66
Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016 VIE: Central Mekong Delta Region Connectivity Project Part 2 Annexes Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.

Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

Environmental Monitoring Report Semi-Annual Environmental Monitoring Report No. 5 January-June 2016

VIE: Central Mekong Delta Region Connectivity

Project

Part 2 Annexes

Prepared by Detailed Design and Implementation Support: Joint Venture of CDM Smith, WSP Finland Limited and Yooshin Engineering Corporation for the Socialist Republic of Viet Nam and the Asian Development Bank.

Page 2: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

NOTE

In this report, “$” refers to US dollars.

This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area

Page 3: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 4: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 5: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 6: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 7: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 8: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 9: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 10: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 11: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions
Page 12: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

1 Doc-CDM/WSP/YOOSHI JV-SH&E

SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT

The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety

and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.

The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.

This report is a reflection of acts and conditions noted at the time of the inspection.

Report #01. SH&E-7822-VIE-P1- CW1A-SH&E - 020

Contractor: Hoang An-Tuan Loc-Thang Long JV Severity Rating

Date/Time: 1.6.2016 13:30 Contract number: 4213-CIPM-HĐKT Health & Safety Environmental

Last Visit: 18.5.2016 Location: Dinh Chung &Linh Son, TinhThoi Bridge Km. 0+00 – 3+800.

Very High Immediate H (Major) Immediate

Insp Type: Planned Joint Weekly Accompanied By: Mr.Nhung High 24 Hours L (Minor) 3-5 Days

Report by: Huynh Van Nhung Mr.Nhan Medium 3 days Note No Action

The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.

Low 5 days

Note :Good Practice

Page 13: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

2 Doc-CDM/WSP/YOOSHI JV-SH&E

1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.

2. SH&E OBSERVATIONS

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 Unsafe used socket on site

Very High

The industry socket shall be use to prevent shock electric.

Fig: 0200 Date: 1.6.2016 Comment:

Location:

Tuan Loc- Dinh Chung Bridge

2 The grinding power tool are unsafe used.

Very High

The guard protection and handling shall be used to prevent harm injuries.

Fig: 0201 Date: 1.6.2016

Comment: Location:

Tuan Loc- Dinh Chung Bridge

Page 14: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

3 Doc-CDM/WSP/YOOSHI JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

3 The wire electric lied on ground.

Very high The wire electric shall be hung up to prevent shock electric.

Fig: 0202 Date: 1.6.2016 Comment:

Location:

Tuan Loc- Dinh Chung Bridge

4 The gauge meter í damaged.

High

It shall be replace by new one to control compression air due working.

Fig: 0203 Date: 1.6.2016 Comment:

Location:

Tuan Loc- Dinh Chung Bridge

Page 15: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

4 Doc-CDM/WSP/YOOSHI JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

5 - No access to

pier Very High

The contractor shall arrange safety access at workplace.

Fig: 0204 Date: 1.6.2016

Comment: Location: Tuan Loc- Linh Son Bridge

6 - Unsafe

scaffolding Very High

- The scaffolding shall be installed with sufficient ladder, handrail, and railing.

- The scaffolding only allowed to use after inspection passed, tagged by contractor safety officer

Fig: 0205 Date: 1.6.2016 Comment:

Location: Tuan Loc- Linh Son Bridge.

Page 16: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

5 Doc-CDM/WSP/YOOSHI JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

7 The gas/cylinder are not stored on cage.

Very High

The contractor shall provide cylinder cage and fire extinguisher at workplace.

Fig: 0206 Date: 1.6.2016 Comment:

Location: Tuan Loc- Linh Son Bridge

Page 17: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

6 Doc-CDM/WSP/YOOSHI JV-SH&E

3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY. (Not used during Dedicated Environmental Inspection)

ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT

A Plant Mobile

B Plant Mobile

C Plant Static D Power Tool E Lifting gear F Lifting Equipment (Cherry Picker) G Crane H Rigger I Ladders J Fire Extinguisher See item -

K SH&E Question Question - Answer - L Risk Assessments Location -

M Hazardous MaterialLog (locations recorded/inspected ) Yes No NA

N Scaffolds Register (All labelled and inspected weekly) Yes No NA O Daily Log Check(up to date) Yes No NA

P Environmental Monitoring(up to date) Yes No NA

Q Incident Log(up to date) Yes No NA R Lift Plan(Available if required for the operation) Yes No NA

S Safety meetings held and records available. Yes No NA

T Permits or NOCs (Displayed and in date) Yes No NA

U P.T.W. log(All permits registered for the day) Yes No NA

Page 18: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

7 Doc-CDM/WSP/YOOSHI JV-SH&E

4. REPLYING TO THE REPORT

Please forward your response to the observations made during the Site Inspection to:

E mail: CONTACT NUMBER:

[email protected] 0906816121

[email protected] 0939953363

[email protected] 0932196201

We thank you for your efforts in implementing corrective actions to the observations made.

