FIELD INSPECTION REPORTPHED KPKAssociate in Development
Splash Screen
Sync Data Lists• Make sure internet
connectivity on mobile• Click on Sync button to get
all the Schemes, Activity, Equipment, Material and etc data lists from the server
Sync Data Lists• Sync activity will be used
when changes will be occurred on server side in data lists
• After sync internet connection will not be required
Add New FIR• Press Add New button to
start FIR questionnaire
GPS Settings• Press Settings button• Note: Enable GPS before
starting app
GPS Settings• Enable “Google location
service”, “GPS satellites” and “Location & Google search”
Add New FIR• Press Add New button to
start FIR
Scheme Type• Select Scheme Type• Select Scheme Sub Type
Name of Scheme• Select Name of Scheme
Construction Start Date• Select Construction Start
Date• Select Weather Condition
Log book found in order?
Inspection Team Member• Type the name of team
members visiting the construction site
• Team member field is MANDATORY
• If you want team member field to blank. Then type a blank space
Name of Supervisor• Type the name of the
supervisor present at site• Supervisor field is
MANDATORY• If you want Supervisor field
to blank. Then type a blank space
Work in Progress?
Labor Working at site• Type a NUMBER for no. of
skilled & unskilled labor working at site
• Both fields are MANDATORY
• if skilled & unskilled labor working at site are ZERO then type “0”
Construction Activity• Rate the contractor's
performance• List of Activities are pre-
defined. If you want to add a new Activity coordinate to you web app administrator
• After add new activity SYNC your app
Construction Activity• In case “% completed”
answer is 0%. “0” Rating field should be filled.
• For adding new Construction Activity SELECT “Add (Rate the constructor’s performance)” option
Equipment available at site• No. / Quantity field is
MANDATORY• For adding new Equipment
SELECT “Add (Equipment available at site)” option
Material available at site• No. / Quantity field is
MANDATORY• For adding new Material
SELECT “Add (Material available at site)” option
Remarks for Progress
Inst./Sugg. To Construction Team
Images• Press Camera Icon to take
field visit picture• If you point out some
important thing on the pic type your message in Image description field
• Press the Save button to save FIR
Upload FIRs’• Press “List All” button to
upload saved FIRs’ to the server.
• You should have internet connectivity to upload saved FIRs’
Upload FIRs’ • Press Submit All button to
upload listed FIRs’
FIRs’ Uploding