Environmental Monitoring Report This Environmental Performance Report is the document of the borrower and is made publicly available in accordance with ADB’s public communications policy (2011). The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. Project Number: 41903 June 2013 PAK: Daharki Power Project Prepared by Shaukhat Ali, HSE Officer For Foundation Power Company Daharki Limited

Environmental Monitoring Report · Environmental Monitoring Report This Environmental Performance Report is the document of the borrower and is made publicly available in accordance

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Environmental Monitoring Report

This Environmental Performance Report is the document of the borrower and is made publicly available in accordance with ADB’s public communications policy (2011). The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.

Project Number: 41903 June 2013

PAK: Daharki Power Project

Prepared by Shaukhat Ali, HSE Officer For Foundation Power Company Daharki Limited

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 1 of 26

Environmental Monitoring Report

of

Foundation Power Company Daharki Ltd.

April to June, 2013

id22649781 pdfMachine by Broadgun Software - a great PDF writer! - a great PDF creator! - http://www.pdfmachine.com http://www.broadgun.com

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 2 of 26

Table of Contents:

1. Plant introduction����������.�����������������...���.3

2. Purpose and Scope��������������������������...���....3

3. Legal Requirements��������������������������...��.�.3

4. Environmental Monitoring Team��������������������...��..�....3

5. Health Safety & Environmental Statistics...�.���������������...����.4

6. Smapling Locations, Results & their Discussions���.���..��������...���.6

6.1. Main & Bypass Stack Emission ������������.��������.�.�.6

6.2. Cooling Tower Blow Down����������...�����������..��..9

6.3. Waste Water Collection Pit ���������.....���������..�.��....11

6.4. Canal Water ������������������������������.12

6.5. Raw Water Storage Tank �����������������������..�...13

6.6. Drinking Water Quality ����������.���������������..14

6.7. EPA Priority Parameters Wsate Water Moniotring .���������������15

6.8. Noise Survey�������������������..������.��.....�.17

6.9. Solid Waste Disposal..������������..������.����..���.19

7. NEQS and World Bank Limits���������������.��������..�.....20

8. Photographs��������������....������������.�.....�..��.24

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 3 of 26

1. Plant Introduction:

Foundation Power Plant Daharki is the Combined Cycle Power Plant based on low BTU gas. The

Foundation Power Company Daharki Limited (FPCDL) is the Owner of plant and KEPCO Plant Service

and Engineering Company Limited is the O & M Operator of Plant. Power plant is utilizing Low BTU

Gas (530-590 BTU/SCF), which is being produced by the Mari Petroleum Company Gas Fields. Total

generation of the plant was 334. 713 GWh during this reporting period (April ~ June 2013).

2. Purpose and Scope:

The main purpose of this environmental monitoring was to determine the plant�s compliance with the

National Environmental Quality Standards and World Bank Standards.

The scope of this monitoring was limited to stack emission monitoring, recording sound level (plant area

and outside the plant boundary) and testing of waste water, canal water, drinking water and raw water.

3. Legal Requirements:

In accordance to legal requirements under Pakistan Environmental Protection Act 1997 (PEPA, 1997),

industry is under obligation to monitor its pollution load (effluents/emission) and report it to respective

Provincial Environmental Protection Department.

According to this legal requirement and also according to commitment made through the Environmental

Impact Assessment (EIA) of the Project (Fitchner 2005) and Initial Environmental Examination (SIEE

2007), Foundation Power Plant Daharki is obliged to prove that the plant confirms to legal

environmental protection requirements of PEPA, 1997 (NEQS, amended 2000)

4. Environmental Monitoring Team:

Foundation Power Plant Daharki Environmental Monitoring Team consisted of:

Shaukat Ali (HSE Officer)

Jamil Ahmad Soomro (Chemical Engineer)

Wahid Bux (Assistant Chemist)

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 4 of 26

5. Health Safety & Environmental Statistics:

5.1 Health Safety & Environmental Statistics:

Sr. No.

Description April to June 13

COD to 30th June 2013

Remarks

1 Safe Man-hours 69068 595663 KPS = 445724

Contractor = 148139

2 Days completed without LTA 91 777

3 No of Loss Time Accident 0 0

4 No of Recordable Injuries (MT,RWI) 0 3

5 No. of Environmental Incidents 0 0

6 No. of property damage and fire incidents 0 3

6 Recordable Injuries (LTA + RWI +MT) Frequency Rate - 0.00 For 16th May 2012 to 15th May 2013

7 Other incidence frequency rate - *1.40 For 16th May 2012 to 15th May 2013

5.2 HSE Trainings Record:

5.3 Safety/Tool Box Talks Record:

Sr. No.

