77
Environmental Monitoring Report Special Report February 2017 VIE: Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project - Tranche 1 Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB Review Mission, 17-24 October 2016. Prepared by Dasan Consultants Co., Ltd. in joint venture with Kunhwa Engineering & Consulting Co., Ltd and International Consultants and Technocrats Pvt, Ltd for the Vietnam Expressway Corporation, the Ministry of Transport of Vietnam, and the Asian Development Bank.

Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

Environmental Monitoring Report Special Report February 2017

VIE: Greater Mekong Subregion Ben Luc-Long Thanh Expressway Project - Tranche 1 Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB Review Mission, 17-24 October 2016.

Prepared by Dasan Consultants Co., Ltd. in joint venture with Kunhwa Engineering & Consulting Co., Ltd and International Consultants and Technocrats Pvt, Ltd for the Vietnam Expressway Corporation, the Ministry of Transport of Vietnam, and the Asian Development Bank.

Page 2: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

CURRENCY EQUIVALENTS (as of 10 February 2017)

VND1.00 = $0.000045 $1.00 = VND22,286

NOTE

In this report, "$" refers to US dollars unless otherwise stated. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 3: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 4: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 5: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 6: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 7: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 8: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 9: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 10: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 11: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 12: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 13: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 14: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 15: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 16: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 17: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 18: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

REPORT

on

Implementing Remedied countermeasures

responding to MoU of ADB Mission

(17th to 24th October 2016)

Page 19: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

PACKAGE A1

Page 20: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

NHÀ THẦU THỰC HIỆN CÁC CÔNG TÁC AN TOÀN LAO ĐỘNG TRÊN CÔNG TRƯỜNG THEO KẾ HOẠCH QUẢN LÝ AN TOÀN LAO ĐỘNG

The Contractor has carried out the Safety Work on the Construction site in accordance with Safety Management Schedule

1. Nhà Thầu thực hiện lắp dựng hàng rào ngăn cách khu vực thi công với nhà ở của

dân địa phương và lán trại của công nhân The Contractor installed fences around the construction limits to separate the site from local resident areas and the worker camps

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed fences around the construction to separate the Site and existing local road.

Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với đường dân sinh

Page 21: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed fences around the construction site to separate existing local road

Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với đường dân sinh

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed fences around the construction site to separate existing local road

Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với đường dân sinh

Page 22: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After

The Contractor installed fences around the construction site to separate local resident areas Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương

Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After

Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương

The Contractor installed fences around the construction site to separate local resident areas

Page 23: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

2. Nhà Thầu thực hiện lắp đặt biển báo không cho người không có trách nhiệm vào

khu vực thi công

The Contractor has installed safety signs in order to prohibit the people without duty from entering the construction site

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed the excavated holes signs/ prohibit the people without duty from

entering the construction site Nhà Thầu lắp đặt biển báo Hố sâu nguy hiểm/ cấm người lạ đăng nhập vào công trường

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed the excavated holes signs/ prohibit the people without duty from

entering the construction site Nhà Thầu lắp đặt biển báo Hố sâu nguy hiểm/ cấm người lạ đăng nhập vào công trường

Page 24: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installs emergency sign/ construction regulations sign Nhà Thầu lắp đặt biển thông tin ứng cứu khẩn cấp/ biển nội quy công trình

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installs emergency sign/ construction regulations sign

Nhà Thầu lắp đặt biển thông tin ứng cứu khẩn cấp/ biển nội quy công trình

Page 25: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

3. Nhà Thầu thực hiện sửa chữa những đoạn đường công vụ bị hư hỏng The Contractor repaired the damaged sections of service road

Hình ảnh trước khắc phục/ Before

The Contractor repaired the damaged sections of service road

Nhà Thầu thực hiện sữa chữa những đoạn đường công vụ bị hư hỏng

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor repaired the damaged sections of service road

Nhà Thầu thực hiện sữa chữa những đoạn đường công vụ bị hư hỏng

Page 26: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

4. Nhà Thầu thực hiện vệ sinh khu vực lán trại công nhân, khu vực thi công The Contractor has kept the worker camps, job sites clean and tidy

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor has kept the worker camps, job sites clean and tidy

Nhà Thầu thực hiện vệ sinh khu vực lán trại và khu vực thi công

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor has kept the worker camps, job sites clean and tidy

Nhà Thầu thực hiện vệ sinh khu vực lán trại và khu vực thi công

Page 27: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

5. Nhà Thầu thực hiện lắp đặt biển báo ở các điểm giao cắt tiếp giáp với đường dân địa phương, xịt rửa bánh xe trước khi ròi công trường The Contractor installed the safety signs at intersection with local road, The Contractor washed the wheels

