State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Adams County
Indiana Department
of Transportation
0810233 SR 218 Bridge Deck Overlay Bridge over the Wabash River,
0.73 miles E of SR 116
Fort Wayne 0 BR Bridge
Construction
CN $0.00 $0.00 $0.00 $0.00 Init.
Bridge Consulting PE $72,000.00 $18,000.00 $90,000.00
Indiana Department
of Transportation
1173148 US 224 Environmental
Mitigation
From 0.87 miles E to 1.2 miles E
of US 27
Fort Wayne .809 On Federal Aid Statewide ROW RW $0.00 $0.00 ($80,000.00) $80,000.00M 08
Comments: MODIFY STIP to move RW funding in the amount of $80K from FY 2014 into FY 2015. Modify the 2014-2017 STIP. NOT IN MPO.
Indiana Department
of Transportation
1173148 US 224 Environmental
Mitigation
From 0.87 miles E to 1.2 miles E
of US 27
Fort Wayne .809 STP Statewide ROW RW $64,000.00 $16,000.00 $80,000.00 Init.
Statewide
Construction
CN $314,400.00 $78,600.00 $393,000.00
Indiana Department
of Transportation
9904180 US 224 Pavement
Replacement
From 0.87 miles E to 1.27 miles
E of US 27.
Fort Wayne .809 STP Statewide ROW RW $1,373,120.00 $343,280.00 $1,682,000.00 $34,400.00 Init.
Road Consulting PE $31,480.00 $7,870.00 $39,350.00
Statewide
Construction
CN $2,869,600.00 $717,400.00 $3,587,000.00
Adams County 0810406 IR 1005 Bike/Pedestrian
Facilities
Adams Co BP, Geneva to
Berne, Priority 1
Fort Wayne 1.2 Off Federal Aid 100% Local
Funds
CN $0.00 $95,630.00 $95,630.00Init.
Local Trans
Enhancement
Program
CN $382,520.00 $0.00 $382,520.00
Local Trans
Enhancement
Program
PE $53,120.00 $0.00 $53,120.00
100% Local
Funds
PE $0.00 $13,280.00 $13,280.00
Adams County 0810406 IR 1005 Bike/Pedestrian
Facilities
Adams Co BP, Geneva to
Berne, Priority 1
Fort Wayne 1.2 Off Federal Aid 100% Local
Funds
CN $0.00 $108,910.00 $108,910.00 A 01
Local
Transportation
Alternatives
CN $435,640.00 $0.00 $435,640.00
Adams County 0810406 IR 1005 Bike/Pedestrian
Facilities
Adams Co BP, Geneva to
Berne, Priority 1
Fort Wayne 1.2 Off Federal Aid 100% Local
Funds
RW $0.00 $7,090.00 $7,090.00 A 10
Local Trans
Enhancement
Program
RW $28,360.00 $0.00 $28,360.00
Comments: Add Right of Way to STIP.
Indiana Department
of Transportation
0101512 US 27 Small Structure
Replacement
Small Structure Over Habegger
Ditch, from 1.2 miles N of SR
218
Fort Wayne 0 NHS Bridge
Construction
CN $447,600.00 $111,900.00 $559,500.00 M 01
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 1 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Comments: Submitted modification for moving FY 2016 CN $559,500 to FY 2017 in the 2014-2017 STIP. The FY 15 CN funding for Utilities remains in the 2014-2017 STIP for this des.
Indiana Department
of Transportation
0101512 US 27 Small Structure
Replacement
Small Structure Over Habegger
Ditch, from 1.2 miles N of SR
218
Fort Wayne 0 NHS Bridge
Construction
CN $502,400.00 $125,600.00 $598,000.00 $30,000.00A 01
Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00
Bridge Consulting PE $0.00 $0.00 $0.00
Indiana Department
of Transportation
0101513 US 27 Small Structure
Replacement
Small Structure Over Wittmer
#1 Ditch, 1.0 mile N of SR 218.
Fort Wayne 0 NHS Bridge
Construction
CN $524,320.00 $131,080.00 $655,400.00 M 01
Comments: Submitted modification for moving FY 2016 CN $655,400 to FY 2017 in the 2014-2017 STIP. The FY 15 CN for Utilities remains in FY 2015 in the 2014-2017 STIP fro this des.
Indiana Department
of Transportation
0101513 US 27 Small Structure
Replacement
Small Structure Over Wittmer
#1 Ditch, 1.0 mile N of SR 218.
Fort Wayne 0 NHS Bridge
Construction
CN $218,400.00 $54,600.00 $243,000.00 $30,000.00A 01
Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00
Bridge Consulting PE $0.00 $0.00 $0.00
Indiana Department
of Transportation
1006144 US 27 Small Structure Pipe
Lining
3.62 Miles North of US 224 (
Over Branch of St. Marys
River)
Fort Wayne 0 NHS Bridge
Construction
CN $41,600.00 $10,400.00 $0.00 $52,000.00$0.00Init.
Indiana Department
of Transportation
1006160 SR 218 Bridge Deck Overlay Bridge Over Little Blue Creek,
6.70 Miles East of US 27.
Fort Wayne .088 BR Bridge Consulting PE $48,000.00 $12,000.00 $45,000.00 $15,000.00Init.
Bridge
Construction
CN $355,200.00 $88,800.00 $444,000.00
Adams County 0901261 IR 1004 Bridge Deck Overlay Winchester Rd Brg #41 over
Holthouse Ditch
Fort Wayne .13 On Federal Aid Local Bridge
Program
CN $483,200.00 $0.00 $483,200.00 A 01
100% Local
Funds
CN $0.00 $120,800.00 $120,800.00
Indiana Department
of Transportation
1296169 US 224 Small Structure
Replacement
Small Structure Over Kohne
Ditch #1; 0.35 Miles West of US
27/US 33.
Fort Wayne 0 BR Bridge Consulting PE $84,000.00 $21,000.00 $80,000.00 $25,000.00Init.
Bridge
Construction
CN $524,000.00 $131,000.00 $655,000.00
Bridge ROW RW $16,000.00 $4,000.00 $13,000.00 $7,000.00
Decatur 1173223 ST 1001 Road Rehabilitation
(3R/4R Standards)
E. Monroe Street (CR 600N):
From Piqua Rd to 400' E of
Waters Edge Dr.
Fort Wayne .45 STP 100% Local
Funds
PE $0.00 $34,800.00 $34,800.00Init.
Group III Program CN $1,074,031.00 $0.00 $1,074,031.00 $0.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 2 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Decatur 1173223 ST 1001 Road Rehabilitation
(3R/4R Standards)
E. Monroe Street (CR 600N):
From Piqua Rd to 400' E of
Waters Edge Dr.
Fort Wayne .45 STP 100% Local
Funds
CN $0.00 $268,508.00 $268,508.00 $0.00Init.
Group III Program PE $139,200.00 $0.00 $139,200.00
Decatur 1173223 ST 1001 Road Rehabilitation
(3R/4R Standards)
E. Monroe Street (CR 600N):
From Piqua Rd to 400' E of
Waters Edge Dr.
Fort Wayne .45 On Federal Aid 100% Local
Funds
RW $0.00 $31,989.00 $31,989.00 A 07
Group III Program RW $127,955.00 $0.00 $127,955.00
Comments: Adding ROW phase to project for FY 2014. Funds moved from CN in '15.
Adams County 1173218 IR 1005 Bike/Pedestrian
Facilities
Adams Co BP: from the
Wabash River to CR 850S
Fort Wayne .32 Off Federal Aid Local
Transportation
Alternatives
RW $97,760.00 $0.00 $97,760.00 Init.
Local
Transportation
Alternatives
CN $515,400.00 $0.00 $515,400.00
100% Local
Funds
RW $0.00 $24,440.00 $24,440.00
100% Local
Funds
CN $0.00 $347,800.00 $347,800.00
Indiana Department
of Transportation
1006195 SR 218 HMA Overlay,
Preventive
Maintenance
From 0.75 Mi. West of US 27 to
1.07 Mi. East of US 27.
Fort Wayne 1.81 STP Road
Construction
CN $543,200.00 $135,800.00 $0.00 $679,000.00$0.00Init.
Indiana Department
of Transportation
1297610 US 27 Surface Treatment,
Ultrathin Bonded
Wearing Course
From 1.03 Miles South of SR
124 to 0.10 Miles North of US
33.
Fort Wayne 5.514 NHS Road
Construction
CN $1,196,800.00 $299,200.00 $1,496,000.00 Init.
Berne 1173729 ST 1001 Bike/Pedestrian
Facilities
Parkway Street in Berne, near
S. Adams Elem. and Middle
Schools
Fort Wayne .51 Off Federal Aid Local Safety
Program
CN $138,000.00 $0.00 $138,000.00A 33
Comments: Add CN to STIP for Fiscal year 2015. $138,000 of 100% SRTS funds. No MPO.
Indiana Department
of Transportation
1382159 US 224 Debris Removal From
Channel
Bridge Over St. Marys River,
0.83 Miles East of US 27.
Fort Wayne .01 On Federal Aid Bridge
Construction
CN $8,000.00 $2,000.00 $10,000.00A 10
Comments: CN phase added to the FY 14-17 STIP for FY 15. -BCPI-
Indiana Department
of Transportation
1382163 SR 218 Debris Removal From
Channel
Bridge Over Wabash River,
0.73 Miles East of SR 116.
Fort Wayne .01 On Federal Aid Bridge
Construction
CN $8,000.00 $2,000.00 $10,000.00A 10
Comments: CN phase added to the FY 14-17 STIP for FY 15. -BCPI-
Adams County 1382099 IR 1004 Bridge Inspections Inspection and reinspection of
county bridges 20 feet and
longer
Fort Wayne 0 Multiple Local Bridge
Program
PE $147,952.00 $0.00 $81,144.00 $66,808.00 A 12
100% Local
Funds
PE $0.00 $36,988.00 $20,286.00 $16,702.00
Comments: Add NBIS project to STIP for Adams County.
