USDA Forest Service Region 5 FY22 GAOA Deferred Maintenance Projects Title State Project Description Placerville Site Backup Generator CA Install a site-wide automatic backup power generator at the Placerville Institute of Forest Genetics (IFG) to protect critical irreplaceable research assets at risk (both USFS & partner) and to allow site operations to continue. 0517 FY22 Campground Public Access & Safety Improvements CA Purchase and installation of bear resistant food lockers at 40 family and group campgrounds across the forest. Purchase of bear-resistant dumpsters for ten campgrounds. 0517 Sand Pond Interp. Trail Boardwalk Replacement CA This project will replace the 1,000 ft of deteriorating and constantly shifting boardwalk with a stable, inert environmentally friendly pier substructure and accessible boardwalk. 0517 TL Loop 6 Bridge Replacement CA Remove existing structure and replace the steel I beams and replace the wooden deck and railings. 40 GAOA 0517 FY22 Campground Resilience & Vegetation Management CA Implement vegetation management prescriptions and treatments at priority campgrounds to promote forest health, increase public safety and improve facility aesthetics. 1

FY22 GAOA Deferred Maintenance Projects - USDA

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

FY22 GAOA Deferred Maintenance ProjectsUSDA Forest Service Region 5 FY22 GAOA Deferred Maintenance Projects
Title State Project Description
Placerville Site Backup Generator CA Install a site-wide automatic backup power generator at the Placerville Institute of Forest Genetics (IFG) to protect critical irreplaceable research assets at risk (both USFS & partner) and to allow site operations to continue.
0517 FY22 Campground Public Access & Safety Improvements
CA Purchase and installation of bear resistant food lockers at 40 family and group campgrounds across the forest. Purchase of bear-resistant dumpsters for ten campgrounds.
0517 Sand Pond Interp. Trail Boardwalk Replacement
CA This project will replace the 1,000 ft of deteriorating and constantly shifting boardwalk with a stable, inert environmentally friendly pier substructure and accessible boardwalk.
0517 TL Loop 6 Bridge Replacement CA Remove existing structure and replace the steel I beams and replace the wooden deck and railings.
40 GAOA 0517 FY22 Campground Resilience & Vegetation Management
CA Implement vegetation management prescriptions and treatments at priority campgrounds to promote forest health, increase public safety and improve facility aesthetics.
1
Title State Project Description
40 GAOA RD07 - Repair Road, Arroyo Seco and Camino Cielo, Los Padres NF
CA Project includes Installing/constructing retaining walls at downslope edge at both road failures to stabilize the roadway after storm damage. Both of these roads are vital travelways for fire suppression activities.
40 GAOA RD88 - Medicine Lake Roads FY22 CA Road deferred maintenance, pavement preservation, and repairs to primary NFS roads accessing Medicine Lake Recreation Area.
40 GAOA RF01 - Enhancing Los Angeles Foothill Community Rec Destination at Chantry Flat
CA Project includes replacing water system and flush toilets, constructing retaining walls and moving the unusable portion of the picnic area on the upward portion of the rec site.
40 GAOA RF04 Forestwide Wilderness Trailhead Improvements
CA The project will maintain 10 paved, 30 aggregate, and 11 native surface parking lots. 51 decayed trailhead kiosks will be replaced. Replacement trailhead interpretive signage will be designed, fabricated, and installed. This is a two- year project.
40 GAOA RF06 - Forest Wide Deferred Maintenance
CA This project replaces toilet risers, picnic tables, and fire rings, asphalt patching, repair & replacement of parking barriers/bollards, repair of signs/kiosks and painting of signs and restrooms for 15 sites.
40 GAOA RF09 - MDF Forestwide Campground Maintenance Phase 2
CA Maintenance and repairs to drinking water systems, accessibility, tables, trash receptacles, roads and campsite stalls, signage, kiosks, fee stations.
2
40 GAOA RF12 - Lytle Creek Recreation Corridor Improvements
CA This project would construct convenient bathrooms, make safety improvements to parking areas, and construct a purpose-built trail to protect water, reduce traffic hazards, and protect riparian areas from damage.
40 GAOA RF12 - Rehabilitate Developed and Dispersed/Developed Recreational Sites on BDF
CA This project would replace and refurbish existing recreational sites and facilities, forest wide. Project would replace worn campfire rings, damaged picnic tables, windows, flush toilets, re-paving of walkway, and replacing small footpath bridge
40 GAOA RF13 FY22 - Tenmile-Lava Butte Campground Giant Sequoia National Monument
CA This Project will convert the Tenmile Overflow into Lava Butte fee campground to eliminate public sanitation concern, add universal accessibility, eliminate resource damage while reducing agency managerial costs and generating fee income.
40 GAOA RF15 Jerseydale Campground Rehabilitation Phase 4
CA Phase 4 campground improvements include installation and/or construction of food lockers, hitching rails, hitching rail area with path, single gate, parking spur, single campsite, tent pad, ORARs, and steps.
40 GAOA TL08 MNF Yolla Bolly Wilderness Deferred Trail Maint
CA Work includes brushing, tread repair, repairing erosion control features and removing down trees across the trails.
3
40 GAOA TL17 - Granite Chief Wilderness Trail Reroutes
CA The project would realign the trail segments and harden stream crossings that are creating safety and resource issues among 8-miles of wilderness trails, including trails within recently acquired lands added to the wilderness.
40 GAOA TL19 - Pope-Baldwin National Recreation Trail Reconstruction
CA This project will reconstruct and widen a portion of the Pope Baldwin National Recreation Trail.
40GAOA PSW Arcata Elevator Replacement CA This project is to replace the elevator and modify the shaft such the elevator meets current seismic code and is ADA accessible.
40GAOA RF11 - Plumas Forest-Wide Campground and Day Use Site Improvements
CA Campground and day use site upgrades on 17 recreation sites - project work would include paving, road repairs, gates, replacing picnic tables, barriers, signs, and firerings, purchasing & installing bear boxes
Antelope Lake Rec Area 27N41 & 28N03 DOUBLE CHIP SEAL
CA Work consists of brushing, cleaning culverts, and applying a double chipseal layer over existing paved road
Antelope Lake Rec Area road Culvert upsizing CA Replacement of 80 undersized and aged culverts along the antelope road.
Antelope Rec Area Boulder and Lone Rock campground pavement
CA PAVEING 4.48 MILES OF CAMPGROUND SITES AND CAMP GROUND ROADS.
4
Title State Project Description
BR03-Big Silver Bridge CA Replace existing rail car bridge with new bridge. Project includes survey, design, and construction of single lane width, approximately 40 feet span bridge.
BR05 - Mule Trail Bridge Replacement CA Project includes replacing an aging major trail bridge over North Fork Salmon River at a trailhead to Marble Mtn. Wilderness. This bridge accesses an important trailhead for outfitter guides that provide service to public.
BR05 - O'Neil Bridge Repair CA Remove two existing broken panels. Construct and place two new replacement panels. New panels shall match the material and dimensions of the removed panel and meet or exceed the load-carrying capacity of the removed panel. Design is 100% complete
BR05 - Salmon Methodist & Scott River Bridge: Pressure grout cracks in bridge deck and beams
CA The project consists of repairing the deteriorating surface of Salmon-Methodist Bridge and Scott River Bridge. The repair will include epoxy injection of cracks on the topside of both bridge decks.
BR05- Slater Fire Bridge Replacements (3) CA Replace dolittle, Mill Creek and West Branch vehicle bridges that burned in the Slater Fire (2020). These bridges access timber stands and recreation sites.
BR06 - Black Rock Bridge Reconstruction CA Project will replace the girders and eliminate the fracture critical condition as well as replace the deck and railing system and repair scour holes at base of piers at the main span.
5
BR07- Monterey RD Renovate Historic Pack-Stock Bridge & Trails
CA Renovate historic Horse Bridge and assoc. trails to access 24 mi. of Wilderness trails. Replace all treads on 98-foot steel structure. Refurbish and paint exterior of bridge for protection from the natural elements. Rehab trails to pack stock standards.
BR08 - Beaver Creek Bridge Abutment Retrofit CA Design and construct foundation system that allows slide to move under bridge without causing damage. Foundation moves ~5/8" per year. Excavation and removal of old structure and construction of new abutment without disturbing bridge deck.
BR08 - Eel River AOP CA REPLACE FAILED CULVERTS. DESIGN, AND CONSTRUCT BRIDGE, REMOVE AND DISPOSE OF 10,000 CUBIC YARDS OF FILL.
BR09 - Middle Fork Parker Creek Bridge replacement
CA Replacement of the Middle Fork Parker Creek Bridge on Forest Route 31. A standard Region 5 concrete structure would be utilized. The original bridge components and the temporary bridge would be removed and rehabilitated as part of this effort.
BR14 - Critical Bridge Repair CA Critical Bridge Repair on Brown's Creek, Castle Creek and Kosk creek bridges on the Shasta Trinity Natioanl Forest. BR1: Deck & railing replacement; Br2: Repair rip rap of scour damage of 20' hole in stream bead near foundations; Br3: removal of upstream drift logs/trees up against the center pier.
