GE Experience with Turbine Integrated Battery Energy Storage Nicholas W. Miller, GE 1 © 2014 General Electric Company 1 sec 1 min 10 min 1 hr 1 day 1 wk 0.1 1 10 100 1000 10,000 100,000 1000,000 Time (s) Inertial Response Frequency Droop Curtailment/ dispatch down Enhanced: Short-term scheduling (predictable power) Ramp Control Frequency Regulation (Secondary Response)* Today’s Wind Plants w/o ES: Today’s Wind Plants with ES: Grid Operations … A wide range of timescales *Careful of language…many variations world-wide, with different meanings!

GE Experience with Turbine Integrated Battery Energy Storage · GE Experience with Turbine Integrated Battery Energy ... • Integrated Energy Storage on 3 GE 2.5 MW ... GE Hybrid

  • Upload
    lamcong

  • View
    260

  • Download
    1

Embed Size (px)

Citation preview

GE Experience with Turbine

Integrated Battery Energy

Storage

Nicholas W. Miller, GE

1

© 2014 General Electric Company

1 sec 1 min 10 min 1 hr 1 day 1 wk

0.1 1 10 100 1000 10,000 100,000 1000,000

Time (s)

Inertial Response

Frequency Droop Curtailment/dispatch down

Enhanced:• Short-term scheduling (predictable power)• Ramp Control • Frequency Regulation (Secondary Response)*

Today’sWind Plantsw/o ES:

Today’sWind Plantswith ES:

Grid Operations … A wide range of timescales

*Careful of language…many variations

world-wide, with different meanings!

What did we do? Filter

Grid

Pgrid

Pstator

Pline

Rotor-side

converterLine-side

converter

Doubly-fed induction

generator (DFIG)

690 volts

Protor

Battery connection at the DC link thru bi-directional DC-DC converter

•Battery Integration point: as part of

the farm, just like an additional turbine.

Typically in 1-2 MW blocks.

•Battery Integration point: via the

WTG converter. Distributed as 200 KW

blocks throughout the farm.

Central vs. Integrated Storage Central Storage Integrated Storage

Inverter

BOP Required: separate inverter, switchgear, cabling, and transformer.

BOP Required: Filter cabinet, DC chopper, and cabling.

How does it work? Connected 200kWhs of batteries w/ GE 1.6-100 in 2012

@Tehachapi and demonstrated Predictable Power

Okay … what else are we doing?

Time (min)

0 5 10 15 20 25 30

© 2014 General Electric Company

© 2013 General Electric Company

How might storage work in a 5 minute

cycle Economic Dispatch system?

© 2014 General Electric Company

AGC signal

Farm output w/frequency reg.

Frequency Regulation…”REG”

Frequency Regulation Pilot at Goldthwaite Texas

Wind plant dispatched

What’s Next: Primary frequency response*A growing issue today:

• Today’s State-of-the-art Wind Plants:

• Provide over-frequency response with no opportunity cost

• Provide under-frequency response with opportunity cost: pre-curtailment

• Next-generation with Hybrid turbines:.

• Provide under-frequency response without opportunity cost

• As fast (or slow) as the grid needs

Participate more competitively and more often in future primary frequency response markets

Today’s Frequency Response Curve Integrated Energy Storage Frequency Response Curve

© 2013 General Electric Company 11

What’s Next: WindINERTIAtm….Inertial Response

• Today: Extract rotational

energy; pay back in 10s of

seconds

With Hybrid: Extract battery energy; pay back in 10s of minutes:

© 2013 General Electric Company

Invenergy Goldthwaite Site - ERCOT• First Commercial Installation

• Integrated Energy Storage on 3 GE 2.5 MW –

120meter WTGs

• Now in commercial operation

• Presently in first phase of ERCOT certification

for short-term predictable power

• Second phase of certification for participation

in REG (secondary frequency control) market

10

11

Batteries

Chopper/

Switches

GE Hybrid Wind Turbine

Invenergy Goldthwaite Site

HMI – During Predictable Power

Operation

12

Conclusion

• 1st Commercial Installation in operation now

• Certification underway to allow Wind Plant

owner to participate in ERCOT ancillary

services market (by end 2014)

• Many potential opportunities and potential

applications….