Topic Department Number of

Participants Delivered

By Date Remarks

1 Environmental

Policy Electrical 07

Abdul Jabbar (EE)

30-04-2013

2 Everyone is

Responsible for Safety

Mechanical 08 M. Rizwan

Nazeer (ME)

30-04-2013

3 Toolbox-1 TA WTP 07 Wahid Bux 30-04-2013 4 Vehicle Safety Operation 04 M. Arif 05-05-2013 5 Housekeeping Mechanical 08 M. Rizwan 07-05-2013

6 Health & Safety

Policy Electrical 05

Abdul Jabbar (EE)

07-05-2013

7 Environmental

Policy I&C 08 Shaukat Ali 07-05-2013

8 Heat Stroke Operation 04 Muhammad

Kaleem 07-05-2013

Sr. No

Topic Detail Attendee Date

1 Basic Fire And Fire Extinguishers Training

Operation, Electrical, Mechanical, Admin, Technical+ I & C

25-04-2013

2

Basic First Aid Training in Heart attack, heat stroke, burn, DRABC, Biting, CPR, Fracture, Bleeding etc.

Operation, Electrical, Mechanical, Admin, Technical+ I & C

21-05-2013

3 Mess Hygiene Mess Staff 20-06-2013

4 CO2, GT CO2 & FM 200 Fire Fighting System

Operation, Electrical, Mechanical, Technical+ I & C

25-06-2013

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 5 of 26

Sr. No. Topic Department Number of

Participants Delivered By Date Remarks

9 Heat Stroke Operation 04 M. Kaleem 07-05-2013 10 Heat Stroke TA 07 Jamil Ahmed 08-05-2013

11 Shut It Off First Operation 04 Muhammad

Mushtaq 13-05-2013

12 First Aid In

Bleeding & Burns Electrical 08 Shaukat Ali 14-05-2013

13 Health & Safety

Policy TA 07 Jamil Ahmed 14-05-2013

14 Fire Extinguishers Operation 04 Hidayatullah 15-05-2013

15 Everyone Is

Responsible For Safety

TA 07 Jamil Ahmed

(CE) 21-05-2013

16 Abdul Jabbar Electrical 07 Abdul Jabbar

(EE) 21-05-2013

17 First Aid in Bleeding

Operation 04 Nouman Ahmed

( SBO) 22-05-2013

18 Housekeeping Electrical 08 Shaukat Ali

(HSE Officer) 28-05-2013

19 Housekeeping I&C 06 Shaukat Ali

(HSE Officer) 28-05-2013

20 First Aid In

Bleeding Mechanical 10

M. Rizwan (ME)

28-05-2013

21 Falls From Height TA WTP 05 Jamil Ahmed

(CE) 28-05-2013

22 First Aid in Burns Mechanical 12 M. Rizwan 04-06-2013

23 Health Safety &

Environment Policy

Wahid & Company

20 Shaukat Ali 04-06-2013

24 Electrical Safety Electrical 04 Aminuallah

Sharif 04-06-2013

25 First Aid in Burns Operation 04 Naseer Ahmed 06-06-2013

26 Housekeeping is Safekeeping at

Work TA WTP 05 Jamil Ahmed 11-06-2013

27 Falls From Height Mechanical 09 M. Rizwan

(ME) 11-06-2013

28 Falls From Height Electrical 07 Abdul Jabbar 11-06-2013 29 Heat Stroke I & C 06 Shaukat Ali 18-06-2013 30 Heat Stroke Electrical 08 Shaukat Ali 18-06-2013 31 Heat Stroke Mechanical 11 M. Rizwan 18-06-2013 32 Fire Introduction TA WTP 05 Ghulam Asghar 18-06-2013

33 Noise & Hearing

System TA WTP 04 Naveed Hassan 25-06-2013

34 Compliance of PPE�s & their

Importance

Wahid & Co.

