Hyosung Corporation
PowerTransformersHyosung, China
(Nantong Factory)
February, 2015
Who we are
What we do
How we do it
What we’ve done
Hyosung – A Global Brand of Power and Industrial Systems
Hyosung Corporation is a global B2B company, $12 billion in revenue
Hyosung China is a 100% subsidiary of Hyosung Corporation
Wind Turbine Systems
Wind farms
Solar Power Systems
Fuel Cells
Transformers GIS and GCBs
Substations
STATCOM Systems
Motors
Gear Reducers
Plants
Chemical Plant Equip.
Large Size Pumps
General Purpose Pumps
Petrochemical Pumps
Desalination Systems
*Hyosung China: Transformer only
Opened New UHV transformer factory in Nantong
Transformer HistoryOur History
Establishment of Hyosung Corp Heavy Industries
154kV Transformer, First in Korea
345kV Transformer, First in Korea
Acquired power transformer company in Nantong,
China
765kV Transformer, First in Asia and #5 in the world
1962
1969
1978
1992
1997
2006
2008
2011
345kV Shunt Reactor
Hyosung, China started exporting power
transformers to the global market
HICO America (2001)
New Factory in China (2008)
1st Factory in Korea (1962)
Over 50 years of experience in electrical equipment
Hyosung China Factory Key Facts
Area 200,000 m²
Production Capacity 50,000 MVA per year
Number of Employees approximately 1,209 persons
(Design & Engineering(136) / Quality(72) / Manufacturing(788) / Others(213)
Products UHV power transformers up to 750kV 2500MVA
Distribution transformers, including oil-immersed type and cast-resin type
Special transformers for industry application
Shanghai PortAbout 200km
Organization Chart
Head of Transformer
Division
Domestic Sales
Power Transformer Global Sales
Distribution TR Sales
Technology
Development
Engineering
Production
Transformer
Marketing
Production
Technology
Customer
Service
Execution
(Installation)
PU Head(KOREA)
Head ofHyosung, Korea
Factory
Quality
Innovation
Head of Hyosung, China
Factory
Quality
Management
Engineering
Production
Customer
Service
Execution
(Installation)
Domestic Sales
Project
Management
Members of your project team
Procurement
Procurement
Key functions are led by Korean managers in order to assure same level of
Design & Engineering, Manufacturing, QC/QA as Changwon factory in Korea.
Organization Chart
President
Design & EngineeringDivision
ManufacturingDivision
QA/QC Division Sales Division
Project Management Dept. Labor Union
UHV TR Design &Engineering Dept.
Distrubution TRD & E Dept.
Special TRD & E Dept.
UHV TR.Manuf. Dept.
Distribution TRManuf. Dept.
QA Dept.
QC Dept.
Service CenterProduction Technology Dept.
Oversea SalesDept.
Domestic SalesDept.
Eight(8)Branch Offices
Special TR. Sales Dept.Design ReviewCenter
Administration Division
Planning Dept.
Purchase Dept.
Human ResourceDept.
The world’s leading transformer supplier
Hyosung has supplied over 5,800 units¹ of EHV and UHV power transformers globally
Hyosung China has a wide range of customers in Asia, North/South America and Africa
Hyosung Sales Office Maintenance/Production Facility, Sales Office Project Office, Turnkey Project Execution Site
Spain Italy
GermanyRussia
Turkey
Jordan
Albania
IraqQatar
Saudi Arabia
UAE
India
China
Bangladesh
Thailand
Singapore
Indonesia
Malaysia Philippines
Japan
LAPittsburgh
Mexico
Panama
Brazil
Chile
Algeria
UK
Korea
South Africa
Hyosung, China (Nantong)
Hyosung, Korea (Changwon)
Hyosung China Transformer Line-up
Rectifier Transformer
Core form
Extensive supply record in core form technology
According to IEC, IEEE/ANSI, NEMA, JEC, BS, GB standards
and all applicable national standards
10kV ~ 330kV
Transmission Transformers
66kV ~ 750kV
Dry-type Transformer
10kV ~ 35kV
Cast-Resin type
GSU Transformers
66kV ~ 750kV
Distribution Transformers
10kV ~ 35kV
Oil-immersed type
Amorphous Transformer
10kV
Strong
ULTRA HIGH VOLTAGE
TECHNOLOGY ROBUST TECHNOLOGY
Hyosung was 6st to develop 765kV
transformers in the world.
