.00 $0.00 $97,760.00 Init.

    Local

    Transportation

    Alternatives

    CN $515,400.00 $0.00 $515,400.00

    100% Local

    Funds

    RW $0.00 $24,440.00 $24,440.00

    100% Local

    Funds

    CN $0.00 $347,800.00 $347,800.00

    Indiana Department

    of Transportation

    1006195 SR 218 HMA Overlay,

    Preventive

    Maintenance

    From 0.75 Mi. West of US 27 to

    1.07 Mi. East of US 27.

    Fort Wayne 1.81 STP Road

    Construction

    CN $543,200.00 $135,800.00 $0.00 $679,000.00$0.00Init.

    Indiana Department

    of Transportation

    1297610 US 27 Surface Treatment,

    Ultrathin Bonded

    Wearing Course

    From 1.03 Miles South of SR

    124 to 0.10 Miles North of US

    33.

    Fort Wayne 5.514 NHS Road

    Construction

    CN $1,196,800.00 $299,200.00 $1,496,000.00 Init.

    Berne 1173729 ST 1001 Bike/Pedestrian

    Facilities

    Parkway Street in Berne, near

    S. Adams Elem. and Middle

    Schools

    Fort Wayne .51 Off Federal Aid Local Safety

    Program

    CN $138,000.00 $0.00 $138,000.00A 33

    Comments: Add CN to STIP for Fiscal year 2015. $138,000 of 100% SRTS funds. No MPO.

    Indiana Department

    of Transportation

    1382159 US 224 Debris Removal From

    Channel

    Bridge Over St. Marys River,

    0.83 Miles East of US 27.

    Fort Wayne .01 On Federal Aid Bridge

    Construction

    CN $8,000.00 $2,000.00 $10,000.00A 10

    Comments: CN phase added to the FY 14-17 STIP for FY 15. -BCPI-

    Indiana Department

    of Transportation

    1382163 SR 218 Debris Removal From

    Channel

    Bridge Over Wabash River,

    0.73 Miles East of SR 116.

    Fort Wayne .01 On Federal Aid Bridge

    Construction

    CN $8,000.00 $2,000.00 $10,000.00A 10

    Comments: CN phase added to the FY 14-17 STIP for FY 15. -BCPI-

    Adams County 1382099 IR 1004 Bridge Inspections Inspection and reinspection of

    county bridges 20 feet and

    longer

    Fort Wayne 0 Multiple Local Bridge

    Program

    PE $147,952.00 $0.00 $81,144.00 $66,808.00 A 12

    100% Local

    Funds

    PE $0.00 $36,988.00 $20,286.00 $16,702.00

    Comments: Add NBIS project to STIP for Adams County.

    Indiana Department

    of Transportation

    1298003 US 27 Replace

    Superstructure

    Bridge Over Over Loblolly

    Creek, 0.62 Miles South of SR

    116.

    Fort Wayne .099 NHS Bridge ROW RW $32,000.00 $8,000.00 $10,000.00 $30,000.00 A 04

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 3 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1298003 US 27 Replace

    Superstructure

    Bridge Over Over Loblolly

    Creek, 0.62 Miles South of SR

    116.

    Fort Wayne .099 NHS Bridge Consulting PE $156,000.00 $39,000.00 $20,000.00 $175,000.00A 04

    Indiana Department

    of Transportation

    1298015 US 27 Bridge Deck

    Replacement &

    Widening

    Bridge Over Wabash River,

    1.80 Miles North of SR 116.

    Fort Wayne .099 NHS Bridge Consulting PE $164,000.00 $41,000.00 $20,000.00 $185,000.00A 04

    Bridge ROW RW $32,000.00 $8,000.00 $10,000.00 $30,000.00

    Indiana Department

    of Transportation

    1383393 SR 124 HMA Overlay,

    Preventive

    Maintenance

    From US 27 to 0.98 Miles East

    of US 27 (Monroe).

    Fort Wayne 1.059 On Federal Aid District Other

    Construction

    CN $200,000.00 $50,000.00 $250,000.00A 18

    Comments: CN phase for $250,000 added to the current FY 2014-17 STIP for FY 2015 (New Contract).

    Indiana Department

    of Transportation

    1400327 SR 218 Debris Removal From

    Channel

    Bridge over Wabash River,

    0.73 Miles East of SR 116.

    Fort Wayne 0 On Federal Aid Bridge

    Construction

    CN $8,400.00 $2,100.00 $10,500.00 A 18

    Comments: CN phase added ($10.5K) for 2014-2017 STIP - for FY 2016.

    Indiana Department

    of Transportation

    1400328 US 224 Debris Removal From

    Channel

    Bridge over St. Mary's River,

    0.85 Miles East of US 27.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $8,400.00 $2,100.00 $10,500.00 A 18

    Comments: CN phase added ($10.5K) for 2014-2017 STIP - for FY 2016.

    Indiana Department

    of Transportation

    1400429 SR 218 Bridge Maintenance

    And Repair

    Bridge Over Wabash River

    Overflow, 0.60 Miles East of

    SR 116.

    Fort Wayne 0 On Federal Aid Bridge

    Construction

    CN $14,480.00 $3,620.00 $18,100.00 A 31

    Comments: Amend CN phase to the current 2014-2017 STIP for FY 2016 for $ 18,100.00. Not in an MPO.

    Indiana Department

    of Transportation

    1401235 US 27 Concrete Pavement

    Restoration (CPR)

    From 0.10 Mi. N. of US 33 to

    2.53 Mi. North of US 224.

    Fort Wayne 4.42 NHS Road

    Construction

    CN $1,676,532.00 $419,133.00 $2,095,665.00A 30

    Comments: Amend CN phase to the current 2014-2017 STIP for FY 2015 for $2,095,665. New Contract and not in an MPO.

    Indiana Department

    of Transportation

    1401471 SR 218 Debris Removal From

    Channel

    Bridge Over Wabash River,

    0.73 Miles East of SR 116.

    Fort Wayne 0 On Federal Aid Bridge

    Construction

    CN $17,920.00 $4,480.00 $22,400.00 A 32

    Comments: Add CN Phase in FY2017 for $22,400 to the 2014-2017 STIP. NON-MPO.

    Indiana Department

    of Transportation

    1401472 US 224 Debris Removal From

    Channel

    Bridge over St. Mary's River,

    0.85 Miles East of US 27.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $17,920.00 $4,480.00 $22,400.00 A 32

    Comments: Add CN Phase in FY2017 for $22,400 to the 2014-2017 STIP. NON-MPO.

    Adams County Total

    Federal: $15,240,910.00 Match :$3,994,678.00 2014: $4,440,374.00 2015: $4,662,415.00 2016: $3,003,099.00 2017: $7,129,700.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 4 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Allen County

    Indiana Department

    of Transportation

    0800202 I 469 Signing Installation /

    Repair

    From I-69, S jct to SR 37 Fort Wayne 24.158 Interstate District Other

    Construction

    CN $270,000.00 $30,000.00 $300,000.00Init.

    Fort Wayne 1382498 ST 1026 Road Reconstruction

    (3R/4R Standards)

    Anthony Blvd: from Tillman Rd

    to Rudisill Blvd

    Fort Wayne 2.3 On Federal Aid Fort Wayne MPO CN $1,000,000.00 $0.00 $1,000,000.00 Init.

    100% Local

    Funds

    PE $0.00 $60,000.00 $60,000.00

    100% Local

    Funds

    CN $0.00 $250,000.00 $250,000.00

    Fort Wayne MPO PE $240,000.00 $0.00 $240,000.00

    Fort Wayne 1382765 ST 1028 Road Reconstruction

    (3R/4R Standards)

    Paulding Rd from Lafayette St

    to Hessen Cassel Rd

    Fort Wayne 1.95 On Federal Aid Fort Wayne MPO PE $0.00 $0.00 $0.00 A 12

    100% Local

    Funds

    PE $0.00 $0.00 $0.00

    Comments: Funding for PE was rolled into CN, (for FY '16), on STIP Amendment 14-04. $135,000 Federal ($168,750 Total) was included in NIRCC amendment 14-05 for PE. Adding PE to STIP, funds

    already in STIP.

    Fort Wayne 1382765 ST 1028 Road Reconstruction

    (3R/4R Standards)

    Paulding Rd from Lafayette St

    to Hessen Cassel Rd

    Fort Wayne 1.95 On Federal Aid Fort Wayne MPO CN $1,375,000.00 $0.00 $1,375,000.00 A 04

    100% Local

    Funds

    CN $0.00 $152,778.00 $152,778.00

    Indiana Department

    of Transportation

    0300086 I 69 Bridge Deck

    Replacement

    Bridge over Cedar Creek (NB),

    3.62 miles N of SR 1

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $1,410,300.00 $156,700.00 $1,567,000.00Init.

    Indiana Department

    of Transportation

    0300087 I 69 Bridge Deck

    Replacement

    Bridge over Cedar Creek (SB),

    3.62 miles N of SR 1

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $1,410,300.00 $156,700.00 $1,567,000.00Init.

