GOVERNMENT OFGOVERNMENT OFBALOCHISTANBALOCHISTAN

BRIEF ON BRIEF ON MEGA PROJECTS OF MEGA PROJECTS OF

PUBLIC HEALTH ENGINEERINGPUBLIC HEALTH ENGINEERING DEPARTMENTDEPARTMENT

Page 2: Presentaton on Mega Projects of PHED

WATER SUPPLY SCHEMEWATER SUPPLY SCHEME SUI TOWN SUI TOWN

IN DERA BUGTI DISTRICT IN DERA BUGTI DISTRICT

Page 3: Presentaton on Mega Projects of PHED

Sui Water Supply SchemeSui Water Supply Scheme• Approved CostApproved Cost

• GOB ShareGOB Share• PPL SharePPL Share

On request of PPL, consultant was hired for supervision of the On request of PPL, consultant was hired for supervision of the project implementation which expired on June 2012. Due to project implementation which expired on June 2012. Due to additional man months of supervision upto December 2014 additional man months of supervision upto December 2014 and increase of non-schedule items prices as per market and increase of non-schedule items prices as per market prevailing rates, the cost of the project needs to be revised. prevailing rates, the cost of the project needs to be revised.

Rs.412.231 Million.Rs.412.231 Million.Rs.312.231 Million.Rs.312.231 Million.Rs.100.000 Million.Rs.100.000 Million. Revised CostRevised Cost Rs.432.210 Million Rs.432.210 Million

Date of StartDate of StartDate of CompletionDate of Completion

February 2011February 2011December 2013December 2013(Subject to Release of Funds)(Subject to Release of Funds)

Present Population Present Population Projected PopulationProjected Population

40,000 Souls40,000 Souls72,000 Souls72,000 Souls

Release PositionRelease Position• Released By GOBReleased By GOB• Released By PPLReleased By PPL

2011-12 2012-132011-12 2012-13Rs.135.00 (M) Rs.43.00 (M)Rs.135.00 (M) Rs.43.00 (M)Rs. 20.00 (M) Rs.20.00 (M)Rs. 20.00 (M) Rs.20.00 (M) Total Release: Rs.218.00 (M)Total Release: Rs.218.00 (M)

Expenditure Upto 31Expenditure Upto 31stst December 2012 December 2012 2011-12 2012-13 2011-12 2012-13 Rs.155.00 (M) Rs. 193.424 (M)Rs.155.00 (M) Rs. 193.424 (M)

Page 4: Presentaton on Mega Projects of PHED

Sui Water Supply SchemeSui Water Supply Scheme• Main Main

ComponentsComponentsPipeline Trunk & Zone A.B,C,D,E & FPipeline Trunk & Zone A.B,C,D,E & F 74%

Construction of O.H.S.R 120,000 gallon 4 Nos. Construction of O.H.S.R 120,000 gallon 4 Nos. 51%

Construction of Pump House 2 Nos.Construction of Pump House 2 Nos. 95%

Repair & Maintenance of Tank 120,000 gallon 2 Nos.Repair & Maintenance of Tank 120,000 gallon 2 Nos. 80%

Supplying & Installation of Pumping Machinery 6 setsSupplying & Installation of Pumping Machinery 6 sets 90%

Construction of staff Quarter 1 No.Construction of staff Quarter 1 No. 5%

Construction of StoreConstruction of Store 5%

Construction of DDO OfficeConstruction of DDO Office 5%

Repair & Maintenance of Servant Quarter Repair & Maintenance of Servant Quarter 85%

Land Acquisition Land Acquisition -

Purchase of Tool , Plant & Survey instruments Purchase of Tool , Plant & Survey instruments -

Soil Investigation Soil Investigation 100%

Supply of pipes for Household Connection Supply of pipes for Household Connection 60%

Overall ProgressOverall Progress• Physical Progress 55%Physical Progress 55%• Financial Progress 47%Financial Progress 47%

Page 5: Presentaton on Mega Projects of PHED

Way forward Way forward

The allocation in the PSDP for the financial year The allocation in the PSDP for the financial year 2012-13 is Rs.43.00 million but we need Rs.50.00 2012-13 is Rs.43.00 million but we need Rs.50.00 million addition to allocation of current financial year million addition to allocation of current financial year and remainin in 2013-14, so that the scheme could be and remainin in 2013-14, so that the scheme could be completed by December 2013.completed by December 2013.