Enthusiasm for Hyosung’s 765kV
transformers around the world: Korea,
Venezuela, India etc.
Hyosung China can produce up to
750kV class
Dielectric
Strength
Thermal
Strength
Mechanical
Strength 765kV Transformers to American Customer
Dielectric Strength: Uniform Impulse
Voltage Distribution, Dielectric Field Plot
Thermal Strength: Effective Cooling
System, Low Hottest-spot Temperature
Mechanical Strength: Withstands any
Short-Circuits, Seismic and
Transportation condition
Smooth
“Customer First” mindset enables speed
and flexibility
Fast delivery through efficient
manufacturing and engineering capacity
Reference Projects
CONVENIENT COMMUNICATIONFAST AND FLEXIBLE
Systematic communication through
“Happy Call” (Customer Satisfaction
System)
Frequent communication with
customer
CountryTransformer
RatingsPO Date LT (FOB)
Canada 3ph 230KV 195MVA Apr 2013 3.4 months
Philippines 3ph 220kV 100MVA Jun 2013 3 months
Turkey 3ph 154kV 62.5MVA Aug 2011 4 months
Pakistan 3ph 110kV 26MVA Feb 2012 3 months
China 3ph 110kV 100MVA Sep 2012 1 month DDP
China 3ph 220kV 180MVA Sep 2012 1 month DDP
China 3ph 220kV 150MVA July, 2013 2 months DDP
◀ Real time reply to Happy
Call & notification of
shipping progress
Client meeting at
Hyosung, China ▶
Manufacturing Capacity & Lead Time
Voltage Class
3ph 110kV
3ph 220kV
1ph 500kV
3ph 330kV
Time Cycle (Manufacturing) Delivery (FOB)
120 Days / 17 Weeks 6 Months
90 Days / 13 Weeks 5 Months
75 Days / 11 Weeks 4.5 Months
60 Days / 9 Weeks 3.5 Months
Delivery(FOB) = Engineering + Document Approval by Customer + Material Procurement + Production*Based on using the Chinese material and components
Standard Delivery
No.
CountryCustomer
NameTransforme
r Type
Date Of Receive Purchase
Order
Delivery Date(condition)
Lead Time
1 CANADACOLUMBIA POWEROF CANADA
3Phase 230KV 195MVA
10 April, 2013 20 July, 2013 (FOB) 3.4-Months
2 PHILIPPINESHYOSUNG CORPORATION
(PHILIPPINES)
3Phase 220kV 100MVA
10 June, 201310, September, 2013 (FOB)
3-Months
3 TURKY BERG Co.3Phase 154kV 62.5MVA
August 2011 December 2011(FOB) 4-Months
4 PAKISTAN MES Adyala Co.3Phase 110kV 26MVA
February 2012 May 2012(FOB) 3-Months
5 CHINAGRID STATE(RUDONG)
3Phase 110kV 100MVA
10 September, 2012
15 October, 2012(DDP)
1-Month
6 CHINASHANXI CHANZHIXIWANG PROJECT
3Phase 220kV 180MVA
5 September, 20128 October, 2012(DDP)
1-Month
7 CHINACHINA Hydro Electricity GROUP
3Phase 220kV150MVA
3 July, 20131 September, 2013 (DDP)
2-Months
Manufacturing Capacity & Lead Time
Reference of Order
Operation environment Seismic
conditions, extreme ambient temperature,
high altitude level, corrosive atmosphere
Special performance Low noise, Fire
resistant fluid(like as ester oil or vegetable
oil)
Special configuration Three phase site-
combined configuration for efficient
transportation
CASE-SPECIFIC QUALITY
SOPHISTICATED CUSTOMIZATION
Sophisticated
Every detail as you want to have it
Interface matters
▲Safety ladders and platforms as per local
regulations and preferences
◀ Painting
according to C5M
(ISO 12944)
Total film thickness:
260㎛
Design
Mutual Exchange of Technology Cross-Functional Design Review
Design review by independent team in
Nantong and expert in Changwon
Magnetic
(%IZ, Force, Loss)
Transient Voltage
& Dielectric Mechanical Cooling
Reliable and Design Integrated Software
Hyosung proprietary software and commercial software (ANSYS, NASTRAN/PATRAN, AutoCAD)
Automatic drawing system
▲ Korean expert dispatched in Nantong
▼ Nantongengineers inChangwon
4. Electric Field Analysis
Analysis of electric field and transient voltage, assure reliable insulation
2.1 Design & Engineering System
<Before : Separate Type Program >
* Field Analysis (Commercial) + Evaluation (Hyosung)
<After : Combined Type Program (EST – Dielectric analysis)>
* Field Analysis(Hyosung) + Evaluation(Hyosung)
- The Dielectric analysis program has been developed and applied , which can allow not only easy approach for designers, but also reduction of lead-time for the designing process by conducting analysis and evaluation process at the same time. This program can be applied to every type of Hyosung’s TR up to 800kV Class.
