20
ICT INTERVENTIONS FOR IMPROVING ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IMPLEMENTATION OF NREGA IN WEST BENGAL IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation and closer monitoring For better planning geo-referenced (GIS) map of the Gram Panchayats are being used which helps to prepare spatial plans in the GIS map of the GP For more efficient preparation of schemes computer aided design & estimation is being developed For closer monitoring an innovative solution based on SMS is in use

ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

Embed Size (px)

Citation preview

Page 1: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

ICT INTERVENTIONS FOR IMPROVING ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IMPLEMENTATION OF NREGA

IN WEST BENGALIN WEST BENGALThe ICT interventions include improved

planning, more efficient scheme preparation and closer monitoring

For better planning geo-referenced (GIS) map of the Gram Panchayats are being used which helps to prepare spatial plans in the GIS map of the GP

For more efficient preparation of schemes computer aided design & estimation is being developed

For closer monitoring an innovative solution based on SMS is in use

Page 2: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

USING GEO-REFERENCED MAPS FOR USING GEO-REFERENCED MAPS FOR IMPROVED SPATIAL PLANNINGIMPROVED SPATIAL PLANNING

A unique initiative for preparation of GIS maps of GPs for more clarity, objectivity and convergence in planning

GP outlines prepared from revenue maps & geo-referenced, PMGSY Core Network (CN) ported on the maps followed by showing the social & economic delivery institutions collected from each point using GPS and porting satellite data (Cartosat I, Pan 2.5 m resolution) showing the habitations and natural features like water bodies as well as other rural roads on the same map

Out of 3351 GPs – porting of CN completed in all GPs, delivery institutions done in 2843 (90%) GPs, Habitation mapping completed in 2806(84%) GPs and final maps prepared in 1032 GPs (30%). Those maps are being uploaded in the website of the department (so far uploaded around 300). Entire task will be completed by 2010

Page 3: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation
Page 4: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

INCORPORATION OF ATTRIBUTE SURVEY DATA IN THE GP MAP

Habitation Name

4

Page 5: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

Objects captured in GP Maps

Educational Institutions•Primary School•Upper Primary School•High School•Madrasa •SSK•MSK•College

Health Institutions:•Health Sub Centre•PHC•BPHC

Other Institutions•Market / Haat•Veterinary Centre•Post Office•Bank•Tourist Spot

Government Offices•GP Office•Block Office•CDPO Office

Child Care and Pre-School:•Anganwadi Centres

Road Connectivity Revenue VillageRailway Connectivity Major WaterbodyHabitation Forest

Page 6: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

66

GP Map showing Service Delivery Institutions, PMGSY Core Network and Habitations – (may be seen at www.wbprd.nic.in

by clicking the map of West Bengal)

Page 7: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

USE OF MAPS FOR NREGA

The use of maps has just started in districts where the same have been delivered so far

A Road Register is being prepared for all GPs showing how the habitations are connected to the PMGSY CN, the status of roads as well as the roads to be built for providing connectivity are being clearly delineated

Thus the perspective plans for all roads in existence & to be constructed is not only listed but can be seen in the GP map to help plan for all works related to rural connectivity

The Maps also show all the existing water bodies and the big ones can be selected exhaustively to plan for water conservation

Page 8: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

USE OF MAPS/SATELLITE DATA FOR NREGAUSE OF MAPS/SATELLITE DATA FOR NREGA In Purulia the quantum of annual rainfall and estimated

water storage in each GP has been worked out which varies from merely 3% to 7%

The GP-wise maps have been shown to the PRI members and a goal has been set to enhance quantum of water stored within the water bodies of the GP by 10%. Detail water conservation plan will follow from this exercise

The maps can be printed showing different attributes and will be used to also prepare plans for drainage, forestry etc

The NRDMS unit of the district has identified, based on satellite based ground water & geological data the exact locations for constructing check dams, percolation tanks, and other bunds

In Purulia construction of 64 number of such dams for storing 1000 CuM of water started.

To be replicated in other districts.