6
Title State Project Description
BR16 - Essential Bridge Repairs CA Reconstruct Upper Moore Creek Bridge and perform major repairs on Boards Crossing Bridge
BR16-Trail Bridge Installation - Herring Creek- Strawberry
CA Re-engineer existing abutments for suitability and upgrades for the construction of trail bridge across Herring Creek.
Davis Forestry Sciences Lab CA To construct a new owned PSW Davis Forestry Sciences Laboratory building for PSW HQ near UC Davis.
DM09 - Quail Lake Dam Spillway Stabilization CA Project entails stabilization of existing primary spillway and installing auxiliary spillway. Quail lake dam is a 17 foot tall HH embankment dam with approximately 60 lives at risk, state highway downstream, and public beach downstream.
DM10 - Hume Lake Phase 3 CA Outfall interior corrosion protection - ceramic or concrete. Tree removal on west abutment. Tertiary grouting on west abutment to address seepage around the end of the structure.
DM11 - Lake Mary Auxiallary Spillway CA Entails construction of auxiliary spillway. Primary spillway is blocked by local water district gates which they use to store water for Mammoth Lakes Ca.
DM12 - Lost Lake Dam Siphon Spillway CA The project entails the construction and installation of an automatic siphon spillway.
7
FC** - R5 Multi Forest Trailer Park Expansion Project
CA This project will increase housing capacity at LTBMU's Baldwin trailer park, Inyo National Forest's Mammoth Compound and the Tahoe National Forest's Truckee District Campus by adding new trailer pads spaces. A total of 19 trailer pads will be constructed
FC-001Patrick Creek Bath House Restoration CA The Forest plans to renovate the historic stone bath house at Patrick's Creek, with the ultimate intent of utilizing it as a rustic overnight rental, and historic show piece for the district.
FC-003Forest Wide Boat ramp/river access maintenance
CA The proposed plan is to improve, repair and restore historic river access sites, to allow for river watercraft access, by Search & Rescue, outfitter guides, and the public.
FC-004Forest Wide Recreation Sign Maintenance CA This project would contribute to reduce the deferred maintenance to recreation signs across the forest. This includes replacement of highest priority signs first followed by the repair, or replacement of other recreation signs across the forest.
FC01 - Chilao Water System CA The proposed project will replace the main lines that lead into the campgrounds and major loops. This would allow us to isolate and turn off water in the loops to address leaks and safety issues.
8
Title State Project Description
FC01 - Clear Creek Station Improvements CA This project proposes to replace windows with energy efficient models. Install, water system chlorination system and renovations to create 2 separate restroom spaces with showers.
FC02 - Multiple Fire Station Roof replacement and Energy Upgrades
CA Replace multiple CNF Fire Station roofs that are past service life and are failing.
FC03 - Eldorado Forest Supervisor's Office and Consolidation
CA Design and build one new administrative office to consolidate Supervisor's Office, Placerville District Office, and additional facilities on the Forest (200 employees). Demolish old buildings and terminate the lease.
FC03 - Grizzly Flat Fire Station CA Replace the failing engine garage using standard designs. Existing Space is 957 SF. New space needs is 3,840 SF. (Standard R5 Design) Provide two engine bays and adequate PT facilities. Address snow load.
FC03 - Roof Replacements CA The project will remove and replace the existing roofs with new standing seam metal roofs.
FC04 - Rock Creek Lake Boat Launch Rehabilitation
CA This project is for the construction of a new boat launch ramp, boarding float, installation of a new vault toilet, construction of ADA accessible sidewalks and the resurfacing & restriping of the facility parking lot including facility access roads.
9
FC04 -R5 Multi-Forest High Priority Accessible Toilet Replacement, Phase 2
CA This project will address current deficiencies that exist at developed recreation sites on the Inyo, by replacing 12 non accessible toilets at 7 recreation sites. The improvements will enable the sites to meet ABA and ADA accessibility requirements.
FC05 - Grass Lake Engine Bay Replacement & Building Demolition
CA The project consists of the complete design and construction contract administration of work needed to demolish four (4) small structures and construct one new engine office at US Forest Service Grass Lake fire station.
FC05 - Happy Camp District Office CA Construct a 9090 sq ft District Office on open land at the Happy Camp administrative site on the west end of the community. The office will house 45 FTEs and Fire Dispatch supporting Cal-Fire, State OES, Karuk Tribe, and local and county fire agencies.
FC05 - Scott Bar Station CA Construct New 2,000 SF, 2-bay Fire Engine/Cache Bldg, Construct New 2,100 SF 5-Person Barracks, Renovate Historic Residence for Admin Office, Demolish/Disposal of Existing Butler Bldg/Restroom,
FC05- Collins Baldy Lookout CA Replace and repair lookout structural support and decking
FC05- Grass Lake Water System Repairs and Upgrades
CA Repair and replacement of components of existing water system, including storage tank, distribution lines and hydrants
10
Title State Project Description
FC05- Petersburg Station Engine Bay Remodel CA Design and construction to enlarge the engine bay at US Forest Service Petersburg fire station.
FC06 - Almanor Fire Engine Bay w/ Office Design & Build
CA Design/build a new 4600 SF Engine Bay w/ offices & associated utilities to support the district fire staff of perm & temp employees. This new structure will replace the ALM Engine Bay (FS2200) & the temp modular office rental.
FC06 - Lassen Forest Supervisors Office CA Construction of a government owned 12,000 square foot office building and associated parking local to the Susanville area to serve as the Forest Headquarters.
FC06 - LNF ELRS HVAC Replacements CA Replace three +20 year old HVAC units that have exceeded their design life due to frequent and costly repairs in the Eagle Lake Ranger Station.
FC07 - Construct Fire Station to Replace Nacimiento Station/Barracks/Pumphouse Lost to Fire
CA Construct replacement facilities to include Fire Station/Engine Garage, Barracks, and all required site utilities/support (water well, electrical connections/solar, wastewater, parking)
FC07 - Maintain 3 Fire Stations, Forest-Wide CA Replace flooring, windows, interior plumbing and related work at the three stations. Exterior renovations include roof replacements and siding at some locations. Structural improvements including foundation repair to a well house at Arroyo Grande.
11
Title State Project Description
FC07 - Maintain 7 Barracks Facilities, Forest-Wide CA Project scope includes repairs to the barracks facilities including interior and exterior as well as plumbing and basic utilities. Some of the issues identified for repairs include code compliance as well as health and safety
FC07 - Repair Engine Bays, Expanding to Fit Engines, at 4 Stations, Los Padres NF
CA Expand the engine garages to fully accommodate the new, larger engines.
FC07 - Repair Fencing/Landing Surface at 3 Helitack Bases, Los Padres NF
CA Repair/replace fencing around all three helitack bases (Chuchupate, Arroyo Grande, Casitas). Resurface landing pad area at two bases (Arroyo Grande, Chuchupate).
FC07 - Repair Potable Water Systems at 7 Sites, Forest-Wide
CA Project would be to repair/replace piping in these water systems, to prevent failures and ensure water delivery to Fire personnel, residents, and recreators. Project would also install water treatment systems at several locations.
FC07 - Repair Roofs at 7 Fire/Barracks Facilities, Forest-Wide, Los Padres NF
CA Replace the roof and repair any leaks (replacing flashing, repairing leaks at roof penetrations at Ojai Engine Bay, Pacific Valley Barracks, Los Alamos Station, Arroyo Grande Station, Chuchupate Womens' Barracks, Temescal Station, Ozena Barracks.
FC07 - Repair/Upgrade Exterior of 3 buildings, Los Prietos Compound
CA Project scope includes replacing the roofing, window, doors and siding at three buildings. Project will restore buildings to weather proof and rodent proof for Fire and other district staff that occupy/use these buildings.
12
Title State Project Description
FC08 - Critical Forest Wide Roof Replacement CA Remove and replace roofing on 9 recreation buildings and 5 FA&O buildings; locations vary.
FC08 - High Glade Lookout Replacement CA High Glade Lookout burned in the 2018 Ranch Complex fire. Decommission existing structure and replace with new lookout. Grade 1.3 miles of road to improve access.
FC08 - Stonyford HVAC Replacement and Attic Insulation
CA Remove and replace the Main Office, Engine Office and Hotshot Office HVAC units at the Stonyford Work Center. The Hotshot Office HVAC is located in the attic requires proper insulation and attic fan replacement.
FC08 - Stonyford WC Compound Water Line Replacement and Asphalt Resurfacing
CA Replace all potable and non-potable GSP water lines, valves, hydrants, irrigation components, backflow devices and all other appurtenances needed to supply safe drinking water to employees and visitors. Re-surface asphalt throughout compound.
FC09 - Modoc South Fork Barracks Replacement CA This project will install a new government barracks facility for 13-20 tenants within the FS-owned South Fork Compound in Alturas, CA. The antiquated "west house" on site will also be demolished and eliminated.
FC09 - Modoc South Fork Utility Shop CA Construct new Utility Shop (6,000 SF) at the South Fork Compound, fabricate and install water and sewer systems, fabricate and install electrical, and import gravel for sub-base to elevate new building above the 100-year flood plain.
