Environmental Monitoring Report
This Environmental Performance Report is the document of the borrower and is made publicly available in accordance with ADB’s public communications policy (2011). The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website.
Project Number: 41903 June 2013
PAK: Daharki Power Project
Prepared by Shaukhat Ali, HSE Officer For Foundation Power Company Daharki Limited
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 1 of 26
Environmental Monitoring Report
of
Foundation Power Company Daharki Ltd.
April to June, 2013
id22649781 pdfMachine by Broadgun Software - a great PDF writer! - a great PDF creator! - http://www.pdfmachine.com http://www.broadgun.com
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 2 of 26
Table of Contents:
1. Plant introduction����������.�����������������...���.3
2. Purpose and Scope��������������������������...���....3
3. Legal Requirements��������������������������...��.�.3
4. Environmental Monitoring Team��������������������...��..�....3
5. Health Safety & Environmental Statistics...�.���������������...����.4
6. Smapling Locations, Results & their Discussions���.���..��������...���.6
6.1. Main & Bypass Stack Emission ������������.��������.�.�.6
6.2. Cooling Tower Blow Down����������...�����������..��..9
6.3. Waste Water Collection Pit ���������.....���������..�.��....11
6.4. Canal Water ������������������������������.12
6.5. Raw Water Storage Tank �����������������������..�...13
6.6. Drinking Water Quality ����������.���������������..14
6.7. EPA Priority Parameters Wsate Water Moniotring .���������������15
6.8. Noise Survey�������������������..������.��.....�.17
6.9. Solid Waste Disposal..������������..������.����..���.19
7. NEQS and World Bank Limits���������������.��������..�.....20
8. Photographs��������������....������������.�.....�..��.24
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 3 of 26
1. Plant Introduction:
Foundation Power Plant Daharki is the Combined Cycle Power Plant based on low BTU gas. The
Foundation Power Company Daharki Limited (FPCDL) is the Owner of plant and KEPCO Plant Service
and Engineering Company Limited is the O & M Operator of Plant. Power plant is utilizing Low BTU
Gas (530-590 BTU/SCF), which is being produced by the Mari Petroleum Company Gas Fields. Total
generation of the plant was 334. 713 GWh during this reporting period (April ~ June 2013).
2. Purpose and Scope:
The main purpose of this environmental monitoring was to determine the plant�s compliance with the
National Environmental Quality Standards and World Bank Standards.
The scope of this monitoring was limited to stack emission monitoring, recording sound level (plant area
and outside the plant boundary) and testing of waste water, canal water, drinking water and raw water.
3. Legal Requirements:
In accordance to legal requirements under Pakistan Environmental Protection Act 1997 (PEPA, 1997),
industry is under obligation to monitor its pollution load (effluents/emission) and report it to respective
Provincial Environmental Protection Department.
According to this legal requirement and also according to commitment made through the Environmental
Impact Assessment (EIA) of the Project (Fitchner 2005) and Initial Environmental Examination (SIEE
2007), Foundation Power Plant Daharki is obliged to prove that the plant confirms to legal
environmental protection requirements of PEPA, 1997 (NEQS, amended 2000)
4. Environmental Monitoring Team:
Foundation Power Plant Daharki Environmental Monitoring Team consisted of:
Shaukat Ali (HSE Officer)
Jamil Ahmad Soomro (Chemical Engineer)
Wahid Bux (Assistant Chemist)
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 4 of 26
5. Health Safety & Environmental Statistics:
5.1 Health Safety & Environmental Statistics:
Sr. No.
Description April to June 13
COD to 30th June 2013
Remarks
1 Safe Man-hours 69068 595663 KPS = 445724
Contractor = 148139
2 Days completed without LTA 91 777
3 No of Loss Time Accident 0 0
4 No of Recordable Injuries (MT,RWI) 0 3
5 No. of Environmental Incidents 0 0
6 No. of property damage and fire incidents 0 3
6 Recordable Injuries (LTA + RWI +MT) Frequency Rate - 0.00 For 16th May 2012 to 15th May 2013
7 Other incidence frequency rate - *1.40 For 16th May 2012 to 15th May 2013
5.2 HSE Trainings Record:
5.3 Safety/Tool Box Talks Record:
Sr. No.