Indiana Department
of Transportation
1298003 US 27 Replace
Superstructure
Bridge Over Over Loblolly
Creek, 0.62 Miles South of SR
116.
Fort Wayne .099 NHS Bridge ROW RW $32,000.00 $8,000.00 $10,000.00 $30,000.00 A 04
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 3 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1298003 US 27 Replace
Superstructure
Bridge Over Over Loblolly
Creek, 0.62 Miles South of SR
116.
Fort Wayne .099 NHS Bridge Consulting PE $156,000.00 $39,000.00 $20,000.00 $175,000.00A 04
Indiana Department
of Transportation
1298015 US 27 Bridge Deck
Replacement &
Widening
Bridge Over Wabash River,
1.80 Miles North of SR 116.
Fort Wayne .099 NHS Bridge Consulting PE $164,000.00 $41,000.00 $20,000.00 $185,000.00A 04
Bridge ROW RW $32,000.00 $8,000.00 $10,000.00 $30,000.00
Indiana Department
of Transportation
1383393 SR 124 HMA Overlay,
Preventive
Maintenance
From US 27 to 0.98 Miles East
of US 27 (Monroe).
Fort Wayne 1.059 On Federal Aid District Other
Construction
CN $200,000.00 $50,000.00 $250,000.00A 18
Comments: CN phase for $250,000 added to the current FY 2014-17 STIP for FY 2015 (New Contract).
Indiana Department
of Transportation
1400327 SR 218 Debris Removal From
Channel
Bridge over Wabash River,
0.73 Miles East of SR 116.
Fort Wayne 0 On Federal Aid Bridge
Construction
CN $8,400.00 $2,100.00 $10,500.00 A 18
Comments: CN phase added ($10.5K) for 2014-2017 STIP - for FY 2016.
Indiana Department
of Transportation
1400328 US 224 Debris Removal From
Channel
Bridge over St. Mary's River,
0.85 Miles East of US 27.
Fort Wayne 0 NHS Bridge
Construction
CN $8,400.00 $2,100.00 $10,500.00 A 18
Comments: CN phase added ($10.5K) for 2014-2017 STIP - for FY 2016.
Indiana Department
of Transportation
1400429 SR 218 Bridge Maintenance
And Repair
Bridge Over Wabash River
Overflow, 0.60 Miles East of
SR 116.
Fort Wayne 0 On Federal Aid Bridge
Construction
CN $14,480.00 $3,620.00 $18,100.00 A 31
Comments: Amend CN phase to the current 2014-2017 STIP for FY 2016 for $ 18,100.00. Not in an MPO.
Indiana Department
of Transportation
1401235 US 27 Concrete Pavement
Restoration (CPR)
From 0.10 Mi. N. of US 33 to
2.53 Mi. North of US 224.
Fort Wayne 4.42 NHS Road
Construction
CN $1,676,532.00 $419,133.00 $2,095,665.00A 30
Comments: Amend CN phase to the current 2014-2017 STIP for FY 2015 for $2,095,665. New Contract and not in an MPO.
Indiana Department
of Transportation
1401471 SR 218 Debris Removal From
Channel
Bridge Over Wabash River,
0.73 Miles East of SR 116.
Fort Wayne 0 On Federal Aid Bridge
Construction
CN $17,920.00 $4,480.00 $22,400.00 A 32
Comments: Add CN Phase in FY2017 for $22,400 to the 2014-2017 STIP. NON-MPO.
Indiana Department
of Transportation
1401472 US 224 Debris Removal From
Channel
Bridge over St. Mary's River,
0.85 Miles East of US 27.
Fort Wayne 0 NHS Bridge
Construction
CN $17,920.00 $4,480.00 $22,400.00 A 32
Comments: Add CN Phase in FY2017 for $22,400 to the 2014-2017 STIP. NON-MPO.
Adams County Total
Federal: $15,240,910.00 Match :$3,994,678.00 2014: $4,440,374.00 2015: $4,662,415.00 2016: $3,003,099.00 2017: $7,129,700.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 4 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Allen County
Indiana Department
of Transportation
0800202 I 469 Signing Installation /
Repair
From I-69, S jct to SR 37 Fort Wayne 24.158 Interstate District Other
Construction
CN $270,000.00 $30,000.00 $300,000.00Init.
Fort Wayne 1382498 ST 1026 Road Reconstruction
(3R/4R Standards)
Anthony Blvd: from Tillman Rd
to Rudisill Blvd
Fort Wayne 2.3 On Federal Aid Fort Wayne MPO CN $1,000,000.00 $0.00 $1,000,000.00 Init.
100% Local
Funds
PE $0.00 $60,000.00 $60,000.00
100% Local
Funds
CN $0.00 $250,000.00 $250,000.00
Fort Wayne MPO PE $240,000.00 $0.00 $240,000.00
Fort Wayne 1382765 ST 1028 Road Reconstruction
(3R/4R Standards)
Paulding Rd from Lafayette St
to Hessen Cassel Rd
Fort Wayne 1.95 On Federal Aid Fort Wayne MPO PE $0.00 $0.00 $0.00 A 12
100% Local
Funds
PE $0.00 $0.00 $0.00
Comments: Funding for PE was rolled into CN, (for FY '16), on STIP Amendment 14-04. $135,000 Federal ($168,750 Total) was included in NIRCC amendment 14-05 for PE. Adding PE to STIP, funds
already in STIP.
Fort Wayne 1382765 ST 1028 Road Reconstruction
(3R/4R Standards)
Paulding Rd from Lafayette St
to Hessen Cassel Rd
Fort Wayne 1.95 On Federal Aid Fort Wayne MPO CN $1,375,000.00 $0.00 $1,375,000.00 A 04
100% Local
Funds
CN $0.00 $152,778.00 $152,778.00
Indiana Department
of Transportation
0300086 I 69 Bridge Deck
Replacement
Bridge over Cedar Creek (NB),
3.62 miles N of SR 1
Fort Wayne 0 Interstate Bridge
Construction
CN $1,410,300.00 $156,700.00 $1,567,000.00Init.
Indiana Department
of Transportation
0300087 I 69 Bridge Deck
Replacement
Bridge over Cedar Creek (SB),
3.62 miles N of SR 1
Fort Wayne 0 Interstate Bridge
Construction
CN $1,410,300.00 $156,700.00 $1,567,000.00Init.
Indiana Department
of Transportation
0400603 I 469 Pavement
Replacement
From (Winchester Rd) 2.63
miles E of SR 1 to .05 mile E of
US 27
Fort Wayne 3.603 Interstate Road
Construction
CN $19,072,800.00 $2,119,200.00 $21,192,000.00Init.
Road Consulting CN $0.00 $0.00 $0.00
Indiana Department
of Transportation
0400917 I 469 Bridge Deck Overlay EB bridge over Snyder Ditch,
2.73 miles E of SR 1
Fort Wayne 3.503 Interstate Road
Construction
CN $268,200.00 $29,800.00 $298,000.00Init.
Indiana Department
of Transportation
0400918 I 469 Bridge Deck Overlay EB bridge over the St. Mary's
River, 0.45 mile W of US 27
Fort Wayne 0 Interstate Road
Construction
CN $409,500.00 $45,500.00 $0.00 $455,000.00$0.00Init.
Indiana Department
of Transportation
0400919 I 469 Bridge Deck Overlay EB bridge over US 27, 4.96
miles E of SR 1
Fort Wayne 0 Interstate Road
Construction
CN $451,800.00 $50,200.00 $0.00 $502,000.00$0.00Init.
Indiana Department
of Transportation
0400922 I 469 Bridge Deck Overlay WB bridge over Snyder Ditch,
2.73 miles E of SR 1
Fort Wayne 0 Interstate Road
Construction
CN $259,200.00 $28,800.00 $0.00 $288,000.00$0.00Init.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 5 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
0400923 I 469 Bridge Deck Overlay WB bridge over the St. Mary's
River, 0.45 mile W of US 27
Fort Wayne 0 Interstate Road
Construction
CN $400,500.00 $44,500.00 $0.00 $445,000.00$0.00Init.
Indiana Department
of Transportation
0400924 I 469 Bridge Deck Overlay WB bridge over US 27, 4.96
miles E of SR 1
Fort Wayne .313 Interstate Road
Construction
CN $432,900.00 $48,100.00 $0.00 $481,000.00$0.00Init.
Fort Wayne 0710322 IR 1001 Intersect. Improv. W/
Added Turn Lanes
St Joseph Center
Rd/Washington Center Rd: from
Clinton St to Campus Ct
Fort Wayne .2 On Federal Aid 100% Local
Funds
CN $0.00 $400,000.00 $400,000.00 Init.
Fort Wayne MPO CN $1,600,000.00 $0.00 $1,600,000.00
Fort Wayne MPO RW $200,000.00 $0.00 $200,000.00
100% Local
Funds
RW $0.00 $50,000.00 $50,000.00
Fort Wayne 0710322 IR 1001 Intersect. Improv. W/
Added Turn Lanes
St Joseph Center
Rd/Washington Center Rd: from
Clinton St to Campus Ct
Fort Wayne .2 On Federal Aid Fort Wayne MPO CN $1,600,000.00 $0.00 $1,600,000.00 A 04
Fort Wayne MPO PE $240,000.00 $0.00 $240,000.00
100% Local
Funds
CN $0.00 $400,000.00 $400,000.00
100% Local
Funds
RW $0.00 $50,000.00 $50,000.00
100% Local
Funds
PE $0.00 $60,000.00 $60,000.00
Fort Wayne MPO RW $200,000.00 $0.00 $200,000.00
Fort Wayne 1005151 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Clinton
St (Phase One)
Fort Wayne .19 On Federal Aid Fort Wayne MPO CN $1,200,000.00 $0.00 $1,200,000.00 M 02
100% Local
Funds
CN $0.00 $300,000.00 $300,000.00
Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: FY ?15 to ?17.