20 Shaukat Ali 25-06-2013

35 Material Handling & Manual Lifting

Mechanical 10 M. Rizwan 25-06-2013

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

6. Smaple Locations, Results & their Discussions:

6.1 Main & Bypass Stack Emission:

6.1.1 Main & Bypass Stacks Emission Sample Point Location:

EVAPORATION POND

GT

COLONY

COLLECTION PIT ADMIN BLDG

WTP

HRSG

CCR

GATE

HRSGB. Pass

B. Pass

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 7 of 26

6.1.2 Main Stack Emission Result (Average):

Parameters Nitrogen Oxides

(NOX) Carbon Monoxide

(CO) Sulphur oxide

(SOx) Particulate Matter

Unit mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3

Threshold values according to NEQS August 2000

400 800 1700 -

Values according to World bank Pollution Prevention & Abatement Handbook 1998

125 - 2000 50

Quarter Month Monthly Quarterly Monthly Quarterly Monthly Quarterly Monthly Quarterly

2nd Quarter 2013 (1st April to 30th

June)

April 75.9

46.4

1.1

1.1

7.4

9.4

5.8

5.0 May 32.2 1.3 7.7 5.4

June 31.2 0.82 13.1 3.9

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 8 of 26

6.1.3 Bypass Stack Emission Results:

Date: 02-06-2013

Parameters Nitrogen Oxides (NOX)

Carbon Monoxide (CO)

Sulphur oxide (SOx)

Particulate Matter

Unit mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3

Threshold values according to NEQS August 2000

400 800 1700 -

Values according to World bank Pollution Prevention & Abatement Handbook 1998

125 - 2000 50

Measured Values 0.34 0.8 8.9 2.2

6.1.4 Result�s Discussion: All the above said parameters of gaseous emission from Main and Bypass Stacks were found within the NEQS (National

Environmental Quality Standard) and WB (World Bank) limit values and no any abnormal condition observed.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

6.2 Cooling Tower Blow Down:

6.2.1 Cooling Tower Blow Down Sample Point Location:

EVAPORATION POND

GT

COLONY

COLLECTION PIT ADMIN BLDG

WTP

HRSG

CCR

GATE

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 10 of 26

6.2.2 Cooling Tower Blow Down Test Result:

Sampling Date: 27-06-2013

S. No Parameter Unit ( Level) NEQS

Standards Lab Test

1 Temperature (Lab) ˚C - 30

2 pH value N/A 6 ~ 9 8

3 5 days Biochemical Oxygen

Demand BOD @ 20 ˚C mg/l (ppm) 80 7

4 Chemical Oxygen Demand COD mg/l (ppm) 150 10

5 TSS mg/l (ppm) 200 13

6 TDS mg/l (ppm) 3500 1350

7 Oil & Grease mg/l (ppm) 10 2.8

8 Chloride as (Cl) mg/l (ppm) 1000 334

9 Sulphate as (SO4) mg/l (ppm) 600 552

10 Nickel mg/l (ppm) 1 Nil

11 Zinc mg/l (ppm) 5 0.94

12 Iron mg/l (ppm) 8 0.82

13 Chlorine mg/l (ppm) 1 0.17

Temperature change measured in dilution zone was 0 ˚C.

6.2.3 Result�s Discussion: All the above said parameters of waste water from Cooling Tower Blow

Down were found within the NEQS (National Environmental Quality Standard) and WB (World

Bank) limit values and no any abnormal result found.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

6.3 Waste Water Collection Pit:

6.3.1 Waste Water Collection Pit Sample Point Location:

EVAPORATION POND

GT

COLONY

COLLECTION PIT ADMIN BLDG

WTP

HRSG

CCR

GATE

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 12 of 26

6.3.2 Waste Water Collection Pit Test Results:

Sampling Date: 27-06-2013

S. No Parameter Unit ( Level) NEQS Standards Lab Test

1 Temperature (Lab) ˚C - 32

2 pH value N/A 6 ~ 9 8.1

3 5 days Biochemical Oxygen

Demand BOD @ 20 ˚C mg/l (ppm) 80 9

4 Chemical Oxygen Demand

COD mg/l (ppm) 150 7

5 TSS mg/l (ppm) 200 12

6 TDS mg/l (ppm) 3500 748

7 Oil & Grease mg/l (ppm) 10 3.4

8 Sulphate as (SO4) mg/l (ppm) 600 115

9 Iron mg/l (ppm) 8 0.93

10 Chlorine mg/l (ppm) 1 Nil

Temperature change measured in dilution zone was 0 ˚C.