    Indiana Department

    of Transportation

    0400603 I 469 Pavement

    Replacement

    From (Winchester Rd) 2.63

    miles E of SR 1 to .05 mile E of

    US 27

    Fort Wayne 3.603 Interstate Road

    Construction

    CN $19,072,800.00 $2,119,200.00 $21,192,000.00Init.

    Road Consulting CN $0.00 $0.00 $0.00

    Indiana Department

    of Transportation

    0400917 I 469 Bridge Deck Overlay EB bridge over Snyder Ditch,

    2.73 miles E of SR 1

    Fort Wayne 3.503 Interstate Road

    Construction

    CN $268,200.00 $29,800.00 $298,000.00Init.

    Indiana Department

    of Transportation

    0400918 I 469 Bridge Deck Overlay EB bridge over the St. Mary's

    River, 0.45 mile W of US 27

    Fort Wayne 0 Interstate Road

    Construction

    CN $409,500.00 $45,500.00 $0.00 $455,000.00$0.00Init.

    Indiana Department

    of Transportation

    0400919 I 469 Bridge Deck Overlay EB bridge over US 27, 4.96

    miles E of SR 1

    Fort Wayne 0 Interstate Road

    Construction

    CN $451,800.00 $50,200.00 $0.00 $502,000.00$0.00Init.

    Indiana Department

    of Transportation

    0400922 I 469 Bridge Deck Overlay WB bridge over Snyder Ditch,

    2.73 miles E of SR 1

    Fort Wayne 0 Interstate Road

    Construction

    CN $259,200.00 $28,800.00 $0.00 $288,000.00$0.00Init.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 5 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    0400923 I 469 Bridge Deck Overlay WB bridge over the St. Mary's

    River, 0.45 mile W of US 27

    Fort Wayne 0 Interstate Road

    Construction

    CN $400,500.00 $44,500.00 $0.00 $445,000.00$0.00Init.

    Indiana Department

    of Transportation

    0400924 I 469 Bridge Deck Overlay WB bridge over US 27, 4.96

    miles E of SR 1

    Fort Wayne .313 Interstate Road

    Construction

    CN $432,900.00 $48,100.00 $0.00 $481,000.00$0.00Init.

    Fort Wayne 0710322 IR 1001 Intersect. Improv. W/

    Added Turn Lanes

    St Joseph Center

    Rd/Washington Center Rd: from

    Clinton St to Campus Ct

    Fort Wayne .2 On Federal Aid 100% Local

    Funds

    CN $0.00 $400,000.00 $400,000.00 Init.

    Fort Wayne MPO CN $1,600,000.00 $0.00 $1,600,000.00

    Fort Wayne MPO RW $200,000.00 $0.00 $200,000.00

    100% Local

    Funds

    RW $0.00 $50,000.00 $50,000.00

    Fort Wayne 0710322 IR 1001 Intersect. Improv. W/

    Added Turn Lanes

    St Joseph Center

    Rd/Washington Center Rd: from

    Clinton St to Campus Ct

    Fort Wayne .2 On Federal Aid Fort Wayne MPO CN $1,600,000.00 $0.00 $1,600,000.00 A 04

    Fort Wayne MPO PE $240,000.00 $0.00 $240,000.00

    100% Local

    Funds

    CN $0.00 $400,000.00 $400,000.00

    100% Local

    Funds

    RW $0.00 $50,000.00 $50,000.00

    100% Local

    Funds

    PE $0.00 $60,000.00 $60,000.00

    Fort Wayne MPO RW $200,000.00 $0.00 $200,000.00

    Fort Wayne 1005151 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Clinton

    St (Phase One)

    Fort Wayne .19 On Federal Aid Fort Wayne MPO CN $1,200,000.00 $0.00 $1,200,000.00 M 02

    100% Local

    Funds

    CN $0.00 $300,000.00 $300,000.00

    Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: FY ?15 to ?17.

    Fort Wayne 1005151 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Clinton

    St (Phase One)

    Fort Wayne .19 On Federal Aid Fort Wayne MPO CN $1,040,000.00 $0.00 $1,040,000.00Init.

    100% Local

    Funds

    CN $0.00 $260,000.00 $260,000.00

    Fort Wayne MPO PE $160,000.00 $0.00 $160,000.00

    100% Local

    Funds

    PE $0.00 $40,000.00 $40,000.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 6 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    0301149 US 30 Small Structure Pipe

    Lining

    Br # 3 over Seegar Ditch, 2.16

    Miles West of US 33.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $103,200.00 $25,800.00 $129,000.00 $0.00Init.

    Indiana Department

    of Transportation

    0800143 US 30 Small Structure Pipe

    Lining

    Small Structure over a Field

    Run, 11.55 miles E. of SR 205.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $103,200.00 $25,800.00 $129,000.00 $0.00Init.

    Allen County 0500892 IR 1001 Road Reconstruction

    (3R/4R Standards)

    Coverdale Rd, from Indianapolis

    Rd to Airport Exp, 2.25 mi NE of

    I 469

    Fort Wayne 1.5 On Federal Aid 100% Local

    Funds

    CN $0.00 $558,400.00 $558,400.00 Init.

    100% Local

    Funds

    PE $0.00 $70,840.00 $70,840.00

    Group IV Program PE $283,360.00 $0.00 $283,360.00

    Group IV Program CN $2,233,600.00 $0.00 $2,233,600.00

    Allen County 0710344 IR 1001 Bridge Deck

    Replacement

    Coverdale Rd: Bridge # 231

    over Robinson-Brindle Drain

    Fort Wayne 0 On Federal Aid 100% Local

    Funds

    PE $0.00 $11,940.00 $11,940.00 Init.

    100% Local

    Funds

    CN $0.00 $79,431.00 $79,431.00

    Local Bridge

    Program

    CN $317,724.00 $0.00 $317,724.00

    Local Bridge

    Program

    PE $47,760.00 $0.00 $47,760.00

    Allen County 0710345 IR 1001 Bridge Replacement,

    Other Construction

    Coverdale Rd: Bridge #232

    over Suter Ditch

    Fort Wayne 0 STP 100% Local

    Funds

    CN $0.00 $61,400.00 $61,400.00 Init.

    Group IV Program CN $245,600.00 $0.00 $245,600.00

    Indiana Department

    of Transportation

    0301145 US 27 Small Structure Pipe

    Lining

    Pipeliner for Valentine Ditch,

    3.2 miles N of Adams/Allen Co

    Line.

    Fort Wayne 0 NHS Bridge ROW RW $22,400.00 $5,600.00 $26,000.00 $2,000.00Init.

    Bridge

    Construction

    CN $71,200.00 $17,800.00 $89,000.00

    Bridge Consulting PE $16,000.00 $4,000.00 $20,000.00

    Indiana Department

    of Transportation

    1296076 SR 205 Small Structure Pipe

    Lining

    Pipeliner for Johnson Ditch,

    2.09 Miles North of US 33.

    Fort Wayne 0 BR Bridge

    Construction

    CN $67,200.00 $16,800.00 $84,000.00 Init.

    Bridge ROW RW $1,600.00 $400.00 $2,000.00

    Indiana Department

    of Transportation

    0901298 I 69 Interchange

    Modification

    At the I-69 and SR 1 (Dupont

    Rd) Interchange

    Fort Wayne .346 Interstate Mobility

    Construction

    CN $1,882,923.30 $209,213.70 $2,092,137.00 Init.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 7 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1173208 ST 1011 Bike/Pedestrian

    Facilities

    SR1/Dupont Rd Trail crossing

    of I 69

    Fort Wayne .4 TE Enhancement -

    Construction

    CN $239,200.00 $59,800.00 $299,000.00 Init.

    Indiana Department

    of Transportation

    1297170 SR 1 Bridge Deck Overlay Bridge on SR 1 over I-69 at SR

    1/(Dupont Rd) & I-69

    Interchange.

    Fort Wayne 0 Interstate Mobility

    Construction

    CN $578,067.30 $64,229.70 $642,297.00 Init.

    Indiana Department

    of Transportation

    0400872 US 27 HMA Functional

    Overlay on PCCP

    From (Edgewood Ave) 1.01

    miles S of SR 930, to SR 930

    (Coliseum Blvd).

    Fort Wayne 1.079 NHS Road

    Construction

    CN $1,550,400.00 $387,600.00 $1,938,000.00 Init.

    Fort Wayne 1005152 ST 1001 New Bridge, Other State Blvd ? Bridge of Spy Run

    Creek

    Fort Wayne .04 On Federal Aid Fort Wayne MPO CN $0.00 $0.00 $0.00 M 02 $1,800,000.00

    Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: ?16 to ?18.

    Fort Wayne 1005152 ST 1001 New Bridge, Other State Blvd ? Bridge of Spy Run

    Creek

    Fort Wayne .04 On Federal Aid Fort Wayne MPO CN $1,440,000.00 $0.00 $1,440,000.00 Init.

    100% Local

    Funds

    CN $0.00 $360,000.00 $360,000.00

    Fort Wayne 1005154 ST 1001 Added Travel Lanes State Blvd ? Cass St to Clinton

    St (Phase Two)

    Fort Wayne .46 On Federal Aid Fort Wayne MPO CN $0.00 $0.00 $0.00 M 02 $4,584,500.00

    Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: ?16 to ?18.

