Hydrocarbon Impacts and Remedial Action at an Active Service Station

Jeff Linke, Chevron Canada Limited, Vancouver, BC

Saleh A. Haidar, Keystone Environmental, Burnaby, BC

Remediation Technologies Symposium 2006

Fairmont Banff Springs Hotel

October 11, 2006

Page 2: Hydrocarbon Impacts and Remedial Action at an Active

2DOC ID© Chevron 2005

WHAT WE LEARNED

Value in Early Communication with Stakeholder Groups

Spend Time to Choose the Right Team

Do Not Hesitate to Innovate

Page 3: Hydrocarbon Impacts and Remedial Action at an Active

3DOC ID© Chevron 2005

BACKGROUND

Retail Location Since 1920’s

Chevron Retail Outlet Since 1950’s

Currently Four 46,000L Fiberglass USTs

Maintenance Upgrade Work in the 1990’s

Early Investigation Work in Late 1990’s

On Site Source Removal in Late 1990’s

Page 4: Hydrocarbon Impacts and Remedial Action at an Active

4DOC ID© Chevron 2005

PROJECT GOALS

Ensure Safety of All Receptors

Manage Contamination Issue and Liabilities

Obtain CoC for Off-Site Stakeholders

How to Obtain These Goals:

Define and Delineate Hydrocarbon Plume

Abate Further Migration

Remove Existing Contamination

Retain Future Lingering Contamination to Site

Execute Monitoring Strategy

Page 5: Hydrocarbon Impacts and Remedial Action at an Active

5DOC ID© Chevron 2005

SITE CHARACTERIZATION

Keystone Environmental Conducts Detailed Site Investigation

62 Boreholes Advanced On and Off-Site

Analyzed > 400 Soil samples for Hydrocarbon Indicators

Analyzed > 500 Ground Water Samples for Hydrocarbon Indicators

Developed Detailed Conceptual Site Model

Conducted Indoor Air Quality Monitoring

Regular Liaison with Stakeholders (i.e. Residents, Local and Provincial Governments)

Page 6: Hydrocarbon Impacts and Remedial Action at an Active

6DOC ID© Chevron 2005

SITE LAYOUT

Work Area

Page 7: Hydrocarbon Impacts and Remedial Action at an Active

7DOC ID© Chevron 2005

INVESTIGATED AREAS

Soil Data

Page 8: Hydrocarbon Impacts and Remedial Action at an Active

8DOC ID© Chevron 2005

INVESTIGATED AREAS

Groundwater Data

Page 9: Hydrocarbon Impacts and Remedial Action at an Active

9DOC ID© Chevron 2005

SOIL AND GROUNDWATER PLUME

Page 10: Hydrocarbon Impacts and Remedial Action at an Active

10DOC ID© Chevron 2005

PROJECT PLANNING

Evaluate Remedial Options

Series of Options Developed

Economic Evaluation of Options

Select Remedial Option

Agreement with Stakeholders, Internal and External

Assemble Project Team

Coordinate with Municipality, Utilities, Residents and Neighbours

Page 11: Hydrocarbon Impacts and Remedial Action at an Active

11DOC ID© Chevron 2005

REMEDIATION

Underpinning and Shoring

Piles and grade beams installed on 4 homes

One home demolished

Excavation

Removed all backyard improvements

Removed soil from backyards and under homes

Barrier Wall Installation

45m by 5.5m organic reactive barrier wall installed on retail station property line

Page 12: Hydrocarbon Impacts and Remedial Action at an Active

12DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 13: Hydrocarbon Impacts and Remedial Action at an Active

13DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 14: Hydrocarbon Impacts and Remedial Action at an Active

14DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 15: Hydrocarbon Impacts and Remedial Action at an Active

15DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 16: Hydrocarbon Impacts and Remedial Action at an Active

16DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 17: Hydrocarbon Impacts and Remedial Action at an Active

17DOC ID© Chevron 2005

UNDERPINNING AND SHORING

Page 18: Hydrocarbon Impacts and Remedial Action at an Active

18DOC ID© Chevron 2005

EXCAVATION LIMITS

Page 19: Hydrocarbon Impacts and Remedial Action at an Active

19DOC ID© Chevron 2005

EXCAVATION

Page 20: Hydrocarbon Impacts and Remedial Action at an Active

20DOC ID© Chevron 2005

EXCAVATION

Page 21: Hydrocarbon Impacts and Remedial Action at an Active

21DOC ID© Chevron 2005

EXCAVATION

Page 22: Hydrocarbon Impacts and Remedial Action at an Active

22DOC ID© Chevron 2005

EXCAVATION

Page 23: Hydrocarbon Impacts and Remedial Action at an Active

23DOC ID© Chevron 2005

EXCAVATION

Page 24: Hydrocarbon Impacts and Remedial Action at an Active

24DOC ID© Chevron 2005

EXCAVATION

Page 25: Hydrocarbon Impacts and Remedial Action at an Active

25DOC ID© Chevron 2005

EXCAVATION

Page 26: Hydrocarbon Impacts and Remedial Action at an Active

26DOC ID© Chevron 2005

EXCAVATION

Page 27: Hydrocarbon Impacts and Remedial Action at an Active

27DOC ID© Chevron 2005

BARRIER WALL DESIGN

Page 28: Hydrocarbon Impacts and Remedial Action at an Active

28DOC ID© Chevron 2005

BARRIER WALL MODEL

Page 29: Hydrocarbon Impacts and Remedial Action at an Active

29DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 30: Hydrocarbon Impacts and Remedial Action at an Active

30DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 31: Hydrocarbon Impacts and Remedial Action at an Active

31DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 32: Hydrocarbon Impacts and Remedial Action at an Active

32DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 33: Hydrocarbon Impacts and Remedial Action at an Active

33DOC ID© Chevron 2005

BARRIER WALL INSTALLATION

Page 34: Hydrocarbon Impacts and Remedial Action at an Active

34DOC ID© Chevron 2005

POST REMEDIATION ACTIVITIES

Install Post Remediation Confirmatory Wells

Reinstate Structures (eg. floor slabs)

Reinstate Rear Yards, Fences, Garages

Reconnect Utilities

Performance Monitoring of Barrier Wall

Preparing Closure Reports for Certificates of Compliance on Off-Site Properties

Page 35: Hydrocarbon Impacts and Remedial Action at an Active

35DOC ID© Chevron 2005

PROJECT PARTICIPANTS

Chevron Canada Limited (Environment, Public and Government Affairs, Legal, and Engineering)

Keystone Environmental Ltd. (Environmental and Contract Administrator)

Hazco Environmental Services Ltd. (Remediation Contractor)

City of Burnaby (Engineering, Planning, Traffic)

GeoPacific Consultant Ltd. (Geotechnical)

Sommerset Engineering Group (Structural)

PLUS several other sub-contractors

Page 36: Hydrocarbon Impacts and Remedial Action at an Active

36DOC ID© Chevron 2005

CONCLUDING REMARK

Treat project as an investment, not an expense