Euclid Payload Module Industry Day Organised by ESA and Astrium SAS Plenary Session ESTEC, 17 Apr 2013

Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

  • Upload
    vohanh

  • View
    226

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid Payload Module Industry Day Organised by ESA and Astrium SAS

Plenary Session

ESTEC, 17 Apr 2013

Page 2: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Industry Day for Euclid Payload Module17th April 2013

Noordwijk Space ExpoKeplerlaan 3 – 2201 AZ Noordwijk

(The Netherlands)

Foreword1. The Euclid Mission

Euclid is an optical/near-infrared survey mission designed to understand the origin of the accelerating expansion of the Universe. It will use cosmological probes to investigate the nature of dark energy, dark matter and gravity by tracking their observational signatures on the geometry of the Universe and on the cosmic history of structure formation.

The mission will investigate the distance-redshift relationship and the evolution of the cosmic structures by measuring shapes and redshifts of distant galaxies by looking back on 10 billion years of cosmic history. It combines several techniques of investigation, also called cosmological probes, in a very large survey over the full extragalactic sky. Among these cosmological probes, two of them play a major role in the EUCLID mission concept and the instrumental approach: the Weak Gravitational Lensing (WL) and the Baryon Acoustic Oscillations (BAO).

The Euclid spacecraft consists of two main modules:

The PLM which consists of the PLM structure, the telescope assembly, the optical elements (including the dichroic), the support structure, the Instruments (VIS and NISP), the thermal hardware and the re-focus system.the Euclid Service Module (SVM) which comprises all the conventional spacecraft subsystems, the instruments warm electronics units, the sunshield and the solar array.

The target orbit is a large-amplitude libration orbit around the night-side Lagrange point of the Sun-Earth system. The launch service shall be provided by the Soyuz 2-1b with a Fregat upper stage from Kourou.

2. Responsibility

The Euclid mission has been approved by ESA and delegated bodies for a planned launch in 2020 in the frame of the Cosmic Vision 2015-2025 plan. ESA has the overall responsibility for the Euclid mission design and implementation including the procurement of the launch service.

The established Euclid Consortium is responsible for the development and delivery of the Instruments (VIS and NISP).

The industrial Prime Contractor is responsible for the development, procurement, manufacturing, assembly, integration, test, verification and timely delivery of a fully

Page 3: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

integrated spacecraft capable of accommodating the Payload Module and fulfilling the mission objectives.

The PLM Contractor is responsible for the development, procurement, manufacturing, assembly, integration, test, verification and timely delivery of a fully integrated Payload Module and related items capable of accommodating the delivered Instruments and fulfilling the mission objectives.

3. The Industry Day

Following the Invitation To Tender (ITT) released by the European Space Agency (ESA) in July 2012, Astrium SAS has been selected as Contractor of the Payload Module for the Implementation phase (B2/C/D/E1).

Therefore, Astrium SAS has been authorized to proceed with the competitive procurement process in order to build up the remainder of the PLM industrial team in a time period from Q2 2013 to Q2 2014 for PLM related items. This tendering process will be governed by ESA rules reported in the “Best practices for the selection of subcontractors by Prime Contractors in the frame of ESA’s major procurements” document (available on EMITS, addresshttp://emits.esa.int/ under “Reference Documentation” and “Administrative Documents”).

In advance to the announcement on EMITS of the ITTs to be released, the objective of this Industry Day is to present to the European industry the overall Euclid mission, the business opportunities, the bidding process and schedule for the build-up of the Euclid PLM industrial team.

Page 4: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Agenda9 :30 – Plenary Session - Noordwijk Space Expo Ariane-Room a) Introduction : objectives & organization of the Euclid PLM Industry Day (ESA)b) The Euclid mission (ESA)c) The Euclid System and Space segment (ESA)d) The Euclid programmatics (ESA)e) The Euclid Space segment procurement approach : PLM First, then Prime (ESA)f) The GEO return constraints for PLM and then Prime (ESA)g) Procurement rules (Best practices, ESA and Industry roles) (ESA)h) ECOS (ESA)

10 :15a) The Euclid PLM overall design (Astrium)b) The Euclid product tree and constituents (Astrium)c) The Euclid development logic : Models and objectives & schedule (Astrium)d) The ITT Process (according to Best Practices) (Astrium)e) List and dates of the future ITT’s (Astrium)

10 :45a) Presentation of each ITT (description and key-requirements, particular points, model

philosophy, schedule)

12 :00 Lunch

13 :30 Splinter meetings1. Mechanical ITT’s - Noordwijk Space Expo Ariane-Rooma) External baffleb) Strutsc) Supports & radiatorsd) Internal baffles & shielding & ISMe) M2 mechanism

2. Support activities – Noordwijk Space Expo Astronaut-Rooma) Project office supportb) Product assurance supportc) Mech/Opt AIT opsd) Thermal analysese) AIT SW & EGSE bench operations

3. Other ITT’s – ESTEC – ESCAPE Dance Rooma) EEE partsb) MLIc) Harnessd) Handling & adaptorse) AC flat mirror, Collimator, Mirrors, dichroic plate

16 :15 : end of the splinter meetings16 :30 : wrap-up with ESA17 :00 departure

Page 5: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid: a mission to map the Dark Universe The implementation Phase

Payload Module Industry Day Noordwijk, 17 April 2013 Giuseppe Racca

Page 6: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Outline of the presentation

1. Euclid Science Objectives

2. Euclid Mission Overview

3. Euclid Product trees

4. The Euclid programmatics

5. The Euclid Space segment procurement approach

6. The GEO return constraints for PLM and then Prime

7. Procurement rules (Best practices, ESA and Industry roles)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 2

Page 7: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

What Don’t we know? (Science Mag. 2005)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 3

At Science, we tend to get excited about new discoveries that lift the veil a little on how things work, from cellsto the universe. That puts our focus firmly on what has been added to our stock of knowledge. For thisanniversary issue, we decided to shift our frame of reference, to look instead at what we don’t know: thescientific puzzles that are driving basic scientific research.

We began by asking Science’s Senior Editorial Board, our Board of Reviewing Editors, and our owneditors and writers to suggest questions that point to critical knowledge gaps. The ground rules: Scientists

should have a good shot at answering the questions over the next 25 years, or they should at least know how to go aboutanswering them. We intended simply to choose 25 of these suggestions and turn them into a survey of the big questionsfacing science. But when a group of editors and writers sat down to select those big questions, we quickly realized that25 simply wouldn’t convey the grand sweep of cutting-edge research that lies behind the responses wereceived. So we have ended up with 125 questions, a fitting number for Science’s 125th anniversary.

First, a note on what this special issue is not: It is not a survey of the big societal challenges thatscience can help solve, nor is it a forecast of what science might achieve. Think of it instead as a surveyof our scientific ignorance, a broad swath of questions that scientists themselves are asking. As TomSiegfried puts it in his introductory essay, they are “opportunities to be exploited.”

We selected 25 of the 125 questions to highlight based on several criteria: how fundamental theyare, how broad-ranging, and whether their solutions will impact other scientific disciplines. Somehave few immediate practical implications—the composition of the universe, for example. Others wechose because the answers will have enormous societal impact—whether an effective HIV vaccine isfeasible, or how much the carbon dioxide weare pumping into the atmosphere will warm ourplanet, for example. Some, such as the nature ofdark energy, have come to prominence onlyrecently; others, such as the mechanism behindlimb regeneration in amphibians, haveintrigued scientists for more than a century. Welisted the 25 highlighted questions in no specialorder, but we did group the 100 additionalquestions roughly by discipline.