    Fort Wayne 1005154 ST 1001 Added Travel Lanes State Blvd ? Cass St to Clinton

    St (Phase Two)

    Fort Wayne .46 On Federal Aid Fort Wayne MPO PE $457,600.00 $0.00 $457,600.00 Init.

    100% Local

    Funds

    PE $0.00 $114,400.00 $114,400.00

    Fort Wayne MPO CN $2,960,000.00 $0.00 $2,960,000.00

    100% Local

    Funds

    CN $0.00 $740,000.00 $740,000.00

    Fort Wayne 1005155 ST 1001 Bike/Pedestrian

    Facilities

    State Blvd ? Pufferbelly

    Pedestrian Brg over State Blvd.

    Fort Wayne .04 Off Federal Aid Fort Wayne MPO CN $0.00 $0.00 $0.00 M 02 $625,000.00

    Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: FY ?16 to ?18.

    Fort Wayne 1005155 ST 1001 Bike/Pedestrian

    Facilities

    State Blvd ? Pufferbelly

    Pedestrian Brg over State Blvd.

    Fort Wayne .04 Off Federal Aid Fort Wayne MPO CN $400,000.00 $0.00 $400,000.00 Init.

    100% Local

    Funds

    CN $0.00 $100,000.00 $100,000.00

    Allen County 0400584 VA

    VARI

    Road Reconstruction

    (3R/4R Standards)

    Gump Road; from SR3 (Lima

    Rd) tp Coldwater Road

    Fort Wayne 0 On Federal Aid Fort Wayne MPO CN $6,246,400.00 $0.00 $6,246,400.00 Init.

    100% Local

    Funds

    CN $0.00 $1,561,600.00 $1,561,600.00

    Indiana Department

    of Transportation

    0902222 I 69 New Interchange

    Construction

    North of SR 1 Fort Wayne 0 Interstate Major New -

    Consulting

    PE $30,420.00 $3,380.00 $33,800.00 M 16

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 8 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Comments: JUN 19, 2015 - an interchange project that is already built in Fort Wayne, IN. Des. No. is 0902222. At this point we need to initiate a work order request to pay for Monitoring and

    Maintenance of a mitigation area. The amount is $33,800. The PE was authorized at the federal level as follows.;

    Fort Wayne 0810513 ST 1011 Bike/Pedestrian

    Facilities

    Covington Rd, Aboite Twnshp

    Trail System - W Hamilton Rd

    to Beal Taylor Ditch

    Fort Wayne .9 Off Federal Aid 100% Local

    Funds

    CN $0.00 $90,800.00 $90,800.00 Init.

    100% Local

    Funds

    PE $0.00 $37,850.00 $37,850.00

    Local

    Transportation

    Alternatives

    PE $151,399.00 $0.00 $151,399.00

    Local

    Transportation

    Alternatives

    CN $363,200.00 $0.00 $363,200.00

    Indiana Department

    of Transportation

    0401082 SR 930 Added Travel Lanes From 1.23 mi east of US 27(

    Parnell Ave) to 2.18 mi east of

    US 27 (Crescent Av).

    Fort Wayne .984 NHS Mobility ROW RW $8,800.00 $2,200.00 $11,000.00 Init.

    Mobility

    Construction

    CN $3,551,200.00 $887,800.00 $4,439,000.00

    Indiana Department

    of Transportation

    1297168 SR 930 Bridge Deck

    Reconstruction &

    Widening

    (EB) Bridge over St. Joseph

    River, 1.74 Miles East of US 27.

    Fort Wayne 0 NHS Mobility

    Construction

    CN $721,971.20 $180,492.80 $902,464.00 Init.

    Indiana Department

    of Transportation

    1297169 SR 930 Bridge Deck

    Reconstruction &

    Widening

    (WB) Bridge over the St.

    Joseph River 1.74 Miles East of

    US 27.

    Fort Wayne 0 NHS Mobility

    Construction

    CN $721,971.20 $180,492.80 $902,464.00 Init.

    Indiana Department

    of Transportation

    1382839 SR 930 New Sign Installation 0.9 Miles East of US 27 Fort Wayne 0 NHS 100% Local

    Funds

    CN $29,040.00 $7,260.00 $36,300.00 A 10

    Comments: CN for 2014 amended into 2014-2017 NIRCC TIP, via resolution submitted by Ft. Wayne MPO 11/25/2013.

    Indiana Department

    of Transportation

    0100843 SR 930 Intersect. Improv. W/

    Added Turn Lanes

    1.1 miles west of I-469; at the

    Intersection of Green Street in

    New Haven.

    Fort Wayne 0 NHS Mobility ROW RW $240,000.00 $60,000.00 $0.00 $300,000.00M 02

    Comments: Rw moved from 2014 to 2015, NIRCC modification #14-47, dated 4/22/14

    Indiana Department

    of Transportation

    0100843 SR 930 Intersect. Improv. W/

    Added Turn Lanes

    1.1 miles west of I-469; at the

    Intersection of Green Street in

    New Haven.

    Fort Wayne 0 NHS Mobility ROW RW $240,000.00 $60,000.00 $300,000.00 Init.

    Mobility

    Construction

    PE $0.00 $0.00 $0.00

    Mobility

    Construction

    CN $2,032,800.00 $508,200.00 $2,471,000.00 $70,000.00

    Indiana Department

    of Transportation

    9904160 US 30 Interchange

    Modification

    At US 33, 0.66 mile W of I-69 Fort Wayne .434 NHS Safety

    Construction

    CN $1,874,400.00 $468,600.00 $2,343,000.00 Init.

    Safety ROW RW $160,000.00 $40,000.00 $200,000.00

    Safety Consulting PE $12,000.00 $3,000.00 $15,000.00

    Fort Wayne 0810457 ST 1011 Bike/Pedestrian

    Facilities

    Six Mile Creek Trail, Ph 1

    Southtown Centre to Lemar Dr

    Fort Wayne .91 Off Federal Aid Fort Wayne MPO CN $606,435.00 $0.00 $606,435.00 A 12

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 9 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Fort Wayne 0810457 ST 1011 Bike/Pedestrian

    Facilities

    Six Mile Creek Trail, Ph 1

    Southtown Centre to Lemar Dr

    Fort Wayne .91 Off Federal Aid 100% Local

    Funds

    CN $0.00 $151,609.00 $151,609.00 A 12

    Comments: Per NIRCC TIP amend. 14-16 Federal MPO TA funds increased significantly. Only increase shown on this amendment. Total Fed is $699,200.

    Fort Wayne 0810457 ST 1011 Bike/Pedestrian

    Facilities

    Six Mile Creek Trail, Ph 1

    Southtown Centre to Lemar Dr

    Fort Wayne .91 Off Federal Aid Local

    Transportation

    Alternatives

    CN $92,765.00 $0.00 $92,765.00 Init.

    100% Local

    Funds

    CN $0.00 $620,000.00 $620,000.00

    Fort Wayne 0710990 ST 1011 Bike/Pedestrian

    Facilities

    Pufferbelly Trail: State St, to

    Fernhill Ave

    Fort Wayne 1.5 Off Federal Aid 100% Local

    Funds

    RW $0.00 $45,000.00 $45,000.00 Init.

    100% Local

    Funds

    PE $0.00 $43,080.00 $43,080.00

    Local

    Transportation

    Alternatives

    CN $1,253,646.00 $0.00 $1,253,646.00

    Local

    Transportation

    Alternatives

    PE $172,320.00 $0.00 $172,320.00

    100% Local

    Funds

    CN $0.00 $313,412.00 $313,412.00

    Local

    Transportation

    Alternatives

    RW $180,000.00 $0.00 $180,000.00

    Fort Wayne 0500695 ST 1001 Road Reconstruction

    (3R/4R Standards)

    Maplecrest Rd from Lake Ave

    to State Blvd

    Fort Wayne .85 On Federal Aid 100% Local

    Funds

    CN $0.00 $1,694,163.00 $1,694,163.00M 03

    Fort Wayne MPO CN $3,680,000.00 $0.00 $3,680,000.00

    Comments: Change FY for CN from 2014 to 2015, NIRCC Modification 14-52.

    Fort Wayne 0500695 ST 1001 Road Reconstruction

    (3R/4R Standards)

    Maplecrest Rd from Lake Ave

    to State Blvd

    Fort Wayne .85 On Federal Aid Fort Wayne MPO CN $3,680,000.00 $0.00 $3,680,000.00 Init.

    100% Local

    Funds

    CN $0.00 $1,242,000.00 $1,242,000.00

    Huntertown 0901973 IR 1001 Road Reconstruction

    (3R/4R Standards)

    Carroll Rd: from Preserve Blvd

    to Bethel Rd

    Fort Wayne .52 STP Group IV Program RW $67,200.00 $0.00 $67,200.00 Init.

