7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 1/78 Page 1 of 1 HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS 01. Name of the Project: Enhancement of Production of Iron Ore from 0.06 million TPA to 1.5 million TPA INDUSTRIES LIMITED, at KOIRA IRON MINES, Sundargarh District of Odisha State.  02. MoEF Clearance No. & Date: Environment Clearance (EC) No. J-11015/599/2007-IA.II (M) on 24.09.2008. 03. Period of Compliance Report: From 01.04.2012 to 30.09.2012. Sl. No. Special Condition Compliance Stat i The project proponent shall obtain Consent to Establish from the State Pollution Control Board, Orissa and effectively implement all the conditions stipulated therein. Consent to Establish has been obtained Control Board for production capacity no.-9171/IND-II-NOC-4251 dated 16.04. are being implemented as per consent is enclosed as Annexure – 1. ii Environmental clearance is subject to grant of forestry clearance. Necessary forestry clearance under the Forest (Conservation) Act, 1980 for an area of 59.458ha forestland involved in the project shall be obtained before starting mining operation in that area. No mining will be undertaken in the forest area without obtaining requisite prior forestry clearance. Stage-I Forest Clearance has been ob February 2011 vide letter no:- 8-102 / 1980 over an area of 59.458ha fore project. The approval copy is enclose present the mining operation is confine land only. The compliance of conditions for obtai under process. iii The mining operations shall be restricted to above ground water table and it should not intersect groundwater table. In case of working below ground water table, prior approval of the Ministry of Environment and Forests and Central Ground Water Authority shall be obtained, for which a detailed hydro- geological study shall be carried out. At present mining operations is restric the level of ground water table is at Thus there is no intersection of groun activity so far. Necessary permission wi and MoEF in case of working below the

Half Yearly Compliance Report of Environmental Clearance Conditions

  • Upload
    ksbbs

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 1/78

Page 1 of 1 

HALF YEARLY COMPLIANCE REPORT OF ENVIRONMENTAL CLEARANCE CONDITIONS

01. Name of the Project: Enhancement of Production of Iron Ore from 0.06 million TPA to 1.5 million TPA INDUSTRIES LIMITED, at KOIRA IRON MINES, Sundargarh District of Odisha State. 

02. MoEF Clearance No. & Date: Environment Clearance (EC) No. J-11015/599/2007-IA.II (M) on 24.09.2008. 

03. Period of Compliance Report: From 01.04.2012 to 30.09.2012.

Sl. No. Special Condition Compliance Stat

i The project proponent shall obtain Consent to Establish fromthe State Pollution Control Board, Orissa and effectivelyimplement all the conditions stipulated therein.

Consent to Establish has been obtained

Control Board for production capacity

no.-9171/IND-II-NOC-4251 dated 16.04.

are being implemented as per consent

is enclosed as Annexure – 1. 

ii Environmental clearance is subject to grant of forestryclearance. Necessary forestry clearance under the Forest(Conservation) Act, 1980 for an area of 59.458ha forestlandinvolved in the project shall be obtained before starting miningoperation in that area. No mining will be undertaken in theforest area without obtaining requisite prior forestry clearance.

Stage-I Forest Clearance has been ob

February 2011 vide letter no:- 8-102 /

1980 over an area of 59.458ha fore

project. The approval copy is enclose

present the mining operation is confine

land only.

The compliance of conditions for obtai

under process.

iii The mining operations shall be restricted to above ground water

table and it should not intersect groundwater table. In case of working below ground water table, prior approval of theMinistry of Environment and Forests and Central Ground WaterAuthority shall be obtained, for which a detailed hydro-geological study shall be carried out.

At present mining operations is restric

the level of ground water table is at Thus there is no intersection of groun

activity so far. Necessary permission wi

and MoEF in case of working below the

Page 2: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 2/78

Page 3: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 3/78

Page 4: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 4/78

Page 5: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 5/78

Page 6: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 6/78

Page 6 of 6 

xxii The project proponent shall take all precautionary measuresduring mining operation for conservation and protection of endangered fauna namely Asiatic elephant, tiger, python, Indianwolf etc. spotted in the study area. Action plan for conservationof flora and fauna shall be prepared and implemented inconsultation with the State Forest and Wildlife Department.Necessary allocation of funds for implementation of theconservation plan shall be made and the funds so allocated shallbe included in the project cost. All the safeguard measuresbrought out in the Wildlife Conservation Plan so preparedspecific to the project site shall be effectively implemented. Acopy of action plan shall be submitted to the Ministry of Environment and Forests and its Regional Office, Bhubaneswar.

A site specific Wildlife conservation

endangered fauna found in the study a

PCCF (Wildlife)-cum-Chief Wildlife W

8752/1WL(C) SSP-268/2011 Dtd. 30

conservation plan it is projected to

lakhs. An amount of Rs. 120.00 lakhs

State Forest Department towards im

wildlife management plan. And an amo

spent within the leasehold area in cons

department. The copy of the Wild

depicting various action plans is enclose

xxiii Provision shall be made for the housing of construction labourwithin the site with all necessary infrastructure and facilitiessuch as fuel for cooking, mobile toilets, mobile STP, safedrinking water, medical health care, crèche etc. The housingmay be in the form of temporary structures to be removed after

the completion of the project.

Necessary basic amenities have b

construction labour.

xxiv A Final Mine Closure Plan along with details of Corpus Fund shallbe submitted to the Ministry of Environment & Forests 5 years inadvance of final mine closure for approval.

A Final Mine Closure Plan along with d

be submitted to the Ministry of Environ

advance of final mine closure for appro

Page 7: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 7/78

Page 8: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 8/78

Page 9: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 9/78

Page 9 of 9 

Pollution Control Board. Periodically,

the status of compliance of the e

conditions, including results of mo

company’s website.

xiv A copy of clearance letter will be marked to concerned

Panchayat / local NGO, if any, from whom suggestion /

representation has been received while processing the proposal.

Copy of environment clearance letter

the Koira Gram Panchayat and local NG

xv State Pollution Control Board should display a copy of the

clearance letter at the Regional office, District Industry Centre

and Collector`s office/ Tehsildar`s Office for 30 days.