Please note, that your reply is politely requested within 5 working days from receipt of this report.

Page 19: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

1 Doc-CDM/WSP/YOOSHI JV-SH&E

SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT

The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety

and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.

The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.

This report is a reflection of acts and conditions noted at the time of the inspection.

Report #01. SH&E-7822-VIE-P1- CW1A-SH&E - 018

Contractor: Hoang An-Tuan Loc-Thang Long JV Severity Rating

Date/Time: 10.5.2016 13:30 Contract number: 4213-CIPM-HĐKT Health & Safety Environmental

Last Visit: 20.4.2016 Location: Dinh Chung &Linh Son, TinhThoi Bridge Km. 0+00 – 3+800.

Very High Immediate H (Major) Immediate

Insp Type: Planned Joint Weekly Accompanied By: Mr.Nhung High 24 Hours L (Minor) 3-5 Days

Report by: Huynh Van Nhung Mr.Nhan Medium 3 days Note No Action

The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.

Low 5 days

Note :Good Practice

Page 20: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

2 Doc-CDM/WSP/YOOSHI JV-SH&E

1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.

2. SH&E OBSERVATIONS

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 The gas/oxygen cylinder is not stored on cage.

High The cage shall provided to store.

Fig: 0188 Date: 10.5.2016 Comment:

Location:

Tuan Loc- Dinh Chung Bridge

2 The out put from generator is not protected, warned.

Very High

They shall be insulate protected and warned to prevent shock electric.

Fig: 0189 Date: 10.5.2016

Comment: Location:

Tuan Loc- Dinh Chung Bridge

Page 21: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

3 Doc-CDM/WSP/YOOSHI JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

3 The hard barrier is not properly installed.

Very high It must be installed to prevent fall down.

Fig: 0190 Date: 10.5.2016 Comment:

Location: Hoan An- TinhThoi Bridge

4 The wire electric is not hang up.

Very High

The wire electric using on site must be hang up to prevent shock electric.

Fig: 0191 Date: 10.5.2016 Comment:

Location: Hoang An- TinhThoi Bridge

Page 22: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

4 Doc-CDM/WSP/YOOSHI JV-SH&E

3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY. (Not used during Dedicated Environmental Inspection)

ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT

A Plant Mobile

B Plant Mobile

C Plant Static D Power Tool E Lifting gear F Lifting Equipment (Cherry Picker) G Crane H Rigger I Ladders J Fire Extinguisher See item -

K SH&E Question Question - Answer - L Risk Assessments Location -

M Hazardous MaterialLog (locations recorded/inspected ) Yes No NA

N Scaffolds Register (All labelled and inspected weekly) Yes No NA O Daily Log Check(up to date) Yes No NA

P Environmental Monitoring(up to date) Yes No NA

Q Incident Log(up to date) Yes No NA R Lift Plan(Available if required for the operation) Yes No NA

S Safety meetings held and records available. Yes No NA

T Permits or NOCs (Displayed and in date) Yes No NA

U P.T.W. log(All permits registered for the day) Yes No NA

Page 23: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

5 Doc-CDM/WSP/YOOSHI JV-SH&E

4. REPLYING TO THE REPORT

Please forward your response to the observations made during the Site Inspection to:

E mail: CONTACT NUMBER:

[email protected] 0906816121

[email protected] 0939953363

[email protected] 0932196201

We thank you for your efforts in implementing corrective actions to the observations made.

Please note, that your reply is politely requested within 5 working days from receipt of this report.

Page 24: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

1 Doc- CDM/YOOSHIN JV-SH&E

SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT

The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety

and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.

The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.

This report is a reflection of acts and conditions noted at the time of the inspection.