Our sister online publications are also devot-ing special issues to Science’s 125th anniversary.The Science of Aging Knowledge Environment,SAGE KE (www.sageke.org), is surveyingseveral big questions confronting researchers onaging. The Signal Transduction KnowledgeEnvironment, STKE (www.stke.org), hasselected classic Science articles that have had ahigh impact in the field of cell signaling and ishighlighting them in an editorial guide. AndScience’s Next Wave (www.nextwave.org) islooking at the careers of scientists grappling withsome of the questions Science has identified.

We are acutely aware that even 125 un-knowns encompass only a partial answer to thequestion that heads this special section: WhatDon’t We Know? So we invite you to participatein a special forum on Science’s Web site(www.sciencemag.org/sciext/eletters/125th),in which you can comment on our 125 questionsor nominate topics we missed—and we apol-ogize if they are the very questions you areworking on.

–DONALD KENNEDY AND COLIN NORMAN

W H A T D O N ’ T W E K N O W ?

www.sciencemag.org SCIENCE VOL 309 1 JULY 2005 75

Sp

ec

ial

Se

cti

on

What Don’t We Know?

CR

EDIT

:KEL

LY B

UC

KH

EIT

/SCIENCE

I N T RODUCT ION

76 In Praise of Hard Questions

78 What Is the Universe Made Of?

79 What Is the Biological Basis of Consciousness?

80 Why Do Humans Have So Few Genes?

81 To What Extent Are Genetic Variation and Personal Health Linked?

82 Can the Laws of Physics Be Unified?

83 How Much Can Human Life Span Be Extended?

84 What Controls Organ Regeneration?

85 How Can a Skin Cell Become a Nerve Cell?

86 How Does a Single Somatic Cell Become a Whole Plant?

87 How Does Earth’s Interior Work?

88 Are We Alone in the Universe?

89 How and Where Did Life on Earth Arise?

90 What Determines Species Diversity?

91 What Genetic Changes Made Us Uniquely Human?

92 How Are Memories Stored and Retrieved?

93 How Did Cooperative Behavior Evolve?

94 How Will Big Pictures Emerge From a Sea of Biological Data?

95 How Far Can We Push Chemical Self-Assembly?

96 What Are the Limits of Conventional Computing?

97 Can We Selectively Shut Off Immune Responses?

98 Do Deeper Principles Underlie Quantum Uncertainty and Nonlocality?

99 Is an Effective HIV Vaccine Feasible?

100 How Hot Will the Greenhouse World Be?

101 What Can Replace Cheap Oil—and When?

102 Will Malthus Continue to Be Wrong?

78 So Much More to Know …

See also Editorial on p. 19 and

www.sciencemag.org/sciext/125th

Contents >> NEWS

Published by AAAS

on

Febr

uary

11,

201

3w

ww

.sci

ence

mag

.org

Dow

nloa

ded

from

•  1st: What Is the Universe Made Of?

•  2nd: What Is the Biological Basis of Consciousness?

•  3rd: Why Do Humans Have So Few Genes?

•  4th: To What Extent Are Genetic Variation and Personal Health Linked?

•  5th: Can the Laws of Physics Be Unified?

Page 8: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid Scientific Objectives (1/6)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 4

ESA Cosmic Vision – 2008 plan

Theme 4 question: How did the Universe originate and what is it made of?   Investigate the nature and origin of the

Dark Energy that is accelerating the expansion of the Universe

Page 9: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Cosmology in one chart

  The universe is governed by its geometrical properties and by the stuff that it contains (Einstein’s General Relativity, but also classical physics);

  Basic physics (Friedman equation) says that if universe is flat, the density of “stuff” in the universe must be ρc which is today ~ 10-26 kg/m3;

  Observations of MBR shows that Universe is indeed flat. Planck showed very well:

  But ordinary matter (people, stars, dust, planets, etc.) can only be about 5% of ρc

  Evidence of dark matter (only interacting gravitationally) from galaxy rotation curve can be < 35% of ρc

  Observations of SN 1a (2011 Nobel Prize) shows that the Universe is expanding in an accelerated fashion. We need a new component (cosmological constant) exerting a negative pressure of a density of about 70% of ρc

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 5

Page 10: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid Scientific Objectives (2/6)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 6

The Cosmology Standard Model: ΛCDM

Komatsu et al. 2011 (WMAP7+LSS+SNe): H0=68.5±2.0 km/s/Mpc Ωm= 0.282±0.016 Ωb= 0.048±0.0028 ΩΛ= 0.723±0.016 Ωr= 0.000086 (photons + 3 massless neutrinos) 0.99 < Ωtot < 1.02 (2 sigma)

Page 11: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

The latest news from Planck

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 7

Page 12: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid Scientific Objectives (3/6)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 8

Issue Euclid’s Targets What is Dark Energy Measure the Dark Energy equation of state parameters

wp and wa to a precision of 2% and 10%, respectively, using both expansion history and structure growth.

Beyond Einstein’s Gravity

Distinguish General Relativity from modified-gravity theories, by measuring the galaxy clustering growth factor exponent γ with a precision of 2%.

The nature of dark matter

Test the Cold Dark Matter paradigm for structure formation, and measure the sum of the neutrino masses to a precision better than 0.04eV when combined with Planck.

The seeds of cosmic structure

Improve by a factor of 20 the determination of the initial condition parameters compared to Planck alone. n (spectral index), σ8 (power spectrum amplitude), fNL (non-gaussianity)

Euclid Science Objectives Summary

Page 13: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid Scientific Objectives (4/6)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 9

Concept and Requirements

  Optimize the mission for galaxy clustering and weak lensing two complementary dark energy probes

  Minimum survey area of 15,000 deg2 (40% of all) 6 year nominal mission Weak Lensing: VIS imager + NIR photometer   Shapes and shear of galaxies with a density of >30 galaxies/arcmin2.   Very high image quality, high stability   Minimum Systematics σsys < 10-7

  Redshift accuracy dz/z ~ 0.04, down to z~2 Galaxy clustering NIR slitless spectrometer   Redshifts for >3500 galaxies/deg2   Redshift range 0.7 < z <2.05   Redshift accuracy dz/z < 0.001 in same volume as WL   ….Line Flux limit < 3 10-16 erg cm-2s-1 ne Flux limit < 3 10-16 erg cm-2s-1 .