Page 6: Presentaton on Mega Projects of PHED

BottlenecksBottlenecks

Contractor is not willing to continue work on the Contractor is not willing to continue work on the already approved rates. The PC-I has been revised already approved rates. The PC-I has been revised twice and required third revision due to enhancement twice and required third revision due to enhancement of rates .of rates .

If the cash flow remains same it will take 2-3 years If the cash flow remains same it will take 2-3 years more to complete the scheme and the out come more to complete the scheme and the out come results will be achieved. results will be achieved.

Page 7: Presentaton on Mega Projects of PHED

Rehabilitation/Reconstruction of Rehabilitation/Reconstruction of Akra Kaur Dam Akra Kaur Dam

GwadarGwadar

Page 8: Presentaton on Mega Projects of PHED

REHABILITATION/RE-CONSTRUCTION OF AKRA KAUR

Approved Cost Rs.415.000 Million

Date of Approval 7th April 2011

Date of Start 1st July 2011

Target Date of Completion within 18 Months (As per PC-I)

Expected Completion date 31st December 2013Subject to availability of Funds

Financial Phasing

Allocation Funds Released

Expenditure Up to date

2011-12 100.000 60.000 60.000

2012-13 100.000 20.00 20.00

TOTAL:- 200.000 80.000 80.000

Page 9: Presentaton on Mega Projects of PHED

S.# Major Components Physical Financial1 Rehabilitation / Reconstruction of Akra Kaur Dam 10% 15%2 Providing & Laying of Pipeline for Faqir Colony 85% 68%3 Providing & Laying of parallel 12" pipeline class C from Akra

Kaur Dam to Gwadar Town40% 24%

4 Construction of Boundary Wall for Airport Pumping Station 45% 35%

5 Construction of Boundary Wall for Pishukan Water Supply Scheme Gwadar

- -

6 Construction of Boundary Wall for Jiwani Pumping Station Gwadar

- -

7 Construction of Boundary Wall for Surbandar Pumping Station Gwadar

100% 100%

8 Restoration of flood damages to Cyclone PHET during June 2010

25% -

9 Providing & Laying of parallel 10" dia PVC pipe class C from Junction 1 (Nigore Sharif) to Junction 2 (Palleri Pumping Station)

45% 7%

MAJOR COMPONENTSMAJOR COMPONENTS

Page 10: Presentaton on Mega Projects of PHED

REHABILITATION/RE-CONSTRUCTION OF AKRA KAUR

OVERALL PROGRESSOVERALL PROGRESS

PhysicalPhysical 41%41%FinancialFinancial 19%19%

• Reason of Delay Meager Allocation of Funds

• Remedial Measures Funds may be made available

Page 11: Presentaton on Mega Projects of PHED

Clean Drinking Water ProjectClean Drinking Water Project

Provincial Project Implementation UnitProvincial Project Implementation Unit

Clean Drinking Water for All Project Clean Drinking Water for All Project

Page 12: Presentaton on Mega Projects of PHED

Total No of Plants No. of union councils 567+8 Additional Plants (Total: 575)

Ultra filtration plants 542Reverse Osmosis plants 33

Sites/Locations Union councils identified by the respective District Government

Coordination and Monitoring

Project Management Unit Ministry of Special Initiative (Devolved)

Implementation PPIU with the collaboration of Executive Engineer, Public Health Engineering Department

Monitoring Project Monitoring Cell working under the administrative control of Secretary PHE Department

Operation & Maintenance

After commissioning of the plants the same contractor shall carry out the O&M for a period of three years

Clean Drinking Water for All ProjectClean Drinking Water for All Project

Project Digest Project Digest

Page 13: Presentaton on Mega Projects of PHED

Pre-qualification of Contractors

By the pre-qualification committee constituted the Federal Government level

Contract award By the contract award committee constituted at the Federal Government level with the representation of Provincial Government.