13
FC10 - Six Rivers SO Consolidation with Research Lab
CA Install cubicle office workstations at the RSL. Install computer servers and hardware needed. Remodel Nursery to house fleet support and fire. for all office work stations. Improve parking in existing lot and build new lot in lower parking area.
FC-10-001 New Fire Engine Bays CA Expand the engine garages to fully accommodate the new, larger engines.
FC-10-002 Resource Building CA Remove carpet and replace with laminate flooring. Replace existing bathroom fixtures with water saving fixtures.
FC-10-005 Ship Mountain Lookout CA Repair water damage and dry rot in the lower level of the lookout and the baring wall of the Ship Mountain Lookout.
FC-10-006 NRA Men's Barracks Remodel CA Repair water damage and fix fireplace and chimney. Upgrade electrical wiring to meet safety codes, install a whole house HVAC system, replace worn out flooring and windows reroof.
FC-10-007 Gasquet Garage Restoration CA Repair damage to historic building.
FC-10-008 Salyer Residence CA Repair exterior wood siding and trim that is damaged due to dry rot and insect damage.
14
Title State Project Description
FC11 - Brush Creek North Complex Fire Rebuild CA Plan location of new buildings, design new facilities and utilities including new septic and water. Construct designed building. Repave parking lots after.
FC11 - Brush Creek Work Station Water Filtration & Upgrades
CA A filtration system will be installed along with replacement of the collection tank & distribution lines from spring to pump shed, and pump shed to buildings.
FC11 - Mt Hough Ranger Station Barracks Replacement
CA Dispose of existing barracks, replace with new permanent stick frame building with same capacity. Hookup to existing utilities.
FC11 - Plumas Supervisor's Office Compound Paving
CA Grind and repave and strip compound parking lot address drainage infrastructure as needed.
FC11 - Red Rock Lookout Retrofit CA Replace lookout roof, flooring and cabinets.
FC11 - Strawberry Engine Garage Retrofits CA Design and retrofit existing engine garage. Extend the back of building, install roofing, replace exterior light, repaint entire building.
FC11- Plumas NF Heliport Design Build CA Decommission current helibase, construct new office and HLS/IHOG compliant helipad utilizing regional standard design.
15
Title State Project Description
FC12 - Air Tanker Base Trench Drain Replacement CA Remove and replace damaged concrete trench sections. Trench will match existing trench. Contractor is responsible for verifying damage areas, and for establishing correct alignment and elevation of new section.
FC12 - Fire Facilities Roof Replacements CA Project consists of removal and replacement of corrugated metal roofs and
replacement with standup seam metal or asphalt shingle roofs. Work includes installation of extra roof supports and sheeting at some of the locations.
FC12 - Forest Administrative Site Water and Wastewater Improvements
CA This project includes well surveys and new well pumps for multiple sites, refurbishment of septic systems, replacement of failing system components, and general maintenance of the water and wastewater systems for these sites.
FC12 - Forest-wide HVAC Replacements CA Replace various failing HVAC units at 18 locations throughout the forest.
FC12 - Lytle Creek Engine Garage Replacement CA Replacement of a fire engine garage with office space for fire operations and storage space for Fire, Rec and Admin operations.
FC13 - Greenhorn Summit Station Engine Garage Replacement
CA Construct a new fire station at Greenhorn Summit to replace a 480 SF 1950's cabin and a condemned 1930's garage that has been decommissioned. Location is critical for strategic fire protection and prevention needs; and serves public contact needs also.
16
CA Tenmile Overflow will be converted into Lava Butte fee campground to eliminate public sanitation concern, add universal accessibility, eliminate resource damage while reducing agency managerial costs and generating fee income. 2-phase construction.
FC14 - Ash Creek Guard Station Multi Year CA Design and Construct engine garage/office, Construct Barracks, remove office/barracks. Remove existing warehouses, elec bldg.
FC14 - Ash Creek Helispot CA Location across Hwy 89 from Ash Creek Guard Sta. Clear/grade/construct helipads for 3 Type I helicopters, access rd, configure utilities, as well as stubs. Construct 1000 SF bldg (Pilot Rm, Rest Rm, Staging Area).
FC14 - Harrison Gulch Barracks Replacement CA Design/construct (2) 9-person barracks and decom 5 poor seasonal housing units over 3 yrs.Ph 1 design 100%, Ph 2 build 1st 9-bed Barracks & Decom 2 seas. housing units. Ph 3 build 2nd 9-bed Barracks & Decom other 3 seas. housing units.
FC14 - Junction City Engine Garage Expansion CA Design and construct Expanded Engine Garage and adjacent Cache with opening & length enlarged to fit increased engine height and length.
17
Title State Project Description
FC14 - Minersville Boat Launch Facility CA Initiate A&E Planning & Design services, NEPA and related permits now to prepare for construction in 2023/2024. Design includes low water access ramp, min 25 pull through boat stalls, ADA access, pay kiosk, restroom, and vehicle circulation.
FC14 - SHF Supervisors Office - Redding CA Design and Construct new building on USDA owned property. Multi-agency personnel to be housed in new facility adjacent to NorthOps campus. Will house 140 Govt employees, including FS WO, R5 & NZ employees, as well as hosted employees from FS/PSW & USDA Bureaus.
FC14 - Weaverville UST Remediation CA Remediation by removal of contaminated soil & GW treatment adjacent to and beneath Sidney Gulch required by RWQCB. Remediation must be completed before stream restoration to native geomorphological state (by others) can proceed.
FC15 - Jerseydale Campground Rehabilitation Phase 2
CA Project work consists of campground rehabilitation and replacement of existing campground features (barries, signs, tables, fire rings and toilets).
FC15 - Kirch Flat Campground Rehabilitation CA The SNF Kirch Flat Campground Rehabilitation project includes the Kirch Flat Group Campground and Raft-Take-Out. The existing features (barriers, boards, signs, road, tables, fire rings, toilets) are in poor condition and need to be replaced.
18
FC15 - Trimmer Fire Station and Work Center Water System
CA The project includes design and construction of a water system to provide potable water to 35 buildings. The project would also include the demolition of the existing, deteriorated, water system.
FC15 Fire, Timber, and Silviculture Barracks CA The project would consist of 3 each 10 person barracks with a kitchen, water, sewage and power. The work centers would be brought up to date with current codes and accessibility standards. The buildings would be placed in the same footprint
FC15 Forestwide Toilet Building Replacement/Rehabilitation
CA Replace or rehabilitate 29 toilets in recreation facilities across the forest.
FC15 SierraNF Supervisor's Office CA Construct a 26,500 sq ft Supervisors Office colocated with the Fresno Co Ag Department located in Fresno, CA.
FC16 - [COMBO] Spicer Snowpark Pavement Repair [MFSSSP]
CA Grind existing asphalt into road base, overlay with new asphalt, and restripe.
FC16 - Mi-Wok/Summit District Office CA Construct a District Office with Visitor Center to centrally house District Staff.
FC16-Snow Shed 108 Snow Park CA Construct a secure storage building for snow grooming equipment and related supplies.
19
FC17 - Tahoe Office Modernizations & Hotshot Facilities (design & construction)
CA This project consists of the design and construction of a new office. The Unit proposes a downsize from 25,000SF to 16,780SF, consolidating with other offices within 30 miles to reduce annual lease costs.
FC17 - Truckee Hotshot Workcenter CA Construct an Interagency Hotshot Crew Office and Cache at the Truckee Public Services Center. Design and build of a 6000 SF steel building with crew training, offices, cache and module storage.
FC19 - Lake Tahoe Basin Restrooms CA Four bathrooms will be constructed in California at Watson Lake Campground, 64 acres Day Use site, Baldwin Trailer Park and Kiva Beach day use site. Two additional bathrooms will be constructed along Highways 28 and 50 in Nevada.
FC19 - Lake Tahoe Fire Stations CA This project involves the decommissioning of the old building at Meeks Bay, and constructing a new fire station on the West Shore of Lake Tahoe. The Lake Valley project consists of remodeling the existing interior.
FC19 - Lake Valley Fire Station Remodel CA Remodel existing building to house two fire engines and their crew, includes office space, bathrooms, and engine bays.
FC19 - Nevada Beach Day Use and Campground Water Mains
NV This project involves the replacement of approximately 3,000 linear feet of water mains which will serve the existing six bathrooms. The new water mains will reduce deferred maintenance and provide safe drinking water to bathrooms and campground.
20
Title State Project Description
FC19 - Tallac Historic Site Facility Preservation CA Preserve roofs and reconstruct foundations on historic buildings at the tallac historic site and at the taylor creek visitor center stream profile center.
FC20 - RO HVAC System Upgrade CA This project will replace and upgrade various pieces of the existing HVAC system. Specifically, all Variable Air Volume (VAV) Units, Building Controls, Variable Frequency Drives (VFDs), fan motors, ductwork, piping, and insulation.
