Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016
VIE: Central Mekong Delta Region Connectivity
Project
Part 2 Annexes
Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.
NOTE
In this report, “$” refers to US dollars.
This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area
1 Doc-CDM/WSP/YOOSHI JV-SH&E
SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT
The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety
and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.
The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.
This report is a reflection of acts and conditions noted at the time of the inspection.
Report #01. SH&E-7822-VIE-P1- CW1A-SH&E - 020
Contractor: Hoang An-Tuan Loc-Thang Long JV Severity Rating
Date/Time: 1.6.2016 13:30 Contract number: 4213-CIPM-HĐKT Health & Safety Environmental
Last Visit: 18.5.2016 Location: Dinh Chung &Linh Son, TinhThoi Bridge Km. 0+00 – 3+800.
Very High Immediate H (Major) Immediate
Insp Type: Planned Joint Weekly Accompanied By: Mr.Nhung High 24 Hours L (Minor) 3-5 Days
Report by: Huynh Van Nhung Mr.Nhan Medium 3 days Note No Action
The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.
Low 5 days
Note :Good Practice
2 Doc-CDM/WSP/YOOSHI JV-SH&E
1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.
2. SH&E OBSERVATIONS
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 Unsafe used socket on site
Very High
The industry socket shall be use to prevent shock electric.
Fig: 0200 Date: 1.6.2016 Comment:
Location:
Tuan Loc- Dinh Chung Bridge
2 The grinding power tool are unsafe used.
Very High
The guard protection and handling shall be used to prevent harm injuries.
Fig: 0201 Date: 1.6.2016
Comment: Location:
Tuan Loc- Dinh Chung Bridge
3 Doc-CDM/WSP/YOOSHI JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
3 The wire electric lied on ground.
Very high The wire electric shall be hung up to prevent shock electric.
Fig: 0202 Date: 1.6.2016 Comment:
Location:
Tuan Loc- Dinh Chung Bridge
4 The gauge meter í damaged.
High
It shall be replace by new one to control compression air due working.
Fig: 0203 Date: 1.6.2016 Comment:
Location:
Tuan Loc- Dinh Chung Bridge
4 Doc-CDM/WSP/YOOSHI JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
5 - No access to
pier Very High
The contractor shall arrange safety access at workplace.
Fig: 0204 Date: 1.6.2016
Comment: Location: Tuan Loc- Linh Son Bridge
6 - Unsafe
scaffolding Very High
- The scaffolding shall be installed with sufficient ladder, handrail, and railing.
- The scaffolding only allowed to use after inspection passed, tagged by contractor safety officer
Fig: 0205 Date: 1.6.2016 Comment:
Location: Tuan Loc- Linh Son Bridge.
5 Doc-CDM/WSP/YOOSHI JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
7 The gas/cylinder are not stored on cage.
Very High
The contractor shall provide cylinder cage and fire extinguisher at workplace.
Fig: 0206 Date: 1.6.2016 Comment:
Location: Tuan Loc- Linh Son Bridge
6 Doc-CDM/WSP/YOOSHI JV-SH&E
3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY. (Not used during Dedicated Environmental Inspection)
ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT
A Plant Mobile
B Plant Mobile
C Plant Static D Power Tool E Lifting gear F Lifting Equipment (Cherry Picker) G Crane H Rigger I Ladders J Fire Extinguisher See item -
K SH&E Question Question - Answer - L Risk Assessments Location -
M Hazardous MaterialLog (locations recorded/inspected ) Yes No NA
N Scaffolds Register (All labelled and inspected weekly) Yes No NA O Daily Log Check(up to date) Yes No NA
P Environmental Monitoring(up to date) Yes No NA
Q Incident Log(up to date) Yes No NA R Lift Plan(Available if required for the operation) Yes No NA
S Safety meetings held and records available. Yes No NA
T Permits or NOCs (Displayed and in date) Yes No NA
U P.T.W. log(All permits registered for the day) Yes No NA
7 Doc-CDM/WSP/YOOSHI JV-SH&E
4. REPLYING TO THE REPORT
Please forward your response to the observations made during the Site Inspection to:
E mail: CONTACT NUMBER:
[email protected] 0906816121
[email protected] 0939953363
[email protected] 0932196201
We thank you for your efforts in implementing corrective actions to the observations made.
