17
' il] iii ETRA H{fiR GOVERNMENT OF INDIA qqtqrur,Tr(rziffiraryqMat'Trilq i.:;,r';..'',;-., MlNlsrRY oF ENVIRoNMENT, FoREsrs & CLIMATE CHANGE *i*lr* Regional office (South Eastern Zone), 1" & 2nd froor, HEpc Buirding, No.34, cathedrar Garden Road, Nungambakkam, Chennai _ 600034 F.No. Ept12.lt 20r0-tU49tAo/ut, t To, 10.02.2017 G.V.A. Rama Raju Chief Executive Officer (CEO) S.No. 162 & 153, A.D.B. Rcad Peddapuram-533431 . East Godavari District. Andhra Pradesh. Subject: i' Femo Alloy Plant (5x9 MVA & 1x5.4 Electric Arc Furnace; Fe Mn 36,000 TpA & Si-Mn 7?,000 TPA) along with Captive Power Plant (Coal based CFBC, 2x36 MW and gas based, 4x9 MW.) iJ !V X" l4g pt., 149 p,t., 151_153, 154 pt., 162_ 163, 164 pt', Village & Tehsil Peddapuram, District East Godavari, Andhra Pradesh by M7s. Sri Girija Power Private Limited-Certified Copy of the Compliance Report_Reg. ii' Femo Alloy Plant (5x9 MVA & 1x5.4 Electric Arc Furnace; Fe Mn 36,000 TpA & Si-Mn 72,000 TPA) along with Captive Power Plant (Coal based CFBC, 2x36 MW and gas based, 4x9 MW) I !y Xo t4g pt., 749 pt.,15l_153, 154 pt., 162_ 163. 164- pt., Village & Tehsil Peddapuram, District East Godavari, Andhra Pradesh by M/s Sri Girija Power Private Limited-Arnendment in EC-certified Copy of the Compliance Report_Reg. Reference: 1) MoEF F.No. .I-1101 1167912009-I,4. II (I) dated 24th December 2010. 2) MotiF letter no. J-1 101 1t6lgt2oT()_IA iI (I) dated 24.12.2010. 3) Your lerter dared O2.Ol.2oll. Sir, with reference to 3'd cited above, please find enclosed herewith a cerlified copy of the compliance report. This has been approved by the Addl.pccF(c) vide diary no. 124 dt 06.02.2017 Yours faith (Dr.C.Kaliy Director (S) DT, C. KALIYAPERUMAL, M.E., PhD Director (S) Govemrnent of lndia Minislry_ot Environment, Forests & Climate Change .._ Regional Offic6 (South Eastem Zone) HEPC Buitding, No.g4, Carhedrat Garden iloart, Nungambakkam, ChennaF600 034. Encl: As above. Page 1 of 1"2

il] iii...Minislry_ot Environment, Forests & Climate Change.._ Regional Offic6 (South Eastem Zone) HEPC Buitding, No.g4, Carhedrat Garden iloart, Nungambakkam, ChennaF600 034. Encl:

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

  • ' il]

    iii

    ETRA H{fiRGOVERNMENT OF INDIA

    qqtqrur,Tr(rziffiraryqMat'Trilqi.:;,r';..'',;-., MlNlsrRY oF ENVIRoNMENT, FoREsrs & CLIMATE CHANGE*i*lr* Regional office (South Eastern Zone),

    1" & 2nd froor, HEpc Buirding, No.34, cathedrar Garden Road,Nungambakkam, Chennai _ 600034

    F.No. Ept12.lt 20r0-tU49tAo/ut, tTo, 10.02.2017

    G.V.A. Rama RajuChief Executive Officer (CEO)S.No. 162 & 153, A.D.B. RcadPeddapuram-533431 .East Godavari District.Andhra Pradesh.

