Environmental Compliance Monitoring Report Semi-Annual Report No. 3 Loan/Grant Number: L2851 NEP/G0284 NEP January-June, 2016 Nepal: Integrated Urban Development Project Prepared by the Government of Nepal for the Asian Development Bank. This environmental Monitoring Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Environmental Compliance Monitoring Report

Semi-Annual Report No. 3

Loan/Grant Number: L2851 NEP/G0284 NEP January-June, 2016

Nepal: Integrated Urban Development Project

Prepared by the Government of Nepal for the Asian Development Bank.

This environmental Monitoring Report is a document of the borrower. The views expressed herein do not

necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in

nature. Your attention is directed to the “terms of use” section of this website.

In preparing any country program or strategy, financing any project, or by making any designation of or

reference to a particular territory or geographic area in this document, the Asian Development Bank does

not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Government of Nepal Asian Development Bank

Ministry of Urban Development

Department of Urban Development and Building Construction

IUDP, Project Coordination Office

INTEGRATED URBAN DEVELOPMENT PROJECT (IUDP)

Loan/Grant Number(s): L2851-NEP; G0284-NEP

SEMIANNUAL ENVIRONMENTAL SAFEGUARD REPORT

(January-June, 2016)

July, 2016

Page 3: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

List of Acronyms and Abbreviations

ADB Asian Development Bank BoQ Bill of Quantity CBR California Bearing Ration DCP Dynamic Cone Penetration DSC Design and Supervision Consultant DUDBC Department of Urban Development and Building Construction DWSMB Dharan Water Supply Management Board EA Executing Agency EARF Environmental Assessment and Review Framework EIA Environmental Impact Assessment EMP Environmental Management Plan GESI Gender Equality and Social Inclusion GoN Government of Nepal GRC Grievance Redress Committee GRM Grievance Redress Mechanism IEE Initial Environmental Examination IUDP Integrated Urban Development Project MoSTE Ministry of Science, Technology and Environment MoUD Ministry of Urban Development MPMC Municipal Project Management Committee NGO Non-Government Organization OHS Occupational Health and Safety PCO Project Coordination Office PAM Project Administration Manual PMSC Project Management Support Consultant PIU Project Implementation Unit PPTA Project Preparation Technical Assistance REA Rapid Environmental Assessment RF Resettlement Framework RP Resettlement Plan SLF Sanitary Landfill SMC Sub-metropolitan City SMR Safeguard Monitoring Report SWM Solid Waste Management ToR Terms of Reference VDC Village Development Committee

Page 4: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

Table of Content

1 Introduction ............................................................................................................................... 1

2 Description of Sub-projects ....................................................................................................... 1

3 Purpose of Report ..................................................................................................................... 2

4 Environmental Category of the Project ...................................................................................... 3

5 Environmental Safeguards Implementation Arrangements ....................................................... 4

6 Overall Project Progress Status ................................................................................................ 5

7 Environmental Safeguard Compliance Status ........................................................................... 6

8 Implementation Status of Mitigation Measures .......................................................................... 7

8.1 Incorporation of Environmental Requirements into Project Contractual Arrangement ............... 7

8.2 Compliance of Environmental Safeguards in Major Construction Activities ............................... 8

9 Monitoring and Reporting System on Environmental Safeguard ............................................... 8

10 Major Project Issues ................................................................................................................. 8

11 Conclusion and Recommendation ............................................................................................ 9

List of Figure Figure1: Project Municipalities List of Tables Table 1: Compliance Status with Environmental Loan Covenants Table 2: National Statutory Environmental Requirements Table 3: Physical Progress Status of Subprojects Table 4: Status of Environmental Assessment Table 5: Municipality/SMC Wise Provisional Cost for Environmental Mitigation Table 6: Remaining Input of Environmental Safeguard Expert of all DSC Annexes Annex-I : Status of Environmental Safeguards During Planning and Implementation Stage Annex-II : Environmental Monitoring Checklist submitted by Contractor Annex-III : Photographs

