    The basic objective of the Act is to enhancelivelihood security in rural areas byProviding at least 100 days of guaranteed wage

    employment in a financial year to everyBPL & APL household whose adult membersvolunteer to do unskilled manual work.

    This work guarantee can also serves otherobjectives like

    1. Generating productive assets,2. Protecting the environment, empowering

    rural women,3. Reducing rural urban migration and

    fostering social equity, among others.

    Objectives and Goals

  • 7/29/2019 NREGA .pptx

    3/35

    2/12/13

    The Gram Panchayat after due verification willissue a job card.The job card should be issued within 15 days

    of application

    A job card holder may submit a writtenapplication for employment to the GramPanchayat,

    Employment will be given within 15 days if it is

    not then daily unemployment allowance will begiven as per the Act

    Work should ordinarily be provided within 5 km

    Wages are to be paid according to piece rate ordaily rate.

    Salient Features of theAct

  • 7/29/2019 NREGA .pptx

    4/35

    2/12/13

    Wages should be paid through Bank orpost office.At least one third beneficiaries shall be

    women.Crche, drinking water, first aid kit and

    shade facilities have to be provided.A 60:40 wage and material ration has

    to be maintained.Shelf of projects for a village will be

    recommended by the Gram Sabha .

    No contractors and machinery isallowed.

    Salient Features (contd.)

  • 7/29/2019 NREGA .pptx

    5/35

    2/12/13

    1) Waterconservation and

    Creating CommunityAssets

  • 7/29/2019 NREGA .pptx

    6/35

    2/12/13

    7) Flood control and protection works,including drainage in waterlogged areas;

    8) Rural connectivity to provide all-weatheraccess. The construction of roads mayinclude culverts where necessary, and withinthe village area may be taken up along withdrains;

    9) Any work that may be notified by theCentral Government in consultation with theState Government.

    Creating CommunityAssets(contd.)

  • 7/29/2019 NREGA .pptx

    7/352/12/13

    1. Increasing Employment Opportunities2. Enhancing Wage Earning and Impact on

    Minimum Wage

    3. Increasing Outreach to the poor andmarginalized

    4. Strengthening Natural Base

    5. Financial Inclusion of the poor

    6. Insurance Coverage

    Outcomes of NREGA

  • 7/29/2019 NREGA .pptx

    8/352/12/13

    Analysis

  • 7/29/2019 NREGA .pptx

    9/352/12/13

    Trilok meenaBhanudhay BirlaDevendra Meena

    Lokesh BaswalParesh NagoreRam Cheez MeenaVijay Anjana

    Data Used

  • 7/29/2019 NREGA .pptx

    10/35

    2/12/13

    Sample size of 14 quite small.Equal number of men and women surveyedCaste of people: -

    Background of people

  • 7/29/2019 NREGA .pptx

    11/35

    2/12/13

    0

    2

    4

    6

    8

    10

    12

    Age Distribution

  • 7/29/2019 NREGA .pptx

    12/35

    2/12/13

    Analysis

    Monthly Income ofrespondents

    0

    2

    4

    6

    8

    10

    12

  • 7/29/2019 NREGA .pptx

    13/35

    2/12/13

    0

    2

    4

    6

    8

    10

    12

    Number of daysworked

  • 7/29/2019 NREGA .pptx

    14/35

    2/12/13

    Income per day

  • 7/29/2019 NREGA .pptx

    15/35

    2/12/13

    Ground Work

    Keeping Records

    Irrigation Work

    Road/Levelling

    Construction

    Others

    Types of work

    done

  • 7/29/2019 NREGA .pptx

    16/35

    2/12/13

    Other insights

    Officials work

    0 1 2 3 4 5 6 7 8 9 10

  • 7/29/2019 NREGA .pptx

    17/35

    2/12/13

    Officials work distributionof job cards

  • 7/29/2019 NREGA .pptx

    18/35

    2/12/13

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

    Other details

  • 7/29/2019 NREGA .pptx

    19/35

    2/12/13

    Maximum age of worker in the survey :- 43years.

    No scope for old people??No child labor but people below 20 as extra

    income source.Huge variation in monthly income.. Varying

    from as much as 3500 to as low as zero.Large variation in working days as well, only

    some being close to the promised 100.Variation in income per day from 60 to 140.This maybe due to the amount of work doneper day

    Work done mainly in irrigation, road making

    Summary of statisticalanalysis

  • 7/29/2019 NREGA .pptx

    20/35

    2/12/13

    Both the genders not paid equallyInvolvement of middlemen violation of

    Act.Improper attendance and corruption,

    leading to fudging of muster rolls and fundsexploitation

    Workers forced to work under sarpanch andprivate land owners farms another

    violation of Act and misuse of position.Uneven and unjustified distribution of job

    cards even the non-deserving people getcards and wages

    Summary contd.

  • 7/29/2019 NREGA .pptx

    21/35

    2/12/13

    Insufficient awareness of facilities grantedby the Act laxity of local officials, need ofcommunity building (example of Barwanidistrict)

    Need for better working facilities likedrinking water, shade, crches etc.

