    We are a Regional Treatment Plant.

    We treat flows from Euclid, Willoughby Hills,and portions of Richmond Heights and South

    Euclid. (Consumption Based) We also treat all flow from Willowick and

    Wickliffe (Master Metered).

    Euclid makes up ~55% of flow, while thesatellite communities are ~45%.

  • 8/2/2019 Euclid Sewer

    3/19

    Euclid is a Combined Sewer Community.

    Euclid has approximately 270 miles of sewer ofwhich ~ 7% are Combined Sewers.

    Majority of sewer was installed in the 1940sand 1950s. (Leak badly)

    Treat an average of 14-16 MGD of dry weather

    flow. During wet weather, flows can reach a peak

    rate of 250MGD.

  • 8/2/2019 Euclid Sewer

    4/19

  • 8/2/2019 Euclid Sewer

    5/19

    There has not been an increase in the OM&Rcomponent of Sewer Rate since 2000.

    Large Revenue drop over the last 3-4 years due toeconomy, foreclosures, and reduced consumptionfrom the commercial sector.

    While revenue was up in 2011, this is mostlyattributed to wet weather, not an increase inconsumption.

    Cost of projects associated with Consent Decreeapproaching 135 million dollars. (2012 Cost Est.)

    Consent Decree allows for 10-15 years to completework.

  • 8/2/2019 Euclid Sewer

    6/19

    Date

    SewerConsumption

    MCFsCommercial

    MCFsResidential

    MCFs

    Oct-Dec 2010 55,774 28,428 27,346

    Jan Mar 2011 52,160 24,864 27,296

    Apr June 2011 47,635 22,152 25,483

    July Sep 2011 45,920 19,105 26,815

  • 8/2/2019 Euclid Sewer

    7/19

    Component/Fund 2012 Rate/MCF % of Total Rate

    OM&R (510) $19.60 -

    Capital (510) $ 4.08 -

    Sub-total $23.68 51.29%

    Peterson Fund (515) $11.88 25.73%Cleveland Billing (510) $ 1.61 3.49%

    Sub-total $37.17 -

    Waterline (516) $ 9.00 19.49%

    TOTAL/MCF

    Note: These rates/percentages takeaffect with April billing.

    $46.17 100%

  • 8/2/2019 Euclid Sewer

    8/19

    Component Current Rate Proposed Rate 2012

    OM&R $19.60 $24.60

    Capital $ 4.08 $ 8.08

    Sub-Total $23.68 $32.68

    Peterson Fund $11.88 $13.88

    Cleveland Billing $1.61 $ 1.61

    Sub-Total $37.17 $48.17

    Waterline $9.00 $10.00

    TOTAL/MCF $46.17 $58.17

  • 8/2/2019 Euclid Sewer

    9/19

    Provide for the first $70 Million in Capital Costs.

    Funding for Maintenance, Operation & Management ofCollection System

    Elimination of Sanitary Sewer Overflows Improvements to Combined Sewer areas within the

    city.

    Note: For all plant improvements, main line sewers,

    the satellite communities will contribute 45% ofimprovements.

  • 8/2/2019 Euclid Sewer

    10/19

    Type of User Increase/month

    Minimum 1.0MCF/Quarter $4.00

    1.875MCF/Quarter $7.50

    2.5 MCF/Quarter $10.00

    3.0MCF/Quarter $12.00

    2012 2016 rates

  • 8/2/2019 Euclid Sewer

    11/19

    2012-2016 rate schedule

    Cleveland SuburbsBase charge

    RegularAffordability/Homestead

    RegularAffordability/Homestead

    2012

    $5.85

    $49.55

    $29.75

    $52.55

    $31.75

    2013 $6.30 $55.45 $33.35 $58.15 $35.152014 $6.60 $62.15 $37.35 $64.55 $38.952015 $6.90 $69.65 $41.85

    $71.75 $43.252016 $7.20 $78.05 $46.85 $79.85 $48.05

    Affordability program income limitsHomestead program Affordability program income limitsHomestead program

    Details about the new Wastewater Affordability Program are available on our Cost Saving Programs page, and Crisis Assistance Program details will be available in 2012. If you have anyquestions about our rates or saving programs, please email us or call (216) 881-8247.

    2012-2016 rates

    http://www.neorsd.org/I_Library.php?a=download_file&LIBRARY_RECORD_ID=5166http://neorsd.org/homestead.phphttp://www.neorsd.org/I_Library.php?a=download_file&LIBRARY_RECORD_ID=5166http://neorsd.org/homestead.phphttp://neorsd.org/savehttp://neorsd.org/ask_us.phphttp://neorsd.org/ask_us.phphttp://neorsd.org/savehttp://neorsd.org/homestead.phphttp://www.neorsd.org/I_Library.php?a=download_file&LIBRARY_RECORD_ID=5166http://neorsd.org/homestead.phphttp://www.neorsd.org/I_Library.php?a=download_file&LIBRARY_RECORD_ID=5166
  • 8/2/2019 Euclid Sewer

    12/19

    NEORSD only maintains interceptor sewers(trunk line) which collect flow fromcommunities and transport to WWTP.

    Communities are responsible for sewers whichflow into interceptors.

    In 2007, these charges ranged from$10.50/MCF - $13.39/MCF.

  • 8/2/2019 Euclid Sewer

    13/19

    Proposed Euclid Rate Structure If We Joined NEORSD/Suburbs

    OM&R $24.60 Regular $52.55

    Capital $ 8.08 Base Charge $ 5.85/Q

    Peterson $13.88 Peterson $13.88

    Cleveland Billing $ 1.61 Cleveland Billing $ 1.61

    Waterline $10.00 Waterline $10.00

    TOTAL/MCF $58.17 TOTAL/MCF $78.05 + 5.85

    Typical User 1.875 $109.07/Q Typical User 1.875 $152.19

  • 8/2/2019 Euclid Sewer

    14/19

    Membrane Technology

    EQ Tanks

    Project Project Cost

    Combined Sewers in System $8,220,000

    Sanitary Sewer Overflow Elimination $14,280,000

    Wastewater Plant Upgrade $113,915,000

    Total Cost $136,415,000

  • 8/2/2019 Euclid Sewer

    15/19

  • 8/2/2019 Euclid Sewer

    16/19

  • 8/2/2019 Euclid Sewer

    17/19

  • 8/2/2019 Euclid Sewer

    18/19

  • 8/2/2019 Euclid Sewer

    19/19

    Apply for Summer Sprinkling Program.

    Make certain your toilet is working properly.A cracked or leaking Flush Valve can waste upto 388,800 gallons/quarter.

    A refill valve that is not working properly canresult in up to 64,800 gallons of wasted water.

    Make certain you have no

    faucets that drip or leak.