Page 5: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

1

1 Introduction

Integrated Urban Development Project (IUDP) is funded by Asian Development Bank (ADB) and Government of Nepal in four Municipalities in order to develop the urban environmental infrastructures. These four municipalities/SMC are: Nepalgunj SMC, Siddharthanagar Municipality, Janakpur SMC and Dharan SMC. The project cost is $ 83.87 millions. The project has started from July 2012 and will end in June 2017. The project provides the population in the municipalities of Nepalgunj, Siddharthanagar, Janakpur and Dharan with better access to municipal infrastructure and services in a socially inclusive manner. In accordance with the priorities of each municipality, integrated urban environmental improvements, including drainage systems, solid waste management (SWM) facilities, and urban roads, will be implemented in Nepalgunj, Siddharthanagar and Janakpur municipalities/SMC. A water supply development subproject will be implemented in Dharan SMC. The project will also undertake community development programs (CDP), focusing primarily on poverty pockets in the municipalities/SMC and communities that may not benefit directly from major infrastructure improvement subprojects. Gender equality and social inclusion (GESI) will be mainstreamed in all subprojects in the municipalities/SMC, and the capacity to address GESI in the Ministry of Urban Development (MoUD) strengthened by establishing an appropriate institutional structure and mechanisms for GESI mainstreaming. 2 Description of Sub-projects Nepalgunj SMC

60.051 km new storm water drainage, 12.62 natural water course, 13.206 primary drain, 11.032 secondary drain, 7.038 tertiary drain, and 16.155 road side drain

8.09 km urban road construction and Improvement Integrated solid waste management with sanitary landfill site Community development program and mainstreaming gender equality and social inclusion

Siddharthanagar Municipality

42.742 km new storm water drainage, 11.295 primary drain, 8.03 secondary drain, 2.159 tertiary drain, and 20.628 road side drain

9 km urban road construction and improvement Integrated solid waste management with sanitary landfill site Community development program and mainstreaming gender equality and social inclusion

Janakpur SMC

31.08 km new construction (RCC humepipe) 9.29 km road construction and improvement Integrated solid waste management with sanitary landfill site Community development program and mainstreaming gender equality and social inclusion

Dharan SMC

421 km water supply construction, improvement and expansion 7 new tube wells construction Dharan water supply management board (DWSMB) formation for operation and

maintenance Community development program and mainstreaming gender equality and social inclusion

Page 6: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

2

Figure1: Project Municipalities/SMC (Nepalgunj, Siddharthanagar, Janakpur and Dharan)

3 Purpose of Report

As defined in the environmental requirements semiannual environmental safeguard reports have to be prepared and submitted to ADB. The semiannual environmental safeguard report prepared for the project covering the period from January to June 2016. Over this period, contracts have been awarded of Storm water drainage and road improvement in Nepalgunj, Siddharthanagar, Janakpur water supply in Dharan municipalities/SMC and Solid waste management in Nepalgunj SMC and Siddharthanagar Municipality. The following covenants to the financing agreement with ADB be complied with during design and implementation stage. Table 1: Compliance Status with Environmental Loan Covenants

List schedule and paragraph number of Loan Agreement

Covenant Status of Compliance

Action Required

Schedule 5, Para 3

The Beneficiary shall ensure or cause MOUD to ensure that the preparation, design, construction, implementation, operation and decommissioning of the Project, each Subproject and all Project facilities comply with (a) all applicable laws and regulations of the Beneficiary relating to environment, health and safety; (b) the Environmental Safeguards; (c) the EARF, for Subproject under Part 2 of the Project; and (d) all measures and requirements set forth in the respective IEE, the EMP, and any corrective or preventative

Complied with /Being complied with. These will be the part of subproject appraisal report.

Dharan

Janakpur

Siddharthanagar

Nepalgunj

Nepal

Page 7: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

3

actions set forth in a Safeguards Monitoring Report. Schedule 5, Para 7

The Beneficiary shall make available or cause MOUD to make available necessary budgetary and human resources to fully implement the EMP, the RP and any indigenous peoples' plan.

Complied with.

Schedule 5, Para 8a to 8e

The Beneficiary shall ensure or cause MOUD to ensure that all bidding documents and contracts for Works contain provisions that require contractors to.

(a) comply with the measures relevant to the contractor set forth in the IEE, the EMP, the RP and any indigenous peoples' plan (to the extent they concern impacts on affected people during construction), and any corrective or preventative actions set forth in a Safeguards Monitoring Report;

Complied/being complied with. Provision will be made in bidding documents and contracts for works.

