60
Prince Mohammad Bin Fahd University College of Engineering Department of Electrical Engineering Internship Report At Consulting Services Department (CSD) Electrical Systems Division (ESD) [16/07/2012 - 5/09/2012] Submitted by: Nawaf .A. AL-Qahtani 200700312 Submission date 15/09/2012

folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

Embed Size (px)

Citation preview

Page 1: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

Prince Mohammad Bin Fahd University

College of Engineering

Department of Electrical Engineering

Internship Report

At

Consulting Services Department (CSD)

Electrical Systems Division (ESD)

[16/07/2012 - 5/09/2012]

Submitted by:

Nawaf .A. AL-Qahtani

200700312

Submission date

15/09/2012

Summer 2012

Page 2: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Abstract

Abstract

Internship is a program that helps me to get in real engineering world. It

makes me use other skills that I have learned in university such as critical

thinking, teamwork, and communication skills and apply them to a real

engineering environment. Saudi Aramco is a company that helps the internship

students to get involve into a special engineering world. Saudi Aramco has a lot

of engineering field that has huge experience, which will be reflected on their

internship students. Also, Saudi Aramco is considering the safety as a high priority

and applies the safety in plants, offices, driving, and homes. In this report, you are

going to explore my internship program and what I have learned and worked on

during my internship period.

Page 1 of 43

Page 3: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Acknowledgments

Acknowledgements

I am grateful and thankful to my supervisor, mentor, and who I worked with,

whose inspiration, guidance, and continued supporting me from the beginning to

the completion of this summer training program and empowered me to get me in

an electrical engineering field. Finally, I offer my best regards and gratefulness to

the Consulting Services Department, Electrical System Division, and all of those

who supported me in any aspect in my summer training program

Page 2 of 43

Page 4: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Table of Content

Page

Abstract…………………………………………………………………... 1

Acknowledgments………………………………………………….... 2

Table of contents……………………………………………………... 3

i. List of Figures………………………………………………………….. 4

ii. List of Tables…………………………………………………………… 5

1. Introduction…………………………………………………………... 6

2. The Company…………………………………………………………. 6

3. Activities and responsibilities…………………………………. 7

3.1 Al-Olayan Workshop

Visit………………………………7

3.2 WESCOSA Visit……………………………………………… 8

3.3 Motors………………………………………………………….. 12

3.4 Wasit Project Review…………………………………….. 15

4. Major tasks or

projects…………………………………………….17

4.1 Meeting With FPD…………………………………………. 17

4.2 Repairing Motor in Melssa Workshop…………….. 19

5. Conclusion……………………………………………………………... 22

Appendix A…………………………………………………………….……..

Appendix

B……………………………………………………………………

Industry Supervisor

Report……………………………………………

Student Feedback

Form…………………………………………………

Page 3 of 43

Page 5: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Student Log

Sheet………………………………………………………….

Progress Technical Reports…………………………………………...

Page 4 of 43

Page 6: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

i. List of Figures:

Page

Fig.1 Pictures of the Motor and the burn on the winding……………. 7

Fig.2a Pad Mounted Transformer……………………………………………….. 9

Fig.2b Pole Mounted Transformer………………………………………………. 9

Fig.2c Power Transformer…………………………………………………………. 10

Fig.2d Switchgear and Control Panel…………………………………………... 11

Fig.3a Magnetic Theory……………………………………………………………… 12

Fig.3b Components of DC Motor…………………………………………………. 13

Fig.3c Components of AC Motor…………………………………………………. 13

Fig.3d Squirrel-Cage Rotor…………………………………………………………. 14

Fig.3e Three-Phase Motor Winding…………………………………………….. 14

Fig.3f Synchronous Motor…………………………………………………………. 14

Fig.4One line diagram for electrical generation and distribution system of Wasit Project…………………………………………………….