    Subject: i' Femo Alloy Plant (5x9 MVA & 1x5.4 Electric Arc Furnace; Fe Mn 36,000 TpA &Si-Mn 7?,000 TPA) along with Captive Power Plant (Coal based CFBC, 2x36MW and gas based, 4x9 MW.) iJ !V X" l4g pt., 149 p,t., 151_153, 154 pt., 162_163, 164 pt', Village & Tehsil Peddapuram, District East Godavari, AndhraPradesh by M7s. Sri Girija Power Private Limited-Certified Copy of theCompliance Report_Reg.

    ii' Femo Alloy Plant (5x9 MVA & 1x5.4 Electric Arc Furnace; Fe Mn 36,000 TpA& Si-Mn 72,000 TPA) along with Captive Power Plant (Coal based CFBC, 2x36MW and gas based, 4x9 MW) I !y Xo t4g pt., 749 pt.,15l_153, 154 pt., 162_163. 164- pt., Village & Tehsil Peddapuram, District East Godavari, AndhraPradesh by M/s Sri Girija Power Private Limited-Arnendment in EC-certifiedCopy of the Compliance Report_Reg.

    Reference: 1) MoEF F.No. .I-1101 1167912009-I,4. II (I) dated 24th December 2010.2) MotiF letter no. J-1 101 1t6lgt2oT()_IA iI (I) dated 24.12.2010.3) Your lerter dared O2.Ol.2oll.

    Sir,

    with reference to 3'd cited above, please find enclosed herewith a cerlified copy ofthe compliance report. This has been approved by the Addl.pccF(c) vide diary no. 124 dt06.02.2017

    Yours faith

    (Dr.C.KaliyDirector (S)

    DT, C. KALIYAPERUMAL, M.E., PhDDirector (S)

    Govemrnent of lndiaMinislry_ot Environment, Forests & Climate Change.._ Regional Offic6 (South Eastem Zone)HEPC Buitding, No.g4, Carhedrat Garden iloart,

    Nungambakkam, ChennaF600 034.

    Encl: As above.

    Page 1 of 1"2

    santhoshText BoxANNEXURE - II

  • Certified Copy of the Compliance Report

    Sub: Ferro Alloy Plant (5x9 MVA & 1x5.4 Electric Arc Furnace; Fe Mn 36,000 TPA &Si-Mn 72,000 TPA) along with Captive Power Plant (Coal based CFBC, 2x36 MWand gas based, 4x9 MW) at Sy.No. 148 pt., 149 pt.,151-1 53, 154 pt., 162-163, 164pt., Village & Tehsil Peddapuram, District East Godavari, Andhra Pradesh by M/s.Sri Girija Power Private Limited - regarding Environmental Clearance.

    Ref: MoEF F.No.J-1 1011161912009-I,{ II (I) dated 24thDecember 2010.

    Present Status ofthe project:

    The environmental clearance issued during 2010 is for of 5 x 9 MVA + 1 x 5.4 MVAElectric Arc Furnaces along with Captive Power Plant (coal based) 2 x 36 MW and gasbased 4 x 9 MW. For that the project authority had obtained an amendment on 26thFebruary 2013. The Ferro Alloy plant originally was with a capacity of 5 x 9 MVA + 1x 5.4 MVA Electric Arc Furnaces along with Captive Power Plant (coal based) 2 x36MW and gas based 4 x 9 MW. Instead as stated above the PA have obtained anamendment of for only Captive Power Plant i.e. instead of 4 x 9 MW gas based PowerPlant, they have gone for 1 x 36 MW Coal based unit. There is no change in the FerroAlloy Plant. Instead of 2x36 MW coal based now the PA have installed 3 x 36 MW coalbased Power Plant Units.

    The Ferro Alloy Plant is being r:un @ of above 60oh capacity as on today and out of 3Captive Power Plant Units, only 2 units are generating power. The porver plantgeneration is based on the requirement of State Electricity Board.

    Date of Monitorin g: 25.01.2011 .

    A. Specific Conditions

    S.No Conditions Compliance1 No charcoal shall be used as fuel.

    Pet coke shall be used as fuelinstead of charcoal from unknownsources.

    Complied.No Charcoal is being used. Pet Cokeis used as a fuel instead of charcoal.