Report #02. SH&E-7822-VIE-P1- CW1B-SH&E - 022

Contractor: CRBC-VinaconexE&C JV Severity Rating

Date/Time: 14/6/2016 08:30 PM Contract number: 3712A-CIPM-HĐKT Health & Safety Environmental

Last Visit: 31/5/2016 Location: Cao Lanh Bridge Km. 03+800 – 06+200.

Very High Immediate H (Major) Immediate

Insp Type: Planned Joint Weekly Accompanied By: Mr.Vic/ Mr.Nhung High 24 Hours L (Minor) 3-5 Days

Report by: Huynh Van Nhung Mr. Tue/ Mr.Kien/ Mr.ZhouCaofeng and Subcontractors.

Medium 3 days Note No Action

The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.

Low 5 days

Note :Good Practice

Page 25: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

2 Doc- CDM/YOOSHIN JV-SH&E

1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.

2. SH&E OBSERVATIONS

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 The steel plate is put on ground without warning and protection.

High

The warning sign, warning tape shall providing to prevent person hitting foot when pass.

Fig: 0322 Date: 14.6.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

2 The wire electric is not protected.

Very High

The insulate material for cover wire electric is required.

Page 26: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

3 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0323 Date: 14.6.2016 Comment:

Location: CRBC-Cao Lanh Bridge

3 The electric panel is not separate protection with handrail.

Very high

The insulate material shall installed to separation EP with handrail.

Fig: 0324 Date: 14.6.2016 Comment:

Location:

Tuan Loc and -Cao Lanh Bridge

4

1. The hook is not sufficient installed.

2. The load capacity/SWLis not provided.

High

1. The hook shall be sufficient installed, and the load capacity/ SWL provided to assure safe in case lifting.

Page 27: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

4 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0325 Date: 14.6.2016

Comment: Location:

Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge

5 The handrail is damaged. Very High

The handrail shall be properly fixed to assure safe and prevent fall down on river.

Remove and not use

Fig: 0326 Date: 14.6.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

Page 28: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

5 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

6 The access is not assure safe to use.

Very high

- The Cage protection and lifeline shall be installed to prevent fall down due worker climbing

Fig: 0327 Date: 14.6.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

7 The formwork is damaged.

Very High

The contractor are required to fixing and modifying the open space and light locate.

Page 29: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

6 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0328 Date: 14.6.2016

Comment: Location: Tuan Loc-Cao Lanh Bridge

Page 30: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

7 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

8 The walkway is obstructed.

Very high The walkway shall be keep clear at all time.

Fig: 0329 Date: 14.6.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

9 The damaged harness put at workplace.

Very high

The contractor shall properly inspecting all harness use on site. And immediately eliminate all damaged harness.

Eliminate all damaged harness

Fig: 0330 Date: 14.6.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

Page 31: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

8 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

10 The access go to hoist are not closed.

Very High

The properly designed door shall be installed to prevent the door is not locked before go in hoist.

Fig: 0331 Date: 14.6.2016 Comment:

Location: TaunLoc-Cao Lanh Bridge

11

The electric generator is not provided drip tray, warning sign, emergency contact, erected with earth and the fire-extinguisher.

Low

The generator is used on emergency case when no power supplying from power station. However, the contractor shall provided safety device and warning sign to assure safety.

Page 32: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

9 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0332 Date: 14.6.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

12 The oxygen cylinder is not properly stored on cage.

Very high All cylinder used on site shall be stored on cage to prevent falling.

Fig: 0333 Date: 14.6.2016 Comment:

Location: Br.No.12 JSC-Cao Lanh Bridge

13 The workers are not worn required PPE due welding, cutting.

Very High

To prevent harm to worker, the PPE required such gloves, face mask…are shall beworn.

Fig: 0334 Date: 14.6.2016 Comment:

Location:

Br.No.12 JSC -Cao Lanh Bridge

Page 33: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

10 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

14

The insulate protection of welding machine are damaged or deformed. The out-put is not covered. And they are not erected with earth to prevent shock from electric leakage.

Very High

The contractor are required to repairing or remove out site with unsafe electric welding.

Remove welding machine are damaged

Fig: 0335 Date: 14.6.2016 Comment:

Location Br.No. 12- Cao Lanh Bridge.

Page 34: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

11 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

15 The air compressor machine is damaged.

Very high

Repair and inspected as law required or remove out of site.

Remove out site and repair

Fig: 0336 Date: 14.6.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

16 The gas gauge meter are damaged.

High They shall be replaced by new one.