Environment clearance letter display

Control Board for 30 days at the R

Industry Centre and Collector’s Office/

xvi The project authorities should advertise at least in two local

newspapers widely circulated, one of which shall be in the

vernacular language of the locality concerned, within 7 days of 

the issue of the clearance letter informing that the project has

been accorded environmental clearance and a copy of the

clearance letter is available with the State Pollution Control

Board and also at web site of the Ministry of Environment andForests at http://envfor.nic.in and a copy of the same should

be forwarded to the Regional Office of this Ministry located

Bhubaneswar.

Information regarding obtaining th

availability of clearance letter with S

have been duly published in two wide

The Samaj and Sambad on dated 01

publication have since been forwarded

MoEF, Bhubaneswar.

Page 10: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 10/78

ANNEXURE-I

ESSEL MINING AND INDUSTRIES LIMITED

HALF-YEARLY AAQ MONITORING REPORT FOR THE PERIOD

APRIL 2012 TO SEPTEMBER 2012

PROJECT: KOIRA IRON ORE MINES

LOCATION: MINES OFFICE PREMISES

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

1

APRIL 

02-04-2012 65 20 8.9 10.2 0.29

2 03-04-2012 53 19 7.5 10.6 0.63

3 09-04-2012 61 18 9.2 10.9 0.75

4 10-04-2012 52 24 8.6 11.3 0.68

5 16-04-2012 57 18 9.1 10.7 0.85

6 17-04-2012 47 20 8.9 10.5 0.63

7 23-04-2012 52 16 9.4 11.3 0.12

8 24-04-2012 46 22 8.3 10.9 0.45

9

MAY

09-05-2012 49 18 7.2 10.5 0.23

10 10-05-2012 65 20 8.3 11.1 0.45

11 16-05-2012 72 25 8.7 10.5 0.63

12 17-05-2012 56 23 9.3 10.8 0.72

13 23-05-2012 58 19 8.1 9.9 0.56

14 24-05-2012 67 23 7.6 9.6 0.61

15 30-05-2012 53 19 8.9 10.2 0.25

16 31-05-2012 58 21 9.6 10.4 0.43

17

JUNE

04-06-2012 51 17 8.0 9.2 0.21

18 05-06-2012 48 21 7.5 10.1 0.36

19 11-06-2012 63 20 8.2 10.3 0.48

20 12-06-2012 47 16 9.0 9.7 0.65

21 18-06-2012 43 19 8.6 10.2 0.51

22 19-06-2012 59 20 8.1 10.3 0.62

23 25-06-2012 50 15 7.5 9.4 0.29

24 26-06-2012 46 23 9.4 10.5 0.44

Page 11: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 11/78

 

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

25

JULY

02-07-2012 43 12 8.6 9.9 0.25

26 03-07-2012 41 16 8.2 10.5 0.38

27 09-07-2012 51 15 8.6 10.8 0.49

28 10-07-2012 40 11 9.6 10.1 0.69

29 16-07-2012 38 15 8.9 10.8 0.48

30 17-07-2012 45 16 8.6 10.7 0.51

31 23-07-2012 42 11 7.9 9.9 0.34

32 24-07-2012 39 15 9.8 10.9 0.48

33

AUGUST

06-08-2012 41 11 8.4 9.7 0.20

34 07-08-2012 43 18 8.5 10.0 0.42

35 13-08-2012 50 14 8.1 10.3 0.49

36 14-08-2012 45 16 9.5 10.0 0.65

37 20-08-2012 33 10 8.6 10.5 0.46

38 21-08-2012 49 20 8.7 10.8 0.49

39 27-08-2012 44 13 7.4 9.4 0.32

40 28-08-2012 46 22 9.7 10.6 0.47

41

SEPTEMBER

04-09-2012 52 18 9.2 10.0 0.21

42 05-09-2012 49 15 8.2 10.5 0.35

43 11-09-2012 45 16 9.6 10.2 0.45

44 12-09-2012 46 18 10.1 11.3 0.56

45 18-09-2012 45 15 8.4 9.6 0.42

46 19-09-2012 56 23 7.6 8.9 0.45

47 25-09-2012 61 24 8.9 9.5 0.31

48 26-09-2012 57 20 9.1 10.2 0.48

Maximum Value 72 25 10.1 11.3 0.85

Minimum Value 33 10 7.2 8.9 0.12

98th Percentile Value 67 24 9.8 11.3 0.75

Page 12: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 12/78

 

       0       3   -       0       4   -       2       0       1       2

       1       0   -       0       4   -       2       0       1       2

       1       7   -       0       4   -       2       0       1       2

       2       4   -       0       4   -       2       0       1       2

       1       0   -       0       5   -       2       0       1       2

       1       7   -       0       5   -       2       0       1       2

       2       4   -       0       5   -       2       0       1       2

       3       1   -       0       5   -       2       0       1       2

       0       5   -       0       6   -       2       0       1       2

       1       2   -       0       6   -       2       0       1       2

       1       9   -       0       6   -       2       0       1       2

       2       6   -       0       6   -       2       0       1       2

       0       3   -       0       7   -       2       0       1       2

       1       0   -       0       7   -       2       0       1       2

       1       7   -       0       7   -       2       0       1       2

       2       4   -       0       7   -       2       0       1       2

       0       7   -       0       8   -       2       0       1       2

       1       4   -       0       8   -       2       0       1       2

       2       1   -       0       8   -       2       0       1       2

       2       8   -       0       8   -       2       0       1       2

       0       5   -       0       9   -       2       0       1       2

       1       2   -       0       9   -       2       0       1       2

       1       9   -       0       9   -       2       0       1       2

       2       6   -       0       9   -       2       0       1       2

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

   C  o  n  c  e  n   t  r  a   t   i  o  n   (  u  g   /  m   3   )

Date

PM10

PM2.5

SO2

NOx

  TREND GRAPH OF AMBIENT AIR QUALITY

TREND ANALYSIS FOR THE PERIOD APRIL 2012 -SEPTEMBER 2012

  MINES OFFICE PREMISES

 

Page 13: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 13/78

 