FC55 - Southern Sierra Zone Heating, Air Conditioning and Ventilation Unit Replacements
CA This is a multi-year project geared towards the systematic replacement of HVAC units on the Inyo, Sierra, Sequoia, Stanislaus that have well exceeded their useful life. HVAC units at District Offices, Fire Offices, Barracks & Warehouses will be replaced.
FC55 - Southern Sierra Zone Roofing, Siding and Window Repairs
CA The project will complete needed repairs at 2 fire stations on the Sequoia NF, 7 facilities on the Sierra NF, and 2 district offices on the Stanislaus NF; including roofing, siding, windows, doors, and repainting.
Hilo Mechanical Renovation HI Replace 13 split unit compressors with a central chiller and cooling tower system, serving the 3 buildings on site. Replacing split systems with robust central system will save mtc & time & reduce energy consumption.
Puuwaawaa Renovation HI Renovate bunkhouse, replacing the water lines, septic system, electrical system, and meeting house deck.
21
RD&TL-14-Parks Creek Recreation Area Deferred Maintenance Improvements (roads, trails, trailheads)
CA Upgrade PCT TH, Restore two non-motorized, multi-use trails; Eddy Creek and Lower Deadfalls Trails, Reconstruct Trinity Heritage Scenic Byway (Parks Creek Road - 42N17)
RD01 - 3N17 Washout Repair CA Storm damage road repairs of washout and construction of retaining wall. This wall will allow us to open to public and permittees.
RD01 - Pavement Rehabilitation on Existing Paved Roads
CA Mix of chip seal, slurry, patch, and replacement of asphalt at Manker, South Fork, Chilao, Switzer, Frenchman's Flat, Crystal Lake. Replace guardrails and signs along old Highway 99.
RD01 - Post Fire Repair and Restoration to Roads and Trails Affected by 2020 Fires
CA To mitigate for moderate to high burn severity as well as repairs to road and trail assets, this project would repair approximately 120 miles of trails (including PCT, Fish Cyn, Burnt Peak) and 90 miles of NFS roads.
RD01 - Road AOP & Restoration CA AOP structures are needed for 6N24 (Ruby Clearwater) and 4N37 (Indian Canyon) and require minor alignment to account for AOP and rechannelization of the stream. 6N24 has a sensitive species consideration. Both roads support vegetation and fuel treatments.
22
RD01 - Telecomm Road Repairs and Wall Reconstruction
CA Approx. 60 miles of ML 2 or 3 NFS Roads that lead to telecommunication sites have significant structural deficiencies on steep sections that require new walls or wall replacements (2N66, 2N76, 3N39, 2N16, 2N31, 3N17, 2N07, 6N53, 2N50, 3N07).
RD02 - Forest Wide Road Improvements to Recreation Sites
CA Road Maintenance on high use segments that provide access to recreation sites across the CNF.
RD02 - Trabuco Canyon AOP installation CA Replace low-water, hardened crossings in Trabuco Canyon with structures that allow passage of aquatic organisms. Each crossing would be designed to site specific standards based on the channel characteristics and topography.
RD02 - Trabuco Canyon AOP #3 CA Replace low-water, hardened crossings in Trabuco Canyon with structures that allow passage of aquatic organisms. Each crossing would be designed to site specific standards based on the channel characteristics and topography.
RD02 - Trabuco Canyon AOP Restoration CA Replace low-water, hardened crossings in Trabuco Canyon with structures that allow passage of aquatic organisms. Each crossing would be designed to site specific standards based on the channel characteristics and topography.
RD02 Pine Creek Road (14S05) Resurfacing CA This project consists of resurfacing Pine Creek Road. Pine creek road leads to the Mount Laguna National Recreation Area, provides access to dispersed camping, fuels treatment and Patrol in High Fire Threat areas on the CNF.
23
Title State Project Description
RD03 - Blacksmith Flat Rd Stabilization CA Construct horizontal drains, MSE wall to restore road prism, construction of debris bench/buttress MSE, soil nail slope, install slope protection netting and rockfall barrier or fence. Prework scaling and blasting will be included.
RD03 - Brush Creek Bridge Replacement CA Design and install new road bridge. Bridge to be approximately 35 foot span, single lane.
RD03 - Capps Reservoir Road Reconstruction CA Pothole patch and overlay 14 miles with 2" AC or single chip seal with fog seal,which ever is most feasible. Remaining 5.3 miles of unsurfaced road will be maintained by reconditioning roadbed, culvert cleaning, rolling dip repair and construction.
RD03 - Eldorado Forest wide Road Patching CA Repair 55 miles of bituminous surface on Rock Creek, Sand Mountain Blvd, South Creek, Old Ice house, and Eleven Pines Road. Work includes crack filling/sealing, cutting and patching areas with a suitable AC depth, AC overlays in weak areas of road.
RD03 - Eleven Pines Land Slide Repair CA Stabilize slide by excavating outboard shoulder of road to unload slide. Move road inboard 20 feet. Place geomembrane to cap failed MSE. Install piles through existing MSE along shoulder of new alignment to unload lower portion of slide.
24
RD03 - John Don't Specified Road Reconstruction CA Reconstruct approximately 25 miles of National Forest System Roads. Work includes, clearing and grubbing, roadbed reconditioning, construction of drainage features, replacement of culverts, and other maintenance items.
RD03 - Mormon Emigrant Trail (10N50) Reconstruction
CA Resurface entire length of road with three inches of asphalt with fiber reinforcement. Additional work includes improving user experience by building parking areas for dispersed recreation use, install vault toilets, and place interpretive signs.
RD03 - Panther Creek Road Repair CA Stabilize and reconstruct road at multiple locations. Work includes slope stabilization, spot rocking, culvert replacements, and chip seal surfacing.
RD03 - Plum Creek Rock Wall CA Reinforce existing stacked rock wall through backfill by installing steel grid or similar and soil nails along 6000 linear feet. Repair of rock face with shotcrete or similar will also be done to reduce further damage.
RD03- Granite Springs Road Reconstruction CA Stabilize and reconstruct road prism, construction of MSE wall, install geomembrane and rip rap fill slope, and resurface with chip seal.
RD04 - Coldwater Campground Paving CA 1.5 miles of road will be reconstructed to drastically improve the surface condition of the road to provide better run-off and sediment control. Campground spurs will also be reconstructed/regraded to provide a safer recreational experience.
25
RD04 - Mammoth Ranger Station and Welcome Center Parking Rehab
CA This project will repair major asphalt damage, including widespread potholes, alligator cracking, damaged wheel stops, large expansion cracking, and striping, including ADA parking stalls and routes. Minor repair to asphalt sidewalks is also included.
RD05 - Mt. Ashland Siskiyou Crest area FS20 Road repaving and repairs
CA Project reduces deferred maintenance backlog on the currently deteriorated road access to a high use recreation area: repaves 3 miles of Forest Road No. 20 from Mt. Ashland ski area to Grouse Gap area
RD05 - FS15 Repaving CA Apply a 2-inch asphalt overlay and 2-foot shoulder backings. All project work will be contained within the existing road prism.
RD05 - FH3 Repaving CA Repairs include patching of critical potholes and repaving damaged road.
RD05 - Granite Basin OHV Access RD 23N28 Surface Improvement
CA Apply a double chip seal on to road 23N28.
RD05 - Indian Scotty Campground Road Repairs CA Repair and repave campsite loop roads; repair and repave road to group site.
RD05 - Klamath NF - Legacy Site Treatments Westside 2021
CA Repair approximately 22 legacy sites in the White's Gulch drainage on the North Fork of the Salmon River, 40N61. Design is 100% complete and drawings.
26
RD05 - Legacy Site Treatments Westside 2020 CA The project consists of constructing rolling dips, installing CMPs, resurfacing the roadway, re-grading the impacted roadway for road 15N75.
RD05 - Little Grass Valley Campground Access RD 22N57 Paving
CA Project would be to pave ~10 miles of 24' wide road around the entirety of Little Grass Valley Reservoir. Upgrade existing culverts as needed.
RD05 - Siskiyou Divide Road Maintenance Project OR Repair and repave one-mile section to Mt. Ashland CG plus a parking area; repair 2-miles of aggregate road from campground to Forest Rd. 40S30; repair drainage on 40S30A; install parking barriers at Grouse Gap Day Use Area to protect Botanical Area.
RD05 - South Indian Storm Damage Repair Road repair on 17N32
CA Construct 2 Mechanically Stabilized Earth walls.
RD05 - Taylor Lake Road (road 41N18) CA Repave approximately 2.5 miles of road leading to Taylor Lake Recreation Site
RD05 - Walker Road Storm Damage Repair Road repair on 46N64
CA Construct two new MSE walls including a subdrain system.
RD05- Klamath NF- Legacy Site Treatments Westside 2022
CA Repair approximately 16 legacy sites in the South Russian Creek and Jessup Watershed on 40N54, 39N54, and 39N27.
27
RD06 - Windy Cut Bridge Replacement CA Windy Cut Bridge on 27N08 road provides access for recreation (Ishi Wilderness, McCarthy Point Lookout rental, campgrounds, trailheads), fire suppression, anadromous fish ladder, government land management, rock pit, and private timber land companies.