Page 14: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Evolution of mass distribution

1. Primordial acoustic peaks are imprinted in the distribution of matter when light and matter decoupled (CMB);

2. Provides an independent length scale of the universe expansion (Hubble parameter);

3. Structure follows the expansion of the Universe caused by Gravity PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 10

Page 15: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium
Page 16: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

1. The weak distortion is simply a (very small) change in ellipticity of a galaxy

Weak Lensing

Dark Matter

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 12

WL reveals the geometry using the dark matter:   Measure shapes of galaxies over a large volume   Obtain the shear power spectrum for a given redshift bin   Determine the changes of the power spectrum as a function of redshift   Determine also the growth factor γ

Page 17: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Outline of the presentation

1. Euclid Science Objectives

2. Euclid Mission Overview

3. Euclid Product trees

4. The Euclid programmatics

5. The Euclid Space segment procurement approach

6. The GEO return constraints for PLM and then Prime

7. Procurement rules (Best practices, ESA and Industry roles)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 13

Page 18: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid mission overview (1/8)

  Euclid is fundamentally a telescope taking pictures and spectra of galaxies for a large part of the extragalactic sky. Quality of images requires a high pointing stability and extreme telescope quality

  Euclid is launched from Kourou with Soyuz and injected directly to a trajectory leading it to an orbit revolving around L2. The propulsion system is used to make small corrections

 Once in L2, the spacecraft performs rotations in steps and taking pictures at every step to have a complete coverage of the sky. The spacecraft rotates fundamentally on a plane perpendicular to the sun direction.

 As the earth revolve around the sun, the rotation plan of Euclid rotates and allow the completion of the coverage.

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 14

Mission facts

Euclid

1.5 Mkm 150 Mkm

L2

Page 19: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid mission overview (2/8)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 15

Quick view of the spacecraft

  Spacecraft is designed to shadow the telescope assembly, PLM, from the sun and maintain it at low temperature.

  The sunshield is set of large panels creating the required shadow, and upon which the solar array is mounted.

  A structure on the bottom of the spacecraft, the SVM, host the compartments where all the electronics and the propulsion system are hosted.

  Protruding outside the SVM are the antennas and the thrusters for navigation, station keeping and attitude control.

  Euclid is equipped with chemical propulsion for high force manoeuvres, and cold gas propulsion for high accuracy manoeuvres.

SVM

sunshield PLM

Page 20: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid mission overview (3/8)

The Euclid payload module consists of:   Optical configuration: 3-mirrors anastigmatic Korsch

  field of view: 0.763×0.709 deg2, 0.45deg off-axis

  free aperture: 1.2 m2

  WFS (or directly VIS CCD) and M2 mechanism for calibration

  optical quality: WFE ≤ 70nm rms (NISP channel)

  common bench for telescope and instruments, interface to SVM

  Silicon Carbide SiC-100 technologies

  Dichroic at the exit pupil transmit IR light to NISP and reflects visible light to VIS

  A visible imager (VIS)

  A near-IR instrument (NISP)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 16

Payload Module facts

Page 21: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid mission overview (6/8)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 17

Payload facts

Page 22: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid mission overview (7/8)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 18

Spacecraft Electrical Architecture

Solar Array

Power Conditioning Batteries

Power Distribution

On Board Computer

Mass Memory

1500 Watt

10-15 m^2

X Band Transponder

K Band Transmitter

High Gain Antenna

Low Gain Antenna

Antenna Orientation

2.5 – 5 Tbit

75 Mbps

Valves

Communication Bus

Sun Sensors

Star Tracker

Fine GuidanceSensor

Gyro Reaction Wheels

Thrusters

NISP Instrument

Control

VISP Computer

High Speed Lines

VISP PMCU

Read Out Electronics

Shutter

NISP Digital

Processing

850 Gbit/day

800 Whr

70 power outlets

20 thrusters

30 Kbps

Cold Gas Control Thrusters

Valves

Page 23: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Subsystem Breakdown

1. The spacecraft design is decomposed in subsystems. Each subsystem is designed and procured by a subcontractor selected the Prime contractor following the established procurement rules. The ITT proposed the following:

Page 19/43

Euclid Statement of Work for the Implementation Phase

Date: 5 Dec 2012 Issue: 1 Rev: 0

ESA UNCLASSIFIED – Releasable to the Public

ESA UNCLASSIFIED – Releasable to the Public

• PLM subcontractor o Design/Verification o AIT o Procurement

! Mirrors ! Structure ! Mechanism ! Thermal HW ! Harness

• Reaction Control subcontractor o Design o Procurement

! Chemical Propulsion Elements ! Cold Gas Propulsion Elements

• Structure & Thermal subcontractor o Design and Verification o Procurement

! Structure ! Sun-Shield

• Avionics subcontractor o Design and Verification o Procurement

! On-Board Computer ! Mass Memory ! Transponders X/K ! Antennas ! Antenna Pointing

• AOCS subcontractor o Design and Verification o Procurement

! Gyros ! AST ! Reaction Wheel ! Fine Guidance Sensor ! Sun Sensors

• ISVV subcontractor • Software subcontractor

o Design and Verification

• Power subcontractor o Design and Verification o Procurement

! PCDU ! Battery ! Harness ! PVAs

• System AIT Contractor o STM AIT o AVM AIT o FM AIT o Procurement

! GSE ! Simulators

6.4 System Definition and Design Tasks The Contractor is expected to perform all activities necessary to deliver a spacecraft design, which fully complies with all the requirements contained in the applicable documents, standards and herein. The tasks to be executed by the Contractor, according to the ECSS requirements [ES-3], [ES-4] [ES-5] and [ES-6], are expected to include as a minimum:

1. Perform all analyses necessary to derive the System Requirements Specification [SYS-EN-3] and lower levels requirements specifications. The System Requirements Specification, which shall be agreed and approved by the Agency, shall be the top-level applicable specification for procurement of subsystems and units.

2. Define early in the program an architectural design of the Spacecraft command and control and FDIR functionality, following a hierarchical approach to authority and actions. The system design shall take into account this underlying architecture, and the subsystem requirements shall be derived to comply with this overall concept.

3. Establish and optimise design solutions taking into account technical performance and reliability, and perform trade-offs of various mission scenarios and options, to optimise, to reduce risks, and then to baseline the mission design.

4. Establish the optical and attitude control apportionment of requirements in order to fulfil the SRD stated objectives and performances in an optimized and robust manner.

5. Establish and maintain detailed budgets including optical performances, mass properties, power, energy, !V, propellant, life limited item usage, link, alignment and alignment stability, pointing

Page 19/43

Euclid Statement of Work for the Implementation Phase

Date: 5 Dec 2012 Issue: 1 Rev: 0

ESA UNCLASSIFIED – Releasable to the Public

ESA UNCLASSIFIED – Releasable to the Public

• PLM subcontractor o Design/Verification o AIT o Procurement

! Mirrors ! Structure ! Mechanism ! Thermal HW ! Harness

• Reaction Control subcontractor o Design o Procurement

! Chemical Propulsion Elements ! Cold Gas Propulsion Elements

• Structure & Thermal subcontractor o Design and Verification o Procurement

! Structure ! Sun-Shield

• Avionics subcontractor o Design and Verification o Procurement

! On-Board Computer ! Mass Memory ! Transponders X/K ! Antennas ! Antenna Pointing

• AOCS subcontractor o Design and Verification o Procurement

! Gyros ! AST ! Reaction Wheel ! Fine Guidance Sensor ! Sun Sensors

• ISVV subcontractor • Software subcontractor

o Design and Verification

• Power subcontractor o Design and Verification o Procurement

! PCDU ! Battery ! Harness ! PVAs

• System AIT Contractor o STM AIT o AVM AIT o FM AIT o Procurement

! GSE ! Simulators

6.4 System Definition and Design Tasks The Contractor is expected to perform all activities necessary to deliver a spacecraft design, which fully complies with all the requirements contained in the applicable documents, standards and herein. The tasks to be executed by the Contractor, according to the ECSS requirements [ES-3], [ES-4] [ES-5] and [ES-6], are expected to include as a minimum:

1. Perform all analyses necessary to derive the System Requirements Specification [SYS-EN-3] and lower levels requirements specifications. The System Requirements Specification, which shall be agreed and approved by the Agency, shall be the top-level applicable specification for procurement of subsystems and units.