Fort Wayne 1005151 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Clinton
St (Phase One)
Fort Wayne .19 On Federal Aid Fort Wayne MPO CN $1,040,000.00 $0.00 $1,040,000.00Init.
100% Local
Funds
CN $0.00 $260,000.00 $260,000.00
Fort Wayne MPO PE $160,000.00 $0.00 $160,000.00
100% Local
Funds
PE $0.00 $40,000.00 $40,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 6 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
0301149 US 30 Small Structure Pipe
Lining
Br # 3 over Seegar Ditch, 2.16
Miles West of US 33.
Fort Wayne 0 NHS Bridge
Construction
CN $103,200.00 $25,800.00 $129,000.00 $0.00Init.
Indiana Department
of Transportation
0800143 US 30 Small Structure Pipe
Lining
Small Structure over a Field
Run, 11.55 miles E. of SR 205.
Fort Wayne 0 NHS Bridge
Construction
CN $103,200.00 $25,800.00 $129,000.00 $0.00Init.
Allen County 0500892 IR 1001 Road Reconstruction
(3R/4R Standards)
Coverdale Rd, from Indianapolis
Rd to Airport Exp, 2.25 mi NE of
I 469
Fort Wayne 1.5 On Federal Aid 100% Local
Funds
CN $0.00 $558,400.00 $558,400.00 Init.
100% Local
Funds
PE $0.00 $70,840.00 $70,840.00
Group IV Program PE $283,360.00 $0.00 $283,360.00
Group IV Program CN $2,233,600.00 $0.00 $2,233,600.00
Allen County 0710344 IR 1001 Bridge Deck
Replacement
Coverdale Rd: Bridge # 231
over Robinson-Brindle Drain
Fort Wayne 0 On Federal Aid 100% Local
Funds
PE $0.00 $11,940.00 $11,940.00 Init.
100% Local
Funds
CN $0.00 $79,431.00 $79,431.00
Local Bridge
Program
CN $317,724.00 $0.00 $317,724.00
Local Bridge
Program
PE $47,760.00 $0.00 $47,760.00
Allen County 0710345 IR 1001 Bridge Replacement,
Other Construction
Coverdale Rd: Bridge #232
over Suter Ditch
Fort Wayne 0 STP 100% Local
Funds
CN $0.00 $61,400.00 $61,400.00 Init.
Group IV Program CN $245,600.00 $0.00 $245,600.00
Indiana Department
of Transportation
0301145 US 27 Small Structure Pipe
Lining
Pipeliner for Valentine Ditch,
3.2 miles N of Adams/Allen Co
Line.
Fort Wayne 0 NHS Bridge ROW RW $22,400.00 $5,600.00 $26,000.00 $2,000.00Init.
Bridge
Construction
CN $71,200.00 $17,800.00 $89,000.00
Bridge Consulting PE $16,000.00 $4,000.00 $20,000.00
Indiana Department
of Transportation
1296076 SR 205 Small Structure Pipe
Lining
Pipeliner for Johnson Ditch,
2.09 Miles North of US 33.
Fort Wayne 0 BR Bridge
Construction
CN $67,200.00 $16,800.00 $84,000.00 Init.
Bridge ROW RW $1,600.00 $400.00 $2,000.00
Indiana Department
of Transportation
0901298 I 69 Interchange
Modification
At the I-69 and SR 1 (Dupont
Rd) Interchange
Fort Wayne .346 Interstate Mobility
Construction
CN $1,882,923.30 $209,213.70 $2,092,137.00 Init.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 7 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1173208 ST 1011 Bike/Pedestrian
Facilities
SR1/Dupont Rd Trail crossing
of I 69
Fort Wayne .4 TE Enhancement -
Construction
CN $239,200.00 $59,800.00 $299,000.00 Init.
Indiana Department
of Transportation
1297170 SR 1 Bridge Deck Overlay Bridge on SR 1 over I-69 at SR
1/(Dupont Rd) & I-69
Interchange.
Fort Wayne 0 Interstate Mobility
Construction
CN $578,067.30 $64,229.70 $642,297.00 Init.
Indiana Department
of Transportation
0400872 US 27 HMA Functional
Overlay on PCCP
From (Edgewood Ave) 1.01
miles S of SR 930, to SR 930
(Coliseum Blvd).
Fort Wayne 1.079 NHS Road
Construction
CN $1,550,400.00 $387,600.00 $1,938,000.00 Init.
Fort Wayne 1005152 ST 1001 New Bridge, Other State Blvd ? Bridge of Spy Run
Creek
Fort Wayne .04 On Federal Aid Fort Wayne MPO CN $0.00 $0.00 $0.00 M 02 $1,800,000.00
Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: ?16 to ?18.
Fort Wayne 1005152 ST 1001 New Bridge, Other State Blvd ? Bridge of Spy Run
Creek
Fort Wayne .04 On Federal Aid Fort Wayne MPO CN $1,440,000.00 $0.00 $1,440,000.00 Init.
100% Local
Funds
CN $0.00 $360,000.00 $360,000.00
Fort Wayne 1005154 ST 1001 Added Travel Lanes State Blvd ? Cass St to Clinton
St (Phase Two)
Fort Wayne .46 On Federal Aid Fort Wayne MPO CN $0.00 $0.00 $0.00 M 02 $4,584,500.00
Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: ?16 to ?18.
Fort Wayne 1005154 ST 1001 Added Travel Lanes State Blvd ? Cass St to Clinton
St (Phase Two)
Fort Wayne .46 On Federal Aid Fort Wayne MPO PE $457,600.00 $0.00 $457,600.00 Init.
100% Local
Funds
PE $0.00 $114,400.00 $114,400.00
Fort Wayne MPO CN $2,960,000.00 $0.00 $2,960,000.00
100% Local
Funds
CN $0.00 $740,000.00 $740,000.00
Fort Wayne 1005155 ST 1001 Bike/Pedestrian
Facilities
State Blvd ? Pufferbelly
Pedestrian Brg over State Blvd.
Fort Wayne .04 Off Federal Aid Fort Wayne MPO CN $0.00 $0.00 $0.00 M 02 $625,000.00
Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: FY ?16 to ?18.
Fort Wayne 1005155 ST 1001 Bike/Pedestrian
Facilities
State Blvd ? Pufferbelly
Pedestrian Brg over State Blvd.
Fort Wayne .04 Off Federal Aid Fort Wayne MPO CN $400,000.00 $0.00 $400,000.00 Init.
100% Local
Funds
CN $0.00 $100,000.00 $100,000.00
Allen County 0400584 VA
VARI
Road Reconstruction
(3R/4R Standards)
Gump Road; from SR3 (Lima
Rd) tp Coldwater Road
Fort Wayne 0 On Federal Aid Fort Wayne MPO CN $6,246,400.00 $0.00 $6,246,400.00 Init.
100% Local
Funds
CN $0.00 $1,561,600.00 $1,561,600.00
Indiana Department
of Transportation
0902222 I 69 New Interchange
Construction
North of SR 1 Fort Wayne 0 Interstate Major New -
Consulting
PE $30,420.00 $3,380.00 $33,800.00 M 16
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 8 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Comments: JUN 19, 2015 - an interchange project that is already built in Fort Wayne, IN. Des. No. is 0902222. At this point we need to initiate a work order request to pay for Monitoring and
Maintenance of a mitigation area. The amount is $33,800. The PE was authorized at the federal level as follows.;
Fort Wayne 0810513 ST 1011 Bike/Pedestrian
Facilities
Covington Rd, Aboite Twnshp
Trail System - W Hamilton Rd
to Beal Taylor Ditch
Fort Wayne .9 Off Federal Aid 100% Local
Funds
CN $0.00 $90,800.00 $90,800.00 Init.
100% Local
Funds
PE $0.00 $37,850.00 $37,850.00
Local
Transportation
Alternatives
PE $151,399.00 $0.00 $151,399.00
Local
Transportation
Alternatives
CN $363,200.00 $0.00 $363,200.00
Indiana Department
of Transportation
0401082 SR 930 Added Travel Lanes From 1.23 mi east of US 27(
Parnell Ave) to 2.18 mi east of
US 27 (Crescent Av).
Fort Wayne .984 NHS Mobility ROW RW $8,800.00 $2,200.00 $11,000.00 Init.
Mobility
Construction
CN $3,551,200.00 $887,800.00 $4,439,000.00
Indiana Department
of Transportation
1297168 SR 930 Bridge Deck
Reconstruction &
Widening
(EB) Bridge over St. Joseph
River, 1.74 Miles East of US 27.
Fort Wayne 0 NHS Mobility
Construction
CN $721,971.20 $180,492.80 $902,464.00 Init.
Indiana Department
of Transportation
1297169 SR 930 Bridge Deck
Reconstruction &
Widening
(WB) Bridge over the St.
Joseph River 1.74 Miles East of
US 27.
Fort Wayne 0 NHS Mobility
Construction
CN $721,971.20 $180,492.80 $902,464.00 Init.
Indiana Department
of Transportation
1382839 SR 930 New Sign Installation 0.9 Miles East of US 27 Fort Wayne 0 NHS 100% Local
Funds
CN $29,040.00 $7,260.00 $36,300.00 A 10
Comments: CN for 2014 amended into 2014-2017 NIRCC TIP, via resolution submitted by Ft. Wayne MPO 11/25/2013.
Indiana Department
of Transportation
0100843 SR 930 Intersect. Improv. W/
Added Turn Lanes
1.1 miles west of I-469; at the
Intersection of Green Street in
New Haven.
Fort Wayne 0 NHS Mobility ROW RW $240,000.00 $60,000.00 $0.00 $300,000.00M 02
Comments: Rw moved from 2014 to 2015, NIRCC modification #14-47, dated 4/22/14
Indiana Department
of Transportation
0100843 SR 930 Intersect. Improv. W/
Added Turn Lanes
1.1 miles west of I-469; at the
Intersection of Green Street in
New Haven.
