GEOTERMALNI POTENCIALI ZA PROIZVODNJO ZELENE
ELEKTRIKE
Peter KRALJGejzir d.o.o.
SI-1000 Ljubljana, Turnerjeva 17, SloveniaTel.: 040 20 36 05, Fax: 01 56 56 494,
e-mail: [email protected]
WORLD ENERGY SCENARIO 2000 - 2050
1 5 0 . 0
2 0 0 . 0
2 5 0 . 0
3 0 0 . 0
WORLD E NE RGY DE M AND
2% ANNUAL GROWT H
RE NE WABLE E NE RGY
0 . 0
5 0 . 0
1 0 0 . 0
2000 2010 2020 2030 2040
So u r c e f o r F i n i t e E n e r g y D a t a : A SP O a t w w w . p e a k o i l . n e t & K y o t o P r o t o c o l
RE NE WABLE E NE RGY
DE M AND GROWT H AV . 5. 2 %
FI NI T E E NE RGY DE CLI NE
Evolution of Geothermal Energy
���� ���� ���� ����
from 8000 BC from 1910 from 1960 from 2010
1st Generation 2nd Generation 3rd Generation 4th Generation Ancient Power plants Power plants GEOCOGEN
thermal bath with natural fed by drilled with closed thermal bath with natural fed by drilled with closed heat sources heat sources water cycle
natural random random artificial without artificial discoveries hydro geology hydro geology overpressure
(also heat pumps) (co-generation) geographically geographically !! Earth quake risks !! no dangers limited limited with deep boreholes can be built to hot springs to volcanic using high hydraulic nearly everywhere
areas overpressures (all underground) (geologic (hydraulic fracturing) very big anomalies) relatively small power & heat
energy yield production kW category only MW class lower MW class GW class Examples: Examples: Examples: Potential:
Baden Iceland Riehen BS * worldwide Abano Terme New Zealand Soultz unlimited Hungary Philippines Landau * in the proximity Hot Springs Hawaii Cornwall of energy consumers Spa Lardarello Staufen * (short distances) virtually free heat 0,05-0,20 $/kWh 0,10 – 0,90 $/kWh 0,02 – 0,04 $/kWh * partly total loss *
Sevanje
ZEMLJA 30 TWZEMLJA 30 TW
SONCE 600 PW
WEA – World Energy Assesment, povezovalna institucija med UNDP (United Nations Development Programme), UNDESA (United Nations Department of Economic and Social Affairs) in WEC (World Energy Council)
Svetovni potencial OVE(WEA 2000).
PROIZVODNA CENA IN
VREDNOST INVESTICIJ(Fridleifsson, 2001)
danesUS¢/kWh
jutriUS¢/kWh
Investicijska vrednostUS$/kWUS¢/kWh US¢/kWh US$/kW
biomasa 5 - 15 4 - 10 900 - 3000
geotermalna 2 - 10 1 - 8 800 - 3000
veter 5 - 13 3 - 10 1100 - 1700
sončna (fotovoltaika) 25 - 125 5 - 25 5000 - 10 000
sončna (termična) 12 - 18 4 - 10 3000 - 4000
bibavica 8 – 15 8 – 15 1700 - 2500
ELEKTRIKASVETOVNI GEOTERMALNI POTENCIJAL
(IGA, 2001)
konvencionalnetehnologije
TWhe/yr
konvencionalne in binarne tehnologije
TWhe/yr
Evropa 1830 3700Evropa 1830 3700
Azija 2970 5900
Afrika 1220 2400
Severna Amerika 1330 2700
Latinska Amerika 2800 5600
Oceanija 1050 2100
svetovni potencial 11 200 22 400
GEOTERMALNA ENERGIJAELEKTRIKA (Bertani, 2010)
2010: 10,715 MW; 67,246 GWh
PRISPEVEK K CILJU 20% OVE DO 2020 V EU27
PROIZVODNJA EL. EN. 2007 2010 2020PROIZVODNJA EL. EN. 2007 2010 2020
Konvencionalna (MWe) 815 920 1200
Binarna (MWe) 15 70 300
Povečani sistemi (MWe) - 10 4500
Skupna instalirana moč (MWe) 830 1000 6000
Letna proizvodnja (TWh) 6,5 8 50
elektrika toplota stranski produkti (Si)
NAMEMBNOST
GEOTERMALNA ENERGIJA
elektrika toplota stranski produkti (Si)
Daljinsko ogrevanje
toplice kmetijstvoprocesna
toplota
LINDALOV DIAGRAM
PRVA GEOTERMALNA ELEKTRARNA
Princ Piero Ginori Conti: Larderello 1904
Terestični toplotni tok(Pollack et al., 1993)
kontinenti 65 mWm-2kontinenti 65 mWm-2
oceani 101 mWm-2
povprečje 87 mWm-2
SEVEROVZHODNA SLOVENIJA
Viri:potencial: 50.000 PJ
izkoristljivo: 12.000 PJ
ELEKTRIKA:
TERMAL II:TERMAL II:
direktno: 414 PJ (115 TWh)
binarno : 643 PJ (179 TWh)
PALEOZOIK: ?
