    HMS Directive No. 34 - Manag ementof Chang e

    Prepared by: Verified by: Approved by:

    Revision number: Issue date: Next review date:Classification: Public/unclassified BP int ernal Confid ent ial Se cr et

  • 7/28/2019 Hse 2011 Management of Change Bp

    2/23

    Document control sheet

  • 7/28/2019 Hse 2011 Management of Change Bp

    3/23

    Table of content

  • 7/28/2019 Hse 2011 Management of Change Bp

    4/23

    1 Gener al

    plant, process /

    people

  • 7/28/2019 Hse 2011 Management of Change Bp

    5/23

    The framework regulations

    The Management Regulations

    BP Getting HSSE right BP Integrity Management Standard

    http://www.npd.no/regelverk/r2002/Rammeforskriften_n.htmhttp://www.npd.no/regelverk/r2002/Styringsforskriften_n.htmhttp://www.npd.no/regelverk/r2002/Styringsforskriften_n.htmhttp://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/G/Getting_HSE_right_A_guide_for_BP_Managers_2001.pdfhttp://integritymanagement.bpweb.bp.com/Display.aspx?&MasterId=1750f663-72d2-4082-a004-2d6450dfadaa&NavigationId=178http://integritymanagement.bpweb.bp.com/Display.aspx?&MasterId=1750f663-72d2-4082-a004-2d6450dfadaa&NavigationId=178http://www.npd.no/regelverk/r2002/Styringsforskriften_n.htmhttp://www.bp.com/liveassets/bp_internet/globalbp/STAGING/global_assets/downloads/G/Getting_HSE_right_A_guide_for_BP_Managers_2001.pdfhttp://integritymanagement.bpweb.bp.com/Display.aspx?&MasterId=1750f663-72d2-4082-a004-2d6450dfadaa&NavigationId=178http://www.npd.no/regelverk/r2002/Rammeforskriften_n.htm
  • 7/28/2019 Hse 2011 Management of Change Bp

    6/23

    BP Golden Rules for Safety Management of Change

    BPN Directive 35 Processing unwanted events and exemptions

    BPN Directive 36 Risk analysis and acceptance criteria

    BPN Projects & Modification Procedure 1.70.005

    BPN Control of Temporary Equip m ent 1.70.007. BPN Handover document - Transition of Roles and Re sponsibilities.

    Acceptance criteria

    ALARP

    Critical work process

    HAZID

    HSSE (

    MoC

    Plant

    Process

    People

    s in this directive related to plant, facilities andequipment such as buildings, structure, piping, safetyequipment, escape routes, tie-ins, by-passes, etc.

    Is in this directive related to work processes or systemssuch as procedures, software, conditions or requirements (work-flow)

    Is in this directive related to organizational changeprocesses

    Risk - Expression of the combination of probability and consequences of oneor more accident/incidents happening

    Risk analysis

    :

    http://www.bp.com/sectiongenericarticle.do?categoryId=9003463&contentId=7007835http://stavanger.bpweb.bp.com/depot/webCache/root/hsedirektiver_2008/2_adm_directives/06_directive_Risk_Analyses_and_Acceptance_Criteria/Risk_Analyses_and_Acceptance_Criteria.dochttp://docweb.svg.eu.bp.com/bp_no/component/drl?objectId=09006e6b80376aaa&ReLoad=1161694627218http://docweb.svg.eu.bp.com/bp_no/drl/objectId/09006e6b8036173ehttp://docweb.svg.eu.bp.com/bp_no/drl/objectId/09006e6b8036173ehttp://docweb.svg.eu.bp.com/bp_no/drl/objectId/09006e6b8036173ehttp://docweb.svg.eu.bp.com/bp_no/drl/objectId/09006e6b8036173ehttp://docweb.svg.eu.bp.com/bp_no/drl/objectId/09006e6b8036173ehttp://stavanger.bpweb.bp.com/intranet/hrn/forms/links/Other_forms/Handover%20Document%20-%20BPN%202003.dochttp://stavanger.bpweb.bp.com/intranet/hrn/forms/links/Other_forms/Handover%20Document%20-%20BPN%202003.dochttp://www.bp.com/sectiongenericarticle.do?categoryId=9003463&contentId=7007835http://stavanger.bpweb.bp.com/depot/webCache/root/hsedirektiver_2008/2_adm_directives/06_directive_Risk_Analyses_and_Acceptance_Criteria/Risk_Analyses_and_Acceptance_Criteria.dochttp://docweb.svg.eu.bp.com/bp_no/component/drl?objectId=09006e6b80376aaa&ReLoad=1161694627218http://docweb.svg.eu.bp.com/bp_no/drl/objectId/09006e6b8036173ehttp://stavanger.bpweb.bp.com/intranet/hrn/forms/links/Other_forms/Handover%20Document%20-%20BPN%202003.doc
  • 7/28/2019 Hse 2011 Management of Change Bp