    2 Continuous monitoring facilities forall the stacks and sufficient airpollution control equipments viz.ESP, fume extraction system withbag filters, ID fan and stack ofadequate heieht to submers.ed arc

    Complied.The Project Authority (PA) haveinstalled Online, ContinuousMonitoring facilities for all the stacksand sufficient air pollution controlequipments viz. ESP, fume extraction

    Page 2 of 12

  • furnace shall be provided to controlemissions below 50 mgA{m3.

    system with bag filters, ID fan andstack of adequate height to submergedarc furnace are provided to controlemissions below 50 mgA{m3. Thereal time online monitored data isbeing hooked into the APPCB's andCPCB's Server. Apart from thisthrough External Agency also they aremonitoring the stack emissions and asper the repofts the levels are within50mg ,Nm3. APPCB also monitoredthe stack emission and the levels arewithin 50me / Nm3.

    fJ The national Ambient zrir QualityStandards issued by the Ministryvide G.S.R. No. 826(E) dated 16'hNovember,2009 shall be followed.

    Complied.The PA have installed one AmbientAir Quality Monitoring Station tomonitor PM 2.5, PM 10 and the levelsare within the National Ambient AirQuality Standards issued by theMinistry vide G.S.R. No. 826(E)dated 16th November. 2009.

    4 Secondary fugitive emissions fromall the sources shall be controlledwithin the latest permissible limitsissued by the Ministry and regularlymonitored. GuidelinesiCode ofPractice issued by the CPCB shallbe followed.

    Complied.To control the secondary fugitiveemissions the measures taken are byprovidinga) Closed conveyors for the entirelength and travel of the conveyors forboth Ferro Alloys and Power Plantb) Dust Extraction Systems have beenprovided at all transfer points in thePower Plant.c) The entire raw materials for thePower Plant have been stored underclosed sheds.d) Regular cleaning and maintenancee) Water spraying on all the internalroadsf) Tarpaulin coverage is provided tocover the manganese ore fines.

    5 Efforts shall be made to make use ofrain water harvested; capacity of thereservoir should be enhanced tomeet the maximum waterrequirement. Only balance water

    Complied.The PA have made to harvest the rainwater. Capacity of the Reservoir hasbeen increased from 60000 M3 to100000 M3.

    Page 3 of 12

  • requirement should be met fromother sources.

    6 Regular monitoring of influent andeffluent surface, sub-surface andground water shall be ensured andtreated wastewater shall meet thenorms prescribed by the StatePollution Control board or describedunder the E(P) act whichever aremore. stringent. Leach ate study forthe effluent generated and analysisshould also be regularly carried putand report submitted to theMinistry's Regionai Office atBangalore, SPCB and CPCB.

    Complied.The influent and effluent quality aremonitored on daily basis and thelevels are within the norms prescribedby the State Pollution Control boardor described under the E(P) act. Theground water quality is monitored attwo locations within the project siteby PA once in six months. Themonitored data are being submitted toSPCB regularly and not to MoEF.RO. But the PA have agreed tosubmit in future.

    l The total water requirement shallnot exceed 324m'lday. 'Zero'effluent discharge shall be strictlyfollowed and no wastewater shouldbe discharged outside the premises.Permission from the CompetentAuthority shall be obtained fordrawl of water.

    Reler below.The PA informed that the waterrequirement is within the limit.Permission for drawl of water fromSamalkot Canal is obtained from theIrrigation Department of AndhraPradesh. The effluent such as theBoiler blow downs, RO blow downsand WTP blow downs are beingcollected in the tank and therebybeing processed into the ETP whichconsists of UF stage and double stageRO which is recovering 74o/o of thetotal rejects. The balance rejects arebeing used for Ash quenching andcooling of hot metal cakes. ThusZero effluent discharge is beingfollowed. Septic Tanks with soak pitsare provided to the toilets.