Fort Wayne 0 NHS Mobility ROW RW $240,000.00 $60,000.00 $300,000.00 Init.
Mobility
Construction
PE $0.00 $0.00 $0.00
Mobility
Construction
CN $2,032,800.00 $508,200.00 $2,471,000.00 $70,000.00
Indiana Department
of Transportation
9904160 US 30 Interchange
Modification
At US 33, 0.66 mile W of I-69 Fort Wayne .434 NHS Safety
Construction
CN $1,874,400.00 $468,600.00 $2,343,000.00 Init.
Safety ROW RW $160,000.00 $40,000.00 $200,000.00
Safety Consulting PE $12,000.00 $3,000.00 $15,000.00
Fort Wayne 0810457 ST 1011 Bike/Pedestrian
Facilities
Six Mile Creek Trail, Ph 1
Southtown Centre to Lemar Dr
Fort Wayne .91 Off Federal Aid Fort Wayne MPO CN $606,435.00 $0.00 $606,435.00 A 12
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 9 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Fort Wayne 0810457 ST 1011 Bike/Pedestrian
Facilities
Six Mile Creek Trail, Ph 1
Southtown Centre to Lemar Dr
Fort Wayne .91 Off Federal Aid 100% Local
Funds
CN $0.00 $151,609.00 $151,609.00 A 12
Comments: Per NIRCC TIP amend. 14-16 Federal MPO TA funds increased significantly. Only increase shown on this amendment. Total Fed is $699,200.
Fort Wayne 0810457 ST 1011 Bike/Pedestrian
Facilities
Six Mile Creek Trail, Ph 1
Southtown Centre to Lemar Dr
Fort Wayne .91 Off Federal Aid Local
Transportation
Alternatives
CN $92,765.00 $0.00 $92,765.00 Init.
100% Local
Funds
CN $0.00 $620,000.00 $620,000.00
Fort Wayne 0710990 ST 1011 Bike/Pedestrian
Facilities
Pufferbelly Trail: State St, to
Fernhill Ave
Fort Wayne 1.5 Off Federal Aid 100% Local
Funds
RW $0.00 $45,000.00 $45,000.00 Init.
100% Local
Funds
PE $0.00 $43,080.00 $43,080.00
Local
Transportation
Alternatives
CN $1,253,646.00 $0.00 $1,253,646.00
Local
Transportation
Alternatives
PE $172,320.00 $0.00 $172,320.00
100% Local
Funds
CN $0.00 $313,412.00 $313,412.00
Local
Transportation
Alternatives
RW $180,000.00 $0.00 $180,000.00
Fort Wayne 0500695 ST 1001 Road Reconstruction
(3R/4R Standards)
Maplecrest Rd from Lake Ave
to State Blvd
Fort Wayne .85 On Federal Aid 100% Local
Funds
CN $0.00 $1,694,163.00 $1,694,163.00M 03
Fort Wayne MPO CN $3,680,000.00 $0.00 $3,680,000.00
Comments: Change FY for CN from 2014 to 2015, NIRCC Modification 14-52.
Fort Wayne 0500695 ST 1001 Road Reconstruction
(3R/4R Standards)
Maplecrest Rd from Lake Ave
to State Blvd
Fort Wayne .85 On Federal Aid Fort Wayne MPO CN $3,680,000.00 $0.00 $3,680,000.00 Init.
100% Local
Funds
CN $0.00 $1,242,000.00 $1,242,000.00
Huntertown 0901973 IR 1001 Road Reconstruction
(3R/4R Standards)
Carroll Rd: from Preserve Blvd
to Bethel Rd
Fort Wayne .52 STP Group IV Program RW $67,200.00 $0.00 $67,200.00 Init.
100% Local
Funds
RW $0.00 $16,800.00 $16,800.00
100% Local
Funds
CN $0.00 $408,256.00 $408,256.00
Group IV Program CN $1,309,984.00 $0.00 $1,309,984.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 10 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Grabill 0901974 IR 1001 Road Reconstruction
(3R/4R Standards)
2nd St: from Country Shoal Ln
to Main St
Fort Wayne .35 On Federal Aid Group IV Program CN $75,000.00 $0.00 $75,000.00A 30
100% Local
Funds
CN $0.00 $18,750.00 $18,750.00
Comments: NIRCC Amendment 14-78
Grabill 0901974 IR 1001 Road Reconstruction
(3R/4R Standards)
2nd St: from Country Shoal Ln
to Main St
Fort Wayne .35 STP Group IV Program CN $667,600.00 $0.00 $667,600.00Init.
Group IV Program RW $68,000.00 $0.00 $68,000.00
100% Local
Funds
RW $0.00 $17,000.00 $17,000.00
100% Local
Funds
CN $0.00 $166,900.00 $166,900.00
Allen County 1005320 ST 1001 Intersection
Improvement,
Roundabout
Till Road at Bethel Rd &
Huguenard Rd
Fort Wayne .2 Off Federal Aid Fort Wayne MPO CN $1,392,000.00 $0.00 $1,392,000.00M 03
100% Local
Funds
CN $0.00 $348,000.00 $348,000.00
Comments: Change FY from 2014 to 2015, Increase in CN of by NIRCC per TIP modification 14-49. New CN Federal (80%) share is $ 1,392,000 ($1,740,000 total CN). Increase of $102,000
Allen County 1005320 ST 1001 Intersection
Improvement,
Roundabout
Till Road at Bethel Rd &
Huguenard Rd
Fort Wayne .2 Off Federal Aid Fort Wayne MPO CN $1,087,800.00 $0.00 $1,087,800.00 Init.
Fort Wayne MPO PE $172,200.00 $0.00 $172,200.00
100% Local
Funds
PE $0.00 $43,050.00 $43,050.00
100% Local
Funds
CN $0.00 $271,950.00 $271,950.00
Indiana Department
of Transportation
1006211 SR 37 Sight Distance
Improvement
At SR 101 Fort Wayne 0 On Federal Aid Safety ROW RW $32,000.00 $8,000.00 $4,000.00 $36,000.00M 02
Safety
Construction
CN $0.00 $0.00 $0.00
Comments: RW funding split to show $4,000 in 2014 & $36,000 in 2015, Cn moved to show in 2015 for in house construction by INDOT. NIRCC modicication 14-48, 4/22/14
Indiana Department
of Transportation
1006211 SR 37 Sight Distance
Improvement
At SR 101 Fort Wayne 0 Safety Safety ROW RW $32,000.00 $8,000.00 $40,000.00 Init.
Safety Consulting PE $20,400.00 $5,100.00 $25,500.00
Safety
Construction
CN $0.00 $0.00 $0.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 11 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1006555 I 469 Added Travel Lanes,
Construct Turn Lanes
Westbound I-469 off-ramp at
Auburn Rd.(RP31.43), 0.6
mi.West of I-69
Fort Wayne 0 Interstate Safety
Construction
CN $270,000.00 $30,000.00 $300,000.00 Init.
Indiana Department
of Transportation
1006146 US 27 Small Structure Pipe
Lining
11.51 Miles North of US 224
(Over Nine Mile Drain)
Fort Wayne 0 NHS Bridge
Construction
CN $41,600.00 $10,400.00 $0.00 $52,000.00$0.00Init.
Indiana Department
of Transportation
0810227 US 30 HMA Overlay,
Preventive
Maintenance
From 8.02 miles W of I-69 (Near
Allen/Whitley Co Line) to I-69.
Fort Wayne 7.828 NHS Road
Construction
CN $0.00 $0.00 $0.00 A 40
Comments: Per NIRCC Resolution 14-149: CN $3,453,000 Total for 2016. New addition to TIP, previously listed in STIP for FY '16.
Indiana Department
of Transportation
0810227 US 30 HMA Overlay,
Preventive
Maintenance
From 8.02 miles W of I-69 (Near
Allen/Whitley Co Line) to I-69.
Fort Wayne 7.828 NHS Road
Construction
CN $2,762,400.00 $690,600.00 $3,453,000.00 Init.
Indiana Department
of Transportation
1006129 SR 1 New Br, Precast Box
Culvert
Small Structure over
Nettlehorst Drain/Ditch, 5.85
Miles East of I-69 (N. Jct).
Fort Wayne .03 BR Bridge
Construction
CN $693,600.00 $173,400.00 $817,000.00 $50,000.00Init.
Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00
Bridge Consulting PE $17,600.00 $4,400.00 $22,000.00
Indiana Department
of Transportation
1006129 SR 1 New Br, Precast Box
Culvert
Small Structure over
Nettlehorst Drain/Ditch, 5.85
Miles East of I-69 (N. Jct).
Fort Wayne .03 On Federal Aid Bridge Consulting PE $7,200.00 $1,800.00 $9,000.00 A 04
Bridge ROW RW $24,000.00 $6,000.00 $15,000.00 $15,000.00
Bridge
Construction
CN $693,600.00 $173,400.00 $817,000.00 $50,000.00
Indiana Department
of Transportation
1006213 I 469 Bridge Deck Overlay 5.51 Miles South of US 24,
(I-469 Over I-69 EBL)
Fort Wayne .01 Interstate Bridge
Construction
CN $852,300.00 $94,700.00 $0.00 $947,000.00 Init.
Bridge Consulting PE $72,000.00 $8,000.00 $80,000.00
Indiana Department
of Transportation
1006214 I 469 Bridge Deck Overlay 5.51 Miles South of US 24,
(I-469 Over I-69 WBL)
Fort Wayne .01 Interstate Bridge
Construction
CN $852,300.00 $94,700.00 $0.00 $947,000.00 Init.
Bridge Consulting PE $72,000.00 $8,000.00 $80,000.00
Indiana Department
of Transportation
1006158 SR 101 Bridge Deck Overlay Bridge Over Brown Ditch
(Adam Schlemmer Baker
Drain), 4.97 Miles South of US
Fort Wayne .08 BR Bridge Consulting PE $56,000.00 $14,000.00 $55,000.00 $15,000.00Init.