Status of contract award in Balochistan

409 Ultra filtration plants to M/s GP-BIDC Islamabad33 Reverse osmosis plants to M/s Ever Green Lahore

Contract Cost of 409 UF Plants

Rs. 812.187 Million

Contract Cost of 33 RO Plants

Rs. 246.236 Million

Contract of 133 plants awaited

Rs. 332.50 Million

Project Digest Project Digest

Clean Drinking Water for All ProjectClean Drinking Water for All Project

Page 14: Presentaton on Mega Projects of PHED

DescriptionDescription ProgressProgressUF Plants R.O Plants

Work Awarded 409 33Completed plants 405 7In complete plants 4 3Functional plants 336 7Non functional plants 69 -Physical progress against 409 83% 21%

Status of work awardedStatus of work awarded

Page 15: Presentaton on Mega Projects of PHED

Financial ProgressFinancial Progress (Expenditure incurred so far)(Expenditure incurred so far)

•Clean Drinking Water for All Project (CDWA) Contract cost of 409 ordinary Plants Rs. 812.187 MillionEstimated cost of 133 ordinary left over Plants Rs. 332.500 MillionContract Cost of 33 Reverse Osmosis Plants Rs. 246.236 Million

•Water Deficit SitesDevelopment of Water deficit sites Rs. 122.663 Million

Total (A+B) Rs. 1513.586MillionAmount Released Till dateC. Ordinary plants under CDWA Rs. 803.814 MillionD. Development of Water deficit sites Rs. 86.521 Million

Total (C+D) Rs. 890.335 MillionBalance Required= Rs. 1513.586 (-) 890.335 Million Rs. 623.251 Million

Page 16: Presentaton on Mega Projects of PHED

Brief on Completion of Brief on Completion of incomplete and incomplete and

Rehabilitation of Old and Rehabilitation of Old and Construction of New Construction of New

Water Supply Schemes in Water Supply Schemes in various District of various District of

Balochistan Balochistan (Federal Portfolio)(Federal Portfolio)

Page 17: Presentaton on Mega Projects of PHED

BackgroundBackground

PHE department prepared a portfolio of 189 water supply schemes PHE department prepared a portfolio of 189 water supply schemes requiring completion, rehabilitation & construction.requiring completion, rehabilitation & construction.

PDWP and CDWP approved the scheme amounting to PDWP and CDWP approved the scheme amounting to Rs.497.665 Million.Rs.497.665 Million. The scheme was reflected in Federal PSDP 2009-10 and 2011-12 The scheme was reflected in Federal PSDP 2009-10 and 2011-12 under housing and works sector.under housing and works sector.

Page 18: Presentaton on Mega Projects of PHED

Physical ProgressPhysical Progress Number of schemes approvedNumber of schemes approved == 189189

– Completed Completed == 4747– Under progressUnder progress == 2222– Physical progressPhysical progress == 25%25%

Financial ProgressFinancial Progress Approved CostApproved Cost = 497.665 Million= 497.665 Million Amount released by the Federal Govt:Amount released by the Federal Govt: = 135.052 Million= 135.052 Million Up to date expenditureUp to date expenditure = 135.052 Million= 135.052 Million Financial ProgressFinancial Progress = 27%= 27%

Page 19: Presentaton on Mega Projects of PHED

Further ProgressFurther Progress Federal Government stopped further financing after Federal Government stopped further financing after promulgation of 18promulgation of 18thth amendment. amendment. In a meeting held under the chairmanship of Secretary In a meeting held under the chairmanship of Secretary Planning Government of Balochistan on 4Planning Government of Balochistan on 4 thth October October 2011, 2011, it was decided that PHE department:it was decided that PHE department:

i.i. would take up the issue through P&D department with the Federal would take up the issue through P&D department with the Federal Government.Government.

ii.ii. To prepare separate PC-I of prioritized on going projects to be To prepare separate PC-I of prioritized on going projects to be completed in near future for its financing through Provincial completed in near future for its financing through Provincial Government funds Government funds

Page 20: Presentaton on Mega Projects of PHED

Present StatusPresent Status Federal Government did not consider the Federal Government did not consider the Provincial Government’s request even after a Provincial Government’s request even after a D.O D.O letter by the former worthy ACS (Dev).letter by the former worthy ACS (Dev).

