Gilsland Village Hall Refurbishment Project. Built in 1893 as a reading room for the village Large function room upstairs and smaller hall, kitchen and toilets downstairs Used as a venue for some village events but not used to its full potential Very cold Very expensive to heat - PowerPoint PPT Presentation

Citation preview

Page 1: Gilsland  Village Hall Refurbishment Project

Gilsland Village HallRefurbishment Project

Page 2: Gilsland  Village Hall Refurbishment Project

• Built in 1893 as a reading room for the village• Large function room upstairs and smaller hall,

kitchen and toilets downstairs• Used as a venue for some village events but

not used to its full potential• Very cold• Very expensive to heat• Not very welcoming• Often people would sit through an event

without taking their hats and coats off!!

Page 3: Gilsland  Village Hall Refurbishment Project

Wall mounted electric heaters

Page 4: Gilsland  Village Hall Refurbishment Project

Very well used electricity coin meter!

Page 5: Gilsland  Village Hall Refurbishment Project

Upstairs Hall before its refurbishment

Page 6: Gilsland  Village Hall Refurbishment Project

Old style wall heaters

Page 7: Gilsland  Village Hall Refurbishment Project

No insulation in the roof

Page 8: Gilsland  Village Hall Refurbishment Project

• Loss of Village Post Office – outreach service in village hall 3 times a week

• Loss of Village Shop• Village Hall became more important for

facilities, services and social inclusion• Some improvements had taken place,

including double glazing, improvements to kitchen

• Becoming obvious that some major refurbishment was needed

Page 9: Gilsland  Village Hall Refurbishment Project

• Change of committee• New committee realised importance of

developing the hall and making it more welcoming

• Poor thermal efficiency and inadequate heating arrangements

Page 10: Gilsland  Village Hall Refurbishment Project

Working with Community Action Northumberland

• Village Hall Health Check

• Village Hall Energy Audit– Identified poor insulation (none)– Identified increased cost of electricity – more than

doubled between 2008 and 2009 and likely to get worse

Page 11: Gilsland  Village Hall Refurbishment Project

Working with Northumberland National Park Authority

• Needed to look at the feasibility of a programme of improvements

• Funding from NNPA enabled us to commission a renewable energy options appraisal

• Appointed architect and structural engineer

Page 12: Gilsland  Village Hall Refurbishment Project

Proposed Energy Efficiency Measures

• Recommended by project architect:-• Sheep’s wool insulation in the roof void• Window reveals in large upstairs hall and smaller

downstairs hall to be lined internally with high performance insulated plasterboard

• External walls of both halls to be lined internally with high performance insulated plasterboard

• Sloping portion of roof to be insulated with rigid foam and high performance insulated plasterboard

• New entrance lobby to be formed

Page 13: Gilsland  Village Hall Refurbishment Project

• Would involve other building work – electrical, re-plastering, internal decoration, new heating distribution system

• Calculated heat loss reduction of 70%

Page 14: Gilsland  Village Hall Refurbishment Project

Options for Renewable Energies

Page 15: Gilsland  Village Hall Refurbishment Project

• Solar photo voltaics – 3kw system over the rear load bearing wall should generate around 2,344 kWh per annum with a cost benefit of around £1,200 through Feed In Tariff

• Clean Energy Cash Back would be a significant new income stream for the hall

• Air Source Heat Pump and Distribution System - remove electric wall heaters (using 37Kw) replace with single heat pump using 5.2Kw and modern distribution system

Page 16: Gilsland  Village Hall Refurbishment Project

How an Air Source Heat Pump works

• Air source heat pumps absorb heat from the outside air, in the same way that a fridge extracts heat from its inside.

• It can get heat from the air even when the temperature is as low as -15° C.

• Heat pumps have some impact on the environment as they need electricity to run, but the heat they extract from the air is constantly being renewed naturally.

• Heat from the air is absorbed at low temperature into a fluid. This fluid then passes through a compressor where its temperature is increased, and transfers its higher temperature heat to the heating circuits of the hall.