(b) make available a budget for all such environmental and social measures;

Complied/being complied with. Provision will be made in bidding documents and contracts for works.

(c) provide the Beneficiary with a written notice of any unanticipated environmental, resettlement or indigenous peoples risks or impacts that arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, the RP or any indigenous peoples' plan;

Complied/being complied with. Will be followed.

Schedule 5, Para 9a to 9 c

The Beneficiary shall do the following or cause MOUD to do the following:

(a) submit semi-annual Safeguards Monitoring Reports to ADB and disclose relevant information from such reports to affected persons promptly upon submission;

Complied with /being complied with.

(b) if any unanticipated environmental and/or social risks and impacts arise during construction, implementation or operation of the Project that were not considered in the IEE, the EMP, the RP or any indigenous peoples' plan, promptly inform ADB of the occurrences of such risks or impacts, with detailed description of the event and proposed corrective action plan; and

Complied with/Being complied with. Will be followed.

(c) report any actual or potential breach of compliance with the measures and requirements set forth in the EMP, the RP or any indigenous peoples' plan promptly after becoming aware of the breach.

Will be followed.

4 Environmental Category of the Project

According the ADB safeguard policy statement the project is classified as category B with respect to environment. As per legislation of Nepal, Initial Environmental Examination (IEE) is required for water supply, storm water drainage and road subprojects, Environmental Impact Assessment (EIA) is required for solid waste management.

Page 8: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

4

Table 2: National Statutory Environmental Requirements No. Sub-Project Name Statutory Environmental

Requirements

1 Nepalgunj SMC

Solid Waste Management EIA Storm water drainage and Road IEE 2 Siddharthanagar Municipality Solid Waste Management EIA Storm water drainage and Road IEE 3 Janakupur SMC Solid Waste Management EIA Storm water drainage and Road IEE 4 Dharan SMC Water Supply IEE

5 Environmental Safeguards Implementation Arrangements

The following are institutional roles and responsibilities to ensure IEE, EIA and EMPs are implemented during design and implementation stages. Project Coordination Office (PCO): The PCO, with assistance from the project management support consultant is to:

confirm IEEs/EMPs are updated based on detailed designs confirm EMPs are included in the bidding documents and civil works contracts; ensure contractor EMPs are prepared by contractors prior to construction and endorsed by

PIUs; establish a system to monitor environmental safeguards of the project including monitoring

the indicators set out in the monitoring plan of the EMP; facilitate and confirm overall compliance with all Government rules and obtain all required

environmental clearances and any other environmental permits prior to contract award; supervise and provide guidance to the PIUs to properly carry out environmental monitoring

and reporting; review, monitor and evaluate the effectiveness with which the EMPs are implemented, and

recommend necessary corrective actions to be taken as necessary; consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual

environmental monitoring report to ADB; ensure timely disclosure of final IEE/EMPs in locations and form accessible to the public, address, record and report on any grievances brought about through the Grievance Redress

Mechanism in a timely manner as per the IEE/EIAs. Project Implementation Units (PIUs): The four PIUs in Nepalgunj, Siddharthanagar, Janakpur and Dharan, with the assistance of design supervision consultants, are to:

ensure the draft IEE/EMP prepared during the feasibility study is updated during detailed design stage, where necessary;

ensure EMPs are included in bidding documents and civil works contracts;

Page 9: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

5

ensure overall compliance with all Government rules and obtain all required environmental clearances as well as any other environmental permits prior to contract award;

oversee implementation of EMPs including environmental monitoring; take corrective actions when necessary to ensure no major environmental impacts; submit quarterly environmental monitoring reports to the PCO, and; address any grievances brought about through the Grievance Redress Mechanism in a

timely manner as per the IEE/EIAs. Regarding institutional arrangement, Grievance Redress Committees (GRCs) have been formed in all four municipalities to address overall safeguard related issues (environment, social and resettlement).

6 Overall Project Progress Status

Table 3: Physical Progress Status of Subprojects No.

