FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET Alexandria City Public Schools EVERY STUDENT SUCCEEDS http://www.acps.k12.va.us/ Alexandria, Virginia (USA)

FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

FY 2021-2030SUPERINTENDENT’S PROPOSED

CAPITAL IMPROVEMENT PROGRAM BUDGET

Alexandria City Public SchoolsEVERY STUDENT SUCCEEDS

http://www.acps.k12.va.us/Alexandria, Virginia (USA)

Page 2: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

This page intentionally left blank.

Page 3: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

School Board

Cindy Anderson, ChairVeronica Nolan, Vice Chair

Meagan AldertonRamee A. Gentry Jacinta GreeneMargaret Lorber

Michelle Rief, Ph.D.Christopher SuarezHeather Thornton

Administrative Personnel

Gregory C. Hutchings, Jr., Ed.D.Superintendent of Schools

Alexandria City Public SchoolsOperations Department1340 Braddock Place

Alexandria, Virginia 22314Telephone: 703-619-8038http://www.acps.k12.va.us/

FY 2021 - 2030 Capital Improvement Program Budget

Jennifer Abbruzzese, Director of Policy & Board InitiativesSusan Neilson, Clerk of the Board

Shanel Hill, Deputy Clerk of the Board

Terri H. Mozingo, Ed.D. Chief Academic Officer

Superintendent’s Designee

Julie Crawford, Ed.D.Chief Student Services Officer

Clinton PageChief Accountability Officer

Lisa Piehota, Ph.D.Executive Director of Elementary Instruction

Kurt HuffmanDirector of School, Business, and Community Partnerships

Stephen Wilkins, Ed.D.Chief Human Resources Officer

Superintendent’s Designee

Mignon R. AnthonyChief Operating Officer

Dominic TurnerChief Financial Officer

Elizabeth Hoover, Ed.D.Chief Technology Officer

Gerald Mann, Ed.D.Executive Director of Secondary Instruction

Helen LloydDirector of Communications

Page 4: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Transportation

Charles StoneDirector

Kifaya HamadAssistant Director

Safety and Security Services

James BartlettDirector

John ContrerasCoordinator, Security and Emergency Management

School Nutrition Services

Cynthia HormelDirector

ACKNOWLEDGEMENT

The Operations staff extends thanks and appreciation to the School Board, principals, senior staff, program managers and support staff who contributed to the production of the FY 2021-2030 Capital Improvement Program. This process takes a tremendous amount of time and effort. Your hard work and cooperation allow us to present an effective budget.

Educational Facilities

Anita CordovaActing Director of Facilities

Tracey ArmahFinancial Analyst

Alex AlexanderFacilities Engineer

Paul MayConstruction Project Manager

Azuka BartlettConstruction Project Manager

John FinniganConstruction Project Manager

Eric KellyBuilding Systems Manager

Key Operations Staff

Anita CordovaDirector of Operations Coordination

Erika GulickSenior Planner

Page 5: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Executive Summary Introduction ......................................1

Strategic Planning Framework..........1 CIP Planning and Project .................1 FY 2021-2030 CIP.............................4 Capacity Plan....................................4 Non-Capacity Program....................11 Basis of Estimates...........................13 Operating Budget Impact.................13 Budget Timeline and Planning Cycle................................................14

Projects

Overview..........................................17Charles Barrett.................................18Cora Kelly.........................................20Douglas Macarthur...........................22Ferdinand T. Day..............................24George Mason.................................26James K. Polk..................................29Jefferson-Houston............................32John Adams......................................34Lyles-Crouch Traditional Academy...37Matthew Maury.................................40Mount Vernon Community School..............................................43Patrick Henry....................................45Samuel Tucker.................................47Williams Ramsay..............................50Francis C. Hammond.......................53George Washington.........................56 T.C. Williams: Minnie Howard..........59 T.C. Williams:King Street ................60 Building Systems Upgrades & Modernization..................................63 Capacity...........................................64 System-Wide...................................65Rowing Facility................................66Transportation Services..................67

Supporting Data Enrollment Projections............................68

CIP by Site...............................................69

TABLE OF CONTENTS

Page 6: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

This page intentionally left blank.

Page 7: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

INTRODUCTION

The Alexandria City Public Schools (ACPS) Superintendent’s Proposed FY 2021-2030 Capital Improvement Program (CIP) is framed with consideration for the School Board’s FY 2021-2030 CIP Budget Priorities including:• Capacity• Safety & Security• Modernization; and• Equity.

The FY 2021-2030 CIP budget continues the previous change in the capital improvement program that moves the school division forward in improving its facilities conditions through comprehensive modernization. This approach calls for the renewal of aging buildings. Some of the existing issues include:

• Insufficient safety and security systems• Building accessibility, Americans with

Disabilities Act (ADA) challenges• Inadequate roof systems• Inadequate classroom and play spaces• Outdated heating, ventilation and air

conditioning (HVAC) systems and lighting• Insufficient common areas such as cafeterias

and gymnasiums

Each major capacity project is intended to be comprehensive and the expected lifespan is 30-50 years.

The FY 2021-2030 CIP reflects previous goals of a comprehensive approach and maintains the commitment to the recommended CIP schedule from the Ad-Hoc Joint City-Schools Facilities Investment Task Force (Task Force) from November 2017. However, this budget also acknowledges that our dilapidated facilities will need interim modernization projects to sustain a deferred replacement or major renovation to the school.

In 2019, ACPS conducted Targeted Facilities Conditions Assessments at six facilities expected to be in the worst condition: Cora Kelly, George

Mason, Matthew Maury, Francis C. Hammond, George Washington and the Transportation Facility. The Targeted Facilities Assessment prioritized projects for these facilities in the following categories:Priority 1 - Currently Critical:

This includes projects that require immediate action to either correct a safety hazard, stop accelerated deterioration or return a facility to operation. The Superintendent’s Proposed CIP prioritizes these projects in FY 2021.

Priority 2 - Becoming CriticalThis includes projects that, if not corrected expeditiously, will become critical within two years. The Superintendent’s Proposed CIP prioritizes these projects in FY 2022.

Priority 3 - Necessary, But Not Yet CriticalThis includes projects that require attention to preclude further deterioration and higher costs from deferring. The Superintendent’s Proposed CIP prioritizes these proejcts in FY 2023-2025.

Priority 4 - RecommendedThis includes projects that are considered sensible improvements to existing conditions. The Superintendent’s Proposed CIP prioritizes these projects in FY 2026-2030.

The Superintendent’s Proposed CIP used this prioritization method for all non-capacity projects at all facilities to evaluate projects with the same prioritization framework.

STRATEGIC PLANNING FRAMEWORK

Equity is an essential part of the ACPS 2020 Plan. This is particularly relevant in the facilities we offer our students and staff. Our 2020 plan pledges to work for the modernization of schools so that every student has not just a beautiful building and learning space, but optimal learning environments with access to program opportunities.

CIP PLANNING AND PROJECT

This CIP reflects a commitment to the School Board’s CIP Budget Priorities which were organized in the following categories:

Page 1 ACPS FY 2021 - 2030 CIP Superintendent’s Proposed Budget

EXECUTIVE SUMMARY

Page 8: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

1. Capacity:Capacity ensures that ACPS has enough suitable spaces to deliver instruction to the estimated number of students. Current enrollment indicates ACPS is experiencing a capacity deficit across all grade levels and will continue to for years to come.

2. Safety and Security:Examples of safety and security related projects include upgrading of fire and life safety systems, upgrading of access control and improvements in ADA accessibility. This CIP also reflects a commitment to upgrade dated access systems, or lack thereof, and increase repair and monitoring of facilities and buses.

3. Modernization:This category ensures the learning spaces utilize best practices for energy efficiency and environmental sustainability. These projects include upgrades to indoor air quality and HVAC systems, as well as, day lighting and other sustainability features related to plumbing

and electrical systems. In addition, we have a renewed focus on improving the energy efficiency, resistance to water intrusion, and appearance of our facilities through building assessments, envelope repairs and painting.

4. Equity:This category is focused on providing clean, safe and conducive learning environments in each ACPS school. Projects include play spaces, cafeterias, etc.

Table 1: ACPS FY 2021 - 2030 Proposed CIP Budget

Superintendent's Proposed FY 2021‐2030 CIP Budget

City Council FY 2020‐2029 

Approved CIP Budget

Difference in School Board and City Council CIP 

BudgetsFY 2020 36,829,355              FY 2021 198,801,502             119,757,459             (79,044,043)            FY 2022 83,827,369               82,930,320               (897,049)                  FY 2023 22,211,757               60,664,412               38,452,655              FY 2024 41,592,320               31,717,443               (9,874,877)               FY 2025 37,756,043               29,135,345               (8,620,698)               FY 2026 16,529,097               13,974,236               (2,554,861)               FY 2027 41,144,569               36,844,606               (4,299,963)               FY 2028 20,026,719               15,782,876               (4,243,843)               FY 2029 53,861,414               51,824,252               (2,037,162)               FY 2030 14,962,208               (14,962,208)            

Grand Total*             530,712,998              479,460,304              (51,252,694)*The Grand Total compares the total of the FY 2021‐2030 proposed CIP to the total of the approved FY 2020‐2029 CIP.

Page 2

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 9: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Figu

re 1

: AC

PS H

isto

rical

and

Pro

ject

ed E

nrol

lmen

t (B

ased

on

FY 2

019

Proj

ectio

ns)

18,331

 

15,737

 

 ‐

 5,000

 10,000

 15,000

 20,000 FY

09FY11

FY13

FY15

FY17

FY19

FY21

FY23

FY25

FY27

FY29

ACPS

Enr

ollm

ent G

row

th:

Hist

oric

al a

nd P

roje

cted

Actual Enrollm

ent

FY18

 Projected

 Enrollm

ent

1 Pe

rcen

tage Point Abo

ve Trend

line

1 Pe

rcen

tage Point Below

 Trend

line

FY 200

7

FY 201

9

Page 3 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Executive Summary

Page 10: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

FY 2021-2030 CIP FUNDING REQUEST

This budget request contains three primary drivers:

1. Increasing capacity to accommodate anticipated enrollment growth and student needs

2. Modernization to aggressively address unmet facilities needs through a comprehensive approach

3. On-going major repairs of facilities that are not scheduled to be modernized within the 10-year program

The total proposed CIP budget is $530,712,999 This is $51.3M more than the total ten-year City Council approved FY 2020-2029 CIP; which can be largely attributed to cost escalation on The High School Project and priorities identified from the Targeted Facilities Conditions Assessments (TFCAs). Table 2 shows the funding requests by site for FY 2021 - 2030.

CAPACITY PROGRAM

The capacity portion of the CIP program totals $403,000,570 over the 10-year period. This includes funding for design, project management support for the renovation of existing buildings, and construction of additional capacity where necessary. Swing space, transportation, and project scheduling are critical components of the capacity plan.

Major Factors

There are four major components of the capacity program.

1. Adding Capacity

Based on the annual review and analysis of student enrollment forecasts, ACPS is expecting approximately 2,000 new K-12th grade students within the 10-year program (see Figure 1). Please note that these projections are based on last year’s enrollment projections. Updated projections will be finalized prior to the adoption of the CIP. Growth is expected to continue through FY 2030.

Elementary Capacity

Elementary capacity will be added with replacements or major renovations, which will likely require temporary displacement of the school.

Douglas MacArthur, George Mason, Cora Kelly are all proposed for capacity additions. Budgets for these three schools were increased in the proposed FY 2021-2030 CIP to account for construction cost escalations, parking structures and contingency. A new school is also proposed in the out years to accommodate enrollment growth; the grade configuration of this school has not been determined.

Secondary Capacity

Enrollment projections indicate that secondary enrollment will exceed capacity in coming years. ACPS has begun The High School Project to

Page 4

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 11: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 2:

AC

PS P

ropo

sed

CIP

Bud

get,

FY 2

021-

2030

Site

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

Building S

ystem Upgrade

s and

 Mod

ernizatio

n1,40

0,00

0           

1,34

6,63

6           

581,57

5               

1,24

1,34

7           

3,00

0,00

0           

3,41

7,91

8           

3,00

0,00

0           

3,00

0,00

0           

3,00

0,00

0           

3,00

0,00

0           

22,987

,476

        

Charles

 Barrett

106,00

0               

1,37

5,00

0           

50,000

                 

810,39

4               

88,555

                 

2,42

9,94

9          

Cora Ke

lly38

5,00

0               

573,00

0               

64,500

                 

7,55

6,82

2           

30,227

,289

         

38,806

,611

        

Douglas

 MacArthur

69,433

,250

         

69,433

,250

        

Ferdinand T. Day

566,74

1               

830,00

0               

1,39

6,74

1          

Francis

 C. H

ammon

d4,88

3,69

6           

389,55

5               

138,22

8               

3,42

9,75

8           

1,29

5,15

6           

10,136

,393

        

George M

ason

280,00

0               

200,00

0               

13,599

,467

         

27,198

,934

         

27,198

,934

         

68,477

,334

        

George W

ashington

2,37

0,00

0           

4,19

4,00

0           

230,00

0               

515,00

0               

10,000

                 

386,00

0               

954,37

9               

8,65

9,37

9          

High

 Scho

ol Pr

oject

103,71

2,46

9       

54,503

,900

         

158,21

6,36

9     

James K.

 Polk

814,17

5               

158,63

5               

1,58

1,00

0           

1,77

1,68

7           

21,312

                 

4,34

6,80

9          

Jeffe

rson

‐Hou

ston

750,00

0               

10,000

                 

10,000

                 

770,00

0             

John

 Adams

1,65

3,00

0           

814,50

0               

11,000

                 

191,50

0               

359,00

0               

3,02

9,00

0          

Lyles

‐Crouch

2,30

8,38

8           

1,06

5,38

1           

220,16

8               

22,500

                 

15,000

                 

82,056

                 

3,71

3,49

3          

Matthew

 Maury

1,46

8,53

3           

2,12

8,00

0           

91,383

                 

206,05

5               

425,00

0               

6,06

7,60

1           

10,386

,572

        

Mou

nt Verno

n78

0,00

0               

433,00

0               

206,00

0               

1,41

9,00

0          

New Scho

ol11

,358

,381

         

45,433

,524

         

56,791

,906

        

Patrick Hen

ry31

5,00

0               

315,00

0             

Rowing

 Facility

62,000

                 

400,50

0               

11,000

                 

11,500

                 

15,000

                 

16,000

                 

16,000

                 

532,00

0             

Samue

l Tucker

147,00

0               

1,50

4,00

0           

82,280

                 

51,000

                 

140,50

0               

12,000

                 

12,500

                 

1,94

9,28

0          

Syste

m‐W

ide

3,76

6,18

5           

3,40

9,08

0           

3,35

4,11

3           

3,49

6,04

0           

3,65

5,23

9           

2,99

4,07

9           

3,60

3,08

5           

3,66

6,17

7           

3,73

1,16

2           

3,79

8,09

7           

35,473

,256

        

T.C. W

illiam

s King S

treet Cam

pus

720,16

5               

2,83

9,31

3           

350,00

0               

3,90

9,47

8          

Transportatio

n Service

s2,03

6,00

0           

8,48

0,00

4           

879,90

9               

1,75

5,79

4           

1,50

6,12

9           

1,86

2,72

2           

1,59

0,84

9           

1,97

6,16

1           

1,68

0,72

8           

2,09

6,51

0           

23,864

,804

        

William

 Ram

say

905,90

0               

175,00

0               

2,31

0,00

0           

278,00

0               

3,66

8,90

0          

Gran

d To

tal

198,80

1,50

2       

83,827

,369

         

22,211

,757

         

41,592

,320

         

37,756

,043

         

16,529

,097

         

41,144

,569

         

20,026

,719

         

53,861

,414

         

14,962

,208

         

530,71

2,99

9     

Page 5 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Executive Summary

Page 12: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3:

AC

PS A

ctua

l and

Pro

ject

ed E

nrol

lmen

t by

Gra

de L

evel

, Bas

ed o

n FY

201

9 En

rollm

ent P

roje

ctio

ns

Schoo

l Lev

elGrad

ePK K 1 2 3 4 5 6 7 8 9 10 11 12

NGGran

d Tota

l

ES To

tal

MS

MS To

tal

HS

HS To

tal

ES

FY 20

16 Ac

tual 

Enrol

lmen

tFY

 2017

 Actua

l En

rollm

ent

FY 20

18 Ac

tual 

Enrol

lmen

tFY

 2019

 Actua

l Enrol

lmen

t  FY

20 To

tal Pr

oj. 

Enrol

lmen

t    

 FY21

 Total

 Proj.

 En

rollm

ent  

  FY22

 Total

 Proj.

 En

rollm

ent

FY23

 Total

 Proj.

 En

rollm

ent

FY24

 Total

 Proj.