    100% Local

    Funds

    RW $0.00 $16,800.00 $16,800.00

    100% Local

    Funds

    CN $0.00 $408,256.00 $408,256.00

    Group IV Program CN $1,309,984.00 $0.00 $1,309,984.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 10 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Grabill 0901974 IR 1001 Road Reconstruction

    (3R/4R Standards)

    2nd St: from Country Shoal Ln

    to Main St

    Fort Wayne .35 On Federal Aid Group IV Program CN $75,000.00 $0.00 $75,000.00A 30

    100% Local

    Funds

    CN $0.00 $18,750.00 $18,750.00

    Comments: NIRCC Amendment 14-78

    Grabill 0901974 IR 1001 Road Reconstruction

    (3R/4R Standards)

    2nd St: from Country Shoal Ln

    to Main St

    Fort Wayne .35 STP Group IV Program CN $667,600.00 $0.00 $667,600.00Init.

    Group IV Program RW $68,000.00 $0.00 $68,000.00

    100% Local

    Funds

    RW $0.00 $17,000.00 $17,000.00

    100% Local

    Funds

    CN $0.00 $166,900.00 $166,900.00

    Allen County 1005320 ST 1001 Intersection

    Improvement,

    Roundabout

    Till Road at Bethel Rd &

    Huguenard Rd

    Fort Wayne .2 Off Federal Aid Fort Wayne MPO CN $1,392,000.00 $0.00 $1,392,000.00M 03

    100% Local

    Funds

    CN $0.00 $348,000.00 $348,000.00

    Comments: Change FY from 2014 to 2015, Increase in CN of by NIRCC per TIP modification 14-49. New CN Federal (80%) share is $ 1,392,000 ($1,740,000 total CN). Increase of $102,000

    Allen County 1005320 ST 1001 Intersection

    Improvement,

    Roundabout

    Till Road at Bethel Rd &

    Huguenard Rd

    Fort Wayne .2 Off Federal Aid Fort Wayne MPO CN $1,087,800.00 $0.00 $1,087,800.00 Init.

    Fort Wayne MPO PE $172,200.00 $0.00 $172,200.00

    100% Local

    Funds

    PE $0.00 $43,050.00 $43,050.00

    100% Local

    Funds

    CN $0.00 $271,950.00 $271,950.00

    Indiana Department

    of Transportation

    1006211 SR 37 Sight Distance

    Improvement

    At SR 101 Fort Wayne 0 On Federal Aid Safety ROW RW $32,000.00 $8,000.00 $4,000.00 $36,000.00M 02

    Safety

    Construction

    CN $0.00 $0.00 $0.00

    Comments: RW funding split to show $4,000 in 2014 & $36,000 in 2015, Cn moved to show in 2015 for in house construction by INDOT. NIRCC modicication 14-48, 4/22/14

    Indiana Department

    of Transportation

    1006211 SR 37 Sight Distance

    Improvement

    At SR 101 Fort Wayne 0 Safety Safety ROW RW $32,000.00 $8,000.00 $40,000.00 Init.

    Safety Consulting PE $20,400.00 $5,100.00 $25,500.00

    Safety

    Construction

    CN $0.00 $0.00 $0.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 11 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1006555 I 469 Added Travel Lanes,

    Construct Turn Lanes

    Westbound I-469 off-ramp at

    Auburn Rd.(RP31.43), 0.6

    mi.West of I-69

    Fort Wayne 0 Interstate Safety

    Construction

    CN $270,000.00 $30,000.00 $300,000.00 Init.

    Indiana Department

    of Transportation

    1006146 US 27 Small Structure Pipe

    Lining

    11.51 Miles North of US 224

    (Over Nine Mile Drain)

    Fort Wayne 0 NHS Bridge

    Construction

    CN $41,600.00 $10,400.00 $0.00 $52,000.00$0.00Init.

    Indiana Department

    of Transportation

    0810227 US 30 HMA Overlay,

    Preventive

    Maintenance

    From 8.02 miles W of I-69 (Near

    Allen/Whitley Co Line) to I-69.

    Fort Wayne 7.828 NHS Road

    Construction

    CN $0.00 $0.00 $0.00 A 40

    Comments: Per NIRCC Resolution 14-149: CN $3,453,000 Total for 2016. New addition to TIP, previously listed in STIP for FY '16.

    Indiana Department

    of Transportation

    0810227 US 30 HMA Overlay,

    Preventive

    Maintenance

    From 8.02 miles W of I-69 (Near

    Allen/Whitley Co Line) to I-69.

    Fort Wayne 7.828 NHS Road

    Construction

    CN $2,762,400.00 $690,600.00 $3,453,000.00 Init.

    Indiana Department

    of Transportation

    1006129 SR 1 New Br, Precast Box

    Culvert

    Small Structure over

    Nettlehorst Drain/Ditch, 5.85

    Miles East of I-69 (N. Jct).

    Fort Wayne .03 BR Bridge

    Construction

    CN $693,600.00 $173,400.00 $817,000.00 $50,000.00Init.

    Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00

    Bridge Consulting PE $17,600.00 $4,400.00 $22,000.00

    Indiana Department

    of Transportation

    1006129 SR 1 New Br, Precast Box

    Culvert

    Small Structure over

    Nettlehorst Drain/Ditch, 5.85

    Miles East of I-69 (N. Jct).

    Fort Wayne .03 On Federal Aid Bridge Consulting PE $7,200.00 $1,800.00 $9,000.00 A 04

    Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00

    Bridge

    Construction

    CN $693,600.00 $173,400.00 $817,000.00 $50,000.00

    Indiana Department

    of Transportation

    1006213 I 469 Bridge Deck Overlay 5.51 Miles South of US 24,

    (I-469 Over I-69 EBL)

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $852,300.00 $94,700.00 $0.00 $947,000.00 Init.

    Bridge Consulting PE $72,000.00 $8,000.00 $80,000.00

    Indiana Department

    of Transportation

    1006214 I 469 Bridge Deck Overlay 5.51 Miles South of US 24,

    (I-469 Over I-69 WBL)

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $852,300.00 $94,700.00 $0.00 $947,000.00 Init.

    Bridge Consulting PE $72,000.00 $8,000.00 $80,000.00

    Indiana Department

    of Transportation

    1006158 SR 101 Bridge Deck Overlay Bridge Over Brown Ditch

    (Adam Schlemmer Baker

    Drain), 4.97 Miles South of US

    Fort Wayne .08 BR Bridge Consulting PE $56,000.00 $14,000.00 $55,000.00 $15,000.00Init.

    Bridge

    Construction

    CN $311,200.00 $77,800.00 $389,000.00

    Indiana Department

    of Transportation

    1006130 US 24 Small Structure

    Replacement

    Small Structure Over

    Zentsmaster Drain, 2.99 Miles

    East of SR 114.

    Fort Wayne 0 NHS Bridge ROW RW $16,000.00 $4,000.00 $10,000.00 $10,000.00Init.

    Bridge

    Construction

    CN $872,800.00 $218,200.00 $0.00 $1,091,000.00$0.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 12 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1006130 US 24 Small Structure

    Replacement

    Small Structure Over

    Zentsmaster Drain, 2.99 Miles

    East of SR 114.

    Fort Wayne 0 NHS Bridge Consulting PE $17,600.00 $4,400.00 $22,000.00 Init.

    Indiana Department

    of Transportation

    1006170 SR 14 Bridge Deck Overlay Bridge Over Beal Taylor Ditch;

    8.30 Miles East of SR 9.

    Fort Wayne 0 BR Bridge Consulting PE $36,000.00 $9,000.00 $45,000.00Init.

    Bridge

    Construction

    CN $342,400.00 $85,600.00 $428,000.00

    Indiana Department

    of Transportation

    1006172 I 69 Bridge Deck

    Replacement &

    Widening

    Hillegas Road Bridge Over I-69,

    0.48 Miles South of US 30.

    Fort Wayne 0 Interstate Bridge Consulting PE $72,000.00 $8,000.00 $80,000.00 Init.

    Bridge

    Construction

    CN $828,900.00 $92,100.00 $921,000.00

    Indiana Department

    of Transportation

    1006187 SR 930 Bridge Deck Overlay 5.22 Miles West of I-469, (Over

    SR 930 & Washington Blvd.)

    Fort Wayne 0 NHS Bridge

    Construction

    CN $585,600.00 $146,400.00 $732,000.00Init.

    Bridge Consulting PE $84,000.00 $21,000.00 $105,000.00

    Fort Wayne 1005158 ST 1001 Bike/Pedestrian

    Facilities

    Engle Rd Trail: Jefferson Blvd

    to Towpath Trail

    Fort Wayne .64 STP Fort Wayne MPO CN $548,000.00 $0.00 $548,000.00 Init.

    100% Local

    Funds

    CN $0.00 $137,000.00 $137,000.00

    New Haven 0710319 ST 1012 Road Reconstruction

    (3R/4R Standards)

    Landin Rd: from North River Rd

    to Maysville Rd

    Fort Wayne 1.92 On Federal Aid Fort Wayne MPO CN $292,800.00 $0.00 $292,800.00 M 02

    100% Local

    Funds

    CN $0.00 $73,200.00 $73,200.00

    Comments: Increase in Federal for CN per NIRCC modification 14-39. Increase only shown here.