Please note, that your reply is politely requested within 5 working days from receipt of this report.
1 Doc-CDM/WSP/YOOSHI JV-SH&E
SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT
The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety
and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.
The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.
This report is a reflection of acts and conditions noted at the time of the inspection.
Report #01. SH&E-7822-VIE-P1- CW1A-SH&E - 018
Contractor: Hoang An-Tuan Loc-Thang Long JV Severity Rating
Date/Time: 10.5.2016 13:30 Contract number: 4213-CIPM-HĐKT Health & Safety Environmental
Last Visit: 20.4.2016 Location: Dinh Chung &Linh Son, TinhThoi Bridge Km. 0+00 – 3+800.
Very High Immediate H (Major) Immediate
Insp Type: Planned Joint Weekly Accompanied By: Mr.Nhung High 24 Hours L (Minor) 3-5 Days
Report by: Huynh Van Nhung Mr.Nhan Medium 3 days Note No Action
The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.
Low 5 days
Note :Good Practice
2 Doc-CDM/WSP/YOOSHI JV-SH&E
1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.
2. SH&E OBSERVATIONS
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 The gas/oxygen cylinder is not stored on cage.
High The cage shall provided to store.
Fig: 0188 Date: 10.5.2016 Comment:
Location:
Tuan Loc- Dinh Chung Bridge
2 The out put from generator is not protected, warned.
Very High
They shall be insulate protected and warned to prevent shock electric.
Fig: 0189 Date: 10.5.2016
Comment: Location:
Tuan Loc- Dinh Chung Bridge
3 Doc-CDM/WSP/YOOSHI JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
3 The hard barrier is not properly installed.
Very high It must be installed to prevent fall down.
Fig: 0190 Date: 10.5.2016 Comment:
Location: Hoan An- TinhThoi Bridge
4 The wire electric is not hang up.
Very High
The wire electric using on site must be hang up to prevent shock electric.
Fig: 0191 Date: 10.5.2016 Comment:
Location: Hoang An- TinhThoi Bridge
4 Doc-CDM/WSP/YOOSHI JV-SH&E
3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY. (Not used during Dedicated Environmental Inspection)
ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT
A Plant Mobile
B Plant Mobile
C Plant Static D Power Tool E Lifting gear F Lifting Equipment (Cherry Picker) G Crane H Rigger I Ladders J Fire Extinguisher See item -
K SH&E Question Question - Answer - L Risk Assessments Location -
M Hazardous MaterialLog (locations recorded/inspected ) Yes No NA
N Scaffolds Register (All labelled and inspected weekly) Yes No NA O Daily Log Check(up to date) Yes No NA
P Environmental Monitoring(up to date) Yes No NA
Q Incident Log(up to date) Yes No NA R Lift Plan(Available if required for the operation) Yes No NA
S Safety meetings held and records available. Yes No NA
T Permits or NOCs (Displayed and in date) Yes No NA
U P.T.W. log(All permits registered for the day) Yes No NA
5 Doc-CDM/WSP/YOOSHI JV-SH&E
4. REPLYING TO THE REPORT
Please forward your response to the observations made during the Site Inspection to:
E mail: CONTACT NUMBER:
[email protected] 0906816121
[email protected] 0939953363
[email protected] 0932196201
We thank you for your efforts in implementing corrective actions to the observations made.
Please note, that your reply is politely requested within 5 working days from receipt of this report.
1 Doc- CDM/YOOSHIN JV-SH&E
SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT
The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety
and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.
The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.