16

Fig.5 The original study case of Tnajeeb drop voltage………………... 19

Note:

Other figures can be found in Appendix A

Page 5 of 43

Page 7: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

ii. List of Tables:

Page

Table.1 Studies of starting motor in Tnajeeb…………………………………….. 17

Table.2 The repair costs for the 21000 HP motor……………………………… 20

Table.3 The total cost for stator repair.…………………………………………….. 21

Note:Other Tables can be found in Appendix A

Page 6 of 43

Page 8: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Introduction & The Company

1. Introduction

As an Engineering student in Prince Mohammad bin Fahd University at the

Electrical Engineering Department, I am required to do summer training at a

company in the Kingdom of Saudi Arabia or abroad. The summer training

program is an eleven weeks training. I have taken my summer training in Saudi

Aramco Company working for Consulting Services Department/Electrical

Engineering Division from Jun 16 to Sept 5, 2012

In this period of training tried to gain field experience in the areas related to

the electrical engineering. Also, I tried to look for new technologies and tools

available in area of electrical engineering. I applied theoretical engineering skills

into real world engineering problems. In Addition, I learned how to deal with

engineering project and technical problem solving. I got familiar with

organizational skills, work ethics, teamwork skills, and time management in a

field environment.

2. The Company

Aramco was established in 1933. It was the Arabian American Oil Company

until 1988 it was owned by the government and became Saudi Arabian Oil

Company. Aramco kept growing to be the most valuable company in the world. It

manages over 100 oil and gas fields and produces 3.4 billion barrels annually.

Consulting Services Department (CSD) focuses on safety, research and

technology, standards optimization, capital programs support, and operation

support and Improvement. CSD consists of four divisions; Materials Engineering

and Corrosion Control Division, Mechanical Engineering Division, Rotating

Equipment and Civil Engineering Division and Electrical Systems Division (ESD).

ESD consists of three units, Electrical Equipment Unit (EEU), Power Systems

Unit (PSU), Direct-Current Systems and Cathodic Protection Systems Unit

(DCSU). ESD provides consultation in these four fields.

Page 7 of 43

Page 9: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Introduction & The Company

Page 8 of 43

Page 10: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

The objective of my summer training with CSD is to familiarize me with

industrial application of electrical engineer in the area of power system design,

analysis, and equipment. They planed me a program that include safety

orientation, site visits, and getting introductory sessions on different major of

electrical equipments and power systems. My Supervisor is Salh ali assigned me

a mentor. My mentor is Odah Al Shahrani, who is an engineer (II), is working

with power systems and substation equipment group. Odah introduced me to the

department and the electrical systems division and gave me orientation on the

safety at office and plants.

My plan with ESD included working with the eight specialties that the division

have. The specialties are Cables and lighting, substation equipment, motors and

generators, cathodic protection, UPS and DC systems, power system, design and

studies, and substation automation.

3. Activities and responsibilities

3.1 Al-Oalyan Workshop Visit

I went with Mr. Hussian from Electrical Equipment Unit, motors and

generators group, to inspect a submersible pump from Khursaniyah Gas Plant.

The pump was tripped due to a ground fault immediately after starting it. The

pump was inspected and found that the motor side was having sort of “burn” or

heat exposed to the majority of the winding. Signs of carbon and discoloration

were observed on the winding, aside from the stator but not the rotor.

Fig.1 (Pictures Motor and the burn on the winding)

Page 9 of 43

Page 11: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

Khursaniyah Gas Plant found that:

1. No Failure of the seal – Mechanical or cable Seal – found

2. Bearing was found moving freely

3. Greasing was in good condition

4. Lubricant oil was found clean

5. Signs of carbons found around the winding of the motors

6. 2/3 windings were found in a bad condition - carbonized and insulation

damage

7. The shaft was intact

8. Discoloration was found on the stator segments along with the damaged

windings

9. The failure occurred on the motor from the pump side only

At the workshop we saw the motor and we inspected it to see what could

cause the ground fault. The burn can be seen clearly on the winding there was a

sensor but we were not sure of it, is it for temperature or for the flow. After the

inspection, we discussed the possibilities of causing the problem.

Note:

For more pictures you can found in Appendix A

For motor’s data sheet, you can find it in Appendix A

3.2 WESCOSA Visit:

As a part of our summer training program with CSD, we had a site visit to

WESCOSA in Dammam in July 26, 2012. The purpose of this visit is to be familiar

with electrical equipments, transformers and switchgears, and the process of

manufacturing them. During this visit we got a quick overview about WESCOSA.