    New Haven 0710319 ST 1012 Road Reconstruction

    (3R/4R Standards)

    Landin Rd: from North River Rd

    to Maysville Rd

    Fort Wayne 1.92 On Federal Aid 100% Local

    Funds

    CN $0.00 $1,292,200.00 $1,292,200.00M 03

    Fort Wayne MPO CN $5,168,800.00 $0.00 $5,168,800.00

    Comments: Change FY for CN from 2014 to 2015, NIRCC TIP Modification 14-51.

    New Haven 0710319 ST 1012 Road Reconstruction

    (3R/4R Standards)

    Landin Rd: from North River Rd

    to Maysville Rd

    Fort Wayne 1.92 On Federal Aid Fort Wayne MPO CN $4,876,000.00 $0.00 $4,876,000.00Init.

    100% Local

    Funds

    CN $0.00 $1,219,000.00 $1,219,000.00

    Fort Wayne 0901798 ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR

    3) to Coldwater Rd

    Fort Wayne 1.8 On Federal Aid 100% Local

    Funds

    RW $0.00 $200,000.00 $200,000.00A 14

    Fort Wayne MPO RW $800,000.00 $0.00 $800,000.00

    Comments: RW Phase in 14-17 NIRCC TIP for FY 14

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 13 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Fort Wayne 0901798 ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR

    3) to Coldwater Rd

    Fort Wayne 1.8 On Federal Aid 100% Local

    Funds

    RW $0.00 $200,000.00 $200,000.00M 03

    Fort Wayne MPO RW $800,000.00 $0.00 $800,000.00

    Comments: Change FY for RW from 2014 to 2015, NIRCC Modification 14-50.

    Fort Wayne 0901798 ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR

    3) to Coldwater Rd

    Fort Wayne 1.8 On Federal Aid 100% Local

    Funds

    CN $0.00 $2,000,000.00 $2,000,000.00Init.

    Fort Wayne MPO CN $8,000,000.00 $0.00 $8,000,000.00

    Indiana Department

    of Transportation

    1296460 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek

    (NBL), 6.68 Miles North of US

    224.

    Fort Wayne 0 Interstate Bridge Consulting PE $0.00 $0.00 $0.00 $0.00A 30

    Bridge

    Construction

    CN $482,850.00 $53,650.00 $536,500.00

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2017 via resolution #14-96 on 9/2/2014, for $536,500.

    Indiana Department

    of Transportation

    1296460 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek

    (NBL), 6.68 Miles North of US

    224.

    Fort Wayne 0 Interstate Bridge Consulting PE $40,500.00 $4,500.00 $45,000.00 Init.

    Bridge

    Construction

    CN $0.00 $0.00 $0.00 $0.00

    Indiana Department

    of Transportation

    1296462 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek

    (SBL), 6.68 Miles North of US

    224.

    Fort Wayne 0 Interstate District Other

    Consulting

    PE $0.00 $0.00 $0.00 A 30

    Bridge

    Construction

    CN $482,850.00 $53,650.00 $536,500.00

    Bridge Consulting PE $211,050.00 $23,450.00 $234,500.00 $0.00

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2017 via resolution #14-96 on 9/2/2014, for $536,500.

    Indiana Department

    of Transportation

    1296462 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek

    (SBL), 6.68 Miles North of US

    224.

    Fort Wayne 0 Interstate Bridge Consulting PE $40,500.00 $4,500.00 $45,000.00 Init.

    Bridge

    Construction

    CN $0.00 $0.00 $0.00 $0.00

    Indiana Department

    of Transportation

    1400375 US 33 Bridge Maintenance

    And Repair

    Bridge Over Eel River, 3.30

    Miles South of SR 205.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $24,640.00 $6,160.00 $30,800.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $30,800.

    Indiana Department

    of Transportation

    1296471 SR 101 HMA Overlay,

    Preventive

    Maintenance

    From 0.18 Mi. N. of US 24 to

    8.49 Mi. N. of US 24

    Fort Wayne 8.391 On Federal Aid Road

    Construction

    CN $0.00 $0.00 $1,413,000.00 ($1,413,000.00) A 40

    Comments: Per NIRCC Resolution 14-152: CN $1,413,000 Total for 2016. New addition to TIP, previously listed in STIP in FY ?17.

    Indiana Department

    of Transportation

    1296471 SR 101 HMA Overlay,

    Preventive

    Maintenance

    From 0.18 Mi. N. of US 24 to

    8.49 Mi. N. of US 24

    Fort Wayne 8.391 STP Road

    Construction

    CN $1,130,400.00 $282,600.00 $0.00 $1,413,000.00 Init.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 14 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1296277 SR 930 Bridge Deck Overlay Bridge Over N & S Railroad,

    WBL, 5.07 Miles West of I-469

    Fort Wayne 0 NHS Bridge

    Construction

    PE $9,600.00 $2,400.00 $12,000.00A 35

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for RR PE phase in 2015 via resolution #14- 109 on 1/13/2015, for $15,000.

    Indiana Department

    of Transportation

    1296277 SR 930 Bridge Deck Overlay Bridge Over N & S Railroad,

    WBL, 5.07 Miles West of I-469

    Fort Wayne 0 NHS Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00 Init.

    Bridge

    Construction

    CN $547,200.00 $136,800.00 $684,000.00

    Indiana Department

    of Transportation

    1296929 I 69 Interchange

    Modification

    NB lanes at US 30 Interchange

    Weave Area.

    Fort Wayne .307 Interstate Mobility Consulting PE $2,250.00 $250.00 $2,500.00A 40

    Mobility

    Construction

    CN $0.00 $0.00 $0.00

    Comments: Additional Information: FY 16 CN previously listed in STIP for FY?16 but new to the TIP. FY2015 PE is New to the TIP and STIP.

    Indiana Department

    of Transportation

    1296929 I 69 Interchange

    Modification

    NB lanes at US 30 Interchange

    Weave Area.

    Fort Wayne .307 Interstate Mobility

    Construction

    CN $144,900.00 $16,100.00 $161,000.00 Init.

    Indiana Department

    of Transportation

    1296931 I 69 Interchange

    Modification

    SB Lanes at US 30 Interchange

    Weave Area.

    Fort Wayne .311 Interstate Mobility Consulting PE $2,250.00 $250.00 $2,500.00A 40

    Mobility

    Construction

    CN $0.00 $0.00 $0.00

    Comments: Please amend FY 2015 PE phase ($2.5K), NIRCC Resolution # 14-121 and FY 2016 CN phase ($161K), NIRCC Resolution # 14-121 dated 04/09/2015, into Current 2014-2017 STIP. NOTE:

    FY 16 CN previously listed in STIP for FY?16 but is new to the NIRCC TIP. FY2015 PE is New to the TIP and STIP.

    Indiana Department

    of Transportation

    1296931 I 69 Interchange

    Modification

    SB Lanes at US 30 Interchange

    Weave Area.

    Fort Wayne .311 Interstate Mobility

    Construction

    CN $144,900.00 $16,100.00 $161,000.00 Init.

    Indiana Department

    of Transportation

    1296053 I 69 Small Structure Pipe

    Lining

    Pipeliner for Brandt Ditch, 0.22

    Miles South of I-469 South Jct.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $77,400.00 $8,600.00 $86,000.00 A 14

    Comments: CN phase amended into the FY 14- 17 NIRCC MPO TIP for FY 16, via resolution dated 2-4-14.

    Indiana Department

    of Transportation

    1296335 I 69 HMA Overlay,

    Preventive

    Maintenance

    From 0.64 Mi. S. of I-469 to

    4.20 Mi. N. of I-469, Yohne Rd

    bridge.

    Fort Wayne 4.828 Interstate Road

    Construction

    CN $2,241,900.00 $249,100.00 $2,491,000.00 Init.

    Indiana Department

    of Transportation

    1296933 I 69 Interchange

    Modification

    SB at the I-469 S Jct. Weave

    Area.

    Fort Wayne .313 Interstate Mobility

    Construction

    CN $144,900.00 $16,100.00 $161,000.00 A 14

    Comments: CN phase amended into the FY 14- 17 NIRCC MPO TIP for FY 16, via resolution dated 2-4-14.

    Indiana Department

    of Transportation

    1296933 I 69 Interchange

    Modification

    SB at the I-469 S Jct. Weave

    Area.

    Fort Wayne .313 Interstate Mobility Consulting PE $2,250.00 $250.00 $2,500.00A 40

    Comments: Please amend FY 2015 PE phase ($2.5K), NIRCC Resolution # 14-122 dated 04/09/2015, into Current 2014-2017 STIP.

    The project information shows this to be at the South Junction of I-69 at I-469. This is a cross road.

    I-69, I-469, SB at the I-469 S Jct. Weave Area.

    Indiana Department

    of Transportation

    1296407 US 27 HMA Overlay,

    Preventive

    Maintenance

    From 7.83 Mi. N. of US 224

    N.Jct to 17.67 Mi. N. of N. Jct

    US 224,(Paulding Rd)

    Fort Wayne 9.816 NHS Road

    Construction

    CN $0.00 $0.00 $0.00 A 40

    Comments: Per NIRCC Resolution 14-151: CN $4,813,000 Total for 2016. New addition to TIP, previously listed in STIP in FY ?16.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 15 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1296407 US 27 HMA Overlay,

    Preventive

    Maintenance

    From 7.83 Mi. N. of US 224

    N.Jct to 17.67 Mi. N. of N. Jct

    US 224,(Paulding Rd)

    Fort Wayne 9.816 NHS Road

    Construction

    CN $3,850,400.00 $962,600.00 $4,813,000.00 Init.

