31
HUMANITARIAN OPERATIONS UPDATE 23 April 2003

HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

Embed Size (px)

Citation preview

Page 1: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

HUMANITARIAN OPERATIONS

UPDATE

23 April 2003

Page 2: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

223 Apr 03

Introduction

• Welcome to new attendees

• Purpose of the HOC update

• Limitations on material

• Expectations

Page 3: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

323 Apr 03

WEATHER UPDATE

Page 4: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

423 Apr 03

Kuwait City Baghdad

Forecast

Page 5: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

523 Apr 03

Amman Batman

Forecast

Page 6: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

623 Apr 03

Page 7: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

723 Apr 03

Page 8: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

823 Apr 03

Page 9: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

923 Apr 03

OPERATIONAL SUMMARY

Page 10: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1023 Apr 03

Operational Summary

• Coalition forces resetting– Establishing security– Setting conditions for stable and free Iraq

• Still encountering resistance pockets

Page 11: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1123 Apr 03

Security Situation Update

• Rear Area Threat: – Iraqi paramilitary activities north of Kuwaiti

border

• Travel in Iraq entails risk– Close interaction with HOC prior to departure

is highly recommended to ensure receipt of the most recent security updates

Page 12: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1223 Apr 03

Permissive Cities• Al Hillah• Al Qa’im• An Najaf• An Nasiriyah• Ah Humza• Ar Rutbah• Ash Shumali• As Samawah• As Sulimaniyah• As Sumali• Az Zubayr

• Dahuk• Irbil• Karbala• Kirkuk• Mudaysis• Nukyhab• Rumaithah• Rumaylah• Safwan• Umm Qasr

Page 13: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1323 Apr 03

Significant CMO/Civil Developments

• Anticipate HA ship arriving Aqaba today– 50k tons of wheat; requires bagging before

shipment onward

• First HA fuel shipments expected soon– Cooking gas is first shipment

• UAE reportedly plans more aid– Basrah desalination plant– Hospital equipment

Page 14: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1423 Apr 03

Southern Highlights

• Umm Qasr– Rail line test to Basrah successful

• Az Zubayr– Broken water pipes repaired– Awaiting power restoration for water service

Page 15: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1523 Apr 03

Southern Highlights• Basrah

– Power plant has 8 days fuel at current output

• An Nasiriyah– Schools open, attendance low– Hiring water tankers for hospitals– Pontoon bridge to Suq Ash Shuwukh

• Small vehicle traffic only

• As Samawah– General Hospital in good condition overall

• Priorities: security, fuel, food, and money• Dialysis ward damaged, machines functional

Page 16: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1623 Apr 03

Southern City Critical Status

Southern Iraq

Al Basrah A A A A/G A

Qalat Sukkar A R A A Power from Ar Rifa

An Nasiriyah R/A R A G G

As Samawah A A G

Umm Qasr G G R/A G G

Az Zubayr A A G 80% have running water

Wat

er

Fo

od

Fu

el

Sec

uri

ty

Po

wer

R - Red – Definite need, little or no assistance provided, extremely limited supply, no access by general HA communityA – AmberAmber - Some need, some assistance provided, restricted supply, restricted access by general HA CommunityG – Green – No need or all assistance provided, ample supply, generally unimpeded access by general HA community

Page 17: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1723 Apr 03

• An Najaf– Power awaiting natural gas supply / cable repair

• Karbala– Power lines need to be repaired

• Hwy 10 bridge one lane total; use caution– Approx 60 km east of Ar Rutbah– N 33O03’58” E 040O41’56”

Central Highlights

Page 18: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1823 Apr 03

Central Highlights• Al Hillah

– The 3 city hospitals need oxygen• Otherwise, supplies for 2 months on hand

– Electricity in 60% of homes from generators– Fuel reserves low, but some supplies flowing– Police force presence grows daily– Food plentiful; likely OFF warehouse secured– 80% of city has running water– Schools are open

Page 19: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

1923 Apr 03

Central Highlights

• Ar Rutbah– Water pipeline from Ar Ramadi being repaired

• Pre-war Iraqi workers doing repairs

– Discussions ongoing to establish HACC– Efforts to rebuild or relocate destroyed

hospital

Page 20: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2023 Apr 03

Central City Critical Status

Central Iraq

An Najaf A A G G

Al Amarah G R A Potable water for entire city

Al Kut R R G A

Ad Diwaniyah A/G A Depends upon An Najaf for power

Karbala G G G G

Baghdad A A A R

Wat

er

Fo

od

Fu

el

Po

wer

Sec

uri

ty

R - Red – Definite need, little or no assistance provided, extremely limited supply, no access by general HA communityA – AmberAmber - Some need, some assistance provided, restricted supply, restricted access by general HA CommunityG – Green – No need or all assistance provided, ample supply, generally unimpeded access by general HA community

Page 21: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2123 Apr 03

Northern Highlights

• Mosul– CMOC now operated by 101st Airborne Div

Page 22: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2223 Apr 03

Northern City Critical Status

Northern Iraq

Kirkuk G G G G

Irbil G G G G G

As Sulaymaniyah G G G G G

Dahuk G G G G G

Mosul R A A A A Power unavailable due to natural gas supply problem

Wat

er

Fo

od

Fu

el

Po

wer

Sec

uri

ty

R - Red – Definite need, little or no assistance provided, extremely limited supply, no access by general HA communityA – AmberAmber - Some need, some assistance provided, restricted supply, restricted access by general HA CommunityG – Green – No need or all assistance provided, ample supply, generally unimpeded access by general HA community

Page 23: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2323 Apr 03

AirportsBasrah A Not permissive

Safwan R Coalition forces not using facility

Jalibah A Under coalition control

Tallil A Under coalition control

Qalat Salih R Not Secured, Not Assessed

Qalat Sikar R Not Secured, Not Assessed

Al-Kut R Not Secured, Not Assessed

An Numaniyah A Under coalition control

Baghdad A Under coalition control

SeaportUmm Qasr G HA operations in progress

R - Red A – AmberAmber G – Green Blank – No information

Page 24: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2423 Apr 03

Border CrossingsKuwait A

Saudi Arabia R Closed

Jordan G Open

Syria R Closed

Turkey A Border crossing reportedly getting smoother

Iran R/A Reports of aid moving across border

R - Red A – Amber Amber G – Green Blank – No information

Page 25: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2523 Apr 03

Dislocated Civilians Information

• When details are available, will provide– Location – Number– Activity– Direction of movement– Actions taken

Page 26: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2623 Apr 03

UN SECURITY POSTURE

Page 27: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2723 Apr 03

HUMANITARIAN ORGANIZATION

INPUTS

Page 28: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2823 Apr 03

Standing RFIs

• Significant civilian population movements

• Landmine, UXO, depleted uranium locations

• Information on border procedures

Page 29: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

2923 Apr 03

RFI Status

• No open RFIs

Page 30: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations

3023 Apr 03

DATA

PENDING

APATAP AT Mix

UXOUnknownSubMunition

Explosive Locations

As of 22 Apr 03

Page 31: HUMANITARIAN OPERATIONS UPDATE 23 April 2003. 23 Apr 03 2 Introduction Welcome to new attendees Purpose of the HOC update Limitations on material Expectations