PHE department framed a PC-I costing Rs. PHE department framed a PC-I costing Rs. 43.314 Million for completion of 22 ongoing 43.314 Million for completion of 22 ongoing schemes for arrangement of funds through schemes for arrangement of funds through bridge bridge financing, so that expenditure already financing, so that expenditure already incurred incurred may not go waste. may not go waste.

Page 21: Presentaton on Mega Projects of PHED

Present StatusPresent Status The said PC-I stands submitted to P&D The said PC-I stands submitted to P&D department in November 2012, but without any department in November 2012, but without any further action.further action.

P&D department vide letter dated 27P&D department vide letter dated 27thth November 2012, desired for arrangement of November 2012, desired for arrangement of brief brief for worthy ACS (Dev) for worthy ACS (Dev)

Page 22: Presentaton on Mega Projects of PHED

RecommendationsRecommendations Approval of the PC-I costing Rs. 43.314 Million Approval of the PC-I costing Rs. 43.314 Million by the PDWP on priority basis. by the PDWP on priority basis.

Release of funds through PSDP 2012-13 against Release of funds through PSDP 2012-13 against overall saving.overall saving.

Approaching Federal Government yet again for Approaching Federal Government yet again for release of the balance funds to the tune of Rs. release of the balance funds to the tune of Rs. 362.613 Million.362.613 Million.

Page 23: Presentaton on Mega Projects of PHED

KACHHI PLAIN WATER SUPPLY PROJECTKACHHI PLAIN WATER SUPPLY PROJECTPh-I & IIPh-I & II

Page 24: Presentaton on Mega Projects of PHED
Page 25: Presentaton on Mega Projects of PHED

BRIEF NOTE KACHHI PLAIN WATER SUPPLY PROJECT .

The phase-I of the project was approved by PDWP at a total cost of Rs.197.469 Million in June, 2001 to cater the drinking water requirements Nautal, Bakhtiarabad and enrooted population. The work on the project was initiated during the second week of November, 2001 with a planned implementation period of 18 months. The PC-I was subsequently revised and approved by PDWP on 30th August , 2004 a cost of Rs.213.750 Million to accommodate of laying of pipeline from Nautal to Landhi Sharif on the directive of the than Prime Minister of Pakistan.

Page 26: Presentaton on Mega Projects of PHED

BOTTLE NECKS. 1. FINANCIAL:-

Insufficient and un-timely release of funds for the project.The detail is given as under :- 

Year Year ReleaseRelease Expenditure Expenditure 1.1. 2001-022001-02 Rs.1.9600 MRs.1.9600 M Rs.1.9600 MRs.1.9600 M2.2. 2002-032002-03 Rs.30.000 MRs.30.000 M Rs.30.000 MRs.30.000 M3.3. 2003-042003-04 Rs.60.000 MRs.60.000 M Rs.60.000 MRs.60.000 M4.4. 2004-052004-05 Rs.38.000 MRs.38.000 M Rs.38.000 MRs.38.000 M5.5. 2005-062005-06 Rs.28.303 MRs.28.303 M Rs.28.303 MRs.28.303 M6.6. 2006-072006-07 Rs.28.000 M Rs.28.000 M Rs.28.000 MRs.28.000 M7.7. 2007-082007-08 Rs.20.000 MRs.20.000 M Rs.20.000 MRs.20.000 M8.8. 2008-092008-09 Rs.29.077 MRs.29.077 M Rs.29.077 MRs.29.077 M9.9. 2009-102009-10 Rs.38.310 MRs.38.310 M Rs.38.310 MRs.38.310 M10.10. 2010-112010-11 Rs.7.840 MRs.7.840 M Rs.7.840 MRs.7.840 M