    8 All the Ferro Alloy slag shall beused for land filling inside the plantor used as building material onlyafter passing through ToxicChemical Leachability Potential(TCLP) test. Otherwise, hazardoussubstances shall be recovered fromthe slag and output waste and bedisposed in secured landfill as per

    Complied.The PA informed that all ferro alloyslag is used for production of SilicoManganese and Fly ash is given tobrick and cement manufacturers.

    Page 4 of 12

  • CPCB suidelines.I Slag produced in Ferro Manganese

    (Fe-Mn) production shall be used inmanufacture of Silico Manganese(Si-Mn). Fly ash from the CFBCboiler shall be sold to the cementmanufacturing units.

    Complied.As stated above Ferro ManganeseSlag is used for production of SilicoManganese and Fly ash is given tobrick and cement manufacturers.

    10 No Ferro Chrome shall bemanufactured without prior approvalfrom the Ministry of Environment &Forests.

    Complied.Ferro Chrome is not beingmanufactured

    11 Risk and Disaster Management Planalong with the mitigation measuresshould be prepared and a copysubmitted to the Ministry's RegionalOffice at Bangalore, SPCB andCPCB within 3 months of issue ofenvironment clearance letter.

    Complied.The PA informed that Risk andDisaster Management Plan along withthe mitigation measures should beprepared and a copy submitted to theMinistry's Regional Office atBangalore, SPCB and CPCB within 3months of issue of environmentclearance letter.

    t2 All the commitments made to thepublic during the PublicHearing/Public Consultationmeeting held on 1't October, 2010should be satisfactorilyimplemented and a separate budgetfor implementing the same shouldbe allocated and informationsubmitted to the Ministry' RegionalOffice at Bansalore.

    Complied.The PA informed that all thecommitments made during publichearing are implemented. Annexure-I.

    13 As proposed, green belt should bedeveloped in at least 33% of theproject area. Selection of plantspecies shall be as per the CPCBguidelines in consultation with theDFO.

    Complied.As on today, the PA have broughtabout 33o/o of the area under GreenBelt by planting different species inconsultation with the DFO. The PAhave developed their own nursery.The survival rate is about 90%.

    t4 At least 5o/o of the total cost of theproject should be earmarkedtowards the corporate socialresponsibility and item-wise detailsalong with time bound action plan(need based) should be prepared andsubmitted to the Ministrv's Reeional

    Complied.The total cost of the project is Rs. 700Crore and 5o/o of the total cost is Rs.35 Crore. The CSR activities arecarried out as per the advice of localadministration. Details of theactivities carried out so far are given

    Page 5 of 12

  • Office at Bangalore. Implementationof such program shall be ensuredaccordingly in a time bound manner.

    in Annexure 2. The PA informed thatitem-wise details along with timebound action plan (need based) wasprepared and a copy of the same wassubmitted to the Ministry's RegionalOffice at Bangalore. Implementationof the program is being followed asper the plan.

    15 The company shall provide housingfor construction labour within thesite with all necessary infrastructureand facilities such as fuel forcooking, mobile toilets, mobile STP,safe drinking water , medical healthcare, creche etc. The housing maybe in the form of temporarystructures to be removed after thecompletion of the project.

    Complied.The necessary infrastructure andfacilities such as fuel for cooking,toilets, STP, drinking water, medicalhealth care etc. were provided duringthe construction time to theconstruction labours. The housingwas in the form of temporarystructures and was removed after thecompletion of the project constructionworks.

    B. General Conditions

    S.No Conditions ComnlianceI The Project Authorities must strictly

    adhere to the stipulations made bythe Andhra Pradesh PollutionControl Board (APPCB )and theState Government

    Complied.The consent is valid up to 31 March2018. The PA informed that all thestipulations made by the APPCB arebeine implemented.

    1l No fuither expansion ormodifications in the plant shall becarried out without prior approval ofthe Ministry of Environment andForests.

