Page 1: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

Graphics Studio 1Final PortfolioIvan Au

Page 2: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

2

Project 1: Precedent DrawingsStretto House

The objective of this assignment was to create a set of scaled plan, section and elevation drawings through hand and computer drafting techniques.

Hand Drawings:

2nd Floor

Ground Floor

East Elevation South Elevation

North ElevationWest Elevation

North to South Section

Overview:

Page 3: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

3

CAD Drawings:

Page 4: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

4

The objective of this assignment was to create a set of graphics which articulate data gathered through the site analysis process. The site was located at Shaganappi point, at the top of a slope and within view of Crowchild Trail.

Site Boundaries

Micro Circulation

Macro Circulation

Project 2: Site Analysis DiagramsShaganappi Point

Overview:

Page 5: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

5

North to South Site Section

East to West Site Section

Macro Circulation

Page 6: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

6

The objective of the project was to collect and visualize data of an immaterial quality of the site. In this project, I decided to explore the change in sound intensity on the site relative to the time of day.

Sound data was collected at various points on the site during rush hours, afternoon and evening over the course of several days. The collected data was then used to create a point cloud and a series of surfaces visualizing the data.

Project 3: Site Mapping Immaterial Flows; Site ModelSound

Overview:

Page 7: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

7

The generated surfaces were then used to create a model which visuallized the data. Each layer was constructed of a different opacity material and is used to signify a particular point in time when the data was collected. The height of each layer displays the sound intensity of each data point.

Project 3: Site Mapping Immaterial Flows; Site ModelSound

Page 8: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

8

Project 4: Digital TransformationsStretto House

The project explores the process of digital transformation through the manipulation of a portion of a precedent house. A section of the precedent was selected for a particular qualtiy and transformations were applied to change the form while preserving that particular quality. Each transformation was doccumented and the final result was placed in a contextual situation.

The utilization of the roofline by the Stretto House as a repository of shadow is a key feature of the building, giving it a means to chronicle time through the changes in light and shadow. This is used in conjunction with other elements present in the house to produce a unique phenomenlogical experience for the users.

Precedent:

Modelled Section

Overview:

The section chosen is an excellent example of the use of light and shadow in the Stretto House, as it features numerous sections of overlapping roofs

Page 9: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

9

The object of the transformation process was to preserve the effect of the roofline on light while enhancing and condensing its effect, while also maintaining the original spirit of the house.

Due to its sculptural form, it was determined that it would be most appropriate to place it within a gallery space, as it expressed some of the qualities found in abstract sculptural works.

A final model was created via 3D printing due to the complexity of the form.

Transformation:

Context: Model:

Original Delete Blend Rotate Bend Twist Rotate

Page 10: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

10

Project 5A/B: Measured DrawingsPF2160Partners: Adam Poole, Vanessa Hausman

Measured drawings of the classroom PF 2160.

9' -

2"

38' - 4 1/2"

1' -

11"

1' - 11"

3' - 11"

10' - 1"

1' -

11"

6' -

10"

26' -

10"

EXIT

EXIT

POT LIGHTS

TRACK LIGHTING

EXIT SIGN

TRACK LIGHTING

TRACK LIGHTING

1/4" = 1'-0"CEILING PLAN

1

1/4" = 1'-0"

Ground level

0' - 0"

0' -

5"9'

- 3

1/2"

0' -

8 1/

2"

3' - 11 1/2"

10' -

0"

13' - 10 1/2"

2’ 11 1/2” TYP. TYP. TYP.

West Elevation4

10' -

0"

7' -

5"2'

- 7"

3' - 0" 3' - 0" 2' - 0" 28' - 10 1/2"1' - 7" 3' - 7"

2' - 10 1/2"

0' -

9 1/

2"

1' - 8" 5' - 8" 1' - 6 1/2"

Ground level

0' - 0"

1/4" = 1'-0"

NORTH ELEVATION1

10' -

0"

0' -

5"

0' - 7"

MEDIA CONTROLSELECTRICAL OUTLET

2' - 1

1"4'

- 0

1/2"

1' - 3 1/2" 8' - 2 1/2"0' - 6"

8' - 2 1/2" 1' - 4"

1' - 4 1/2"

2' -

3"

0' - 1

0"

Ground level

0' - 0"

1/4" = 1'-0"

SOUTH ELEVATION2

1/4" = 1'-0"

EAST ELEVATION3

Ground level

0' - 0"

10' -

0"

7' -

1"2'

- 11"