G.Total:-G.Total:- Rs.281.49MRs.281.49M Rs.281.49 MRs.281.49 M

Page 27: Presentaton on Mega Projects of PHED

KACHHI PLAIN WATER SUPPLY PROJECTKACHHI PLAIN WATER SUPPLY PROJECT

Salient FeaturesSalient FeaturesApproved CostApproved Cost Rs. 283.199 Million Rs. 283.199 Million Total ReleaseTotal Release Rs. 281.490 MillionRs. 281.490 MillionExpenditure Expenditure Rs. 281.490 MillionRs. 281.490 Million

Date of StartDate of Start October, 2002October, 2002Date of CompletionDate of Completion June, 2011June, 2011CoverageCoveragePresent PopulationPresent Population 53,000 Souls53,000 SoulsProjected PopulationProjected Population 94,000 Souls94,000 Souls

No. of villages/Town to be benefitedNo. of villages/Town to be benefited 1818Maximum Daily Demand (Present)Maximum Daily Demand (Present) 1.0 MGD1.0 MGD

Page 28: Presentaton on Mega Projects of PHED

COMPONENT WISE PROGRESSDERA MURAD TREATMENT WORKSDERA MURAD TREATMENT WORKS1. Acquisition of Land 1 Job 100%2. Const: of Intake Structure 1 Job 100%3. Const: of Sedimentation Tanks 2 Nos. 100%4. Const: of Sump Well with Pump House 1 Job 100%5. Raw Water Tanks 2 Nos. 100%6. Filter Units 3 Nos. 100%7. Clear W/Tank with P/House at main water Works 1 No 100%8. Const. of Chowkidar Quarter 1 No 100%

9. Purchase of Vehicle 1 No 100%10. Const. of Generator Room 1 No 100%11. S/Installation of Pumping Machinery 4 Set 100%12. Barbed Wire Fencing around Water Works 1 Job 100%13. Energization by QESCO 1 Job 100%14. Const. of Assistant Engineer Residence. 1 No 100%

15. Supply & Installation of 135 KVA Generator 1.No 100%

Page 29: Presentaton on Mega Projects of PHED

BB CONST. OF NAUTAL BOOSTING STATIONCONST. OF NAUTAL BOOSTING STATION

1. Land Acquisition 1 Job 100%

2. Const. of S/Tanks 30000 Gln: & 75000 Gln: with P/House 2 No 100%

3. S/Installation of Pumping Machinery 2 Set 100%

4. S/Installation of Generator 150 KVA 1 Set 100%

5.6.

Const. of Generator RoomSupply & Installation of Innovator for Generator

1 No1No

100%100%

7. Energization by QESCO 1 Job 100%

8. Const. of Chowkidar Quarter 1 No 100%

CC BAKHTIARABAD WATER WORKSBAKHTIARABAD WATER WORKS

1 Land Acquisition 1 Job 100%

2 Const. of S/Tank 75000 Glns with P/House 1 Job 100%

3 Const. of Chowkidar Quarter 1 JNo 100%

4 Barbed wire Fencing around water works 1 Job 100%

Page 30: Presentaton on Mega Projects of PHED

PROGRESSPROGRESSPhysicalPhysical 100%100%FinancialFinancial 99.39%99.39%Overall Progress Overall Progress 100%100%

DD COMMUNITY TANKCOMMUNITY TANK

1 Const. of Community Tank 5000 glns 6 No 98%

EE LAYING OF PIPE LINE LAYING OF PIPE LINE

1 Supplying and Laying of Pipe Line from treatment work to Bakhtiarabad 18", 16", 55 Kms

1 Job 100%

2 Supplying and Laying of Pipe Line from Nautal to Landhi Sharif

1 Job 95%

3 Supplying and Laying of Pipe Line from Bakhtiarabad to Bahag 6” dia 23 Km.

1 Job 100%

4 Supplying and Laying of Pipe Line from Nautal to Hejiwani & Ramdani

1 Job 98%

Page 31: Presentaton on Mega Projects of PHED

KACHHI PLAIN WATER SUPPLY PROJECT KACHHI PLAIN WATER SUPPLY PROJECT PHASE-IIPHASE-II

Page 32: Presentaton on Mega Projects of PHED

The PC-I for Kachhi Plain water supply projectThe PC-I for Kachhi Plain water supply projecthas been submitted to P & D department for has been submitted to P & D department for

approval .approval .