■ Dielectric Analysis Program Newly Developed
■ TVA - TRANSIENT VOLTAGE analysis
program
FULL WAVE
CHOPPED WAVE
5. Magnetic Field and Temperature Analysis
Analysis of loss and temperature by using self – developed program
2.1 Design & Engineering System
■ HITOT - FORCE & LOAD LOSS analysis
program
(MAGNETIC FIELD analysis)
■ TRCORE - CORE LOSS and TEMPERATURE
analysis program
■ COOLING - TEMPERATURE analysis
program
ONANONAFODAF
5. Automatic drawing program
2.1 Design & Engineering System
- For the prevention of the human error, the automation design program for the winding & insulation has been developed and
applied.
Through the program, Hyosung’s winding & Insulation design can be more accurate and effective .
■ Auto-Drawing - Winding Design and Drawing Program
Core Drawing End Frame Drawing Winding Drawing
Using magnetic analysis, eliminate hot spot heating on tank structure
■ High current bushing turret
▲ Before improvement▲ After improvement
▲ Verification Test
2.1 Design & Engineering System
5. Magnetic Field and Temperature Analysis
■ ANSYS – Vacuum and Mechanical strength analysis
6. Mechanical Analysis
Vacuum and seismic strength
■ NASTRAN & PATRAN – Seismic analysis
2.1 Design & Engineering System
7. Mechanical Analysis
Short-circuit reports from international laboratories
▲ KERI / Korea▲KEMA / Netherlands ▲ XIHARI / China▲ CESI / Italy
KEMA: Netherlands Association for Testing Electrical Materials CESI: Italian Electrical and Technical Experimental Center KERI: Korea Electro Technology Research Institute CTQC: China National Transformer Quality Supervision and Testing Center XIHARI: Xi’an High Voltage Apparatus Research Institute Co., Ltd.
▲ CTQC / China
2.1 Design & Engineering System
BPDB : Bangladesh Power Development Board KEPCO : Korea Electric Power Corporation GASCO : Abu Dhabi Gas Industries Ltd. SONELGAZ : Algeria Electric Power SGCC : State Grid Corporation of China IESCO : Islamabad Electric Supply Company Limited, Pakistan
Customer Description Test Lab Date
BPDB
BPDB
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
KEPCO
SGCC
KEPCO
SGCC
GASCO
GASCO
SONELGAZ
TERNA
IESCO
3ph 60Hz 15/20MVA 132/33kV DY
3ph 50Hz 25/41MVA132/33kV DY
3ph 60Hz 60MVA154/23kV YYD
1ph 60Hz 15/20MVA 154/23kV YYD
1ph 60Hz 20MVA 154/23kV YYD
1ph 60Hz 20MVA 154/23 YYD
3ph 60Hz 60MVA154/23kV YYD
1ph 60Hz 15/20MVA 154/23kV YYD
1ph 60Hz 20MVA 154/23kV YYD
1ph 60Hz 15/20MVA 154/23KV YYD
3ph 50Hz 80MVA 110/21/10.5KV YYD
3ph 60Hz 60MVA 154/23kV YYD
3ph 50Hz 126/180MVA 230/121/11kV YYD
3ph 50Hz 50MVA 132/11kV YD
3ph 50Hz 96/120MVA 132/34.5kV YYD
1ph 50Hz 60/80/100MVA 400/225/31.5kV YYD
3ph 50Hz 200MVA 400/115kV AUTO
3ph 50Hz 40MVA 132/11.5kV DY
KERI
KERI
KERI
KERI
KERI
KERI
KERI
KERI
KERI
KERI
XIHARI
KERI
CTQC
KERI
KERI
CESI
KEMA
CTQC
'89.06
'89.06
'96.08
'97.04
'98.12
'00.01
'01.02
’06.11
’07.06
‘08.08
’09.08
’09.12
’10.07
’10.11
’10.12
’11.06
’11.11
’12.10
7. Mechanical Analysis
Record of Short-circuit Test
2.1 Design & Engineering System
■ Step-Lap stacking for minimizing core loss
8. Low Loss High Efficiency
Design low loss and high efficiency product
■ CTC and sub-divided conductor for low eddy-current loss in winding
■ Apply magnetic shunt for low stray loss
2.1 Design & Engineering System
■ Paint(Tropic, Salt and Chemical pollution area)
Description Standard Special (C5M)
Prime Coat
Type of paintPoly Urethane
Q/D-2Epoxy Zinc prime
Dry film thickness 40㎛ 40㎛
Color Red Brown Red Brown
Intermediate Coat