Sub-Project Name Progress Status

1 Nepalgunj SMC Storm water drainage

and Road Contract awarded to CTCE - Kalika Construction JV on December 17, 2014. Construction of about 59.391 km (60.051) of storm water drain; 12.62 km (12.62) Natural Water Course, 13.206 km (13.206) primary drain, 11.032 km(11.032) secondary drain, 6.718 km (7.038) tertiary drain, 15.815 km (16.155) road side drain and 7.61 km (8.09) urban road (Asphalt) completed. Overall, about 98 % of construction work completed. IEE report approved by MoUD on August 9, 2015 .and uploaded in project's website. Approved IEE report submitted to ADB.

Solid waste management with sanitary landfill site development

Land acquisition: 12.5 Bigha (8.47 ha) Private Land/ Ward -7, Hirminiya VDC procured on May 23, 2013. Contract agreement has been signed with RAMKY-NANC JV on June13, 2016. EIA report submitted to MoUD for approval process (to be approved by MoPE). Public hearing was held on December 17, 2015.

2 Siddharthanagar Municipality Storm water drainage

and Road Contract awarded to M/S China Guangzhou-Sharma & Co. Pvt. Ltd JV, Sitapaila, Kathmandu, Nepal on December 15, 2014. About 24.269 km storm water drain; 6.67 km primary drain, 4.242 km secondary drain, 0.367 tertiary drain and 12.990 road side drain completed. About 62 % of construction works completed. The progress of construction work slowed down due to rainy season.

IEE report approved by MoUD on August 9, 2015, and uploaded in project website Approved IEE report submitted to ADB

Solid waste management with sanitary landfill site development

Land acquisition: 6 Bigha (4.06ha) Private Land/ Ward -8, Patkhauli VDC. The municipality received the ownership of land on 29 June, 2012.

Contract awarded to M/S UPLEEL-NANC JV on April 18, 2016. EIA report submitted to MoPE through MoUD for approval. .

3 Janakpur SMC

Page 10: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

6

No Sub-Project Name Progress Status

Storm water drainage and Road

Contract awarded to ZIEC-Sharma JV on December 23, 2015. About 6 % of construction works completed.

IEE report submitted to MoUD for approval.

Solid waste management with sanitary landfill site development

New location for sanitary landfill site yet to be finalized

4 Dharan SMC Water supply Contract agreement signed with Tianjian and Tundi JV on March 25,

2015. Contractor mobilized from July 15, 2015. 187 km of DI, GI and HDPE pipe laying completed. Construction of RVT at Phushre, Pindeshwor and railway system ongoing. 5 nos. of production wells developed. Physical progress is 30%. IEE report submitted to MoUD. Resettlement Plan submitted to ADB.

7 Environmental Safeguard Compliance Status

Each sub project requires safeguard assessment and plans for mitigating impacts before contracts award. All sub-projects of the Integrated Urban Development Project (IUDP) has been environmentally screened and assessed. Sub-projects are not located in or near sensitive or protected areas and environmental screening conclude that no significant adverse impacts are anticipated from proposed locations, designs, and construction activities. The net environmental benefits will be positive and large, including reduced, urban flooding from improved drainage systems, and environmental pollution from improved SWM. Progress status of preparation of environmental assessment till June 30, 2016 for the subprojects is presented in the following table. Table 4: Status of Environmental Assessment No. Subproject

Name Environmental

screening TOR/EIA/IEE Status GRC is

established Remarks

1 Nepalgunj SMC

Solid Waste Management

Carried out Scoping and ToR for EIA study approved by MoSTE on December 11, 2014, EIA report submitted to MoUD for approval process (to be approved by MoPE).

Yes Public hearing was

held on December 17,

2015.

Storm water drainage, and Road

Carried out IEE report approved by MoUD on August 9, 2015 .and

uploaded in project's website. Approved IEE report submitted

to ADB.

2 Siddharthanagar municipality

Solid Waste Management

Carried out Scoping and ToR for EIA study approved by MoSTE on December 26, 2014, EIA report submitted to

Yes Public hearing was held on

April 17, 2015.

Page 11: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

7

No. Subproject Name

Environmental screening

TOR/EIA/IEE Status GRC is established

Remarks

MoPE through MoUD for approval.

