What is a Three-Phase Pad Mounted Transformer?
What are its Applications?
How is it Installed?How is it Wired?
The Specification Package
The Specification Letter
Miscellaneous
What We Will Cover
8/11/2019 Pad Mounted Threephase Transformer
3/29
What is a Three-Phase Pad Mounted Transformer?
Outside
Metal Encased, Tank, Fins, Cabinet
Sits on a Three Piece Vault
Fragile Enclosure, Not for Storage
Inside Contains
Oil Tank, Windings, Terminals
Primary and Secondary Compartments
Grounding Loop
Cables and Terminations
8/11/2019 Pad Mounted Threephase Transformer
4/29
What is a Three-Phase Pad Mounted Transformer?
Steps Down Primary Voltage to Secondary
Primary Side (4kV, 13kV, or both)
Secondary Side (120/208v, 277/480v)
Three Phase Wye Configuration Only
Pad Mounted, or Submersible
Di-Electric Fluid (insulates and cools)
LIPA Sizes Range From:
75KVA to 1000KVA for 120/208
75KVA to 1500KVA for 277/480
Special Order 2500KVAs
8/11/2019 Pad Mounted Threephase Transformer
5/29
The outside of a Three-Phase Pad Mounted Transformer
Side View of a 150KVA Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
6/29
The Outside of a Three-Phase Pad Mounted Transformer
Orientation Away From Building
Clearances
5 From Transformer to Building Wall
10 to Vent Openings, Doors, Windows
25 to Non-Fire-Rated Openings
Auditorium Exits
Truck Accessible (delivery & removal purposes)
NEC Class 1, Division 1, and 2 Locations Shall Require a
Minimum 25 ft. Clearance (oil, gas, etc)
Set Vault Level, Grade to Slope Away
Traffic Protection
8/11/2019 Pad Mounted Threephase Transformer
7/29
The Inside of a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
8/29
Inside a Three-Phase Pad Mounted Transformer
Primary Compartment(left side)
Primary Connections(radial, or loop)
Incoming - H1C, H1A,H1B
Outgoing - H2B, H2A,H2C
No Load Tap Changer
A Through E (2.5%increments, middleis zero boost)
Bayonet Fuses, ProtectPrimary Side ofTransformer
8/11/2019 Pad Mounted Threephase Transformer
9/29
Primary Compartment
Load Break Elbows
Sizes: #2, 1/0, 3/0
Lightning ArrestorElbows (radials, and
open points)
Static Drain Wires(#14, and #10 Cu.)
Grounding Loop
#2BTN, One HLC
Primary Bushings
Standoff BushingSlots (open point)
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
10/29
Primary L/B Elbow
Load Break Elbow, Bushing,Static Drain Wire, and PrimaryCable
Detail in Spec. Package
Follow Mfg. Instructions
Pulling Eye
Test Point, & Cap
5 of Taped Neutral
#2 EPR Insulated May beHylinked
Sealing Strip, 36 Below HoseClamp
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
11/29
Primary Bushing
Supplied by LIPA withL/B, L/A Elbow
Screws in
Must be Kept Clean,Contamination WillCause ElectricalFailure
#14 Static Drain WireFrom Eyelet toGrounding Split Bolt
L/B Elbow ShouldCover Yellow (nowRED) Band
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
12/29
Secondary Compartment(right side)
Secondary Spades;X0, X1, X2, X3
Nema 2 Hole Lugs(tinned alum. Or Cu.)
Al Lug - ExtraBelleville Washer Req
Oxide Inhibitor on Al
Cu to be Tinned, orAlloy plated
750 Cu now Accepted
Buss Supports
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
13/29
SecondaryCompartment
Color Coding
120/208v or
277/480v
Integrated/Isolated
8 Sets Max
Grounding Pads,Loop, Split Bolts,Ground Rods
Oil Drain Valve
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
14/29
SecondaryCompartment
Pressure
Relief ValveDo Not Pull
Oil Fill Level
Oil
TemperatureGauge
Oil Level
Gauge
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
15/29
Nameplate
Identifies Primary andSecondary Voltage
Indicates Voltage onDifferent Tap Settings
Shows Internal CoilConfiguration
Indicates TransformerWeight
Indicates TransformerImpedance
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
16/29
Common equipment
Primary Cable
Sizes: 3-2/c#2, 1/0, 3/0
Secondary Cable
Sizes: Minimum #2, Maximum 750
Maintain 5 min. Slack in Vault
Maintain as Much Physical Separation as Possible
Grounding Pads, Lugs, and Split Bolts
Bare #6 Cu to Ground Rods
Bare Tinned Copper #2 for Ground Loop
Inside a Three-Phase Pad Mounted Transformer
8/11/2019 Pad Mounted Threephase Transformer
17/29
What are its Applications?