Page 17: Gilsland  Village Hall Refurbishment Project

FUNDING !!!

• Business Plan– Background– SWOT analysis– Project Proposal– Environmental Benefits– Social and Economic Benefits– Funding Strategy– Cash Flow– Support from the Community

Page 18: Gilsland  Village Hall Refurbishment Project

• Two Phase approach – Thermal measures, building costs etc. total £39,000

• Renewable Energies – Solar PV panels, Air Source Heat Pump, Distribution System total £31,000

• Project Management by Natural Regeneration Consultancy included

• Enabled us to target different funders for different parts of the project

Page 19: Gilsland  Village Hall Refurbishment Project

• Phase One – Northumberland Uplands LEADER Programme – funding thermal measures - £18,500

• Phase two – Community Sustainable Energy Programme (CSEP) – renewable energies - £12,500

• Total cost of £69,000 at this stage• Identified additional major structural work

required to roof costing £14,000• Total funding required – approx. £83,000

Page 20: Gilsland  Village Hall Refurbishment Project

• Made applications to 27 organisations• Many different application processes• Business plan, presentations, second

applications, additional information, visits

• Supported by 18 organisations to obtain funding for the complete project

• Supported with money and help in kind• Local fundraising / help in kind

Page 21: Gilsland  Village Hall Refurbishment Project

The work begins!

Page 22: Gilsland  Village Hall Refurbishment Project

The roof comes down

Page 23: Gilsland  Village Hall Refurbishment Project

with 120 years of dirt!

Page 24: Gilsland  Village Hall Refurbishment Project

New Structural Work

Page 25: Gilsland  Village Hall Refurbishment Project

Kingspan to create the walls

Page 26: Gilsland  Village Hall Refurbishment Project

Sheep's Wool Insulation

Page 27: Gilsland  Village Hall Refurbishment Project

All electrics to be moved

Page 28: Gilsland  Village Hall Refurbishment Project

Worked around the Post Office

Page 29: Gilsland  Village Hall Refurbishment Project

Post Office carried on as normal

Page 30: Gilsland  Village Hall Refurbishment Project

Walls take shape

Page 31: Gilsland  Village Hall Refurbishment Project

Helpers from Carillion

Page 32: Gilsland  Village Hall Refurbishment Project

Our new main hall

Page 33: Gilsland  Village Hall Refurbishment Project

Helpers from the village

Page 34: Gilsland  Village Hall Refurbishment Project

Non-slip staircase

Page 35: Gilsland  Village Hall Refurbishment Project

Team from Carillion came to tea

Page 36: Gilsland  Village Hall Refurbishment Project

Solar PV Panels were installed

Page 37: Gilsland  Village Hall Refurbishment Project

Air source heat pump was installed

Page 38: Gilsland  Village Hall Refurbishment Project

A new sign!

Page 39: Gilsland  Village Hall Refurbishment Project

Other improvements too

Page 40: Gilsland  Village Hall Refurbishment Project

Official opening by the Duchess of

Northumberland

Page 41: Gilsland  Village Hall Refurbishment Project

Benefits for Gilsland

• Warm, friendly venue for any village event• Economically viable• Lowered our carbon footprint• More groups using the hall, therefore more

services and activities available locally• More income for the hall without increasing

charges• Secured the venue as the hub of the village for the

future

Page 42: Gilsland  Village Hall Refurbishment Project

Increased use of hall• Previous groups – craft, WI, Whist Drive, Dominoes,

occasional sport activities, PO, Gardening Club

• New groups – Youth Club, church, village coffee mornings, Rusty painters, Foot Clinic, Clog Dancers, Beauty and Nail session, Jewellery Valuer, Girl Guide weekend, outside organisations for meetings and training (LEADER, Wildlife Trust, WNBC), Fibre and Spinning Group, Birthday parties, Tea Dances, Gilsland Station, Gilsland Show, Exhibitions and Events, Summer Teas, Craft Fairs and more enquires

• A real centre for activities in the village and surrounding area

Page 43: Gilsland  Village Hall Refurbishment Project

No More Hats and Coats!!