Storm water

drainage, and Road

Carried out IEE report approved by MoUD on August 9, 2015 .and uploaded in project's website. Approved IEE report submitted to ADB.

3 Janakpur SMC

Solid Waste Management

Carried out New location for sanitary landfill site yet to be finalized

Yes

Storm water drainage and Road

Carried out IEE report submitted to MoUD for approval

4 Dharan SMC

Water Supply Carried out IEE report submitted to MoUD for approval

Yes

The detail is given in Annex-I.

8 Implementation Status of Mitigation Measures

8.1 Incorporation of Environmental Requirements into Project Contractual Arrangement

EMPs incorporated into the bidding and contract documents. Contract Clauses on Environmental protection included in contract document. Environmental mitigation and enhancement measures incorporated in bill of quantities. Municipality/sub-project wise provisional cost for environmental mitigation is presented in the following table. Table 5: Municipality Wise Provisional Cost for Environmental Mitigation No. Sub-project Name Provisional cost for

environmental mitigation(NRs.)

Remarks

1 Nepalgunj SMC

Storm water drainage, and Road 3,298,500 (Include plantation work, Traffic management, drainage outlet management, OHS, and Air water quality test.)

Solid Waste Management 3,086,754.9 (Include measures of air, noise water quality and OHS, plantation work)

2 Siddharthanagar Municipality

Storm water drainage, and Road 2,630,585 ( Include plantation work, Traffic management, drainage outlet management, OHS, and Air water quality test.)

Solid Waste Management 2,019,466 (Include measures of air, noise water quality and OHS, plantation work)

3 Janakpur SMC

Storm water drainage, and Road 1,250,000

Solid Waste Management

Page 12: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

8

4 Dharan SMC 17,995,000 With compensatory tree plantation.

Source: Contract document of relevant municipalities/SMC.

8.2 Compliance of Environmental Safeguards in Major Construction Activities

Construction works of Storm Water Drainage and Road almost completed in Nepalgunj, and construction work ongoing in Siddharthanagar, Janakpur. Water supply work at Dharan is ongoing. Monitoring checklist has been developed as per EMP and field monitoring for Environmental Safeguards has been done. Prepared sample checklist is Solid waste management and land fill site construction in Nepalgunj and Siddharthanagar is just started. However, it is found that implementation of EMP is not fully followed. Contractor also given environmental monitoring report by checklist, attached in Annex-II

9 Monitoring and Reporting System on Environmental Safeguard

Regular compliance monitoring has been done by DSC. The remaining input of DSC environmental Safeguard expert has been given in Table 6. Semiannual report is submitted to ADB regularly, but municipality yet to be submitted quarterly environmental monitoring reports to the PCO. Due to the lack of regular quarterly environmental monitoring report from municipalities/SMC, semiannual report could not address all information. Table 6: Remaining Input of Environmental Safeguard Expert of all DSC No. Sub-project Name Responsible personnel

for Environmental safeguard

Contract Man month

Consumed Input upto June, 2016

Remark

1 Nepalgunj SMC S.K Pandit 18.0 16 Replacement process

2 Siddharthanagar Municipality

R.K. Sah 18.0 22

3 Janakupur SMC

Mahesh Bhattarai 18.0 13.32

4 Dharan SMC

Subodh Sharma 6.0 5.85

Source: Monthly progress report of June 2016, IUDP.

10 Major Project Issues

The input of Environmental Safeguard Expert of all DSC has been almost completed. IEE report on drainage and road construction of Janakpur and water supply of Dharan SMCs and EIA report of solid waste management of Nepalgunj and Siddharthanagar yet to be approved. Occupational health and safety measures have been partially followed. Workers have been provided with safety gears like jackets, helmet, boots etc. However, these items are in limited quantity and not sufficient for all the workers. They are also given first aid kit with medicines. To bring positive change in this regard, corrective action plan is required. The contractor is therefore, suggested to supply sufficient number of the safety gears and first aid with required medicines in all work sites. The Contractor was strongly advised to compel the workers to use protective clothing

Page 13: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Integrated Urban Development Project (IUDP) Semi-annual Environmental Safeguard Report

July, 2016

9

during work hours for their safety. Relocation and reinstatement of drinking water pipeline, shifting of electric poles etc are provisioned in BoQ and will be done along the corridor. The Contractor has stockpiled materials such as aggregates, sand, cement, steel and bricks at various work sites. However, the stockpiling of materials needs good planning to avoid obstruction to construction works and provide ease for traffic flow. Recommendation was made on proper planning of stockyard and piling of construction material with proper coverage to avoid surface runoffs. The municipalities yet to be established a system to monitor environmental safeguards of the project.