This report is a reflection of acts and conditions noted at the time of the inspection.
Report #02. SH&E-7822-VIE-P1- CW1B-SH&E - 022
Contractor: CRBC-VinaconexE&C JV Severity Rating
Date/Time: 14/6/2016 08:30 PM Contract number: 3712A-CIPM-HĐKT Health & Safety Environmental
Last Visit: 31/5/2016 Location: Cao Lanh Bridge Km. 03+800 – 06+200.
Very High Immediate H (Major) Immediate
Insp Type: Planned Joint Weekly Accompanied By: Mr.Vic/ Mr.Nhung High 24 Hours L (Minor) 3-5 Days
Report by: Huynh Van Nhung Mr. Tue/ Mr.Kien/ Mr.ZhouCaofeng and Subcontractors.
Medium 3 days Note No Action
The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.
Low 5 days
Note :Good Practice
2 Doc- CDM/YOOSHIN JV-SH&E
1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.
2. SH&E OBSERVATIONS
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 The steel plate is put on ground without warning and protection.
High
The warning sign, warning tape shall providing to prevent person hitting foot when pass.
Fig: 0322 Date: 14.6.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
2 The wire electric is not protected.
Very High
The insulate material for cover wire electric is required.
3 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0323 Date: 14.6.2016 Comment:
Location: CRBC-Cao Lanh Bridge
3 The electric panel is not separate protection with handrail.
Very high
The insulate material shall installed to separation EP with handrail.
Fig: 0324 Date: 14.6.2016 Comment:
Location:
Tuan Loc and -Cao Lanh Bridge
4
1. The hook is not sufficient installed.
2. The load capacity/SWLis not provided.
High
1. The hook shall be sufficient installed, and the load capacity/ SWL provided to assure safe in case lifting.
4 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0325 Date: 14.6.2016
Comment: Location:
Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge
5 The handrail is damaged. Very High
The handrail shall be properly fixed to assure safe and prevent fall down on river.
Remove and not use
Fig: 0326 Date: 14.6.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
5 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
6 The access is not assure safe to use.
Very high
- The Cage protection and lifeline shall be installed to prevent fall down due worker climbing
Fig: 0327 Date: 14.6.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
7 The formwork is damaged.
Very High
The contractor are required to fixing and modifying the open space and light locate.
6 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0328 Date: 14.6.2016
Comment: Location: Tuan Loc-Cao Lanh Bridge
7 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
8 The walkway is obstructed.
Very high The walkway shall be keep clear at all time.
Fig: 0329 Date: 14.6.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
9 The damaged harness put at workplace.
Very high
The contractor shall properly inspecting all harness use on site. And immediately eliminate all damaged harness.
Eliminate all damaged harness
Fig: 0330 Date: 14.6.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
8 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
10 The access go to hoist are not closed.
Very High
The properly designed door shall be installed to prevent the door is not locked before go in hoist.
Fig: 0331 Date: 14.6.2016 Comment:
Location: TaunLoc-Cao Lanh Bridge
11
The electric generator is not provided drip tray, warning sign, emergency contact, erected with earth and the fire-extinguisher.
Low
The generator is used on emergency case when no power supplying from power station. However, the contractor shall provided safety device and warning sign to assure safety.
9 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0332 Date: 14.6.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
12 The oxygen cylinder is not properly stored on cage.
Very high All cylinder used on site shall be stored on cage to prevent falling.
Fig: 0333 Date: 14.6.2016 Comment:
Location: Br.No.12 JSC-Cao Lanh Bridge
13 The workers are not worn required PPE due welding, cutting.
Very High
To prevent harm to worker, the PPE required such gloves, face mask…are shall beworn.
Fig: 0334 Date: 14.6.2016 Comment:
Location:
Br.No.12 JSC -Cao Lanh Bridge
10 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
14
The insulate protection of welding machine are damaged or deformed. The out-put is not covered. And they are not erected with earth to prevent shock from electric leakage.