 En

rollm

ent

328

          

          

          

      

324

          

          

          

      

331

          

          

          

     32

9     

          

          

         

324

          

          

          

    32

5     

          

          

         

326

          

          

          

      

326

          

          

        

326

          

          

    1,4

67     

          

          

       

1,453

          

          

          

  1,4

74     

          

          

       

1,516

          

          

          

1,504

          

          

          

1,528

          

          

          

1,474

          

          

          

  1,4

97     

          

         

1,521

          

          

1,402

          

          

          

  1,4

53     

          

          

       

1,416

          

          

          

  1,4

33     

          

          

     1,4

97     

          

          

     1,4

85     

          

          

     1,5

08     

          

          

       

1,454

          

          

    1,4

77     

          

     1,3

65     

          

          

       

1,347

          

          

          

  1,4

10     

          

          

       

1,394

          

          

          

1,403

          

          

          

1,467

          

          

          

1,455

          

          

          

  1,4

76     

          

         

1,425

          

          

1,377

          

          

          

  1,3

09     

          

          

       

1,308

          

          

          

  1,3

24     

          

          

     1,3

43     

          

          

     1,3

50     

          

          

     1,4

17     

          

          

       

1,404

          

          

    1,4

26     

          

     1,1

99     

          

          

       

1,336

          

          

          

  1,2

70     

          

          

       

1,254

          

          

          

1,298

          

          

          

1,308

          

          

          

1,317

          

          

          

  1,3

80     

          

         

1,368

          

          

1,101

          

          

          

  1,1

94     

          

          

       

1,292

          

          

          

  1,2

48     

          

          

     1,2

20     

          

          

     1,2

61     

          

          

     1,2

70     

          

          

       

1,279

          

          

    1,3

41     

          

     8,2

39     

          

          

       

8,416

          

          

          

  8,5

01     

          

          

       

8,498

          

          

          

8,589

          

          

          

8,724

          

          

          

8,767

          

          

          

  8,8

16     

          

         

8,884

          

          

959

          

          

          

      

1,010

          

          

          

  1,1

25     

          

          

       

1,208

          

          

          

1,132

          

          

          

1,163

          

          

          

1,251

          

          

          

  1,2

57     

          

         

1,255

          

          

956

          

          

          

      

931

          

          

          

      

1,001

          

          

          

  1,0

95     

          

          

     1,1

53     

          

          

     1,1

08     

          

          

     1,1

50     

          

          

       

1,221

          

          

    1,2

25     

          

     92

2     

          

          

          

 94

5     

          

          

          

 91

7     

          

          

          

977

          

          

          

    1,0

78     

          

          

     1,1

33     

          

          

     1,1

00     

          

          

       

1,122

          

          

    1,2

01     

          

     2,8

37     

          

          

       

2,886

          

          

          

  3,0

43     

          

          

       

3,280

          

          

          

3,363

          

          

          

3,404

          

          

          

3,501

          

          

          

  3,6

00     

          

         

3,681

          

          

975

          

          

          

      

1,077

          

          

          

  1,2

17     

          

          

       

1,156

          

          

          

1,200

          

          

          

1,324

          

          

          

1,391

          

          

          

  1,3

38     

          

         

1,378

          

          

1,069

          

          

          

  1,0

22     

          

          

       

991

          

          

          

     1,0

29     

          

          

     1,0

21     

          

          

     1,0

59     

          

          

     1,1

69     

          

          

       

1,228

          

          

    1,1

81     

          

     81

4     

          

          

          

 88

3     

          

          

          

 88

6     

          

          

          

883

          

          

          

    90

4     

          

          

         

897

          

          

          

    93

1     

          

          

          

 1,0

28     

          

         

1,079

          

          

736

          

          

          

      

772

          

          

          

      

855

          

          

          

     89

1     

          

          

         

871

          

          

          

    89

2     

          

          

         

885

          

          

          

      

919

          

          

        

1,015

          

          

3,594

          

          

          

  3,7

54     

          

          

       

3,949

          

          

          

  3,9

59     

          

          

     3,9

96     

          

          

     4,1

72     

          

          

     4,3

76     

          

          

       

4,513

          

          

    4,6

53     

          

     14,67

0     

          

          

     15,05

6     

          

          

    15,49

3     

          

          

     15,73

7     

          

          

   15,94

8     

          

          

   16,30

0     

          

          

   16,64

4     

          

          

     16,92

9     

          

       

17,21

8     

          

   

Page 6

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 13: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Figu

re 2

: A

ge a

nd S

ize

of A

CPS

Sch

ool B

uild

ings

0

5000

0

1000

00

1500

00

2000

00

2500

00

3000

00

3500

00

4000

00

4500

00

5000

00

1923

1929

1935

1939

1942

1949

1954

1955

1956

1958

1958

1965

1966

1999

2000

2007

2014

2019

Age an

d Squa

re Foo

tage of A

CPS Scho

ol Buildings

As of N

ovem

ber 2

019

(*Exclud

es Gym

nasium

s whe

re Owne

d by

 City

)

Mt. Vernon*

Maury

George Washington 

Mason

MacArthur

Barrett*

Patrick Henry*

TC W MInnie Howard Campus

Cora Kelly*

Francis C. Hammond

Lyles‐Crouch

William Ramsay*

James K. Polk

John Adams

Jefferson Houston

Samuel Tucker

TC Williams King Street Campus

Build

ings

over 60 Ye

ars 

Ferdinand T. Day

Page 7 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Executive Summary

Page 14: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

better serve the high school students academic experience while accommodating enrollment. New high school capacity is proposed based on previous assumptions; however will be updated once a project approach is confirmed prior to development of the FY 2021 - 2030 CIP. Middle school capacity will be met through a combination of the following: feasibility studies, community engagement, land acquisition, grade level configuration analysis and the use of relocatables.

2. Renovating existing buildings because of their age and building condition.

The second major component of the modernization program is to renovate the existing school facilities. By 2020, five of the 17 ACPS schools will be older than 75-years (see Figure 2).

Mount Vernon, Matthew Maury, George Mason, Douglas MacArthur and George Washington (our second largest school) will all reach or exceed 75 years of age within the next five years. Over the next 20 years, an additional seven schools will reach 75-plus years. Due to their age, the condition of these buildings are not all currently at a state where they can be properly maintained. This causes significant reactionary and unpredictable maintenance and repairs. Part of the final CIP includes new buildings and modernizations to address building condition issues at select facilities.

3. Swing Space

Swing space is a location to deliver the educational program while a school is undergoing renovation or new construction. Construction can be very disruptive to students so swing space is a critical component of the overall modernization program. Students can be accommodated in several ways. For example, in order to advance the Douglas MacArthur Elementary School modernization, ACPS and the City of Alexandria worked together to retain the old Patrick Henry building for swing space use for Douglas MacArthur while its site is under construction. Another option may be portable classrooms on-site or at a centralized location. In some cases, swing space could be built on site or construction

could be phased such that it avoids the swing space requirement.

4. Transportation

The transportation facility has not been upgraded since it was constructed in 1979. Since then, ACPS has gained more than 4,000 students and expanded the school bus fleet. This project to upgrade the transportation facility will need to include an expanded garage and personnel space to meet the needs of the expanding fleet. Construction funding for the building expansion is shown in FY 2022; however, this will be part of a collaborative effort with the City’s departments near the site.

Stages of Implementation Stage One- Staying the Course

As part of the continued implementation of the modernization program, ACPS will focus on completing current projects approved in previous CIPs. This includes a complete review of all the existing projects and a discussion of items that would be deferred and addressed through the modernization process.

Stage Two- Putting Structures, Communication Systems and Processes in Place

ACPS will continue to develop robust community engagement on major projects. The goal of each major project is to engage the community in the process from inception to completion.

Stage Three- Modernization in Action FY 2017 and beyond

The design phase of the process, which includes schematic design, design development, and construction documents and specifications, can last anywhere from six months to up to two years. Each step in the design process involves more detailed and specific information about the technical aspects of the building systems and components. The design process will require ACPS School Board decisions and approval, with each phase offering more detailed descriptions

Page 8

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 15: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

of the scope, budget and schedule. The products of this phase would include sketches, drawings, models, and technical reports that would be shared with the school and community through public hearings, workshops, and other forms of public relations and community involvement. Community participation is critical for stakeholder support through every phase of the modernization process.

Recommended Modernization and Capacity Projects

Table 5 outlines the proposed capacity projects, funding years and total estimated budget, as included in the CIP budget.

A typical modernization project would include a programming study to determine how to renovate the existing structure to meet the standards outlined in the educational specifications. Each renovation is intended to be comprehensive, and the expected lifespan of the project is 30-50 years. Part of the renovation may include HVAC systems replacement, ceiling and lighting upgrades, newly configured classrooms, new windows, fire sprinklers, electrical and plumbing upgrades, painting, flooring and both fixed and loose furnishings. Capacity will be added based on each site’s need and ability to accommodate additional staff and students.

High School - The high school project began in FY 2019 and will continue over the next several years. Based on the School Board’s vote on September 26, 2019, this project includes a complete new build for the Minnie Howard campus accommodating the maximum capacity possible and grades 9-12. Construction funding is proposed for FY 2021 and FY 2022. The project is currently being funded by design funds approved in FY 2019 and FY 2020.

Douglas MacArthur- Because of the building condition and the interior configuration, a total school replacement is recommended to rectify the deteriorating building condition and to accommodate the projected future enrollment. This project was advanced in the Superintendent’s Proposed CIP and costs re-evaluated based on

the decision to use the old Patrick Henry building as Swing Space for Douglas MacArthur. This project began in FY 2020 using funds from the FY 2018 CIP for Flexible Capacity/Swing Space.

Transportation Facility- This will include an upgrade the existing building and build an addition to accommodate the increase in personnel and the bus fleet. ACPS is currently working with the City’s relevant departments on the Witter Wheeler Campus Master Plan which will analyze co-location opportunities.

George Mason- Because of the building condition and the interior configuration, a total school replacement is recommended to rectify the deteriorating building condition and to accommodate the projected future enrollment. ACPS is currently conducting a feasibility study to determine what is possible at this site.

Cora Kelly- This project will include a total building renovation and ten classroom addition for elementary grades. ACPS is currently conducting a feasibility study to determine what is possible at the site.

New School- Enrollment projections indicate the need for an additional school in the future. This project includes design costs for a 600 student capacity new school building in FY 2028 and construction costs in FY 2029.

Matthew Maury- This project will include a total building renovation and addition for elementary grades. The funds included in FY 2030 are for design only. Funding for construction will be proposed in FY 2031.

Page 9 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Executive Summary

Page 16: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 5:

AC

PS C

apac

ity P

roje

cts,

incl

udin

g A

dditi

onal

Cap

acity

Site

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d Tota

l

Cora 

Kelly

7,556

,822

          

30,22

7,289

       

37,78

4,111

       

Douglas

 MacA

rthur

69,43

3,250

       

69,43

3,250

       

Georg

e Maso

n

13,59

9,467

       

27,19

8,934

       

27,19

8,934

       

67,99

7,334

       

High S

choo

l Proj

ect

103,7

12,46

9     

54,50

3,900

       

158,2

16,36

9     

Matth

ew M

aury

6,067

,601

          

6,067

,601

          

New Sch

ool

11,35

8,381

       

45,43

3,524

       

56,79

1,906

       

Transp

ortati

on 

Servi

ces

6,710

,000

          

6,710

,000

          

Gran

d Tota

l17

3,145

,719

     61

,213,9

00     

  13

,599,4

67     

  27

,198,9

34     

  27

,198,9

34     

  7,5

56,82

2     

    30

,227,2

89     

  11

,358,3

81     

  45

,433,5

24     

  6,0

67,60

1     

    40

3,000

,570

     

Page 10

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 17: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

NON-CAPACITY PROGRAM

The non-capacity portion of the CIP program totals $127,712,429 over the 10-year period. This includes funding for major repairs and minor construction ,projects as well as funding for transportation services, technology modernization and textbooks. The 10-year request totals $127,712,429 and includes:

• $29,356,383 for elementary• $22,705,250 for secondary• $76,147,536 for system-wide projects

including HVAC, emergency repairs, planning, the Rowing Facility, safety and security, curriculum materials, technology upgrades and Transportation services

Non-capacity projects are shown by site in Table 6.

PROJECT DETAILS

Safety and Security Planning for these projects include an assessment of the access system and camera upgrades, system wide.

Project PlanningThis funds project planning for projects at least one to two years prior to the execution of work. This allows time for feasibility studies, proper scoping, cost estimating, coordination and permitting.

Exterior Playgrounds or Sports Areas These projects remove and replace old playground equipment and protective surfaces to provide new play/recreational areas for students.

Fire Alarm SystemThese projects replace existing fire alarm system components, particularly fire alarm panels. This will improve the safety conditions for students, staff and visitors to ACPS facilities. HVAC Repair/Replacement

These projects repair or replace existing HVAC equipment: HVAC repairs will be initiated to restore operability, efficiency and reliability; HVAC replacements will address outdated and outmoded equipment with installation of new high efficiency units tied into ACPS automated building systems.

Plumbing/Restroom upgradesThese projects upgrade and “refresh” existing restrooms with current ADA requirements, new tile, urinals and hand sinks as well as any associated water service. Upgrades may include new weather tight windows as well as energy efficient lighting. New plumbing will include low-flow water efficient fixtures, and all restroom upgrades will be consistent with the ACPS goal of energy efficiency and sustainability.

Roof Repair/ReplacementThese projects repair or replace existing roofing systems to prevent water leaks, moisture infiltration, and deterioration of the building structure. New roofing systems will include high reflectance, increased insulation and thermal efficiency resulting in higher energy efficiency and thus lower utility costs.

Site Hardscape Repair/Replacement These types of projects include resealing and striping asphalt, rubber safety surface play areas, and parking lot repairs. It also includes replacing sidewalks, patios, walkways and other pedestrian or play surfaces that have deteriorated to the point of presenting a risk of injury to students, parents, staff and visitors at the facility. Repair and/or reconstruction of exterior retaining walls are also done as part of site hardscape repairs.

Storm Water ManagementThese types of projects address the flow of storm water at the facility; directing water away from the facility and controlling the volume of water flowing into the sewer system. Stormwater best management practices include the management of water flow through grading and vegetation as well as through building and maintaining structures to contain, filter and detain storm water. Storm water management may also seek to capture or harvest water for reuse in landscape

Page 11 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Executive Summary

Page 18: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 6:

Non

-Cap

acity

Sum

mar

y by

Site

Site

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d Tota

l

Building

 Syste

m Up

grade

s and

 Mod

erniza

tion

1,400

,000

          

 1,3

46,63

6     

      

581,5

75     

          

1,241

,347

          

 3,0

00,00

0     

      

3,417

,918

          

 3,0

00,00

0     

      

3,000

,000

          

 3,0

00,00

0     

      

3,000

,000

          

 22

,987,4

76     

   Ch

arles 

Barre

tt10

6,000

          

     1,3

75,00

0     

      

50,00

0     

          

  81

0,394

          

     88

,555

          

       

2,429

,949

          

Cora 

Kelly

385,0

00     

          

573,0

00     

          

64,50

0     

          

  1,0

22,50

0     

     Ferdi

nand

 T. Da

y56

6,741

          

     83

0,000

          

     1,3

96,74

1     

     Fra

ncis C

. Ham

mond

4,883

,696

          

 38

9,555

          

     13

8,228

          

     3,4

29,75

8     

      

1,295

,156

          

 10

,136,3

93     

   Ge

orge M

ason

280,0

00     

          

200,0

00     

          

480,0

00     

        

Georg

e Wash

ington

2,370

,000

          

 4,1

94,00

0     

      

230,0

00     

          

515,0

00     

          

10,00

0     

          

  38

6,000

          

     95

4,379

          

     8,6

59,37

9     

     Jam

es K. Po

lk81

4,175

          

     15

8,635

          

     1,5

81,00

0     

      

1,771

,687

          

 21

,312

          

       

4,346

,809

          

Jeffer

son‐H

ousto

n75

0,000

          

     10

,000

          

       

10,00

0     

          

  77

0,000

          

   Joh

n Adams

1,653

,000

          

 81

4,500

          

     11

,000

          

       

191,5

00     

          

359,0

00     

          

3,029

,000

          

Lyles‐

Crouch

2,308

,388

          

 1,0

65,38

1     

      

220,1

68     

          

22,50

0     

          

  15

,000

          

       

82,05

6     

          

  3,7

13,49

3     

     Ma

tthew

 Maury

1,468

,533

          

 2,1

28,00

0     

      

91,38

3     

          

  20

6,055

          

     42

5,000

          

     4,3

18,97

1     

     Mo

unt V

ernon

780,0

00     

          

433,0

00     

          

206,0

00     

          

1,419

,000

          

Patrick 

Henry

315,0

00     

          

315,0

00     

        

Rowing

 Facili

ty62

,000

          

       

400,5

00     

          

11,00

0     

          

  11

,500

          

       

15,00

0     

          

  16

,000

          

       

16,00

0     

          

  53

2,000

          

   Samu

el Tucke

r14

7,000

          

     1,5

04,00

0     

      

82,28

0     

          

  51

,000

          

       

140,5

00     

          

12,00

0     

          

  12

,500

          

       

1,949

,280

          

Syste

m‐Wi

de3,7

66,18

5     

      

3,409

,080

          

 3,3

54,11

3     

      

3,496

,040

          

 3,6

55,23

9     

      

2,994

,079

          

 3,6

03,08

5     

      

3,666

,177

          

 3,7

31,16

2     

      

3,798

,097

          

 35

,473,2

56     

   T.C

. William

s King

 Stree

t Cam

pus

720,1

65     

          

2,839

,313

          

 35

0,000

          

     3,9

09,47

8     

     Tra

nspo

rtatio

n Serv

ices

2,036

,000

          

 1,7

70,00

4     

      

879,9

09     

          

1,755

,794

          

 1,5

06,12

9     

      

1,862

,722

          

 1,5

90,84

9     

      

1,976

,161

          

 1,6

80,72

8     

      

2,096

,510

          

 17

,154,8

04     

   Wi

lliam 

Rams

ay90

5,900

          

     17

5,000

          

     2,3

10,00

0     

      

278,0

00     

          

3,668

,900

          

Gran

d Tota

l25

,655,7

83     

    22

,613,4

69     

    8,6

12,29

1     

      

14,39

3,387

         

10,55

7,110

         

8,972

,275

          

 10

,917,2

80     

    8,6

68,33

8     

      

8,427

,890

          

 8,8

94,60

7     

      

127,7

12,42

9     

Page 12

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 19: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

irrigation or as a non-potable source of water for cooling towers and toilet flushing.

BASIS OF ESTIMATES

Capacity

The capacity project estimates are based on a per square foot costs. ACPS based the estimated high school construction of $380/SF on anticipated high school construction costs for the region. ACPS based the estimated elementary construction cost of $360/SF on the actual construction cost of Jefferson-Houston School and Patrick Henry School as well as schools in the region. The cost basis for renovation projects is $260/SF, except those involving the retrofitting of commercial leased space for which $150/ SF was used. Cost estimate factors are outlined in Table 7. These are budgetary numbers for the purpose of CIP planning. During the planning phase of the implementation of this program, budget numbers should be revised for each upcoming project.

Non-Capacity

The current estimates included in the CIP for non-capacity come from various professional sources. We are continuing to conduct facilities condition assessments of buildings on a regular basis.

OPERATING BUDGET IMPACTThere is a critical relationship that marries the CIP and the Operations and Maintenance budgets. In addition to implementing a comprehensive facilities modernization plan, we are also developing practices and protocols that will lead to the establishment of a comprehensive facility maintenance program that will be monitored by the school division. The maintenance program will include several distinct programs, including preventive, repair/upkeep and emergency maintenance.