6.3.3 Result�s Discussion: All the above said parameters of Waste Water from Waste Water Collection

Pit were found within the NEQS (National Environmental Quality Standard) and WB (World

Bank) limit values and no any abnormal condition found.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 13 of 26

6.4 Canal Water:

6.4.1 Canal Water Test Results:

Sampling Date: 27-06-2013

S.No Parameter Unit ( Level) Lab Test Remarks

1 pH value N/A 8.3

2 Temperature (Lab) ˚C 25

3 TSS mg/l (ppm) 542

4 TDS mg/l (ppm) 154

5 Turbidity NTU 764

6 5 days Biochemical

Oxygen Demand BOD @ 20 ˚C

mg/l (ppm) 3

7 Dissolve Oxygen mg/l (ppm) 7.8

8 Nickel mg/l (ppm) Nil

9 Zinc mg/l (ppm) 0.007

10 Iron mg/l (ppm) 0.51

11 Chloride mg/l (ppm) 26

12 Sulphate mg/l (ppm) 31

13 Total Hardness mg/l (ppm) 90

14 M-Alkalinity mg/l (ppm) 56

15 Silica mg/l (ppm) 7

6.4.2 Result�s Discussion: All the above said parameters of Canal Water were found ok and no any

abnormal condition found.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 14 of 26

6.5 Raw Water (Service Water) Storage Tank:

6.5.1 Raw Water (Service Water) Storage Tank Test Results:

Sampling Date: 27-06-2013

S.No Parameter Unit ( Level) WHO Standards Lab Test

1 pH N/A 6.5 ~ 8.5 6.9

2 Conductivity µ S/cm Not required 327

3 TDS mg/l (ppm) < 1000 164

4 Taste & Odor N/A Non Objectionable Non Objectionable

5 Turbidity NTU < 5 NTU 1.22

6 Residual Chlorine mg/l (ppm) 0.2 ~ 0.5 0.01

7 Nitrite (NO2) mg/l (ppm) 3 Nil

8 Nickel (Ni) mg/l (ppm) 0.02 Nil

9 Zinc (Zn) mg/l (ppm) 3 0.038

10 Iron mg/l (ppm) 0.3 0.307

11 Chloride ( Cl) mg/l (ppm) 250 46

12 Sulfate (SO4) mg/l (ppm) 250 37

13 Sodium Na+ mg/l (ppm) 200 23

6.5.2 Result�s Discussion: All the above said parameters of Raw Water (Service water) Storage Tank

were found within the NEQS (National Environmental Quality Standard) and WHO (World

Health Organization) limit values and no any abnormal result found.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 15 of 26

6.6 Drinking Water (Atlantic Prime Water):

6.6.1 Drinking Water Quality Results:

6.6.2 Result�s Discussion: All the above said parameters of Drinking Water (Atlantic Prime Water)

were found within the NEQS (National Environmental Quality Standard) and WHO (World

Health Organization) limit values and no any abnormal result found.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 16 of 26

6.7 EPA Priority Parameters Monitoring for Waste Water:

6.7.1 Results of Waste Water (Average):

Parameters Flow Temperature pH TSS Oil & Grease

Unit m3/day °C - mg/l mg/l

Threshold values according to NEQS August 2000

NA ≤3 6~9 200 10

Values according to World bank Pollution Prevention & Abatement Handbook

1998

NA ₌<3 6~9 50 10

Quarter Month Month Quarterly Month Quarterly Month Quarterly Month Quarterly Month Quarterly

2nd Quarter 2013 (1st April to 30th

June)

April 00

64.4

0.0

0.0

8.0

8.1

8.5

10.7

1.1

1.5 May 30.0 0.0 8.05 9.3 1.5

June 163.2 0.0 8.1 14.4 1.8

6.7.2 Result�s Discussion: All the above said priority parameters of waste water discharged into canal were monitored and found within the NEQS (National

Environmental Quality Standard) and WB (World Bank) limit values and no any abnormal condition found.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 17 of 26

6.8 Noise Survey:

6.8.1 Noise Survey Locations:

1

Evaporation Pond

Switch Gear

Colony

Collection Pit Admin Bldg

WTP

Gate

CCR

6

5

4 3

2

9

14

15

12

8

Workshop

Warehouse

10

11

13

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 18 of 26

6.8.2 Noise Survey Results:

Sper Scientific (Model # 850014) Sound meter was used for measuring the noise.

6.8.3 Result�s Discussion: Noise levels measured were found within the NEQS (National Environmental Quality Standard) and WB (World Bank) limit values and no any abnormal condition/noise found.