Type of paintAcryl Urethane
500Epoxy prime
Dry film thickness 80㎛ 160㎛
Color Grey Red
Finish Coat
Type of paint Acryl Urethane 500 Acryl Urethane 500
Dry film thickness 40㎛ 60㎛
Color GreyAccording to Customer
required
Total film thickness 160㎛ 260㎛ C5M
9. Anti-Corrosion
Anti-corrosion method against site and operating condition
2.1 Design & Engineering System
Procurement
Core
Steel Plate
Coil
Bushing
Tap Changer
Insulation
Oil
Relay
Effective Supplier Management Global Suppliers for Materials & Parts
Semi-annual supplier evaluation
3 strike-out for non-conforming material
Approval after re-audit for new suppliers
Same system as Changwon plant
▲ PRD test ▲ OLTC test
1. Supplier Management
■ Check and test materials/components before receiving (reject the disqualified one)
■ Arranging expert for inner material inspection
■ Perform QA audit for new supplier
■ 3 Strike-out system for Non-conforming material/component
1st time: Warning;
2nd time: QA re-audit to supplier
3rd time: Delete from supplier list
■ Quality evaluation of suppliers periodically, twice a year
▲ KANBAN system for supplier
2.2 Quality Control System
2. Receiving Test
■ Carry out receiving tests in house
■ Raw materials and Major components
▲ Conductor resistance measurement ▲ BH-Relay test ▲ PRD test
▲ Temperature Indicator Test ▲ Silicon Steel Test ▲ LTC Test
2.2 Quality Control System
▲ Test equipment of AC withstand andpartial discharge test for 1,000kVbushing
▲ Insulation material test by X-Ray
2.2 Quality Control System
Manufacturing
Clean Environment
Advanced air-conditioned ventilation
and purification system
Modern Manufacturing Machinery
High Standard for Precision
Computer-controlled processes
Strict control of dimensions after drying
Vertical and horizontal
winding machines
Solvent type vapor-phase
drying plants
Large sized cranes:
up to 400 tons
Air pallets:
up to 500 tons (250 tons*2)
■ Max. working weight: 35tons
■ Max. working height: 3,000m
m
■ Max. working diameter: 3,500
mm
Winding machine
■ Max. pressure: 250tons
■ Oven size: 5m(W)x12m(L)x5.5
m(H)
■ Max. vacuum: 5Pa
Constant pressing equipment during drying
2.3 Manufacturing Technology
1. Manufacturing equipment
■ Autoclave size: 5.5m(W)x14m(L)x6.2
m(H)
■ Insulating oil Impregnate after fine va
cuum
Vapor-phase drying facilities
■ Oil temperature: 120℃
■ Oil spraying under vacuum
Hot-oil drying facilities
2.3 Manufacturing Technology
1. Manufacturing equipment
▪ Because of blocking out the smal
lest
moisture & particle, operate a
double
clean room in the assembly line
2.3 Manufacturing Technology
1. Manufacturing equipment
2.3 Manufacturing Technology
▲ Green
▲Blue
▲Yellow
ID control by name plateProcess schedule managementby target date
Particle control in the shop
2. Manufacturing Technology
▲ Announcement of target(loading) to each
people during morning meeting
▲ Particle monitoring and control at shop
Chamfer R3
2.3 Manufacturing Technology
2. Manufacturing Technology ■ Eliminate the sharp edge on insulation components, to reduce partial discharge■ To control the partial discharge under 50pc (Criteria on strandard: ≤ 300 pC, IEC)
Chamfer more than R10
Around R5
Insulation Frame
Chamfer R5
◀ Leakage testincluding tank base bottom
◀ Positive pressure storage and
transportation to prevent moisture
incoming
■ To prevent defect and disqualification, Nantong Hyosung consistently improve
technology, work standard, production capability and inspection method.