RD07 - Repair Big Sur Roads CA Repair South Coast Ridge Road, Plaskett Ridge/Alms Ridge Road, Cold Springs Road, Los Burros Rd, and Prewitt Ridge Rd in Big Sur, Work includes resurfacing, drainage repairs and culvert repair/replacement.
RD07 - Repair/Rehabilitate 2 Stream Crossings, Santa Barbara District
CA Replaced damaged crossing at Juncal with drainage structure to allow for AOP crossing. Replaced restore Upper Oso crossing with stilling basin or similar structures to reduce velocities and provide safe vehicle crossing for recreating public.
RD07 - Repave Parking/Roadways - Rose Valley, Ojai RD
CA Repair structural issues with the road way at numerous locations, repair drainages to reduce future risk to the roadway. Fill pot holes and resurface the road with asphalt.
RD07 - Repave Parking/Roadways SLRD CA Resurface the asphalt at the 3 locations on this district (Arroyo Grande Helitack Base, Pine Canyon Station, and Santa Lucia Ranger District Office).
28
Title State Project Description
RD09 - Modoc Blue Lake Recreation CA This project is a companion to FLTP project and involves reconditioning and resurfacing of Forest Service roads, boat launch, day use area, and accessible National Recreation Trail around Blue Lake. Also includes replacement of the boat dock and repairs to the fishing platforms.
RD10 - Buck Mountain Road Restoration CA This project consists of replacing 2 failed culverts on FS Road 1N10, near the crossing with Kuntz Creek.
RD10 - Forest Route 1 Pavement Rehab CA Pavement Reconstruction, grind outs and replacement, as well as skin patching and potholes repairs.
RD10 - Orleans Complex Road Washouts CA The repair two roads (15N17 and 13N11) on the district which are the only two north to south connector roads on the district. These are the only roads within the District which allow for North-South travel.
RD10 - Route 6 Slide and Road Damage Repair CA Repair storm damage on Forest roads 06N06 and 04N13. These routes are a main ingress egress route for the communities.
RD11 - Bucks Lake Wilderness Silver Lake 24N29X Resurfacing
CA Resurface entire 6 mile section of road with 3/4" road base to a depth of 4". Masticate & brush sides of road prior to road work.
29
RD11 - Humbug Valley & Yellow Creek Access Improvements and Hazard Abatement
CA Remove hazard trees along 8.4 mile section of road. Recondition ~2 miles of road bed to address watershed impacts, including culverts, rolling dips and roadside slope reconditioning.
RD11 - Lumpkin Ridge & Hartman Bar Road Chip Seal
CA Project would be to apply a 3/8" chip seal overlay on 10 miles of 22N94 and 30 miles of 22N27.
RD11 - Plumas NF Butterfly Valley Road Surface Replacement 25N12 / 25N34Y
CA Work consists of placing 1"minus ag., 4" deep, & 16 ft. wide, with 15 turnouts, for 5.5 miles. Force account road crew will perform work resulting in 30% cost savings. Native soil surface is dusty in summer & slick in winter from high traffic volume.
RD11 - Plumas NF Mohawk Chapman Road Reconditioning
CA Work includes pulverizing road to a depth of 4", adding 2" of aggregate, reshape, compact, and apply Mag Chloride. Finishing this work prior to the TS would allow for a reduced cost to the TS purchaser, improve sustainability, and decrease maintenance.
RD11 - Plumas NF Mooreville Ridge Double Chip 21N16
CA Work consists of brushing, cleaning culverts, and applying a double chipseal layer over existing surface. Soper Wheeler Company LLC will contribute per cost-share. Work will be performed under CE, and no reconst. will be done to existing road template.
30
Title State Project Description
RD12 - City Creek Road (1N09) Stabilization CA Recondition and place aggregate surfacing on 6.1 miles of native surface road to stabilize road surface and reduce sediment delivery to nearby rivers and streams. Stabilization will also help reduce the frequency of road maintenance.
RD12 - Forest Road Pavement Rehabilitation (3N06, 2N10)
CA 3N06 was reconstructed 15 years ago and requires surface maintenance (chip seal). 2N10 work includes complete rehabilitation (pulverizing, new AC) on the failed section.
RD12 - Pavement Rehabilitation at Administrative Sites
CA Reconstruction of existing AC pavement. This includes: pulverization of existing AC, reshaping and compaction, and placement of 3" AC surfacing. Also includes restriping and sign replacement.
RD13 - Burton Road Rehab CA Road 14S02 has heavy damage due to storms, it was many pavement segments that need repair. Repairs include; crack sealing, pothole patching, overlays, new asphalt segments.
RD13 - Horse Corral Road Rehab CA Road 14S11 has heavy damage due to storms, it was many pavement segments that need repair. Repairs include; crack sealing, pothole patching, overlays, new asphalt segments, centerline stripping.
RD13 - Hume Lake RD Recreation Roads Pavement Preservation
CA Performs pavement preservation work on 8.6 miles of recreation roads in 15 recreation sites on the Hume Lake Ranger District, primarily around the very popular and heavily used Hume Lake in partnership with NPS and FHWA.
31
Title State Project Description
RD13 - Recreation Sites Asphalt Rehabilitation CA Repair asphalt roadways and parking areas at two campground sites (Hobo and Fairview). They have many pot holes and broken asphalt edges. Repair work will include patch pave, grindout and repave, crack seal, and seal coat or slurry seals as needed.
RD13 - Sugarloaf Road Rehab CA Road 23S16 has heavy damage due to storms, many pavement segments that need repair. Repairs include; crack sealing, pothole patching, overlays, new asphalt segments, centerline stripping.
RD13 - Tenmile Road Rehab CA Road 13S09 has heavy damage due to storms, many pavement segments that need repair. Some of the repairs needed include; crack sealing, pothole patching, overlays, new asphalt segments, centerline stripping.
RD13-Tenmile Road and Hume Lake Bridge FLTP CA Project includes reconstruction of paved road, upgrading drainage structures, roadside vegetation clearing, replacement of bridge and traffic control devices.
RD14 - Pelletreau Road Repair CA Storm damage road repair. The winter storms of 2019 caused two washouts on the roadway. At the first washout, the road width has been reduced from 20 feet to 13 feet. At the second washout, the road is currently not passable and a temporary bypass have been created by users.
RD14 - Trinity Alps Access FLTP CA Road and trail reconstruction
32
Title State Project Description
RD14 - Underwood Mtn. Road Patch and Pave CA To patch pot holes in worst 2 to 2.5 miles of Underwood Road adjacent to previous repairs made in the last 4 years. To then pave 2 miles of the repaired potholes to extend the life of the repairs and roadway.
RD14--Canyon Creek Road Construction CA The road needs drainage improvements, patching of existing chip seal potholes, and doing a chip seal overlay over the existing chip seal.
RD15 - Minarets Road (4S81) Repair CA The Forest is proposing to do a road rehabilitation project on approximately 7 miles of the project consist of sawcutting and deep patching unstable road sections, restore and improve drainage functions, and chip-seal the 12 miles.
RD15 - Minarets Road (4S81) Surface Treatment CA This project consists of deep-patching identified unstable, settling isolated, road sections and chip-seal road surface. Main purpose of this work is to preserve asphalt (ML-4) using the paving management system recommendation.
RD15 Sierra Vista Scenic Byway Rehabilitation Project
CA Scenic Byway roads, campgrounds and vista points are in poor condition. Work includes chip seal for paved roads and campgrounds, base rock for gravel roads, and replacement of regulatory, warning, road destination and recreation site identification signs.
RD16- 4N01 Fraser Flat Rd. Road Rehabilitation Project
CA Work Includes Chip Sealing, Providing Pavement Markings for 3 miles of road and 4 miles of aggregate resurfacing.
33
RD16- 4N01 Frasier Flat Rd. Road Rehabilitation Project
CA Work Includes- Placing a new double chip seal layer on the paved section of road, resurfacing the aggregate road portion with aggregate base and applicable providing pavement markings.
RD16- 4N12 Road Rehabilitation CA Work includes, Chip Sealing the Paved section and providing striping. On the native section, work includes reconditioning the roadway and restoring proper drainage.
RD16- 5N02/5N14 Road Repair CA Work Includes Chip Sealing, Road Repair, Aggregate Surfacing, Restoring the road prism and drainage features.
RD16-GAOA 4N01 Frasier Flat Rd. Road Rehabilitation Project
CA Work includes 3 miles of double chip seal, applicable pavement markings, and 4 miles of Aggregate base resurfacing
RD17 - Asphalt Repair and Modernization of Campground Loops
CA Improvements to asphalt surface, lane width, curve radius and providing more turnouts, patching, backing shoulders and provide clearing for site distance of encroaching vegetation.
RD17 - Logger CG Repave CA Includes asphalt grinding, removal of shallow tree roots, spur leveling/extension/widening, additional overflow parking. This project will repave the entire facility. Accessibility for wheelchair users and other disabled campers will improve greatly
34
Title State Project Description
RD17 - Province Asphalt restoration CA Multi Forest road deferred maintenance on priority transportation system. This project would maintain valuable road assets for future use.