SLO poraba: 11 TWh/a
Slovenija: Pregled vlaganjza obdobje 2005-2009 vir Rajver et all, 2010
2000 – 2004: 8 vrtin (6,75 km) cena 5,45 Mio USD (810.000 USD/km) subvencija: 1,6 Mio USDpridobljena moč: 45,7 MWt, (35.523,00 USD/MWt).
(Brez Be-2/03 406.585,00 USD/ MWt).
Električna energija
Prvi mednarodni projekt: 1994
Prvi s strani EU odobreni projekt: 1999
Današnje stanje: Ø
Za izrabo geotermalnih virovMorajo biti izpolnjeni naslednji pogoji:
• profesionalni,
• politični in
• ekonomski
Ljutomer Geothermal Project
Investor: Municipality of Ljutomer
Executive GeoZSinstitutions: IBE CONSULTERS,
Geotherma, Parisinstitutions: IBE CONSULTERS,
Geotherma, Paris
Utilization Electricity productionpurpose: Direct use
Balneology
Investment cost: 10.641.000,00 €
Simple Pay Back: 6 years
State-of-the art: Inactive since 1996
IGES – Integrated use of Geothermal Energy for Sustainable Development
Investor: PETROL d.d.
Executive Nafta Lendava, GeoZS, RRA MuraExecutive Nafta Lendava, GeoZS, RRA Murainstitutions: NITG-TNO Delft, Gaudriot Geotherma SA, Paris
Frauenhofer Institut, Karlsruhe
Utilzation Electricity production, Direct use, Coolingpurpose: Aquacultures, Balneology
Investment cost: 30.712.000,00 €
Simple Pay Back: 6,8 years
State-of-the-art: Closed in the year 2000
Geothermal Project Tolmin
Investor: GEJZIR CONSULTING
Executive Gejzir d.o.o., IBE d.d., PRC
institutions: Geoproduction consultants, Paris, Geoteam, GleisdorfParis, Geoteam, Gleisdorf
Utilization Electricity production
purpose: Direct use, Balneology
Investment cost: 91.980.000,00 €
Simple Pay Back: 6-10 years
State-of-the-art: Looking for Investors
Geothermal ProjectBenedikt
Investor: Municipality of Benedikt
Executive Gejzir d.o.o., Investment cost: 11.830.000,00 €
institutions: IBE d.d.
Simple Pay Back: 5,5 years
Utilization Electricity production,
purpose: Direct use State-of-the-art: Started in the year 2003
Proizvodnja električne energije
Izgradnja demonstracijske geotermalne elektrarne moč: 15 MWe
PREDLOG ZA 10-LETNO OBDOBJE
moč: 15 MWe
letna proizvodnja: 112,5 GWh (1 % SLO porabe). investicija: 30 Mio €
. letni dohodek: 6,39 Mio € (5,68 c€/kWh)
vračilo: 5-6 letih
AKCIJSKI NAČRT ZA OBNOVLJIVE VIRE ENERGIJE ZA OBDOBJE 2010-2020 (AN OVE) SLOVENIJA
Ljubljana, julij 2010
Slovenija 2020
OVE – proizvodnja električne energije (brez HIDRO)
Za denar razpisa NER300 se potegujejo:
Avstrija, Madžarska, Slovaška, Romunija, Avstrija, Madžarska, Slovaška, Romunija, Nemčija in Grčija....
omrežje
baterije gorivna celica
SVAROG 1SVAROG 1SVAROG 1SVAROG 1
Center za upravljanje
elektrolizer vodik
Uporabnik
Eden izmed dolgoletnih vplivnih akterjev na tem področju mi je dejal:
»Pameti nimamo za to, kaj bi počeli na »Pameti nimamo za to, kaj bi počeli na stvareh in s stvarmi, ki jih vidimo vsak dan (na primer Sava), kaj šele, da bi doumeli tisto, kar je v nederjih zemlje.«
7 FP - GRUOND-MEDDemo project Benedikt
MOBILNA OVE ELEKTRARNA
SVAROG 1SVAROG 1SVAROG 1SVAROG 1
Hvala za pozornost