Survey Date: 21 - 6 � 2013 Survey Time: 10:00 Hrs Plant Load: 169 MW (Base Load) Wind Speed: 3.5 m/sec Wind direction: NE to SW (240 Degree)

Point No

Area/location Noise Level

(dB) 1st Reading

Noise Level (dB) 2nd

Reading

Noise Level (dB) Average

Noise Limit

Remarks

1 WTP Building 48.4 49 48.8 OHSA Limits

85 dB for 8 hours

2 Gas Receiving

Station 47 48 47.5

3 KPS Office 55 55.6 55.3

4 FPCDL Office 50 51 50.5

5 Complex Gate 46 45 45.5

6 C Type Colony

Housing 41 42 41.5

7 Canal Intake 51 52 51.5 Did not show in layout

8 CCR Room 50 50.6 50.3

9 AIS Control

Room 51 50 50.5

10 Workshop 51 50 50.5

11 Warehouse 51 52 51.5

12 Security Post 6 55 56 55.5

13 Security Post 7 60 61 60.5

14 Security Post 8 45 46 45.5

15 Security Post 11 66 67 66.5

16 Sultan Leshari

Village 40 40 40

Did not show in layout

17 Mitho Lakhan

Village 41 41 41

Did not show in layout

18 Khatian Houses near plant gate

52 51 51.5 Did not show in layout

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 19 of 26

6.9 Solid Waste:

6.9.1 Physical Composition :

Sr. No. Waste type Estimated Weight % Remarks

1 Plastic & rubber 2 Recyclable

2 Metals 2 Recyclable

3 Paper 3 Recyclable

4 Rags 5

5 Food & kitchen waste 35

6 Leaves and grasses 30 Recyclable

7 Wood 2 Reusable

8 Fines 17

9 Clinic al waste 0.001 Stored for

incineration

10 Chemical contaminated drums 1 Recyclable

11 Others 2

Estimated waste (Plant & Colony) generated from 1st April to 30th June 2013= 27 tones

6.9.2 Result�s Discussion: Disposable solid waste was disposed of properly outside the plant boundary though the contractor and no any complaint was received from the local community regarding the solid waste disposal.

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 20 of 26

7. NEQS and World Bank Limits:

NEQS Pakistan Limits:

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 21 of 26

NEQS For Noise:

National Environmental Quality Standards for Industrial Gaseous Emissions (mg/Nm3, Unless Otherwise Defined)

S. No. Parameter Source of emission Standards Revised Standards

1. Smoke Smoke opacity not to exceed:- 40% or 2 (Ringlemann

Scale).

40% or 2 Ringlemann Scale

or equivalent smoke number

2. Particulate Matter1

(a) Boilers and furnaces:

(I) Oil fired. 300 300 (ii) Coal fired. 500 500 (iii) Cement Kilns. 200 300 (b) Grinding, crushing, clinker

coolers and related processes, metallurgical processes, convertors, blast furnaces and cupolas.

500

500

3. Hydrogen Chloride2

Any. 400 400

4. Chlorine2 Any. 150 150 5. Hydrogen

Fluoride2 Any. 150 150

6. Hydrogen Sulphide2

Any. 10 10

7. Sulphur Oxides Sulfuric Acid / Sulfuric Acid Plants. Others Plants. 3

400 400

5000 1700

8. Carbon Monoxide4

Any. 800 800

9. Lead 2 Any. 50 50 10. Mercury 2 Any. 10 10 11. Cadmium 2 Any. 20 20 12. Arsenic 2 Any. 20 20 13. Copper 2 Any. 50 50 14. Antimony 2 Any. 20 20 15. Zinc 2 Any. 200 200 16. Oxides of

Nitrogen (NOx) 4

(i) Nitric Acid manufacturing unit. (ii) Gas fired (iii) Oil fired (iv) Coal fired

400 400

- -

3000 400 600

1200

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 22 of 26

World Bank Guidelines on Environmental Standards:

Air Emission:

Effluents From Thermal Power Plants:

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 23 of 26

Noise Level Standards:

Ambient Air Quality:

Parameter Limit value (EPA Pak)

Values According to World Bank Pollution Prevention and

Abatement Handbook 1998 Remarks

NO2 40 µg/m3 80 µg/m3

100 µg/m3 150 µg/m3

Annual arithmetic mean Maximum 24 hours

average

SO2 80 µg/m3

120 µg/m3 80 µg/m3 150 µg/m3

Annual arithmetic mean Maximum 24 hours

average

CO 5 mg/m3 10 mg/m3 -

8 hours 1 hour

Particulates <10

360 500

50 µg/m3 150 µg/m3

Annual arithmetic mean Maximum 24 hours

average

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 24 of 26

8. Photographs:

Foundation Power Plant Lab Picture

Foundation Power Plant Lab Picture

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 25 of 26

Foundation Power Plant Lab Picture

Foundation Power Plant Lab Picture

ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)

FOUNDATION POWER PLANT DAHARKI

Page 26 of 26

Sampling picture

Sampling Picture