    7/23

  • 7/28/2019 Hse 2011 Management of Change Bp

    8/23

  • 7/28/2019 Hse 2011 Management of Change Bp

    9/23

    EngineeringAuthority

    MoC team's HSSErepresentative

  • 7/28/2019 Hse 2011 Management of Change Bp

    10/23

    3 Pr ocesses

    3.1 Plant/Equipment Change

    Plant/Equipment change process may

  • 7/28/2019 Hse 2011 Management of Change Bp

    11/23

    In general, the following changes would not need a documented MoC:

  • 7/28/2019 Hse 2011 Management of Change Bp

    12/23

    Checklist Plant/equip m ent

    changes

    http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2
  • 7/28/2019 Hse 2011 Management of Change Bp

    13/23

    3.2 Process/System Change

    Workprocess/System change process may

    with safety, health and environmental effects.

    o

    o o

    In general, the following changes would not need a documented MoC:

    Checklist Process/s y stemchange s

    3.3 People/Organisational Change

    People/Organisational change process

    http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2
  • 7/28/2019 Hse 2011 Management of Change Bp

    14/23

    In general, the following changes would not need a documented MoC:

    Checklist- Organisational changes

  • 7/28/2019 Hse 2011 Management of Change Bp

    15/23

    4 Demand Analysis

    http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2http://stavanger.bpweb.bp.com/asp/procweb2/?menuLink=4_5_2_666&segment=2
  • 7/28/2019 Hse 2011 Management of Change Bp

    16/23

    Related activities being completely left out

  • 7/28/2019 Hse 2011 Management of Change Bp

    17/23

    Related activities being performed, but withreduced quality.

    Losses

    5 Risk Ev aluation

  • 7/28/2019 Hse 2011 Management of Change Bp

    18/23

    by using appropriate checklist (appendix 2-5) and other toolsavailable for Hazard recognition

    High potential

  • 7/28/2019 Hse 2011 Management of Change Bp

    19/23

  • 7/28/2019 Hse 2011 Management of Change Bp

    20/23

    consequence-reducing measures

    whether or not

  • 7/28/2019 Hse 2011 Management of Change Bp

    21/23

    MoC

    Performancemanagement The use of MoC -s y stem shall be assessed by processes which:

    mailto:Tr@ctionmailto:Tr@ction
  • 7/28/2019 Hse 2011 Management of Change Bp

    22/23

    1. Confirm the change achieve its original intent

    2. Confirm the changes are executed correctly

    3. Confirm the actions are closed

    4. EA or dele gated audit MOC-processes at least annually

  • 7/28/2019 Hse 2011 Management of Change Bp

    23/23

    Clientidentifyingneed for change

    Describe the change The change does not requirea MoC when: the change does not

    introduce any riskfactors. the change is covered in

    chapter 3 stating MoC notrequired.

    Client and supervisor,and person withadequateexperience/expertise

    Client

    Does the changerequire a no

    Management ofChange process?

    yes

    Complete Terms of Reference for MOCorinitiate other robustly documentedriskmanagement process.

    Should you be indoubt whether the change requiresMoC, please contact a person with adequate experience/expertise (directiveowner,HSE department, teamleadersetc.)

    MoCteam

    Identifypotentialelements of risk usingofthe change by usingappropriate checklist

    MoCteamIdentifyprobability-reducing measures

    and/or consequence-reducing measures

    Are thereducing nomeasuressufficient?

    MoCteam

    yes

    Establish plan forimplementation ofactions

    identified

    MoCteam Complete MoCReport

    MoCapprover Follow up actionsin

    Traction

    MoCapprover Verify implementedrisk-reducing measures.

    Engineering Auth(EA)&/ HSSE Manager

    Review the management ofchanges within theirfunction

    annually to assess the cumulativeimpact of allchanges.