ESSEL MINING AND INDUSTRIES LIMITED

HALF-YEARLY AAQ MONITORING REPORT FOR THE PERIOD

APRIL 2012 TO SEPTEMBER 2012

PROJECT: KOIRA IRON ORE MINES

LOCATION: KOIRA VILLAGE

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

1

APRIL 

02-04-2012 60 21 9.5 10.7 0.23

2 03-04-2012 57 25 8.9 11.1 0.58

3 09-04-2012 45 29 10.1 11.3 0.47

4 10-04-2012 52 24 8.6 10.2 0.52

5 16-04-2012 46 22 9.7 11.4 0.68

6 17-04-2012 58 23 8.3 10.2 0.16

7 23-04-2012 43 22 9.8 10.5 0.29

8 24-04-2012 41 19 10.3 11.4 0.37

9

MAY

09-05-2012 52 20 8.6 10.2 0.23

10 10-05-2012 63 24 9.2 10.5 0.45

11 16-05-2012 56 18 7.9 9.6 0.39

12 17-05-2012 70 23 8.2 9.9 0.45

13 23-05-2012 58 20 8.6 10.1 0.56

14 24-05-2012 63 19 9.2 10.4 0.29

15 30-05-2012 44 21 8.1 9.9 0.32

16 31-05-2012 56 18 9.7 11.3 0.34

17

JUNE

04-06-2012 46 19 8.1 9.6 0.29

18 05-06-2012 58 23 9.0 10.2 0.35

19 11-06-2012 53 21 7.9 9.1 0.34

20 12-06-2012 49 20 8.4 10.0 0.41

21 18-06-2012 54 16 9.3 9.6 0.29

22 19-06-2012 60 23 10.1 11.2 0.34

23 25-06-2012 45 24 8.6 9.5 0.36

24 26-06-2012 53 17 9.5 10.1 0.33

Page 14: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 14/78

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

25

JULY

02-07-2012 38 14 8.3 9.5 0.34

26 03-07-2012 44 17 9.5 10.6 0.38

2709-07-2012 42 16 8.5 9.8 0.38

28 10-07-2012 39 14 8.9 10.4 0.46

29 16-07-2012 43 11 9.6 10.2 0.34

30 17-07-2012 52 18 10.6 11.5 0.35

31 23-07-2012 37 17 8.9 9.9 0.38

32 24-07-2012 42 14 9.9 10.5 0.36

33

AUGUST

06-08-2012 33 10 8.9 10.1 0.34

34 07-08-2012 46 19 9.0 10.2 0.36

35 13-08-2012 40 14 8.7 10.4 0.32

36 14-08-2012 36 11 8.5 10.6 0.40

37 20-08-2012 46 15 9.5 10.0 0.38

38 21-08-2012 59 25 10.0 11.1 0.33

39 27-08-2012 40 21 8.1 9.2 0.31

40 28-08-2012 41 13 9.3 10.6 0.30

41

SEPTEMBER

04-09-2012 54 22 8.5 10.0 0.31

42 05-09-2012 49 16 9.2 11.3 0.32

43 11-09-2012 45 18 8.3 10.3 0.15

44 12-09-2012 43 15 10.0 10.9 0.29

45 18-09-2012 49 19 9.6 11.2 0.32

46 19-09-2012 53 21 8.7 10.2 0.30

47 25-09-2012 60 25 8.6 9.8 0.45

48 26-09-2012 48 16 9.5 10.4 0.32

Maximum Value70 29 10.6 11.5 0.68

Minimum Value33 10 7.9 9.1 0.15

98th Percentile Value63 25 10.3 11.4 0.58

Page 15: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 15/78

       0       3   -       0       4   -       2       0       1       2

       1       0   -       0       4   -       2       0       1       2

       1       7   -       0       4   -       2       0       1       2

       2       4   -       0       4   -       2       0       1       2

       1       0   -       0       5   -       2       0       1       2

       1       7   -       0       5   -       2       0       1       2

       2       4   -       0       5   -       2       0       1       2

       3       1   -       0       5   -       2       0       1       2

       0       5   -       0       6   -       2       0       1       2

       1       2   -       0       6   -       2       0       1       2

       1       9   -       0       6   -       2       0       1       2

       2       6   -       0       6   -       2       0       1       2

       0       3   -       0       7   -       2       0       1       2

       1       0   -       0       7   -       2       0       1       2

       1       7   -       0       7   -       2       0       1       2

       2       4   -       0       7   -       2       0       1       2

       0       7   -       0       8   -       2       0       1       2

       1       4   -       0       8   -       2       0       1       2

       2       1   -       0       8   -       2       0       1       2

       2       8   -       0       8   -       2       0       1       2

       0       5   -       0       9   -       2       0       1       2

       1       2   -       0       9   -       2       0       1       2

       1       9   -       0       9   -       2       0       1       2

       2       6   -       0       9   -       2       0       1       2

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

   C  o  n  c  e  n   t  r  a   t   i  o  n   (  u  g   /  m

   3   )

Date

PM10

PM2.5

SO2

NOx

  TREND GRAPH OF AMBIENT AIR QUALITY

TREND ANALYSIS FOR THE PERIOD APRIL 2012 -SEPTEMBER 2012

  KOIRA VILLAGE

 

Page 16: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 16/78

 