2.3 Manufacturing Technology
2. Manufacturing Technology
Testing
In-house UHV Testing Capacity
LI: ~3600kV BIL, SI: ~2800kV BSL
Modern Testing Facilities
Large Testing Capacity
Control rooms
Doble/USA Haefely/Swiss Highvolt/Germany
Test Lab
• 2,400 m2 (25,834 ft2)
• Up to 1,000kV
Receiving Test Room
Oil Test Lab in house
Transport & Supervising
Ocean Transport Hub Excellent Supervisor
Full assurance through site supervising
Site training service for customer
maintenance crew
Nantong
Rugao Port
Distance from Hyosung, China
to Rugao port: 80 km
to Yangkou port: 82 km
to Shanghai port: 250 km(155 miles)
Shanghai Port
Yangkou Port
■ A/S system:
• After request from customer,
- Within 10 minutes, reply to his reque
st
- Within 24hours, dispatch service
engineer to site to solve the problem,
in case of domestic site
■ B/S system:
• Routine site inspection after communic
ation
with client
• Change or replacement of consumable
parts
1. After sales service (A/S) and Before sales service (B/S)
2.4 Service Center
2.4 Service Center
The thankful letter of Intergen SLP PJT in Mexico
■ Major service:
1. Collection of customer requirement and complaints after delivery
2. V.O.C report (VOC: Voice of Customer)
3. Reply our improvement or activity to client for VOC and complaints
Happy call center
2. Happy Call (Customer Satisfaction System)
2.4 Service Center
Happy call response
3. Notice of the Happy Call & Tracking the progress of transportation
■ Through SMS by cellular phone, notify the response of Happy Call and
the tracking the progress of transportation to customer
2.4 Service Center
Tracking the progress of transportation
Quality Management Program
VOC Improvement Report
Total Quality Management Quality with Relevance
ISO9001, ISO14001, ISO18001 by DNV Easy feedback by customer through VOC
system
All issues are recorded and reviewed for
continuous improvement
DesignProcure-
ment
Manufact-
uring
Trans-
port
Install-
ationFAT SAT
Protocol &
training
Bell
system
Line stop
system
产品型号 项目名称
担任职务 客户电话
发出部门 发出者
措施部门 接收者
完成纳期
No. 担当
1
2
3
4
回复方式 回复人
确认人 确认时间
*担当部门填写
措施内容
措施制定
超高压设计部发出时间
客户信息及要求事项
18502510202张工
*发出部门填写
NP12-1009-01生产编号
专工
OSSZ11-240000/220
编号:AS-14-11-002
紧急度 C
朱卫东
请于 4小时内回复
江苏省盐城供电公司盐城佳湖变
R-NH-3/QA3-009 表1
指出事项详细内容
*发出部门填写
现接客户服务中心朱卫东担当反馈,江苏省盐城供电公司盐城佳湖变(NP12-1009-01,OSSZ11-240000/220)客户张工现场验收时提出以下问题: 1、高压套管及瓦斯继电器的连接油管的法兰、散热器法兰之间未做接地跨接线。 2、主变压器爬梯无明显接地。 3、主变压器的本体电缆槽盒连接部位需要做接地跨接线。
接收时间 客户服务中心
完成时间
赵峰
2014.11.17 9:20
□口头 □电话 □书面
*发出部门填写
※备注:
完成情况 □完成 □未完成
回复客户
※补充说明: 客户意见
VOC(顾客要求事项)通报书流程简述:客户提出要求→接收部门填写VOC→QA发出VOC→措施部门对策→提出部门回复客户→QA跟踪
措施部门
客户姓名
*担当部门指定 担当人
2014.11.17 9:40
完成跟踪 *QA VOC担当填写
□满意 □不满意
回复时间
3. Bell System
■ When there is a quality/delivery issue at workshop, the bell will be triggered to the related
departments, QA/QC / Design & Engineering / Manufacturing / Manufacturing Technology /
Procurement dept.■ Related engineers should arrive at shop in 20 minutes■ Take measure and solve the issue within 24 hours■ Documentation and standardization for improvement