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed the safety signs at intersection with local road

Nhà Thầu thực hiện lắp đặt biển báo An Toàn Giao Thông

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed the safety signs

Page 28: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

Nhà Thầu thực hiện lắp đặt biển báo An Toàn Giao Thông

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor has laid out the sign people at intersection with local road

Nhà Thầu bố trí người đánh tín hiệu tại những điểm giao cắt với đường dân sinh

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor has laid out the sign people at intersection with local road

Nhà Thầu bố trí người đánh tín hiệu tại những điểm giao cắt với đường dân sinh

Page 29: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor washed the wheels

Nhà thầu thực hiện rửa bánh xe

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor washed the wheels

Nhà thầu thực hiện rửa bánh xe

Page 30: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

6. Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ thùng chứa dầu Fire extinguishers have been equipped near worker camp and fuel stations

Hình ảnh thực hiện trên công trường ( Pictures on site)

Fire extinguishers have been equipped near worker camp and fuel stations Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ khu vực bồn chứa dầu

Hình ảnh thực hiện trên công trường ( Pictures on site)

Fire extinguishers have been equipped near worker camp and fuel stations

Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ khu vực bồn chứa dầu

Page 31: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After

Fire extinguishers have been equipped near worker camp and fuel stations

Nhà Thầu thực hiện bố trí bình cứu hỏa tại khu vực lán trại/ khu vực bồn chứa dầu

Hình ảnh thực hiện trên công trường ( Pictures on site)

the Contractor installed concrete floor at the area of chemical preservatives in order to

prevent chemical spills out. Nhà Thầu thực hiện lắp đặt sàn bê tông quanh khu vực bảo quản hóa chất tránh tình trạng

tràn hóa chất ra ngoài

Page 32: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

7. Nhà Thầu thực hiện trang bị tử thuốc, các loại thuốc và dụng cụ sơ cấp cứu The Contractor has provided medicine kits, first aid kits at construction site

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor has provided medicine kits, first aid kits at construction site Nhà Thầu thực hiện trang bị tử thuốc, các loại thuốc và dụng cụ sơ cấp cứu

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor has provided medicine kits, first aid kits at construction site Nhà Thầu thực hiện trang bị tử thuốc, các loại thuốc và dụng cụ sơ cấp cứu

Page 33: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

8. Nhà Thầu thực hiện lắp đặt hệ thống lan can, lưới bảo vệ và cầu than lên xuống

The Contractor installed the handrails, protection mesh and ladders at construction

9. Báo cáo khắc phục của từng Đơn Vị Nhà Thầu Phụ

Corrective Report of each Sub-contractor.

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed the handrails, protection mesh and ladders at construction

Nhà Thầu thực hiện lắp đặt hệ thống lan can, lưới bảo vệ và cầu than lên xuống

Hình ảnh thực hiện trên công trường ( Pictures on site)

The Contractor installed the handrails, protection mesh and ladders at construction Nhà Thầu thực hiện lắp đặt hệ thống lan can, lưới bảo vệ và cầu than lên xuống

Page 34: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

NHÀ THẦU THỰC HIỆN CÁC HƯỚNG DẪN CỦA TƯ VẤN GIÁM SÁT IMPLEMENTATION OF THE CONTRACTOR FOR NOTICE OF

CONSULTANTS MISSION OUTCOMES

NhàThầuxinchânthànhcảmơn Ban QuảnLýdựán, TưVấnGiámSátđãquantâm, sâusátvàcónhữnghướngdẫnđểNhàThầuhoànthiệnhơnvềcôngtácquảnlý An

ToànVệSinhMôiTrường. SauđâyNhàThầuđãtriểnkhaikhắcphụccácvấnđềmàTưVấnđãchỉdẫn:

The Contractor would like to thank all closed supports and instructions of EPMU BLLT, CSC for Safety & Environment Managements. Based on notice of CONSULTANTS

mission outcomes, we remedied as follows: 1.Nhà thầu Nam Tân khắc phục trong lán trại

AFTER

layouts the recycle bin Fire extinguishers have been equipped near worker camp

2.Trang bị tủ thuốc cứu thương trong lán trại

The Contractor has provided medicine kits, first aid kits at construction site

The Contractor has kept the worker camps

Page 35: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

3. Lắp đặt hệ thống lan can trên mố A1.

AFTER AFTER

The Contractor installed the handrails, protection mesh and ladders at construction

AFTER AFTER

The Contractor installed the handrails, protection mesh and ladders at construction