ESSEL MINING AND INDUSTRIES LIMITED

HALF-YEARLY AAQ MONITORING REPORT FOR THE PERIOD

APRIL 2012 TO SEPTEMBER 2012

PROJECT: KOIRA IRON ORE MINES

LOCATION: ORAHARI VILLAGE

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

1

APRIL 

02-04-2012 62 21 8.5 10.3 0.25

2 03-04-2012 60 25 9.0 10.6 0.36

3 09-04-2012 56 22 7.6 9.6 0.57

410-04-2012 48 20 9.3 10.5 0.69

5 16-04-2012 50 18 8.7 10.4 0.82

6 17-04-2012 53 20 9.2 11.1 0.47

7 23-04-2012 57 24 8.6 10.4 0.63

8 24-04-2012 51 26 9.3 10.5 0.76

9

MAY

09-05-2012 56 20 9.5 10.1 0.32

10 10-05-2012 49 23 8.7 9.9 0.45

11 16-05-2012 65 19 9.1 10.2 0.56

12 17-05-2012 42 26 8.3 10.2 0.63

13 23-05-2012 56 27 9.0 10.5 0.75

14 24-05-2012 65 18 8.9 10.2 0.56

15 30-05-2012 59 23 9.2 10.3 0.60

16 31-05-2012 64 21 7.8 9.9 0.82

17

JUNE

04-06-2012 52 19 8.1 9.6 0.24

18 05-06-2012 46 16 7.6 10.1 0.56

19 11-06-2012 53 17 8.3 10.5 0.42

20 12-06-2012 40 20 8.9 9.8 0.53

21 18-06-2012 48 23 7.5 9.6 0.39

22 19-06-2012 53 17 9.2 11.0 0.37

23 25-06-2012 58 20 9.6 10.4 0.54

24 26-06-2012 61 18 8.3 9.7 0.75

Page 17: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 17/78

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

25

JULY

02-07-2012 43 14 8.6 9.9 0.27

26 03-07-2012 37 13 7.9 10.5 0.45

2709-07-2012 45 11 8.9 10.8 0.48

28 10-07-2012 35 15 9.6 10.2 0.45

29 16-07-2012 41 17 8.4 10.4 0.34

30 17-07-2012 46 12 9.6 11.5 0.41

31 23-07-2012 43 13 10.1 10.9 0.42

32 24-07-2012 51 14 8.8 11.2 0.51

33

AUGUST

06-08-2012 39 20 8.6 9.5 0.25

34 07-08-2012 42 19 7.4 10.2 0.43

35 13-08-2012 49 15 8.2 10.6 0.46

36 14-08-2012 30 12 9.3 10.5 0.48

37 20-08-2012 41 17 8.9 10.0 0.39

38 21-08-2012 38 12 9.7 11.1 0.36

39 27-08-2012 46 16 10.0 10.9 0.40

40 28-08-2012 50 13 9.5 11.0 0.49

41

SEPTEMBER

04-09-2012 48 15 9.2 9.9 0.31

42 05-09-2012 56 21 8.4 10.0 0.42

43 11-09-2012 42 16 10.1 10.8 0.25

44 12-09-2012 49 18 9.8 10.2 0.31

45 18-09-2012 53 21 10.0 11.3 0.32

46 19-09-2012 45 16 8.6 10.5 0.41

47 25-09-2012 49 20 9.6 11.2 0.32

48 26-09-2012 54 23 10.5 11.5 0.45

Maximum Value65 27 10.5 11.5 0.82

Minimum Value30 11 7.4 9.5 0.24

98th Percentile Value65 26 10.1 11.5 0.82

Page 18: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 18/78

       0       3   -       0       4   -       2       0       1       2

       1       0   -       0       4   -       2       0       1       2

       1       7   -       0       4   -       2       0       1       2

       2       4   -       0       4   -       2       0       1       2

       1       0   -       0       5   -       2       0       1       2

       1       7   -       0       5   -       2       0       1       2

       2       4   -       0       5   -       2       0       1       2

       3       1   -       0       5   -       2       0       1       2

       0       5   -       0       6   -       2       0       1       2

       1       2   -       0       6   -       2       0       1       2

       1       9   -       0       6   -       2       0       1       2

       2       6   -       0       6   -       2       0       1       2

       0       3   -       0       7   -       2       0       1       2

       1       0   -       0       7   -       2       0       1       2

       1       7   -       0       7   -       2       0       1       2

       2       4   -       0       7   -       2       0       1       2

       0       7   -       0       8   -       2       0       1       2

       1       4   -       0       8   -       2       0       1       2

       2       1   -       0       8   -       2       0       1       2

       2       8   -       0       8   -       2       0       1       2

       0       5   -       0       9   -       2       0       1       2

       1       2   -       0       9   -       2       0       1       2

       1       9   -       0       9   -       2       0       1       2

       2       6   -       0       9   -       2       0       1       2

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

   C  o  n  c  e  n   t  r  a   t   i  o  n   (  u  g   /  m   3   )

Date

PM10

PM2.5

SO2

NOx

  TREND GRAPH OF AMBIENT AIR QUALITY

TREND ANALYSIS FOR THE PERIOD APRIL 2012 -SEPTEMBER 2012

  ORAHARI VILLAGE

Page 19: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 19/78

 