Bridge
Construction
CN $311,200.00 $77,800.00 $389,000.00
Indiana Department
of Transportation
1006130 US 24 Small Structure
Replacement
Small Structure Over
Zentsmaster Drain, 2.99 Miles
East of SR 114.
Fort Wayne 0 NHS Bridge ROW RW $16,000.00 $4,000.00 $10,000.00 $10,000.00Init.
Bridge
Construction
CN $872,800.00 $218,200.00 $0.00 $1,091,000.00$0.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 12 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1006130 US 24 Small Structure
Replacement
Small Structure Over
Zentsmaster Drain, 2.99 Miles
East of SR 114.
Fort Wayne 0 NHS Bridge Consulting PE $17,600.00 $4,400.00 $22,000.00 Init.
Indiana Department
of Transportation
1006170 SR 14 Bridge Deck Overlay Bridge Over Beal Taylor Ditch;
8.30 Miles East of SR 9.
Fort Wayne 0 BR Bridge Consulting PE $36,000.00 $9,000.00 $45,000.00Init.
Bridge
Construction
CN $342,400.00 $85,600.00 $428,000.00
Indiana Department
of Transportation
1006172 I 69 Bridge Deck
Replacement &
Widening
Hillegas Road Bridge Over I-69,
0.48 Miles South of US 30.
Fort Wayne 0 Interstate Bridge Consulting PE $72,000.00 $8,000.00 $80,000.00 Init.
Bridge
Construction
CN $828,900.00 $92,100.00 $921,000.00
Indiana Department
of Transportation
1006187 SR 930 Bridge Deck Overlay 5.22 Miles West of I-469, (Over
SR 930 & Washington Blvd.)
Fort Wayne 0 NHS Bridge
Construction
CN $585,600.00 $146,400.00 $732,000.00Init.
Bridge Consulting PE $84,000.00 $21,000.00 $105,000.00
Fort Wayne 1005158 ST 1001 Bike/Pedestrian
Facilities
Engle Rd Trail: Jefferson Blvd
to Towpath Trail
Fort Wayne .64 STP Fort Wayne MPO CN $548,000.00 $0.00 $548,000.00 Init.
100% Local
Funds
CN $0.00 $137,000.00 $137,000.00
New Haven 0710319 ST 1012 Road Reconstruction
(3R/4R Standards)
Landin Rd: from North River Rd
to Maysville Rd
Fort Wayne 1.92 On Federal Aid Fort Wayne MPO CN $292,800.00 $0.00 $292,800.00 M 02
100% Local
Funds
CN $0.00 $73,200.00 $73,200.00
Comments: Increase in Federal for CN per NIRCC modification 14-39. Increase only shown here.
New Haven 0710319 ST 1012 Road Reconstruction
(3R/4R Standards)
Landin Rd: from North River Rd
to Maysville Rd
Fort Wayne 1.92 On Federal Aid 100% Local
Funds
CN $0.00 $1,292,200.00 $1,292,200.00M 03
Fort Wayne MPO CN $5,168,800.00 $0.00 $5,168,800.00
Comments: Change FY for CN from 2014 to 2015, NIRCC TIP Modification 14-51.
New Haven 0710319 ST 1012 Road Reconstruction
(3R/4R Standards)
Landin Rd: from North River Rd
to Maysville Rd
Fort Wayne 1.92 On Federal Aid Fort Wayne MPO CN $4,876,000.00 $0.00 $4,876,000.00Init.
100% Local
Funds
CN $0.00 $1,219,000.00 $1,219,000.00
Fort Wayne 0901798 ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR
3) to Coldwater Rd
Fort Wayne 1.8 On Federal Aid 100% Local
Funds
RW $0.00 $200,000.00 $200,000.00A 14
Fort Wayne MPO RW $800,000.00 $0.00 $800,000.00
Comments: RW Phase in 14-17 NIRCC TIP for FY 14
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 13 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Fort Wayne 0901798 ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR
3) to Coldwater Rd
Fort Wayne 1.8 On Federal Aid 100% Local
Funds
RW $0.00 $200,000.00 $200,000.00M 03
Fort Wayne MPO RW $800,000.00 $0.00 $800,000.00
Comments: Change FY for RW from 2014 to 2015, NIRCC Modification 14-50.
Fort Wayne 0901798 ST 1001 Added Travel Lanes Dupont Rd: from Lima Rd (SR
3) to Coldwater Rd
Fort Wayne 1.8 On Federal Aid 100% Local
Funds
CN $0.00 $2,000,000.00 $2,000,000.00Init.
Fort Wayne MPO CN $8,000,000.00 $0.00 $8,000,000.00
Indiana Department
of Transportation
1296460 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek
(NBL), 6.68 Miles North of US
224.
Fort Wayne 0 Interstate Bridge Consulting PE $0.00 $0.00 $0.00 $0.00A 30
Bridge
Construction
CN $482,850.00 $53,650.00 $536,500.00
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2017 via resolution #14-96 on 9/2/2014, for $536,500.
Indiana Department
of Transportation
1296460 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek
(NBL), 6.68 Miles North of US
224.
Fort Wayne 0 Interstate Bridge Consulting PE $40,500.00 $4,500.00 $45,000.00 Init.
Bridge
Construction
CN $0.00 $0.00 $0.00 $0.00
Indiana Department
of Transportation
1296462 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek
(SBL), 6.68 Miles North of US
224.
Fort Wayne 0 Interstate District Other
Consulting
PE $0.00 $0.00 $0.00 A 30
Bridge
Construction
CN $482,850.00 $53,650.00 $536,500.00
Bridge Consulting PE $211,050.00 $23,450.00 $234,500.00 $0.00
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2017 via resolution #14-96 on 9/2/2014, for $536,500.
Indiana Department
of Transportation
1296462 I 69 Bridge Deck Overlay Bridge Over Eight Mile Creek
(SBL), 6.68 Miles North of US
224.
Fort Wayne 0 Interstate Bridge Consulting PE $40,500.00 $4,500.00 $45,000.00 Init.
Bridge
Construction
CN $0.00 $0.00 $0.00 $0.00
Indiana Department
of Transportation
1400375 US 33 Bridge Maintenance
And Repair
Bridge Over Eel River, 3.30
Miles South of SR 205.
Fort Wayne 0 NHS Bridge
Construction
CN $24,640.00 $6,160.00 $30,800.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $30,800.
Indiana Department
of Transportation
1296471 SR 101 HMA Overlay,
Preventive
Maintenance
From 0.18 Mi. N. of US 24 to
8.49 Mi. N. of US 24
Fort Wayne 8.391 On Federal Aid Road
Construction
CN $0.00 $0.00 $1,413,000.00 ($1,413,000.00) A 40
Comments: Per NIRCC Resolution 14-152: CN $1,413,000 Total for 2016. New addition to TIP, previously listed in STIP in FY ?17.
Indiana Department
of Transportation
1296471 SR 101 HMA Overlay,
Preventive
Maintenance
From 0.18 Mi. N. of US 24 to
8.49 Mi. N. of US 24
Fort Wayne 8.391 STP Road
Construction
CN $1,130,400.00 $282,600.00 $0.00 $1,413,000.00 Init.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 14 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1296277 SR 930 Bridge Deck Overlay Bridge Over N & S Railroad,
WBL, 5.07 Miles West of I-469
Fort Wayne 0 NHS Bridge
Construction
PE $9,600.00 $2,400.00 $12,000.00A 35
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for RR PE phase in 2015 via resolution #14- 109 on 1/13/2015, for $15,000.
Indiana Department
of Transportation
1296277 SR 930 Bridge Deck Overlay Bridge Over N & S Railroad,
WBL, 5.07 Miles West of I-469
Fort Wayne 0 NHS Bridge Consulting PE $64,000.00 $16,000.00 $80,000.00 Init.
Bridge
Construction
CN $547,200.00 $136,800.00 $684,000.00
Indiana Department
of Transportation
1296929 I 69 Interchange
Modification
NB lanes at US 30 Interchange
Weave Area.
Fort Wayne .307 Interstate Mobility Consulting PE $2,250.00 $250.00 $2,500.00A 40
Mobility
Construction
CN $0.00 $0.00 $0.00
Comments: Additional Information: FY 16 CN previously listed in STIP for FY?16 but new to the TIP. FY2015 PE is New to the TIP and STIP.
Indiana Department
of Transportation
1296929 I 69 Interchange
Modification
NB lanes at US 30 Interchange
Weave Area.
Fort Wayne .307 Interstate Mobility
Construction
CN $144,900.00 $16,100.00 $161,000.00 Init.
Indiana Department
of Transportation
1296931 I 69 Interchange
Modification
SB Lanes at US 30 Interchange
Weave Area.
Fort Wayne .311 Interstate Mobility Consulting PE $2,250.00 $250.00 $2,500.00A 40
Mobility
Construction
CN $0.00 $0.00 $0.00
Comments: Please amend FY 2015 PE phase ($2.5K), NIRCC Resolution # 14-121 and FY 2016 CN phase ($161K), NIRCC Resolution # 14-121 dated 04/09/2015, into Current 2014-2017 STIP. NOTE:
FY 16 CN previously listed in STIP for FY?16 but is new to the NIRCC TIP. FY2015 PE is New to the TIP and STIP.
Indiana Department
of Transportation
1296931 I 69 Interchange
Modification
SB Lanes at US 30 Interchange
Weave Area.
Fort Wayne .311 Interstate Mobility
Construction
CN $144,900.00 $16,100.00 $161,000.00 Init.
Indiana Department
of Transportation
1296053 I 69 Small Structure Pipe
Lining
Pipeliner for Brandt Ditch, 0.22
Miles South of I-469 South Jct.
Fort Wayne 0 Interstate Bridge
Construction
CN $77,400.00 $8,600.00 $86,000.00 A 14
Comments: CN phase amended into the FY 14- 17 NIRCC MPO TIP for FY 16, via resolution dated 2-4-14.