    The PA is planning to go for anexpansion and for that only they haverequested a certified copy of thecompliance report. The details of theproposed expansion activity are givenin Annexure 3.

    lll At least four ambient air qualitymonitoring stations shall beestablished in the downwarddirection as well as where minimumground level concentration ofSPM,SO2 and NOX are anticipatedin consultation with the APPCBincluding one ambient air qualitymonitoring station in the downwinddirection. Data on ambient air

    Complied.Online continuous Ambient AirQuality Monitoring Station has beeninstalled covering two directions andthe real time monitored data arbhooked into APPCB as well asCPCB's server. In' addition to thismanual monitoring also is beingcarried out through external approvedlaboratory and the monitored data are

    Page 5 of 12

    GY*+-

  • quality and stack emission should beregularly submitted to this Ministryincluding its Regional Office atBangalore and the APPCB /CPCBonce in Six Months.

    being regularly submitted to MOEFRO, APPCB & CPCB. The Ambientair quality is well within the norms.

    tv Industrial wastewater shall beproperly collected, treated so as toconform to the standards prescribedunder GSR 422 (E) dated 19th May1993 and 31't December 1993 or asamended from time to time. Thetreated wastewater shall be utilizedfor plantation purpose.

    Complied.As given in specific condition no. 6the effluent is treated and recycled aswell as reused after conforming to thestandards prescribed under GSR 422(E) dated 19th May 1993 and 31"December 1993 or as amended fromtime to time. The treated wastewateris utilized for plantation purpose.

    v The overall noise levels in andaround the plant area shall be keptwell within the standards (85 dBA)by providing noise control measuresincluding acoustic hoods, silencers,enclosures etc. on all sources ofnoise generation. The ambient noiselevels should conform to thestandards prescribed under EPARules, 1989 viz.15 dBA (daytime)andl0 dBA (nighttime).

    Complied.The overall noise levels in and aroundthe plant area are kept well within thestandards (85 dBA) by providingnoise control measures includingacoustic hoods, silencers, enclosuresetc. on all sources ofnoise generation.The ambient noise levels aremonitored at various locations duringday and night time and as per thereports the levels are within theprescribed standards under EPARules, 1989 viz.l5 dBA (day.time)and 70 dBA (nighttime).

    V1 Occupational health surveillance ofthe workers shall be done on aregular basis and records maintainedas per the Factories Act.

    Complied.Occupational health surveillance ofthe workers are carried out on aregular basis and records maintainedas per the Factories Act.

    vll The company shall develop rainwater harvesting structures toharvest the rain water for utilizationin the lean season besidesrecharging the ground water table.

    CornpliedThe company has developed rainwater harvesting structures to harvestthe rain water for utilization in thelean season besides recharging theground water table.

    vlll The project proponent shall alsocornply with all the environmentalprotection measures and safeguardsrecommended in the EIA/EMPreoort. Further. the company must

    Complied.The PA implementing all theenvironmental protection measuresand safeguards recommended in theEIA/EMP report. Further, the

    PageT of L2

  • undertake socio-economicdevelopment programmes,educational programmes, drinkingwater supply and health care etc.

    company is undertaking socio-economic development programmes,educational programmes, drinkingwater supply and health care etc.around villages.

    lx As proposed Rs. 30 Crores andRs.78 Lakhs shall be earmarkedtowards the capital cost andrecurring coast/annum forenvironmental protection measuresand judiciously utilized toimplement the conditions stipulatedby the Ministry of Environment andForests as well as the StateGovernment. The funds so providedshall not be diverted for and otherpurpose.

    Complied.The PA have allocated the capital aswell as recurring cost as stipulatedand assured that this amount will notbe diverted for any other pulpose.

    x A copy of the clearance letter shallbe sent by the proponent toconcerned Panchayat, Zilla Parishad/ Municipal Corporation, UrbanLocal Body and the Local NGO, ifdfly, from whom suggestions /representations, if dfly, werereceived while processing theproposal. The clearance letter shallalso be put on the web site of theCompany by the proponent.