11 Conclusion and Recommendation

With the increase of pace of construction work, the Contractor’s compliance towards environmental management has been rated fair. No accident and incident were registered. All concern stakeholders shall be trained on environmental issues to reduce adverse impacts related with the construction activities. The followings are conclusions made based on progress status: Further work to be taken up in the next reporting period will focus on approval of IEE report of

Janakpur and Dharan SMCs and approval of EIA report of Solid waste management and land fill site construction in Nepalgunj and Siddharthanagar.

The construction work has been fully commenced in Nepalgunj, Siddharthanagar, Janakpur and Dharan municipalities/SMC. At this stage, the Contractor’s compliance towards environmental management has been rated satisfactory. The same pace is expected in future when major construction work takes place simultaneously at various locations. Occupational health and safety measures have been partially followed. The contractor is therefore, suggested to supply sufficient number of the safety gears and first aid with required medicines in all work sites.

Establish safeguard desk in Nepalgunj, and regular safeguard monitoring in each municipality/SMC.

Quarterly environmental monitoring report to be submitted regularly to PCO by PIU.

Page 14: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

ANNEX-I

Status of Environmental Safeguards during Planning and Implementation Stage

Page 15: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Annex I

page 1of 1

Name of the Project: Integrated Urban Development Project Reporting period: Jun-16

S. No. Name of Project or Subproject

Environmental

screening is carried

out? (Yes or No)

Environment

category of

the project /

subproject

(A/B/C/FI)

EARF is

prepared (if

applicable)

(Yes/No)

EIA/IEE/DDR

with EMP is

prepared

(Yes/No)

ADB approved

EIA/IEE with

EMP

(Yes / Under Review / Not Yet Due/Over Due)

Government

approved EIA/IEE

with EMP

(Yes / Under Review / Not Yet Submitted)

Safeguard

monitoring and

coordination

mechanism

established

(Yes/No)

GRC is

established

(Yes/No)

Automated

safeguard

monitoring

system

customized

(Yes/No)

EMP cost in

approved

document is

included in BOQ

as an individual

item (Yes/No)

Remarks

1 Nepalgunj SMC

Solid Waste Management Yes B/C Yes Scoping and ToR approved by MoSTE and EIA prepared and submitted

to MoPE

Submitted Submitted for approval

No Yes Yes Yes

Stormwater Drainage and Road Yes B/C Yes Yes Yes Approved No Yes Yes Yes

2 Siddharthanagar Municipality

Solid Waste Management Yes B/C Yes Scoping and ToR approved by MoSTE and

Final EIA prepared and

submitted.

Submitted Submitted for approval

No Yes Yes Yes

Stormwater Drainage and Road Yes B/C Yes Yes Yes Approved No Yes Yes Yes

3 JanakpurSMC

Solid Waste Management Yes B/C Yes Scoping and ToR in

progress

Not Yet Due Not Yet Submitted No Yes Yes Not Yet Due

Stormwater Drainage and Road Yes B/C Yes IEE submitted to MoUD for

approval

Submitted Submitted for approval

No Yes Yes Yes

4 Dharan SMC

Water Supply Yes B/C Yes IEE submitted to MoUD for

approval

Submitted Submitted for approval

No Yes Yes Yes

Note: EIA- Environmental Impact Assessment; IEE- Initial Environmental Examination; DDR- Due Diligence Report; EMP- Environmental Management Plan;

GRC- Grievance Redress Committee; BOQ- Bill of Quantity

Status of Environmental Safeguards During Planning Stage

Page 16: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Annex I

Page 2 of 2

Name of Project: Integrated Urban Development Project Reporting period:

Quarry Operation and

restoration

Target

(Nos.)

Replanted

(Nos.)