    Indiana Department

    of Transportation

    1173904 I 469 Small Structure Pipe

    Lining

    Pipeliner for Ditch at Minnich

    Road Interchange (SWL), 1.94

    Miles South of US 30

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $97,200.00 $10,800.00 $108,000.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-88 on 9/2/2014, for $108,000.

    Indiana Department

    of Transportation

    1173908 I 469 Small Structure Pipe

    Lining

    Pipeliner for Drain, 1.29 Miles

    East of US 27

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $87,300.00 $9,700.00 $97,000.00 Init.

    Indiana Department

    of Transportation

    1173909 I 469 Small Structure Pipe

    Lining

    Pipeliner for Drain at Tillman

    Road Interchange SWR, 3.80

    Miles South of US 30.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $63,000.00 $7,000.00 $70,000.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-90 on 9/2/2014, for $70,000.

    Indiana Department

    of Transportation

    1173910 I 469 Small Structure Pipe

    Lining

    Pipeliner for Ditch at Tillman

    Road Interchange SER, 3.80

    Miles South of US 30.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $63,000.00 $7,000.00 $70,000.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-90 on 9/2/2014, for $70,000.

    Indiana Department

    of Transportation

    1296054 I 69 Small Structure Pipe

    Lining

    Pipeliner for Branch of

    Robinson Ditch, 3.50 Miles

    North of I-469 South Jct.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $97,200.00 $10,800.00 $108,000.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-91 on 9/2/2014, for $108,000.

    Indiana Department

    of Transportation

    1296072 US 30 Small Structure Pipe

    Lining

    Pipeliner for Ditch, 0.05 Miles

    West of I-69.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $68,800.00 $17,200.00 $86,000.00 Init.

    Indiana Department

    of Transportation

    1172175 US 27 Traffic Signals

    Modernization

    Between 6.31 Mi. S. of SR 930

    (PauldingRd) to 1.01 Mi. S.of

    SR 930 (Edgewood D

    Fort Wayne 5.268 NHS Safety

    Construction

    CN $1,252,000.00 $313,000.00 $1,565,000.00 A 14

    Comments: CN phase amended into the FY 14- 17 NIRCC MPO TIP for FY 16, via resolution dated 2-4-14.

    Indiana Department

    of Transportation

    1172175 US 27 Traffic Signals

    Modernization

    Between 6.31 Mi. S. of SR 930

    (PauldingRd) to 1.01 Mi. S.of

    SR 930 (Edgewood D

    Fort Wayne 5.268 NHS Safety

    Construction

    CN $1,256,960.00 $314,240.00 $1,571,200.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2017 via resolution #14-95 on 9/2/2014, for $1,571,200.

    Indiana Department

    of Transportation

    1296321 US 27 HMA Overlay,

    Preventive

    Maintenance

    From 6.31 Mi. S. of SR 930

    (Paulding Rd) to 1.01 Mi. S. of

    SR 930 (Edgewood Dr)

    Fort Wayne 5.268 NHS Road Consulting PE $816,000.00 $204,000.00 $700,000.00 $320,000.00A 10

    Comments: PE for 2014 & 2015 amended into NIRCC 2014-2017 TIP, via amendment submitted by FT. Wayne MPO on 11/25/2013

    Indiana Department

    of Transportation

    1296321 US 27 HMA Overlay,

    Preventive

    Maintenance

    From 6.31 Mi. S. of SR 930

    (Paulding Rd) to 1.01 Mi. S. of

    SR 930 (Edgewood Dr)

    Fort Wayne 5.268 NHS Road

    Construction

    CN $4,142,160.00 $1,035,540.00 $5,177,700.00 A 30

    Road ROW RW $96,000.00 $24,000.00 $100,000.00 $20,000.00

    Road Consulting PE $542,244.00 $135,561.00 $455,000.00 $120,000.00 $102,805.00

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for PE in 2015 @ $200,000, RW in 2016 @ $120,000, CN in 2017 @ $5,177,700 via resolution #14-94 on 9/2/2014.

    Indiana Department

    of Transportation

    1296321 US 27 HMA Overlay,

    Preventive

    Maintenance

    From 6.31 Mi. S. of SR 930

    (Paulding Rd) to 1.01 Mi. S. of

    SR 930 (Edgewood Dr)

    Fort Wayne 5.268 NHS Road

    Construction

    CN $2,315,200.00 $578,800.00 $2,894,000.00 Init.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 16 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1296586 VA

    VARI

    Auxiliary Lane

    Construction

    I-69 NB off Ramp at the I-469 N

    Jct

    Fort Wayne .5 Interstate District Other

    Consulting

    PE $18,000.00 $2,000.00 $20,000.00 A 16

    Comments: PE phase amended into NIRCC TIP #14-30 for the 2014-2017 TIP.

    Indiana Department

    of Transportation

    1296586 VA

    VARI

    Auxiliary Lane

    Construction

    I-69 NB off Ramp at the I-469 N

    Jct

    Fort Wayne .5 Interstate Mobility

    Construction

    CN $468,000.00 $52,000.00 $520,000.00Init.

    Indiana Department

    of Transportation

    1297327 I 469 Repair PCCP & HMA

    Overlay

    From 0.54 Mi. E. of I-69 S. Jct.

    to 0.63 Mi. N. of US 24.

    Fort Wayne 20.949 Interstate District Other

    Construction

    CN $234,000.00 $26,000.00 $260,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-25

    Indiana Department

    of Transportation

    1296911 SR 930 Intersect. Improv. W/

    Added Turn Lanes

    0.77 M.E. of US 27(at

    Coldwater Rd), Add Right Turn

    Lanes on N,E, & W approaches

    Fort Wayne .199 NHS Mobility Consulting PE -$8,000.00 -$2,000.00 ($30,000.00) $20,000.00 $0.00A 41 $2,928,000.00

    Comments: IN MPO

    Please amend FY 2016 PE phase for $20K into Current 14-17 STIP, NIRCC Resolution # 14-155 dated 05/12/2015.

    Indiana Department

    of Transportation

    1296911 SR 930 Intersect. Improv. W/

    Added Turn Lanes

    0.77 M.E. of US 27(at

    Coldwater Rd), Add Right Turn

    Lanes on N,E, & W approaches

    Fort Wayne .199 NHS Mobility

    Construction

    CN $1,742,400.00 $435,600.00 $400,000.00 $1,778,000.00 Init.

    Mobility ROW RW $600,000.00 $150,000.00 $750,000.00

    Mobility Consulting PE $24,000.00 $6,000.00 $30,000.00

    Indiana Department

    of Transportation

    0901185 I 469 Bridge Deck Overlay EB Bridge over Houk Ditch,

    2.19 mi E of US 27/US 33

    interchange.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $171,000.00 $19,000.00 $0.00 $190,000.00 Init.

    Indiana Department

    of Transportation

    0901186 I 469 Bridge Deck Overlay WB Bridge over Houk Ditch,

    2.19 mi E of US 27/US 33

    interchange.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $171,000.00 $19,000.00 $0.00 $190,000.00 Init.

    Indiana Department

    of Transportation

    1296429 I 469 Pavement

    Replacement

    From 0.85 Mi. E. of US 27 to

    3.14 Mi. S. of US 30 (Tillman

    Rd).

    Fort Wayne 3.886 Interstate Road Consulting PE $2,340,000.00 $260,000.00 $20,000.00 $1,080,000.00 $1,500,000.00Init.

    Road

    Construction

    CN $31,149,000.00 $3,461,000.00 $34,610,000.00

    Indiana Department

    of Transportation

    1401085 I 469 Bridge Thin Deck

    Overlay

    Bridge Over CFE Railroad EBL,

    3.81 Miles West of US 30

    Fort Wayne .01 Interstate Road

    Construction

    CN $160,920.00 $17,880.00 $178,800.00 A 41 $178,000.00

    Comments: IN MPO

    Please amend FY 2017 CN phase for $178.8K into Current 14-17 STIP, NIRCC Resolution # 14-156 dated 04/09/2015.

    Indiana Department

    of Transportation

    1401086 I 469 Bridge Thin Deck

    Overlay

    Bridge Over CFE Railroad WBL,

    3.81 Miles West of US 30

    Fort Wayne .01 Interstate Road

    Construction

    CN $147,420.00 $16,380.00 $163,800.00 A 41 $163,800.00

    Comments: IN MPO

    Please amend FY 2016 CN phase for $163.8K into Current 14-17 STIP, NIRCC Resolution # 14-157 dated 04/09/2015.

    Indiana Department

    of Transportation

    1297641 I 469 Concrete Pavement

    Restoration (CPR)

    From 0.54 Miles East of I-69 to

    8.82 Miles East of I-69

    Fort Wayne 7.948 Interstate Road

    Construction

    CN $1,180,800.00 $131,200.00 $0.00 $1,312,000.00$0.00Init.