Indiana Department
of Transportation
1296335 I 69 HMA Overlay,
Preventive
Maintenance
From 0.64 Mi. S. of I-469 to
4.20 Mi. N. of I-469, Yohne Rd
bridge.
Fort Wayne 4.828 Interstate Road
Construction
CN $2,241,900.00 $249,100.00 $2,491,000.00 Init.
Indiana Department
of Transportation
1296933 I 69 Interchange
Modification
SB at the I-469 S Jct. Weave
Area.
Fort Wayne .313 Interstate Mobility
Construction
CN $144,900.00 $16,100.00 $161,000.00 A 14
Comments: CN phase amended into the FY 14- 17 NIRCC MPO TIP for FY 16, via resolution dated 2-4-14.
Indiana Department
of Transportation
1296933 I 69 Interchange
Modification
SB at the I-469 S Jct. Weave
Area.
Fort Wayne .313 Interstate Mobility Consulting PE $2,250.00 $250.00 $2,500.00A 40
Comments: Please amend FY 2015 PE phase ($2.5K), NIRCC Resolution # 14-122 dated 04/09/2015, into Current 2014-2017 STIP.
The project information shows this to be at the South Junction of I-69 at I-469. This is a cross road.
I-69, I-469, SB at the I-469 S Jct. Weave Area.
Indiana Department
of Transportation
1296407 US 27 HMA Overlay,
Preventive
Maintenance
From 7.83 Mi. N. of US 224
N.Jct to 17.67 Mi. N. of N. Jct
US 224,(Paulding Rd)
Fort Wayne 9.816 NHS Road
Construction
CN $0.00 $0.00 $0.00 A 40
Comments: Per NIRCC Resolution 14-151: CN $4,813,000 Total for 2016. New addition to TIP, previously listed in STIP in FY ?16.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 15 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1296407 US 27 HMA Overlay,
Preventive
Maintenance
From 7.83 Mi. N. of US 224
N.Jct to 17.67 Mi. N. of N. Jct
US 224,(Paulding Rd)
Fort Wayne 9.816 NHS Road
Construction
CN $3,850,400.00 $962,600.00 $4,813,000.00 Init.
Indiana Department
of Transportation
1173904 I 469 Small Structure Pipe
Lining
Pipeliner for Ditch at Minnich
Road Interchange (SWL), 1.94
Miles South of US 30
Fort Wayne 0 Interstate Bridge
Construction
CN $97,200.00 $10,800.00 $108,000.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-88 on 9/2/2014, for $108,000.
Indiana Department
of Transportation
1173908 I 469 Small Structure Pipe
Lining
Pipeliner for Drain, 1.29 Miles
East of US 27
Fort Wayne 0 Interstate Bridge
Construction
CN $87,300.00 $9,700.00 $97,000.00 Init.
Indiana Department
of Transportation
1173909 I 469 Small Structure Pipe
Lining
Pipeliner for Drain at Tillman
Road Interchange SWR, 3.80
Miles South of US 30.
Fort Wayne 0 Interstate Bridge
Construction
CN $63,000.00 $7,000.00 $70,000.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-90 on 9/2/2014, for $70,000.
Indiana Department
of Transportation
1173910 I 469 Small Structure Pipe
Lining
Pipeliner for Ditch at Tillman
Road Interchange SER, 3.80
Miles South of US 30.
Fort Wayne 0 Interstate Bridge
Construction
CN $63,000.00 $7,000.00 $70,000.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-90 on 9/2/2014, for $70,000.
Indiana Department
of Transportation
1296054 I 69 Small Structure Pipe
Lining
Pipeliner for Branch of
Robinson Ditch, 3.50 Miles
North of I-469 South Jct.
Fort Wayne 0 Interstate Bridge
Construction
CN $97,200.00 $10,800.00 $108,000.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-91 on 9/2/2014, for $108,000.
Indiana Department
of Transportation
1296072 US 30 Small Structure Pipe
Lining
Pipeliner for Ditch, 0.05 Miles
West of I-69.
Fort Wayne 0 NHS Bridge
Construction
CN $68,800.00 $17,200.00 $86,000.00 Init.
Indiana Department
of Transportation
1172175 US 27 Traffic Signals
Modernization
Between 6.31 Mi. S. of SR 930
(PauldingRd) to 1.01 Mi. S.of
SR 930 (Edgewood D
Fort Wayne 5.268 NHS Safety
Construction
CN $1,252,000.00 $313,000.00 $1,565,000.00 A 14
Comments: CN phase amended into the FY 14- 17 NIRCC MPO TIP for FY 16, via resolution dated 2-4-14.
Indiana Department
of Transportation
1172175 US 27 Traffic Signals
Modernization
Between 6.31 Mi. S. of SR 930
(PauldingRd) to 1.01 Mi. S.of
SR 930 (Edgewood D
Fort Wayne 5.268 NHS Safety
Construction
CN $1,256,960.00 $314,240.00 $1,571,200.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2017 via resolution #14-95 on 9/2/2014, for $1,571,200.
Indiana Department
of Transportation
1296321 US 27 HMA Overlay,
Preventive
Maintenance
From 6.31 Mi. S. of SR 930
(Paulding Rd) to 1.01 Mi. S. of
SR 930 (Edgewood Dr)
Fort Wayne 5.268 NHS Road Consulting PE $816,000.00 $204,000.00 $700,000.00 $320,000.00A 10
Comments: PE for 2014 & 2015 amended into NIRCC 2014-2017 TIP, via amendment submitted by FT. Wayne MPO on 11/25/2013
Indiana Department
of Transportation
1296321 US 27 HMA Overlay,
Preventive
Maintenance
From 6.31 Mi. S. of SR 930
(Paulding Rd) to 1.01 Mi. S. of
SR 930 (Edgewood Dr)
Fort Wayne 5.268 NHS Road
Construction
CN $4,142,160.00 $1,035,540.00 $5,177,700.00 A 30
Road ROW RW $96,000.00 $24,000.00 $100,000.00 $20,000.00
Road Consulting PE $542,244.00 $135,561.00 $455,000.00 $120,000.00 $102,805.00
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for PE in 2015 @ $200,000, RW in 2016 @ $120,000, CN in 2017 @ $5,177,700 via resolution #14-94 on 9/2/2014.
Indiana Department
of Transportation
1296321 US 27 HMA Overlay,
Preventive
Maintenance
From 6.31 Mi. S. of SR 930
(Paulding Rd) to 1.01 Mi. S. of
SR 930 (Edgewood Dr)
Fort Wayne 5.268 NHS Road
Construction
CN $2,315,200.00 $578,800.00 $2,894,000.00 Init.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 16 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1296586 VA
VARI
Auxiliary Lane
Construction
I-69 NB off Ramp at the I-469 N
Jct
Fort Wayne .5 Interstate District Other
Consulting
PE $18,000.00 $2,000.00 $20,000.00 A 16
Comments: PE phase amended into NIRCC TIP #14-30 for the 2014-2017 TIP.
Indiana Department
of Transportation
1296586 VA
VARI
Auxiliary Lane
Construction
I-69 NB off Ramp at the I-469 N
Jct
Fort Wayne .5 Interstate Mobility
Construction
CN $468,000.00 $52,000.00 $520,000.00Init.
Indiana Department
of Transportation
1297327 I 469 Repair PCCP & HMA
Overlay
From 0.54 Mi. E. of I-69 S. Jct.
to 0.63 Mi. N. of US 24.
Fort Wayne 20.949 Interstate District Other
Construction
CN $234,000.00 $26,000.00 $260,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-25
Indiana Department
of Transportation
1296911 SR 930 Intersect. Improv. W/
Added Turn Lanes
0.77 M.E. of US 27(at
Coldwater Rd), Add Right Turn
Lanes on N,E, & W approaches
Fort Wayne .199 NHS Mobility Consulting PE -$8,000.00 -$2,000.00 ($30,000.00) $20,000.00 $0.00A 41 $2,928,000.00
Comments: IN MPO
Please amend FY 2016 PE phase for $20K into Current 14-17 STIP, NIRCC Resolution # 14-155 dated 05/12/2015.
Indiana Department
of Transportation
1296911 SR 930 Intersect. Improv. W/
Added Turn Lanes
0.77 M.E. of US 27(at
Coldwater Rd), Add Right Turn
Lanes on N,E, & W approaches
Fort Wayne .199 NHS Mobility
Construction
CN $1,742,400.00 $435,600.00 $400,000.00 $1,778,000.00 Init.
Mobility ROW RW $600,000.00 $150,000.00 $750,000.00
Mobility Consulting PE $24,000.00 $6,000.00 $30,000.00
Indiana Department
of Transportation
0901185 I 469 Bridge Deck Overlay EB Bridge over Houk Ditch,
2.19 mi E of US 27/US 33
interchange.
Fort Wayne 0 Interstate Bridge
Construction
CN $171,000.00 $19,000.00 $0.00 $190,000.00 Init.
Indiana Department
of Transportation
0901186 I 469 Bridge Deck Overlay WB Bridge over Houk Ditch,
2.19 mi E of US 27/US 33
interchange.
Fort Wayne 0 Interstate Bridge
Construction
CN $171,000.00 $19,000.00 $0.00 $190,000.00 Init.
Indiana Department
of Transportation
1296429 I 469 Pavement
Replacement
From 0.85 Mi. E. of US 27 to
3.14 Mi. S. of US 30 (Tillman
Rd).
Fort Wayne 3.886 Interstate Road Consulting PE $2,340,000.00 $260,000.00 $20,000.00 $1,080,000.00 $1,500,000.00Init.