We had a presentation about WESCOSA transformers that meet the

requirements of Aramco. It follows SAES-P-121 and 16-SAMSS-536,531,534,533

in Aramco standards. They produce three types of transformers, Pole-Mounted,

Power Transformers and Pad-Mounted Three-Phase Distribution Transformers.

Page 10 of 43

Page 12: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

First, the Pad Mounted Distribution Transformer is three phase, oil filled, and

serves underground distribution loads. Pad Mounted Transformers are available

in two constructions live front construction, or dead front construction. The

ratings of the transformer are From 45 – 1500 kVA. The high voltage taps are ±2-

2.5% from normal.

Fig.2a (Pad Mounted Transformer)

Second, the Pole Mounted Distribution Substation Transformer is designed

for continues operation and It cooled itself for tropical climates. Pole Mounted

Transformers are suitable for indoor and outdoor installation. The ratings of the

transformer are From 50 – 1500 kVA and the high voltage taps are ±2-2.5% from

normal.

Fig.2b (Pole Mounted Transformer)

Third, the Power Substation Transformers is used to provide electrical

services for distribution system. In power transformer, both primary and

secondary cables enter the transformer cable boxes from below. There are

different designs to meet both IEC and ANSI standards. The ratings of the

transformer are from 500 – 34500 kVA and the high voltage taps are ±2-2.5%

from normal

Page 11 of 43

Page 13: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

Fig.2c (Power Transformer)

Process of transformer manufacturing:

The process of transformer manufacturing is done by several steps:

1. Winding

They wind three phase winding , one by one

The inner winding is the secondary, while the outer is the primary

At the secondary, after certain winding turns, they extract a voltage

tap

2. Shell Core

They mostly use steel core

They are made of laminated steel to reduce Eddy current losses in the

core

Then they set them inside the winding side by side

3. Bushings

They weld three bushings, each to the transformer tank , each

bushing is connected with a phase winding

4. Closing

They place the windings inside the tank

Each type of transformer has different tank shape

Also, they inject a nitrogen gas to protect the transformer from arc

flash

After that, they inject the oil into the transformer from an oil reservoir

Page 12 of 43

Page 14: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

5. Testing

They do a test for both high voltage transformers and medium voltage

transformers

They have two testing areas for each type

Some of the testing they do are :

o They test the open circuit and short circuit to measure the

losses in the core and the winding

o They do a high voltage test to inspect the insulation between

the winding turns

Switchgear manufacturing process:

In the factory of switchgear, we have started with how they do the cover box

and where they cut, band and insulate the cupper plates. Also, we have seen how

they connect the circuit breakers as well as the wiring. Finally, they explained to

us how the test of switchgears is done. In addition we saw different types of

switchgears with respect to voltage, which are low, medium and high voltage

switchgears. At the end of our visit we have seen the control panels. These

control panels are used in low voltage applications as the panels used at homes.

Fig.2d (Switchgear & Control Panel)

Note:

WESCOSA prevents taken pictures in inside the factory. However, I took some

picture from the outside; you can find it in Appendix A

Also, you can find the report of the visit in Appendix B

Page 13 of 43

Page 15: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

3.3 Motors:

During my summer training program with CSD, I took courses on motors

with Mr. Al-Ali. Also, I worked with the motors and I had an overview of their

function, types, and motors that Aramco uses. The main function of motors is to

convert electrical energy to mechanical and produce torque.

The operation of motors is based on three main principles. First, when the

electric current passes through a conductor, magnetic field is produced around

it. So, if the wire is wound around iron rod, the magnetic field will strengthened

and the rod will be magnetized. And, the magnetic field becomes stronger as the

turns of coil increases. Second, the direction of the current flow through coils

determines the location of the poles on the electromagnetic. Third, like poles,

such as two north poles repel each other. Unlike poles attract each other. So, if a

bar magnet is suspended between the ends of a horseshoe magnet, the bar

magnet will rotate until its north pole is opposite the horseshoe magnet's South

Pole.

Fig.3a (Magnetic Theory)

There are two types of motor, DC motors and AC motors. DC motors are used

where high torque and controlled speed over a wide range are needed. It

requires high level of maintenance. AC motors are usually used in industrial

applications.