    Complied.The PA have sent a copy of the EC tothe Local Panchayat.

    x1 The project proponent shall uploadthe status of compliance of thestipulated environment clearanceconditions, including results ofmonitored data on their website andshall update the same periodicaily.If shall simultaneously be sent to theRegional Office of the MOEF, therespective Zonal Office of CPCBand the APPCB. The criteriapollutant levels namely; RSPM,SiO2, NO1(ambient levers ad well asstack emissions) or critical sectoralparameters, indicated for theprojects shall be monitored anddisplayed at a convenient location

    Complied.The PA have uploaded the status ofthe Compliance of the stipulatedconditions including the monitoreddata on their website and alsosubrnitted to the Regional Office. Themonitored data was displayed at aconvenient location near the maingate of the company in the publicdomain.

    Page 8 of 12 dt-*^".tc-r

  • near the main gate of the companyin the public domain.

    xil The project proponent shall alsosubmit six monthly reporls in thestatus of the compliance of thestipulated environmental conditionsincluding results of monitored data(both in hard copies as well as bY e-mail) to the Regional Office ofMOEF at Bangalore, the resPectiveZonal Office of CPCB and theSPCB. The Regional Office of thisMinistry atBangalore/CPCB/APPCB shallmonitor the stipulated conditions.

    Agreed to comply.Six Monthly compliance report (bothin hard copies as well as by email)was not submitted to the RegionalOffice and agreed to submit in future.

    xlll The environmental statements foreach financial year ending 31stMarch in Form-V as is mandated tobe submitted by the projectproponent to the concerned StatePollution Control Board asprescribed under the Environment(Protection) Rules, 1986, asamended subsequently, shall also beput on the website of the companyalong with the status of complianceof environmental conditions andshall also be sent to the respectiveRegional Offices of the MOEF by e-mail.

    Refer below.The Form V has been uploaded on theCompany's website and agreed tosend by email in future to RegionalOffice.

    " xlv The project Proponent shall informthe public that the project has beenaccorded environmental clearanceby the ltlinistry and copies of theclearance letter are available withthe APPCB and may also be seen atWebsite of the Ministry ofEnvironment and Forests athttp:/envfor.nic.in. This shall beadvertised within seven days fromthe..date of issue of the clearanceletter, at least in two localnewspapers that are widelYcirculated in the region of which one

    Complied.The PA had given an advertisement intwo local news papers namelY TheHindu on 12-01-2011 and Eenadu on12-01-2011 and the copies of thesame are submitted to RegionalOffice.

    Page 9 of 12

  • shall be in the vernacular languageof the locality concerned and a copyof the same shall be forwarded tothe Regional office at Bangalore.

    xv Project authorities shall inform theRegional Office as well as theMinistry, the date of financialclosure and final approval of theproject by the concerned authoritiesand the date of commencing theland development work.

    Complied.The PA have informed the RegionalOffice about the date of financialclosure and final approval of theproject by the concerned authoritiesand the date of commencing the landdevelopment work.

    This has the approval of the Addl.PCCF(C) vide diary no.I24 dt06.02.2011.

    Director (S)DT. C. KALIYAPERUMAL, M.E., PhD

    Director (S)

    Government of lndia

    Ministrv ol Environment, Forests & Climate Change

    """-" h;;ffi i;iti." t's*m Eastem zone)r-rEpc'iiriioins, r'lo'iti, cameoral Garden

    Road'"-' -ffilfi;akkam' chennai'6oo 034'

    (Dr. C.Kaliyapelfimal)

    Page 10 of 12

  • Certified Copy of the Compliance Report

    Sub: Ferro Alloy Plant (5x9 MVA & 1x5.4 Electric Arc Furnace; Fe Mn 36,000 TPA &Si-Mn 72,000 TPA) along with Captive Power Plant (Coal based CFBC, 2x36 MWand gas based, 4x9 MW) at Sy.No. 148 pt., 149 pt.,151-153,154 pt., 162-163,164pt., Village & Tehsil Peddapuram, District East Godavari, Andhra Pradesh by M/s.Sri Girija Power Private Limited regarding amendment in EnvironmentalClearance.

    Ref: i) MoEF letter no. J-11011167912009 - IA II (I) dated 24.12.2010.ii) Your ietters no. Nil dated 10.09.2AD,21-10-2A12 and 11 .12.2012.