Very High
The contractor are required to repairing or remove out site with unsafe electric welding.
Remove welding machine are damaged
Fig: 0335 Date: 14.6.2016 Comment:
Location Br.No. 12- Cao Lanh Bridge.
11 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
15 The air compressor machine is damaged.
Very high
Repair and inspected as law required or remove out of site.
Remove out site and repair
Fig: 0336 Date: 14.6.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
16 The gas gauge meter are damaged.
High They shall be replaced by new one.
Fig: 0337 Date: 14.6.2016 Comment:
Location: Br.No.12 JSC- Cao Lanh Bridge
12 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
17
- The warning tape, warning sign and rigger are not provided.
- The wire rope is not sufficient connected when lift activities
Very High
The contractor shall following safety lifting regulation.
Fig: 0338 Date: 14.6.2016 Comment:
Location:
Br.No.12 JSC- Cao Lanh Bridge
18 Damaged wire rope is used to lift.
Very high
- Remove immediately.
- The contractor shall pay responsibilities for safety inspection all lifting gear and mark colour code. .
Cancel and not use
Fig: 0339 Date: 14.6.2016 Comment:
Location:
Br.No.12 JSC- Cao Lanh Bridge
13 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
19
The electric panel used on site without any warning, protection and information.
Very High
The warning sign, emergency contact, roofing protection, and erection with earth shall be done.
14 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0340 Date: 31.5.2016
Comment: Location:
Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge
20 Damaged handrail. Very high
The contractor are required to properly modify immediately to prevent fall down.
15 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0341 Date: 14.6.2016 Comment:
Location:
Bridge 12 JSC-Cao Lanh Bridge
21
The cylinder cage is not provided capacity, SWL. And the fire fighting equipment is not installed.
Very High
The contractor are required to implement gas/ oxygen safety using regulation.
Fig: 0342 Date: 14.6.2016 Comment:
Location: Br.No.12 JSC-Cao Lanh Bridge
22 The safety net is damaged.
Very High
The contractor are required to re-installation to prevent falling object.
Fig: 0343 Date: 14.6.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
16 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
23 The connecting joint is not properly protected.
Very high The insulate protection shall be covered to prevent electric leakage.
Fig: 0344 Date: 14.6.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
17 Doc- CDM/YOOSHIN JV-SH&E
3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY.(Not used during Dedicated Environmental Inspection)
ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT
A. Plant Mobile
B. Plant Static
C. Power Tool
D. Lifting gear
E. Lifting Equipment (Cherry Picker)
F. Crane
G. Rigger
H. Ladders
I. Fire Extinguisher See item -
J. SH&E Question Question - Answer -
K. Risk Assessments Location -
L. Hazardous MaterialLog (locations recorded/inspected ) Yes No NA
M. Scaffolds Register (All labelled and inspected weekly) Yes No NA
N. Daily Log Check(up to date) Yes No NA
O. Environmental Monitoring(up to date) Yes No NA
P. Incident Log(up to date) Yes No NA
Q. Lift Plan(Available if required for the operation) Yes No NA
R. Safety meetings held and records available. Yes No NA
S. Permits or NOCs (Displayed and in date) Yes No NA
T. P.T.W. log(All permits registered for the day) Yes No NA
18 Doc- CDM/YOOSHIN JV-SH&E
4. REPLYING TO THE REPORT
Please forward your response to the observations made during the Site Inspection to:
E mail: CONTACT NUMBER:
[email protected] 0906816121
[email protected] 0939953363
Anders Loof 01203628036
We thank you for your efforts in implementing corrective actions to the observations made.
Your name
Please note, that your reply is politely requested within 5 working days from receipt of this report.
1 Doc- CDM/YOOSHIN JV-SH&E
SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT
The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety
and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.
The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.
This report is a reflection of acts and conditions noted at the time of the inspection.