Page 9: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

A map showing identified water retention bodies

Page 10: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

USING MAPS FOR MONITORING For better visualization of progress or

drawbacks, the performance indicators are ported in the GIS framework against each GP

Key performance indicators of the programm say mandays generated, expenditure made, per GP expenditure are shown against each location;

These data are then ported in the GIS framework to show spatial impact of the work for a particular month or for a range of months;

The performance is analyzed and based on that the GP/Block is shown in different colours (usually three – showing good, average & bad) in meetings

GP wise ranking are also made based on the performance indicators – PRI members can remember their performance shown in different colours rather than abstract numbers or percentage

Page 11: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation
Page 12: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

Gram Panchayat wise Person-days generated per Household under NREGA

Less than 30

30 to 40

More than 40 October 2009

Page 13: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

Block wise Person-days generated per Household under NREGA

Less than 30

30 to 40

More than 40 October 2009

Page 14: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

Gram Panchayat wise Dash Board analysis on NREGA indicators

Page 15: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

Gram Panchayat wise Ranking status for a particular NREGA indicator

Page 16: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

m – Governance InitiativesOrdinary e- Gov initiatives require computer & internet

connectivity. Penetration of computer in rural areas is still low & internet connectivity is not good. Computer literacy is also low

As compared to that mobile connectivity is available even in remote areas, ordinary people have access and can easily use the mobile phone

m – Gov uses those strength in which data is captured at the point of occurrence and text message in pre-designed format is sent to a server for populating existing database seamlessly & generating MIS readily

The low initial investment as well as low recurring cost makes it more attractive. It also works in both push & pull mode for transmitting information to target groups and getting information from the field, which is difficult in other modes

Page 17: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

M-GOV FOR IMPLEMENTATION OF NREGA The work sites under NREGA covers a huge

geographical area; Similarly, payments are made from 3351

Gram Panchayats throughout the state; The present MIS captures information by

entering data post facto, which is normally available after a month’s interval;

The SMS based solution captures & process real time data from the site & generates MIS instantaneously – also since there is no data entry operator in between there is no mistake of data entry

Data sent from work site are automatically ported in the web server, collated and presented in the website www.smswbprd.org

Page 18: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

M-GOV FOR IMPLEMENTATION OF NREGA

This is helping to provide real time information on labour deployment & payment on a daily basis & one can intervene immediately for improvement

The attendance data is transmitted by 12 Oclock by the supervisors and the same is seen instantaneously in the website and any superior officer can visit the site with prior information for verification

This improves correctness of reports since no one can afford to manipulate & be vulnerable. Also, there is enhanced transparency in the system

Similarly GP sends SMS on payment Both of these have started a few months ago &

data from around 1000 GPs in 120 blocks are being received regularly & is in the process of being scaled up to the entire state

Page 19: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

INTEGRATION OF M-GOV WITH GIS MAPSAll Blocks are being provided with GPS devices Every major work to be undertaken will send the

co-ordinates of the works taken under NREGA using structured SMS. All works will be included after GPS is provided to all GPs

The SMS will update the Database with the co-orodiantes (lat & long) of the work site or the starting & end points of the same

Subsequent SMSs sent will continue to capture the progress and attendance and also do compilation of work

In the process, when the work will be completed, the ‘End of Work’ SMS will be sent and the GIS maps will mark it as a complete work

This is at the development stage & is yet to be tried

Page 20: ICT INTERVENTIONS FOR IMPROVING IMPLEMENTATION OF NREGA IN WEST BENGAL The ICT interventions include improved planning, more efficient scheme preparation

IMPROVING ESTIMATION & DESIGN

Improving design & estimation of works is very crucial in creation of assets under NREGA

The diploma engineer of the GP generally prepares the estimate and it takes time & there is subjectivity

Some of the districts have introduced software based designing & estimation of a few types of schemes

To standardize the process the State Govt. has engaged TCS for preparing a software for taking care of all types of works for all the districts

The same is getting finalized and will be operational from the middle of the next financial year