2. Define early in the program an architectural design of the Spacecraft command and control and FDIR functionality, following a hierarchical approach to authority and actions. The system design shall take into account this underlying architecture, and the subsystem requirements shall be derived to comply with this overall concept.

3. Establish and optimise design solutions taking into account technical performance and reliability, and perform trade-offs of various mission scenarios and options, to optimise, to reduce risks, and then to baseline the mission design.

4. Establish the optical and attitude control apportionment of requirements in order to fulfil the SRD stated objectives and performances in an optimized and robust manner.

5. Establish and maintain detailed budgets including optical performances, mass properties, power, energy, !V, propellant, life limited item usage, link, alignment and alignment stability, pointing

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 19

Page 24: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

1. Mission Operation Centre (MOC) a.  at ESOC (Darmstadt, Germany)

2. Science Operation Centre (SOC) a.  at ESAC (Villafranca, Spain)

3. Science Data Centres (SDC’s) a.  9 Location in Member States

Final product ~ 30 Petabytes (incl. ext. obs.)

4. Ground Stations: a.  Cebreros and Malargue antennas

b.  Daily science communication:

~ 850 Gbits in K band (26 GHz) a.  Command and control in X band

EUCLID Ground Segment

Greek Industry Day | Giuseppe Racca | Athens | 16 May 2012 | Euclid Project | Pag. 20

Page 25: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Outline of the presentation

1. Euclid Science Objectives

2. Euclid Mission Overview

3. Euclid Product trees

4. The Euclid programmatics

5. The Euclid Space segment procurement approach

6. The GEO return constraints for PLM and then Prime

7. Procurement rules (Best practices, ESA and Industry roles)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 21

Page 26: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Product Tree (1/3)

Extended Payload Module

Euclid Spacecraft

PLM Detectors

VIS Detectors

(e2V)

NIR Detectors (Teledyne)

Service Module (SVM)

VIS (Euclid Consortium)

Instruments

NISP (Euclid Consortium)

Node of the Product Tree

Item in Competition

Item already assigned

PLM Prime (Astrium France)

PLM Subcontractors

SVM Prime

SVM Subcontractors

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 22

Page 27: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Product Tree (2/3)

SVM

SVM Prime SVM Subcontractors

Design and Verification

Gyros

AST

Reaction Wheels

Fine Guidance Sensors

Sun Sensors

Design and Verification

Structure

Sun Shield

Design and Verification

On Board Computer

Mass Memory

Transponders X/K

Antennas

Antenna Pointing

Design and Verification

PCDU

Battery

Harness

Photovoltaic Assemblies

Design and Verification STM AIT

AVM AIT

FM AIT

GSE

Simulators

AOCS Reaction Control

Structure & Thermal Avionics Power Software ISVV AIT

Design and Verification

Chemical Propulsion

Cold Gas Propulsion

Node of the Product Tree

Item in Competition

Item already assigned

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 23

Page 28: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Product Tree (3/3)

Node of the Product Tree

Item in Competition

Item already assigned

PLM

Other Supports

Internal Baffles

Isostatic Mounts

SiC Structures (Boostec)

Mirrors Polish. & Coat.

Dichroic Plate

Auto Test

Struts

NISP Detectors Radiators

VIS Electronics Radiator

MLI & SLI straps

EEE Parts

Harness Terminal and Cables AC Flat Mirror

Auto-test Optical Sources

Collimator

PLM Subcontractors

PLM Prime (Astrium France)

SiC Structures

Optical Equipment

Non-SiC Structures

Thermal Hardware

Electrical Hardware EGSE MGSE OGSE Mechanical

Equipment

External Baffle

M2 Mechanism

Handling and Adaptors

Alignment Tools

Project Office Support

Thermal Analysis Support

AIT SW & EGSE Support

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 24

Page 29: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Outline of the presentation

1. Euclid Science Objectives

2. Euclid Mission Overview

3. Euclid Product trees

4. The Euclid programmatics

5. The Euclid Space segment procurement approach

6. The GEO return constraints for PLM and then Prime

7. Procurement rules (Best practices, ESA and Industry roles)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 25

Page 30: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid Industrial Schedule

2012 2013 2014 2015 2016 2017 2018 2019 2020

Mission Milestones

SVM

KO Implement. Phase

Subsystems Selection

Equipment Selection

Equipment Manufacturing

Equipment Delivery

PLM

Equipment Selection

Equipment Manufacturing

PLM FM Assembly

KO Implement. Phase

System FM Integration

SRR PDR CDR FAR Launch

Feb 14 May 15 May 17 Aug 19 Mar 20

KO Jul 13

KO Dec 3

PDR Mar 14

Equipment Manufacturing

FM Assembly

Equipm. Selection

Mar 16

Mar 13

QR Jul 18

Subsystems PDR Jul 14

Equipment Selection

Equipment Manufacturing

Equipment Delivery

Aug 14

Feb 16

Mar 18

Mar 17

Mission Adoption

Jun 12

SVT Jun 18

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 26

Page 31: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Outline of the presentation

1. Euclid Science Objectives

2. Euclid Mission Overview

3. Euclid Product trees

4. The Euclid programmatics

5. The Euclid Space segment procurement approach

6. The GEO return constraints for PLM and then Prime

7. Procurement rules (Best practices, ESA and Industry roles)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 27

Page 32: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Euclid Procurement approach

  Euclid procurement approved by IPC ESA/IPC(2012)1, add.41 in Paris, 27 June 2012

  Euclid industrial work is to be procured in two steps:   first, a procurement action covering the Payload Module

(PLM), to be released in July 2012 and placed during the fourth quarter 2012; ✔

  second a procurement action covering the Euclid Spacecraft and Prime contractor activities, including the Service Module (SVM), to be released during the fourth quarter 2012. ✔

  This second procurement will eventually subsume the PLM contract, by contract novation;

  The plan is present a Contract Proposal to June IPC for the full Prime Contract (incl. SVM and subsumed PLM)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 28

Page 33: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Outline of the presentation

1. Euclid Science Objectives

2. Euclid Mission Overview

3. Euclid Product trees

4. The Euclid programmatics

5. The Euclid Space segment procurement approach

6. The GEO return constraints for PLM and then Prime

7. Procurement rules (Best practices, ESA and Industry roles)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 29

Page 34: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Geo-Return Requirements

1. Payload Module contract only: (D, F, I, UK) 60%, all others 40%;

2.  For the entire Euclid Industrial contract, i.e. PLM+SVM =>

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 30

Member&State& Geo,return&requirements&for&Euclid&

& &

Austria( 2.6(

Belgium( 3.2(

Czech(Rep.( 1.2(

Denmark( 2.1(Finland( 1.7(

Greece( 2.2(

Ireland( 1.5(

Luxembourg( 0.2(

Netherlands( 5.5(Norway( 2.9(

Poland( 2.6(

Portugal( 1.5(

Romania( 1.2(

Spain( 10.0(Sweden( 3.1(

Switzerland( 3.5(

Sub,total& 45.0&

France( (

Germany( (Italy( (

U.Kingdom( (

Sub,total& 55.0&

Total& 100.0&

Page 35: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Outline of the presentation