Road
Construction
CN $31,149,000.00 $3,461,000.00 $34,610,000.00
Indiana Department
of Transportation
1401085 I 469 Bridge Thin Deck
Overlay
Bridge Over CFE Railroad EBL,
3.81 Miles West of US 30
Fort Wayne .01 Interstate Road
Construction
CN $160,920.00 $17,880.00 $178,800.00 A 41 $178,000.00
Comments: IN MPO
Please amend FY 2017 CN phase for $178.8K into Current 14-17 STIP, NIRCC Resolution # 14-156 dated 04/09/2015.
Indiana Department
of Transportation
1401086 I 469 Bridge Thin Deck
Overlay
Bridge Over CFE Railroad WBL,
3.81 Miles West of US 30
Fort Wayne .01 Interstate Road
Construction
CN $147,420.00 $16,380.00 $163,800.00 A 41 $163,800.00
Comments: IN MPO
Please amend FY 2016 CN phase for $163.8K into Current 14-17 STIP, NIRCC Resolution # 14-157 dated 04/09/2015.
Indiana Department
of Transportation
1297641 I 469 Concrete Pavement
Restoration (CPR)
From 0.54 Miles East of I-69 to
8.82 Miles East of I-69
Fort Wayne 7.948 Interstate Road
Construction
CN $1,180,800.00 $131,200.00 $0.00 $1,312,000.00$0.00Init.
Indiana Department
of Transportation
1297804 I 469 Bridge Rehab-Pipe
Lining
Bridge on I-469 Over Rock
Ditch, 1.31 Miles East of US 27
Fort Wayne 0 Interstate Bridge
Construction
CN $90,000.00 $10,000.00 $100,000.00 Init.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 17 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Allen County 1297753 IR 1001 Guard Rail
Attenuators, New Or
Modernize
Bridge Guardrail Treatments at
various locations in Allen Co
Fort Wayne 0 Multiple Fort Wayne MPO PE $93,150.00 $0.00 $93,150.00 Init.
100% Local
Funds
PE $0.00 $10,350.00 $10,350.00
Fort Wayne MPO CN $277,200.00 $0.00 $277,200.00
100% Local
Funds
CN $0.00 $30,800.00 $30,800.00
Indiana Department
of Transportation
1297934 SR 14 HMA Overlay,
Preventive
Maintenance
From 0.24 Mi. W. of I-69
(Hadley Rd) to 0.26 Mi. E. of
I-69 ( Magnavox Way).
Fort Wayne .415 STP District Other
Construction
CN $200,000.00 $50,000.00 $250,000.00 Init.
Indiana State
Agencies
1173219 ST 1011 Bike/Pedestrian
Facilities
IPFW Pedestrian Bridge over
Coliseum Blvd
Fort Wayne .2 Off Federal Aid Local
Transportation
Alternatives
CN $3,312,000.00 $0.00 $3,312,000.00 A 18
100% Local
Funds
CN $0.00 $828,000.00 $828,000.00
Comments: NIRCC Amendment 14-27
Fort Wayne 1173162 ST 1001 Road Reconstruction
(3R/4R Standards)
Maplecrest Rd: from State Blve
to Stellhorn Rd
Fort Wayne 1.4 On Federal Aid 100% Local
Funds
PE $0.00 $74,000.00 $74,000.00 M 02 $8,000,000.00
Fort Wayne MPO PE $296,000.00 $0.00 $296,000.00
Comments: Increase in PE per NIRCC Modification 14-38. Increase only shown here.
Fort Wayne 1173162 ST 1001 Road Reconstruction
(3R/4R Standards)
Maplecrest Rd: from State Blve
to Stellhorn Rd
Fort Wayne 1.4 On Federal Aid Fort Wayne MPO RW $400,000.00 $0.00 $400,000.00 Init.
Fort Wayne MPO PE $600,000.00 $0.00 $600,000.00
100% Local
Funds
RW $0.00 $100,000.00 $100,000.00
100% Local
Funds
PE $0.00 $1,150,000.00 $150,000.00 $1,000,000.00
Allen County 1297238 IR 1001 Other Intersection
Improvement
Liberty Mills Rd/CR 900N @
County Line Rd Intersection
Fort Wayne 0 On Federal Aid Fort Wayne MPO PE $160,000.00 $0.00 $160,000.00 Init.
100% Local
Funds
RW $0.00 $41,300.00 $41,300.00
100% Local
Funds
PE $0.00 $40,000.00 $40,000.00
Fort Wayne MPO RW $165,000.00 $0.00 $165,000.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 18 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1382161 I 469 Debris Removal From
Channel
Bridge Over St. Marys River,
0.45 Miles West of US 27.
Fort Wayne .01 Interstate Bridge
Construction
CN $9,000.00 $1,000.00 $10,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-21
Indiana Department
of Transportation
1382169 I 469 Bridge Thin Deck
Overlay
Bridge Over North River Road
NBL, 0.64 Miles North of US 24.
Fort Wayne .01 Interstate Bridge
Construction
CN $72,000.00 $8,000.00 $80,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-18
Indiana Department
of Transportation
1382170 I 469 Bridge Thin Deck
Overlay
Bridge Over North River Road
SBL, 0.64 Miles North of US 24.
Fort Wayne .01 Interstate Bridge
Construction
CN $72,000.00 $8,000.00 $80,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-18
Indiana Department
of Transportation
1382171 I 469 Bridge Maintenance
And Repair
Bridge Over Wheelock Road
EBL, 1.92 Miles West of SR 37.
Fort Wayne .01 Interstate Bridge
Construction
CN $18,000.00 $2,000.00 $20,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-19
Indiana Department
of Transportation
1382172 I 469 Bridge Maintenance
And Repair
Bridge Over Wheelock Road
WBL, 1.92 Miles West of SR
37.
Fort Wayne .01 Interstate Bridge
Construction
CN $18,000.00 $2,000.00 $20,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-19
Indiana Department
of Transportation
1382173 I 469 Bridge Maintenance
And Repair
Bridge Over St. Joe Road WBL,
4.33 Miles West of SR-37.
Fort Wayne .01 Interstate Bridge
Construction
CN $13,500.00 $1,500.00 $15,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-20
Indiana Department
of Natural
Resources
1005570 ST 1011 Other Type Project
(Miscellaneous)
Pufferbelly Trail North Fort Wayne 0 On Federal Aid 100% Local
Funds
PE $0.00 $14,855.00 $14,855.00 Init.
Recreational
Trails Program
CN $141,000.00 $0.00 $141,000.00
Recreational
Trails Program
RW $31,500.00 $0.00 $31,500.00
Indiana Department
of Transportation
0710276 ST 1001 Single Location Bridge
Inspection
IUPUFW-Cressent Avenue
Bridge Inspection
Fort Wayne 0 Off Federal Aid Bridge Consulting PE $120,000.00 $30,000.00 $75,000.00$75,000.00Init.
Bridge
Construction
CN $0.00 $0.00 $0.00
Indiana Department
of Transportation
1297574 ST 1001 Railroad Protection at Nuttman Avenue at NS in
Fort Wayne
Fort Wayne 0 Off Federal Aid Local Safety
Program - 130
CN $25,000.00 $0.00 ($280,000.00) $305,000.00 M 12
Comments: CN funding moving from FY 2014 to FY 2016. CN for FY 2014 was $280,000.00 and is being increased to $305,000.00 for CN in FY 2016. NIRCC TIP amendment # 14-28.
Indiana Department
of Transportation
1297574 ST 1001 Railroad Protection at Nuttman Avenue at NS in
Fort Wayne
Fort Wayne 0 Off Federal Aid Local Safety
Program
CN $280,000.00 $0.00 $280,000.00 Init.
Indiana Department
of Transportation
1297575 ST 1001 Railroad Protection Covington Avenue at NS RR in
Fort Wayne
Fort Wayne 0 Off Federal Aid Local Safety
Program - 130
CN $60,000.00 $0.00 ($280,000.00) $340,000.00 M 12
Comments: CN funding moving from FY 2014 to FY 2016. CN for FY 2014 was $280,000.00 and is being increased to $340,000.00 for CN in FY 2016. NIRCC TIP amendment # 14-29.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 19 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1297575 ST 1001 Railroad Protection Covington Avenue at NS RR in
Fort Wayne
Fort Wayne 0 Off Federal Aid Local Safety
Program
CN $280,000.00 $0.00 $280,000.00 Init.
Allen County 1382497 ST 1027 Bridge Deck
Reconstruction
Bridge 95 on Washington Cntr
Rd over Spy Run Creek
Fort Wayne .1 On Federal Aid 100% Local
Funds
PE $0.00 $37,500.00 $37,500.00M 03
Fort Wayne MPO PE $150,000.00 $0.00 $150,000.00
Comments: Change FY for PE from 2014 to 2015, NIRCC Modification 14-54.
Allen County 1382497 ST 1027 Bridge Deck
Reconstruction
Bridge 95 on Washington Cntr
Rd over Spy Run Creek
Fort Wayne .1 On Federal Aid Fort Wayne MPO PE $26,800.00 $0.00 $26,800.00M 08
100% Local
Funds
PE $0.00 $6,700.00 $6,700.00
Comments: NIRCC resolution 14-62: Modifying PE. Increase Federal from $150,000 to $176,800. $26,800 federal, ($33,500 Total) added in this modification.
Allen County 1382497 ST 1027 Bridge Deck
Reconstruction
Bridge 95 on Washington Cntr
Rd over Spy Run Creek
Fort Wayne .1 On Federal Aid 100% Local
Funds
PE $0.00 $37,500.00 $37,500.00 Init.
Fort Wayne MPO RW $100,000.00 $0.00 $100,000.00
100% Local
Funds
RW $0.00 $25,000.00 $25,000.00
Fort Wayne MPO PE $150,000.00 $0.00 $150,000.00
Allen County 1382100 IR 1022 Bridge Inspections Inspection and reinspection of
county bridges 20 feet and
longer
Fort Wayne 0 Multiple 100% Local
Funds
PE $0.00 $116,000.00 $58,000.00 $58,000.00 A 04
Local Bridge
Program
PE $464,000.00 $0.00 $232,000.00 $232,000.00
Allen County 0902238 ST 1001 Intersection
Improvement,
Roundabout
Intersection of Bass Road and
Hadley Road
Fort Wayne .1 On Federal Aid Fort Wayne MPO CN $2,428,000.00 $0.00 $2,428,000.00 Init.