Topic Department Number of
Participants Delivered
By Date Remarks
1 Environmental
Policy Electrical 07
Abdul Jabbar (EE)
30-04-2013
2 Everyone is
Responsible for Safety
Mechanical 08 M. Rizwan
Nazeer (ME)
30-04-2013
3 Toolbox-1 TA WTP 07 Wahid Bux 30-04-2013 4 Vehicle Safety Operation 04 M. Arif 05-05-2013 5 Housekeeping Mechanical 08 M. Rizwan 07-05-2013
6 Health & Safety
Policy Electrical 05
Abdul Jabbar (EE)
07-05-2013
7 Environmental
Policy I&C 08 Shaukat Ali 07-05-2013
8 Heat Stroke Operation 04 Muhammad
Kaleem 07-05-2013
Sr. No
Topic Detail Attendee Date
1 Basic Fire And Fire Extinguishers Training
Operation, Electrical, Mechanical, Admin, Technical+ I & C
25-04-2013
2
Basic First Aid Training in Heart attack, heat stroke, burn, DRABC, Biting, CPR, Fracture, Bleeding etc.
Operation, Electrical, Mechanical, Admin, Technical+ I & C
21-05-2013
3 Mess Hygiene Mess Staff 20-06-2013
4 CO2, GT CO2 & FM 200 Fire Fighting System
Operation, Electrical, Mechanical, Technical+ I & C
25-06-2013
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 5 of 26
Sr. No. Topic Department Number of
Participants Delivered By Date Remarks
9 Heat Stroke Operation 04 M. Kaleem 07-05-2013 10 Heat Stroke TA 07 Jamil Ahmed 08-05-2013
11 Shut It Off First Operation 04 Muhammad
Mushtaq 13-05-2013
12 First Aid In
Bleeding & Burns Electrical 08 Shaukat Ali 14-05-2013
13 Health & Safety
Policy TA 07 Jamil Ahmed 14-05-2013
14 Fire Extinguishers Operation 04 Hidayatullah 15-05-2013
15 Everyone Is
Responsible For Safety
TA 07 Jamil Ahmed
(CE) 21-05-2013
16 Abdul Jabbar Electrical 07 Abdul Jabbar
(EE) 21-05-2013
17 First Aid in Bleeding
Operation 04 Nouman Ahmed
( SBO) 22-05-2013
18 Housekeeping Electrical 08 Shaukat Ali
(HSE Officer) 28-05-2013
19 Housekeeping I&C 06 Shaukat Ali
(HSE Officer) 28-05-2013
20 First Aid In
Bleeding Mechanical 10
M. Rizwan (ME)
28-05-2013
21 Falls From Height TA WTP 05 Jamil Ahmed
(CE) 28-05-2013
22 First Aid in Burns Mechanical 12 M. Rizwan 04-06-2013
23 Health Safety &
Environment Policy
Wahid & Company
20 Shaukat Ali 04-06-2013
24 Electrical Safety Electrical 04 Aminuallah
Sharif 04-06-2013
25 First Aid in Burns Operation 04 Naseer Ahmed 06-06-2013
26 Housekeeping is Safekeeping at
Work TA WTP 05 Jamil Ahmed 11-06-2013
27 Falls From Height Mechanical 09 M. Rizwan
(ME) 11-06-2013
28 Falls From Height Electrical 07 Abdul Jabbar 11-06-2013 29 Heat Stroke I & C 06 Shaukat Ali 18-06-2013 30 Heat Stroke Electrical 08 Shaukat Ali 18-06-2013 31 Heat Stroke Mechanical 11 M. Rizwan 18-06-2013 32 Fire Introduction TA WTP 05 Ghulam Asghar 18-06-2013
33 Noise & Hearing
System TA WTP 04 Naveed Hassan 25-06-2013
34 Compliance of PPE�s & their
Importance
Wahid & Co.