Table 7: Basis of Modernization Estimates

New Building Construction Cost/SF

$360

Design, Project Management and Other Soft Costs

25%

Inflation/Year 3%

Contingency 10%

Basis of Capacity Estimates

Page 13 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Executive Summary

Page 20: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

BUDGET TIME LINE AND PLANNING CYCLE

The CIP addresses the school division’s needs for the construction, expansion, and refurbishment of long-lived capital assets to ensure the provision of instruction in a safe and effective environment. The CIP is framed by the ability of current school infrastructure to meet the demands of the project-ed student population and instructional program requirements.

ACPS incorporates current enrollment informa-tion, program requirements, city population data, planning & zoning assessments, along with prin-cipal and department head needs to develop the CIP. In addition, staff used operations and main-tenance data, School Board strategic plans and facility needs assessments to determine capital needs. The adoption of the Capital Improvement Program is an annual commitment to a series of projects with estimated costs based on current knowledge, market conditions and priorities.

The City of Alexandria defines a capital project as one that acquires or improves a physical asset with a useful life of three or more years for greater than $5,000; it is not day-to-day maintenance. Some capital projects have direct impacts on the operating budget. These projects are gener-ally ones related to capacity and the information located in the chapters provide greater detail on operating budget impacts.

The CIP is presented to the School Board for pub-lic consideration in November. During the School Board’s involvement, additions, deletions or modi-fications to projects may occur. After the School Board approves the ACPS Capital Improvement Program, it is submitted to the City Council for consideration and approval.

The City Council has until May to approve the City capital budget, including the consideration of the appropriate financing necessary to support the requested projects. The full budget calendar is shown on the following page.

Once the capital projects are approved, the City maintains all CIP funding and the accounting for these funds. ACPS is given the budget authority to execute CIP projects. ACPS awards contracts, monitors the design and construction progress, verifies that work has been completed and autho-rizes payment. The City Treasurer issues checks for payments from the appropriate accounts.

While the program serves as a long range plan, it is reviewed and revised annually based on current planning circumstances. Priorities may change due to facilities assessments, the economic en-vironment, new laws and regulations, population shifts or the strategic planning process.

Page 14

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 21: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Table 8: CIP Budget and Decision-Making Cycle Alexandria City Public Schools

FY 2021 Budget Calendar

Description Combined Funds (CF)

Capital Improvement Program (CIP)

School Board Preliminary Two-by-Two Meetings with Superintendent and CFO Begin on Combined Funds (CF) X

Modified Calendar (Samuel W. Tucker) School OpensSchool Board RetreatSchool Board Two-by-Two Meetings with Superintendent and COO Begin on Capital Improvement Program (CIP) X

Labor Day: ACPS Schools and Administrative Offices ClosedTraditional Calendar Schools Opens

School Board Work Session: Budget Calendar, Budget Process Resolution, Rules of Engagement, CF and CIP Budget Priorities, Discussion of CIP Format

X X

Regular School Board Meeting:Adoption of the Budget Calendar, Budget Process Resolution, Rules of Engagement X X

School Board Work Session: Fiscal Forecast, High School Project X X

City Council/School Board Subcommittee MeetingRegular School Board Meeting:Adoption of the CF and CIP Budget Priorities X X

Public Hearing on the FY 2021 CF and FY 2021-2030 CIP Budgets X XRegular School Board MeetingCommunity Forum on the FY 2021 CF and FY 2021-2030 CIP Budgets X XCity Council/School Board Joint Work Session on FY 2021-2030 CIP Budget XRegular School Board MeetingCity Council/School Board Subcommittee MeetingCity Manager Proposed Guidance and Revenue Outlook X X

Regular School Board Meeting: Presentation of the Superintendent's Proposed FY 2021-2030 CIP Budget (During Regular School Board Meeting)

X

School Board CIP Work Session #1 and CF Employee Compensation X XSchool Board Deadline to Submit Questions on the CIP Budget X

Staff Deadline to Publicly Post Responses to School-Board Questions on the CIP Budget X

Special Called School Board Meeting: Public Hearing on the FY 2021-2030 CIP Budget XCity Council/School Board Subcommittee MeetingSchool Board CIP Work Session #2 X

Thanksgiving Holiday: ACPS Schools and Administrative Offices Closed

School Board Deadline to Submit CIP Add/Delete Requests to Staff (Due by Noon) XRegular School Board MeetingStaff Deadline to Compile CIP Add/Delete Log and Submit Back to School Board for Co-Sponsorships (Due by Noon) X

School Board Deadline to Submit CIP Add/Delete Co-Sponsorships to Staff (Due by Noon) X

Staff Deadline to Compile CIP Add/Delete Co-Sponsorships, Publicly Post Co-Sponsorships, and Publicly Post Updated Superintendent's Recommendations X

School Board Two-by-Two Meetings with Superintendent and CFO Begin on CF XSchool Board CIP Add/Delete Work Session #1 XSchool Board CIP Add/Delete Work Session #2 XRegular School Board Meeting: Adoption of the FY 2021-2030 CIP (During Regular School Board Meeting) X

Winter Break: ACPS Schools Closed

Regular School Board and Organizational Meeting: Presentation of the Superintendent's Proposed FY 2021 CF Budget (During Regular School Board Meeting)

X

School Board CF Work Session #1 XMartin Luther King Day: ACPS Schools and Administrative Offices ClosedRegular School Board MeetingPublic Hearing on the FY 2021 CF Budget XSchool Board Deadline to Submit Questions on the FY 2021 CF Budget (Due by Noon) XCity Council/School Board Subcommittee MeetingSchool Board CF Work Session #2 X

October 23, 2019

November 7, 2019

September 26, 2019

October 21, 2019October 10, 2019

October 24, 2019October 28, 2019November 2019 (Estimate)

Date

August 2019

August 1, 2019

September 2, 2019September 3, 2019

August 22, 2019

September 2019

September 5, 2019

September 12, 2019

September 19, 2019

September 23, 2019

September 26, 2019

December 9, 2019

December 10, 2019

December 12, 2019

November 25, 2019

November 14, 2019

December 5, 2019December 3, 2019

December 6, 2019

November 18, 2019

November 25, 2019November 25, 2019

November 22, 2019

November 27 - November 29, 2019

January 27, 2020January 23, 2020

January 30, 2020

January 23, 2020January 23, 2020

December 11, 2019

December 19, 2019

December 23, 2019 - January 3, 2020

January 9, 2020

January 16, 2020January 20, 2020

December 17, 2019

Revised as of 10/3/19 Page 1 of 2

Page 15 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Executive Summary

Page 22: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Alexandria City Public SchoolsFY 2021 Budget Calendar

Description Combined Funds (CF)

Capital Improvement Program (CIP)

Date

Staff Deadline to Publicly Post Responses to School-Board Questions on the FY 2021 CF Budget X

School Board Deadline to Submit CF Add/Delete Requests to Staff (Due by Noon) XRegular School Board MeetingStaff Deadline to Compile CF Add/Delete Log and Submit Back to School Board for Co-Sponsorships X

School Board Deadline to Submit CF Add/Delete Co-Sponsorships to Staff (Due by Noon) X

Staff Deadline to Compile CF Add/Delete Co-Sponsorships, Publicly Post Co-Sponsorships and Publicly Post Updated Superintendent's Recommendations X

School Board CF Add/Delete Work Session #1 XPresident's Day: ACPS Schools and Administrative Offices ClosedCity Manager Presents the City of Alexandria's FY 2021 Proposed Budget X XSchool Board CF Add/Delete Work Session #2 XRegular School Board Meeting:Adoption of the FY 2021 CF Budget (During Regular School Board Meeting) X

City Council/School Board Subcommittee MeetingRegular School Board MeetingCity Council/School Board Joint Work Session on the FY 2021 CF and FY 2021-2030 CIP Budgets X X

City Council Introduces Tax rate Ordinance and Sets Maximum Tax Rate X XCity Council Advertises Effective Tax Rates X XRegular School Board MeetingCity Council/School Board Subcommittee MeetingRegular School Board MeetingSpring Break: ACPS Schools and Administrative Offices ClosedRegular School Board MeetingCity Council/School Board Subcommittee MeetingCity Council Add/Delete Session #1 X XCity Council Add/Delete Session #2 X X

City Council Adoption of Tax Rate, FY 2021 General Fund and FY 2021-2030 CIP Budgets X X

Regular School Board Meeting:Superintendent's Adjusted Proposed Budget on the FY 2021 CF and FY 2021-2030 CIP Budgets

X X

Public Hearing on the FY 2021 CF and FY 2021-2030 CIP Budgets X XSchool Board CF and CIP Work Session X XSchool Board Deadline to Submit Questions on the FY 2021 CF and FY 2021-2030 CIP Budgets (Due by Noon) X X

Staff Deadline to Publicly Post Responses to School-Board Questions on the FY 2021 CF and FY 2021- 2030 CIP Budgets X X

School Board Deadline to Submit CF and CIP Add/Delete Requests to Staff (Due by Noon) X X

Staff Deadline to Compile CF and CIP Add/Delete Log and Submit Back to School Board for Co-Sponsorships X X

City Council/School Board Subcommittee MeetingSchool Board Deadline to Submit CF and CIP Add/Delete Co-Sponsorships to Staff (Due by Noon) X X

Staff Deadline to Compile CF and CIP Add/Delete Co-Sponsorships, Publicly Post Co-Sponsorships and Publicly Post Updated Superintendent's Recommendations X X

Regular School Board MeetingSchool Board CF and CIP Add/Delete Work Session #1 X XMemorial Day: ACPS Schools and Administrative Offices ClosedSchool Board CF and CIP Add/Delete Work Session #2, If Needed X X

Regular School Board Meeting: Adoption of the Final FY 2021 CF and FY 2021-2030 CIP Budgets (During Regular School Board Meeting)

X X

Regular School Board MeetingLast Day of SchoolCity Council/School Board Subcommittee MeetingRegular School Board Meeting, If Needed

January 31, 2020

February 6, 2020

February 7, 2020

February 10, 2020

February 4, 2020

February 11, 2020

February 13, 2020

February 18, 2020 (Estimate)February 18, 2020

May 21, 2020

May 13, 2020

May 15, 2020

March 10, 2020 (Estimate)

February 17, 2020

March 05, 2020 (Estimate)

February 20, 2020

May 8, 2020

April 23, 2020April 6, 2020 - April 10, 2020

May 7, 2020

May 12, 2020

June 4, 2020

June 18, 2020

July 9, 2020

February 24, 2020

March 23, 2020

April 27, 2020

May 18, 2020

June 22, 2020June 19, 2020

May 25, 2020May 21, 2020

March 5, 2020

March 19, 2020

April 2, 2020

May 7, 2020

May 28, 2020

May 18, 2020

May 20, 2020

May 7, 2020

March 13, 2020 (Estimate)

April 2020 (Estimate)April 2020 (Estimate)

April 29, 2020

Revised as of 10/3/19 Page 2 of 2

Page 16

Executive Summary

ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 23: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

OVERVIEW OF CIP BUDGET: The elementary projects represent all planned projects for the elementary school sites. There are 14 existing elementary sites, which include two grade K-8 schools, Jefferson-Houston and Patrick Henry. The other sites are Charles Barrett, Lyles-Crouch, Ferdiand T. Day, John Adams which is co-located with the Early Childhood Center, Cora Kelly, Douglas MacArthur, George Mason, Matthew Maury, James K. Polk, William Ramsay, Samuel W. Tucker and Mount Vernon. The ACPS School Board approved implementation of new elementary school boundaries for the 2018-2019 school year. Projections in the document are based on school year 2018-2019 enrollment and will be updated in the School Board adopted CIP.

The secondary projects represent all planned projects for the secondary school sites. There are four secondary sites: Francis C. Hammond, George Washington, and the two campuses of T.C. Williams High School: Minnie Howard Cam-pus and King Street Campus. Other ACPS facilities and system-wide accounts are represented in the following areas: Building Systems Upgrades and Modernization; Capac-ity Projects; System-Wide; Swing Space; Rowing Facility; and Transportation Services.

PROJECT DETAILS:

The project descriptions for FY 2021-2025 for each school, where available, are based on the budget request shown in Table 2.

READING THE PROJECT DESCRIPTIONS:

Each project narrative begins with the project name, description and the project years during which the work will be funded.

Each project is assigned to a group, as follows:

• Group 1: Ongoing, regular capital mainte-nance programs, including a relatively con-sistent funding level from year to year, used to fund capital maintenance efforts of relatively smaller size.

• Group 2: Stand-alone, major capital main-tenance projects, typically $300k-$400k and above in total cost.

• Group 3: New or expanded capital facilities or infrastructure. Typically, these projects have a clearly defined start and stop date, but could also be an ongoing, regular funding stream if the result of the project is an ex-pansion of capital assets. There is no dollar threshold for this category.

Elementary Projects

Page 17 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

OVERVIEW OF PROJECTS

Page 24: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Charles Barrett Elementary School (PK-5)1115 Martha Custis DriveAlexandria, VA 22302 Tel: 703-824-6960 | Fax: 703-379-3782 Principal: Kellie Conlan, Ed.D.http://www.acps.k12.va.us/barrett/

Community Use• Community Police Liaison program • Church rentals• Extended day care• Girl Scout/Boy Scout programs• Recreation Department programs

SITE SUMMARY:

Charles Barrett Elementary School, which current-ly serves grades Pre-K-5 and a full-time recreation center, was originally constructed in 1949. There have been four major additions over the years. The kindergarten wing was built in 1971, the gym addition was built in 1977 (it was remodeled into a full-time recreation center in 1995), and the media center addition was constructed in 1997. A class-room addition was installed for fall 2011 use and another four classroom addition was opened at the start of the 2015-2016 school year.

Table 2. Actual and Projected Enrollment

543 

594 

623 640  651 

675

 350

 400

 450

 500

 550

 600

 650

 700

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Charles Barrett Programmatic Capacity

Elementary Projects

Page 18 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Table 1

Charles Barrett Statistics

CHARLES BARRETT SCHOOL

Year Built 1949Age 67Site Area (in Sqft.) 70,844                     

Building Component Year CompletedRoof 1997Windows 1995HVAC 2003Elevator 2003Building Systems 2001Playground 1995Building Additions 1971/99/2011/15

Charles Barrett Statistics

Page 25: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Tabl

e 4

PRO

GR

AM

DET

AIL

FY

2021

- 20

25

Elementary Projects

Page 19 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Prog

ram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Grand

 Total

Elevator re

pair/rep

lacemen

t10

6,00

0          

106,00

0          

Exterior Playgroun

ds or S

ports 

Areas

50,000

            

50,000

            

Floo

ring

 Rep

air/Re

place

175,00

0          

175,00

0          

HVA

C Re

pair or R

eplacemen

t1,20

0,00

0       

1,20

0,00

0       

Kitche

n/ Cafeteria re

novatio

n and reconfigurations

810,39

4          

810,39

4          

Interior/Exterior P

ainting

88,555

            

88,555

            

106,00

0          

1,37

5,00

0       

50,000

            

810,39

4          

88,555

            

2,42

9,94

9       

Charles 

Barrett

Charles Ba

rrett T

otal

Site

Program

Program Details 

2021

2022

2023

2024

2025

Elevator re

pair/

replacem

ent

This project w

ill re

place the hydraulic elevator.

106,00

0         

Exterio

r Playgroun

ds or S

ports 

Areas

This project w

ill re

place playgrou

nd equ

ipmen

t.50

,000

           

Floo

ring Re

pair/

Replace

This project fun

ds ca

rpet re

placem

ent.

175,00

0         

HVAC

 Rep

air o

r Rep

lacemen

tThis project w

ill re

place HV

AC equ

ipmen

t which has 

reache

d the en

d of its life

‐cycle.

1,20

0,00

0     

Kitche

n/ Cafeteria re

novatio

n an

d reconfigurations

This project fun

ds kitche

n up

grades as 

recommen

ded in th

e B&

D assessmen

t.81

0,39

4         

Interio

r/Exterio

r Painting

This project w

ill perform

 life‐cycle

 painting.

88,555

           

Charles B

arrett

Page 26: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Community Use• Extended day care • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs• Head Start

SITE SUMMARY:

Cora Kelly School for Math, Science and Technology, which serves grades K-5, was originally constructed in 1955. The City’s recreation department constructed a gymnasium/community center connected to the school facility in 1991. In 1996, a classroom addition was constructed in response to the continued growth on the east end of the city. A large city park, Four Mile Run Park, is adjacent to this school facility, which is zoned for Public Open Space.

The Long Range Educational Facilities Plan indicates a renovation of this building should be performed. ACPS is currently conducting a feasibility study on the options for the major modernization project.

Cora Kelly School for Math, Science and Technology (PreK-5)3600 Commonwealth AvenueAlexandria, VA 22305 Tel: 703-706-4420 | Fax: 703-706-4425 Principal: Jasibi Crews-Westwww.acps.k12.va.us/kelly/

Table 1

Cora Kelly Statistics

Table 2. Actual and Projected Enrollment

365  351  361  361  362  374

 200

 300

 400

 500

 600

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Cora Kelly Programmatic Capacity

Year Built 1955Age 61Site Area (in Sqft.) 69,000                     

Building Component Year CompletedRoof 1996/1998Windows 1994HVAC 1994Elevator 1996/2000Building Systems N/APlayground 2001/2011Building Additions 1996

Cora Kelly Statistics

Elementary Projects

Page 20 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

CORA KELLY ELEMENTARY SCHOOL

Page 27: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

01 -

2025

Site

Program

Program Details 

2021

2022

2023

2024

2025

Build

ing En

velope

 Re

pair

This project will rep

lace 30 windo

ws an

d sills and

 provide

 cau

lking

60,000

              

Elevator 

repa

ir/rep

lacemen

tTh

is project provide

s a sing

le 350

0lb hy

drau

lic elevator from

 the main lobb

y to th

e second

 floo

r.15

0,00

0            

This project will in

sulate existing exterior ducts on the roof.

75,000

              

This project will rep

lace th

e existin

g gas fired

 packaged RT

Us an

d do

mestic

 water hea

ters

438,00

0            

Interior 

Acoustics/Lighting

This project will evaluate existin

g system

 ade

quacy an

d prov

ide supp

lemen

tal emergency 

lighting un

its.