Fig: 0337 Date: 14.6.2016 Comment:

Location: Br.No.12 JSC- Cao Lanh Bridge

Page 35: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

12 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

17

- The warning tape, warning sign and rigger are not provided.

- The wire rope is not sufficient connected when lift activities

Very High

The contractor shall following safety lifting regulation.

Fig: 0338 Date: 14.6.2016 Comment:

Location:

Br.No.12 JSC- Cao Lanh Bridge

18 Damaged wire rope is used to lift.

Very high

- Remove immediately.

- The contractor shall pay responsibilities for safety inspection all lifting gear and mark colour code. .

Cancel and not use

Fig: 0339 Date: 14.6.2016 Comment:

Location:

Br.No.12 JSC- Cao Lanh Bridge

Page 36: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

13 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

19

The electric panel used on site without any warning, protection and information.

Very High

The warning sign, emergency contact, roofing protection, and erection with earth shall be done.

Page 37: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

14 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0340 Date: 31.5.2016

Comment: Location:

Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge

20 Damaged handrail. Very high

The contractor are required to properly modify immediately to prevent fall down.

Page 38: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

15 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0341 Date: 14.6.2016 Comment:

Location:

Bridge 12 JSC-Cao Lanh Bridge

21

The cylinder cage is not provided capacity, SWL. And the fire fighting equipment is not installed.

Very High

The contractor are required to implement gas/ oxygen safety using regulation.

Fig: 0342 Date: 14.6.2016 Comment:

Location: Br.No.12 JSC-Cao Lanh Bridge

22 The safety net is damaged.

Very High

The contractor are required to re-installation to prevent falling object.

Fig: 0343 Date: 14.6.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

Page 39: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

16 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

23 The connecting joint is not properly protected.

Very high The insulate protection shall be covered to prevent electric leakage.

Fig: 0344 Date: 14.6.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

Page 40: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

17 Doc- CDM/YOOSHIN JV-SH&E

3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY.(Not used during Dedicated Environmental Inspection)

ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT

A. Plant Mobile

B. Plant Static

C. Power Tool

D. Lifting gear

E. Lifting Equipment (Cherry Picker)

F. Crane

G. Rigger

H. Ladders

I. Fire Extinguisher See item -

J. SH&E Question Question - Answer -

K. Risk Assessments Location -

L. Hazardous MaterialLog (locations recorded/inspected ) Yes No NA

M. Scaffolds Register (All labelled and inspected weekly) Yes No NA

N. Daily Log Check(up to date) Yes No NA

O. Environmental Monitoring(up to date) Yes No NA

P. Incident Log(up to date) Yes No NA

Q. Lift Plan(Available if required for the operation) Yes No NA

R. Safety meetings held and records available. Yes No NA

S. Permits or NOCs (Displayed and in date) Yes No NA

T. P.T.W. log(All permits registered for the day) Yes No NA

Page 41: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

18 Doc- CDM/YOOSHIN JV-SH&E

4. REPLYING TO THE REPORT

Please forward your response to the observations made during the Site Inspection to:

E mail: CONTACT NUMBER:

[email protected] 0906816121

[email protected] 0939953363

Anders Loof 01203628036

We thank you for your efforts in implementing corrective actions to the observations made.

Your name

Please note, that your reply is politely requested within 5 working days from receipt of this report.

Page 42: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

1 Doc- CDM/YOOSHIN JV-SH&E

SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT

The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety

and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.

The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.

This report is a reflection of acts and conditions noted at the time of the inspection.

Report #02. SH&E-7822-VIE-P1- CW1B-SH&E - 021

Contractor: CRBC-VinaconexE&C JV Severity Rating

Date/Time: 31/5/2016 08:30 PM Contract number: 3712A-CIPM-HĐKT Health & Safety Environmental

Last Visit: 24/5/2016 Location: Cao Lanh Bridge Km. 03+800 – 06+200.

Very High Immediate H (Major) Immediate

Insp Type: Planned Joint Weekly Accompanied By: Mr.Vic/ Mr.Nhung High 24 Hours L (Minor) 3-5 Days

Report by: Huynh Van Nhung Mr. Tue/ Mr.Kien/ Mr.ZhouCaofeng and Subcontractors.

Medium 3 days Note No Action

The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.