20 Shaukat Ali 25-06-2013
35 Material Handling & Manual Lifting
Mechanical 10 M. Rizwan 25-06-2013
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
6. Smaple Locations, Results & their Discussions:
6.1 Main & Bypass Stack Emission:
6.1.1 Main & Bypass Stacks Emission Sample Point Location:
EVAPORATION POND
GT
COLONY
COLLECTION PIT ADMIN BLDG
WTP
HRSG
CCR
GATE
HRSGB. Pass
B. Pass
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 7 of 26
6.1.2 Main Stack Emission Result (Average):
Parameters Nitrogen Oxides
(NOX) Carbon Monoxide
(CO) Sulphur oxide
(SOx) Particulate Matter
Unit mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3
Threshold values according to NEQS August 2000
400 800 1700 -
Values according to World bank Pollution Prevention & Abatement Handbook 1998
125 - 2000 50
Quarter Month Monthly Quarterly Monthly Quarterly Monthly Quarterly Monthly Quarterly
2nd Quarter 2013 (1st April to 30th
June)
April 75.9
46.4
1.1
1.1
7.4
9.4
5.8
5.0 May 32.2 1.3 7.7 5.4
June 31.2 0.82 13.1 3.9
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 8 of 26
6.1.3 Bypass Stack Emission Results:
Date: 02-06-2013
Parameters Nitrogen Oxides (NOX)
Carbon Monoxide (CO)
Sulphur oxide (SOx)
Particulate Matter
Unit mg/Nm3 mg/Nm3 mg/Nm3 mg/Nm3
Threshold values according to NEQS August 2000
400 800 1700 -
Values according to World bank Pollution Prevention & Abatement Handbook 1998
125 - 2000 50
Measured Values 0.34 0.8 8.9 2.2
6.1.4 Result�s Discussion: All the above said parameters of gaseous emission from Main and Bypass Stacks were found within the NEQS (National
Environmental Quality Standard) and WB (World Bank) limit values and no any abnormal condition observed.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
6.2 Cooling Tower Blow Down:
6.2.1 Cooling Tower Blow Down Sample Point Location:
EVAPORATION POND
GT
COLONY
COLLECTION PIT ADMIN BLDG
WTP
HRSG
CCR
GATE
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 10 of 26
6.2.2 Cooling Tower Blow Down Test Result:
Sampling Date: 27-06-2013
S. No Parameter Unit ( Level) NEQS
Standards Lab Test
1 Temperature (Lab) ˚C - 30
2 pH value N/A 6 ~ 9 8
3 5 days Biochemical Oxygen
Demand BOD @ 20 ˚C mg/l (ppm) 80 7
4 Chemical Oxygen Demand COD mg/l (ppm) 150 10
5 TSS mg/l (ppm) 200 13
6 TDS mg/l (ppm) 3500 1350
7 Oil & Grease mg/l (ppm) 10 2.8
8 Chloride as (Cl) mg/l (ppm) 1000 334
9 Sulphate as (SO4) mg/l (ppm) 600 552
10 Nickel mg/l (ppm) 1 Nil
11 Zinc mg/l (ppm) 5 0.94
12 Iron mg/l (ppm) 8 0.82
13 Chlorine mg/l (ppm) 1 0.17
Temperature change measured in dilution zone was 0 ˚C.
6.2.3 Result�s Discussion: All the above said parameters of waste water from Cooling Tower Blow
Down were found within the NEQS (National Environmental Quality Standard) and WB (World
Bank) limit values and no any abnormal result found.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
6.3 Waste Water Collection Pit:
6.3.1 Waste Water Collection Pit Sample Point Location:
EVAPORATION POND
GT
COLONY
COLLECTION PIT ADMIN BLDG
WTP
HRSG
CCR
GATE
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 12 of 26
6.3.2 Waste Water Collection Pit Test Results:
Sampling Date: 27-06-2013
S. No Parameter Unit ( Level) NEQS Standards Lab Test
1 Temperature (Lab) ˚C - 32
2 pH value N/A 6 ~ 9 8.1
3 5 days Biochemical Oxygen
Demand BOD @ 20 ˚C mg/l (ppm) 80 9
4 Chemical Oxygen Demand
COD mg/l (ppm) 150 7
5 TSS mg/l (ppm) 200 12
6 TDS mg/l (ppm) 3500 748
7 Oil & Grease mg/l (ppm) 10 3.4
8 Sulphate as (SO4) mg/l (ppm) 600 115
9 Iron mg/l (ppm) 8 0.93
10 Chlorine mg/l (ppm) 1 Nil
Temperature change measured in dilution zone was 0 ˚C.