RD17 - Sardine CG Repaving CA Repair of campground roads, some spur re-routs and additional parking grading. Then the site will be completely re-paved.
RD17 - Striping of FSR 96 (Mosquito Ridge Rd) for public safety
CA Striping of FSR 96 (Mosquito Ridge Road). The high use and winding road needs striping for public safety.
RD17 - White Cloud Redisign and Repave CA The project will consist of grinding the asphalt, removing shallow tree roots causing damage, and some spur re-routes and additional parking grading. Then the site will be completely re-paved.
RD17 Captain Roberts Boat Launch pavement replacement
CA The Project will involve grinding and replacing the asphalt in the boat ramp road and the 2 large parking areas at the boat ramp facility. A significant amount of curbs will be replaces, as well as drainage structures.
RD17-Grantie Flat CG Pavement Replacement CA The project would include grinding of the existing asphalt, removing near surface roots, and some spur re-routs and additional parking grading. Then the site will be completely re-paved.
35
RD19 - Jameson Beach Road Reconstruction and Parking
CA The project will reconstruct 1,400 linear feet of Jameson Beach Road, 400 feet of cabin access road, and relocate 90 parking spaces. In addition, the Forest Service has secured ATP funding to construct a separated bike and pedestrian path.
RD19 - Phase 1 Access Improvements for Maintenance Level 3-5 Roads
CA This project will accomplish 10 miles of work, addressing the most severe deferred maintenance items such as potholes, striping, and edge unraveling of the road system. This project includes improved signage as addressed in the sign plans for each road.
RD19 - Phase 2 Access Improvements Maintenance Level 3-5 Roads
CA This project will build upon phase 1 and accomplish 10 miles of work, addressing the most severe deferred maintenance items such as potholes, striping, and edge unraveling of the road system. This project includes improved signage as addressed in the sign plans for each road.
RD19 - Phase 2 Baldwin Beach Day Use Road Reconstruction
CA This project will improve safety for bicycle, pedestrian, and vehicle circulation by widening the road to provide a shoulder bike path, and build new parking lots. Also, this project will install new water quality BMPs and AOP road crossings.
RD19 - Roads Maintenance Level 2 CA Genoa Peak Road Grading and Brushing FS14N32. Glenn Alpine AC patching and shoulder gravel FS 12N16. Noonchester Mine Road brushing. FS 14N34A.
36
Title State Project Description
RD19 - Round Hill Pines Access Road and Parking NV This project involves the construction of a new access road, reconfiguration of bike path, and second phase 100 car parking lot. The first phase 80 car parking lot was constructed in 2018. FLTP Companion Project.
RD55 Southern Sierra Zone Pavement Stripping and Safety Maintenance
CA Southern Sierra Zone is proposing a pavement striping and safety maintenance project. This includes pavement marking and the installation of regulatory, warning, road destination and recreation site identification signs.
Rec-002 Facilities Water Systems Upgrades CA The plan is to replace 13 forest drinking water treatment systems, with in kind modern units, to supply water to agency staff, and the public, across Rec/Admin sites across the Forest.
Rec-006Forest Wide Campground Deferred Maintenance
CA This project would be to begin onsite maintenance of the highest priority Campgrounds, and Day-Use sites across the forest, to include inventories, in a starter approach to rectify years of deferred maintenance.
RF&TL-14- Gateway Phase 2 Trail System & McBride Springs CG Improvements
CA Repair drainage features, install features, replace stolen and expand trail signs, and expand the trail system, McBride Springs CG; re-asphalted (access road/site spurs), picnic tables/fire rings replaced and bear proof storage containers
RF01 - Install/Replace Recreation ID signs Forest wide
CA Recreation Site/Wilderness ID Sign Replacements - Replacement of Recreation Site Signs for the Forest.
37
RF01 - Secure & Protect Recreation Infrastructure- Forest Wide Gate and Barrier Installation
CA Includes a combination of repair, replace, or install new gates to control seasonal use at CG's or to discourage overnight @ day use sites.
RF01 - SST/Decomposing Toilet CA Replace existing toilets with new double vault toilets at 2 high use sites - Blue Ridge, Jackson Flat CG's.
RF02 - Forest Wide Update Design & Replace Rec Signage and Interpretive Panels
CA Update, Design, Replace Recreation signs and Interpretive Panels on the Descanso Ranger District.
RF02 - Renovate Dripping Springs Campground CA Dripping Springs Campground Renovation: Repave access road, site improvements, replace barriers, replace fire rings, and tables, trash receptacles. Improvement of visitor experience.
RF02 - Renovate Indian Flats Campground CA Improve access road, site improvements, replace barriers, replace fire rings, and tables, trash receptacles. Toilet replacement. Improvement of visitor experience.
RF02 - Renovate Oak Grove Campground CA Improve access road, site improvements, replace barriers, replace fire rings, and tables, trash receptacles. Toilet replacement. Improvement of visitor experience.
RF02 - Replace Toilets to meet sanitation standards - Blue Jay CG
CA Delivery and Installation of two CXT restrooms at Blue Jay CG: 1 at lower loop, 1 at "20s" loop.
38
RF02 - Upper San Juan Campground Renovation CA Improve access road, site improvements, replace barriers, replace fire rings, picnic tables, trash receptacles. Vault toilet replacement. Improvement of visitor experience.
RF03 - Adventure Mountain Lodge Roof Replacement
CA Replacement of roof at Adventure Mountain Lodge
RF03 - Black Oak Group Campground Improvements
CA Project would install 2 large shade structures at Black Oak Group Campground that have minimal shade following King Fire, thus improving visitor comfort and safety at those sites. Structures would be a contract. Partner with concessionaire REPM to assist with installation.
RF03 - Caples RV Dump Station & Automated Fee Machine Installation
CA Project would install a RV dump station at this site, along with an automated fee machine to collect these and other site fees. Project would be implemented via a contract in one phase ideally at the same time EID does the parking area.
RF03 - Silver Lake Potholes Trailhead Construction CA New trailhead construction to support the area's popularity.
RF03 - Stumpy Meadows Campground Improvements
CA Project would install small shade structures at 7 sites at Stumpy Meadows Campground that have minimal shade following King Fire, thus improving visitor comfort and safety at those sites. Structures would be a contract. Partner with concessionaire REPM to assist with installation.
39
RF03 -Forest-wide Campground Concessionaire Operations Hwy 88 Corridor Storage
CA Construct a storage building to accommodate all recreation operations and maintenance activities on the District.
RF04 - Hot Creek Geologic Site Safety Improvements
CA This project will address the safety issues resulting from damage due to trespass into closed areas and improvements to the trails and interpretation to provide a safe, educational recreational opportunity. Several conceptual designs have been started.
RF04 - Inyo Campground Improvements Project furthering Conservation Finance
CA This project will secure architectural and engineering services to develop construction documents for 22 campgrounds that are ripe for renovation based on the preliminary results of the Profitability Study as identified by Quantified Ventures.
RF04 - Inyo National Forest Campground Accessibility Upgrades
CA This project will address current deficiencies that exist at developed recreation sites on the Inyo, by installing 11 vault toilets at 4 recreation sites. The improvements will enable these sites to meet ABA and ADA accessibility requirements.
RF05 - Sarah Totten and Kangaroo CGs and day use areas deferred maintenance and parking lot repaving
CA Project repairs and resurfaces or repaves campground roads, campsite spurs, and one day-use area; provides ADA access to vault toilets; and replaces minor constructed features at
40
RF05 - Juanita Lake Campground Water System Replacement
CA Project would: replace spring box at water source with a sealed system; replace existing water line with a new line that runs around the lake; replace aging chlorination system; and improve capacity of solar system that runs the chlorination system.
RF05 - Mathews Creek Campground Vault Toilet Replacement
CA Remove and dispose of two existing toilet structures and vaults, and replace with two new concrete toilet structures and vaults.
RF05 - Orr Lake fishing Docks Storm Damage Repairs
CA Repair the five dock structures, purchase additional anchoring blocks, and reinstall five docks with each dock anchored by two concrete blocks.
RF05 - Queen Lily Campground Water System Upgrade
CA In a previous project a water line was brought from an adjacent campground to the entrance of the Queen Lily CG. Project would decommission the spring tank, replace the water pipes throughout the campground and tie in the new piping to the existing system.
RF05 - Sarah Totten Campground Deferred Maintenance
CA Contract to repair and add aggregate to campsite loop roads above flood plain; California Conservation Corps crew to repair minor constructed features, walkways, and replace picnic tables and BBQs
41
RF05 - Siskiyou Crest Recreation Facilities Maintenance
OR Campground: repair campsite pads, eroding parking spurs, and accessible pathways; replace picnic tables and BBQs. Grouse Gap: install boulder barriers around parking area to protect Botanical Area, repair vault toilet roof, and repair shelter roof.