75,000

              

This project wll remod

el boy

s an

d girls room

s on

 the second

 floo

r.15

0,00

0            

This project will rep

lace plumbing

 fixtures in

 the original portio

n of th

e bu

ilding.

45,000

              

This project provide

s draina

ge and

 ven

tilation to red

uce hu

midity

 issues und

er th

e flo

or and

 in 

classroo

ms. Tne

mec rust inh

ibito

r pa

int o

n existin

g trusses an

d stee

l.10

,000

              

This project will relocate the sprink

ler ba

ckflo

w preventor and

 main valve to a m

ore accessible 

locatio

n.12

,000

              

This project will rep

lace th

e ob

solete pan

elbo

ard.

7,50

0                

Cora Kelly

HVAC Re

pair or 

Replacem

ent

Plum

bing

 /Restroo

mUpgrade

s

Reno

vation

s & 

Reconfigurations

Elementary Projects

Page 21 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Prog

ram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Grand

 Total

Building Envelope

 Rep

air

60,000

              

60,000

              

Constructio

n of Ren

ovation & 

Capacity

30,227

,289

       

30,227

,289

       

Design, Project M

anagem

ent &

 Other Soft C

osts

7,55

6,82

2         

7,55

6,82

2         

Elevator re

pair/replacem

ent

150,00

0            

150,00

0            

HVA

C Re

pair or Rep

lacemen

t75

,000

              

438,00

0            

513,00

0            

Interio

r Acoustics/Lightin

g75

,000

              

75,000

              

Plum

bing

 /Re

stroom

Upgrade

s15

0,00

0            

45,000

              

195,00

0            

Reno

vatio

ns & Recon

figurations

10,000

              

19,500

              

29,500

              

385,00

0            

573,00

0            

64,500

              

7,55

6,82

2         

30,227

,289

      

38,806

,611

      

Cora Kelly

Cora Kelly Total

Page 28: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Community Use• Extended day care • Recreation department programs• Girl Scout/Boy Scout programs • City/Public meetings

SITE SUMMARY:

Douglas MacArthur Elementary School, which serves grades K-5, originally opened in 1942 and has received six subsequent additions, includ-ing a gymnasium addition in 1966 and a major classroom addition in 1971, which doubled the size of the school. The most recent addition was the media center in 2003.

CAPACITY: A total school replacement is recommended to rectify the deteriorating building condition and to accomodate current and projected future enrollment. ACPS will be using the old Patrick Henry building as swing space beginning next school year for the Douglas MacArthur capacity project.

Douglas MacArthur Elementary School (K-5)1101 Janneys LaneAlexandria, VA 22302 Tel: 703-461-4190 | Fax: 703-370-2719 Principal: Linda Miller, Ed.D.www.acps.k12.va.us/macarthur/

Table 2. Actual and Projected Enrollment

Table 1

Douglas MacArthur Statistics

Year Built 1942Age 74Site Area (in Sqft.) 63,120                     

Building Component Year CompletedRoof 1996/1998Windows 1996/2007HVAC 1998/2006Elevator ‐Building Systems 2002Playground 2005Building Additions 2000

Douglas MacArthur Statistics

696  704  719  724  734 757

 450

 500

 550

 600

 650

 700

 750

 800

 850

 900

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Elementary Projects

Page 22 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

DOUGLAS MACARTHUR ELEMENTARY SCHOOL

Page 29: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Elementary Projects

Page 23 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Progra

m202

1202

2202

3202

4202

5202

6202

7202

8202

9203

0Gra

nd To

tal

Dougl

as Ma

cArthu

rDe

sign, P

roject

 Mana

gement

 & Oth

er Sof

t Co

sts; Co

nstruc

tion o

f Reno

vation

 & Cap

acity

69,433

,250

          

  69,

433,25

0    

69,433

,250

          

  69,

433,25

0    

Dougl

as Ma

cArthu

r Tota

l

Site

Progra

mPro

gram 

Detai

ls 20

2120

2220

2320

2420

25

Douglas

 Ma

cArth

ur

Desig

n, Pro

ject M

anagem

ent &

 Ot

her S

oft Co

sts; C

onstr

uctio

n of 

Reno

vatio

n & Ca

pacity

This i

nclud

es so

ft and

 hard 

costs

 associa

ted with

 site w

ork an

d constru

ction

 of a ne

w sch

ool w

ith a 82

5 stud

ent c

apacity

.69

,433,2

50        

Page 30: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SITE SUMMARY:

Ferdinand T. Day Elementary School was pur-chased and retrofitted for an elementary school using FY 2017 CIP funding. Boundaries were adjusted to incorporate the new school capacity in the 2018-2019 school year. Due to grandfa-thering policies, the school is still filling up and is expected to be at capacity next year.

A facility condition assessment will be taking place this upcoming year to assess the condition of all existing building systems and their replacement schedules will be incorporated into the CIP ac-cordingly.

Ferdinand T. Day Elementary School1701 N. Beauregard StreetAlexandria, VA 22311Tel: 703-619-8430Principal: Rachael Dischner

Community Use

Table 1. Actual and Projected Enrollment

417 

573  587  588  601  625 

 100

 200

 300

 400

 500

 600

 700

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Ferdinand T. Day Programmatic Capacity

Elementary Projects

Page 24 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

FERDINAND T. DAY ELEMENTARY SCHOOL

Page 31: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Elementary Projects

Page 25 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Prog

ram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

Constructio

n of 

Reno

vatio

n & Cap

acity

496,74

1         

496,74

1         

Site Hardscape

 Re

pair/Re

placem

ent

70,000

           

830,00

0         

900,00

0         

566,74

1        

830,00

0        

1,39

6,74

1     

Ferdinan

d T. 

Day Fe

rdinan

d T. Day Total

Site

Prog

ram

Prog

ram Details 

2021

2022

2023

2024

2025

Constructio

n of Ren

ovation & 

Capa

city

This project fu

nds gym add

ition

 escalation in 

constructio

n costs.

496,74

1          

This project fu

nds the de

sign

 for p

arking

 garage 

upda

tes ba

sed on

 assessm

ent.

70,000

            

This project fu

nds pa

rking garage upd

ates based

 on 

assessmen

t.83

0,00

0          

Ferdinan

d T. 

Day

Site Hardscape

 Re

pair/

Replacem

ent

Page 32: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Community Programs• Recreation Department programs • Extended day care• Girl Scout/Boy Scout programs

George Mason Elementary School 2601 Cameron Mills RoadAlexandria, VA 22302 Tel: 703-706-4470 | Fax: 703-683-9011 Principal: Brian Orrenmaawww.acps.k12.va.us/mason/

SITE SUMMARY:

George Mason Elementary School was built in the center of the city as a Works Progress Admin-istration project in 1939. This was part of Frank-lin Roosevelt’s New Deal Program’s Federal Emergency Administration of Public Works. A classroom addition was constructed in 1949 and a multipurpose room addition constructed in 1961. This facility currently serves grades K-5.

CAPACITY: A total school replacement is recom-mended to rectify the deteriorating building condi-tion and to accomodate projected future enroll-ment. ACPS is currently conducting a feasibility study on the options for the major modernization project.

Table 2. Actual and Projected Enrollment

482 436  420  436  439  450

 100

 200

 300

 400

 500

 600

 700

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

George Mason Programmatic Capacity

Elementary Projects

Page 26 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Table 1George Mason Statistics

GEORGE MASON ELEMENTARY SCHOOL

Year Built 1939Age 77Site Area (in Sqft.) 63,535                     

Building Component Year CompletedRoof 1987/2000Windows 1990HVAC 2002/2011Elevator 1976Building Systems 2003Playground 1999Building Additions 1949/77/2015

George Mason Statistics

Page 33: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Elementary Projects

Page 27 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

SitePro

gram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Grand 

Total

Buildin

g Enve

lope R

epair

60,000

          

    60,

000     

         

Constru

ction o

f Renov

ation &

 Cap

acity

27,198

,934

       

27,198

,934

       

54,397

,867

       

Design

, Proje

ct Mana

gement

 & Oth

er Soft

 Costs

13,599

,467

       

13,599

,467

       

Elevat

or repa

ir/repl

aceme

nt200

,000

          

  200

,000

          

  

Plumb

ing /R

estroo

mUpgr

ades

15,000

          

    15,

000     

         

Roof Re

pair or

 Repla

cement

205,00

0     

       

205,00

0     

       

280,00

0      

      200

,000

            

13,599

,467

      27,

198,93

4      

27,198

,934

      68,

477,33

4      

Georg

e Ma

son

Georg

e Maso

n Tota

l

Page 34: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Site

Progra

mPro

gram 

Detai

ls 20

2120

2220

2320

2420

25

Build

ing En

velop

e Rep

airTh

is proj

ect ad

dresse

s wate

r intru

sion is

sues in

 court

yard a

nd fro

m sta

irwell 

to ele

ctrica

l pane

l in 

basem

ent.

60,00

0     

         

Const

ructio

n of 

Reno

vation

 & Ca

pacity

This i

nclud

es har

d cost

s asso

ciated

 with 

site wo

rk and

 const

ructio

nof a

 new s

chool w

ith 70

0 stud

ent 

capaci

ty.27

,198,9

34     

  27

,198,9

34     

  De

sign, 

Projec

t Ma

nagem

ent &

 Othe

r Soft

 Co

sts

These

 are t

he so

ft cost

s asso

ciated

 with 

the co

nstruc

tion o

f the m

odern

izatio

n prog

ram.  T

his inc

ludes 

but is

 not li

mited

 to fe

es, pe

rmitti

ng, de

sign, p

roject

 mana

gemen

t, lega

l fees.

13,59

9,467

       

Elevat

or rep

air/re

placem

ent

This p

roject

 will r

eplac

e exis

ting e

levato

r with

 a 2‐st

op cu

stom 

2500

lb hydr

aulic 

200,0

00     

       

Plumb

ing 

/Restr

oomU

pgrad

esTh

is proj

ect wi

ll rep

lace e

xistin

g dup

lex se

wage 

ejecto

r.15

,000

          

    

Roof 

Repa

ir or 

Repla

cemen

tTh

is proj

ect wi

ll upgr

ade ro

ofing 

and gu

tters o

ver or

iginal b

uilding

.20

5,000

          

  

Georg

e Ma

son

Elementary Projects

Page 28 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 35: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

James K. Polk Elementary School (K-5)5000 Polk AvenueAlexandria, VA 22304 Tel: 703-461-4180 | Fax: 703-751-8614 Principal: PreeAnn Johnsonwww.acps.k12.va.us/polk/

Community Use• Church rentals • Extended day care • Recreation Department programs• Girl Scout/Boy Scout programs

SITE SUMMARY:

The James Polk Elementary School, which serves grades K-5, was constructed in the west end of the city in 1965. Minor renovations converted base-ment spaces into music and art classrooms. An addition and renovation project in 1994 expanded the media center and relocated the main adminis-trative office. A new gymnasium addition and ADA accessibility project and additional classrooms were completed in 2011. Another four classroom addition was completed during the summer of FY 2016. Relocatable classrooms were installed on James K. Polk Elementary School site during the summer of 2017 for pre-K students from Patrick Henry School. In 2019 all pre-K students from James K. Polk were moved to the Early Childhood Center.

Table 2. Actual and Projected Enrollment

Table 1

James K. Polk Statistics

786  775 812  806  818 

842

 550

 600

 650

 700

 750

 800

 850

 900

 950

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

James K. Polk Programmatic Capacity

Elementary Projects

Page 29 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

JAMES K. POLK ELEMENTARY SCHOOL

Year Built 1965Age 51Site Area (in Sqft.) 88,623                     

Building Component Year CompletedRoof 1999Windows 1999HVAC 1965/2010/2011Elevator 2010Building Systems 2002Playground 1994/1999/2011Building Additions 2010/2011/15

James K. Polk Statistics

Page 36: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Elementary Projects

Page 30 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Progra

m20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30Gr

and T

otal

Building

 Envelop

e Rep

air21

,312

          

  21

,312

          

  

Exteri

or Pla

ygrou

nds o

r Spo

rts 

Areas

250,0

00     

    25

0,000

         

Floori

ng Re

pair/Re

place

167,1

75     

    16

7,175

         

Interi

or wa

lls mo

dify/r

epair

/repla

ce12

2,000

         

122,0

00     

    

Plumb

ing /R

estroo

mUpgrad

es36

,635

          

  36

,635

          

  

Reno

vation

s & Re

confi

gurat

ions

350,0

00     

    35

0,000

         

Roof 

Repair o

r Rep

lacem

ent

1,470

,000

      

1,470

,000

      

Storm

 water

 managem

ent

47,00

0     

       

47,00

0     

       

Kitchen

/ Cafe

teria r

enovati

on an

d rec

onfigura

tions

1,771

,687

      

1,771

,687

      

Interi

or/Ext

erior 

Paint

ing11

1,000

         

111,0

00     

    

814,1

75     

    15

8,635

         

1,581

,000

      

1,771

,687

      

21,31

2     

       

4,346

,809

      

James 

K. Po

lk James 

K. Po

lk Tota

l

Page 37: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Elementary Projects

Page 31 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Program

Program Details 

2021

2022

2023

2024

2025

Exterio

r Play

grou

nds o

r Sports Areas

This proje

ct inc

ludespo

ured

 in pl

ace r

ubbe

r play

ing su

rface.

250,0

00           

Flooring

 Repa

ir/Re

place

This proje

ct repla

ces v

inyl fl

oor tile.

167,1

75           

Interior

 walls 

mod

ify/re

pair/

repla

ceTh

is proje

ct will p

erform

 necessa

ry int

erior

 wall m

odific

ation

s, repa

irs or

 repla

ceme

nts.

122,0

00           

Plumbin

g /Restro

omUp

grad

esTh

is proje

ct will r

eplac

e D20

11 co

mmercia

l grade

 water closet with

 flush 

valve

 and r

eplac

e D20

12 ur

inal w

ith flu

sh va

lve.

36,63

5             

Reno

vatio

ns & 

Reconfigu

ratio

nsTh

is proje

ct will p

erform

 necessa

ry int

erior

 reno

vatio

ns an

d/or 

reconfigu

ratio

ns.

350,0

00           

Roof Re

pair or 

Repla

cemen

tTh

is proje

ct will r

eplac

e the

 TPO roof.

1,470

,000

        

Storm water m

anagem

ent

This proje

ct will imp

rove stormw

ater m

anagem

ent systems

.47

,000

             

K itchen

/ Cafeteria 

reno

vatio

n and

 reconfigu

ratio

ns

This proje

ct fund

s kitc

hen u

pgrade

s as recom

mend

ed in

 the B

&D 

assessm

ent.

1,771

,687

        

Interior

/Exte

rior P

aintin

gTh

is proje

ct will p

erform

 life‐cycle

 paint

ing.

111,0

00           

James K.

 Polk

Page 38: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Community Use• Extended day care • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs• Head Start

Jefferson-Houston School (PreK-8) 1501 Cameron StreetAlexandria, VA 22314 Tel: 703-706-4400 | Fax: 703-836-7923 Principal: MScott Berkowitzwww.acps.k12.va.us/houston/

SITE SUMMARY:

Jefferson-Houston School was built in 2014. The building includes a full size gymnasium, a white box theater, and a distributed dining operation instead of a traditional cafeteria. Adjacent to the school is the city’s Durant Recreation Center and a city swimming pool. The school also houses the ChildFind offices and City-wide Early Childhood Special Education classes. This building received a LEED Gold Certification.

Table 1

Jefferson Houston Statistics

Table 2. Actual and Projected Enrollment

Year Built 1970Age 46Site Area (in Sqft.) 83,385                     

Building Component Year CompletedRoof 1994Windows 2006HVAC 1996Elevator ‐Building Systems 2000Playground 2006Building Additions ‐

Jefferson‐Houston Statistics

633 683 

725 756  769  776

 450 500 550 600 650 700 750 800 850 900 950

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Jefferson‐Houston Programmatic Capacity

Elementary Projects

Page 32 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

JEFFERSON-HOUSTON SCHOOL

Page 39: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Elementary Projects

Page 33 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Prog

ram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

HVAC

 Rep

air o

r Rep

lacemen

t75

0,00

0          

750,00

0          

Storm water m

anagem

ent

10,000

            

10,000

            

20,000

            

750,00

0          

10,000

            

10,000

            

770,00

0          

Jeffe

rson

‐Ho

uston Je

fferson

‐Hou

ston

 Total

Site

Program

Program Details 

2021

2022

2023

2024

2025

HVA

C Re

pair or 

Replacem

ent

This project fu

nds major re

pair and 

replacem

ent o

f the

 HVA

C system

.75

0,00

0        

Storm water m

anagem

entThis project fu

nds major m

ainten

ance on the 

bioreten

tion filer BMP.

10,000

           

Jefferson‐

Hou

ston

Page 40: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

John Adams Elementary School (K-5)5651 Rayburn AvenueAlexandria, VA 22311 Tel: 703-824-6970 | Fax: 703-379-4853 Principal: Ginja Cantonhttp://www.acps.k12.va.us/adams/

• Early Childhood Center (PK)• 5651 Rayburn Avenue• Alexandria, VA 22311• Tel: 703-578-6822• Principal: Heidi Haggerty Wagner

SITE SUMMARY:

John Adams Elementary School was constructed in 1966 as a middle school and was converted into an elementary school in 1980. In the sum-mer of 2010, this facility was transformed into a new vision to add the Early Childhood Center (ECC) school.

The ECC houses Head Start, Virginia Preschool Initiative and Early Childhood Special Education programs. of a pre-K through grade 5 school, which includes an Early Childhood Learning Cen-ter, and Head Start programs. A second phase of this project was completed prior to this school year to add more classrooms.