Bell for quality issue
Bell for delivery issue
2.2 Quality Control System
4. In-Process Inspection ■ All manufacturing process are controlled by Hyosung manual.
■ Hyosung process manual is gone into detail. (over 400 steps process)
■ Self-inspection & in-process inspection according to its manual.
工序名称 部件名 1
QC工序图名称 相关标准 11
修订 制作QA组确认
0
1
2
3
4
5
顺序 人员时间
(min)
1
2 1 30
3 2 40
南通晓星变压器有限公司
主要设备工装材料
工量具
卧式绕线机
导线折弯工具、拉紧器、拉紧带
电动扳手、导线剪切剪
绕线线模
卷尺、千分尺、胶锤
NH-5/GY1-005-RX-54 层式线圈绕制工序名称
根据线圈内绝缘筒内径选取绕线模。用电动扳手将绕线模收缩到可以放进绝缘筒的尺寸。用抹布擦去绕线模上的浮灰。 周长±5mm
绝缘纸筒尺寸绕线模选用
卷尺
绕线
2009-1-8 单层圆筒式线圈 形式(图纸编号)作业标准产品名
审核 批准
行车
油浸式变压器
修整
原案作成
年.月.日 修订内容
增加内容
09.04.03
09.3.14
08· 12.24
09· 1.8
删除PVG加强
* 作业后收尾时的确认事项
实际作业时间填写主要内容(作业条件)
(*质量, +:安全/环境)
内容 检查项目 检查方法 检查标准业务指南/自主检查表
具体作业内容作业步骤
圆筒式线圈,导体为纸包扁铜导线、换位导线。绕线机采用卧式绕线机。
适用范围
卷尺轴向高度±2mm
内绝缘纸筒安装将调节小的绕线模中间垫一块横木,翘起一头,套入纸筒。也可利用行车配合,套入纸筒。操作时地面要保证清洁,无异物,加铺塑料布,避免污染和硬损伤纸筒。
样式NH-5/GY1-005-RX-54A4(2009.04.03)
◀ Sample:- Tools & device- Method- Process- Time- Check point and e
tc.
2.2 Quality Control System
Key Global Customers of Hyosung China
Europe ,Middle & Central Asia
Poland
Turkey
Kazakhtan
Egypt
Africa
Angola
Chad
Ethiopia
Guinea
Sudan
Ghana
North America
Canada
Mexico
Latin America
Colombia
Brazil
Chile
Ecuador
Peru
Achieved Overseas Market
East Asia
Korea
Bangladesh
Cambodia
Indonesia
Myanmar
Philippines
Pakistan
Vietnam
Achieved Domestic Market
500kV/336MVA
500kV/250MVA330kV/240MVA
220kV/180MVA
220kV/370MVA
500kV/200MVA
Achieved EPC Project
Voltage China Overseas Country
500kV41
units37
units
Philippines, Vietnam, China, Colombia, Peru,Chile, Bangladesh(400KV)
330kV55
unitsChina
220kV246units
68units
Canada, Poland, Mexico, Brazil, Chile, Colombia, Ecuador, Indonesia, Peru, Philippines, Vietnam, Cambodia, Angola, China, Bangladesh
110kV787units
85units
Mexico, Turkey, Chad, China, Ecuador , Ethiopia, Guinea, Myanmar, Philippines, Pakistan, Vietnam, Colombia, Indonesia, Angola
*Hyosung, China started the export on 2011.