The main components are as under:-The main components are as under:-

Page 33: Presentaton on Mega Projects of PHED

COMPONENTCOMPONENT A. MODIFICATION OF TREATMENT PLANTMODIFICATION OF TREATMENT PLANT1. Settling Tank 1.Job

2. Sludge Motor Chamber 2.Nos3. Mechanical and Electrical Units for Treatment Plant 1.Job4. Laboratory & Office 1.No5. Process Control Room and Store 1.No6. Quarters 5.NosB. STORAGE TANKS STORAGE TANKS 1. Storage Tank 1,000 Gallon Capacity at Abro Village 1.No2. Storage Tank 1,500 Gallon Capacity at Got Ghulam Haider 1.No3. Storage Tank 2,500 Gallon Capacity at Takari Aziziullah. 1.No4. Storage Tank 3,000 Gallon Capacity at Damboli Village, Miro Got, Takari

Raisani, Got Raisani, Mach Village.5.No

5. Storage Tank 4,000 Gallon Capacity at Village Nindani, Bhatti village, Machi Village.

4.Nos

6. Storage Tank 5,000 Gallon Capacity at Qalandar Shah. 1.No7. Storage Tank 6,000 Gallon Capacity at Takari Saifullah, Got Juma,

Muradani, Village Doli.5.Nos

8. Storage Tank 7,000 Gallon Capacity at Lindsay and Noshera 2.Nos

Page 34: Presentaton on Mega Projects of PHED

9. Storage Tank 9,000 Gallon Capacity at Mungir Village, Noshera, Got Dashti, Tangoti Khan Mohammad.

6.Nos

10. Storage Tank 10,000 Gallon Capacity at Got Machi (1 No) 1.No

11.Storage Tank 15,000 Gallon Capacity at Chander, Wazir Machi, Chuttalabad.

3.Nos

12. Storage Tank 20,000 Gallon Capacity at Ghulam Haider, Takari Kurd 2.Nos

13. Storage Tank 25,000 Gallon Capacity Wazir Khan and Dashti Village 2.Nos

14. Storage Tank 60,000 Gallon Capacity at Ghazi. 1.No

15. Under Ground Storage Tank 60,000 Gallon Capacity At Nuthal. 1.No

16. Storage Tank 70,000 Gallon Capacity at Baktiarabad. 2.Nos

17. Storage Tank 80,000 Gallon Capacity at Bhag 2.Nos

18. Storage Tank 83,000 Gallon Capacity at Chalgiri . 1.No

19.Storage Tank 1,00,000 Gallon Capacity at Haji Shaher and Babar Ahmad Khan.

5.Nos

C. BUILDINGSBUILDINGS1.

Pump Operator House / Chowkidar Quarter at Baktiarabad and Lindsay2.Nos

2.Pump House Over Clear Water Tank for 75,000 Gallons Tank At Baktiarabad

1.No

3.Pump House Over Clear Water Tank for 60,000 Gallons Tank At Nuthal

1.No

Page 35: Presentaton on Mega Projects of PHED

4.Pump House Over Clear Water Tank for 30,000 Gallons Tank At Lindsay

1.No

5. Patrolling Huts 8.Nos

6. Wash Rooms for Patrolling Huts and Pump Operator House 10.Nos

7. Generator Rooms at Baktiarabad and Lindsay 3.Nos

D.D. LAYING OF PIPELINE LAYING OF PIPELINE 1. Procurement and Laying of Pipe Line 1.Job

E.E. Procurement and installation of pumping machinery & Procurement and installation of pumping machinery & generatorsgenerators

F.F.Providing and fixing 25 KVA transformer at LINDSAYProviding and fixing 25 KVA transformer at LINDSAY

