  • Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from Jan 2018 to Jun 2018

  • Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from Jan 2018 to Jun 2018

    Aug 03, 2018

    UPL Limited, Unit # 05 Plot # 750 & 746, GIDC, Jhagadia, Dist – Bharuch, Gujarat

    The Additional PCCF Ministry of Environment , Forests & CC , Western Region Office, Kendriya Paryavaran Bhavan, Link Road # 3, E – 5, Ravi Shankar Nagar, Bhopal – 462 016. Madhya Pradesh. Dear Sir; Sub :- Half yearly Compliance Report to conditions of Environmental Clearances obtained ( Jan 2018 to Jun 2018) Ref :- 1. Environmental Clearance No. J-11011/42/95-IA.II (I), dated. 17th May, 1996 of 100 TPD Chlor- Alkali Plant; 2. Environmental Clearance No. J.13011/26/96-IA.II, dated. 24th December, 1996 of 50 MW

    Combined Cycle Co. Generation Power Plant; and 3. A. Environmental Clearance No. J-11011/325/2006-IA II (I) dated. 25th July, 2007 for

    various products. B. Amendment for process change of Glyphosate (Technical) in Environmental

    Clearance No. J-11011/325/2006-IA II (I) dated. 18th September, 2009 C. Amendment for process change of Carbon Di Sulphide in Environmental Clearance

    No. J-11011/325/2006-IA II (I) dated. 10th June, 2011 4. Environmental Clearance No. J-11011/80/2015-IA II (I) dated. 5th April, 2018 for expansion of Agro and other organic chemicals

    We are submitting herewith the half yearly compliance report to the above 03 (three) Environmental Clearances obtained to our Unit from MoEF. We are operating our plants with valid Consents & Authorization from Gujarat Pollution Control

    Board (copy of CC&A is attached along with report). Out of the various products mentioned in EC,

    we are manufacturing Mancozeb, Pendimethylene, Carbon Di Sulphide and Glyphosate (OR

    Glufosinate), Acrolein, Antracol, PCL3, POCL3, TPPI, TTDP, DMPAT,MO, Caustic Chlorine, UPDT

  • Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from Jan 2018 to Jun 2018

    which have been included in our Consent. Company has also obtained a CC&A amendment for

    Coal based power plants and 2 (two) @130 TPH boiler, Formulation products, and additional

    plants (DVACL, MPBAL etc) as per the EC / NOC obtained.

    Unit has obtained Environmental clearance vide letter No. J-11011/80/2015-IA II (I) dated. 5th

    April, 2018 for expansion of Agro and other organic chemicals. We have applied for EC to Consent

    to Establish (NOC). Once we obtained Consent to Establish from SPCB we will start construction

    work and equipment installation at our unit.

    Our Unit has invested Rs. 249.39 Crores in Environmental Management System so far and the investment detail is attached along with the report. We hope that above information is sufficient. Thanking you, Yours faithfully, For, UPL Limited Subhat Kumar Jindal Sr. General Manager- Manufacturing Encl : a/a Copy to : The Zonal Officer Central Pollution Control Board Parivesh Bhavan, Opp- VMC Ward Office # 10, Subhanpura, Vadodara – 390 023. : The Regional Officer Gujarat Pollution Control Board GPCB XGN ID # 25353 Ankleshwar – 393 002.

  • Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from Jan 2018 to Jun 2018

    LIST OF ANNEXURES ANNEXURE-1 Copy of CTE & CC&A Obtained

    ANNEXURE-2 Third Party Analysis Reports

    ANNEXURE-3 CSR Activities

    ANNEXURE-4

    Compliance Status for MoEF letter no. UJH/PRO/17/2007 dated 14th May 2007 for the solvent and reactants storage

    ANNEXURE-5 Copy of EC obtained dated, 5th April, 2018

  • Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from Jan 2018 to Jun 2018

    Compliance Report for Environmental Clearance No. J-11011/42/95-IA.II (I), dated 17th May, 1996 of 100 TPD Chlor-Alkali Plant for period Jan 2018 to Jun 2018

    Sr. No. Condition Compliance Status

    The project has been examined and environmental clearance is accorded to the project for manufacturing 100 TPD caustic soda (47%), 88 TPD chlorine gas, 25 TPD HCL (32%) and 25 TPD hydrogen gas subject to implementation of the following conditions and environmental safeguards:

    --

    i The project authorities must strictly adhere to the stipulation made by the State Pollution Control Board and the State govt.

    All conditions given by State Pollution Control Board (GPCB) is being strictly followed (CC&A copy is enclosed as Annexure-1) and summarized result of third party (BEIL, Ankleshwar) is as follows and detail report is attached as Annexure- 2: All results are well within GPCB permissible limit. Complied.