    S.No Conditions ComplianceI In case source of coal supply is to be

    changed at a later stage (nowproposed Indigenous Coal andimported coal from Indonesia) theproject proponent shall intimate theMinistry well in advance along withnecessary requisite documents for itsconcurrence for allowing the chanee.

    Complied.As informed initially 100% importedcoal was planned and during thischange that is from Gas to Coal, the PAhave given their commitment to useImported Coal (80%) and IndigenousCoal (20%) and being followed. Afterthat there is no change.

    ll High efficiency ESP shall be installedto control particulate emission below50mg/Nm3 and emission shall bedispersed through stack of 81mheight.

    Complied.The PA have installed high efficiencyESP to control particulate emissionbelow 50mgA{m3 and emission isdispersed through stack of 81m height.They have provided / installed onlinestack monitoring equipments and thereal time data are transmitted toAP.PCB's as well as CPCB's Server.The real time stack monitoring data areless than 50 ms,Nm'.

    111 Low NOx burners shall be installed tocontrol NOx emission from theboilers.

    Complied.Low NOx burners are installed tocontrol NOx emission from the boilers.

    lv A detailed study on chemicalcomposition of coal used particularlyheavy metal and radio activitycontents shall be carried out through areputed institute and report shall besubmitted to Reeional Office of the

    Complied.A detailed stu{y on chemicalcomposition of coal used particularlyheavy metal and radio activity contentswas carried out by IWs. Vimta Labs,Hvderabad and reoort was submitted to

    Page 11 of 12 *Ts-

  • Ministry at Bangalore. Only afterascertaining its radioactive level shallfly ash be supplied for utilization inbrick manufacturing.

    Regional Office of the Ministry atBangalore. Only after ascertaining itsradioactive level fly ash is supplied forbrick manufacturins.

    V Adequate dust extraction system suchas cyclones/bag filters and waterspray system in dusty areas such as incoal handling and ash handling points,transfer areas and other vulnerabledusty areas shall be provided.

    Complied.Adequate dust extraction system such asbag filters and water spray system industy areas such as coal handling andash handling points, transfer areas andother vulnerable dusty areas areprovided. Dedicated water tankers areavailable including water sprinklers.

    V1 Proper utilization of fly ash shall beensured as per Fly Ash Notification,1999 and subsequent amendment in2003 and2009.

    Complied.The fly ash is collected in to Silos and itis given to brick manufacturingindustries and by doing this they arefollowing Fly Ash Notification, 1999and subsequent amendment in 2003 and2009. The Ash Handling area is keptneat and clean and also regular cleaningas well as water sprinkling are carriedout.

    6. The company shall comply with allthe conditions stipulated in theenvironmental clearance even no.dated 24-12-2010.

    Complied.The company is implementing all theconditions stipulated in theenvironmental clearance even no. dated24-t2-2010

    This has the approval of the Addl.PCCF(c) vide diary no. t24 dt 06.02.201i .

    Director (S)Dr. C. KAL|yAPERUT\4AL, M.E., phD

    Director (S)Govemment ot lndia

    Ministry_of Environmenl, Fore$ts & Climate Change

    . .__ Regional Ofiice (South Eastern Zone)HEPC Buitding, No.34, Cathedrat Garden i1oad,

    Nungambakkam, Chennai€00 094.

    (Dr. C.Kaliyapebtrmal)

    Page 12 of 12

  • ANNEXURE 1

    Sl. No Conditions / Obiection Comnliance

    t

    The project authorities have proposed toadopt zero discharge, latest air pollutioncontrol equipments to the boilers and foreffective fly ash handling to meetEnvironmental Standards and also providerailwby sliding of transportation of rawmaterials to reduce road traffic.

    The PA have informed that Zero LiquidDischarge is being effectivelyimplemented and state of art pollutioncontrol equipments are installed foreffective fly ash handing.

