26
MAXIMIZE THE VALUE OF YOUR MINE 北京盛科瑞仪器有限公司 Beijing SCR Instruments Ltd GeoSLAM ZEB-REVO Applications to Underground Mining in China

GeoSLAM ZEB-REVO Applications to Underground Mining in China

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

MAXIMIZE THE VALUE OF YOUR MINE

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

GeoSLAM ZEB-REVO Applications to Underground Mining in China

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

3D Laser Mapping and Data Processing System to Underground Mining

3D Mapping Point CloudsP r o c e s s i n g

Reverse model

Datamine Resource Model Update

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Case 1 Underground Gold Mine in Henan Province

Mapping underground tunnels, shaft, stopes and cavities.

Mine dimension: E-W: 1300m,S-N: 600m,Depth: 240m

北京盛科瑞仪器有限公司

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

3D view of partial mapped areas.

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Whole mapped underground spaces

Days for on-site mapping:6

Days for data processing:3

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Reverse model of tunnels

Point cloud model

DWG model for mining design software

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Cavities

Point clouds

Wireframe models

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Calculate volume for backfill design

Volume Calculation

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

With 3D spatial

information, geologists

would be able to study

more insight into resource

models and might be able

to identify residual

resources. This is especially

valuable for precious metal

deposits.

Optimizing Resource Model

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Resource models vs actually minedCase 2

MAXIMIZE THE VALUE OF YOUR MINE北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Residual resource model optimization

Identify differences between designed and actually mined

Update the model with new

findings and optimize design

for subsequent operation

Designed

Designed

Measured

Measured

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Case 3 Safety and volume inspections

Sections 470 and 495

Nine sub-sectional scans

Total time: 3 hrs

Total 260 million points

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

DWG Model

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Volume inspection

Using wireframe

model to obtain total

volume of mined. It is

more accurate and

more fair。

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Safety indication

Mapping of #20

line identified that

the raise was

overmined

Over mined

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Mapping raises

The raise at #19.5b line

is too close to the floor

of #495 level which

implies that there are

roof collapse hazards to

#470 level.

2.1m

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Compare with total station survey data

REVO data are

quite close to total

station data from

CAD for #495 level。

Water inundated

at the time of

mapping

Total station surveyed

boundary

A

A

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Inspection

At #470 Level, REVO data are

very close with total station data

for main galleries, but not very

close to access tunnels to

stopes, which were mainly

measured using compasses and

tape measures.

罗盘测量产生误差

C

B B

C

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

斜坡道 A-A 穿脉 C-C

沿脉 B-B

Total station survey points in line with sectional boundary from REVO data

4.489m

4.884m

4.608m

4.671m

3.965m

Total Station Surveying Points

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Case 4 Orepass Shaft Mapping

Depth:110m

Mapping time: 30 mins

Data Processing time: 30 mins

罗盘测量产生误差

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Case 5 Large cavities (needs for long range scanners and/or UAVs)

罗盘测量产生误差

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Summaries

REVO, as a new surveying tool, offers very fast and efficient 3D mapping for

underground mines.

It is especially suitable for complex 3D spaces, shafts, raises, ore passes and their

combinations.

It is very easy to use and can be operated by one person.

It offers high density of point clouds which reflects underground spaces in details.

Fast built 3D models could be read directly by most mining design which facilitate

mine design and management.

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Summaries (Cont.)

It could be used in daily operation for volume inspection, if it is over- or under-

mined for fair auditing.

It could be used to check if there are safety issues.

Data could be used for optimizing resource models, calculating volume of cavities

for backfill design.

Looking forward to seeing a long range REVO for thorough mapping of large

cavities.

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Thank You!

北 京 盛 科 瑞 仪 器 有 限 公 司B e i j i n g S C R I n s t r u m e n t s L t d

Over 20 Mining shows and exhibitions participated

40-50 individual demos run

15 systems purchased from Geoslam

3 demo systems