Low 5 days

Note :Good Practice

Page 43: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

2 Doc- CDM/YOOSHIN JV-SH&E

GOOD PRACTICE:

THE WIRE ELECTRIC IS PROPERLY HUNG UP AND INSULATION

1. OBSERVATIONS CARRIED OVER FROM PREVIOUS INSPECTION.

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 The mask protection is not used for painting work.

Very High

The contractor shall be provided PPE required to worker.

Fig: 0302 Date: 24.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

Page 44: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

3 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

2 The safety latch is damaged. And the colour code not marked

Very High

The contractor shall following and maintain safety lifting procedure. The safety latch and colour code shall properly provide.

Fig: 0303 Date: 24.5.2016 Comment:

Location: Tuan Loc -Cao Lanh Bridge

3

The out-put from welding machine are not protected, and the part of control power damaged. .

Very high

The contractor shall safety inspected and properly maintain, repair to assure safe.

Page 45: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

4 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0304 Date: 24.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

4 Un-used scaffold is not removed.

High

Remove or modifying scaffolding with sufficient handrail, railing and ladder. And the scaffolding just allowed to use after inspected, tagged by contractor safety officer.

Fig: 0305 Date: 24.5.2016

Comment: Location: Tuan Loc- Cao Lanh Bridge

5 Damaged welding machine are used on site.

Very high

The contractor shall properly maintain and remove immediately in this case.

Page 46: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

5 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0307 Date: 24.5.2016

Comment:

Location:

Bridge 12 JSC-Cao Lanh Bridge

2. SH&E OBSERVATIONS

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 The oxygen cylinder is not properly stored.

Medium The store shall casting concrete and arrange frame for tie.

Fig: 0311 Date: 31.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

Page 47: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

6 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

2 The disc of cutting and grinding are not satisfied capacity for install.

Very High

They must be used properly disc as introduction by manufactory, and safe guard, handling erected.

All power tool must be safety inspected, passed, safety tagged before use.

Fig: 0312 Date: 31.5.2016 Comment:

Location:

Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge

3 The electric panel are not properly installed, warned..

Very high

The electric panel shall be installed insulation with frame. And sufficient roofing protection.

The emergence contactor, warning sign, safety inspection tag

Page 48: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

7 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

must be provided.

Fig: 0313 Date: 31.5.2016 Comment:

Location:

Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge

4 The capacity is not marked on baskets.

High

All basket usedon site must be installed the capacity safety working load.

Page 49: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

8 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0314 Date: 31.5.2016 Comment:

Location: Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge

5

The generator is not provided drip tray, fire-extinguisher, warning sign, emergency contactor and earth erection.

High

The generator only use in case of No power supplying by power station. However, the contractor must be arranged safety devices.

Fig: 0315 Date: 31.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

6 Poor housekeeping. Very high

The cylinder must be stored on cage.

Remove unused material, garbage.

Hazardous material shall be stored on drip tray.

And fire extinguisher provided at workplace.

Fig: 0316 Date: 24.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Page 50: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

9 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

7 The cylinder cage is not properly protected. .

Very High

The gas/ oxygen cylinder used at workplace where hazard potential falling objects shall be installed steel roofing to prevent explosive on site.

Fig: 0317 Date: 31.5.2016 Comment:

Location: Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge

8 The support beam are not properly installed.

Very high

The welding joint shall sufficient welded. They should welding more contact joint.

Page 51: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

10 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0318 Date: 17.5.2016 Comment:

Location:

Bridge 12 JSC-Cao Lanh Bridge

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 Electric panel is damaged.

Very High

Remove. Or repair and safety inspected before use.

Fig: 0319 Date: 31.5.2016 Comment:

Location: Br.No.12 JSC-Cao Lanh Bridge

2 The worker is work without PPE.

Very High

The contractor must be strictly control all worker work on site. They shall be equipped required PPE and safety inducted before work on site.

Fig: 0320 Date: 31.5.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

Page 52: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

6 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

2 The disc of cutting and grinding are not satisfied capacity for install.

Very High

They must be used properly disc as introduction by manufactory, and safe guard, handling erected.

All power tool must be safety inspected, passed, safety tagged before use.

Fig: 0312 Date: 31.5.2016 Comment:

Location:

Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge

3 The electric panel are not properly installed, warned..

Very high

The electric panel shall be installed insulation with frame. And sufficient roofing protection.

The emergence contactor, warning sign, safety inspection tag

Page 53: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

7 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

must be provided.