    2 The following objections are raised by thepublic durins public hearing:

    aAlterrrative road for existing Puntha Roadby the Industry

    Cornplied. Alternate Puntha Road ismade adiacent to Proiect Site.

    b Air Pollution Problems to the surroundinglands and villages

    Sophisticated Pollution ControlEquipment are installed. Ambient AirQuality Monitoring Stations are installedwithin in the Project the site andmonitoring is regular and connected toAPPCB & CPCB

    c Health Problerns particularly Lungs areaffected due to air pollution

    dPossible water pollution to the villagetanks

  • ANNEXURE 2 - CORPORATE SOCIAL RESPONSIBILITY

    Shivsai Consulting Eng & Builders

    Construction of Ozili S s Complex

    Sri Venkata Krishna Auto MotorsAmbulance for GGH, Rajahmund

    ' Contpttter and Plirtter

    Powerica LimitedGenerator for Kshatriya Seva Samithi,

    Raiahrnund

    Sri Sita ramaraiu Giriiana Vikasa KendramConstrurction works for drinking water project atAntharvedi

    Laser Comrruters

    Laptop to Govt. De e, Tuni

    Laser Computers

    Referred -t

    Col

    lier i Service Provider

    3,385,684.00

    1,869,598.00Shivsai Consirlting Eng & Builders

    Road works at Ozili Sports Complex

    District Administrator1,363,808.00

    District Administrator1,395,986.00Laser Comrruters

    District Administrator405,022.00

    326.247.00

    District Administrator75,950.00Jawahar Book Centre

    Books for Navodaya School, Pedda

    District Administrator

    District AdministratorLaser ComputersLaptop to Collector Off,tce, Kakinada

    District Administrator73,500.00

    Computers to MRO Office,

  • Sunnlier / Service ProviderSri Lakshmi EnsineerinStrechers & other Materials for GGH,

    Raiahmund

    Hyderabad District Amateur BoxingAssociationDonation lbr 59th Senior Men National Boxing

    Chamnionshi

    i Shri Giriia Allo & Powr Private LimitedBricks for Ramala am Te

    Cooner Strins f,or Mandir

    Beach Festival

    i Sasala SambalalLr

    Siri Aqua Solutions

    RO Svstems

    Sm:rrt Creations

    C.o Items for Annavaram Devasthanam

    frooding Exp at tl"re Time of Maha Pushkaralu

    I Prarnasai Enterprises

    Foodins Exp at the Time of Maha Pushkaralu

    B Bangaraju

    Foodins Exnat the Time of Maha Pushkalalu

    Amount (Rs.

    24,200.00 District Administrator

    tr 5,000.00

    Site Cash i 5,000.00 Local NGODonation to NGO Home, Pedda

    Local NGO

    lndustrial Sales 119,658.00

    101,666.00

    S Srinivasa Rao

    Local NGO33,700.00

    Local NGO

    Local NGORaja Rajeslvarara Rao

    Foodins Exo at the Time of Maha Pushkaralu

  • Amount (Rs.lier / Service ProviderEast Godavari District athletics

    Donation for Athletics

    Local NGO

    Donation to Trust

    Local NGO108,000.00Sri Sitarama Raju Girijanam Vikas kendram

    10.275.519.00

    Sri Sitarama Ra.iu Girijanam Vikas kendram

    Donation to Trust

    Sri Sitarama Raiu Girijanam Vikas kendram

    Save the Childern

    Donation

    Donation to Trust

  • ANNEXURE 3 _ PROPOSED EXPANSION

    S.No Name of the Product Bxisting ProposedI Silico Manganese 12000 TPA 85000 TPA

    2 Ferro Manganese 36000 TPA 120000 TPAa-) Power generatton 108 MW4 Ferro Chrome 85000 TPA

    5 Ferro Silicon 2s000 TPA

    6 Low Carbon Ferro Chrome 3600 TPA

    7 Ferro Molybdenum 3600 TPA

    B Ferro Titanium 3600 TPA

    9 Ferro Vanadium 3600 TPA

    10 Calcium Aluminate basedSynthetic Slag 1 5000 TPA