    Indiana Department

    of Transportation

    1297804 I 469 Bridge Rehab-Pipe

    Lining

    Bridge on I-469 Over Rock

    Ditch, 1.31 Miles East of US 27

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $90,000.00 $10,000.00 $100,000.00 Init.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 17 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Allen County 1297753 IR 1001 Guard Rail

    Attenuators, New Or

    Modernize

    Bridge Guardrail Treatments at

    various locations in Allen Co

    Fort Wayne 0 Multiple Fort Wayne MPO PE $93,150.00 $0.00 $93,150.00 Init.

    100% Local

    Funds

    PE $0.00 $10,350.00 $10,350.00

    Fort Wayne MPO CN $277,200.00 $0.00 $277,200.00

    100% Local

    Funds

    CN $0.00 $30,800.00 $30,800.00

    Indiana Department

    of Transportation

    1297934 SR 14 HMA Overlay,

    Preventive

    Maintenance

    From 0.24 Mi. W. of I-69

    (Hadley Rd) to 0.26 Mi. E. of

    I-69 ( Magnavox Way).

    Fort Wayne .415 STP District Other

    Construction

    CN $200,000.00 $50,000.00 $250,000.00 Init.

    Indiana State

    Agencies

    1173219 ST 1011 Bike/Pedestrian

    Facilities

    IPFW Pedestrian Bridge over

    Coliseum Blvd

    Fort Wayne .2 Off Federal Aid Local

    Transportation

    Alternatives

    CN $3,312,000.00 $0.00 $3,312,000.00 A 18

    100% Local

    Funds

    CN $0.00 $828,000.00 $828,000.00

    Comments: NIRCC Amendment 14-27

    Fort Wayne 1173162 ST 1001 Road Reconstruction

    (3R/4R Standards)

    Maplecrest Rd: from State Blve

    to Stellhorn Rd

    Fort Wayne 1.4 On Federal Aid 100% Local

    Funds

    PE $0.00 $74,000.00 $74,000.00 M 02 $8,000,000.00

    Fort Wayne MPO PE $296,000.00 $0.00 $296,000.00

    Comments: Increase in PE per NIRCC Modification 14-38. Increase only shown here.

    Fort Wayne 1173162 ST 1001 Road Reconstruction

    (3R/4R Standards)

    Maplecrest Rd: from State Blve

    to Stellhorn Rd

    Fort Wayne 1.4 On Federal Aid Fort Wayne MPO RW $400,000.00 $0.00 $400,000.00 Init.

    Fort Wayne MPO PE $600,000.00 $0.00 $600,000.00

    100% Local

    Funds

    RW $0.00 $100,000.00 $100,000.00

    100% Local

    Funds

    PE $0.00 $1,150,000.00 $150,000.00 $1,000,000.00

    Allen County 1297238 IR 1001 Other Intersection

    Improvement

    Liberty Mills Rd/CR 900N @

    County Line Rd Intersection

    Fort Wayne 0 On Federal Aid Fort Wayne MPO PE $160,000.00 $0.00 $160,000.00 Init.

    100% Local

    Funds

    RW $0.00 $41,300.00 $41,300.00

    100% Local

    Funds

    PE $0.00 $40,000.00 $40,000.00

    Fort Wayne MPO RW $165,000.00 $0.00 $165,000.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 18 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1382161 I 469 Debris Removal From

    Channel

    Bridge Over St. Marys River,

    0.45 Miles West of US 27.

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $9,000.00 $1,000.00 $10,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-21

    Indiana Department

    of Transportation

    1382169 I 469 Bridge Thin Deck

    Overlay

    Bridge Over North River Road

    NBL, 0.64 Miles North of US 24.

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $72,000.00 $8,000.00 $80,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-18

    Indiana Department

    of Transportation

    1382170 I 469 Bridge Thin Deck

    Overlay

    Bridge Over North River Road

    SBL, 0.64 Miles North of US 24.

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $72,000.00 $8,000.00 $80,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-18

    Indiana Department

    of Transportation

    1382171 I 469 Bridge Maintenance

    And Repair

    Bridge Over Wheelock Road

    EBL, 1.92 Miles West of SR 37.

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $18,000.00 $2,000.00 $20,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-19

    Indiana Department

    of Transportation

    1382172 I 469 Bridge Maintenance

    And Repair

    Bridge Over Wheelock Road

    WBL, 1.92 Miles West of SR

    37.

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $18,000.00 $2,000.00 $20,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-19

    Indiana Department

    of Transportation

    1382173 I 469 Bridge Maintenance

    And Repair

    Bridge Over St. Joe Road WBL,

    4.33 Miles West of SR-37.

    Fort Wayne .01 Interstate Bridge

    Construction

    CN $13,500.00 $1,500.00 $15,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-20

    Indiana Department

    of Natural

    Resources

    1005570 ST 1011 Other Type Project

    (Miscellaneous)

    Pufferbelly Trail North Fort Wayne 0 On Federal Aid 100% Local

    Funds

    PE $0.00 $14,855.00 $14,855.00 Init.

    Recreational

    Trails Program

    CN $141,000.00 $0.00 $141,000.00

    Recreational

    Trails Program

    RW $31,500.00 $0.00 $31,500.00

    Indiana Department

    of Transportation

    0710276 ST 1001 Single Location Bridge

    Inspection

    IUPUFW-Cressent Avenue

    Bridge Inspection

    Fort Wayne 0 Off Federal Aid Bridge Consulting PE $120,000.00 $30,000.00 $75,000.00$75,000.00Init.

    Bridge

    Construction

    CN $0.00 $0.00 $0.00

    Indiana Department

    of Transportation

    1297574 ST 1001 Railroad Protection at Nuttman Avenue at NS in

    Fort Wayne

    Fort Wayne 0 Off Federal Aid Local Safety

    Program - 130

    CN $25,000.00 $0.00 ($280,000.00) $305,000.00 M 12

    Comments: CN funding moving from FY 2014 to FY 2016. CN for FY 2014 was $280,000.00 and is being increased to $305,000.00 for CN in FY 2016. NIRCC TIP amendment # 14-28.

    Indiana Department

    of Transportation

    1297574 ST 1001 Railroad Protection at Nuttman Avenue at NS in

    Fort Wayne

    Fort Wayne 0 Off Federal Aid Local Safety

    Program

    CN $280,000.00 $0.00 $280,000.00 Init.

    Indiana Department

    of Transportation

    1297575 ST 1001 Railroad Protection Covington Avenue at NS RR in

    Fort Wayne

    Fort Wayne 0 Off Federal Aid Local Safety

    Program - 130

    CN $60,000.00 $0.00 ($280,000.00) $340,000.00 M 12

    Comments: CN funding moving from FY 2014 to FY 2016. CN for FY 2014 was $280,000.00 and is being increased to $340,000.00 for CN in FY 2016. NIRCC TIP amendment # 14-29.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 19 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1297575 ST 1001 Railroad Protection Covington Avenue at NS RR in

    Fort Wayne

    Fort Wayne 0 Off Federal Aid Local Safety

    Program

    CN $280,000.00 $0.00 $280,000.00 Init.

    Allen County 1382497 ST 1027 Bridge Deck

    Reconstruction

    Bridge 95 on Washington Cntr

    Rd over Spy Run Creek

    Fort Wayne .1 On Federal Aid 100% Local

    Funds

    PE $0.00 $37,500.00 $37,500.00M 03

    Fort Wayne MPO PE $150,000.00 $0.00 $150,000.00

    Comments: Change FY for PE from 2014 to 2015, NIRCC Modification 14-54.

    Allen County 1382497 ST 1027 Bridge Deck

    Reconstruction

    Bridge 95 on Washington Cntr

    Rd over Spy Run Creek

    Fort Wayne .1 On Federal Aid Fort Wayne MPO PE $26,800.00 $0.00 $26,800.00M 08

    100% Local

    Funds

    PE $0.00 $6,700.00 $6,700.00

    Comments: NIRCC resolution 14-62: Modifying PE. Increase Federal from $150,000 to $176,800. $26,800 federal, ($33,500 Total) added in this modification.

    Allen County 1382497 ST 1027 Bridge Deck

    Reconstruction

    Bridge 95 on Washington Cntr

    Rd over Spy Run Creek

    Fort Wayne .1 On Federal Aid 100% Local

    Funds

    PE $0.00 $37,500.00 $37,500.00 Init.

    Fort Wayne MPO RW $100,000.00 $0.00 $100,000.00

    100% Local

    Funds

    RW $0.00 $25,000.00 $25,000.00

    Fort Wayne MPO PE $150,000.00 $0.00 $150,000.00

    Allen County 1382100 IR 1022 Bridge Inspections Inspection and reinspection of

    county bridges 20 feet and

    longer

    Fort Wayne 0 Multiple 100% Local

    Funds

    PE $0.00 $116,000.00 $58,000.00 $58,000.00 A 04

    Local Bridge

    Program

    PE $464,000.00 $0.00 $232,000.00 $232,000.00

    Allen County 0902238 ST 1001 Intersection

    Improvement,

    Roundabout

    Intersection of Bass Road and

    Hadley Road

    Fort Wayne .1 On Federal Aid Fort Wayne MPO CN $2,428,000.00 $0.00 $2,428,000.00 Init.