There are three types of DC motors classified according to the type of

winding; Series-wound, Shunt-wound, and Compound-wound motor. In Series-

wound motor armature and field coils are connected in series. In Shunt-Wound

armature and field coils are connected in parallel. The Compound-wound motor

incorporates both Series-wound and Shunt-wound windings.

Page 14 of 43

Page 16: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

The main two parts in typical DC motors are stator and rotor. Where stator is

the stationary part and rotor is the rotating portion of a DC motor. The stator

consists of the frame, filed winding, brush rigging, and brushes and end bells,

where the rotor is consists of the armature, commutator, and blower.

Fig.3b (Components of DC motor)

There are three type of three-phase AC motors; Squirrel-Cage Induction

Motor, Wound-Rotor Inductor Motor, and Synchronous Motor. Squirrel-cage

induction motor is the common of all AC motors and has the sample

construction.

The major components of squirrel-cage motor are; the stator, rotor, field coils,

and fan.

Fig.3c (Components of AC Squirrel-Cage Induction Motor)

Page 15 of 43

Page 17: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

Fig.3d (Squirrel-Cage Rotor)

Fig.3e (Three-Phase Motor Winding)

The other type of AC motor is synchronous motor and it operates at constant

speed. The major components for Synchronous motor are; Stator, Laminated

Salient Pole, Solid Salient Pole Rotor, and Cylindrical Rotor. Synchronous motor

has different starting method. A three-phase current is supplied to stator

winding to produce magnetic field and direct current is supplied to rotor

winding to produce magnetic field with fixed polarities at each end.

Fig.3f (Synchronous Motor)

Page 16 of 43

Page 18: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

Note:

You can find figures of motors in Appendix A

3.4 Wasit Project Review:

I joined Mr. Abdulmohsun form PSU in reviewing the Wasit Cogeneration &

Steam Generation project on ETAP. Wasit Cogeneration & Steam Generation

consists of six generators. Four Combustion Gas Turbine Generators (CGTG),

each rated 148.954MW at 16.5kV. And, two Steam Turbine Generators (STG),

each rated 75MW at 13.8kV. The purpose of the electrical system studies is to

verify the design of the electrical system:

Main Equipment (generators, transformers, switchgear) sizes, ratings and

main parameters

Starting of largest motors

The review includes three parts load flow studies, short circuit studies, and

motor starting studies. For the load flow analysis we did three cases maximum

system voltage, normal system voltage, and minimum systems voltage. In all

cases we shall check the voltage level. For low voltage, the level shall be between

95-105% and for high voltage the level shall be between 97-105%

For the maximum case, it shall be feeding form two sides, all motor

disconnected, and the bus-tie breaker is open. For the normal case, it shall be

feeding from two sides, all loads are running, and the bus-tie breaker is normally

open. For the minimum case, it shall be feeding from one side, the bus-tie

breaker is close, and all loads are running.

For the short circuit analysis we shall assume the pre-fault to 102%. It shall

be feeding from one side and the bus-tie breaker is close. We shall fault all buses.

For the motor starting analysis, the minimum voltage level for the motor

terminal shall be not less than 85%. If utilization equipment modeled as lumped

Page 17 of 43

Page 19: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Activities & Responsibilities

load at distribution bus, minimum voltage shall be not below 90%. We shall

check the largest motor in the system at starting.

There was a problem with the transformer voltage level and Mr. Konash

sends to them an email about it.

The plant one line diagram for electrical generation and distribution system of

Wasit Cogeneration & Steam Generation:

Note:

You can find a review check list table in Appendix A

Page 18 of 43

Page 20: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Major Tasks or Projects

4. Major tasks or projects

1.1 Meeting with Facilities Planning Department (FPD)

I joined a meeting with Mr. Abdulmohsun from Power System Unit (PSU) and

FPD. It was regarding a voltage drop caused by starting a large motor in Tanajeeb

The FPD brought three suggestions they want to discuss and review on ETAP:

1. Adjustable Frequency Drive (AFD)

2. Transfer the loads, which are affected by starting the motor, to another

bus

3. Static Var Compensator (SVC)

The Adjustable Frequency Drive (AFD) was the last choice that may use

because the cost of AFD is very high. Transfer the loads to another bus will not do

much change for the motor to start. But, it will improve the operation of the loads

as the motor start. Static Var Compensator (SVC) will improve the operation so

the motor can start by providing VAR reactive power. However, using the SVC

with loads are connected to the same bus of motor will be a problem to the

operation level of loads as the motor start (it will be less than 90%, NOT OK!).