RF05- Klamath NF- Kangaroo Lake Water System CA The project consists of the development of a new water source and the connection of that new source to the existing water system that services the campground
RF06 - Forest Wide toilet Replacement CA Battle Creek CG needs 3 vaults replaced and wastewater system repair. Ashpan Snowmobile Trailhead replace 1 vault bldg.
RF06 - Lake Almanor Campground Accessible Toilet Replacement
CA Existing vault toilet buildings have deteriorating interior/exterior wood walls and roof components and have exceeded estimated design life. Large heavy access panels for sewage vaults are a safety hazard to open and close compared to modern vault models.
RF07- Replace 10 Toilets (SST/CXT) on two Ranger Districts
CA Replace 10 toilets in total at 6 rec sites/campgrounds with new SST/CXT style toilets. Some existing toilets are in disrepair or damaged from vandalism.
RF07- Resurface Three Campgrounds & Trailheads SLRD
CA Resurface three campgrounds, trailheads, and one day use area with standard mill and overlay asphalt.
42
Title State Project Description
RF08 - Rock Carrier for Eel River CG to preserve cultural areas
CA Replace aged wood barriers at Eel River CG with boulders to protect sacred Native American Sites with in the CG. Wooden barriers are dilapidated.
RF09 - Forestwide Campround Maintenance CA Deferred maint: replace facility and forest route destination signs; replace picnic tables, firepits, bear boxes, and faucets; road and campsite stall maintenance; haz tree and fuels reduction within camp footprints; water system repairs to Rec Sites.
RF11 - Antelope Lake Rec Area Lone Rock CG Water System & Toilet Replacement
CA Complete replacement of the water system that serves campground (10,000 gallon steel bolted water storage tank, valve boxes, water mains, distribution lines (15,000 LF). In addition, replacement of 9 vault restrooms.
RF11 - James Lee Education Center/Campground Development
CA The project includes design and construction of a pavilion with seating for ~50 people, restrooms, and 3-5 group campsites. This project would be done as a design build contract.
RF11 - Little Grass Valley Rec Area Maidu Amphitheatre Rehabilitation
CA Rehabilitate amphitheater, replacing benches, screens, signs, fire ring and other minor features at the site
RF11 - LIttle Grass Valley Rec Area Swim Docks CA Purchase and install 3 swim docks under a contract at Pancake Swim Beach, Black Rock Boating Site, and Blue Water Beach
43
RF11 - Plumas Forest-wide Bear Locker Installation CA Install 200 bear-proof lockers at approximately 11 campgrounds Forest-wide, including REA campgrounds.
RF11 - Plumas Forest-wide Gates at Recreation Sites CA Purchase and install approximately 10 gates at priority recreation sites. Priority recreation sites include Goose Lake CG, Haven Lake CG, Gold Lake Boat Ramp, Lost Cove Boat Ramp, Mill Creek CG.
RF11 Antelope Lake Rec Area RV Dump Station Retrofit
CA Excavate existing septic tank, replace. Install new water lines and fixtures, patch driveway road where needed. Add Signage
RF12 - Applewhite CG/Picnic Area Accessibility Improvements
CA The proposed project will replace an existing restroom constructed in 1982 with an ADA compliant facility. The campground access road, campsites, and spurs will be reconstructed to maximize accessibility of the site.
RF12 - Grout Bay & Grays Peak Day Use Area Reconstruction
CA Replacement of flush restrooms at both Grout Bay and Grays Peak day use sites. Rehab existing paved access roads and parking lots. Rehabilitate original section of water distribution system serving both sites (municipal supply).
RF12 - Keller Peak/Childrens Forest Road and Trailhead Improvements
CA Project includes crack seal and AC overlay on 4 miles of 1N96. All other paved areas are showing signs of failure and require reconstruction - pulverization and new AC surface. Replace MUTCD traffic signs.
44
RF12 - Pavement Rehabilitation at Recreation Facilities
CA Rehab of existing AC (pulverize and reshape) and placement of new AC surfacing at 3 sites.
RF12 - Recreation Sites Water System Improvements
CA This project includes removal and replacement of multiple old valves and other equipment on multiple recreation water systems and bringing them up to an acceptable level of infrastructure for current public health guidelines and best practices.
RF12 - San Bernardino Forest Wide Replacement of Rec and Interpretive Signs
CA Replacement of signs.
RF12 - San Bernardino Forest Wide Replacement of Rec Site Gates
CA Purchase/fabrication and Installation of gates
RF12 -Lake Hemet and Lake Fulmor Day Use Area Site Improvements
CA Replacement of non-ADA compliant restroom at Lake Fulmor Day Use Area and replacement of deteriorated shade structures, picnic tables, and BBQ grills at Lake Hemet Day Use Area. This project will help improve the overall user experience.
RF13 - [COMBO]Giant Sequoia National Monument-Western Divide Toilet Replacement [FSHPTAR2]
CA The Western Divide Ranger District is in need of vault toilet reolacments in several pre-identified locations. Several of the identified toilets are non- accessible toilets which have served the general visiting public at high use areas for 40 plus years.
45
Title State Project Description
RF13 Forest wide Campground Resurfacing CA Campgrounds, and campground access roads, will have pot holes, broken asphalt edges and ruts repaired and resurfaced.
RF13 Forest Wide Recreation Rental Cabin Restoration
CA This project will reduce deferred maintenance on several recreation rental cabins. Work include drilling new wells and replacing water systems, replacing roofing, replacing waste water plumbing, interior and exterior painting and upgrades.
RF13 FY22-Lake Isabella Rec Area Water System Restoration
CA Water and systems will be replaced in Hobo, Pioneer Point, Tillie Creek, and Camp 9 Campgrounds.
RF13 Recreation Rental Rehabilitation CA Rehabilitation of Recreation Rental Cabins
RF-14--Hirz Bay Recreation Complex Critical Maintenance Project
CA Hazard tree reduction within a recreation complex through the use of vegetation manipulation for 46 site campground, two groups camps, a recreation rental cabin, a boat ramp, trail, and provides access to a boat-in only recreation residence tract.
RF-14--McBride Springs Campground Expansion CA Phased construction of additional loop containing 8 -10 paved RV campsites, with associated amenities, and one double vault toilet.
RF-14--Shasta-Trinity Forestwide Vault Replacement
CA Decommission failing vault toilets and replace vaults toilets at a number of sites around the Forest with ADA compliant vault toilets
46
RF-14--Sims Campground Restroom Replacement and Paving
CA Replace failing flush toilet facility and re-pave the campground access road, campsite spurs, and accessibility pathways to restrooms and river footpath
RF-14--Weaverville Historic Barn Defferred Maintenance
CA Replace roof, perform safety upgrades, repair dry rot,
RF15 - Upper Billy Creek CG Rehabilitation CA Replacement of gates (1 double, 2 single), refurbish pumphouse, replace 44 site markers, repair erosion in 15 campsites, remove hazards.
RF15 Eastwood Visitor Information Site Office Building
CA The project would replace the two old buildings currently on site, 240 sq ft FS VIS office and concessionaire mobile trailer (720 sq ft). Demo of current building, construction of new building, septic and water system.
RF15 Forest-wide Deferred Maintenance Backlog at Recreation Facilities
CA Installation of new fire rings, parking barriers, replace dumpsters and concrete pads, site markers, removal of hazard trees, and construction of new tent pads in select sites.
RF15 Scenic Byway Multi-Developed Recreation Site Rehabilitation
CA Signs, bulletin boards, reconstruction of campsites in select locations, hazard tree removal, picnic tables, bear proof dumpsters, water system, pedestal grills, food lockers are all included in the project.
47
RF16 - Multi-Forest High Priority Accessible Toilet Replacement, Phase 2-Sand Flat, Cottonwood, Column of the Giants
CA Demolish existing vault toilet buildings and replace within new prefabricated toilet building structures. Locations identified for this proposal are: Sand Flat Campground, Cottonwood Day Use Area, and Column of the Giants Geologic site.
RF16 - Sourgrass Water System Rehabilitation CA The project will bury the supply waterlines, upgrade retention strapping of the distribution lines and reduce water pressure through installation of low maintenance pressure equalization tanks.
RF16- Campground Pavement Repair (multiple) CA Work includes, Repair, Replacement of Asphalt Campground road pavement. Work includes Grinding and/or replacing existing Asphalt and placing a new Hot Mix Asphalt layer of pavement.
RF16- Water Systems Repairs - Beardsley and TeleLi puLaya Campgrounds
CA Evaluate the wells for the possibility of being under the influence of surface water and implement a turbity solution based on the results. Both results will involve the need for treatment at some level.
RF16-Calaveras FS Campground Upgrades CA Purchase and install a bear resistant food box at each campsite in the 5 campgrounds, a total of 93 campsites.
RF16-Pinecrest Campground Upgrades CA Renovation/repair of Pinecrest (200-unit), Meadowview (100-unit), and Pioneer Trail (group) Campgrounds. Facilities were constructed in the late 1960's and have not been upgraded to make fully accessible for persons with disabilities.
48
RF16-Public Information and Improved Forest Access
CA Proposed to replace information boards at 20+ campgrounds, day use areas, and trailheads. Replace forest road gates to private property inholdings, resurface entryway to visitor information center, and provide public information with mobile VIS station.