1. Euclid Science Objectives

2. Euclid Mission Overview

3. Euclid Product trees

4. The Euclid programmatics

5. The Euclid Space segment procurement approach

6. The GEO return constraints for PLM and then Prime

7. Procurement rules (Best practices, ESA and Industry roles)

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 31

Page 36: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Procurement Rules

1. Best Practice “For the Selection of Subcontractors by Prime Contractors in the frame of ESA's Major Procurements” as approved by the IPC (ESA/IPC(2012)65,rev.2) during its 273th meeting held on 27-28 Sep 2012;

2.  Industrial Procurement Plan (IPP) is approved by ESA and made public;

3. ESA reviews the ITT/RFQ's documentation prepared by the Contractor [], to ensure its "impartiality" in term of guaranteeing [] a fair competition;

4. ESA approves the ITT/RFQ’s and authorise the Contractor to issue ITT/RFQ’s;

5.  If the Contractor is also a sub-contractor tenderer, the Contractor is involved in the evaluation, but the Chairperson of the TEB is an ESA’s staff and no proceedings of the TEB may take place in the absence of the Chairperson;

6. The TEB report is submitted for decision to a Joint Procurement Board (JPB) composed by the ESA and Contractor’s PM’s, CO’s, PC’s and experts;

7.  For competitive tenders, the JPB submit the decision to a Senior Procurement Board (SPB) chaired by ESA head of science projects department;

8. Detailed process in Industry presentation.

PLM Industry Day | Giuseppe Racca | Noordwijk | 17 April 2013 | Euclid Project | Pag. 32

Page 37: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 1

ECOS benefits

1. ECOS 5 unanimously welcomed by the ESA bidders’ Community 2. Allows error-free Price aggregation 3. Faster than Excel-based spread sheets once configured 4. All PSS-A forms printed in one batch.

ESA UNCLASSIFIED – For Official Use

Page 38: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 2

ECOS - The Rate File

Rate file noticeable features

Escalation tables

Variable rate agreement

Multiple rates

Average sellable

hours/year

ESA UNCLASSIFIED – For Official Use

Page 39: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 3

ESA UNCLASSIFIED – For Official Use

ECOS - Building the PT/WBS with Support Functions

Page 40: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 4

ESA UNCLASSIFIED – For Official Use

ECOS - The Price Data Entry Summary

Page 41: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 5

ESA UNCLASSIFIED – For Official Use

ECOS - The Payment Plan Data Entry

Page 42: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 6

ESA UNCLASSIFIED – For Official Use

ECOS - A global view over the price

Page 43: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 7

ECOS - Advanced features

ESA UNCLASSIFIED – For Official Use

Advanced features Comments

Price rounding To give an elegant final touch to the price by presenting rounded numbers per phase. Rounding can easily be cancelled if and when price has to be reworked before generating/submitting the tender

Time shifting To recalculate instantly expenses profiles and escalation in FFP for the block of activities concerned (totality of the scope or only a WBS branch

Fully supported yearly variable rates

To automatically calculate yearly amounts when variable yearly rates apply to some resources categories, overheads or profit rates. Recalculations in case of time shifting are instantaneous

User WP numbering The User can define his own WP numbering system and visualize WP list summaries and produce all WP-related reports sorted by User numbers

Product Libraries

To record and later reuse by simple drag’n drop, blocks of WBS including resources for any type of product. Highly recommended for Equipment suppliers. Also suitable for standard sets of Project Office activities. Allows to transfer all data entries from one file to another in case of data recovery or any kind of contingency action. For instance: transferring all data entries entered in own created project file into an ITT file received from the Upper-tier contractor at a late stage

Travel Libraries All elementary records of price per trip/daily subsistence at your finger tip. Excel Imports (from finance department for instance) allowed

Import/Export dates Allow Import/Export to/from any planning tool (Excel based)

Import/Export data Allows Import/Export to/from any ERP system (CSV based)

Colour settings The User can define his set of colours for various mode (Maintenance/Data Entry/Tender). Useful and agreeable

Page 44: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

Carla Signorini | ESTEC | 15/09/2011 | Slide 8

ECOS - How to get and install ECOS

1. Contact the ECOS Help Desk:

Tel: +31.(0)71.565.6500 Email: [email protected]

2. Follow the instructions of the email that you will receive

3. Self-Training available from download on EMITS :

ESA UNCLASSIFIED – For Official Use

Page 45: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed. Euclid Payload Module

PLM Industrial DayNoordwijk Space ExpoMay, 17th, 2013

Page 46: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 2 -

Contents The Euclid PLM

Overall design The PLM product tree and constituents The Euclid development logic : Models and objectives & schedule

The build-up of the PLM industrial team the ITT Process (according to Best Practices) List and dates of the future ITT’s

Presentation of each ITT Scope, key-requirements, particular points, model philosophy, schedule

Page 47: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 3 -

PLM Configuration

Page 48: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Image Quality Performance VIS Performances

- 4 -

• NISP Performances

• The Criteria of Image Quality are linked to the Point Spread Function and its stability.

Page 49: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 5 -

PLM Euclid main requirements A stable large Euclid telescope

Korsch on axis 1,2 m optical configuration

Sharp and demanding astronomy image quality Shape and stability of the Spread Function (VIS) Encircled Energy (NISP)

It is a cold telescope that includes 2 instruments VIS et NISP at cryogenic temperature (150 K et 95 K) AOCS sensors for pointing One dichroic to split the VIS et NISP channels Efficient thermal design to achieve few mK stability

The Spacecraft is Located at Lagragian L2 point for a 6 year life time Launch on Soyuz

The program requires mature technology : TRL > 5

Page 50: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

2.4 m2.6 m

PLM overview

3,6 m

Page 51: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Functional architecture & constituents

M1+M2

FM1 & FM2 folding mirrors

M3

Dichroïc

M2Mechanism

•VIS optical path•NISP optical path•FGS optical path•Science data•FGS data•Control signals

Shutter(VI-RSU)

VI-CDPU

Filter & grism wheels (NI-FWA & NI-GWA)

Detection system(NI-DS) Thermal

control

Detector plane(VI-FPA-DP)

Electronics(VI-FPA-ES)

Calibration(VI-CU)

Thermalcontrol

SVM

NISP(PLM units)

TelescopeAssembly

VIS(PLM units)

VI-PMCU NI-DCU NI-DPU NI-ICU

PLM

PLM Thermalcontrol

FM3 folding mirror

FGS

Proximity electronics

VPU

SVM resources

MDE

Calibration(NI-CU)

NI-CMUNISP

(SVM units)VIS

(SVM units)

Optics (NI-OA)

Page 52: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 8 -

A silicon-carbide telescope A single homogeneous and isotropic material

for mirrors and stable structures Idem Astrium cameras Idem Gaia

Advantages Outstanding thermo-elastic behaviour Excellent stiffness Process qualified for cold environment Immune to radiations No moisture release