However, the decision has not been taken yet.

Table.1 (Table of the Studies)

Transformer Voltage Magnitude (%) Motor Voltage Magnitude (%) Notes

Case 1 Original

Before 100.95% 106.24% 106.24%

Start 85.05% 63.33% 61.99% Motor will not start

Case 2 Transfer the loads to another Bus

Before 101.12% 106.44% 106.44%

Page 19 of 43

Page 21: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Major Tasks or Projects

Start 85.44% 63.67% 62.31% / 64.12%L Motor will not start

Case 3 Decrease the Impedance (Z) to reduces losses in Transformer

Before 101.18% 106.50% 106.50%

Start 84.85% 66.73% 65.31% / 67.20%L Motor will not start

Case 4 Decrease the Impedance (Z) and Increase mVA to Rating 30 and 30 max

Before 101.32% 106.65% 106.65%

Start 83.14% 74.85% 73.26% / 75.38%L Motor will start

Case 5 Adding Capacitor (SVC), Rating: 34.5kV, 20 mVAR

Before 101.32% 106.65% 106.65%

Start 87.13% 78.44% 76.78% / 79.00%L Motor will start

Case 6 Adding Capacitor (SVC), Rating: 34.5kV, 20 mVAR, with the loads

Before 101.16% 106.48% 106.48%

Start 86.73% 78.08% 76.42% / 78.63%L Motor will start

Comments

Voltage Magnitude (%) for the Loads Bus will be less than 90% when the motor starts (NOT OK!)

When we transfer the Loads to another Bus Voltage Magnitude (%) when the motor starts will be

more than 90% (OK!)

Exception: The motor shall be not below 75% level

Page 20 of 43

Page 22: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Major Tasks or Projects

1. Original

Note:

You can find the other studies’ figures in Appendix A

1.2 Repairing Motor in Melssa Workshop:

I went to Melssa workshop with Mr. Al-Ali to inspect a motor. Then I attended

meeting in Melssa workshop to evaluate maintenance that the motor need. The

meeting was between Melssa, CSD, and MSSD. CSD motor specialist support is

required finding and evaluating the looseness of the Stator supports, Rotor pole

plat looseness, and Bearing housing tight on the bearing.

We have discussed during the meeting:

- The looseness of the Stator supports.

For the fingerplates, we need to apply the epoxy to fix the fingerplates. A

good indication, we have noticed in the fingerplates is that they are not

Page 21 of 43

The load should be more than 90% to justify the standard

The Motor should be more than 75% to start

Page 23: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Major Tasks or Projects

broken so there should not be a major concern with fixing these

fingerplates with epoxy.

- Rotor pole plat looseness -which needs farther inspection as recommended

by CSD and MSSD QA to determine if need to install a new rotor kit.

The contractor should inspect the poles by removing the cover in order

to verify the cause of looseness and also the thickness of the cover should

be measured to verify if it meeting the original design thickness

- Bearing housing tight on the bearing – two options repair plan either to

machine

The ID or adding shim between the bearings spilt surface. If both options

do not work the bearing housing will be replaced with new one

The repair costs for the 2 options of repair the stator & rotor for subject motor

21000 hp sub-orders# 10749446 is as follow:

Page 22 of 43

Page 24: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Major Tasks or Projects

After that, the MSSD request the total cost (Invoice + material) for stator repair

option one. So, the send this as requested:

Repair optionBasic

Overhaul

cost

Additional

work

Required

materialTotal cost Duration

Option #1

Overhaul

including rewind

stator & rotor

$52,000 $171,000 $800,000 $1,023000

14 weeks after

receiving all

material

Option #2

Overhaul with

temporary repair

on the rotor &

stator

$52,000 $20,000 $120,000 $192,000

8 weeks after

receiving all

material

Option #3

Return the motor

unrepaired $52,000 0 0 13,000

3 weeks if

proponent decide

not to repair the

motor

Then, they send the inspection report for reference to review and make the

decision. The inspection report can be found on the Appendix B

Page 23 of 43

Page 25: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Conclusion

2. Conclusion

In this period of training I had a good chance to get field experience in the

areas related to Electrical Engineering. I opened my mind to new technologies

and tools available in industry. I had a chance to use my theoretical engineering

skills gained in academia into real engineering problems. Also, getting involved

in engineering project and technical problem solving helped me to use critical

thinking and teamwork strategies. Visiting factories and workshops helped me to

be familiar with the electrical equipments and the process of manufacturing.