1' - 8"

0' - 2"

4' -

4 1/

2"

2' - 8"

0' -

5"

1/2" = 1'-0"SIDE DOOR SECTION

4

Ground level

0' - 0"

10' - 0"

10' -

0"

6' - 1

1"3'

- 1"

1' - 11"

0' - 1

0"

DOOR

1/2" = 1'-0"PILLAR SECTION

2

Ground level

0' - 0"

10' - 0"

10' -

0"

1' - 5"

0' - 1

0"

9' -

2"

1/2" = 1'-0"FRONT WALL SECTION

3

Ground level

0' - 0"

10' - 0"

10' -

0"

0' - 1

0"

1' - 11"

9' -

2"

1/2" = 1'-0"DOOR SECTION

1

Ground level

0' - 0"

10' - 0"

7' -

6"

7' -

6"

2' -

6 1/

2"

GLASS ENTRANCEDOORS

PLANS SECTIONS

N1

42' - 0 1/2"

9' - 5" 1' - 9" 19' - 7" 1' - 9" 9' - 6 1/2"

1' -

5"

1' -

5"

25' -

3 1

/2"

3' - 7"

30' -

7 1

/2"

24' -

5 1

/2"

38' - 7 1/2"

16' - 10"

2' -

9"3'

- 5"

5' - 0" 4' - 9"

34' -

1"

8' -

9 1/

2"

3' -

5 1/

2"

12' - 0 1/2"

1/4" = 1'-0"FLOOR PLAN

1

DOOR SECTION

PILLAR SECTIONFRONT WALL SECTION

SIDE DOOR SECTION

N

E3

S2

W4

ELEVATIONS

Cro

wn

set

Stu

dio

s

Au

tho

rs: V

an

ess

a H

au

sman

n, A

dam

Po

ole

, Iv

an

Au

Tit

le: P

F216

0 D

raw

ing

s

Date

: 20

15/1

0/3

1U

nit

s: F

eet,

In

Scale

: A

s In

dic

ate

d

Dim

en

sio

ns:

Feet,

In

Revis

on

No

: 1

Revis

ion

Date

: 20

15/1

1/12

Pag

e N

o.

Keyp

lan

:

1

M1

LEGEND

LIGHT SWITCH TYP.

ELECTRICAL OUTLET TYP. ACOUSTIC CEILING TILE TYP.

PROJECTOR SCREEN TYP.

SPRINKLER 2 1/2” DIAMETER TYP.

PROJECTOR TYP.

SPEAKER TYP.

THERMOSTAT TYP.

MEDIA CONTROLS TYP.

PANEL LIGHTS

TRACK LIGHTS

POT LIGHTS

SMOKE DETECTOR TYP.

M1

AIRDUCT 135mm x 1563mm TYP.M2

1/2” GLASS PANEL TYP.M3

M2

M3

PROJECTOR TYP.

FIRE ALARM SPRINKLER TYP.

EXIT EXIT SIGN TYP.

WIFI ROUTER

PROJECTOR SCREEN, RETRACTABLESPEAKER

&

&

&&&&&

& & & &

$ $

$

#

#

TT

TRACK LIGHTING

W

W

Overview:

Page 11: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

11

Using the measured drawings of PF2160, parts of the wall was replaced with a surface articulation. A full set of drawings were constructed for its construction.

Page 12: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

12

The surface articulation reflects on the geometry and formation of honeycombs, with a hexagonal pattern which flows and shifts along an organic surface. The surface acts as a screen to prevent undue distraction from outside the room as well as granting a more private experience inside the room, all the while maintaining permeability to light.

Grasshopper Formula

Final Surface

Grasshopper Results

The object of the project was to create an articulated surface using parametric functions.

Project 6: Surface ArticulationHex Wall

Overview:

Rationale:

Page 13: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

13

Rendered Articulation

Detail Render

Page 14: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

14

Project 6B: Surface Model Assembly

ASSIGNMENT 6B - FABRICATION

PROJECT TEAM:ADAM POOLE

VANESSA HAUSMANIVAN AU

MATERIALS:PLYWOOD, CHIPBOARD

LASER CUT FILE

DIGITAL MODEL

ASSEMBLY

Page 15: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented

15

ASSIGNMENT 6B - FABRICATION

Page 16: Graphics Studio 1 Final PortfolioFinal Portfolio Ivan Au. 2 Project 1: Precedent Drawings Stretto House The objective of this assignment was to create a set of scaled plan, ... doccumented