Sales Reference
Transmission & Distribution
500kV, China
Single phase core transformer
250MVA 500kV
Delivered 2009-2010
Inner Mongolia Power (Group)
Co., Ltd.
330kV, China
Three phase core transformer
250MVA 330kV
Delivered 2012
Qinghai Electric Power
Corporation
500kV, Philippines
Single phase 200MVA 500kV
Three phase 300MVA 230kV
Delivered 2011-2014
NGCP(National Grid Corporation
of the Philippines)
230kV, Ecuador
Three phase 300MVA 230kV
Delivered 2013
CELEC transmission support
project
230kV, Brazil
Three phase 150MVA 230kV
Three phase 50MVA 230kV
Delivered 2013
COPEL, Brazil Santa Quiteria
Project
500kV, Vietnam
Single phase 150MVA 500kV
Delivered 2013
NPPMB, Vietnam Nho Quan
Substation Project
Generation
500kV, China
Three phase GSU Transformer
200MVA 13.8/500kV
Delivered 2011
Duoyuan Hydropower
Development Co., Ltd.
230kV, Canada
Three phase 195MVA 13.8/230kV
Delivered 2013
GSU for Waneta P/S
500kV, China
Three phase GSU Transformer
336MVA 15.75/500kV
Delivered 2011
Mao Ergai Hydropower Co., Ltd.
220kV, Poland
Three phase transformer
386MVA 17/220kV
220MVA 17/220kV
Delivered 2013
Stalowa Wola PJT
220kV, Chile
Three phase 65 MVA 11/220kV
GSU
High altitude, seismic
conditions
Colbun
Delivered 2011
Hydropower, Peru
Three phase 71 MVA
13.8/220kV GSU ODWF
Andritz Hydro
Delivered 20114
Yunnan Huadian / Ludila Hydro-Power Plant
▲Transportation Route:
3,209km by Rail + 129km by truck = Total 3,33
8km
PROJECT: 500kV GSU for Ludila Hydro-Power Plant at Jin-sha River, Yunnan in China
GENERATING CAPACITY: 2,160 MW (6 * 360MW)
WATER HEAD.: 1,223 m
TR. SPEC.: 1-ph 50Hz 140MVA 18/550kV YD with DETC on HV, ODWF Cooling
QUANTITY: 18 units (6 banks)
Unit First Unit Other Units
From Sep-2011 Nov-2011
To Nov-2011 Dec-2012
Lead Time 2.9 months 1.6 months
Lead Time
500kV GSU for Ludila Hydro-Power Plant, China
No. Description Specification
1 Model Number DSP-140000/500
2 Phase Single Phase
3 Frequency 50 Hz
4 Rated Voltage 18 / 550 kV
5 Capacity 140 / 140 MVA
6 Tap Changer DETC (0/+5% on HV)
7
LightningImpulsewithstand(Full Wave)
HV 1,550 kV BIL
XV 125 kV BIL
H0 185 kV BIL
8 AC Induced HV 680 kV
9 Cooling ODWF
10 Numbers of Unit 18 units
11 End-User Ludila / China
Guizhou Xingyi Thermal Power Plant
PROJECT: Guizhou Xingyi Thermal Power Plant 2 * 600MW Project
GENERATING CAPACITY: 1,200 MW (2 * 600MW)
TR. SPEC.: 1-ph 50Hz 240MVA 20/550kV YNd11 with DETC, ODAF Cooling
QUANTITY: 3 units
▲Transportation Route:
500km by Rail + 2,089km by truck = Total 2,58
9km
500kV GSU for Guizhou Xingyi Thermal Power Plant , China
No. Description Specification
1 Model Number DFP-240000/500
2 Phase Single Phase
3 Frequency 50 Hz
4 Rated Voltage 20 / 550 kV
5 Capacity 240MVA
6 Tap Changer DETC
7
LightningImpulsewithstand(Full Wave)
HV 1550 kV BIL
XV 200 kV BIL
H0 325 kV BIL
8 Cooling ODAF
9 Numbers of Unit 3 units
10 End-User Guizhou Xingyi / China
Canada SNC-Lavalin / Waneta Hydro Power Plant
PROJECT: Canada SNC-Lavalin / Waneta Hydro Power Plant Project
GENERATING CAPACITY: 1,000MW
TR. SPEC.: 3Ph 60Hz 195MVA 230/13.8kV ONAN / ONAF1 / ONAF2 DETC