Fig: 0313 Date: 31.5.2016 Comment:

Location:

Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge

4 The capacity is not marked on baskets.

High

All basket usedon site must be installed the capacity safety working load.

Page 54: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

8 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0314 Date: 31.5.2016 Comment:

Location: Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge

5

The generator is not provided drip tray, fire-extinguisher, warning sign, emergency contactor and earth erection.

High

The generator only use in case of No power supplying by power station. However, the contractor must be arranged safety devices.

Fig: 0315 Date: 31.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

6 Poor housekeeping. Very high

The cylinder must be stored on cage.

Remove unused material, garbage.

Hazardous material shall be stored on drip tray.

And fire extinguisher provided at workplace.

Fig: 0316 Date: 24.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Page 55: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

9 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

7 The cylinder cage is not properly protected. .

Very High

The gas/ oxygen cylinder used at workplace where hazard potential falling objects shall be installed steel roofing to prevent explosive on site.

Fig: 0317 Date: 31.5.2016 Comment:

Location: Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge

8 The support beam are not properly installed.

Very high

The welding joint shall sufficient welded. They should welding more contact joint.

Page 56: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

10 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0318 Date: 17.5.2016 Comment:

Location:

Bridge 12 JSC-Cao Lanh Bridge

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 Electric panel is damaged.

Very High

Remove. Or repair and safety inspected before use.

Fig: 0319 Date: 31.5.2016 Comment:

Location: Br.No.12 JSC-Cao Lanh Bridge

2 The worker is work without PPE.

Very High

The contractor must be strictly control all worker work on site. They shall be equipped required PPE and safety inducted before work on site.

Fig: 0320 Date: 31.5.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

Page 57: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

11 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

3

The scaffolding is not sufficient installed and safety inspected, tagged. .

Very high The contractor shall modify this scaffolding and scaf-tag providing.

Remove and not use

Fig: 0321 Date: 31.5.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

Page 58: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

6 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

2 The disc of cutting and grinding are not satisfied capacity for install.

Very High

They must be used properly disc as introduction by manufactory, and safe guard, handling erected.

All power tool must be safety inspected, passed, safety tagged before use.

Fig: 0312 Date: 31.5.2016 Comment:

Location:

Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge

3 The electric panel are not properly installed, warned..

Very high

The electric panel shall be installed insulation with frame. And sufficient roofing protection.

The emergence contactor, warning sign, safety inspection tag

Page 59: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

7 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

must be provided.

Fig: 0313 Date: 31.5.2016 Comment:

Location:

Tuan Loc and Br.No.12 JSC-Cao Lanh Bridge

4 The capacity is not marked on baskets.

High

All basket usedon site must be installed the capacity safety working load.

Page 60: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

8 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0314 Date: 31.5.2016 Comment:

Location: Tuan Loc and Br.No.12 JSC- Cao Lanh Bridge

5

The generator is not provided drip tray, fire-extinguisher, warning sign, emergency contactor and earth erection.

High

The generator only use in case of No power supplying by power station. However, the contractor must be arranged safety devices.

Fig: 0315 Date: 31.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

6 Poor housekeeping. Very high

The cylinder must be stored on cage.

Remove unused material, garbage.

Hazardous material shall be stored on drip tray.

And fire extinguisher provided at workplace.

Fig: 0316 Date: 24.5.2016 Comment:

Location: Tuan Loc-Cao Lanh Bridge

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Page 61: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

9 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

7 The cylinder cage is not properly protected. .

Very High

The gas/ oxygen cylinder used at workplace where hazard potential falling objects shall be installed steel roofing to prevent explosive on site.

Fig: 0317 Date: 31.5.2016 Comment:

Location: Bridge 12 JSC and Tuan Loc-Cao Lanh Bridge

8 The support beam are not properly installed.

Very high

The welding joint shall sufficient welded. They should welding more contact joint.

Page 62: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

10 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

Fig: 0318 Date: 17.5.2016 Comment:

Location:

Bridge 12 JSC-Cao Lanh Bridge

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

1 Electric panel is damaged.

Very High

Remove. Or repair and safety inspected before use.

Fig: 0319 Date: 31.5.2016 Comment:

Location: Br.No.12 JSC-Cao Lanh Bridge

2 The worker is work without PPE.

Very High

The contractor must be strictly control all worker work on site. They shall be equipped required PPE and safety inducted before work on site.