Report #02. SH&E-7822-VIE-P1- CW1B-SH&E - 021
Contractor: CRBC-VinaconexE&C JV Severity Rating
Date/Time: 31/5/2016 08:30 PM Contract number: 3712A-CIPM-HĐKT Health & Safety Environmental
Last Visit: 24/5/2016 Location: Cao Lanh Bridge Km. 03+800 – 06+200.
Very High Immediate H (Major) Immediate
Insp Type: Planned Joint Weekly Accompanied By: Mr.Vic/ Mr.Nhung High 24 Hours L (Minor) 3-5 Days
Report by: Huynh Van Nhung Mr. Tue/ Mr.Kien/ Mr.ZhouCaofeng and Subcontractors.
Medium 3 days Note No Action
The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.
Low 5 days
Note :Good Practice
2 Doc- CDM/YOOSHIN JV-SH&E
GOOD PRACTICE:
THE WIRE ELECTRIC IS PROPERLY HUNG UP AND INSULATION
1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 The mask protection is not used for painting work.
Very High
The contractor shall be provided PPE required to worker.
Fig: 0302 Date: 24.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
3 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
2 The safety latch is damaged. And the colour code not marked
Very High
The contractor shall following and maintain safety lifting procedure. The safety latch and colour code shall properly provide.
Fig: 0303 Date: 24.5.2016 Comment:
Location: Tuan Loc -Cao Lanh Bridge
3
The out-put from welding machine are not protected, and the part of control power damaged. .
Very high
The contractor shall safety inspected and properly maintain, repair to assure safe.
4 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0304 Date: 24.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
4 Un-used scaffold is not removed.
High
Remove or modifying scaffolding with sufficient handrail, railing and ladder. And the scaffolding just allowed to use after inspected, tagged by contractor safety officer.
Fig: 0305 Date: 24.5.2016
Comment: Location: Tuan Loc- Cao Lanh Bridge
5 Damaged welding machine are used on site.
Very high
The contractor shall properly maintain and remove immediately in this case.
5 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0307 Date: 24.5.2016
Comment:
Location:
Bridge 12 JSC-Cao Lanh Bridge
2. SH&E OBSERVATIONS
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 The oxygen cylinder is not properly stored.
Medium The store shall casting concrete and arrange frame for tie.
Fig: 0311 Date: 31.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
6 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
2 The disc of cutting and grinding are not satisfied capacity for install.
Very High
They must be used properly disc as introduction by manufactory, and safe guard, handling erected.
All power tool must be safety inspected, passed, safety tagged before use.
Fig: 0312 Date: 31.5.2016 Comment:
Location:
Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge
3 The electric panel are not properly installed, warned..
Very high
The electric panel shall be installed insulation with frame. And sufficient roofing protection.
The emergence contactor, warning sign, safety inspection tag
7 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
must be provided.
Fig: 0313 Date: 31.5.2016 Comment:
Location:
Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge
4 The capacity is not marked on baskets.
High
All basket usedon site must be installed the capacity safety working load.
8 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0314 Date: 31.5.2016 Comment:
Location: Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge
5
The generator is not provided drip tray, fire-extinguisher, warning sign, emergency contactor and earth erection.
High
The generator only use in case of No power supplying by power station. However, the contractor must be arranged safety devices.
Fig: 0315 Date: 31.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
6 Poor housekeeping. Very high
The cylinder must be stored on cage.
Remove unused material, garbage.
Hazardous material shall be stored on drip tray.
And fire extinguisher provided at workplace.
Fig: 0316 Date: 24.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
9 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
7 The cylinder cage is not properly protected. .
Very High
The gas/ oxygen cylinder used at workplace where hazard potential falling objects shall be installed steel roofing to prevent explosive on site.
Fig: 0317 Date: 31.5.2016 Comment:
Location: Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge
8 The support beam are not properly installed.
Very high
The welding joint shall sufficient welded. They should welding more contact joint.