6.3.3 Result�s Discussion: All the above said parameters of Waste Water from Waste Water Collection
Pit were found within the NEQS (National Environmental Quality Standard) and WB (World
Bank) limit values and no any abnormal condition found.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 13 of 26
6.4 Canal Water:
6.4.1 Canal Water Test Results:
Sampling Date: 27-06-2013
S.No Parameter Unit ( Level) Lab Test Remarks
1 pH value N/A 8.3
2 Temperature (Lab) ˚C 25
3 TSS mg/l (ppm) 542
4 TDS mg/l (ppm) 154
5 Turbidity NTU 764
6 5 days Biochemical
Oxygen Demand BOD @ 20 ˚C
mg/l (ppm) 3
7 Dissolve Oxygen mg/l (ppm) 7.8
8 Nickel mg/l (ppm) Nil
9 Zinc mg/l (ppm) 0.007
10 Iron mg/l (ppm) 0.51
11 Chloride mg/l (ppm) 26
12 Sulphate mg/l (ppm) 31
13 Total Hardness mg/l (ppm) 90
14 M-Alkalinity mg/l (ppm) 56
15 Silica mg/l (ppm) 7
6.4.2 Result�s Discussion: All the above said parameters of Canal Water were found ok and no any
abnormal condition found.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 14 of 26
6.5 Raw Water (Service Water) Storage Tank:
6.5.1 Raw Water (Service Water) Storage Tank Test Results:
Sampling Date: 27-06-2013
S.No Parameter Unit ( Level) WHO Standards Lab Test
1 pH N/A 6.5 ~ 8.5 6.9
2 Conductivity µ S/cm Not required 327
3 TDS mg/l (ppm) < 1000 164
4 Taste & Odor N/A Non Objectionable Non Objectionable
5 Turbidity NTU < 5 NTU 1.22
6 Residual Chlorine mg/l (ppm) 0.2 ~ 0.5 0.01
7 Nitrite (NO2) mg/l (ppm) 3 Nil
8 Nickel (Ni) mg/l (ppm) 0.02 Nil
9 Zinc (Zn) mg/l (ppm) 3 0.038
10 Iron mg/l (ppm) 0.3 0.307
11 Chloride ( Cl) mg/l (ppm) 250 46
12 Sulfate (SO4) mg/l (ppm) 250 37
13 Sodium Na+ mg/l (ppm) 200 23
6.5.2 Result�s Discussion: All the above said parameters of Raw Water (Service water) Storage Tank
were found within the NEQS (National Environmental Quality Standard) and WHO (World
Health Organization) limit values and no any abnormal result found.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 15 of 26
6.6 Drinking Water (Atlantic Prime Water):
6.6.1 Drinking Water Quality Results:
6.6.2 Result�s Discussion: All the above said parameters of Drinking Water (Atlantic Prime Water)
were found within the NEQS (National Environmental Quality Standard) and WHO (World
Health Organization) limit values and no any abnormal result found.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 16 of 26
6.7 EPA Priority Parameters Monitoring for Waste Water:
6.7.1 Results of Waste Water (Average):
Parameters Flow Temperature pH TSS Oil & Grease
Unit m3/day °C - mg/l mg/l
Threshold values according to NEQS August 2000
NA ≤3 6~9 200 10
Values according to World bank Pollution Prevention & Abatement Handbook
1998
NA ₌<3 6~9 50 10
Quarter Month Month Quarterly Month Quarterly Month Quarterly Month Quarterly Month Quarterly
2nd Quarter 2013 (1st April to 30th
June)
April 00
64.4
0.0
0.0
8.0
8.1
8.5
10.7
1.1
1.5 May 30.0 0.0 8.05 9.3 1.5
June 163.2 0.0 8.1 14.4 1.8
6.7.2 Result�s Discussion: All the above said priority parameters of waste water discharged into canal were monitored and found within the NEQS (National
Environmental Quality Standard) and WB (World Bank) limit values and no any abnormal condition found.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 17 of 26
6.8 Noise Survey:
6.8.1 Noise Survey Locations:
1
Evaporation Pond
Switch Gear
Colony
Collection Pit Admin Bldg
WTP
Gate
CCR
6
5
4 3
2
9
14
15
12
8
Workshop
Warehouse
10
11
13
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 18 of 26
6.8.2 Noise Survey Results:
Sper Scientific (Model # 850014) Sound meter was used for measuring the noise.
6.8.3 Result�s Discussion: Noise levels measured were found within the NEQS (National Environmental Quality Standard) and WB (World Bank) limit values and no any abnormal condition/noise found.