Fig: 0320 Date: 31.5.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

Page 63: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

11 Doc- CDM/YOOSHIN JV-SH&E

DDIS CONTRACTOR

Item Observation Risk Requirement/Recommendation

Observation Photo Contractor Response

3

The scaffolding is not sufficient installed and safety inspected, tagged. .

Very high The contractor shall modify this scaffolding and scaf-tag providing.

Remove and not use

Fig: 0321 Date: 31.5.2016 Comment:

Location:

Br.No.12 JSC-Cao Lanh Bridge

Page 64: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

12 Doc- CDM/YOOSHIN JV-SH&E

3. EQUIPMENT INSPECTION RECORDS, TESTING AND REGISTER / LOG AVAILABILITY.(Not used during Dedicated Environmental Inspection)

ITEM ID NUMBER DESCRIPTION/LOCATION REQUIREMENT

A. Plant Mobile

B. Plant Static

C. Power Tool

D. Lifting gear

E. Lifting Equipment (Cherry Picker)

F. Crane

G. Rigger

H. Ladders

I. Fire Extinguisher See item -

J. SH&E Question Question - Answer -

K. Risk Assessments Location -

L. Hazardous MaterialLog (locations recorded/inspected ) Yes No NA

M. Scaffolds Register (All labelled and inspected weekly) Yes No NA

N. Daily Log Check(up to date) Yes No NA

O. Environmental Monitoring(up to date) Yes No NA

P. Incident Log(up to date) Yes No NA

Q. Lift Plan(Available if required for the operation) Yes No NA

R. Safety meetings held and records available. Yes No NA

S. Permits or NOCs (Displayed and in date) Yes No NA

T. P.T.W. log(All permits registered for the day) Yes No NA

Page 65: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

13 Doc- CDM/YOOSHIN JV-SH&E

4. REPLYING TO THE REPORT

Please forward your response to the observations made during the Site Inspection to:

E mail: CONTACT NUMBER:

[email protected] 0906816121

[email protected] 0939953363

Anders Loof 01203628036

We thank you for your efforts in implementing corrective actions to the observations made.

Your name

Please note, that your reply is politely requested within 5 working days from receipt of this report.

Page 66: Environmental Monitoring Report VIE: Central Mekong Delta ......Section 4.This section highlights who the report should be returned to after completing the requested corrective actions

Doc-CDM/WSP/YOOSHI JV-SH&E

SAFETY HEALTH & ENVIRONMENTAL SITE INSPECTION REPORT

The items listed in this report are to be followed up and closed out by the contractor. The report is split into 4 sections as follows; Section 1. Highlights observations noted on previous site inspections that have not been corrected by the contractor, these should receive urgent attention. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 2. Highlights observations from the latest site inspection, the suggested time frame for closing these issues is highlighted in the severity rating. The contractor should attach a photograph in the column named Contractor Response, as well as accompanying comments underneath. Section 3. This section looks at the inspection records, monitoring logs and registers that the contractor should be maintaining to assist in the management of Health Safety

and Environmental issues on the project. The majority of which will contractual and legal requirements, such as inspection records for cranes and equipment, permits, the recording of incidents and near misses etc.

The contractor should attach copies of the requested items to the close out report. Items M-U can be inspected at the site office during the visit. Section 4.This section highlights who the report should be returned to after completing the requested corrective actions.

This report is a reflection of acts and conditions noted at the time of the inspection.

Report # 006.

SH&E-7822-VIE-P1- CW1C-SH&E - 009

Contractor: Dat Phuong – Tranimexco JV Severity Rating

Date/Time: 20.4.2016 02:00 Contract number: 5062-CIPM-HĐKT Health & Safety Environmental

Last Visit: 5.4.2016 Location: Tan My BridgeKm. 06+200 – 07+200 Very High Immediate H (Major) Immediate

Insp Type: Planned Joint Weekly Accompanied By: Mr.Nhung. Mr.Pht High 24 Hours L (Minor) 3-5 Days

Report by: Huynh Van Nhung Mr.Huong Medium 3 days Note No Action

The Engineer expects to be shown the items on the report closed out within the specified timescales, where not immediately possible interim measures should be introduced with a timescale agreed for full rectification. Failure to rectify identified Safety Health and Environmental observationsis not acceptable.

Low 5 days

Note :Good Practice