100% Local
Funds
PE $0.00 $60,000.00 $60,000.00
Fort Wayne MPO PE $240,000.00 $0.00 $240,000.00
100% Local
Funds
CN $0.00 $607,000.00 $607,000.00
Allen County 1382493 IR 1025 Road Reconstruction
(3R/4R Standards)
Bass Rd: from Shakespeare
Blvd to Clifty Parkway
Fort Wayne .95 On Federal Aid Fort Wayne MPO CN $4,915,600.00 $0.00 $4,915,600.00 Init.
100% Local
Funds
CN $0.00 $1,228,900.00 $1,228,900.00
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 20 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Allen County 1382493 IR 1025 Road Reconstruction
(3R/4R Standards)
Bass Rd: from Shakespeare
Blvd to Clifty Parkway
Fort Wayne .95 On Federal Aid Fort Wayne MPO RW $446,600.00 $0.00 $446,600.00 Init.
100% Local
Funds
RW $0.00 $111,650.00 $111,650.00
Allen County 1382492 IR 1025 Road Reconstruction
(3R/4R Standards)
Bass Rd: from Clifty Parkway
to Thomas Rd
Fort Wayne .7 On Federal Aid 100% Local
Funds
RW $0.00 $112,500.00 $112,500.00 Init.
Fort Wayne MPO RW $450,000.00 $0.00 $450,000.00
Fort Wayne 0400587 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Cass
Street
Fort Wayne .16 On Federal Aid 100% Local
Funds
RW $0.00 $460,000.00 $460,000.00M 02
Fort Wayne MPO RW $1,840,000.00 $0.00 $1,840,000.00
Comments: Change in Fiscal Year. NIRCC TIP Modification 14-46: FY ?14 to ?15
Fort Wayne 0400587 ST 1001 Added Travel Lanes State Blvd ? Spy Run to Cass
Street
Fort Wayne .16 On Federal Aid 100% Local
Funds
RW $0.00 $460,000.00 $460,000.00 Init.
Fort Wayne MPO RW $1,840,000.00 $0.00 $1,840,000.00
Allen County 1382818 IR 1001 Intersection
Improvement,
Roundabout
Minnich Rd and Tillman Rd
Intersection
Fort Wayne .25 On Federal Aid Fort Wayne MPO PE $281,300.00 $0.00 $281,300.00M 03
100% Local
Funds
PE $0.00 $31,300.00 $31,300.00
Comments: Change FY for PE from 2014 to 2015, NIRCC Modification 14-53.
Allen County 1382818 IR 1001 Intersection
Improvement,
Roundabout
Minnich Rd and Tillman Rd
Intersection
Fort Wayne .25 On Federal Aid 100% Local
Funds
RW $0.00 $17,000.00 $17,000.00A 04
Fort Wayne MPO CN $1,381,500.00 $0.00 $1,381,500.00
Fort Wayne MPO RW $153,000.00 $0.00 $153,000.00
100% Local
Funds
CN $0.00 $153,500.00 $153,500.00
Fort Wayne MPO PE $238,500.00 $0.00 $238,500.00
100% Local
Funds
PE $0.00 $26,500.00 $26,500.00
Indiana Department
of Transportation
1383079 SR 101 HMA Overlay,
Preventive
Maintenance
From 2.40 Miles South of US 24
to 0.25 Miles South of US 24.
Fort Wayne 2.092 On Federal Aid District Other
Construction
CN $440,000.00 $110,000.00 $550,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-23
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 21 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1383251 SR 37 HMA Overlay,
Preventive
Maintenance
From 0.17 Miles West to 1.13
Miles East of I-469.
Fort Wayne 1.148 On Federal Aid District Other
Construction
CN $320,000.00 $80,000.00 $400,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-24
Indiana Department
of Transportation
1383411 SR 930 Bridge Deck
Replacement
SR 930 Bridge Over NS RR
(HUNTINGTON), 4.38 Miles W
I-469
Fort Wayne 0 NHS Bridge
Construction
CN $2,277,600.00 $569,400.00 $2,847,000.00A 12
Comments: Amended into NIRCC TIP for CN in 2015 via UTAB on 1-7-2014, via resolution 14-22
Indiana Department
of Transportation
1400362 I 469 Bridge Maintenance
And Repair
Bridge Over US 24 SBL, 1.35
Miles North of US 30.
Fort Wayne 0 Interstate Bridge
Construction
CN $8,640.00 $960.00 $9,600.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $9,600.
Indiana Department
of Transportation
1400363 I 469 Bridge Maintenance
And Repair
Bridge Over Maumee River
NBL, 0.47 Miles North of US 24
Fort Wayne 0 Interstate Bridge
Construction
CN $9,090.00 $1,010.00 $10,100.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $10,100.
Indiana Department
of Transportation
1400364 I 469 Bridge Maintenance
And Repair
Bridge Over Maumee River
SBL, 0.47 Miles North of US 24.
Fort Wayne 0 Interstate Bridge
Construction
CN $7,650.00 $850.00 $8,500.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $8,500.
Indiana Department
of Transportation
1400366 I 469 Bridge Maintenance
And Repair
Bridge Over N & S Railroad
NBL, 0.50 Miles South of SR
37.
Fort Wayne 0 Interstate Bridge
Construction
CN $8,595.00 $955.00 $9,550.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $9,550.
Indiana Department
of Transportation
1400367 I 469 Bridge Maintenance
And Repair
Bridge Over N & S Railroad
SBL, 0.50 Miles South of SR
37.
Fort Wayne 0 Interstate Bridge
Construction
CN $9,540.00 $1,060.00 $10,600.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $10,600.
Indiana Department
of Transportation
1400368 SR 3 Bridge Maintenance
And Repair
Bridge Over Willow Creek Ditch
SBL, 4.19 Miles South of SR
205.
Fort Wayne 0 NHS Bridge
Construction
CN $18,240.00 $4,560.00 $22,800.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $22,800.
Indiana Department
of Transportation
1400369 SR 3 Bridge Maintenance
And Repair
Bridge Over Willow Creek Ditch
NBL, 4.19 Miles South of SR
205.
Fort Wayne 0 NHS Bridge
Construction
CN $24,640.00 $6,160.00 $30,800.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $30,800.
Indiana Department
of Transportation
1400378 SR 930 Bridge Maintenance
And Repair
Bridge Over N & S R/R, 4.38
Miles West of I-469.
Fort Wayne 0 NHS Bridge
Construction
CN $16,960.00 $4,240.00 $21,200.00 A 28
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via UTAB resolution dated 8/5/2014, for $21,200.
Indiana Department
of Transportation
1400383 I 469 Bridge Maintenance
And Repair
Bridge Over Lafayette Center
Rd EBL, 0.94 Miles East of I-69.
Fort Wayne 0 Interstate Bridge
Construction
CN $4,320.00 $480.00 $4,800.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP forCN phase in 2016 via resolution #14-82 on 9/2/2014, for $4,800.
Indiana Department
of Transportation
1400384 I 469 Bridge Maintenance
And Repair
Bridge Over Lafayette Center
Rd WBL, 0.94 Miles East of
I-69.
Fort Wayne 0 Interstate Bridge
Construction
CN $4,815.00 $535.00 $5,350.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-82 on 9/2/2014, for $5,400.
*Estimated Costs left to Complete Project column is for costs that may extend beyond the four years of a STIP. This column is not
fiscally constrained and is for information purposes.
Page 22 of 828 Report Created:6/30/2015 3:35:29PM
State Preservation and Local Initiated Projects FY 2014 - 2017
Indiana Department of Transportation (INDOT)
SPONSOR DES ROUTE WORK TYPE LOCATION DISTRICT MILES FEDERAL
CATEGORY
PROGRAM PHASE FEDERAL MATCHEstimated
Cost left to
Complete
Project*
2014 2015 2016 2017STIP
NAME
Indiana Department
of Transportation
1400424 US 24 Bridge Maintenance
And Repair
Bridge Over Aboite Creek WBL,
4.11 Miles West of I-69.
Fort Wayne 0 NHS Bridge
Construction
CN $7,920.00 $1,980.00 $9,900.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-83 on 9/2/2014, for $9,900.
Indiana Department
of Transportation
1400445 I 69 Bridge Maintenance
And Repair
Bridge On Yoder Road Over
I-69, 7.75 Miles North of US
224.
Fort Wayne 0 Interstate Bridge
Construction
CN $6,255.00 $695.00 $6,950.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-84 on 9/2/2014, for $7,000.
Indiana Department
of Transportation
1400446 I 69 Bridge Maintenance
And Repair
Bridge Over Robinson Creek
NBL, 1.69 Miles South of US
24.
Fort Wayne 0 Interstate Bridge
Construction
CN $8,145.00 $905.00 $9,050.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-85 on 9/2/2014, for $9,100.
Indiana Department
of Transportation
1400447 I 69 Bridge Maintenance
And Repair
Bridge Over Robinson Creek
SBL, 1.69 Miles South of US
24.
Fort Wayne 0 Interstate Bridge
Construction
CN $8,145.00 $905.00 $9,050.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-85 on 9/2/2014, for $9,100.
Indiana Department
of Transportation
1400448 I 69 Bridge Maintenance
And Repair
Bridge Over N&S RR SBL, 0.80
Miles South of US 24.
Fort Wayne 0 Interstate Bridge
Construction
CN $7,650.00 $850.00 $8,500.00 A 30
Comments: Amended into the FY 2014-2017 NIRCC MPO TIP for CN phase in 2016 via resolution #14-86 on 9/2/2014, for $8,500.
Indiana Department
of Transportation
1400449 I 69 Bridge Maintenance
And Repair
Bridge Over Hadley