Euclid will be the 10th Korsch telescope designed and aligned by Astrium

Page 53: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 9 -

A cold telescope A cold and passive thermal control

Advantages Invisible for NISP wavelengths NISP detectors at~ 89 K OK Simplified instrument thermal control 100% margin of radiative areas possible Outstanding thermal regulation ~10 mK Better reliability, Low dissipation

Page 54: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

PLM Structural & Thermal Model Objectives

Qualification of the PLM structure The STM PLM is then integrated inside the STM Spacecraft It shall withstand Spacecraft Mechanical & Thermal test sequence It will be used for mechanical & Thermal model correlation & validation It will be used to retrieve mechanical loads at instrument interfaces and PLM

equipment interfaces Most structural and thermal equipment used as spare FM

Test sequence

- 10 -

Page 55: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

PLM Avionic Model Objectives

Verification of electrical design Verification of electrical & software interfaces Verification of the instruments electrical compatibility in integrated environment Verification of the FGS functionality & related electrical interfaces Validation of the test procedures, data base and related test applications Interfaces with the EGSE bench provided by the SC Prime

Test sequence

- 11 -

PLM AVM integration

PLM EMC & FUNCTIONAL

TESTS

VIS FPA / FGS autocompatibility Conducted Emission & Susceptibility

Functional testsDatabase validation

Deliveryto Prime

Instruments EM units

FGS EM units

AVM support, PLM harness &

thermal hardware

MDE EQM

Page 56: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

PLM Flight Model Objectives

Submitted to Proto- flight programme Will perform the end to end performance test under vacuum Suitable for launch and flight operations

Test sequence

- 12 -

PLM SINE & ACOUSTIC

TESTS

PLM mechanical proto-qualification

Correlation of FEM

PLM FM integration

PLM THERMAL VACUUM TEST

Thermal control validationThermal qualification

Optical tests in Thermal VacuumCorrelation of thermal model

Trimming of radiatorsFlight temperatures prediction

End-to-end system performance

PLM EMC & FUNCTIONAL

TESTS

Autocompatibility & CE with VIS & NISPFunctional tests

Database validation

Deliveryto Prime

TelescopeAssembly

FM integration

TELESCOPE AMBIENT

FUNCTIONAL TESTS

Optical performances at ambient±1 g test (WFE)

Instruments FM units

FGS FM units

Page 57: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 13 -

PLM Phase B2,CD schedule

Page 58: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 14 -

Industrial team build-up Geo return constraints applicable to the PLM contract :

Geo return : non-Big4 countries ( F, G, UK et I) ≥ 40%

During proposal phase a large « sourcing » effort 119 RFP/RFIs submitted towards the European industry All subcontractor proposals have been analysed and submitted in our proposal

to ESA Consolidation of requirements, schedule and cost

Now in phase B2, selection of the industrial team Via competitive Best Practices processes In the course of phase B2 and early phase CD

Page 59: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

SubContracted Items

- 15 -

Nature of activity Items to be Subcontracted ITT release Price Target

Project Office support Schedule, Documentation & Configuration control Dec 2013 >500 K€

Product Assurance support  Assurance Quality & RAMS Dec 2013 200‐500 K€

Engineering supportThermal analyses & engineering support during TVAC 

testDec 2013 200‐500 K€

AIT supportAIT SW & EGSE bench operations Oct 2015 200‐500 K€

Mechanical / Optical AIT operations  1 T 2014 >500 K€

Optical equipmentMirrors polishing & coating June 2013 >500 K€

Dichroic plate April 2013 200‐500 K€

Mechanical equipt External baffle Sept 2013 >500 K€

Mechanism with  electronics M2 Mechanism subsystem June 2013 >500 K€

Non ceramic Mechanical structures

Struts Sept 2013 >500 K€

Supports & radiators Oct 2013 >500 K€

Internal baffles & shielding &  Isostatic Mounts Nov 2013 >500 K€

Thermal hardware MLI & SLI, & conductive straps Mars 2014 >500 K€

EEE parts Dec 2013 200‐500 K€

Electrical product PLM Harness Mars 2014 200‐500 K€

MGSE Handling & adaptators April 2014 >500 K€

OGSEAC flat mirror May 2013 >500 K€

Collimator  May 2013 >500 K€

Page 60: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ITT Process Open competition for all the ITT’s following ESA Best practices, which

ensure impartiality in the overall selection process.

At least 2 weeks before ITT emission, an Intended ITT (summary description of the ITT, indicative budget) is issued in EMITS.

The data package is issued on EMITS. It consists mainly in a cover letter, a draft contract, the SCOT, the requirement

specification, the SOW, the PA requirements, the GDIR. The evaluation criteria, the weighting factors and the closing date for the receipts of tenders are given.

The tendering period will be at least 30 working days for procurements > 300 k€, otherwise 20 working days

During the tendering period, any question shall be asked to Astrium, ESA copy (not later than 10d before the closing date). Answers will be quick (< 3d) and given via EMITS. All the tenderers know the question and the answer.

Page 61: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ITT Process At the end of the tendering phase, a Tender Opening Board takes place which

checks the completeness of the proposals. The proposals are distributed to the participants of the Tender Evaluation Board

(ESA + Astrium). They remain confidential. Evaluation period: 2 to 3 weeks. In the event that Astrium or one of its affiliates submits a bid, the TEB is under

the responsibility of ESA

Page 62: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ITT Process Classical evaluation criteria:

Background and experience of the company, key personnel, adequacy of proposed facilities

Understanding of objectives, discussion of problem and risk areas, proposeddesign solutions, performance and trade-offs. Compliance of the requirements

Quality and suitability of proposed programme of wrk, adequacy of engineering and verification approach inclusing risk mitigation

Adequacy of management, costing and planning Compliance with tender conditions and acceptance of contract conditions

Weighting factors are allocated to each criteria and published for ITT. An overallweighted mark is calculated.

Page 63: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

ITT Process TEB prepares a report with a recommendation. It remains confidential. It is transmitted to the Joint Procurement Board, which takes into account the

price and the geo-return constraints and makes a recommendation to the Senior Procurement Board (ESA and Astrium directors).

The JPB/SPB process can take about 1 month. SPB makes the final decision. Negotiation can start with the selected bidder. Questions on the proposal are

sent to the bidder. After analysis of the answers, a negotiation meeting takesplace at Astrium premises

Where negotiations are unsuccessful, the SPB is reconvened

Page 64: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 20 -

This afternoon, It resumes at 13:30 Mechanical ITT’s - Noordwijk Space Expo Ariane-Room

External baffle Struts Supports & radiators Internal baffles & shielding & ISM M2 mechanism

Support activities ITT’s – Noordwijk Space Expo Astronaut-Room Project office support Product assurance support Mech/Opt AIT ops Thermal analyses AIT SW & EGSE bench operations

Other ITT’s – ESTEC – ESCAPE Dance Room EEE parts MLI Harness Handling & adaptors AC flat mirror, Collimator, Mirrors, dichroic plate

Page 65: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed. Euclid Payload Module

Mechanical ITT’s

17/04/2013

Page 66: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

External baffle Abstract

• Tender type: ITT (open competition with preferential clause)• Price range: > 500 k€• Foreseen ITT issue date: Sept 2013

Description and key requirements

• Mechanical, Optical and thermal functions• h 2,6m within 1,9 m• 60 Kg max, QSL 30g + acoustic, 1st mode

above 90 Hz, [60 K – 323 K]

MLIPaint to avoid straylight

Iso-static mounts

Radiator

Thermal straps

Page 67: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

External baffle Particular points

Iso-static mounts; thermal strap efficiency and characterisation, qualification; paint (qualification); contamination

Model philosophy 1 PFM + 1FM + spares (ISMs; thermal straps)

Schedule requirements PDR: 08/14 CDR: 02/15 PFM DRB: 03/16 FM DRB: 09/16

Page 68: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Struts Abstract

• Tender type: ITT (open competition with preferential clause)• Price range: > 500 k€• Foreseen ITT issue date: Sept 2013

Description and key requirements• Mechanical and thermal decoupling• GFRP tube with foam inside, end-fitting acting as a flexural blade and a bracket

on each side. • QSL and I/F forces/displacements from system analysis

6 identical struts of about 1 m (forming 3 bipods) acting as a pseudo iso-static mount.