RF16-Rainbow Pool Site Improvement CA Increase safe parking, toilets, kiosks/signage and fee booth, provide for ADA access to/at facility. Re-Stripe and sign road/parking spaces. Remove storm piled debris from Beach areas and improve trail access upriver.
RF17 - Recreation Site and Trail Wayfinding Signage
CA Added signage to promote consistent signage and trail wayfinding throughout the Truckee and Sierraville Ranger Districts; encourages outdoor recreation use by the public and discourages use of unauthorized trails and recreation sites.
RF17 - Sugar Pine Recreation Infrastructure to Counteract Limited Resource/High Use Damage
CA Installation of two entrance kiosks, a floating pedestrian dock, and two conex boxes at Sugar Pine recreation area.
RF20 - Multi-Forest High Priority Accessible Toilet Replacement, Phase 2
CA This is a multi-forest project to provide toilet replacement or accessibility upgrades to specific facilities and recreational sites on the Inyo, Plumas, Sequoia, Shasta-Trinity and Stanislaus NFs.
49
RF55 - Southern Sierra Zone Recreation Facility Improvements
CA 19 recreation sites across 3 Forests in the Southern Sierra Zone will be brought to standard through repairs and upgrades to potable water sources and distribution systems, roofing, painting, plumbing, and camp site amenity and access improvements.
RF-TL-RD 05 - Carter Meadows Facilities, Trail, Roads, and Legacy Sites Project
CA Construction of Hidden Horse CG group site and vault toilet; decommission unauthorized route and convert to trail; deferred maintenance at East Fork Campground; repairs to Carter Mdws. Rd.; trail maintenance on trails near Carter Meadows.
Riverside Photovoltaic Installation CA This project is to install a 100 kW Photovoltaic System at Riverside to help reduce the energy consumption and demand charges at the site.
TL 0517 Badenaugh Canyon Trail Reconstruction CA Project would use force account crews and volunteers to reestablish the trail tread, install drainage structures, which are lacking, and install new signage.
TL 0517 Truckee Trail/Resource Improvements CA The trails improvement project would: reroute a trail away from archaeological sites and a meadow, restore the meadow; reduce erosion by hardening and rerouting, install a bridge (eliminate stream damage); relocate an OHV trail away from a campground.
50
TL** - Northern California Wilderness Trails Maintenance Priority Area Project
CA Multi Year Project. Year 1 contract replaces S. Fork NRT bridge; Eastern Sierra Conservation Corps trail maintenance and trail bridge repairs. Years 2-3 ESCC re-routes trails, continues bridge repairs and maintains trails. Year 4 replacement Mule Gridge.
TL01 - Engineer Sustainable Trail at Lower Sam Merrill
CA Design and reconstruct failed or damaged Sutter walls.
TL02 - Hiking Trail Assessment for post Holy Fire Trails Reconstruction
CA Feasibility Assessment for rebuild/reroute. Year 1: assessment; outyear: implementation. Enterprise/youth org work to assist with assessment and rebuild.
TL02 - San Mateo Trail System Rehabilitation CA 65 miles of maintenance on Wilderness Trails in the San Mateo WIlderness- brushing, tread, drainage.
TL02 - Tenaja Falls Trail and Trailhead Repair CA Hire trail crew to maintain 2 miles of Tenaja Falls Trail from the trailhead to the top of the falls, including significant erosion damage on lower section. Replace Signs, picnic tables, parking lot improvements, ADA compliance.
TL02 Tenaja Trailhead Toilet replacement and site improvements
CA Improve access road, site improvements, replace barriers, replace fire rings, and tables, trash receptacles. Toilet replacement. Improvement of visitor experience.
TL03 - Forest-wide Deferred Trail Maintenance CA Deferred trail maintenance spread throughout the ENF.
51
TL03 - Highway 88 Trailhead Improvements and Trail Maintenance
CA Renovation and reconstruction of trails and trail heads along the Highways 88 corridor.
TL03 - Lyons Creek and Ralston Trail Maintenance and TH Reconstruction
CA Project will complete 9 miles of heavy trail maintenance on the Lyons Creek and Ralston trails, including tread work, rebuilding drainage features and minor reroutes of the trail to reduce future maintenance needs.
TL04 - Inyo Priority Trail DM and Safety CA The project will address deferred maintenance & safety issues caused by excessive use and storm damage. Repairs include erosion control, trail surface repair and installation of foot bridges.
TL05 Wilderness trails post -fire deferred maintenance
CA Challenge cost-share agreements with two youth corps: Eastern Sierra Conservation Corps & Siskiyou Mountain Club. Maintain to standard (log-out trees, brushing, repair tread and drainage structures) and improve safety on 60 miles of trails & PCT.
TL06 - Volcanic Legacy Scenic Byway and Lassen NF Trails Interpretive Signs and Map Update
CA Fabricate and install interpretive sign on the Volcanic Legacy Scenic Byway forest wide as identified in the Interpretive Plan. Update and replace interp signs/map on Lassen National Forest Recreation Trails
TL07 - Red Reef Trail Maintenance (21W08) CA Deferred maintenance to bring the trail in conformance with standards and trail maintenance objectives.
52
Title State Project Description
TL07 - Ventana Wilderness Trail Restoration CA Deferred maintenance to bring the trail in conformance with standards and trail maintenance objectives. Re-route portions of a trail around a slope failure.
TL07- Convert ML2 Road to Non-Motorized Trail (LaBrea Cyn)
CA Converts 6.6 mi. of road to non-motorized trail standards. Downgrade 34 crossing in total and eliminate vehicle traffic in the streambed (ESA Critical Habitat). Relocated and reconstructed sections of trail that are washed out from multiple storm events.
TL07- Rehabilitate NF Trail System (LPNF Forest- Wide)
CA Deferred trail maintenance includes brushing/clearing, tread work, drainage mitigations. Implement rehabilitation in phases by rotational management blocks. Savings/efficiencies captured by economies of scale & proximity. 1567 miles total/ 42% Wilderness.
TL08 - Mendocino Complex Wildfire Monument/Wilderness Trail Recovery Project
CA Deferred Maintenance of trails within the SMW. Project will ensure resource protection, visitor safety, and having a well-planned, designed, constructed, and managed trails whilst working with partners to manage increased visitor demand in BSMNM/SMW.
TL09-MDF Forestwide Trails Maintenance Phase 2 FY22 GAOA
CA Deferred trail maintenance and repairs to all trails across the Modoc NF. Work includes tread reestablishment, brushing, logging out thousands of downed trees, maintaining trailheads, signage, and repairing drainage features and stream crossings.
53
Title State Project Description
TL11 - Beckwourth Peak New Trail Construction CA 10 Miles of new trail to provide access to the top of Beckwourth Peak from Portola.
TL11 - Challenge Historic Interpretive Trail Planning & Construction
CA Project includes a 2-mile interpretive trail on a historic railroad grade.
TL11 - Feather Falls Trail DM CA This project would allow need trail maintenance on up to 9 miles of the trail; drainage features, crib walls, gabion structures, and new hand rails needed.
TL12 - Rehabilitate Big Falls Overlook and Non- motorized Trails
CA Rehabilitation of overlook includes safety signage and replacement of railing. Non-motorized trail work includes improving trail tread and trailheads; safety signage, vegetation removal; trail maintenance and improvement via partnership agreements.
TL-14--Deferred NFS Trail Maintenance CA Complete heavy deferred maintenance on the following trails; PCT (122 mi), Cabin Creek Tr. (6 mi), McCloud River Tr. (13 mi), Black Butte Tr. (2 mi), Deadfall Lakes Tr. (3 mi), Caldwell Tr. (3 mi), West Park Lakes Tr. (2.5 mi).
TL15 Lewis Creek National Recreation Trail Recreation Management Planning
CA Project will contract out survey and NEPA analysis for the management activities needed at the trailheads, needed trail bridge, trail, and toilet building(s).
54
TL19 - Lake Tahoe Basin Mountain Bike Trail maintenance partnership
CA 20 new positions created through conservation corps and direct employment. Summer seasonal positions, 3 year duration
TL19 - Lake Tahoe Basin Trails CA The baldwin beach path consists of a 950 feet segment of new paved 10' wide bike path. The corral arm and pope Baldwin maintenance projects include rehabilitation and upgrades to existing bike paths.
TL20-Pacitic Crest Trail R4, R5, R6 National Deferred Maintenace
CA, OR & WA
Utilize existing partnership agreements with PCTA, American Conservation Experience (ACE) and other youth corps to continue to leverage multi-forest for trail wide deferred maintenance work in 25 national forests along the trail.
TL55 - South Sierra Zone (INF, SNF, SQF, STF) Deferred Trail Maintenance
CA Forests and Districts will address access and health and safety concerns resulting from deferred maintenance. Work will focus on log out, tread work, brushing and repair of minor bridges.
TR-005Forest wide Trail Maintenance CA This project would be to begin onsite maintenance of the highest priority trail sites across the forest, to include inventories, in a starter approach to rectify years of deferred maintenance.