Also, I had the chance to work with specialties and engineers and benefit from

their experiences.

Page 24 of 43

Page 26: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

Appendix A

3. Al-Olayan Workshop Visit:

Figure.1 (Pictures of the infected motor)

Page 25 of 43

Page 27: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

4. WESCOSA Visit:

Figure.2 (Pictures from outside WESCOSA factory)

Page 26 of 43

Page 28: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

5. Motors Types:

Figure.3a (DC Motor)

Figure.3b (AC Motor)

Page 27 of 43

Page 29: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

6. Meeting With FPD

Screen shots of the studies on ETAP:

Figure.4a (Transfer the loads to another Bus)

Figure.4b (Decrease the Impedance (Z) to reduces losses in Transformer)

Page 28 of 43

Page 30: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

Figure.4c (Increase MVA for transformer to Rating 30 and 30 max)

Figure.4d (Adding Capacitor (SVC), and the Loads connected to another Bus)

Page 29 of 43

Page 31: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

Figure.4e (Adding Capacitor (SVC), with the Loads connected to the same Bus)

Page 30 of 43

Page 32: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

1. Al-Olayan Workshop Visit

Table.1 (Motor Data Sheet)

Page 31 of 43

Page 33: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix A

2. Wasit Project Review:

Table that help in reviewing and doing studies on ETAP by Mr. Konash:

STANDARD Remarks

Load Flow analysis (SAES-P-100 paragraph 7.2.5)In all 3 cases check the voltage level.For low voltage 95-105%for high voltage 97-105%

SAES-P-100 paragraph 6.2

There are 3 cases·        Maximum System Voltage

All motor loads disconnectedBoth transformers feeding double ended switchgear configured with the bus-tie circuit breakers are at normal state (usually open)A ‘global diversity factor’ of 0% for motors and 100% for static loads SAES-P-100 paragraph 7.2.8

·        Normal System VoltageAll continuous and intermittent loads running.All double-ended switchgear operating with both transformers connected and the bus-tie breaker normal.The new Switchgear and MCC global diversity factor is set to 110% (if there is any known future load) as required by

SAES-P-100 section 7.12 & SAES-P-121 section 6.1.3

·        Minimum System VoltageAll continuous and intermittent loads running. Largest spare (standby) motors connected to each of the new switchgear assemblies running. Double- ended substations operate with one transformer out of service and the bus-tie breaker closedThe new Switchgear and MCC global diversity factor is set to 110% as required by

SAES-P-100 section 7.12 & SAES-P-121 section 6.1.3

Short Circuit analysis Assume a pre-fault of 102% Double- ended substations with normally open tie-breaker, operate with one transformer out of service and the bus-tie breaker closed, otherwise botheincomers and tie-breaker are closedcompare the Device capability with (Momentary Duty + Interrupting Duty) buses and interrupting devices shall not be less than 105% of the calculated fault current at the point of application

SAES-P-116 Paragraph 6.13

Fault all bussesMotor Starting analysis

Min voltage at motor terminals not below 85 % SAES-P-100 paragraph 6.3.2

Min voltage at every utilization equipment not below85%. If utilization equipment modeled as lumpedload at distribution bus, min voltage not below 90%.

SAES-P-100 paragraph 6.3.1

Check that the largest motor in the system is beingstarted. SAES-P-100 paragraph 7.1.3

No use of motor starting devices (only direct on-linestarting allowed).