High axial stiffness (typ. 8 107 N/m) and low angular and radial stiffness (< 103 Nm/rd)

Page 69: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Struts Description and key requirements (cont’d)

Particular points GFRP tube / end-fitting thermo-elastic behaviour (cold env.), overall thermal

conductance stringent requirement and performance characterisation, manufacturing skill and mastering / quality / control

Model philosophy 1 PFM + 1FM + 1 Flight Spare kit

Schedule requirements PDR: 08/14; CDR: 04/15; PFM DRB: 12/15; FM: 05/16

pseudo iso-static mount (2 bipods & 2 struts)

GFRP tube length about 300 mmTi end-fittings and bracketfp > 90 Hz

Page 70: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Supports and Radiators Abstract

• Tender type: ITT (open competition with preferential clause)• Price range: > 500 k€• Foreseen ITT issue date: Oct 2013

Description and key requirements• Thermal function only• VIS radiator:

• Rectangular Aluminium Alloy plate, evolving thickness, attached to the equipment through several bolts in its centre, about 1m²

• NISP radiator:• Assembly of Aluminium Alloy plates, • Evolving thickness, supported by struts, • About 1,8 m²

Page 71: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Supports and Radiators Particular points

Thermal decoupling struts, stiffness, paint (qualification), acoustic

Model philosophy 1 PFM + 1FM + spares for mounts

Schedule requirements PDR: 07/14 CDR: 04/15 PFM DRB: 12/15 FM DRB: 05/16

Page 72: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Internal baffles and ISM Abstract

• Tender type: ITT (open competition with preferential clause)• Price range: > 500 k€• Foreseen ITT issue date: Nov 2013

Description and key requirements• Optical function only• Aluminium design seems adequate• QSL 50g & acoustic• [60 K – 333 K]• fp> 100 Hz

h 0,6m within 0,3 m

Iso-static mounts

h 0,36m with 0,32 m

Black paint

Support structure

Page 73: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Internal baffles and ISM Particular points

iso-static mounts; stiffness; paint (qualification)

Model philosophy 1 PFM + 1FM + spares (ISMs)

Schedule requirements PDR: 07/14 CDR: 04/15 PFM DRB: 12/15 FM DRB: 06/16

Page 74: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

M2M Mechanism Abstract

• Tender type: ITT (open competition with preferential clause)• Price range: > 500k€• Foreseen ITT issue date: June 2013

Description and key requirements• Three axis of freedom refocusing mechanism• Supporting M2 mirror (mass 3Kg)• Two boxes architecture : mechanism part (M2MM)

and drive electronic part (MDE)• M2MM [110 K – 125 K]• MDE [273 K – 313 K]• Mass : M2MM<3,5Kg, MDE<2,5Kg

Page 75: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

M2M Mechanism Particular points

Performances : Z axis : translation +/-275 µm , accuracy +/-2 µmX and Y axis: rotation +/- 2 mrad, accuracy +/- 30µrad

Operation at low temperature, limited thermal conduction through harness Model philosophy

PLM need: MDE EM, M2MM EQM, M2M (M2MM+MDE+Harness) FM Development models: depend on heritage

Schedule requirements EM/EQM DRB: 12/15 FM DRB: 05/16

Page 76: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed. PLM Industrial day

Splinter 2 : Support Activities ITTs

Page 77: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 2 -

Contents Support activities

Project office support Project assurance support Thermal analyses AIT software & EGSE bench operations Opto-mechanical AIT support

Page 78: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 3 -

Project office support Abstract

Title : Project office support Tender type : Open Competition with preferential clause. Price Range : > 500 K€ Foreseen ITT issue date : Dec 2013

Scope & key requirements Endorse responsibility during PLM phase CD of

○ Documentation management○ Technical data, configuration management○ Schedule control

Page 79: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 4 -

Project office support Schedule requirements

Kick-off : April 2014 Activities will be performed during phase CD until PLM DRB end July 2018

Specific points The activities will be performed in Astrium Toulouse premises The Astrium management tools and processes will be used for the execution of

the tasks Experience of proposed manpower in ESA space programs Autonomy & ability to integrate the project team

Page 80: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 5 -

Product Assurance support Abstract

Title : Product Assurance support Tender type : Open Competition with preferential clause. Price Range : 200 - 500 K€ Foreseen ITT issue date : Dec 2013

Scope & key requirements Quality assurance responsibility during PLM procurement Focal point for equipment subcontractors for equipment subcontractors Phase CD RAMS activities

Page 81: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 6 -

Product Assurance support Schedule requirements

Kick-off : April 2014 Activities will be performed during phase CD until equipment hardware

deliveries until April 2016 Extra RAMS support activities beyond April 2016 for PLM DRB & QR July 2018

& FAR 3Q2018.

Specific points The activities will be performed in Astrium Toulouse premises until equipment

hardware deliveries until April 2016. The Astrium management tools and processes will be used for the execution of

the tasks Experience of proposed manpower in ESA space programs Autonomy & ability to integrate the project team

Page 82: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 7 -

Thermal analyses Abstract

Title : Project office support Tender type : Open Competition with preferential clause. Price Range : 200 - 500 K€ Foreseen ITT issue date : Dec 2013

Scope & key requirements Endorse responsibility during PLM phase CD of

○ Thermal model updates and analyses○ In situ colocation support during thermal tests

Page 83: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 8 -

Thermal analyses Schedule requirements

Kick-off : Dec 2013 Activities will be performed during phase CD until PLM DRB

Specific points Phase B thermal models provided by Astrium Thermal models are ESATAN TMM and THERMICA GMM Phase CD thermal analyses campaigns for CDR, FM test and flight predictions Full time in situ support during PLM FM Tvac test (May 2018) at CSL Liège

Page 84: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 9 -

AIT software & EGSE bench operations Abstract

Title : AIT software & EGSE bench operations Tender type : Open Competition with preferential clause. Price Range : 200-500 K€ Foreseen ITT issue date : Oct 2015

Scope & key requirements Endorse responsibility during PLM phase CD of

○ AIT software development○ EGSE operations activities

Page 85: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 10 -

AIT software & EGSE bench operations Schedule requirements

Kick-off : 2016 Activities will be performed during phase CD from June 2016 to July 2018