ESSEL MINING AND INDUSTRIES LIMITED

HALF-YEARLY AAQ MONITORING REPORT FOR THE PERIOD

APRIL 2012 TO SEPTEMBER 2012

PROJECT: KOIRA IRON ORE MINES

LOCATION: QUARRY No-06

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

1

APRIL 

02-04-2012 56 20 8.1 9.8 0.78

2 03-04-2012 47 19 9.4 10.2 0.69

3 09-04-2012 50 23 8.6 10.5 0.53

4 10-04-2012 51 25 9.2 11.6 0.64

5 16-04-2012 49 19 8.7 10.9 0.72

6 17-04-2012 60 23 9.5 10.6 0.69

7 23-04-2012 57 26 10.2 11.3 0.83

8 24-04-2012 45 24 8.9 10.4 0.79

9

MAY

09-05-2012 69 22 10.1 11.2 0.45

10 10-05-2012 56 18 8.9 10.5 0.23

11 16-05-2012 63 21 9.8 10.6 0.45

12 17-05-2012 59 20 10.3 11.5 0.53

13 23-05-2012 71 26 9.8 10.2 0.62

14 24-05-2012 62 20 9.1 11.4 0.70

15 30-05-2012 56 21 7.6 9.9 0.52

16 31-05-2012 49 22 8.2 10.4 0.50

17

JUNE

04-06-2012 45 15 9.1 10.4 0.32

18 05-06-2012 51 23 8.5 9.6 0.29

19 11-06-2012 49 19 9.2 10.9 0.36

20 12-06-2012 51 23 8.7 10.2 0.48

21 18-06-2012 65 24 9.3 10.6 0.63

22 19-06-2012 47 19 9.4 10.8 0.48

23 25-06-2012 53 18 8.5 10.2 0.53

24 26-06-2012 45 20 8.7 11.3 0.19

Page 20: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 20/78

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

25

JULY

02-07-2012 38 11 9.7 10.8 0.36

26 03-07-2012 43 18 8.9 9.9 0.32

2709-07-2012 41 15 9.6 11.3 0.39

28 10-07-2012 43 18 9.3 10.8 0.57

29 16-07-2012 52 19 10.2 10.9 0.51

30 17-07-2012 41 15 9.8 11.2 0.51

31 23-07-2012 47 14 8.9 10.8 0.58

32 24-07-2012 40 16 9.3 11.5 0.24

33

AUGUST

06-08-2012 30 16 9.5 10.2 0.31

34 07-08-2012 42 20 9.9 10.8 0.33

35 13-08-2012 40 11 9.4 11.1 0.30

36 14-08-2012 39 15 9.6 10.4 0.55

37 20-08-2012 56 22 10.6 10.9 0.52

38 21-08-2012 49 25 9.2 10.5 0.48

39 27-08-2012 41 14 8.6 10.1 0.56

40 28-08-2012 35 12 8.5 9.6 0.26

41

SEPTEMBER

04-09-2012 56 21 8.6 10.1 0.32

42 05-09-2012 41 15 9.2 10.3 0.15

43 11-09-2012 38 16 8.9 11.7 0.32

44 12-09-2012 42 18 9.1 10.5 0.41

45 18-09-2012 48 21 8.4 10.5 0.56

46 19-09-2012 53 20 9.8 10.2 0.49

47 25-09-2012 59 23 10.0 11.3 0.52

48 26-09-2012 47 18 9.6 10.5 0.23

Maximum Value71 26 10.6 11.7 0.83

Minimum Value30 11 7.6 9.6 0.15

98th Percentile Value69 26 10.3 11.6 0.79

Page 21: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 21/78

Page 22: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 22/78

Page 23: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 23/78

 

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

25

JULY

05-07-2012 45 18 8.8 10.9 0.38

26 06-07-2012 52 17 9.7 11.5 0.34

27 12-07-2012 43 15 8.3 9.9 0.38

28 13-07-2012 51 19 10.5 12.6 0.48

29 19-07-2012 42 11 10.2 10.6 0.45

30 20-07-2012 39 16 8.6 10.1 0.41

31 26-07-2012 36 15 9.8 10.9 0.48

32 27-07-2012 47 14 9.7 11.1 0.59

33

AUGUST

06-08-2012 41 14 8.5 10.5 0.35

34 07-08-2012 45 20 9.4 11.3 0.32

35 13-08-2012 46 11 8.0 9.9 0.36

36 14-08-2012 50 12 10.4 11.6 0.44

37 20-08-2012 38 16 9.3 10.3 0.42

38 21-08-2012 42 17 8.3 9.2 0.39

39 27-08-2012 31 10 9.5 10.1 0.48

40 28-08-2012 47 19 9.3 10.4 0.56

41

SEPTEMBER

07-09-2012 56 15 9.2 10.6 0.31

42 08-09-2012 59 21 8.6 10.6 0.25

43 14-09-2012 48 16 10.0 11.2 0.14

44 15-09-2012 51 18 10.1 11.5 0.26

45 21-09-2012 45 15 10.5 10.9 0.23

46 22-09-2012 53 18 9.6 11.0 0.35

47 28-09-2012 49 15 8.9 10.5 0.42

48 29-09-2012 50 21 10.2 10.6 0.39

Maximum Value64 26 10.7 12.8 0.92

Minimum Value31 10 7.8 8.9 0.14

98th Percentile Value63 25 10.5 12.6 0.63

Page 24: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 24/78

       0       3   -       0       4   -       2       0       1       2

       1       0   -       0       4   -       2       0       1       2

       1       7   -       0       4   -       2       0       1       2

       2       4   -       0       4   -       2       0       1       2

       1       0   -       0       5   -       2       0       1       2

       1       7   -       0       5   -       2       0       1       2

       2       4   -       0       5   -       2       0       1       2

       3       1   -       0       5   -       2       0       1       2

       0       7   -       0       6   -       2       0       1       2

       1       4   -       0       6   -       2       0       1       2

       2       1   -       0       6   -       2       0       1       2

       2       8   -       0       6   -       2       0       1       2

       0       6   -       0       7   -       2       0       1       2

       1       3   -       0       7   -       2       0       1       2

       2       0   -       0       7   -       2       0       1       2

       2       7   -       0       7   -       2       0       1       2

       0       7   -       0       8   -       2       0       1       2

       1       4   -       0       8   -       2       0       1       2

       2       1   -       0       8   -       2       0       1       2

       2       8   -       0       8   -       2       0       1       2

       0       8   -       0       9   -       2       0       1       2

       1       5   -       0       9   -       2       0       1       2

       2       2   -       0       9   -       2       0       1       2

       2       9   -       0       9   -       2       0       1       2

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

   C  o  n  c  e  n   t  r  a   t   i  o  n   (  u  g

   /  m   3   )

Date

PM10

PM2.5

SO2

NOx

  TREND GRAPH OF AMBIENT AIR QUALITY

TREND ANALYSIS FOR THE PERIOD APRIL 2012 -SEPTEMBER 2012

  MINES HAULAGE ROAD

Page 25: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 25/78

 