Table 2. Actual and Projected Enrollment

725 687  678  682  687  709 

174  222  222  222  222  222 

 ‐

 200

 400

 600

 800

 1,000

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

John Adams Early Childhood Center

Programmatic Capacity

Elementary Projects

Page 34 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Table 1John Adams Statistics

JOHN ADAMS ELEMENTARY SCHOOL &EARLY CHILDHOOD CENTER

Year Built 1966Age 50Site Area (in Sqft.) 143,290                   

Building Component Year CompletedRoof 1999Windows 2005HVAC 2010Elevator 2005Building Systems 2001Playground 2006Building Additions 2010/2011

John Adams Statistics

Page 41: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Elementary Projects

Page 35 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Progra

m202

1202

2202

3202

4202

5202

6202

7202

8202

9203

0Gra

nd To

tal

Ceilin

g repa

ir/repl

ace510

,500

        

510,50

0     

   

Roof 

Repai

r or 

Repla

cement

1,500,

000     

1,500,

000     

Site Ha

rdscap

e Re

pair/R

eplace

ment

123,00

0     

   154

,000

        

11,000

          

11,500

          

27,000

          

326,50

0     

   

Storm

 water

 ma

nagem

ent30,

000     

     150

,000

        

180,00

0     

   

Interi

or/Ext

erior 

Painti

ng180

,000

        

332,00

0     

   512

,000

        

1,653,

000     

814,50

0     

   11,

000     

     191

,500

        

359,00

0     

   3,0

29,000

     

John A

dams Joh

n Ada

ms To

tal

Page 42: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Elementary Projects

Page 36 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Progra

mPro

gram 

Detai

ls 20

2120

2220

2320

2420

25

Ceilin

g rep

air/re

place

This p

roject

 will r

eplac

e acoust

ical ce

iling t

iles.

510,5

00     

       

Roof 

Repa

ir or 

Repla

cemen

tTh

is proj

ect will f

und t

he re

maini

ng ro

of rep

air. 

1,500

,000

         

Site H

ardsca

pe 

Repa

ir/Re

placem

ent

This p

roject

 will r

epair

 pavin

g nee

ded i

n driv

eway 

per 

Kimley

‐Horn 

assess

ment.

123,0

00     

       

154,0

00     

       

11,00

0     

         

11,50

0     

         

27,00

0     

         

This p

roject

 will r

e‐desi

gn th

e cou

rtyard

 to pr

even

t flo

oding

 into 

the sc

hool.

30,00

0     

         

This p

roject

 will c

onstr

uct th

e cou

rtyard

 re‐de

sign t

o pre

vent 

flood

ing in

to the

 scho

ol.15

0,000

          

  

Interi

or/Exter

ior Pa

inting

This p

roject

 will p

erform

 life‐c

ycle p

aintin

g.18

0,000

          

  33

2,000

          

  

John A

dams

Storm

 wate

r man

agem

ent

Page 43: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SITE SUMMARY:

Lyles-Crouch was constructed as an elementary school on one square city block in Old Town Al-exandria in 1958. This facility replaced an older, smaller school structure that was originally con-structed on this site. A small storage room addi-tion was built in 1985, and a media center addi-tion with a new main entrance was constructed in 2002. This facility currently serves grades K-5.

Lyles-Crouch Traditional Academy (K-5)530 S. St. Asaph StreetAlexandria, VA 22314 Tel: 703-706-4430 | Fax: 703-684-0252Principal: Patricia Zissios, Ph.D. www.acps.k12.va.us/crouch/

Community Use• Extended day care • Monthly community involvement service projects • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs

464 527 

587 622  634  658

 ‐

 100

 200

 300

 400

 500

 600

 700

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Lyles‐Crouch Programmatic Capacity

Elementary Projects

Page 37 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Table 1Lyles-Crouch Statistics

LYLES-CROUCH TRADITIONAL ACADEMY

Year Built 1958Age 58Site Area (in Sqft.) 65,645                     

Building Component Year CompletedRoof 1997Windows 1993HVAC 1993Elevator 2003Building Systems 2000Playground 2004Building Additions 2002

Lyles‐Crouch Statistics

Page 44: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

RE

QU

ES

T FY

202

1 - 2

030

Elementary Projects

Page 38 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Progra

m20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30Gr

and T

otal

Building

 Envelop

e Rep

air74

0,000

          

       

740,0

00     

  

Exter

ior Playgro

unds or

 Sport

s Areas

61,05

0     

          

    13

9,860

          

       

200,9

10     

  

Floori

ng Re

pair/Re

place

300,0

00     

          

  51

7,901

          

       

817,9

01     

  

Interi

or Acou

stics/

Lighti

ng45

7,480

          

       

457,4

80     

  

Reno

vatio

ns & 

Reconfi

gurat

ions

58,30

8     

          

    58

,308

          

Site H

ardsca

pe 

Repair/Re

placeme

nt11

2,500

          

       

90,00

0     

          

    22

,000

          

         

22,50

0     

          

    15

,000

          

         

262,0

00     

  

Kitchen

/ Cafe

teria ren

ovati

on an

d rec

onfigura

tions

1,094

,838

          

    1,0

94,83

8    

Interi

or/Exter

ior Pa

inting

82,05

6     

          

    82

,056

          

2,308

,388

          

   1,0

65,38

1     

        

220,1

68     

          

  22

,500

          

         

15,00

0     

          

    82

,056

          

         

3,713

,493

    

Lyles‐

Crouch

Lyles‐

Crouch T

otal

Page 45: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Site

Program

Program Details 

2021

2022

2023

2024

2025

Build

ing E

nvelop

e Re

pair

This project w

ill replace windo

ws.

740,00

0           

This project w

ill replace rubb

er su

rfacin

g on the 

playgrou

nd.

61,050

             

This project is for playgroun

d up

grad

es.

139,86

0           

Floo

ring R

epair/Re

place

This project w

ill replace carpet th

roug

hout th

e bu

ilding.

300,00

0           

517,90

1           

Interio

r Acoustics/Lig

hting

This project w

ill fund

 necessary acoustic

s/lighting 

upgrad

es.

457,48

0           

Reno

vatio

ns & 

Reconfigurations

This project w

ill replace metal hallid

e fixture(s)

 in 

library and

 corrido

rs.

58,308

             

Site Hardscape

 Re

pair/

Replacem

ent

This project w

ill re‐design

, pave an

d re‐st

ripe the 

parking lot.

112,50

0           

90,000

             

22,000

             

22,500

             

15,000

             

This project fun

ds kitche

n up

grad

es as recom

men

ded 

in th

e B&

D assessmen

t.91

4,83

8           

This project fun

ds design

 for k

itche

n up

grad

es as 

recommen

ded in th

e B&

D assessmen

t.18

0,00

0           

Lyles‐C

rouch

Exterio

r Playgroun

ds or 

Sports Areas

Kitche

n/ Cafeteria 

reno

vatio

n an

d reconfigurations

Elementary Projects

Page 39 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 46: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Community Use• Church rentals• Girl Scout/Boy Scout troops • Extended day care • Recreation Department programs

Matthew Maury Elementary School (K-5)600 Russell RoadAlexandria, Virginia 22301 Tel: 703-706-4470 | Fax: 703-683-9011 Principal: Victor Powellwww.acps.k12.va.us/maury/

SITE SUMMARY:

Matthew Maury Elementary School was originally built as a six classroom school in 1929. In 1941, three rooms were added at the rear of the school. Two large wings were added to each side of the main building in 1949. In 1961, another wing with a new cafeteria and kitchen was constructed. The gymnasium was added in 1971, and the library has undergone renovation several times. A major renovation, completed in 2004-05, included a new media center, additional classroom space, teacher work areas and a new administrative office space. This facility currently serves grades K-5.

The proposed capacity project is set to begin within this CIP with design funds in FY 2030..

Table 2. Actual and Projected Enrollment

Elementary Projects

Page 40 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Table 1

Matthew Maury Statistics

MATTHEW MAURY ELEMENTARY SCHOOL

381 353 

335  330  335  347

 200

 250

 300

 350

 400

 450

 500

 550

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Matthew Maury Programmatic Capacity

Year Built 1929Age 87Site Area (in Sqft.) 51,800                     

Building Component Year CompletedRoof 1995/2005Windows 1992HVAC 2001/2005Elevator ‐Building Systems 2002Playground 1998Building Additions 1971/2005

Matthew Maury Statistics

Page 47: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30Elementary Projects

Page 41 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Progra

m20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30Gr

and T

otal

Building

 Envelop

e Rep

air10

0,000

          

   1,4

00,00

0     

     1,5

00,00

0     

     

Code

 Comp

liance R

equir

emen

ts30

0,000

          

   25

0,000

          

   55

0,000

          

   

Desig

n, Pro

ject M

anagem

ent &

 Othe

r Soft

 Costs

6,067

,601

          

6,067

,601

          

Fire A

larm 

Syste

m15

0,000

          

   15

0,000

          

   

Floori

ng Re

pair/Re

place

250,0

00     

        

250,0

00     

        

Interi

or Acou

stics/

Lighti

ng75

,000

          

     91

,383

          

     16

6,383

          

   

Plumb

ing /R

estroo

mUpgrad

es25

,000

          

     25

,000

          

     

Roof 

Repair o

r Rep

lacem

ent

1,368

,533

          

1,368

,533

          

Water

 heate

rs/bo

ilers 

repair

/repla

ce78

,000

          

     25

,000

          

     10

3,000

          

   

Interi

or/Exter

ior Pa

inting

206,0

55     

        

206,0

55     

        

1,468

,533

         

2,128

,000

         

91,38

3     

          

206,0

55     

        

425,0

00     

        

6,067

,601

         

10,38

6,572

       

Matth

ew 

Maury

Matth

ew M

aury 

Total

Page 48: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

CIP

FY

2021

- 20

25Elementary Projects

Page 42 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Program

Program

 Detai

ls 20

2120

2220

2320

2420

25

This p

rojec

t will inc

lude b

rick r

epair

 and r

epoin

ting, seala

nt at

 joint

s, ne

w sill

s, a r

ebuild o

f exte

rior con

crete 

exit s

tairs and w

indow

 rep

lacem

ent a

s well as

 paint

 exter

ior trim

s, cornice

s, bu

ilt in gutte

r and

 relat

ed ite

ms.

1,400

,000

         

This p

rojec

t will inc

lude d

esign

 work for br

ick re

pair a

nd re

point

ing, sealan

t at jo

ints, ne

w sill

s, a r

ebuild o

f exte

rior con

crete 

exit s

tairs

and w

indow

 repla

ceme

nt as

 well as

 paint

 exter

ior trim

s, cornice

s, bu

ilt in gutte

r and

 relat

ed ite

ms.

100,0

00            

Code

 Comp

liance 

Requ

ireme

nts

This p

rojec

t will cre

ate a ne

w security v

estib

ule with

 ADA c

ompliant e

ntran

ce (w

heel chair

 lift).

300,0

00            

Flooring

 Repa

ir/Re

place

This p

rojec

t will rep

lace c

arpeti

ng with

 resili

ent floo

ring.

250,0

00            

This p

rojec

t will rep

lace s

tage ligh

ting a

nd au

dio am

plificati

on sy

stems

.91

,383

               

This p

rojec

t will evalu

ate ex

isting

 syste

m adeq

uacy an

d provid

e sup

pleme

ntal em

ergen

cy lig

hting

 units.

75,00

0               

Plumb

ing 

/Restro

omUp

grade

sThis p

rojec

t will up

grade

 plum

bing fixtures to

 age a

ppropriat

e size

s.25

,000

               

Roof 

Repa

ir or 

Repla

ceme

ntThis p

rojec

t will rep

lace a

llsingle ply

 roofi

ng an

d recon

struct a

nd ex

tend g

utter

s1,3

68,53

3         

Wate

r heater

s/boil

ers 

repair

/repla

ceThis p

rojec

t will rep

lace t

he ex

isting

 gas fire

d dom

estic

 wate

r heater

s, bo

iler a

nd pu

mps.

78,00

0               

Interi

or/Exte

rior P

aintin

gThis p

rojec

t will pe

rform

 life‐c

ycle paint

ing.

206,0

55            

Matt

hew 

Mau

ry

Build

ing En

velop

e Rep

air

Interi

or Ac

oustics/

Lighting

Page 49: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SITE SUMMARY:

Mount Vernon Community School is located on one of the oldest school sites in the city. The first Mount Vernon School was constructed in 1906 at the corner of Mount Vernon Avenue and Uhler Street, where the playground currently sits. The existing three-story building was originally opened in 1923, with classroom additions in 1941 and 1950. In 1967, a major addition doubled the size of the school and reoriented the main entrance to Commonwealth Avenue. The media center addition was constructed in 1991 and the City expanded and constructed the Mount Vernon Recreation Center adjacent to the school in 1997. This school serves grades K-5 and operates with a dual language learning program.

Mount Vernon Community School (K-5) 2601 Commonwealth AvenueAlexandria, VA 22305 Tel: 703-706-4460 | Fax: 703-706-4466 Principal: Liza Burrell-Aldanawww.acps.k12.va.us/mtvernon/

Community Use• Church rental• Girl Scout/Boy Scout programs• Recreation Department programs• Extended day care

Table 2. Actual and Projected Enrollment

Table 1

Mount Vernon Statistics

866 

903  910  915  925 949

 700

 750

 800

 850

 900

 950

 1,000

 1,050

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Mount Vernon Programmatic Capacity

Year Built 1923Age 93Site Area (in Sqft.) 112,730                   

Building Component Year CompletedRoof 2002Windows 1995HVAC 1997Elevator 2005Building Systems 2001*Playground 2005Building Additions 1967/91

*partial HVAC controls

Mount Vernon Statistics

Elementary Projects

Page 43 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

MOUNT VERNON COMMUNITY SCHOOL

Page 50: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Tabl

e 4

CIP

FY

2021

- 20

25

Elementary Projects

Page 44 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Prog

ram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

Building Envelope

 Rep

air

100,00

0           

100,00

0           

HVAC

 Rep

air o

r Re

placem

ent

330,00

0           

330,00

0           

Reno

vatio

ns & 

Reconfigurations

433,00

0           

433,00

0           

Storm water m

anagem

ent

350,00

0           

350,00

0           

Interio

r/Exterio

r Painting

206,00

0           

206,00

0           

780,00

0           

433,00

0           

206,00

0           

1,41

9,00

0       

Mou

nt 

Vernon M

ount Verno

n To

tal

Site

Progra

mPro

gram 

Detai

ls 20

2120

2220

2320

2420

25

Build

ing En

velop

e Rep

airTh

is proj

ect will i

nvest

igate/

desig

n drai

nage on

 the 

site.

100,0

00     

 

HVAC

 Repa

ir or 

Repla

cemen

tTh

is proj

ect will r

eplac

e insu

lation

 on ex

isting

 pipin

g an

d rep

lace t

he co

oling

 towe

r.33

0,000

      

Reno

vatio

ns & 

Reconfi

gurat

ions

This p

roject

 will u

pgrad

e the

 librar

y43

3,000

      

Storm

 wate

r man

agem

entTh

is proj

ect will r

e‐desi

gn an

d upg

rade t

he co

urtyard.

350,0

00     

 

Moun

t Ve

rnon

Page 51: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Patrick Henry School 4643 Taney Avenue Alexandria, VA 22304Tel: 703-461-4170 | Fax: 703-823-3350 Principal: Ingrid Bynumwww.acps.k12.va.us/henry/

Community Use• Extended day care • Church rentals• Recreation Department programs• Girl Scout/Boy Scout programs• Head Start

SITE SUMMARY:

Patrick Henry K-8 School and Recreation Center opened in January 2019 for all Patrick Henry students and the community. This school increased the Patrick Henry school size by about 50,000 square feet and added capacity for approximately 180 middle school students.

Following the School Board’s decision in April 2019 to use the old Patrick Henry building for Swing Space for Douglas MacArthur, ACPS has been working on renovation work to bring the old building up to a workable, temporary condition for MacArthur students and staff.

Table 2. Actual and Projected Enrollment

777 

883 929 

959 992 

1,025 

 500

 600

 700

 800

 900

 1,000

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Patrick Henry Programmatic Capacity

Year Built 1953Age 63Site Area (in Sqft.) 77,400                     

Building Component Year CompletedRoof 1999Windows 1994HVAC 1994Elevator 2002Building Systems 2001Playground 1997Building Additions 1955/96/2011

Patrick Henry Statistics

Elementary Projects

Page 45 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Table 1

Patrick Henry Statistics

PATRICK HENRY SCHOOL

Page 52: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Tabl

e 4

CIP

FY

2021

- 20

25

Elementary Projects

Page 46 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Prog

ram20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30Gr

and T

otal

Emerg

ency Ge

nerat

or30

0,000

         

300,0

00         

Furnitu

re, Fixtu

res & Eq

uip.

15,00

0            

15,00

0            

315,0

00         

315,0

00         

Patrick He

nry Patrick He

nry T

otal

SitePro

gram

Progra

m Deta

ils 202

1202

2202

3202

4202

5

Emerg

ency G

enerato

rThi

s proje

ct will in

stall a s

tandby

 genera

tor.

300,00

0      

     

Furnitu

re, Fixt

ures &

 Equ

ip.Thi

s proje

ct will f

und the

 purch

ase of 

a scisso

r lift.

15,000

            

 

Patrick

 Henry

Page 53: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SITE SUMMARY:

When it opened in fall 2000, Samuel Tucker Elementary School was the first new school built in the City of Alexandria in 30 years. It is located in the Cameron Station area of the city and is adjacent to the city’s Boothe Park and also to a nearby industrial area. This facility serves grades K-5 and operates on the modified school calen-dar.

Enrollment is expected to decrease with imple-mentation of the new boundaries; however, because the school is considered programmatic, it will take longer for enrollment to decrease here than at other schools.

