Installation of toucan crossing & guard rails
Surfacing works at Chipmans Platt
Energetics ducts installation
Severn Trent Water Diversion works
Earthworks have commenced on site.
Installation of BT ducts Installation of temporary footpath
Planing works being undertaken
https://www.gloucestershire.gov.uk/highways/major-projects-list/a419-highway-improvements/
Drainage repair works have been undertaken
PROGRESS TO DATE
We have now completed road surfacing
works on the Chipmans Platt phase of
the scheme and all traffic management
has been removed from the area. We
will be completing the surfacing of the
footpaths over the next few weeks.
Utility diversions for Energetics and
Severn Trent Water are currently being
undertaken at Oldends Lane and are
due for completion in December. Final
surfacing works will be undertaken in
January 2020. We have also undertaken
essential drainage repair works within
the area.
Earthworks have commenced on the
Horsetrough phase of the scheme with
service diversions also being
undertaken by both BT and Western
Power Distribution. We have
constructed a temporary footpath for
the safe passage of pedestrians within
this area.
LOOK AHEAD PROGRAMME
Over the next month we will be
undertaking the following works on the
Horsetrough phase of the scheme:
• Diversionary works for BT and
Western Power Distribution
• Bulk excavation and drainage works
We will also be completing footpath
surfacing works at Chipmans Platt and
Oldends Lane.
ADVANCED WARNING
We will be undertaking night works on the Horsetrough phase of the scheme this week from Wednesday 4th December till Saturday 7th December 2019. The night works will be managed under 4 way lights, between 8pm and 6am to enable us to install ducts across the road in two locations.
Our site will close for Christmas on the 20th December and will re-open on 6th January. There will be no lane restrictions in place over the festive period. We wish you all a safe and peaceful Christmas and thank you for your patience and understanding whist we have been undertaking these works.
COMMUNITY ENGAGEMENT
Knights Brown alongside Gloucester’s
Highways department are supporting
the CCP’s annual Hamper Scamper. The
initiative seeks to spread the spirit of
Christmas and give hope by providing
seasonal
food par-
cels and
children's
gifts to
those in