Upload
calin-ortan
View
234
Download
0
Embed Size (px)
Citation preview
-3.85
-3.85-3.85
-3.85
-3.85
-3.85
-3.85
-3.85
-3.85
-3.85
-3.85
-3.85
15 2015 4.80 15 20 15 4.30 15 20 15 3.595 175 20 175 2.475 10 20 10 4.50 15 20 15 4.50 15 20 15 4.08 15 2015 2.80 10 20 10
25 25
50
50
25 25
50
25 25
55
275 275
40
1.50 1.00
20 20
50
25 25
50
25 25
50
25 25
40
20 20
15 20 15 4.80 25 25 4.30 25 25 3.595 55 1.225 1.00 5.15 2525 4.50 25 25 4.08 25 25 2.80 10 20 10
15 20 15 4.80 15 20 15 2.45 15 20 151.3515 20 15 3.595 175 20 175 2.475 10 20 10 4.50 15 20 15 4.50 15 20 15 4.08 15 20 15 2.80 10 20 10
1
5
2
0
1
5
6
.
4
5
1
5
2
0
1
5
2
.
4
5
2
0
1
5
5
.
8
0
1
5
2
0
1
5
1
5
2
0
1
5
6
.
4
5
1
5
2
0
1
5
2
.
4
5
2
0
1
5
5
.
8
0
1
5
2
0
1
5
1
5
2
0
1
5
6
.
4
5
1
5
2
0
1
5
2
.
4
5
2
0
1
5
5
.
8
0
1
5
2
0
1
5
5
0
4
.
7
0
5
0
2
.
3
0
5
0
5
.
8
0
5
0
5
0
2
.
1
0
5
0
3
.
8
5
5
0
4
.
7
0
5
0
2
.
3
0
5
0
5
.
8
0
5
0
5
0
4
.
7
0
5
0
2
.
3
0
5
0
5
.
8
0
5
0
5.30 2.95 1.85 4.12 2.95 4.95 5.00 4.58 3.25
1
.
7
5
3
.
0
0
2
.
2
0
2
.
8
0
6
.
3
0
1
6
.
5
5
35.40
14.745 16.955 3.70
-3.30
-3.30 -3.30 -3.30
-3.30-3.30-3.30
-3.30
-3.30
-3.30
-0.25 -0.25 -0.25 -0.25 -0.25
-0.25 -0.25 -0.25 -0.25
-0.25
-0.25-0.25
-0.25-0.25
-3.25
-3.25
-3.25
-3.25
-2.75
-2.75
-2.75
-2.75 -2.75 -2.75
-2.75
-2.75
-2.75-2.75
-2.75
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
2
.
7
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
-
3
.
8
5
60
1.40 1.00
6
0
5
0
50 50
50
9
0
1
.
5
0
4
0-3.85
-3.25
-2.75
-2.35
0.00 B
B
C
C
A
A
Stepped foundation detail 1:50 Section A
Section B Section C
C25/30
C25/30
1 2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
TECHNICAL UNIVERSITY OF CLUJ-NAPOCA FACULTY OF CONSTRUCTIONS
Bachelor's degree project
date02.07
Calin Ortan
NAME SIGN.
Drawn
Verified
scale1:50
prof.dr.ing.Calin Mircea
Continuous foundation
Concrete- C25/30 Foundation is realized on silty clay brown plastic consistent with conventional pressure P=295 kPa Foundation bottom would be embedded at least 20 cm in the foundation layer. If needed, equalizing concrete layer will be poured. Elevation are disposed with ties.For their continuity it is necessary to be positioned at the same level.
Continuous foundationplan
1:100
Created using an Allplan student version