Specific points The activities will be performed in Astrium Toulouse premises The EGSE is TBD and will be provided by Prime SCOS 2000 (TBC), Matlab, SIS database, MOIS Experience of proposed manpower in ESA space programs Autonomy and & ability to integrate the project team

Page 86: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 11 -

Opto-mechanical AITsupport Abstract

Title : Project office support Tender type : Open Competition

with preferential clause. Price Range : > 500 K€ Foreseen ITT issue date : 1T 2014

Scope & key requirements Endorse responsibility of opto mechanical

activities From integrated telescope to completion of PLM

integration For both STM and FM models Includes MGSE

Telescopealigned byAstrium

Opto/meca AIT of VIS & NISP instruments

Opto/meca AIT Of PLM radiators,Thermal covers,external baffle

Page 87: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

- 12 -

Opto-mechanical AITsupport Schedule requirements

Kick-off : 2T 2014 Activities will be performed during phase CD

until PLM DRB end July 2018

Specific points Collocation period during AIT preparation phase

In Astrium premises (Toulouse) from Kick-off to STM MRR Appropriate large optical clean room Experience of company in optical instruments (preferably with SIC) Autonomy and & ability to integrate the project team

Page 88: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Euclid Payload ModuleOther ITT’s

17/04/2013

Page 89: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Flight mirrors Abstract

• Tender type: ITT (open competition with preferential clause)• Price range: > 500k€• Foreseen ITTs issue dates:

• M1, M2, M3 June 2013• FM1, FM2, FM3 Sept 2013

Page 90: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Optics functional chain

Page 91: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Telescope mirrors description&key requirements

Page 92: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Folding mirrors description&key requirements

Page 93: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Mirrors general features Particular points

Polishing on SiC CVD cladded substrate Coatings

○ Qualification to environments○ Spectral performance validation at 130K○ Foldings : calibration of coating stress at 130K

Model philosophy 1 coated Flight model 1 non coated Flight spare

Schedules M1: 01/16 M2: 02/16 M3: 03/16 FM1: 02/16 FM2:03/16 FM3: 05/16

Page 94: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Dichroic plate Abstract

• Tender type: ITT (open competition with preferential clauses)• Price range: 200-500 k€• Foreseen ITT issue date: April 2013

Description and key requirements

Page 95: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Dichroic plate Particular Point

Minimization the bending effect of the coated plate in order to fulfill optical performance at cold operational temperature

Model philosophy Development in parallel by 2 companies of one DM Choice mid-2014 QM & FM

Schedule requirements• DM DRB: 06/14• QM DRB: 03/15• FM DRB: 02/16

Page 96: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Acflat mirror Abstract

• Tender type: ITT (open competition with preferential clauses)• Price range: > 500 k€• Foreseen ITT issue date: May 2013

Description and key requirements• The ACF Mirror Assembly includes a polished mirror and a supporting cell.• Useful optical aperture Φ>1300 mm • WFE over useful optical aperture <30nm rms

Page 97: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Acflat mirror Particular Point

• Compatible with cryogenic tests Model philosophy

• Single model Schedule requirements

• DRB: Nov 2015

Page 98: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Collimator assembly Abstract

• Tender type: ITT (open competition with preferential clauses)• Price range: > 500 k€• Foreseen ITT issue date: May 2013

Description and key requirements• The collimator assembly includes 3 sub assemblies:

• Polished and coated mirrors• Supporting structure• Focal plane assembly equipped with motorized system for fibre

displacements• Useful optical aperture Φ>1250 mm .• WFE at FOV centre <25 nm rms.

Page 99: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Collimator assembly Particular Point

• Compatible with cryogenic tests .• Low emissivity required during cryogenic tests(heat exchange <5,5W with

Euclid PLM baffle).• Performances to be held with ±0,5°tilt of its optical axis and cryogenic test

conditions. Model philosophy

• Single model Schedule requirements

• DRB: August 2016

Page 100: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Handling & Adaptors Abstract

• Tender type: ITT (open competition with preferential clauses)• Price range: > 500 k€• Foreseen ITT issue date: April 2014

Description PLM +/- 1g trolley Adaptators (vibrations & vacuum) AVM support AC flat mechanism & structure Covers for contamination

Schedule requirements DRB: 12/15

Page 101: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Handling & Adaptors

- 14 -

+/- 1g trolley Handling device

AC flat mechanism & structure

Page 102: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

MLIs / SLIs Abstract

• Tender type: ITT (open competition with preferential clause)• Price range: > 500 k€• Foreseen ITT issue date: March 2014

Model philosophy STM & FM

Schedule requirements• PDR: 11/14• CDR: 02/15• STM DRB: 08/15• FM DRB: 03/16

Page 103: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

MLIs / SLIs

Description and key requirements Geometry/coverage :

Essentially external housing Total surface : 42 m² assessed

Application of MLI design standards for optical instruments

High insulation required from SVM and PLM

- 16 -

Optical Bench (Telescope baseplate)

SVM (T° = 250K to 293K)

VIS Electronics NISP VIS

FPA Cold

Instruments cavity (T=135K)

Radiator surfaces : Alu. : white painted ( = 0.9)

Baseplate : raw SiC ( = 0.67)

MLI (10 layers) standard radiative insulation

Conductive coupling by thermal braid

GFRP bipods isostatic mounts (Very high

conductive insulation)

MLI (20 layers) high radiative insulation

Page 104: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

EEE Thermal hardware parts Abstract

• Tender type: ITT (open competition with preferential clauses)• Price range: < 200 k€• Foreseen ITT issue date: Dec 2013

Description and key requirement Single layer kapton foil at flight standard

○ Wires according ○ Geometry according PLM thermal architect definition○ Single layer only for cold temperature

NTC thermistors 15 kOhm for VI-FPA-ES thermal zone (above 230K) PTC type PT1000 thermistors for all others parts

Page 105: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

EEE Thermal hardware parts Model philosophy

STM & FM

Schedule requirements STM DRB: 12/15 FM DRB: 05/16

Page 106: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Harness Abstract

• Tender type: ITT (open competition with preferential clauses)• Price range: > 500 k€• Foreseen ITT issue date: > 03/14

Description and key requirements • ~2000 wires for different type of signals: video (LVDS, Spacewire), power,

sensors and motors signals• Large temperature gradient between Euclid instrument warm electronics (293K)

and cold focal planes (127K)• Specification to limit heat transfer (6W): cryogenic materials to be used

(stainless steel, phosphor-bronze etc.)• Non-cryogenic harness also part of ITT

Page 107: Euclid Payload Module Industry Day - emits.esa.intemits.esa.int/emits-doc/ESTEC/Euclid-PLM-Industry-Day-all-slides.pdf · Euclid Payload Module Industry Day Organised by ESA and Astrium

This

doc

umen

t is

the

prop

erty

of A

striu

m. I

t sha

ll no

t be

com

mun

icat

ed to

third

par

ties

with

out p

rior w

ritte

n ag

reem

ent.

Its c

onte

nt s

hall

not b

e di

sclo

sed.

Confidentiel Astrium

Harness Particular points

• Several bundles for Visible (VIS), Infra-Red (NISP), thermal control and mechanisms

• Harness design to be proposed to limit heat transfer and meet electrical requirements

Model philosophy STM, EM & FM

Schedule requirements STM DRB: 12/15 EM DRB: 05/15 FM DRB: 05/16