SAES-P-116 paragraph 6.11.4

ETAP studies

SAES-P-100 paragraph 7.1.1.1

ITEMCheck List

SAES-P-100 paragraph 7.1.1.2

SAES-P-100 paragraph 7.1.1.3

SAES-P-100 paragraph 7.9

Table.2 (ETAP Study Check List)

Page 32 of 43

Page 34: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix B

Appendix B

Page 33 of 43

Page 35: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix C

Appendix C: Industry Supervisor Report

Page 34 of 43

Page 36: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix D

Appendix D: Student Feedback Form

Page 35 of 43

Page 37: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix D

Student Feedback Form

Please fill in the form carefully and ensure that it is attached at the back of your Final Technical Report before uploading onto the Blackboard for your Advisor to grade.

Name of Student:

Student ID:

Department: Civil/Electrical/Mechanical

Period of internship:

Company Name:

Department studentwas attached to:

Describe briefly your work experience:

Was nature of work assigned challenging? Yes/NoWas your work environment satisfactory? Yes/NoWas the work technical in nature? Yes/NoWere you treated as a member of a professional team? Yes/NoWere you able to learn from others? Yes/NoWere you able to talk to your supervisor when needed? Yes/NoWould you recommend that we continue to assign studentsto this company in future?

Yes/No

Would you work for this company after graduation? Yes/No

Overall, how do you rate the company in providing you

with this training? Excellent / Good / Satisfactory/Poor

Page 36 of 43

Page 38: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix D

What new knowledge or skill have you acquired as a result of this internship?

Which courses, if any, have helped you in learning the new knowledge, skills and technologies needed to do your work?

What would have better prepared you forth is semester's work?

Suggest ways in which you think the Internship Program, as a whole can be improved:

Date:

Signature of Student:

Page 37 of 43

Page 39: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Appendix E

Appendix E: Student Log Sheet

Page 38 of 43

Page 40: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Student Log Sheet

Student Log Sheet

Please fill in the form carefully and ensure that it is attached at the back of your Final

Technical Report before uploading onto the Blackboard for your Advisor to grade.

Name of Company: Saudi Aramco

Have you been briefed on the company safety guidelines? Yes

Week Work PerformedSupervisor's Signature and

Comment

1

DATE FROM: 16, June 2012 TO: 27, June 2012

I was been introduced to the Consulting Services Department

I was been introduced to the Electrical Systems Division

I took orientation on the safety at office I went over the wiring methods and materials

standard SEAS-P-104

2

DATE FROM: 30, June 2012 TO: 11, July 2012

I worked with Substation Equipment Group I went over SEAS-P-516, SEAS-P-121 I went to Al-Olayan workshop with Mr. Al-

Ali to inspect a submersible pump for KGP. The pump was tripped due to a ground fault

3

DATE FROM: 11, July 2012 TO: 25, July 2012

I worked with Motors and Generators Group I took course (EEX 203.01) on Motors with

Mr. Al-Ali I took a session on ETAB with Mr. Konash I visited WESCOSA to see and be familiar

with electrical equipments such as transformers and switchgears

Page 39 of 43

Page 41: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Student Log Sheet

4

DATE FROM: 28, July 2012 TO: 8, Aug 2012

x

I went to Melssa workshop with Mr. Al-Ali to inspect two motors

I attended a meeting between Aramco and Melssa workshop to evaluate the maintenance that the motors need

I took course (EEX 203.02) on Motors with Mr. Al-Ali

5

DATE FROM: 11, Aug 2012 TO: 15, Aug 2012

I took course (EEX 203.03) on Motors with Mr. Al-Ali

I joined a meeting between CSD and FPD regarding drop voltage in Tnajeeb

6

DATE FROM: 25, Aug 2012 TO: 29, Aug 2012

I joined Mr. Konash in reviewing a request from FPD regarding Tnajeeb drop voltage on ETAP

7

DATE FROM: 1, Sep 2012 TO: 3, Sep 2012

I joined Mr. Konash in reviewing Wasit project on ETAP

8DATE FROM: 3, Sep 2012 TO: 5, Sep 2012

Finalizing my technical report and progress reports

Page 40 of 43

Page 42: folder... · Web viewFirst, the Pad Mounted Distribution Transformer is three phase, oil filled, and serves underground distribution loads. Pad Mounted Transformers are available

PMU | Internship Report

Technical Progress Reports

Page 41 of 43