Samuel W. Tucker Elementary School (K-5)435 Ferdinand Day DriveAlexandria, VA 22304 Tel: 703-933-6300 | Fax: 703-212-8465 Principal: Rene Paschalwww.acps.k12.va.us/tucker/

Community Use• Church rental• Girl Scout/Boy Scout programs• PTA Reflections Program• Recreation Department programs• Extended day care• Head Start

Table 2. Actual and Projected Enrollment

Table 1

Samuel Tucker Statistics

819 

767 

719  708  721 741

 550

 600

 650

 700

 750

 800

 850

 900

 950

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Samuel Tucker Programmatic Capacity

Elementary Projects

Page 47 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

SAMUEL W. TUCKER ELEMENTARY SCHOOL

Year Built 2000Age 16Site Area (in Sqft.) 80,180                     

Building Component Year CompletedRoof 2000Windows 2000HVAC 2000Elevator 2000Building Systems 2000Playground 2005Building Additions ‐

Samuel W. Tucker Statistics

Page 54: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30

Elementary Projects

Page 48 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Prog

ram20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30Gr

and T

otal

Building

 Envelop

e Rep

air16

,000

             

16,00

0             

HVAC

 Repair o

r Re

placeme

nt16

,280

             

16,28

0             

Interi

or walls 

modif

y/rep

air/re

place

40,00

0             

40,00

0             

Roof 

Repair o

r Re

placeme

nt1,3

90,00

0       

1,390

,000

       

Site H

ardsca

pe 

Repair/Re

placeme

nt14

7,000

           

98,00

0             

66,00

0             

11,00

0             

11,50

0             

12,00

0             

12,50

0             

358,0

00           

Interi

or/Exte

rior P

aintin

g12

9,000

           

129,0

00           

147,0

00          

1,504

,000

       

82,28

0             

51,00

0             

140,5

00          

12,00

0             

12,50

0             

1,949

,280

       

Samu

el Tu

cker 

Total

Samu

el Tu

cker

Page 55: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Elementary Projects

Page 49 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Program

Program Details 

2021

2022

2023

2024

2025

Build

ing E

nvelo

pe Rep

airThis project w

ill pe

rform

 necessary b

uildin

g en

velop

e rep

airs

16,00

0          

HVAC

 Rep

air or

 Re

placem

ent

This project w

ill repla

ce HVA

C equ

ipmen

t whic

h has 

reache

d the

 end o

f its life

‐cycle

.16

,280

          

Interio

r walls 

mod

ify/rep

air/rep

lace

This project w

ill pe

rform

 necessary interior

 wall 

mod

ificatio

ns, rep

airs o

r rep

lacem

ents.

40,00

0          

Roof Rep

air or

 Re

placem

ent

This project w

ill repla

ce bu

ilt‐up r

oofin

g, total roo

f.1,3

90,00

0    

Site H

ardscape

 Re

pair/

Replacem

ent

This project w

ill re‐pave h

ardscape

 areas.

147,0

00       

98,00

0          

66,00

0          

11,00

0          

11,50

0          

Interio

r/Exterio

r Pain

ting

This project w

ill pe

rform

 life‐cycle

 paint

ing.

129,0

00       

Samue

l Tu

cker

Page 56: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SITE SUMMARY:

The William Ramsay Elementary School, which serves grades Pre-K-5, was originally constructed in the west end of the City in 1958. In 1963, a three-story classroom addition was constructed. The multipurpose room/nature center addition opened in 1977, and there was a media center addition in 1990. The City Recreation Department constructed a new gymnasium/recreation center adjacent to the school in 2000. In 2002, the multi-purpose room was renovated to create additional classroom space and the city’s Jerome Buddie Ford Nature Center was expanded. This school is located adjacent to the City’s Dora Kelly Park. During FY 2015, construction to add two new el-evators and a lift were completed at this facility.

William Ramsay Elementary School (K-5)5700 Sanger AvenueAlexandria, VA 22311 Tel: 703-824-6950 | Fax: 703-379-7824 Principal: Michael Routhouskawww.acps.k12.va.us/ramsay/

Community Use• After-school Recreation program • Church rentals• Extended day care • Recreation Department programs• Girl Scout/Boy Scout programs• 21st Century program

Table 2. Actual and Projected Enrollment

675 652  644  658  654 

675 

 500

 550

 600

 650

 700

 750

 800

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

William Ramsay Programmatic Capacity

Elementary Projects

Page 50 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Table 1

William Ramsay Statistics

WILLIAM RAMSAY ELEMENTARY SCHOOL

Year Built 1958Age 58Site Area (in Sqft.) 87,650                     

Building Component Year CompletedRoof 2001Windows 1992HVAC 2005Elevator ‐Building Systems 2002Playground 2000Building Additions 1999/2004

William Ramsay Statistics

Page 57: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 3

CIP

FY

2021

- 20

30Elementary Projects

Page 51 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Progra

m20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30Gra

nd To

tal

Building

 Envel

ope R

epair

175,0

00     

       

175,0

00     

       

Interi

or Acou

stics/L

ightin

g98

,000

          

    98

,000

          

    

Roof 

Repair o

r Rep

lacem

ent

831,9

00     

       

831,9

00     

       

Site H

ardsca

pe 

Repair/R

eplac

emen

t74

,000

          

    74

,000

          

    

Kitche

n/ Cafet

eria r

enovati

on an

d rec

onfigura

tions

2,310

,000

         

2,310

,000

         

Interi

or/Ext

erior 

Paint

ing18

0,000

          

  18

0,000

          

  

905,9

00     

       

175,0

00     

       

2,310

,000

        

278,0

00     

       

3,668

,900

        

Willia

m Ra

msay

Willia

m Ra

msay 

Total

Page 58: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Elementary Projects

Page 52 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Site

Program

Program Details 

2021

2022

2023

2024

2025

Build

ing E

nvelo

pe Rep

airTh

is proje

ct will p

erform

 necessary b

uildin

g en

velop

e rep

airs.

175,0

00          

Interio

r Acoustics/Lig

hting

This proje

ct will improv

e the

 interio

r acoustic

s an

d/or lig

hting

 of th

e buil

ding.

98,00

0             

Roof Rep

air or

 Rep

lacem

ent

This proje

ct will r

epair

/repla

ce th

e roo

f.83

1,900

          

Site H

ardscape

 Rep

air/Rep

lacem

ent

This proje

ct will p

erform

 necessary s

ite 

hardscap

e rep

air work.

74,00

0             

Kitch

en/ C

afeteria reno

vatio

n and

 reconfigu

ratio

nsTh

is proje

ct fund

s kitc

hen u

pgrade

s as 

recommen

ded i

n the

 B&D

 assessmen

t.2,3

10,00

0       

Interio

r/Exterio

r Pain

ting

This proje

ct will p

erform

 life‐cycle

 paint

ing.

180,0

00          

William

 Ram

say

Page 59: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Table 1Francis Hammond Statistics

Year Built 1956Age 62Site Area (in Sqft.) 236,125

Building Component Year CompletedRoof 1991/2002Windows 1994/2002HVAC 2005/06Elevator 2002Building Systems 2003Playground/Field 2012Building Additions 1959/2002

F. C. Hammond Statistics

SITE SUMMARY:

Francis C. Hammond Middle School, which serves grades 6-8, opened in 1956 as a four-year high school. A major classroom and cafeteria addition was completed in 1959. In 1979, it began to function as a junior high school for grades 7-9. In 1993, the facility became a middle school for grades 6-8. A major reconstruction and classroom addition, which included additional science, music, art, computer and technical education classrooms and a gymnasium, was completed in 2002. An artificial turf field was completed in 2012. In 2019, ACPS parternered with the Washington Capitals to upgrade the hockey rink, which was completed in October 2019.

Francis C. Hammond Middle School (6-8) 4646 Seminary Road Alexandria, Virginia 22304 Tel: 703-461-4100 | Fax: 703-461-4111 Principal: Pierrette Peterswww.acps.k12.va.us/hammond/

Community Use• Church Rentals• Intramural Program• Recreation Department Programs• Tutorial Program

Table 2. Projected Enrollment and Capacity

1,470  1,447 1,524 

1,600  1,599  1,573 

 500

 700

 900

 1,100

 1,300

 1,500

 1,700

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Francis Hammond MS Programmatic Capacity

Secondary Projects

Page 53 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

FRANCIS C. HAMMOND MIDDLE SCHOOL

Page 60: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Site

Progra

m20

2120

2220

2320

2420

2520

2620

2720

2820

2920

30Gr

and T

otal

Building

 Envelop

e Rep

air40

,000

          

     40

,000

          

     

Code

 Comp

liance 

Requ

ireme

nts25

0,000

          

   25

0,000

          

   

Fire A

larm 

System

750,0

00     

        

750,0

00     

        

Floori

ng Re

pair/Re

place

82,00

0     

          

82,00

0     

          

HVAC

 Repair o

r Re

placem

ent

2,726

,696

          

189,5

55     

        

138,2

28     

        

3,054

,479

          

Interi

or Acou

stics/

Lighti

ng20

0,000

          

   20

0,000

          

   

Plumb

ing 

/Restr

oomU

pgrad

es15

0,000

          

   15

0,000

          

   

Reno

vation

s & 

Reconfi

gurat

ions

570,0

00     

        

2,556

,000

          

3,126

,000

          

Roof 

Repair o

r Rep

lacem

ent

905,0

00     

        

873,7

58     

        

1,778

,758

          

Site H

ardsca

pe 

Repair/Re

placem

ent

350,0

00     

        

350,0

00     

        

Storm

 water

 managem

ent

60,00

0     

          

60,00

0     

          

Interi

or/Ext

erior 

Paint

ing29

5,156

          

   29

5,156

          

   

4,883

,696

         

389,5

55     

        

138,2

28     

        

3,429

,758

         

1,295

,156

         

10,13

6,393

       

Franci

s C. 

Hamm

ond

Franci

s C. H

ammo

nd To

tal

Tabl

e 3

CIP

FY

2021

- 20

30Secondary Projects

Page 54 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 61: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Site

Program

Program Details 

2021

2022

2023

2024

2025

Build

ing E

nvelo

pe 

Repa

irThis project includ

es  cafeteria wind

ow re

placemen

t and

 mitigatio

n for water intru

sion in t

he stair

well 

and in g

ym.

40,00

0          

Flooring 

Repa

ir/Re

place

This project rep

laces th

e auxilia

ry gy

m flo

or.

82,00

0          

This project w

ill repla

ce HVA

C equ

ipmen

t whic

h has re

ache

d the

 end o

f its life

‐cycle

.2,6

86,69

6    

189,5

55        

138,2

28        

This project w

ill ins

tall c

hilled

 water pu

mp a

nd ex

haust fan

40,00

0          

Interio

r Ac

oustics/Ligh

ting

This project w

ill evalu

ate e

xistin

g system ad

equacy an

d provid

e sup

plemen

tal emergency ligh

ting u

nits.

200,0

00        

Plumbing

 /Restro

omUp

grad

esThis project w

ill reconstru

ct 2n

d floo

r toilet ro

oms in D

‐Wing

 and s

pot rep

air an

d refinish 1s

t floo

r toilet 

room

s.15

0,000

        

This project w

ill repair and r

econ

struct floo

r slab

 at ba

semen

t locker roo

m co

rrido

r, provide

 floor dr

ains 

and s

ump p

ump.

40,00

0          

This project w

ill alleviat

e basem

ent floo

ding from ex

terio

r wall at

 Stair

 9, insta

ll basem

ent w

ith 

waterproofing

 and F

rench d

rain,

 insta

ll mult

iple s

ump p

umps an

d draina

ge pr

icing.

500,0

00        

This project w

ill evalu

ate a

nd re

place electrical distrib

ution

 and installatio

n30

,000

          

This project w

ill reno

vate th

e aud

itoriu

m: finishes, seatin

g, lighting

 and H

VAC s

ystem.

2,000

,000

    This project w

ill repla

ce ce

iling finishes an

d wall pa

inting

 in th

e main

 wing

s; provide

 full p

aint, flo

or an

d ceilin

g at locer ro

om an

d basem

ent fitn

ess a

reas.

500,0

00        

This project w

ill repla

ce th

e obsole

te pa

nelbo

ards.

56,00

0          

This project w

ill repla

ce single ply

 SCO Whit

e EPD

M M

embrane r

oof.

873,7

58        

This project w

ill repla

ce D‐W

ing ro

of with

 whit

e EPD

M m

embrane r

oof.

905,0

00        

Site H

ardscape

 Re

pair/

Replacem

ent

This project w

ill regrade c

ourty

ards, create s

ubsurfa

ce storm dr

ain pipin

g and

 conn

ect to r

oof rain

 lea

ders,

 and install w

aterproo

fing a

nd fo

undatio

n drains

 at ba

semen

t wall.

350,0

00        

Storm water 

man

agem

ent

This project fun

ds m

ajor m

aintenance r

equir

ed on

 the t

ree b

ox filter B

MP.

60,00

0          

Fran

cis C.

 Ha

mmon

d

HVAC

 Rep

air or

 Re

placem

ent

Reno

vatio

ns & 

Reconfigu

ratio

ns

Roof Rep

air or

 Re

placem

ent

Secondary Projects

Page 55 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 62: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

George Washington Middle School1005 Mount Vernon Avenue Alexandria, Virginia 22301 Tel: 703-706-4500 | Fax: 703-706-4507 Principal: Jesse Mazurwww.acps.k12.va.us/washington/

Community Use• Head Start• Homework Help • Recreation Department Programs• Soccer & Tennis Clubs• Tutorial/Power Up • Vencedoras

SITE SUMMARY:

The George Washington Middle School, which serves grades 6-8, opened in 1935 as a four-year high school. A major classroom and cafeteria addition was completed in 1937. The GW An-nex building, which originally housed vocational classes, was constructed in 1941, and the GW gymnasium building was constructed in 1961. In 1979, GW was converted to a junior high school for grades 7-9. In 1993, this facility became a middle school for grades 6-8. A major reconstruc-tion and classroom addition, which interconnected all three buildings on campus, was completed in 2003. This addition/renovation included expanded science, computer, art, and technical education classrooms, as well as gymnasium facilities. The third floor was renovated in the summer of 2014 to convert office space previously held by central office into 6th grade classrooms.

Table 1George Washington Statistics

Table 2. Projected Enrollment and Capacity

Year Built 1935Age 83Site Area (in Sqft.) 237,332

Building Component Year CompletedRoof 1991/94/03Windows 2003HVAC 1997/2003/2012*Elevator 1988/2003Building Systems 2003Playground ‐Building Additions 1941/61/2003

*partial replacement

George Washington Statistics

1,393 1,531  1,513  1,505  1,503  1,535 

 ‐ 200 400 600 800

 1,000 1,200 1,400 1,600 1,800 2,000

FY 2018 FY 2020 FY 2022 FY 2024 FY 2026 FY 2028

George Washington MS Programmatic Capacity

Secondary Projects

Page 56 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

GEORGE WASHINGTON MIDDLE SCHOOL

Page 63: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Site

Prog

ram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d Total

Asbe

stos/Lead

 Paint

 Re

med

iation

350,0

00         

350,0

00         

Building

 Envelop

e Re

pair

400,0

00         

150,0

00         

550,0

00         

Code

 Compliance 

Requ

iremen

ts20

,000

           

35,00

0           

55,00

0           

Exterio

r Play

grou

nds o

r Sports Areas

2,500

,000

     

386,0

00         

2,886

,000

     

Fire A

larm Sy

stem

804,3

79         

804,3

79         

Flooring

 Re

pair/Re

place

700,0

00         

700,0

00         

HVAC

 Repair or 

Repla

cemen

t51

5,000

         

560,0

00         

1,075

,000

     

Plumbin

g /Restro

omUp

grades

15,00

0           

15,00

0           

Reno

vatio

ns & 

Reconfigu

ratio

ns55

8,000

         

558,0

00         

Roof Re

pair or 

Repla

cemen

t74

0,000

         

740,0

00         

Site H

ardscape

 Re

pair/Re

placemen

t17

2,000

         

119,0

00         

160,0

00         

55,00

0           

10,00

0           

516,0

00         

Water he

aters/bo

ilers 

repair/repla

ce20

0,000

         

200,0

00         

Interio

r/Exte

rior 

Paint

ing80

,000

           

70,00

0           

60,00

0           

210,0

00         

2,370

,000

     

4,194

,000

     

230,0

00         

515,0

00         

10,00

0           

386,0

00         

954,3

79         

8,659

,379

     

George

 Washin

gton

 Total

George

 Washin

gton

Tabl

e 3

CIP

FY

2021

- 20

30Secondary Projects

Page 57 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 64: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Site

Program

Program Details 

2021

2022

2023

2024

2025

Asbe

stos/Lead Pa

int 

Remed

iatio

nThis project w

ill co

nduct b

asem

ent A

CM and

 mold testing and mitigatio

n, inclu

ding

 repaintin

g.35

0,00

0          

Build

ing En

velope

 Rep

air

This project w

ill re

place historic windo

ws a

long

 western façade

 of B

uilding A.

400,00

0          

This project w

ill install new

 safety ladd

ers a

nd ro

of hatches.

20,000

            

This project w

ill clean, inspect a

nd te

st equ

ipmen

t exposed

 to deterioratin

g agen

ts.

35,000

            

Exterio

r Playgroun

ds or 

Sports Areas

This project include

s track & field im

provem

ents.

2,50

0,00

0       

Floo

ring Re

pair/

Replace

This project w

ill re

move carpets a

nd old floo

ring and install new

 resilient floo

ring in all 

classroom

s.70

0,00

0          

This project w

ill re

place HV

AC equ

ipmen

t which has re

ache

d the en

d of its life

‐cycle.

560,00

0          

This project w

ill provide

 ven

tilation air to cla

ssroom

s A16

0‐A1

65 from

 existing air 

hand

ling un

its as w

ell as the

 existing chiller th

at is not ope

ratio

nal.

315,00

0          

This project w

ill re

place HV

AC equ

ipmen

t which has re

ache

d the en

d of its life

‐cycle 

install piping insulatio

n and HV

AC co

ntrolls

200,00

0          

Plum

bing

 /Restroo

mUp

grad

esThis project w

ill re

place the existing sump pu

mp in th

e mechanical equ

ipmen

t roo

m.

15,000

            

Reno

vatio

ns & 

Reconfigurations

This project w

ill perform

 reno

vatio

n work to 3rd floo

r classroom

s including

 floo

ring.

558,00

0          

Roof Rep

air o

r Re

placem

ent

This project w

ill re

place the roof over the

 library.

740,00

0          

Site Hardscape

 Re

pair/

Replacem

ent

This project w

ill re

pair the existing parking lot.

172,00

0          

119,00

0          

160,00

0          

55,000

            

10,000

            

This project w

ill re

place HV

AC equ

ipmen

t which has re

ache

d the en

d of its life

‐cycle.

100,00

0          

This project w

ill re

place HV

AC equ

ipmen

t which has re

ache

d the en

d of its u

seful life

.10

0,00

0          

Interio

r/Exterio

r Painting

This project w

ill perform

 life‐cycle painting.

