9
FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

  • View
    217

  • Download
    1

Embed Size (px)

Citation preview

Page 1: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

FIDIBE – WP6Results and future challenges

Marjana Majerič

FIDIBE Final Conference, 1/12/2011

Szekesfehervar, Hungary

Page 2: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Overview of the WP6 / 1

Aim of the WP6/1 is to ensure the sustainability and capitalization of the project results.

– continuing the transnational cooperation after the project ends: two Future Cooperation Schemes have been prepared under the work package lead by TP L,

Mentoring scheme Training and development

Incubator Management of the common tool (finance) / teams virtual application

Page 3: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Overview of the WP6 / 2

Aim of the WP6/2 is preparation of the Deed of Foundation of the SEE Innovative Business Parks Association.

-sharing best practices, collaborating on project opportunities and discussing new policies for improving innovation environment-open to new members

Page 4: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Overview of the WP6 / 3

• Aim is to ensure sustainability of the project’s results and „selling” them to the EU funding operations

– Updating and upgrading national / regional / local list of stakeholders

– Desk analysis of national / regional / local programmes, strategies that would support results and ensure the sustainability of FIDIBE results project

– Proposal for national / regional / local policy improvement – elaboration for stakeholders

Page 5: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Impact of the FIDIBE on TP LJ future challenges

Development of the new cluster

in the medical sector and construction building

(Feasibility Study – WP5 Result)

Page 6: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Why to support new pillar?

• Trend in TPs all over the globe: ICT, Life Sciences, Biotechnology• 30 resident companies in TP LJ operating in medicine/biotechnology • Lack of networking and supporting services for companies in the

sector with potential for growth• Idea well accepted among regional actors

Page 7: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Concept

• utilization concept for a further expansion of the medical supply offers has been placed

Principle of a life-

science research centre

included in the future

plans

Page 8: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Invesment

F1/1 €15,000,000.00

Research centre: €43,000,000.00

Laboratories: €12,500,000.00

Sum of investment in total €70,500,000.00

TPLJ in 202512 employees

400 resident companies120.000 m2 office spaces,

14 buildings, segmented park, gateway and landing destination for

talents

TPLJ in 20119 employees

300 resident companies41.000 m2 office spaces,

27.000 m2 service surface,8 buildings, multisector park,

Page 9: FIDIBE – WP6 Results and future challenges Marjana Majerič FIDIBE Final Conference, 1/12/2011 Szekesfehervar, Hungary

Thank you

e-mail: [email protected]

Tehnološki park 19, Ljubljana

Phone: +386 1 620 34 00

Fax: +386 1 620 34 09

www.tp-lj.si/en