Interruptible Load Program(ILP)

Page 2: F 20141105 011821 ilppresentation102214

2

Page 3: F 20141105 011821 ilppresentation102214

3

3

Energy Regulatory Commission’s (ERC) ILP Guidelines

NGCP shall inform all Grid users of any existing alert on the system

Page 4: F 20141105 011821 ilppresentation102214

4

4

Page 5: F 20141105 011821 ilppresentation102214

5

5

ILP Mechanics in Meralco Area

ILP in MERALCO’s franchise area

1. Activated when NGCP issues a RED ALERT notice

2. Longer preparatory stage: Participants will be notified of possible activation even under YELLOW ALERT status

3. Initially for 1MW customers only.

4. “De-loaded kWh” will be based on the difference between an agreed baseline hourly load profile and actual hourly meter reading

5. Compensation for participating customers is the difference in rate between self gen rate and average Meralco rate.

6. Recovery of the compensation costs will be through the generation charge paid for by all customers in Meralco franchise as provided in approved ERC rules.

Page 6: F 20141105 011821 ilppresentation102214

6

6

Page 7: F 20141105 011821 ilppresentation102214

7

7

Energy Regulatory Commission’s (ERC) ILP Guidelines

Compensation paid to ILP participants

(PC) Participating Customer’s Ave. Rate for the current billing

Page 8: F 20141105 011821 ilppresentation102214

8

8

Energy Regulatory Commission’s (ERC) ILP Guidelines

Recovery from all MERALCO customers

Page 9: F 20141105 011821 ilppresentation102214

9

9

Status as of October 20, 2014

Existing ILP Captive Participants

129 Services or Meters

160.26 MW in Capacity : Signed Up80 MW Potential Participants

RESA Contestable Customers Potential

245 MW in Capacity

Page 10: F 20141105 011821 ilppresentation102214

10

10

Activation

How you can help : sign-up to participate

Volunteer to de-load a certain amount of your demand

• Amount of your requirement that can be shifted to your generator

Choose a time slot

• Two options: 10am-1pm or 12nn-3pm

• Captures the peak demand that occurs from 12 noon to 2 pm

Agree on a baseline load profile

• As a reference for calculation of de-loaded energy

Designate 3 Contact persons

• Ensure proper communication and confirmation* at all times

* Basis for eligibility to compensation

A B

Page 11: F 20141105 011821 ilppresentation102214

11

11

Activation

Notification and activation protocol

1st Notification: 4pm of Prior day

• Yellow & Red System Alerts based on information from NGCP (PGC 6.6.6.1)

• Meralco will contact you through e-mail, sms, voice call & RMs

2nd Notification: 6am of the same day

• Yellow and Red System Alerts based on updated information from NGCP

• Meralco will contact you through e-mail, sms, voice call & RMs

Final Confirmation of de-loading: 1 hour before schedule

• Meralco will contact you through e-mail, sms, voice call & RMs

Actual de-loading on chosen schedule

• Load back to normal after schedule

Immediately

confirm:

(1) receipt of

notification/

confirmation,

and (2)

ability to de-

load as

scheduled &

as

committed

Red Alert

status

persists

Page 12: F 20141105 011821 ilppresentation102214

12

12

Activation

16 May 2014 ILP Activation

• 8AM: Luzon grid on YELLOW ALERT based on NGCP advisory• Notified ILP participants of possible de-loading

• 1:25PM: NGCP announced RED ALERT from 1pm to 4PM due to the forced outage of Pagbilao 1 (375 MW deficiency)• Notified all ILP participants of de-loading from 2PM

to 4PM

• 2PM to 4PM: ILP activated• ~70 MW committed for de-loading from more than

50 establishments (e.g. malls, office buildings, etc.)

Page 13: F 20141105 011821 ilppresentation102214

13

13

Activation

16 May 2014 ILP Activation

• Rotating Manual Load Dropping (MLD) had to be performed at 1:27PM to immediately restore system frequency in the grid

• Best effort for ILP was activation at 2PM

• Ensured continuous power supply to ~50,000 households

• Limited duration of rotating MLD

Page 14: F 20141105 011821 ilppresentation102214

14

14

Compensation

Read

• Meralco Reads Meter

• Tags hours of ILP participation

Rate

• Determine Incremental de-loading rate

kWh

• Compare actual meter reading & baseline load profile

• Determine total de-loaded quantity for compensation

Pesos

• De-loading compensation = [Incremental de-loading rate x compensable kWh] + Maintenance Cost

Confirm

• Get customer confirmation and acceptance

• Customer issue invoice or statement of account

Pay & Receipt

• ILP participants receive compensation

• Customer issues receipt to MERALCO

Figures for compensation will be sent together with your bill

Page 15: F 20141105 011821 ilppresentation102214

15

15

Compensation

Rule of thumb on De-Loading Compensation to ILP participant

• If an ILP participant de-loads 10 MW for 10 hours in a month, that participant will receive around ₱0.65 Million as De-loading Compensation

₱0.65 MillionDe-loading Compensation

=[₱6.3/kWh x 100,000 kWh]

Incremental De-loading Rate x

Compensable kWh

+₱23,548Allowable

Maintenance Cost

Where:

₱6.3/kWhIncremental De-loading Rate

=₱15.3/kWh

Allowable Generation Cost of Fuel-

₱9/kWhPC average rate

₱15.3/kWhAllowable Generation Cost of Fuel

=₱45/L x 0.34 L/kWh

Generation Cost of Fuel x Fuel Consumption Rate

Assumption: average price of diesel is ₱45/L

₱23,548Allowable Maintenance Cost

100,000 kWh x 0.32/kWh or ₱23,548 per month, whichever is

lower

100,000 kWhDe-loaded kWh

= 10,000 kW x 10 hours in a month

Page 16: F 20141105 011821 ilppresentation102214

16

16

Compensation

Rule of thumb on the impact of recovering the De-Loading Compensation from end-users

• If 10 ILP customers de-load 10 MW for 10 hours in a month

• Add-on to the generation charge will be ₱0.0026/kWh

• ₱0.52 in the total bill of a residential customer consuming 200 kWh