80,000

            

70,000

            

60,000

            

Code

 Com

pliance 

Requ

iremen

ts

HVAC

 Rep

air o

r Re

placem

ent

Water heaters/boilers 

repa

ir/replace

George

 Washington

Secondary Projects

Page 58 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 65: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

T. C. Williams, Minnie Howard Campus 3801 West Braddock Road Alexandria, Virginia 22302 Tel: 703-824-6750 | Fax: 703-824-6781 Principal: Peter Balas ww.acps.k12.va.us/tcw/

Community Use• Church Rentals• Intramurals Program • Recreation Department Programs

SITE SUMMARY:

The Minnie Howard School building, which houses all students in grade nine except the students enrolled in the International Academy, was origi-nally constructed in 1954 as an elementary school. There was a major classroom and gymnasium addition in 1969 when it was converted to a middle school. The facility served as the central admin-istrative offices from 1981 to 1993, when it was renovated and became the Ninth Grade Center. It is now the Minnie Howard campus of T.C. Williams High School.

CAPACITY:Based on the School Board’s vote for one high school with a maximum build at Minnie Howard, a capacity project is proposed for this site through The High School Project line item. This project is

projected to double the existing existing capac-ity and building size at Minnie Howard. ACPS is currently in the pre-design phase, but the project is expected to be a complete tear-down and re-build of the Minnie Howard site.

Table 1

TC Williams Minnie Howard Statistics

Table 2. Projected Enrollment and Capacity

Year Built 1954Age 62Site Area (in Sqft.) 130,435

Building Component Year CompletedRoof 1988/2004Windows 1996HVAC 2009/2010Elevator 1993Building Systems 1993Playground ‐Building Additions 1955/69

TC Williams: Minnie Howard Campus 

849 

972  982 

1,082  1,086 1,130 

 400

 500

 600

 700

 800

 900

 1,000

 1,100

 1,200

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

Minnie Howard Campus Programmatic Capacity

Secondary Projects

Page 59 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

TC WILLIAMS: MINNIE HOWARD

Page 66: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Year Built 2007Age 11Site Area (in Sqft.) 461,147

Building Component Year CompletedRoof 2007Windows 2007HVAC 2007Elevator 2007Building Systems 2007Playground ‐Building Additions ‐

TC Williams: King Street Campus Statistics

T. C. Williams High School 3330 King Street Alexandria, Virginia 22302 Tel: 703-824-6800 | Fax: 703-824-6826 Principal: Peter Balaswww.acps.k12.va.us/tcw/

Community Use• Head Start• Public Meetings

SITE DESCRIPTION:

TC Williams High School is Alexandria’s only public high school, which serves grade levels 10-12. This state of the art facility opened in fall 2007 to staff and students. The new facility provides smaller learning communities as well as flexible academic space capable of meeting the evolv-ing secondary school curriculum requirements. This school includes an artificial turf sports field, stadium and a two story parking garage. This school was constructed under LEED guidelines as a green campus and was awarded a LEED Gold rating.

Design for the stadium project is moving forward and will include the bleachers, lighting, press box, concessions, ticket booth, track and the field.

CAPACITY:Relocatable classrooms were put on the site in the summer of 2017 to add space.

A capacity project is proposed for high school through The High School Project budget line item to relieve capacity at the King Street campus.

Table 1

TC Williams Statistics

Table 2. Projected Enrollment and Capacity

3,110  3,200 3,531  3,713  3,901  4,063 

 ‐

 500

 1,000

 1,500

 2,000

 2,500

 3,000

 3,500

 4,000

 4,500

FY 2019 FY 2021 FY 2023 FY 2025 FY 2027 FY 2029

T.C. Williams HS Programmatic Capacity

Secondary Projects

Page 60 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

TC WILLIAMS: KING STREET

Page 67: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Site

Prog

ram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

Exterio

r Lighting/Signage

13,875

           

13,875

           

Exterio

r Playgroun

ds or 

Sports Areas

660,16

5         

660,16

5         

HVAC

 Rep

air o

r Re

placem

ent

238,65

8         

238,65

8         

Interio

r Acou

stics

/Lighting

1,89

6,78

0      

1,89

6,78

0      

Site Hardscape

 Re

pair/Re

placem

ent

60,000

           

690,00

0         

750,00

0         

Interio

r/Exterio

r Painting

350,00

0         

350,00

0         

720,16

5         

2,83

9,31

3      

350,00

0         

3,90

9,47

8      

T.C. W

illiams 

King

 Stree

t Ca

mpu

s

T.C. W

illiams K

ing Street Cam

pus T

otal

Tabl

e 3

CIP

FY

2021

- 20

30

Secondary Projects

Page 61 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 68: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Tabl

e 4

PRO

GR

AM

DET

AIL

S FY

202

1 - 2

025

Site

Program

Program Details 

2021

2022

2023

2024

2025

Exterio

r Ligh

ting/Sig

nage

This proje

ct will r

eplac

e elec

tronic

 signage.

13,87

5             

Exterio

r Play

grou

nds o

r Sports Areas

This proje

ct fund

s add

ition

al ne

eds b

ased

 on co

st escalat

ions for th

e sta

dium pr

oject.

660,1

65           

HVAC

 Repa

ir or 

Repla

cemen

tThis proje

ct will r

eplac

e HVA

C equ

ipmen

t whic

h has re

ache

d the

 end 

of its

 life‐cycle

.23

8,658

           

Interior

 Acoustics/Lig

hting

This proje

ct will r

eplac

e stage lig

hting

 equip

men

t, audio

 visual 

proje

ctor system, and

 scho

ol sta

ge au

dio eq

uipmen

t.1,8

96,78

0        

Site H

ardscape

 Re

pair/

Repla

cemen

tThis proje

ct fund

s design

 work for pa

rking

 garage up

grades.

60,00

0             

690,0

00           

Interior

/Exterior

 Paint

ingThis proje

ct will p

erform

 life‐cycle

 paint

ing.

350,0

00           

T.C. W

illiam

s Kin

g Stre

et 

Campu

s

Secondary Projects

Page 62 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 69: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SUMMARY:

These projects provide for the replacement and modernization of the architectural building systems at all school facilities in the Alexandria City Public Schools Division.

DESCRIPTION:This funding can be used at any facility in the ACPS system, on an as-needed basis. Funding

of these projects is key to implementation of a system-wide master key system and enhancing access control to ensure the safety and security of ACPS’s students and staff. An assessment of the security status of ACPS facilities was completed in FY 2018 and funds were adjusted in this proposed budget to reflect the recommendations of this as-sessment along with a prioritization of facilities as well as actual costs.

Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total

Access Control and Security Management

1,400,000         975,321             581,575             847,419             3,804,315        

Placeholder for Non‐Capacity projects pending assessments

3,000,000         3,000,000         3,000,000         3,000,000         3,000,000         3,000,000         18,000,000      

Technology Modernization 371,315             393,928             417,918             1,183,161        

1,400,000         1,346,636         581,575             1,241,347         3,000,000         3,417,918         3,000,000         3,000,000         3,000,000         3,000,000         22,987,476      

Building System Upgrades and Modernization

Building System Upgrades and Modernization Total

Table 1

CIP FY 2021 - 2030

Table 2

CIP DETAILS FY 2021 - 2025

Division & School-Wide Projects

SCHOOL-WIDE PROJECTS: BUILDING SYSTEMS UPGRADES & MODERNIZATION

Site Program Program Details 2021 2022 2023 2024 2025

This project enhances security at TC Williams, including secure vestibule, camera upgrades and access control. 1,400,000      

This project enhances security at George Washington and Francis C. Hammond.975,321         

This project enhances security at WR, MM, CK, and LC.581,575         

This project enhances security at CB, JH, MV, and ST.847,419         

Placeholder for Non‐Capacity projects pending assessments

Placeholder for Non‐Capacity projects pending assessments3,000,000      

Technology ModernizationThis project funds incremental upgrades and replacement of school integrated 

audio visual systems and other technology as needed. 371,315          393,928         

Building System Upgrades and Modernization

Access Control and Security Management

Page 63 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 70: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SUMMARY:

These projects provide for expansion of school capacity due to enrollment increases at all grade levels. Sites for swing space and additional capacity are currently under review.

DESCRIPTION:

This funding will be used with the approval of the School Board, City Council, and the City Planning Commission on expansion of current buildings

and construction of new facilities. In alignment with the first deliverable recommendations of the Ad-Hoc Joint City-Schools Facilities Investment Task Force, ACPS is proposing funds for new high school construction. The estimate included is based on the School Board’s vote to maintain one high school, or a connected high school network with a new facility at Minnie Howard. This category also includes a new school in the out years to accommodate growth.

Table 1CIP FY 2021 - 2030

Division & School-Wide Projects

SCHOOL-WIDE PROJECTS: CAPACITY

Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total

High School Project

Hard costs for a new high school

103,712,469         54,503,900           158,216,369        

103,712,469         54,503,900           158,216,369        High School Project Total

Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total

Construction of Renovation & Capacity

45,433,524        45,433,524       

Design, Project Management & Other Soft Costs

11,358,381        11,358,381       

11,358,381       45,433,524       56,791,906      

New School

New School Total

Page 64 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 71: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SUMMARY:

This project provides for division-wide renova-tion projects. This includes unanticipated and emergency renovations, asbestos removal, and instructional environment upgrades at existing school facilities throughout the school system.

DESCRIPTION:

This funding can be used for renovations at any facility in the ACPS system on an as-needed basis. This funding is also used for asbestos removal on an as-needed basis and for upgrades to the instructional environment.

Table 1

CIP FY 2021 - 2030

Division & School-Wide Projects

SCHOOL-WIDE PROJECTS: SYSTEM-WIDE

Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total

Asbestos/Lead Paint Remediation

66,950                68,959                71,027                73,158                75,353                77,613                79,942                82,340                84,810                87,355                767,507             

Code Compliance Requirements

378,750              132,613              136,591              140,689              144,909              149,257              153,734              158,346              163,097              167,990              1,725,974         

Emergency Repairs 772,500              795,675              819,545              844,132              869,456              895,539              922,405              950,078              978,580              1,007,937          8,855,847         

Exterior Playgrounds or Sports Areas 165,000              165,000              330,000             

Furniture, Fixtures & Equip. 154,500              159,135              163,909              168,826              173,891              179,108              184,481              190,016              195,716              201,587              1,771,169         

HVAC Repair or Replacement

77,250                79,568                81,955                84,413                86,946                89,554                92,241                95,008                97,858                100,794              885,585             

Project Planning 412,000              424,360              437,091              450,204              463,710              477,621              491,950              506,708              521,909              537,567              4,723,118         

Renovations & Reconfigurations

128,750              132,613              136,591              140,689              144,909              149,257              153,734              158,346              163,097              167,990              1,475,974         

Site Hardscape Repair/Replacement

20,600                21,218                21,855                22,510                23,185                23,881                24,597                25,335                26,095                26,878                236,156             

Curriculum & Instruction Materials

1,089,885          929,940              985,550              1,071,420          1,172,880          452,250              1,000,000          1,000,000          1,000,000          1,000,000          9,701,925         

Contract and/or Direct Employee Support 500,000              500,000              500,000              500,000              500,000              500,000              500,000              500,000              500,000              500,000              5,000,000         

3,766,185          3,409,080          3,354,113          3,496,040          3,655,239          2,994,079          3,603,085          3,666,177          3,731,162          3,798,097          35,473,256       System‐Wide Total

System‐Wide

Page 65 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 72: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Rowing Facility#1 Madison StreetAlexandria, VA 22314

Community Use• Alexandria City Community Rowing Association• Crew Boosters Association• Community Rentals

SITE SUMMARY:

The Alexandria Schools’ Rowing Facility is located on the Potomac River at the foot of Madison Street. This facility opened in 1986 and serves the school division’s rowing program for secondary students as well as the Alexandria City Community Rowing Association and the Crew Boosters Association.

DESCRIPTION:

Several projects have been completed in recent years, including dock replacement, new lighting systems, and a custom built boat storage system that was installed for safer and more efficient use along with new siding replacement.

Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total

Site Hardscape Repair/Replacement 62,000             50,500             11,000             11,500             15,000             16,000             16,000             182,000          

Interior/Exterior Painting 350,000           350,000          

62,000             400,500           11,000             11,500             15,000             16,000             16,000             532,000          

Rowing Facility

Rowing Facility Total

Table 1

CIP FY 2021 - 2030

Division & School-Wide Projects

SCHOOL-WIDE PROJECTS: ROWING FACILITY

Page 66 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 73: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

SUMMARY:

This project provides for the phased replacement of older school buses as well as the phased replacement of other school vehicles.

DESCRIPTION:

The current school bus fleet consists of vehicles ranging in age from one to fifteen years. The average life expectancy of a school bus is dependent on mileage, maintenance and repairs, but is recommended to be twelve years for a conventional school bus. Funding is also included for replacement of vehicles on a phased basis which started in 2017. Many vehicles in the fleet are or are approaching over 15 years old. This includes maintenance trucks, tractors, vans, security vehicles and passenger vehicles. Additional buses are included for growing enrollment in the school division. The existing Transportation Facility requires upgrades to meet

the growing enrollment and, therefore, staff.

Renovation of the facility is proposed for FY 2022 to accommodate for the Witter Wheeler Campus Master Plan being conducted jointly with the City of Alexandria’s Department of General Services and other departments. Expansion of the parking for buses will need to be considered as part of this project.

Interim needs were identified in the Targeted Facilities Conditions Assessments and are proposed accordingly in the CIP.

Table 1

CIP FY 2021 - 2030

Division & School-Wide Projects

DIVISION-WIDE PROJECTS: TRANSPORTATION SERVICES

Site Program 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Grand Total

HVAC Repair or Replacement

210,000             210,000            

Roof Repair or Replacement

475,000             475,000            

School bus replacement 1,236,000         1,273,080         764,909             1,350,611         1,391,129         1,432,863         1,475,849         1,520,124         1,565,728         1,612,700         13,622,991      

School vehicle replacement

115,000             115,000             115,000             115,000             115,000             115,000             690,000            

School bus new 381,924             405,183             429,859             456,037             483,810             2,156,813        

Transportation Facility Modernization

6,710,000         6,710,000        

2,036,000         8,480,004         879,909             1,755,794         1,506,129         1,862,722         1,590,849         1,976,161         1,680,728         2,096,510         23,864,804      

Transportation Services

Transportation Services Total

Page 67 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 74: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting Data

SUPPORTING DATA

Three sections are included in this supporting data section: Enrollment Projection information, Useful Definitions, and Detailed Tables.

ENROLLMENT PROJECTIONS

ActuAl Student enrollment

As of September 30, 2019, ACPS PK-12th grade student enrollment was 16,062, an increase of 325 students and a growth rate of 2.1% from last year. Enrollment continues to grow; however, not at the higher rates experienced in recent years.

Projection ProceSS

ACPS enrollment forecasts are prepared each fall, by school and by grade for ten years and used both to prepare the annual operating and capital budgets for the school division. The actual October 1 enrollment count is the basis from which projections are developed.

To develop kindergarten enrollment projections, staff conducts an annual review of birth data collected by the Virginia Department of Health. These are births to mothers living in Alexandria, no matter where the actual birth takes place. This number is compared with the actual number of kindergarteners enrolled in ACPS. A ratio is calculated, averaged, and applied to future years to estimate the number of future kindergarteners.

For the other grades, a cohort survival method is used. This tracks the number of students moving from grade level to grade level at each school, each year. Cohort survival ratios are calculated, averaged, and applied to future years to estimate the number of 1st-12th-grade students.

ACPS has worked closely with the City Planning and Zoning staff to develop these estimates. The group is studying major factors that affect student enrollment and plan to monitor trends in order to develop more accurate forecasting models to capture the impact of development.

This collaboration will continue to support the refinement of enrollment projections by ACPS and improved estimates of the impact of development projects by the City’s Department of Planning and Zoning.

enrollment ProjectionS

Upon School Board Adoption of the FY 2021 - 2030 CIP, ACPS will incorporate the final enrollment projections into the CIP book. Staff anticipate a presentation of enrollment projections at one of the School Board’s CIP work sessions.

CIP DETAILS

A complete detailed list of the Superintendent’s Proposed FY 2021- 2030 CIP projects is inlcuded on the following pages.