    100% Local

    Funds

    PE $0.00 $60,000.00 $60,000.00

    Fort Wayne MPO PE $240,000.00 $0.00 $240,000.00

    100% Local

    Funds

    CN $0.00 $607,000.00 $607,000.00

    Allen County 1382493 IR 1025 Road Reconstruction

    (3R/4R Standards)

    Bass Rd: from Shakespeare

    Blvd to Clifty Parkway

    Fort Wayne .95 On Federal Aid Fort Wayne MPO CN $4,915,600.00 $0.00 $4,915,600.00 Init.

    100% Local

    Funds

    CN $0.00 $1,228,900.00 $1,228,900.00

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 20 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Allen County 1382493 IR 1025 Road Reconstruction

    (3R/4R Standards)

    Bass Rd: from Shakespeare

    Blvd to Clifty Parkway

    Fort Wayne .95 On Federal Aid Fort Wayne MPO RW $446,600.00 $0.00 $446,600.00 Init.

    100% Local

    Funds

    RW $0.00 $111,650.00 $111,650.00

    Allen County 1382492 IR 1025 Road Reconstruction

    (3R/4R Standards)

    Bass Rd: from Clifty Parkway

    to Thomas Rd

    Fort Wayne .7 On Federal Aid 100% Local

    Funds

    RW $0.00 $112,500.00 $112,500.00 Init.

    Fort Wayne MPO RW $450,000.00 $0.00 $450,000.00

    Fort Wayne 0400587 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Cass

    Street

    Fort Wayne .16 On Federal Aid 100% Local

    Funds

    RW $0.00 $460,000.00 $460,000.00M 02

    Fort Wayne MPO RW $1,840,000.00 $0.00 $1,840,000.00

    Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: FY ?14 to ?15

    Fort Wayne 0400587 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Cass

    Street

    Fort Wayne .16 On Federal Aid 100% Local

    Funds

    RW $0.00 $460,000.00 $460,000.00 Init.

    Fort Wayne MPO RW $1,840,000.00 $0.00 $1,840,000.00

    Allen County 1382818 IR 1001 Intersection

    Improvement,

    Roundabout

    Minnich Rd and Tillman Rd

    Intersection

    Fort Wayne .25 On Federal Aid Fort Wayne MPO PE $281,300.00 $0.00 $281,300.00M 03

    100% Local

    Funds

    PE $0.00 $31,300.00 $31,300.00

    Comments: Change FY for PE from 2014 to 2015, NIRCC Modification 14-53.

    Allen County 1382818 IR 1001 Intersection

    Improvement,

    Roundabout

    Minnich Rd and Tillman Rd

    Intersection

    Fort Wayne .25 On Federal Aid 100% Local

    Funds

    RW $0.00 $17,000.00 $17,000.00A 04

    Fort Wayne MPO CN $1,381,500.00 $0.00 $1,381,500.00

    Fort Wayne MPO RW $153,000.00 $0.00 $153,000.00

    100% Local

    Funds

    CN $0.00 $153,500.00 $153,500.00

    Fort Wayne MPO PE $238,500.00 $0.00 $238,500.00

    100% Local

    Funds

    PE $0.00 $26,500.00 $26,500.00

    Indiana Department

    of Transportation

    1383079 SR 101 HMA Overlay,

    Preventive

    Maintenance

    From 2.40 Miles South of US 24

    to 0.25 Miles South of US 24.

    Fort Wayne 2.092 On Federal Aid District Other

    Construction

    CN $440,000.00 $110,000.00 $550,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-23

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 21 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1383251 SR 37 HMA Overlay,

    Preventive

    Maintenance

    From 0.17 Miles West to 1.13

    Miles East of I-469.

    Fort Wayne 1.148 On Federal Aid District Other

    Construction

    CN $320,000.00 $80,000.00 $400,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-24

    Indiana Department

    of Transportation

    1383411 SR 930 Bridge Deck

    Replacement

    SR 930 Bridge Over NS RR

    (HUNTINGTON), 4.38 Miles W

    I-469

    Fort Wayne 0 NHS Bridge

    Construction

    CN $2,277,600.00 $569,400.00 $2,847,000.00A 12

    Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-22

    Indiana Department

    of Transportation

    1400362 I 469 Bridge Maintenance

    And Repair

    Bridge Over US 24 SBL, 1.35

    Miles North of US 30.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $8,640.00 $960.00 $9,600.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $9,600.

    Indiana Department

    of Transportation

    1400363 I 469 Bridge Maintenance

    And Repair

    Bridge Over Maumee River

    NBL, 0.47 Miles North of US 24

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $9,090.00 $1,010.00 $10,100.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $10,100.

    Indiana Department

    of Transportation

    1400364 I 469 Bridge Maintenance

    And Repair

    Bridge Over Maumee River

    SBL, 0.47 Miles North of US 24.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $7,650.00 $850.00 $8,500.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $8,500.

    Indiana Department

    of Transportation

    1400366 I 469 Bridge Maintenance

    And Repair

    Bridge Over N & S Railroad

    NBL, 0.50 Miles South of SR

    37.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $8,595.00 $955.00 $9,550.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $9,550.

    Indiana Department

    of Transportation

    1400367 I 469 Bridge Maintenance

    And Repair

    Bridge Over N & S Railroad

    SBL, 0.50 Miles South of SR

    37.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $9,540.00 $1,060.00 $10,600.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $10,600.

    Indiana Department

    of Transportation

    1400368 SR 3 Bridge Maintenance

    And Repair

    Bridge Over Willow Creek Ditch

    SBL, 4.19 Miles South of SR

    205.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $18,240.00 $4,560.00 $22,800.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $22,800.

    Indiana Department

    of Transportation

    1400369 SR 3 Bridge Maintenance

    And Repair

    Bridge Over Willow Creek Ditch

    NBL, 4.19 Miles South of SR

    205.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $24,640.00 $6,160.00 $30,800.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $30,800.

    Indiana Department

    of Transportation

    1400378 SR 930 Bridge Maintenance

    And Repair

    Bridge Over N & S R/R, 4.38

    Miles West of I-469.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $16,960.00 $4,240.00 $21,200.00 A 28

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $21,200.

    Indiana Department

    of Transportation

    1400383 I 469 Bridge Maintenance

    And Repair

    Bridge Over Lafayette Center

    Rd EBL, 0.94 Miles East of I-69.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $4,320.00 $480.00 $4,800.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP forCN phase in 2016 via resolution #14-82 on 9/2/2014, for $4,800.

    Indiana Department

    of Transportation

    1400384 I 469 Bridge Maintenance

    And Repair

    Bridge Over Lafayette Center

    Rd WBL, 0.94 Miles East of

    I-69.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $4,815.00 $535.00 $5,350.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-82 on 9/2/2014, for $5,400.

    *Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not

    fiscally constrained and is for information purposes.

    Page 22 of 828 Report Created:6/30/2015 3:35:29PM

  • State Preservation and Local Initiated Projects FY 2014 - 2017

    Indiana Department of Transportation (INDOT)

    SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL

    CATEGORY

    PROGRAM PHASE FEDERAL MATCHEstimated

    Cost left to

    Complete

    Project*

    2014 2015 2016 2017STIP

    NAME

    Indiana Department

    of Transportation

    1400424 US 24 Bridge Maintenance

    And Repair

    Bridge Over Aboite Creek WBL,

    4.11 Miles West of I-69.

    Fort Wayne 0 NHS Bridge

    Construction

    CN $7,920.00 $1,980.00 $9,900.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-83 on 9/2/2014, for $9,900.

    Indiana Department

    of Transportation

    1400445 I 69 Bridge Maintenance

    And Repair

    Bridge On Yoder Road Over

    I-69, 7.75 Miles North of US

    224.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $6,255.00 $695.00 $6,950.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-84 on 9/2/2014, for $7,000.

    Indiana Department

    of Transportation

    1400446 I 69 Bridge Maintenance

    And Repair

    Bridge Over Robinson Creek

    NBL, 1.69 Miles South of US

    24.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $8,145.00 $905.00 $9,050.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-85 on 9/2/2014, for $9,100.

    Indiana Department

    of Transportation

    1400447 I 69 Bridge Maintenance

    And Repair

    Bridge Over Robinson Creek

    SBL, 1.69 Miles South of US

    24.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $8,145.00 $905.00 $9,050.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-85 on 9/2/2014, for $9,100.

    Indiana Department

    of Transportation

    1400448 I 69 Bridge Maintenance

    And Repair

    Bridge Over N&S RR SBL, 0.80

    Miles South of US 24.

    Fort Wayne 0 Interstate Bridge

    Construction

    CN $7,650.00 $850.00 $8,500.00 A 30

    Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-86 on 9/2/2014, for $8,500.

    Indiana Department

    of Transportation

    1400449 I 69 Bridge Maintenance

    And Repair

    Bridge Over Hadley