Typical for Large Load, Non-Residential Customers; Long
Distance From ExistingFacilities; and LoopedCommercial Industrial Parks
Pad Mounted Transformers areLIPAs Standard Installation,Non-Standard is Submersible, orNetwork
Transformer is Delivered,Owned, and Maintained by LIPA
for Secondary Metered Service
8/11/2019 Pad Mounted Threephase Transformer
18/29
How is the Three-Phase Pad Mounted TransformerInstalled?
Set on a Three Piece Vault, Always Providedby Contractor (see approved vendor list)
Pad Orientation
Primary Side, Secondary Side
Doors to Face Away From Building
10 Clear in Front of Pad for Switching
Grade Away 1% Slope
Old Way Poured Foundation (slab) Primary and Secondary Cables Have no
Slack
Boom Truck Delivers Transformer, Lifts itonto Vault
8/11/2019 Pad Mounted Threephase Transformer
19/29
8/11/2019 Pad Mounted Threephase Transformer
20/29
8/11/2019 Pad Mounted Threephase Transformer
21/29
How is the Three-Phase Pad Mounted Transformer
Installed?
Boom Truck
Can Deliver All
Transformers
Line Truck
Delivers up to500 kVA
8/11/2019 Pad Mounted Threephase Transformer
22/29
8/11/2019 Pad Mounted Threephase Transformer
23/29
Radial Installation
Contractor Installs Primary and Secondary Cable
Contractor Wires L/B and L/A Elbows
Contractor Makes Secondary Connections
Contractor Wires All Grounding
Contractor Supplies Secondary Lugs, Static Drain
Wires, Ground Rods, Ground Wire, and Grounding
Split BoltsCIPUD Installation
Contractor Supplies and Wires Secondary
LIPA Wires Primary & Grounding
Who Wires the Three-Phase Pad MountedTransformer?
8/11/2019 Pad Mounted Threephase Transformer
24/29
Specification Package Details
Provides Information Common to All Jobs
Pad Specifications, Vault Details
Primary Side, Secondary Side
Contractor to Discuss Location Before Pad is Set
Knock Outs: 4 PVC Sleeve Flush With Wall, Concreted in Place
Duct Seal or Cap Unused Conduits
Galvanized Conduits Require Bonding
Protection From Traffic
Bollard 3.5 Heavy Steel Wall (minimum)
Concrete Filled
Must be Painted Yellow
Doors Must be Able to Open
Required on All Sides Subject to Vehicular Traffic
8/11/2019 Pad Mounted Threephase Transformer
25/29
Primary Cables
Phases Must be Identified (1, 2, 3 rings), on BothExtremities
15kV Tree-Retardant Cross-Linked Polyethylene for
Aluminum (TR-XLPE)
Ethylene Propylene Rubber (EPR) for Copper
Semi-Con 12 Mil
Insulation 220 Mil, Insulation Shield 30 Mil Semi-Con
Jacket 50 Mil Semi-Con
Specification Package Details
8/11/2019 Pad Mounted Threephase Transformer
26/29
Secondary Services
480v - One Service
Exception: Fire Pumps
208v - Multiple Services
Services Must be Labeled
Cables
480v (must be installed in conduit)
USE-2, XHHW-2, or RHW-2
8 Sets Max
208v
USE-2, THW-2, THWN-2, XHHW-2, or RHW-2*
*With neoprene or hypalon jacket only
Specification Package Details
8/11/2019 Pad Mounted Threephase Transformer
27/29
Three-Phase Specification Letter
Gives Project Specific Details, Such as:
Reiterates Customer Load Letter
Designated Riser Pole, or Point of Termination
Describes Cable Ownership
Provides Costs, if Any
Inrush Information, Motor Starting Limitations
Restates Basic Installation Rules,
Call Before You Dig
Repeats Primary and Secondary Cable
Specifications
8/11/2019 Pad Mounted Threephase Transformer
28/29
Miscellaneous
Provide Advance Notification of Projects
Access to an Energized Vault is Forbidden
Industrial Code Rules 753, and 57
These Requirements Conform to the NEC
Contractor to Comply With:
Applicable Codes
Three Phase Transformer Spec. Package
Redbook
Lists Distribution Design Representatives
www.lipower.org
8/11/2019 Pad Mounted Threephase Transformer
29/29
QUESTIONS
?