Page 68 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 75: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting DataTa

ble

1: C

IP

Site

Program

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d Total

Access Co

ntrol and

 Security M

anagem

ent

1,400

,000

        

975,3

21           

581,5

75           

847,4

19           

3,804

,315

        

Techno

logy M

oderniz

ation

371,3

15           

393,9

28           

417,9

18           

1,183

,161

        

Placeho

lder for Non

‐Capacity

 proje

cts pe

nding

 assessmen

ts3,0

00,00

0        

3,000

,000

        

3,000

,000

        

3,000

,000

        

3,000

,000

        

3,000

,000

        

18,00

0,000

      

1,400

,000

        

1,346

,636

        

581,5

75           

1,241

,347

        

3,000

,000

        

3,417

,918

        

3,000

,000

        

3,000

,000

        

3,000

,000

        

3,000

,000

        

22,98

7,476

      

Elevator rep

air/re

placemen

t10

6,000

           

106,0

00           

Exterio

r Play

grou

nds o

r Spo

rts Areas

50,00

0              

50,00

0              

Flooring

 Repair/Re

place

175,0

00           

175,0

00           

HVAC

 Repair or Re

placemen

t1,2

00,00

0        

1,200

,000

        

Kitchen

/ Cafeteria reno

vatio

n and

 reconfigu

ratio

ns81

0,394

           

810,3

94           

Interior

/Exte

rior P

aintin

g88

,555

              

88,55

5              

106,0

00           

1,375

,000

        

50,00

0            

 81

0,394

           

88,55

5            

 2,4

29,94

9        

Building

 Envelop

e Rep

air60

,000

              

60,00

0              

Desig

n, Proje

ct Managem

ent &

 Other So

ft Co

sts7,5

56,82

2        

7,556

,822

        

Constru

ction

 of Re

novatio

n & Ca

pacity

30,22

7,289

      

30,22

7,289

      

Elevator rep

air/re

placemen

t15

0,000

           

150,0

00           

HVAC

 Repair or Re

placemen

t75

,000

              

438,0

00           

513,0

00           

Interior

 Acoustics/L

ightin

g75

,000

              

75,00

0              

Plumbin

g /Re

stroo

mUp

grades

150,0

00           

45,00

0              

195,0

00           

Reno

vatio

ns & Re

configu

ratio

ns10

,000

              

19,50

0              

29,50

0              

385,0

00           

573,0

00           

64,50

0            

 7,5

56,82

2        

30,22

7,289

      

38,80

6,611

      

Douglas

 MacArthur

Desig

n, Proje

ct Managem

ent &

 Other So

ft Co

sts; 

Constru

ction

 of Re

novatio

n & Ca

pacity

69,43

3,250

      

69,43

3,250

      

69,43

3,250

      

69,43

3,250

      

Build

ing 

Syste

Upgrad

es an

d Mod

erniz

ation

Build

ing Sy

stem Upgrade

s and

 Mod

erniz

ation

 Total

Charles

 Barre

tt

Charles

 Barre

tt To

tal

Cora Ke

lly

Cora Ke

lly To

tal

Douglas

 MacArthur To

tal

Page 69 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 76: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting DataTa

ble

1: C

IPSit

eProgram

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d Total

Constru

ction

 of Re

novatio

n & Ca

pacity

496,7

41           

496,7

41           

Site H

ardscape

 Repair/Re

placemen

t70

,000

              

830,0

00           

900,0

00           

566,7

41           

830,0

00           

1,396

,741

        

Building

 Envelop

e Rep

air40

,000

              

40,00

0              

Code

 Compliance Re

quire

men

ts25

0,000

           

250,0

00           

Fire A

larm Sy

stem

750,0

00           

750,0

00           

Flooring

 Repair/Re

place

82,00

0              

82,00

0              

HVAC

 Repair or Re

placemen

t2,7

26,69

6        

189,5

55           

138,2

28           

3,054

,479

        

Interio

r Acoustics/Lig

hting

200,0

00           

200,0

00           

Plumbin

g /Re

stroo

mUp

grades

150,0

00           

150,0

00           

Reno

vatio

ns & Re

configu

ratio

ns57

0,000

           

2,556

,000

        

3,126

,000

        

Roof Re

pair or Re

placemen

t90

5,000

           

873,7

58           

1,778

,758

        

Site H

ardscape

 Repair/Re

placemen

t35

0,000

           

350,0

00           

Storm water m

anagem

ent

60,00

0              

60,00

0              

Interio

r/Exte

rior P

aintin

g29

5,156

           

295,1

56           

4,883

,696

        

389,5

55           

138,2

28           

3,429

,758

        

1,295

,156

        

10,13

6,393

      

Building

 Envelop

e Rep

air60

,000

              

60,00

0              

Desig

n, Proje

ct Managem

ent &

 Other So

ft Co

sts13

,599,4

67      

13,59

9,467

      

Constru

ction

 of Re

novatio

n & Ca

pacity

27,19

8,934

      

27,19

8,934

      

54,39

7,867

      

Elevator rep

air/re

placemen

t20

0,000

           

200,0

00           

Plumbin

g /Re

stroo

mUp

grades

15,00

0              

15,00

0              

Roof Re

pair or Re

placemen

t20

5,000

           

205,0

00           

280,0

00           

200,0

00           

13,59

9,467

      

27,19

8,934

      

27,19

8,934

      

68,47

7,334

      

Fran

cis C.

 Ham

mon

d Total

George

 Mason

George

 Mason

 Total

Ferdina

nd T.

 Da

y

Ferdina

nd T.

 Day To

tal

Fran

cis C.

 Ha

mmon

d

Page 70 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 77: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting DataTa

ble

1: C

IP

Site

Program

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

Asbe

stos/Lead Paint R

emed

iatio

n35

0,00

0           

350,00

0           

Building Envelope

 Rep

air

400,00

0           

150,00

0           

550,00

0           

Code

 Com

pliance Re

quire

men

ts20

,000

              

35,000

              

55,000

              

Exterio

r Playgroun

ds or S

ports A

reas

2,50

0,00

0        

386,00

0           

2,88

6,00

0        

Fire Alarm

 System

804,37

9           

804,37

9           

Floo

ring Re

pair/Re

place

700,00

0           

700,00

0           

HVAC

 Rep

air o

r Rep

lacemen

t51

5,00

0           

560,00

0           

1,07

5,00

0        

Plum

bing

 /Restroo

mUp

grades

15,000

              

15,000

              

Reno

vatio

ns & Recon

figurations

558,00

0           

558,00

0           

Roof Rep

air o

r Rep

lacemen

t74

0,00

0           

740,00

0           

Site Hardscape

 Rep

air/Re

placem

ent

172,00

0           

119,00

0           

160,00

0           

55,000

              

10,000

              

516,00

0           

Water heaters/boilers re

pair/replace

200,00

0           

200,00

0           

Interio

r/Exterio

r Painting

80,000

              

70,000

              

60,000

              

210,00

0           

2,37

0,00

0        

4,19

4,00

0        

230,00

0           

515,00

0           

10,000

            

 38

6,00

0           

954,37

9           

8,65

9,37

9        

High

 Schoo

l Project

Hard co

sts for a new

 high scho

ol10

3,71

2,46

9    

54,503

,900

      

158,21

6,36

9    

103,71

2,46

9    

54,503

,900

      

158,21

6,36

9    

Building Envelope

 Rep

air

21,312

              

21,312

              

Exterio

r Playgroun

ds or S

ports A

reas

250,00

0           

250,00

0           

Floo

ring Re

pair/Re

place

167,17

5           

167,17

5           

Interio

r walls mod

ify/rep

air/replace

122,00

0           

122,00

0           

Plum

bing

 /Restroo

mUp

grades

36,635

              

36,635

              

Reno

vatio

ns & Recon

figurations

350,00

0           

350,00

0           

Roof Rep

air o

r Rep

lacemen

t1,47

0,00

0        

1,47

0,00

0        

Storm water m

anagem

ent

47,000

              

47,000

              

Kitche

n/ Cafeteria re

novatio

n and reconfigurations

1,77

1,68

7        

1,77

1,68

7        

Interio

r/Exterio

r Painting

111,00

0           

111,00

0           

814,17

5           

158,63

5           

1,58

1,00

0        

1,77

1,68

7        

21,312

            

 4,34

6,80

9        

High

 Schoo

l Project Total

James K. P

olk

James K. P

olk To

tal

George

 Washington

George

 Washington To

tal

Page 71 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 78: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting DataTa

ble

1: C

IPSite

Program

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Grand

 Total

HVA

C Re

pair or Rep

lacemen

t75

0,00

0           

750,00

0           

Storm water m

anagem

ent

10,000

              

10,000

              

20,000

              

750,00

0           

10,000

             

10,000

             

770,00

0           

Ceiling

 repair/replace

510,50

0           

510,50

0           

Roof Rep

air o

r Rep

lacemen

t1,50

0,00

0        

1,50

0,00

0        

Site Hardscape

 Rep

air/Re

placem

ent

123,00

0           

154,00

0           

11,000

              

11,500

              

27,000

              

326,50

0           

Storm water m

anagem

ent

30,000

              

150,00

0           

180,00

0           

Interio

r/Exterio

r Painting

180,00

0           

332,00

0           

512,00

0           

1,65

3,00

0        

814,50

0           

11,000

             

191,50

0           

359,00

0           

3,02

9,00

0        

Building Envelope

 Rep

air

740,00

0           

740,00

0           

Exterio

r Playgroun

ds or S

ports A

reas

61,050

              

139,86

0           

200,91

0           

Floo

ring Re

pair/Re

place

300,00

0           

517,90

1           

817,90

1           

Interio

r Acoustics/Lightin

g45

7,48

0           

457,48

0           

Reno

vatio

ns & Recon

figurations

58,308

              

58,308

              

Site Hardscape

 Rep

air/Re

placem

ent

112,50

0           

90,000

              

22,000

              

22,500

              

15,000

              

262,00

0           

Kitche

n/ Cafeteria re

novatio

n and reconfigurations

1,09

4,83

8        

1,09

4,83

8        

Interio

r/Exterio

r Painting

82,056

              

82,056

              

2,30

8,38

8        

1,06

5,38

1        

220,16

8           

22,500

             

15,000

             

82,056

             

3,71

3,49

3        

Building Envelope

 Rep

air

100,00

0           

1,40

0,00

0        

1,50

0,00

0        

Code

 Com

pliance Re

quire

men

ts30

0,00

0           

250,00

0           

550,00

0           

Desig

n, Project M

anagem

ent &

 Other Soft C

osts

6,06

7,60

1        

6,06

7,60

1        

Fire Alarm

 System

150,00

0           

150,00

0           

Floo

ring Re

pair/Re

place

250,00

0           

250,00

0           

Interio

r Acoustics/Lightin

g75

,000

              

91,383

              

166,38

3           

Plum

bing

 /Restroo

mUpgrade

s25

,000

              

25,000

              

Roof Rep

air o

r Rep

lacemen

t1,36

8,53

3        

1,36

8,53

3        

Water heaters/boilers re

pair/replace

78,000

              

25,000

              

103,00

0           

Interio

r/Exterio

r Painting

206,05

5           

206,05

5           

1,46

8,53

3        

2,12

8,00

0        

91,383

             

206,05

5           

425,00

0           

6,06

7,60

1        

10,386

,572

      

Lyles‐Crou

ch

Lyles‐Crou

ch Total

Matthew

 Mau

ry

Matthew

 Mau

ry Total

Jeffe

rson

‐Ho

uston

Jeffe

rson

‐Hou

ston

 Total

John

 Ada

ms

John

 Ada

ms T

otal

Page 72 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 79: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting DataTa

ble

1: C

IP

Site

Program

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d Total

Building

 Envelop

e Rep

air10

0,000

           

100,0

00           

HVAC

 Repair or Re

placemen

t33

0,000

           

330,0

00           

Reno

vatio

ns & Re

configu

ratio

ns43

3,000

           

433,0

00           

Storm water m

anagem

ent

350,0

00           

350,0

00           

Interio

r/Exte

rior P

aintin

g20

6,000

           

206,0

00           

780,0

00           

433,0

00           

206,0

00           

1,419

,000

        

Desig

n, Pr

oject Managem

ent &

 Other So

ft Co

sts11

,358,3

81      

11,35

8,381

      

Constru

ction

 of Re

novatio

n & Ca

pacity

45,43

3,524

      

45,43

3,524

      

11,35

8,381

      

45,43

3,524

      

56,79

1,906

      

Emergency G

enerator

300,0

00           

300,0

00           

Furnitu

re, Fixtures & Eq

uip.

15,00

0              

15,00

0              

315,0

00           

315,0

00           

Site H

ardscape

 Repair/Re

placemen

t62

,000

              

50,50

0              

11,00

0              

11,50

0              

15,00

0              

16,00

0              

16,00

0              

182,0

00           

Interio

r/Exte

rior P

aintin

g35

0,000

           

350,0

00           

62,00

0            

 40

0,500

           

11,00

0            

 11

,500

            

 15

,000

            

 16

,000

            

 16

,000

            

 53

2,000

           

Building

 Envelop

e Rep

air16

,000

              

16,00

0              

HVAC

 Repair or Re

placemen

t16

,280

              

16,28

0              

Interio

r walls m

odify/re

pair/repla

ce40

,000

              

40,00

0              

Roof Re

pair or Re

placemen

t1,3

90,00

0        

1,390

,000

        

Site H

ardscape

 Repair/Re

placemen

t14

7,000

           

98,00

0              

66,00

0              

11,00

0              

11,50

0              

12,00

0              

12,50

0              

358,0

00           

Interio

r/Exte

rior P

aintin

g12

9,000

           

129,0

00           

147,0

00           

1,504

,000

        

82,28

0            

 51

,000

            

 14

0,500

           

12,00

0            

 12

,500

            

 1,9

49,28

0        

Mou

nt Verno

n Total

New Scho

ol

New Scho

ol To

tal

Patrick Hen

ry

Patrick Hen

ry To

tal

Mou

nt Verno

n

Rowing

 Facility

Rowing

 Facility

 Total

Samue

l Tucker

Samue

l Tucker T

otal

Page 73 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 80: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting DataTa

ble

1: C

IP

Site

Program

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

Asbe

stos/Lead Paint R

emed

iatio

n66

,950

              

68,959

              

71,027

              

73,158

              

75,353

              

77,613

              

79,942

              

82,340

              

84,810

              

87,355

              

767,50

7           

Code

 Com

pliance Re

quire

men

ts37

8,75

0           

132,61

3           

136,59

1           

140,68

9           

144,90

9           

149,25

7           

153,73

4           

158,34

6           

163,09

7           

167,99

0           

1,72

5,97

4        

Emergency R

epairs

772,50

0           

795,67

5           

819,54

5           

844,13

2           

869,45

6           

895,53

9           

922,40

5           

950,07

8           

978,58

0           

1,00

7,93

7        

8,85

5,84

7        

Exterio

r Playgroun

ds or S

ports A

reas

165,00

0           

165,00

0           

330,00

0           

Furnitu

re, Fixtures & Equ

ip.

154,50

0           

159,13

5           

163,90

9           

168,82

6           

173,89

1           

179,10

8           

184,48

1           

190,01

6           

195,71

6           

201,58

7           

1,77

1,16

9        

HVAC

 Rep

air o

r Rep

lacemen

t77

,250

              

79,568

              

81,955

              

84,413

              

86,946

              

89,554

              

92,241

              

95,008

              

97,858

              

100,79

4           

885,58

5           

Project P

lann

ing

412,00

0           

424,36

0           

437,09

1           

450,20

4           

463,71

0           

477,62

1           

491,95

0           

506,70

8           

521,90

9           

537,56

7           

4,72

3,11

8        

Reno

vatio

ns & Recon

figurations

128,75

0           

132,61

3           

136,59

1           

140,68

9           

144,90

9           

149,25

7           

153,73

4           

158,34

6           

163,09

7           

167,99

0           

1,47

5,97

4        

Site Hardscape

 Rep

air/Re

placem

ent

20,600

              

21,218

              

21,855

              

22,510

              

23,185

              

23,881

              

24,597

              

25,335

              

26,095

              

26,878

              

236,15

6           

Curricu

lum & Instruction Materials

1,08

9,88

5        

929,94

0           

985,55

0           

1,07

1,42

0        

1,17

2,88

0        

452,25

0           

1,00

0,00

0        

1,00

0,00

0        

1,00

0,00

0        

1,00

0,00

0        

9,70

1,92

5        

Contract and

/or D

irect Employee

 Sup

port

500,00

0           

500,00

0           

500,00

0           

500,00

0           

500,00

0           

500,00

0           

500,00

0           

500,00

0           

500,00

0           

500,00

0           

5,00

0,00

0        

3,76

6,18

5        

3,40

9,08

0        

3,35

4,11

3        

3,49

6,04

0        

3,65

5,23

9        

2,99

4,07

9        

3,60

3,08

5        

3,66

6,17

7        

3,73

1,16

2        

3,79

8,09

7        

35,473

,256

      

Exterio

r Lighting/Signage

13,875

              

13,875

              

Exterio

r Playgroun

ds or S

ports A

reas

660,16

5           

660,16

5           

HVAC

 Rep

air o

r Rep

lacemen

t23

8,65

8           

238,65

8           

Interio

r Acoustics/Lig

hting

1,89

6,78

0        

1,89

6,78

0        

Site Hardscape

 Rep

air/Re

placem

ent

60,000

              

690,00

0           

750,00

0           

Interio

r/Exterio

r Painting

350,00

0           

350,00

0           

720,16

5           

2,83

9,31

3        

350,00

0           

3,90

9,47

8        

HVAC

 Rep

air o

r Rep

lacemen

t21

0,00

0           

210,00

0           

Roof Rep

air o

r Rep

lacemen

t47

5,00

0           

475,00

0           

Scho

ol bus re

placem

ent

1,23

6,00

0        

1,27

3,08

0        

764,90

9           

1,35

0,61

1        

1,39

1,12

9        

1,43

2,86

3        

1,47

5,84

9        

1,52

0,12

4        

1,56

5,72

8        

1,61

2,70

0        

13,622

,991

      

Scho

ol ve

hicle

 replacem

ent

115,00

0           

115,00

0           

115,00

0           

115,00

0           

115,00

0           

115,00

0           

690,00

0           

Scho

ol bus new

381,92

4           

405,18

3           

429,85

9           

456,03

7           

483,81

0           

2,15

6,81

3        

Transportatio

n Facility

 Mod

ernizatio

n6,71

0,00

0        

6,71

0,00

0        

2,03

6,00

0        

8,48

0,00

4        

879,90

9           

1,75

5,79

4        

1,50

6,12

9        

1,86

2,72

2        

1,59

0,84

9        

1,97

6,16

1        

1,68

0,72

8        

2,09

6,51

0        

23,864

,804

      

Tran

sportatio

n Service

s Total

System

‐Wide

System

‐Wide To

tal

T.C. W

illiams 

King

 Street 

Campu

s

T.C. W

illiams K

ing Street Cam

pus T

otal

Tran

sportatio

n Service

s

Page 74 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget

Page 81: FY 2021-2030 SUPERINTENDENT’S PROPOSED CAPITAL IMPROVEMENT PROGRAM BUDGET · 2019. 11. 23. · Shanel Hill, Deputy Clerk of the Board Terri H. Mozingo, Ed.D. Chief Academic Officer

Supporting Data

Site

Program

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

Gran

d To

tal

Building Envelope

 Rep

air

175,00

0           

175,00

0           

Interio

r Acoustics/Lig

hting

98,000

              

98,000

              

Roof Rep

air o

r Rep

lacemen

t83

1,90

0           

831,90

0           

Site Hardscape

 Rep

air/Re

placem

ent

74,000

              

74,000

              

Kitche

n/ Cafeteria re

novatio

n and reconfigurations

2,31

0,00

0        

2,31

0,00

0        

Interio

r/Exterio

r Painting

180,00

0           

180,00

0           

905,90

0           

175,00

0           

2,31

0,00

0        

278,00

0           

3,66

8,90

0        

198,80

1,50

2    

83,827

,369

      

22,211

,757

      

41,592

,320

      

37,756

,043

      

16,529

,097

      

41,144

,569

      

20,026

,719

      

53,861

,414

      

14,962

,208

      

530,71

2,99

9    

William 

Ramsay

William Ram

say To

tal

Gran

d To

tal

Tabl

e 1:

CIP

Page 75 ACPS FY 2021 - 2030 Superintendent’s Proposed CIP Budget