ESSEL MINING AND INDUSTRIES LIMITED

HALF-YEARLY AAQ MONITORING REPORT FOR THE PERIOD

APRIL 2012 TO SEPTEMBER 2012

PROJECT: KOIRA IRON ORE MINES

LOCATION: BONDHALA VILLAGE

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

1

APRIL 

02-04-2012 49 20 9.2 10.6 0.48

2 03-04-2012 53 19 8.9 10.5 0.63

3 09-04-2012 42 25 10.2 11.2 0.72

4 10-04-2012 59 23 8.9 10.7 0.69

5 16-04-2012 58 24 7.9 9.8 0.83

6 17-04-2012 45 20 10.3 11.2 0.56

7 23-04-2012 43 19 10.2 11.5 0.29

8 24-04-2012 51 26 11.1 12.4 0.31

9

MAY

09-05-2012 56 18 10.1 12.4 0.56

10 10-05-2012 62 21 9.6 10.6 0.45

11 16-05-2012 52 20 8.9 11.5 0.65

12 17-05-2012 65 19 7.6 9.9 0.72

13 23-05-2012 48 23 8.2 10.1 0.79

14 24-05-2012 53 18 10.1 12.1 0.63

15 30-05-2012 49 20 9.8 10.6 0.45

16 31-05-2012 56 22 10.5 11.3 0.26

17

JUNE

06-06-2012 48 19 9.6 10.8 0.32

18 07-06-2012 53 20 10.0 11.5 0.41

19 13-06-2012 59 15 9.5 10.3 0.53

20 14-06-2012 47 18 7.9 9.5 0.69

21 20-06-2012 39 21 8.6 10.4 0.71

22 21-06-2012 42 23 10.5 11.3 0.40

23 27-06-2012 43 18 9.2 10.2 0.23

24 28-06-2012 52 19 10.0 12.3 0.29

Page 26: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 26/78

Page 27: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 27/78

       0       3   -

       0       4   -       2       0       1       2

       1       0   -

       0       4   -       2       0       1       2

       1       7   -

       0       4   -       2       0       1       2

       2       4   -

       0       4   -       2       0       1       2

       1       0   -

       0       5   -       2       0       1       2

       1       7   -

       0       5   -       2       0       1       2

       2       4   -

       0       5   -       2       0       1       2

       3       1   -

       0       5   -       2       0       1       2

       0       7   -

       0       6   -       2       0       1       2

       1       4   -

       0       6   -       2       0       1       2

       2       1   -

       0       6   -       2       0       1       2

       2       8   -

       0       6   -       2       0       1       2

       0       6   -

       0       7   -       2       0       1       2

       1       3   -

       0       7   -       2       0       1       2

       2       0   -

       0       7   -       2       0       1       2

       2       7   -

       0       7   -       2       0       1       2

       0       7   -

       0       8   -       2       0       1       2

       1       4   -

       0       8   -       2       0       1       2

       2       1   -

       0       8   -       2       0       1       2

       2       8   -

       0       8   -       2       0       1       2

       0       8   -

       0       9   -       2       0       1       2

       1       5   -

       0       9   -       2       0       1       2

       2       2   -

       0       9   -       2       0       1       2

       2       9   -

       0       9   -       2       0       1       2

5

10

15

20

25

30

35

40

45

50

5560

65

70

75

80

85

90

   C  o  n  c  e  n   t  r  a   t   i  o  n   (  u  g   /  m

   3   )

Date

PM10

PM2.5

SO2

NOx

  TREND GRAPH OF AMBIENT AIR QUALITY

TREND ANALYSIS FOR THE PERIOD APRIL 2012 -SEPTEMBER 2012

  BONDHALA VILLAGE

Page 28: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 28/78

 

ESSEL MINING AND INDUSTRIES LIMITED

HALF-YEARLY AAQ MONITORING REPORT FOR THE PERIOD

APRIL 2012 TO SEPTEMBER 2012

PROJECT: KOIRA IRON ORE MINES

LOCATION: NUAGAON VILLAGE

S.NO MONTH DATE PM10 PM2.5 SO2 NO X CO

1

APRIL 

02-04-2012 65 20 8.9 10.4 0.23

2 03-04-2012 72 23 9.7 10.6 0.45

3 09-04-2012 56 20 7.5 9.8 0.69

4 10-04-2012 62 27 9.6 10.1 0.72

5 16-04-2012 58 25 10.0 11.3 0.63

6 17-04-2012 56 19 9.6 10.2 0.78

7 23-04-2012 62 23 8.9 10.1 0.63

8 24-04-2012 49 24 9.5 11.3 0.96

9

MAY

09-05-2012 56 19 7.6 9.9 0.45

10 10-05-2012 69 25 8.2 10.2 0.36

11 16-05-2012 45 16 9.3 10.5 0.47

12 17-05-2012 70 29 8.7 9.6 0.35

13 23-05-2012 67 24 9.2 11.4 0.41

14 24-05-2012 49 24 8.3 10.5 0.25

15 30-05-2012 63 20 7.8 9.8 0.39

16 31-05-2012 56 22 9.1 10.5 0.42

17

JUNE

06-06-2012 60 23 8.2 9.5 0.23

18 07-06-2012 45 19 7.6 9.2 0.30

19 13-06-2012 38 15 9.1 10.1 0.45

20 14-06-2012 46 20 8.4 10.2 0.28

21 20-06-2012 58 21 8.6 10.3 0.32

22 21-06-2012 52 23 7.8 9.7 0.54

23 27-06-2012 61 18 8.2 10.0 0.29

24 28-06-2012 55 20 9.0 9.9 0.15

Page 29: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 29/78

Page 30: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 30/78

       0       3   -       0       4   -       2       0       1       2

       1       0   -       0       4   -       2       0       1       2

       1       7   -       0       4   -       2       0       1       2

       2       4   -       0       4   -       2       0       1       2

       1       0   -       0       5   -       2       0       1       2

       1       7   -       0       5   -       2       0       1       2

       2       4   -       0       5   -       2       0       1       2

       3       1   -       0       5   -       2       0       1       2

       0       7   -       0       6   -       2       0       1       2

       1       4   -       0       6   -       2       0       1       2

       2       1   -       0       6   -       2       0       1       2

       2       8   -       0       6   -       2       0       1       2

       0       6   -       0       7   -       2       0       1       2

       1       3   -       0       7   -       2       0       1       2

       2       0   -       0       7   -       2       0       1       2

       2       7   -       0       7   -       2       0       1       2

       0       7   -       0       8   -       2       0       1       2

       1       4   -       0       8   -       2       0       1       2

       2       1   -       0       8   -       2       0       1       2

       2       8   -       0       8   -       2       0       1       2

       0       8   -       0       9   -       2       0       1       2

       1       5   -       0       9   -       2       0       1       2

       2       2   -       0       9   -       2       0       1       2

       2       9   -       0       9   -       2       0       1       2

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

   C  o  n  c  e  n   t  r  a   t   i  o  n   (  u  g   /

  m   3   )