Công ty Cổ Phần Nam Tân Chỉ huy phó

Trần Đăng Quân

Page 36: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

NHÀ THẦU THỰC HIỆN CÁC CÔNG TÁC AN TOÀN LAO ĐỘNG TRÊN CÔNG TRƯỜNG THEO KẾ HOẠCH QUẢN LÝ AN TOÀN LAO ĐỘNG

The Contractor has carried out the Safety Work on the Construction site in accordance with Safety Management Schedule

Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After

Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương

The Contractor installed fences around the construction site to separate local resident areas

Hình ảnh trước khắc phục/ Before Hình ảnh sau khi thực hiện khắc phục/ After

Nhà Thầu lắp đặt hàng rào tôn ngăn cách giữa khu vực thi công với nhà ở dân địa phương

The Contractor installed fences around the construction site to separate local resident areas

Page 37: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 38: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

NHÀ THẦU THỰC HIỆN CÁC HƯỚNG DẪN CỦA TƯ VẤN GIÁM SÁT IMPLEMENTATION OF THE CONTRACTOR FOR NOTICE OF

CONSULTANTS MISSION OUTCOMES

NhàThầuxinchânthànhcảmơn Ban QuảnLýdựán, TưVấnGiámSátđãquantâm, sâusátvàcónhữnghướngdẫnđểNhàThầuhoànthiệnhơnvềcôngtácquảnlý An

ToànVệSinhMôiTrường. SauđâyNhàThầuđãtriểnkhaikhắcphụccácvấnđềmàTưVấnđãchỉdẫn:

The Contractor would like to thank all closed supports and instructions of EPMU BLLT, CSC for Safety & Environment Managements. Based on notice of CONSULTANTS

mission outcomes, we remedied as follows:

1.nhà thầu khăc phục.

BEFOR AFTER

Never position fix worker camps and water systems

Chưa khắc phục vị trí lán trại công nhân và hệ thống nước

location fix worker camps and unfreeze water system. khắc phục vị trí lán trại công nhân và khơi thông hệ thống nước.

Page 39: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

2 . nhà thầu khắc phuc.

BEFOR AFTER

Not yet overcome trash sorting. Chưa khắc phục thùng rác chưa phân

loại.

overcoming all the trash has been classified.

khắc phục tất cả thùng rác đã được phân loai.

AFTER AFTER

location fix worker camps and unfreeze water system.

(khắc phục vị trí lán trại công nhân và khơi thông hệ thống nước.)

location fix worker camps and unfreeze water system.

(khắc phục vị trí lán trại công nhân và khơi thông hệ thống nước).

Page 40: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

3.nhà thầu khăc phục.

AFTER AFTER

Chemical storage areas are separated

(Khu vực chứa hóa chất được ngăn cách)

Chemical storage areas are separated (Khu vực chứa hóa chất được ngăn cách)

4. Nhà thầu khắc phục

AFTER

Fully equipped with protective gear for the workers working on construction site Trang bị đầy đủ đồ bảo hộ lao động cho người làm việc trên công trường.

Page 41: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 42: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

PACKAGE A2-1

Page 43: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

REPORT OF CORRECTIVE ACTIONS FOR ENVIRONMENT ISSSUES IN COMPLIANCE WITH ADB MISSION’S REQUIREMENTS FROM OCTOBER

17 TO OCTOBER 24, 2016

BÁO CÁO KHẮC PHỤC VẤN ĐỀ MÔI TRƯỜNG THEO YÊU CẦU CỦA ĐOÀN ADB TỪ NGÀY 17/10 ĐẾN 24/10/2016

PACKAGE A2-1 – GÓI THẦU A2-1

Page 44: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200

1. Pending issues of environment and construction safety in site inspection of ADB Mission/Những vấn đề môi trường và an toàn tồn tại trong đợt kiểm tra của đoàn ADB:

Local road used to access batching plant was damaged./Đường địa phương hiện đang được sử dụng đi vào trạm trộn bị hư hỏng nhiều.

It is required to make a concrete embankment at washing area for concrete trucks near exit of batching plant./Xây dựng một bờ bao bê tông tại khu vực rửa xe bê tông gần lối ra của trạm trộn.

It is required to improve management work of excavated soil on site. Excavated soil shall be moved to disposal area./Quản lý đất đào trên công trường cần được cải thiện và được chuyển đến bãi đổ thải.

Limit/ divide properly boundary between construction site and residential zones./Giới hạn/ phân định đúng ranh giới công trường với khu vực dân cư sinh sống.