Survey Date: 21 - 6 � 2013 Survey Time: 10:00 Hrs Plant Load: 169 MW (Base Load) Wind Speed: 3.5 m/sec Wind direction: NE to SW (240 Degree)
Point No
Area/location Noise Level
(dB) 1st Reading
Noise Level (dB) 2nd
Reading
Noise Level (dB) Average
Noise Limit
Remarks
1 WTP Building 48.4 49 48.8 OHSA Limits
85 dB for 8 hours
2 Gas Receiving
Station 47 48 47.5
3 KPS Office 55 55.6 55.3
4 FPCDL Office 50 51 50.5
5 Complex Gate 46 45 45.5
6 C Type Colony
Housing 41 42 41.5
7 Canal Intake 51 52 51.5 Did not show in layout
8 CCR Room 50 50.6 50.3
9 AIS Control
Room 51 50 50.5
10 Workshop 51 50 50.5
11 Warehouse 51 52 51.5
12 Security Post 6 55 56 55.5
13 Security Post 7 60 61 60.5
14 Security Post 8 45 46 45.5
15 Security Post 11 66 67 66.5
16 Sultan Leshari
Village 40 40 40
Did not show in layout
17 Mitho Lakhan
Village 41 41 41
Did not show in layout
18 Khatian Houses near plant gate
52 51 51.5 Did not show in layout
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 19 of 26
6.9 Solid Waste:
6.9.1 Physical Composition :
Sr. No. Waste type Estimated Weight % Remarks
1 Plastic & rubber 2 Recyclable
2 Metals 2 Recyclable
3 Paper 3 Recyclable
4 Rags 5
5 Food & kitchen waste 35
6 Leaves and grasses 30 Recyclable
7 Wood 2 Reusable
8 Fines 17
9 Clinic al waste 0.001 Stored for
incineration
10 Chemical contaminated drums 1 Recyclable
11 Others 2
Estimated waste (Plant & Colony) generated from 1st April to 30th June 2013= 27 tones
6.9.2 Result�s Discussion: Disposable solid waste was disposed of properly outside the plant boundary though the contractor and no any complaint was received from the local community regarding the solid waste disposal.
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 20 of 26
7. NEQS and World Bank Limits:
NEQS Pakistan Limits:
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 21 of 26
NEQS For Noise:
National Environmental Quality Standards for Industrial Gaseous Emissions (mg/Nm3, Unless Otherwise Defined)
S. No. Parameter Source of emission Standards Revised Standards
1. Smoke Smoke opacity not to exceed:- 40% or 2 (Ringlemann
Scale).
40% or 2 Ringlemann Scale
or equivalent smoke number
2. Particulate Matter1
(a) Boilers and furnaces:
(I) Oil fired. 300 300 (ii) Coal fired. 500 500 (iii) Cement Kilns. 200 300 (b) Grinding, crushing, clinker
coolers and related processes, metallurgical processes, convertors, blast furnaces and cupolas.
500
500
3. Hydrogen Chloride2
Any. 400 400
4. Chlorine2 Any. 150 150 5. Hydrogen
Fluoride2 Any. 150 150
6. Hydrogen Sulphide2
Any. 10 10
7. Sulphur Oxides Sulfuric Acid / Sulfuric Acid Plants. Others Plants. 3
400 400
5000 1700
8. Carbon Monoxide4
Any. 800 800
9. Lead 2 Any. 50 50 10. Mercury 2 Any. 10 10 11. Cadmium 2 Any. 20 20 12. Arsenic 2 Any. 20 20 13. Copper 2 Any. 50 50 14. Antimony 2 Any. 20 20 15. Zinc 2 Any. 200 200 16. Oxides of
Nitrogen (NOx) 4
(i) Nitric Acid manufacturing unit. (ii) Gas fired (iii) Oil fired (iv) Coal fired
400 400
- -
3000 400 600
1200
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 22 of 26
World Bank Guidelines on Environmental Standards:
Air Emission:
Effluents From Thermal Power Plants:
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 23 of 26
Noise Level Standards:
Ambient Air Quality:
Parameter Limit value (EPA Pak)
Values According to World Bank Pollution Prevention and
Abatement Handbook 1998 Remarks
NO2 40 µg/m3 80 µg/m3
100 µg/m3 150 µg/m3
Annual arithmetic mean Maximum 24 hours
average
SO2 80 µg/m3
120 µg/m3 80 µg/m3 150 µg/m3
Annual arithmetic mean Maximum 24 hours
average
CO 5 mg/m3 10 mg/m3 -
8 hours 1 hour
Particulates <10
360 500
50 µg/m3 150 µg/m3
Annual arithmetic mean Maximum 24 hours
average
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 24 of 26
8. Photographs:
Foundation Power Plant Lab Picture
Foundation Power Plant Lab Picture
ENVIRONMENTAL PERFORMANCE (April 2013 ~ June 2013)
FOUNDATION POWER PLANT DAHARKI
Page 25 of 26
Foundation Power Plant Lab Picture
Foundation Power Plant Lab Picture