10 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0318 Date: 17.5.2016 Comment:
Location:
Bridge 12 JSC-Cao Lanh Bridge
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 Electric panel is damaged.
Very High
Remove. Or repair and safety inspected before use.
Fig: 0319 Date: 31.5.2016 Comment:
Location: Br.No.12 JSC-Cao Lanh Bridge
2 The worker is work without PPE.
Very High
The contractor must be strictly control all worker work on site. They shall be equipped required PPE and safety inducted before work on site.
Fig: 0320 Date: 31.5.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
6 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
2 The disc of cutting and grinding are not satisfied capacity for install.
Very High
They must be used properly disc as introduction by manufactory, and safe guard, handling erected.
All power tool must be safety inspected, passed, safety tagged before use.
Fig: 0312 Date: 31.5.2016 Comment:
Location:
Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge
3 The electric panel are not properly installed, warned..
Very high
The electric panel shall be installed insulation with frame. And sufficient roofing protection.
The emergence contactor, warning sign, safety inspection tag
7 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
must be provided.
Fig: 0313 Date: 31.5.2016 Comment:
Location:
Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge
4 The capacity is not marked on baskets.
High
All basket usedon site must be installed the capacity safety working load.
8 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0314 Date: 31.5.2016 Comment:
Location: Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge
5
The generator is not provided drip tray, fire-extinguisher, warning sign, emergency contactor and earth erection.
High
The generator only use in case of No power supplying by power station. However, the contractor must be arranged safety devices.
Fig: 0315 Date: 31.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
6 Poor housekeeping. Very high
The cylinder must be stored on cage.
Remove unused material, garbage.
Hazardous material shall be stored on drip tray.
And fire extinguisher provided at workplace.
Fig: 0316 Date: 24.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
9 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
7 The cylinder cage is not properly protected. .
Very High
The gas/ oxygen cylinder used at workplace where hazard potential falling objects shall be installed steel roofing to prevent explosive on site.
Fig: 0317 Date: 31.5.2016 Comment:
Location: Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge
8 The support beam are not properly installed.
Very high
The welding joint shall sufficient welded. They should welding more contact joint.
10 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0318 Date: 17.5.2016 Comment:
Location:
Bridge 12 JSC-Cao Lanh Bridge
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 Electric panel is damaged.
Very High
Remove. Or repair and safety inspected before use.
Fig: 0319 Date: 31.5.2016 Comment:
Location: Br.No.12 JSC-Cao Lanh Bridge
2 The worker is work without PPE.
Very High
The contractor must be strictly control all worker work on site. They shall be equipped required PPE and safety inducted before work on site.
Fig: 0320 Date: 31.5.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
11 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
3
The scaffolding is not sufficient installed and safety inspected, tagged. .
Very high The contractor shall modify this scaffolding and scaf-tag providing.
Remove and not use
Fig: 0321 Date: 31.5.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
6 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
2 The disc of cutting and grinding are not satisfied capacity for install.
Very High
They must be used properly disc as introduction by manufactory, and safe guard, handling erected.
All power tool must be safety inspected, passed, safety tagged before use.
Fig: 0312 Date: 31.5.2016 Comment:
Location:
Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge
3 The electric panel are not properly installed, warned..
Very high
The electric panel shall be installed insulation with frame. And sufficient roofing protection.
The emergence contactor, warning sign, safety inspection tag
7 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
must be provided.
Fig: 0313 Date: 31.5.2016 Comment:
Location:
Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge
4 The capacity is not marked on baskets.
High
All basket usedon site must be installed the capacity safety working load.
8 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0314 Date: 31.5.2016 Comment:
Location: Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge
5
The generator is not provided drip tray, fire-extinguisher, warning sign, emergency contactor and earth erection.
High
The generator only use in case of No power supplying by power station. However, the contractor must be arranged safety devices.
Fig: 0315 Date: 31.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
6 Poor housekeeping. Very high
The cylinder must be stored on cage.
Remove unused material, garbage.