Page 45: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200

2. Corrective actions of the Contractor/ Các biện pháp khắc phục của Nhà thầu:

Local road was damagedLocal road was damaged

Đường địa phương bị hư hỏng

The Contractor repaired local road at damaged sections

Nhà thầu đã sửa chữa đường địa phương tại các vị trí bị hư hỏng

Page 46: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200

Washing area for concrete truck mixer was not made

embankment to prevent water from overflowing Vị trí rửa xe mix chưa có bờ bao ngăn nước tràn ra

xung quanh

The Contractor made concrete embankment to prevent water from overflowing at sedimentation tank location

Nhà thầu đã đổ bê tông tạo bờ bao ngăn nước tràn ra xung quanh tại vị trí bể lắng

Page 47: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200

The Contractor moved excavated soil to disposal area

Nhà thầu đã di dời đất thải đến bãi đổ thải

Approved disposal area of Package A2-1 Bãi đổ thải được duyệt của Gói thầu A2-1

Page 48: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200

Residential zones are separated with construction site by iron

fence. Khu vực nhà dân với công trường cũng được ngăn cách bởi

hàng rào tôn.

The Contractor installed warning lights at night for areas that construction site intersects with local roads

Nhà thầu bố trí đèn cảnh báo vào ban đêm trên đường giao nhau với đường địa phương.

Page 49: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200

The Contractor limits the boundary between construction areas and residential zones by iron fence. Ranh giới giữa đường đi lại của người dân với công trường được nhà thầu rào lại bằng tôn.

Page 50: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

GMS BEN LUC – LONG THANH EXPRESSWAY PROJECT PACKAGE A2.1: From Km 7+900 to Km 11+200

3. Conclusion/Kết luận:

The Contractor repaired local road used to access batching plant. However, due to rainy season and many traffic vehicles, repairing work is limited.

Nhà thầu đã sửa chữa đường địa phương đi vào trạm trộn. Tuy nhiên, do đang mùa mưa và lượng xe cộ lưu thông nhiều nên việc khắc phục còn hạn chế

The Contractor uses clean water to wash vehicles, so it does not affect environment. The Contractor made concrete embankment near sedimentation tank of batching plant to facilitate for

discharging directly water to sedimentation tank

Việc rửa xe cho xe phục vụ công trình chủ yếu là nước sạch nên cũng không ảnh hưởng tới môi trường nhiều. Nhà thầu đã xây bờ bao bê tông gần bể lắng trạm trộn để nước chảy trực

tiếp vào bễ lắng.

Useless excavated soil will be moved to our approved disposal area.

Đất thải tại công trình nếu không sử dụng tới thì nhà thầu sẽ cho chuyển về bãi đổ thải đúng nơi quy định.

The boundary between residential zones and construction site was installed. The Contractor installed warning lights at night for areas that construction site intersects with local roads

Khu vực ranh giới xung quanh nhà dân với công trường được nhà thầu lắp đặt hàng rào tôn. Nhà thầu cũng bố trí đèn cảnh báo vào ban đêm trên đường giao nhau với đường địa phương.

Page 51: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

PACKAGE A2-2

Page 52: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 53: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 54: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 55: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 56: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 57: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 58: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 59: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

PACKAGE A3

Page 60: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

IMPLEMENTATION IN ACCORDANCE WITH NOTICE OF ADB MISSION OUTCOMES

NHÀ THẦU THỰC HIỆN CÁC HƯỚNG DẪN CỦA ĐOÀN ADB

The Contractor would like to thank all closed supports and instructions of EPMU

BLLT, CSC for Safety & Environment Managements. Based on notice of ADB mission

outcomes, we remedied as follows:

Nhà Thầu xin chân thành cảm ơn Ban Quản Lý dự án, Tư Vấn Giám Sát đã quan tâm,

sâu sát và có những hướng dẫn để Nhà Thầu hoàn thiện hơn về công tác quản lý An Toàn

- Vệ Sinh Môi Trường. Sau đây Nhà Thầu đã triển khai khắc phục các vấn đề mà Đoàn

ADB đã chỉ dẫn:

1. SOIL ON SITE IS REMOVED TO DESIGNATED AREA:

BEFORE AFTER

Page 61: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

2. A CONCRETE-LINED VEHICLE/WHEEL WASHING AREA SHOULD BE

PROVIDED NEAR THE EXIT OF BATCHING PLANT

BEFORE AFTER

Page 62: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB

PACKAGE A4

Page 63: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 64: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 65: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 66: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 67: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 68: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 69: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 70: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 71: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 72: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 73: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 74: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 75: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 76: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB
Page 77: Environmental Monitoring Report VIE: Greater Mekong ......Report on Corrective Actions on Environment and Safety following the Corrective Action Plan defined in the MOU of the ADB