    Stack Monitoring Result (Period Jan-Jun 2018)

    Parameter Monitoring Result (Average value of Jan-Jun

    2018) GPCB Permissible Limit

    Flue Gas Stack Emissions- Fuel as Imported Coal

    Stack attached to power plant

    PM 40.09 - 54.9 mg/nm3 100 mg/nm3

    SO2 13 - 39.1 ppm 100 ppm

    Nox 12.4 - 19.6 ppm 50ppm

    Stack attached to Thermic fluid heater-TPPI plant- Fuel as Natural Gas

    SPM 4.3 – 8.7 mg/nm3 150 mg/nm3

    Sox 2.9 – 13.5 ppm 100 ppm

    Nox 8.7 - 16.9 ppm 50 ppm

    Process Stack Emission

    Stack attached to WAD 100-TPD Plant

    Cl2 BDL mg/nm3 09 mg/nm3

    HCL 1.5 - 11.8 mg/nm3 20 mg/nm3

    Stack attached to HCl furnace 100-TPD Plant

    HCL 4.3 – 7.5 mg/nm3 20 mg/nm3

    Stack attached to POCL3 distillation column

    HCL 1.3 - 8.3 mg/nm3 20 mg/nm3

    Stack attached to PCL3 distillation column

    HCL 3.1 - 7.2 mg/nm3 20 mg/nm3

    PCL3 BDL mg/nm3 09 mg/nm3

    Stack attached to PCL3 plant storage/filling area

    HCL 6 - 8.7 mg/nm3 20 mg/nm3

    PCL3 3- 4.1 mg/nm3 09 mg/nm3

    Stack attached Mancozeb D-14 scrubber

    H2S BDL 5 mg/nm3

    CS2 BDL 180 mg/nm3

    Stack attached to Mancozeb Spray Dryer

    PM 8.1 - 15.6 mg/nm3 20 mg/nm3

    Stack attached to TPPI plant

    HCL 4.3 - 12.8 mg/nm3 20 mg/nm3

    Stack attached to Antracol spray dryer

    PM 8.1 - 15.2 mg/nm3 20 mg/nm3

    Stack attached to Water+ Caustic scrubber- Antracol plant

    H2S BDL 5 mg/nm3

    CS2 25.9 – 53.9 mg/nm3 180 mg/nm3

    Stack attached to CS2 plant fume incinerator

    H2S BDL 10 mg/nm3

  • Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from Jan 2018 to Jun 2018

    Sr. No. Condition Compliance Status

    Stack attached to Caustic scrubber- Glufosinate plant

    NH3 4.1-12.7 mg/nm3 30 mg/nm3

    HC BDL 20 mg/nm3

    HCL 4.4-10.5mg/nm3 20 mg/nm3

    Ambient Air Monitoring Result (Jan-Jun 2018)

    PARAMETERS Range GPCB Permissible Limit

    PM10 45 -77.2 µg/m3 100 µg/m3

    PM2.5 19.7 – 28.6 µg/m3 60 µg/m3

    SOX 12.6-23.6 µg/m3 80 µg/m3

    NOX 16.8 - 27.1 µg/m3 80 µg/m3

    HCl 3.1 -8.2 µg/m3 200 µg/m3

    Cl2 BDL – 1.9 µg/m3 100 µg/m3

    NH3 BDL – 9.5 µg/m3 400 µg/m3

    HF BDL 60 µg/m3

    H2S BDL 500 µg/m3

    CS2 BDL 2000 µg/m3

    HC BDL 160 µg/m3

    P2O5 BDL 70 µg/m3

    Effluent Discharge Range (Jan -Jun2018)

    Sr. No. Parameters GPCB Permissible Limit

    3rd party average results (Jan-Jun 2018)

    1 pH 6-9 7.07 – 8.35

    2 COD (mg/L) 500 76 - 307

    3 SS (mg/L) 100 25 - 83

    4 Amm. Nitrogen (mg/L) 50 BDL – 32

    ii No further expansion or modification in the plant should be carried out without prior approval of this Ministry.

    We have not done any modification in the plant without proper approval from the Ministry.

    Complied.

  • Half Yearly Environmental Clearance Compliance Report by UPL Limited, Unit # 05, Jhagadia, Gujarat Period from Jan 2018 to Jun 2018

    Sr. No. Condition Compliance Status

    iii Gaseous (Cl2, SO2, NOX & HC) and particulate emission from the various process vents and storage tanks should conform to the standards prescribed by the competent authorities from time to time. At no time, the emissions level should go beyond the prescribed standards. In the event of failure of any pollution control system adopted by the units, the respective unit should be put out of operation immediately and should not be restarted until the pollution control measure are rectified to achieve the desired efficiency.

    We do process stack monitoring through our lab and through third party (BEIL, Ankleshwar) and all parameters are within permissible limit prescribed by GPCB. Summarized monitoring data of BEIL, Ankleshwar is given below:

    Parameter Average

    Monitoring results (Jan-Jun 2018)

    GPCB Permissible

    Limit (mg/nm3)

    Process Stack Emission

    Stack attached to WAD 100-TPD Plant

    Cl2 BDL mg/nm3 9

    HCL 1.5 - 11.8 mg/nm3 20

    Stack attached to HCl furnace 100-TPD Plant

    HCL 4.3 – 7.5 mg/nm3 20

    Stack attached to POCL3 distill