Date

PM10

PM2.5

SO2

NOx

  TREND GRAPH OF AMBIENT AIR QUALITY

TREND ANALYSIS FOR THE PERIOD APRIL 2012 -SEPTEMBER 2012

  NUAGAON VILLAGE

Page 31: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 31/78

Page 32: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 32/78

Page 33: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 33/78

Page 34: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 34/78

Page 35: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 35/78

ANNEXURE-II

GROUND WATER QUALITY REPORT

LOCATION: WELL NEAR MINES OFFICE

S.NO TESTS

GROUND WATER QUALITY

RESULTSIS 10500

[DRINKING WATER

SUMMER-2012 MONSOON -2012

WELL NEAR MINES OFFICEDESIRABLE

LIMITS

PERMISSIBLE

LIMITS

1 Odour Un Objectionable Un Objectionable ------- -----

2 Taste Agreeable Agreeable ------- -----

3 Colour (Hazen units) <5 <5 5 25

4 pH 7.51 7.55 6.5 to 8.5 6.5 to 8.5

5 Turbidity, NTU <1 <1 5 10

6 Total Hardness as CaCo3 mg/l 45 15 300 600

7 Mineral oil, mg/l Nil Nil 0.01 0.03

8 Iron as Fe, mg/l 0.08 0.07 0.3 1.0

9 Chlorides as Cl, mg/l 15 7.5 250 1000

10 Dissolved solids, mg/l 65 42 500 2000

11 Calcium as Ca, mg/l 12 4.0 75 200

12 Magnesium as Mg, mg/l 3.6 1.2 30 100

13 Copper as Cu, mg/l <0.01 <0.01 0.05 1.5

14 Manganese as Mn, mg/l <0.01 <0.01 0.1 0.3

15 Sulphate as SO4, mg/l 2 1 200 400

16 Nitrate as No3, mg/l 1 <1 45 100

17 Fluoride as F, mg/l 0.40 0.20 1.0 1.5

18 Mercury as (Hg), mg/l <0.001 <0.001 0.001 0.001

19 Cadmium as (Cd), mg/l <0.01 <0.01 0.01 0.01

20 Selenium as Se, mg/l <0.01 <0.01 0.01 0.01

21 Arsenic as As, mg/l <0.01 <0.01 0.05 0.05

22 Cyanide as CN as mg/l <0.01 <0.01 0.05 0.05

23 Lead Pb, as mg/l <0.01 <0.01 0.05 0.05

24 Zinc as Zn, mg/l <0.01 <0.01 5 15

25 Chromium as Cr+6, mg/l <0.01 <0.01 0.05 0.05

26 Alkalinity as CaCo3, mg/l 25 20 200 600

27 Boron as B, mg/l 0.01 <0.10 1 5

28 Residual Free Chlorine Nil Nil ----- -----

29 Phenolic Compounds asC6H5OH, mg/l

<0.001 <0.001 ----- -----

30 Anionic Detergents as MBAS, Mg/l  <0.02 <0.02 ----- -----

31 Coliform count,

MPN /100 ml

Nil Nil Nil 10

e-coli absent32

Pesticides Absent Absent ----- 0.001

Page 36: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 36/78

Page 37: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 37/78

Page 38: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 38/78

Page 39: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 39/78

LOCATION: ORAHARI VILLAGE

S.NO TESTS

GROUND WATER QUALITY

RESULTSIS 10500

[DRINKING WATER

SUMMER-2012 MONSOON -2012

ORAHARI VILLAGEDESIRABLE

LIMITSPERMISSIBLE

LIMITS

1 Odour Un Obectionable Un Obectionable ------- -----

2 Taste Agreeable Agreeable ------- -----

3 Colour (Hazen units) <5 <5 5 25

4 pH 7.12 7.02 6.5 to 8.5 6.5 to 8.5

5 Turbidity, NTU 2 1 5 10

6 Total Hardness as CaCo3 mg/l 118 104 300 600

7 Mineral oil, mg/l Nil Nil 0.01 0.03

8 Iron as Fe, mg/l 0.02 0.06 0.3 1.0

9 Chlorides as Cl, mg/l 7.1 8.5 250 1000

10 Dissolved solids, mg/l 112 98 500 2000

11 Calcium as Ca, mg/l 41 35 75 200

12 Magnesium as Mg, mg/l 3.9 4.2 30 100

13 Copper as Cu, mg/l <0.01 <0.01 0.05 1.5

14 Manganese as Mn, mg/l <0.01 <0.01 0.1 0.3

15 Sulphate as SO4, mg/l 9 10 200 400

16 Nitrate as No3, mg/l 5 3 45 100

17 Fluoride as F, mg/l 0.42 0.35 1.0 1.5

18 Mercury as (Hg), mg/l <0.001 <0.001 0.001 0.001

19 Cadmium as (Cd), mg/l <0.01 <0.01 0.01 0.01

20 Selenium as Se, mg/l <0.01 <0.01 0.01 0.01

21 Arsenic as As, mg/l <0.01 <0.01 0.05 0.05

22 Cyanide as CN as mg/l <0.01 <0.01 0.05 0.05

23 Lead Pb, as mg/l <0.01 <0.01 0.05 0.05

24 Zinc as Zn, mg/l <0.01 <0.01 5 15

25 Chromium as Cr+6, mg/l <0.01 <0.01 0.05 0.05

26 Alkalinity as CaCo3, mg/l 90 86 200 600

27 Boron as B, mg/l 0.03 <0.1 1 5

28 Residual Free Chlorine Nil Nil ----- -----

29 Phenolic Compounds asC6H5OH, mg/l

<0.001 <0.001 ----- -----

30 Anionic Detergents as MBAS, Mg/l  <0.02 <0.02 ----- -----

31 Coliform count,MPN /100 ml

Nil Nil Nil 10

e-coli absent32

PesticidesAbsent Absent ----- 0.001

Page 40: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 40/78

Page 41: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 41/78

Page 42: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 42/78

Page 43: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 43/78

Page 44: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 44/78

Page 45: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 45/78

Page 46: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 46/78

Page 47: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 47/78

 

