——————High Voltage ◆ High Current ◆ High Power Test System and Components—————— WWW.SAMGOR.COM
TPTTS series Power Transformer Test System
750kV Class Power Transformer Test Lab
PTTS series power transformer test system is the
complete test system for single and three phase power
transformer and power reactor up to 765kV. The system
will perform the following tests in accordance with ANSI /
IEEE C57.12.90 and IEC 76 latest edition standards
Samgor offer the turn-key project of the PTTS power
transformer test system mainly consists of the station
design, type selection and purchase of special equipment,
equipment installation and commissioning, system
connection, system commissioning, transformer test,
training of the testing personnel, etc. The station is
applicable to all delivery tests, type tests and some
special tests of transformers.
Samgor has developed transformer test systems that offer
the customer reliability and flexibility solution. By utilizing
Programmable Logic Controllers (PLC) in the control
system, the PTTS series power transformer test system
allows the customer the ability to add optional features or
change the test sets operating procedures by
reprogramming the PLC. This is much more cost effective
than rewiring the test set as was required in traditional test
systems. Reliability is a top priority for Samgor.
Craftsmanship and the use of top quality materials and
components insure the customer years of reliable service
from their transformer test system.
All test data are recorded automatically and the necessary
correction calculations according to ANSI C57 and IEC
60076 standards are performed automatically. The
system calculates corrected losses, efficiency, regulation
and percent impedance. Computer aided data acquisition
is increasingly becoming the standard as customers
demand computer generated reports that reduce operator
error. The system features Microsoft Windows based
testing software which builds a data base of transformer
test results and creates accurate final test reports in
Microsoft Office format. Setup maps for each test are
provided to reduce costly connection mistakes.
Scope of Work:
◆ Design of the test station (including design of the
primary and secondary systems, the equipment layout
of the hall, the equipment wiring routing, embedded
pipes, grounding system, etc.);
◆ Selection of the test equipment (including the research
and development of special comprehensive intelligent
measurement & control system and equipment
procurement);
◆ Layout and installation of the test station (including
installation of the primary & secondary loops, overall
integration of equipment, construction of the grounding
system and shielding system and so on);
◆ Supply of the measurement & control system of the
test station and its installation and commissioning;
——————High Voltage ◆ High Current ◆ High Power Test System and Components—————— WWW.SAMGOR.COM
◆ Commissioning of the primary and secondary systems
of equipment (including combined commissioning of all
equipment);
◆ Transformer test and training (completing the overall
test of transformer according to testing standards and
providing practical operation training for testing
personnel )
Test Project:
PTTS transformer test systems are designed to perform
transformer tests in accordance with ANSI C57 and IEC
60076 standards, latest edition. These tests include:
Winding Resistance Test
Turns Ratio and Vender Group
Insulation Resistance Measurement
C & Tan Delta Measurement
Excitation Current Measurement, Harmonics
Analysis
Excitation Loss (No-load or core loss) Test
Impedance Voltage Measurement
Full Load Current Measurement, Harmonics
Analysis
Copper Loss (Load loss) Test
Temperature Rise Measurement, Heat Run Test
Applied Voltage Test
Induced Over Voltage Test
Partial Discharge Test
Impulse Voltage test / Chopping Wave Test
Bushing Test
Transformer Oil Test
Sound Level Measurement
Zero Sequence Impedance Measurement
Radio Interference Test
Transit Characteristic Test
Etc.
Project Pictures Overview:
50Hz/60Hz MG Set
200Hz MG Set
VFD
——————High Voltage ◆ High Current ◆ High Power Test System and Components—————— WWW.SAMGOR.COM
Power Capacitor Bank
Compensating Reactor
Control Cabinet
Bus Bar
Oil Cooling Unit
Step Up Transformer
——————High Voltage ◆ High Current ◆ High Power Test System and Components—————— WWW.SAMGOR.COM
AC Apply Voltage Test System (AC Resonant Test System)
AC Apply Voltage Test System (AC Test Transformer)
Impulse Voltage Test System
TMS System
Control Room
Standard Voltage Divider
——————High Voltage ◆ High Current ◆ High Power Test System and Components—————— WWW.SAMGOR.COM
Wall Bushing
Project Drawings Overview:
MG System Drawing
MG Drawing
MG Room Layout Drawing
Welcome to contact us for more details!
For further information please contact:
Samgor Technology Add: No.2979A Chuansha Rd. Pudong, Shanghai,
201201, China
Tel: 86-21-58999552 58999556
Fax: 86-21-68482953 50323350
E-mail: [email protected]
Http:// www.samgor.com