QUANTITY: 2 units
From 10 April , 2013
To 20 July , 2013
Lead Time 3.4 months (101days)
Lead Time ( FOB )
Other Applications
Aluminum smelter, China
Largest rectifier transformer in the
world
Three phase 175MVA 330/1.25kV
Primary: 319.6A
Secondary: 2*40.415kA
Delivered 2011
Turkey
Three phase core
62.5MVA 154/34.5kV
BERG Turkerler Project
Delivered 2011, 2013
Factory, Indonesia
Three phase core
30MVA 150/11kV
Delivered 2012
Steel plant, Vietnam
Three phase 150MVA 110/33kV
Three phase 120MVA 110/22kV
Delivered 2013
Aluminum smelter, China
Three phase 420MVA 220kV
Delivered in 2008
Chemical Factory, China
Three phase 100MVA 220kV
Delivered in 2014
Rectifier Transformer
Largest rectifier transformer in the world
Project No NP10-7011
Customer Aluminum company
Country China
Time of Order Sep-2010
Time of Delivery May-2011
*Supplied by Hyosung, China
Technical Data
Type 3-phase core-form rectifier transformer with voltage regulating
Power 175MVA, 7 units + 165MVA, 17 units
Voltage 330/1.25kV
Current Primary: 320A, Secondary: 2*40.4kA
Cooling OFAF
• 14 years of experience in rectifier transformers.
• Largest rectifier transformer supplied from Hyosung, China.
• Highest voltage and largest capacity in the world
• This customer remains one of Hyosung’s most royal customers to date
and has ordered many more rectifier transformers.
• Hyosung China offers rectifier transformers both for Aluminum process
applications and Copper/Chlorine/Zinc/Magnesium process applications.
Project Highlights
▶ Reference for rectifier transformers since 2000: (220kV and above)• ZHSFPTB-84000/330 6 units Qinghgai Yanhu Magnesium, China.• ZHSFPTB-165000/330 17 units Gansu Dongxing Aluminium, China• ZHSFPTB-117000/330 7 units Qingtongxia Aluminium, China• ZHSTB-150800/220 7 units Xinjiang East Hope Nonferrous Metal, China• ZHSFPTB-110000/220 12 units Shandong Yili Aluminium, China• ZHSFPTB-104000/220 6 units Longkou Donghai Aluminium, China• ZHSFT-103650/220 7 units Henan Wanji Aluminium, China• ZHSFPTB-100000/220 4 units Shandong Xinfa Aluminium, China• ZHSFPTB-92100/220 4 units Lanzhou Aluminium, China
Beta Fluid – Fire Resistant Fluid
Intergen SLP PJT, MexicoThree phase 150MVA 230kV(GSU)
http://dsiventures.com/2015/01/15/230kv-beta-fluid-transformers-energized-in-mexico(January 15, 2015)
TYLER, TX – DSI Ventures, Inc. announces the commissioning of two 230 KV Generator Step-Up (GSU) Transformers filled with Beta Fire Resistant Fluid at the new Bajio thermoelectric power plant in Guanajuato, Mexico.Installed in 80 and 150 MVA, 230 KV transformers built by Hyosung China, Nantong Factory, Beta Fluid was chosen for its 22 year record of fire safety, its low price and its excellent environmental record.Beta Fluid is a fire resistant transformer oil made from petroleum base oils. Developed in 1993, Beta Fluid has been used in tens of thousands of applications worldwide to add a significant margin of safety to transformers located in hazardous locations.
Hyosung, China
Global Top Energy Solution Provider
Your Choice for the Future