1.No1.No

G.G.Procurement of Land at BAKTIARABAD AND LINDSAYProcurement of Land at BAKTIARABAD AND LINDSAY

3.Jobs3.Jobs

H.H. Overhead Water Tank 50,000 GlnsOverhead Water Tank 50,000 Glns 1.NO1.NOG.G. PROJECT SUPPORT COSTPROJECT SUPPORT COST

Page 36: Presentaton on Mega Projects of PHED

PROJECT IN PIPELINE

Page 37: Presentaton on Mega Projects of PHED

Project Title: Provision of Drinking Water to the FishermenCommunities along-with Coastline

Location: Pasni and Ormara Sub-Divisions of Balochistan

Concerned Federal Ministry: Economic Affairs Division

Sponsoring Agency: Government of Pakistan

Executing Agency Public Health Engineering Department, Government of Balochistan

Agency for Operation& Maintenance:

Public Health Engineering Department, Government of Balochistan

  Local FEC TotalPC-I

(Approved by the CDWP on 21-01-2011)

445.00 Nil 445.00

Revised PC-I (December, 2012)

586.415 Nil 586.415

Capital Cost: (Rs. in million)

Provision of Drinking Water to the Provision of Drinking Water to the Fishermen Communities along-with Fishermen Communities along-with

CoastlineCoastline

Page 38: Presentaton on Mega Projects of PHED

Project Title: Rehabilitation of Flood Affected Water Supply Schemes in Balochistan (2012)

Location: Thirteen Districts of Balochistan Province.

Approved Cost: Rs.407.594 MillionRs.407.594 Million

Sponsoring Agency: Federal Government (NDMA) & Government of Balochistan (P&D Department).

Executing Agency Public Health Engineering Department, Government of Balochistan

Objectives:Objectives: The proposed scheme forms an integral part of the objective of the sector to provide improved quality drinking water to the flood effected population of the thirteen Districts of Balochistan.

Present Status:Present Status: • UNICEF provided Rs.45.191 (M) on emergent basis for Restoration UNICEF provided Rs.45.191 (M) on emergent basis for Restoration of Water Supply Schemes in severely affected areas.of Water Supply Schemes in severely affected areas.

• The Honourable Prime Minister of Pakistan has announced The Honourable Prime Minister of Pakistan has announced emergency grant of Rs.2.00 Billion, out of it Rs.150.00 (M) have been emergency grant of Rs.2.00 Billion, out of it Rs.150.00 (M) have been proposed by the NDMA to PHED which is yet to be released.proposed by the NDMA to PHED which is yet to be released.

Rehabilitation of Flood Affected Water Rehabilitation of Flood Affected Water Supply Schemes Supply Schemes

in Balochistan (2012)in Balochistan (2012)

Page 39: Presentaton on Mega Projects of PHED

ABSTRACT

S.No District Total WSS in District

No of Scheme Damaged

# of Scheme Restored

Estimated Cost for Rest: / Reh: of WSS

1 Dera Bugti 74 11 4 7.8162 Khuzdar 196 21 20 5.5403 Loralai 119 2 2 7.9094 Killa Saifullah 125 7 1 6.2355 Sibi 55 11 5 15.9936 Kachhi 51 6 3 16.9507 Kachhi Plain 1 1 1 24.3168 Harnai 24 2 1 0.5509 Jhal Magsi 15 6 6 5.580

10 Nasirabad 53 44 16 118.60011 Jaffarabad 86 47 32 184.00012 kalat 104 3 2 2.59413 Sherani 54 10 7 6.981

  TOTAL 957 171 100 403.064

Water Filtration Plants Damaged due to Recent FloodTotal Plants Total Damaged Restored Not Restored

1 Nasirabad 21 12 5 72 Jaffarabad 45 24 3 21

66 36 8 28

Estimated cost of Rs.7.00 million will be required for restoration of the plants.

Rehabilitation of Flood Affected Water Supply Rehabilitation of Flood Affected Water Supply Schemes Schemes

in Balochistan (2012)in Balochistan (2012)