LOCATION: KOIRA NALA DOWNSTREAM

S.NO TESTS

SURFACE WATER QUALITY

RESULTS

JULY-2012 AUGUST-2012 SEPTEMBER-

2012

GSR 422E

STANDRADS

1 Colour (Hazen units) 15 15 12 ---

2 Odour Objectionable Objectionable Objectionable ---

3 pH 6.72 6.89 6.93 5.5-9.0

4 Oil & grease, mg/l <1 <1 <1 10

5 Total Suspended Solids, mg/l 38 32 35 100

6 Dissolved solids, mg/l 104 115 124 2100

7 BOD for 3 days at 270C, mg/l 4 5 6 30

8 COD,mg/l 12 14 15 250

9 Chlorides as Cl, mg/l 18 19 21 1000

10 Fluoride as F, mg/l 0.30 0.21 0.23 2.0

11 Dissolved phosphate as P,mg/l 0.02 0.01 0.01 5.0

12 Percent Sodium 38 38 35 ----

13 Sulphide as S,mg/l 0.04 0.04 0.04 2.0

14 Boron as B,mg/l <0.1 <0.1 <0.1 2.0

15 Residual Sodium Carbonate,mg/l Nil Nil Nil ----

16 Sulphates as SO4,mg/l <1 <1 <1 1000

17 Iron as Fe, mg/l 0.26 0.23 0.20 3.0

18 MLSS,mg/l  38 31 28 --

19 MLVSS,mg/l  22 17 18 --

20 Microbiological :

Coliforms /100ml 

219 212 206--

Page 48: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 48/78

Page 49: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 49/78

Page 50: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 50/78

Page 51: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 51/78

Page 52: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 52/78

Page 53: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 53/78

Page 54: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 54/78

Page 55: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 55/78

Page 56: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 56/78

Page 57: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 57/78

Page 58: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 58/78

 

ANNEXURE-IX

WATER QUANTITY & FLOW RATE MEASUREMENT

Client : Essel Mining and Industries Ltd.,Name of Mines : Koira Iron Ore MinesMonth : April-2012Sample name : Water Quantity and Flow Rate Monitoring

Location : Koira Nala UpstreamDate : 26-04-2012Time : 11:15 AM

WIDTH OF

NALA

TRAVERSE POINT DEPTH AREA VELOCITY FLOW

RATE

TOTAL 

FLOW

m m m2 m/sec m3/sec m3/hr

3.0

1.0 0.21 0.105 0.312 0.032

2.0 0.15 0.18 0.238 0.042

3.0 0.12 0.06 0.346 0.020

0.094 338.4

1.00m 1.00m 1.00m

0.21m0.15m 0.12m

CROSS SECTION OF KOIRA NALA UP STREAM

3.00m

 

Page 59: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 59/78

Page 60: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 60/78

Page 61: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 61/78

Page 62: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 62/78

Page 63: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 63/78

 

Client : Essel Mining and Industries Ltd.,Name of Mines : Koira Iron Ore MinesMonth : June-2012Sample name : Water Quantity and Flow Rate MonitoringLocation : Koira Nala DownstreamDate : 23-06-2012Time : 10:30 AM

WIDTH

OF NALA

TRAVERSE POINT DEPTH AREA VELOCITY FLOW RATE TOTAL 

FLOW

m m m2 m/sec m3/sec m3/hr

3.0

01 0.31 0.155 0.351 0.054

02 0.24 0.275 0.403 0.110

03 0.27 0.135 0.302 0.040

0.204 734

1.00m 1.00m 1.00m

CROSS SECTION OF KOIRA NALA DOWN STREAM

3.00m

0.31m 0.24m0.27m

 

Page 64: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 64/78

Page 65: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 65/78

Page 66: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 66/78

 

Client : Essel Mining and Industries Ltd.,

Name of Mines : Koira Iron Ore MinesMonth : July-2012Sample name : Water Quantity and Flow Rate MonitoringLocation : Koira Nala UpstreamDate : 14-07-2012Time : 09:10 AM

WIDTH OF

NALA

TRAVERSE POINT DEPTH AREA VELOCITY FLOW

RATE

TOTAL 

FLOW

m m m2 m/sec m3/sec m3/hr

4.0

1.0 0.27 0.135 0.312 0.042

2.0 0.29 0.280 0.239 0.066

3.0 0.32 0.305 0.303 0.092

4.0 0.26 0.130 0.316 0.041

0.241 867

CROSS SECTION OF KOIRA NALA UP STREAM

4.00m

1.00m 1.00m 1.00m 1.00m

0.27m 0.29m 0.32m 0.26m

 

Page 67: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 67/78

Page 68: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 68/78

Page 69: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 69/78

Page 70: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 70/78

Page 71: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 71/78

Page 72: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 72/78

Page 73: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 73/78

Page 74: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 74/78

Page 75: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 75/78

 

Client : Essel Mining and Industries Ltd.,Name of Mines : Koira Iron Ore MinesMonth : September2012Sample name : Water Quantity and Flow Rate MonitoringLocation : Koira Nala DownstreamDate : 29-09-2012Time : 03:30 PM

WIDTH

OF NALA

TRAVERSE POINT DEPTH AREA VELOCITY FLOW RATE TOTAL 

FLOW

m m m2 m/sec m3/sec m3/hr

4.0

01 0.15 0.075 0.262 0.019

02 0.28 0.215 0.477 0.102

03 0.32 0.300 0.501 0.150

04 0.17 0.085 0.238 0.020

0.291 1047.6

CROSS SECTION OF KOIRA NALA UP STREAM

4.00m

1.00m 1.00m 1.00m 1.00m

0.15m

0.28m0.32m

0.17m

 

Page 76: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 76/78

Page 77: Half Yearly Compliance Report of Environmental Clearance Conditions

7/28/2019 Half Yearly Compliance Report of Environmental Clearance Conditions

http://slidepdf.com/reader/full/half-yearly-compliance-report-of-environmental-clearance-conditions 77/78

Page 78: Half Yearly Compliance Report of Environmental Clearance Conditions