Hazardous material shall be stored on drip tray.
And fire extinguisher provided at workplace.
Fig: 0316 Date: 24.5.2016 Comment:
Location: Tuan Loc-Cao Lanh Bridge
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
9 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
7 The cylinder cage is not properly protected. .
Very High
The gas/ oxygen cylinder used at workplace where hazard potential falling objects shall be installed steel roofing to prevent explosive on site.
Fig: 0317 Date: 31.5.2016 Comment:
Location: Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge
8 The support beam are not properly installed.
Very high
The welding joint shall sufficient welded. They should welding more contact joint.
10 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
Fig: 0318 Date: 17.5.2016 Comment:
Location:
Bridge 12 JSC-Cao Lanh Bridge
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
1 Electric panel is damaged.
Very High
Remove. Or repair and safety inspected before use.
Fig: 0319 Date: 31.5.2016 Comment:
Location: Br.No.12 JSC-Cao Lanh Bridge
2 The worker is work without PPE.
Very High
The contractor must be strictly control all worker work on site. They shall be equipped required PPE and safety inducted before work on site.
Fig: 0320 Date: 31.5.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
11 Doc- CDM/YOOSHIN JV-SH&E
DDIS CONTRACTOR
Item Observation Risk Requirement/Recommendation
Observation Photo Contractor Response
3
The scaffolding is not sufficient installed and safety inspected, tagged. .
Very high The contractor shall modify this scaffolding and scaf-tag providing.
Remove and not use
Fig: 0321 Date: 31.5.2016 Comment:
Location:
Br.No.12 JSC-Cao Lanh Bridge
12 Doc- CDM/YOOSHIN JV-SH&E
3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY.(Not used during Dedicated Environmental Inspection)
ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT
A. Plant Mobile
B. Plant Static
C. Power Tool
D. Lifting gear
E. Lifting Equipment (Cherry Picker)
F. Crane
G. Rigger
H. Ladders
I. Fire Extinguisher See item -
J. SH&E Question Question - Answer -
K. Risk Assessments Location -
L. Hazardous MaterialLog (locations recorded/inspected ) Yes No NA
M. Scaffolds Register (All labelled and inspected weekly) Yes No NA
N. Daily Log Check(up to date) Yes No NA
O. Environmental Monitoring(up to date) Yes No NA
P. Incident Log(up to date) Yes No NA
Q. Lift Plan(Available if required for the operation) Yes No NA
R. Safety meetings held and records available. Yes No NA
S. Permits or NOCs (Displayed and in date) Yes No NA
T. P.T.W. log(All permits registered for the day) Yes No NA
13 Doc- CDM/YOOSHIN JV-SH&E
4. REPLYING TO THE REPORT
Please forward your response to the observations made during the Site Inspection to:
E mail: CONTACT NUMBER:
[email protected] 0906816121
[email protected] 0939953363
Anders Loof 01203628036
We thank you for your efforts in implementing corrective actions to the observations made.
Your name
Please note, that your reply is politely requested within 5 working days from receipt of this report.
Doc-CDM/WSP/YOOSHI JV-SH&E
SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT
The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety
and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.
The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.
This report is a reflection of acts and conditions noted at the time of the inspection.
Report # 006.
SH&E-7822-VIE-P1- CW1C-SH&E - 009
Contractor: Dat Phuong – Tranimexco JV Severity Rating
Date/Time: 20.4.2016 02:00 Contract number: 5062-CIPM-HĐKT Health & Safety Environmental
Last Visit: 5.4.2016 Location: Tan My BridgeKm. 06+200 – 07+200 Very High Immediate H (Major) Immediate
Insp Type: Planned Joint Weekly Accompanied By: Mr.Nhung. Mr.Pht High 24 Hours L (Minor) 3-5 Days
Report by: Huynh Van Nhung Mr.Huong Medium 3 days Note No Action
The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.
Low 5 days
Note :Good Practice