    Financial Inclusion all respondents have

    bank accounts and money is transferredinto these accounts.

    Summary contd.

  • 7/29/2019 NREGA .pptx

    22/35

    2/12/13

    The Sarpanch has a lot of power in thesystem.

    People close to the sarpanch can getproxies and therefore get paid for free.

    The jobs cards are issued by the panchayat.As no incentive is given to the sarpanch andco. , the people are forced to remind thepanchayat lots of times to get the cardissued.

    The sarpanch can make the people work inhis own private lands, thus robbing them oftheir income.

    Issues raised

    Sarpanch

  • 7/29/2019 NREGA .pptx

    23/35

    2/12/13

    The labourers are illiterate. They face

    difficulties in filling various forms likewithdrawal form of the bank. They areforced to depend on other people.

    They are usually exploited, in the matter of

    opening bank accounts.Work can be demanded by the people by

    filling the C-6 form.The have no knowledge about the

    unemployment allowance, which has to begiven if no job is available 15 days after thefilling of the C-6 form.

    Illiteracy and Awareness

  • 7/29/2019 NREGA .pptx

    24/35

    2/12/13

    Irregular attendance.Proxies by people close to the person in-

    charge of attendance.People close to the sarpanch get job cards

    and fake attendance.People get attendance and do not work,

    reducing the overall work done in the day

    and the income of the deserving people.

    Attendance issues

  • 7/29/2019 NREGA .pptx

    25/35

    2/12/13

    It causes labour shortage for the fields.It is increasing the labour cost and hence

    the cost of vegetables and other products.NREGA is like giving free money to workers

    i.e. they do very less work and get fullpayment and this is making the workerslazy.

    Not much community assets are beingcreated to aid farming(though, the pie chartseems to show the opposite).

    The state government of Bihar has decided

    to integrate agriculture with NREGA, this isa ood si n for the farmers.

    Issues raised by Farmers

  • 7/29/2019 NREGA .pptx

    26/35

    2/12/13

    Labour shortage faced by urban industries(manufacturing and construction).

    Use of machinery in NREGA which isprohibited by the act.

    Quality of work has been very poor.Contractors are involved in the system

    which is prohibited by the act.

    Other issues

  • 7/29/2019 NREGA .pptx

    27/35

    2/12/13

    There was great fraud in making (of job)cards, muster rolls were not maintainedproperly, and work was not provided to jobseekers.

    Workers performed one day's job but theirattendance was put for 33 days.

    The workers got money for one day whilewages for 32 days were misappropriated bythe people associated with the functioningof NREGA.

    Job cards were found in the possession ofsarpanchs or other panchayat functionaries.

    ob cards were fud ed and fake entries

    Corruption in NREGA :Case Study

  • 7/29/2019 NREGA .pptx

    28/35

    2/12/13

    In the country as a whole, around ten lakhrural BPL households paid bribes to avail ofNREGA benefits, to the tune of Rs 7.15crores in the course of one year !!

    Around 47% of rural BPL households thatinteracted with the NREGA found theofficials/staff corrupt.

    Half the households that paid bribes, did soto get registered for work under thescheme.

    Source :- Centre for Media Studies (CMS) &Transparency International India (TII) in India

    Corruption Study-2009

    ugges ons o mprove

  • 7/29/2019 NREGA .pptx

    29/35

    2/12/13

    Allowing NREGA work to be done in private lands ofsmall and marginal farmers.

    Allowing private contractors to implement NREGAwork.

    Permitting a new set of works that could be doneunder NREGA including, construction of buildings and

    sports stadiums Appointment of ombudsman in each district for

    grievance redressal Going beyond unskilled manual work by including

    "measurable" semi-skilled services like fishery and

    carpentry. Convergence with projects of other ministries. Appointing dedicated staff at the district level to

    educate people of their rights.

    ugges ons o mproveNREGA

    Case study(village

  • 7/29/2019 NREGA .pptx

    30/35

    2/12/13

    Goodness of the Act.1. Poor People and women are happy about

    the act.2.People are Getting about 100 days of work

    in a financial year and getting avg. 90Rs/day.

    3. Less corruption due to transparency inthe system and social audit.

    4. Empowerment to women.5. Reducing migration.

    Case study(villageUmarthana, raj.)

  • 7/29/2019 NREGA .pptx

    31/35

    2/12/13

    Negative side and suggestion :-1. All assets are useless excepting a pond.2. Work done under the scheme has destroyed

    playground, pastures and spoiled so much land.3.Making ponds and roads are actually Machine

    work but in this act, workers are doing this kind ofjob, it doesnt make any sense.

    4.There are so many works that can be done byonly hand like Tree plantation, bricksmanufacturing, handicrafts, domestic industrialwork.

    5. Villages are being dirty and ugly because of

    the work. We have to make all villages clean andgreen not dirty and ugly.

    6. We have to stabilize domestic industries in thevillages for development.

  • 7/29/2019 NREGA .pptx