Safety Gears are

sufficient and

used (Y/N)

Labors

are

insured

(Y/N)

Labor and work

camps are healthy

and have sanitary

facilities (Y/N)

Community

Structure 1

Community

Structure 2

1 Nepalgunj SMC

Solid Waste Management Contract awarded on 13 June 2016, work yet to be started

Stormwater Drainage and Road

90% 0 90.00 NA N NA NA N Y Y Y

Electric pole to be reinstated Y Y

2 Siddharthanagar Municipality

Solid Waste Management Contract awarded on 18 April 2016, Survey work started

Stormwater Drainage and Road

75% 0 40.00 NA N N Y Y Y

Electric pole to be reinstated Y Y

3 Janakpur SMC

Solid Waste Management land field site yet to be finalized

Stormwater Drainage and Road 60% 0 40.00 NA N NA NA N Y Y Y Y N

4 Dharan SMC

Water Supply 70% 0 NA NA N N Y Y Y Y Y/not regular

Note: * Add field as guided by EMP in EIA/IEE/DDR; ** Write percentage of compliance in a scale of 100%; *** mention type of community structures

Status of Environmental Safeguards During Implementation Stage

Compliance to Environmental Management Plan*

Physical Socio-economic

S. No. Name of Subproject

Spoil Management

compliance in %)**

Landslide

protection with

Bio-engg

(compliance in %)**

Drainage

Management

(compliance in %)**

Others as per EMP

(specify)/ Safety sign

Occupational Health and SafetyFirewood

is used for

cooking

and

heating

(Y/N)

No of

grievances

under

processing

Corrective

Action

Plans are

prepared

and

implement

ed (Y/N)

Biological

Grievances

Progress status and issues in brief:

Others as

per EMP

(specify)(Air

/water

pollution)

Compensatory

Plantation

Others as

per EMP

(specify)

Env

compliance

reporting is

maintained

(Y/N)

Remarks

Nos of

grievances

documented

No of

grievances

resolved

Community structures are

compensated / reconstructed

(progress in % of total estimated

Page 17: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

ANNEX-II

Environmental Monitoring Checklist submitted by Contractor

Page 18: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

1

(Contractor’s Mitigation Measures) Name contractor:- TIANJIN TINDI JV Contract No:- IUDP/W/DHN/ICB-01 FOR THE MONTH OF :- March Year :- 2016 Name of DSC:- Building Design Authority Pvt. Ltd. (insert sign √, or scale where applicable)

Project stage

Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Preparation for construction

Indicate in 1-5 scale (1=Low)

Indicate in 1-5 scale (1=Low)

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Identify the temporary areas required by the project and locate them with proper marking

May result social tensions Prepare the details of temporary land

acquisition and other private properties

3 4

Submit to Supervising Engineer 3 4

Follow RAP for temporary acquisition 3 4

Submit applications to get an approval

Submit such agreement and permits to Supervising Engineers for official information

May result social conflict and legal obstructions resulting in delay of work

Obtain Letters of Approval and Agreement

for (i) temporary acquisition of land and

properties (ii) relocation of religious site,

foot trails, (iii) disruption of water supply,

and others

2 3

Delineate and peg the areas required

May result social conflict and legal obstructions resulting in delay of work Pegging of project area

Pegging of all constructions site and labor

camp

4

3

Maintain records of trees and other

properties likely to be affected

3 2 √

Construct workforce camp Haphazard camps resulting in social stress and degradation of local environment

Establish workforce camp at designated site only

5 5 √

Make employment policy for local and affected people as per EMP

Local people may be deprived of opportunities, Minors may be employed

Employ local people (not under age 14)

especially SPAF, and PAF in jobs

3 2 √

Settle wage rate based on DWEC and provide the list of employees to Supervising Engineer

3 3 √

Page 19: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

2

Project stage

Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Indicate in 1-5 scale

Indicate in 1-5 scale

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Construction Phase: Physical Environment

Construction Activity

Adopt cut and fill principle during earthworks Disposal of excess materials in designated area Apply Bio-engineering for controlling of erosion and Gully

Soil Erosion sedimentation and slope instability

Adopt ‘cut and fill' approach, wherever possible

4 3 √

Avoid works during monsoon 5 5 √

Provide proper drainage facilities 2 2 √

Stockpile top soil for reuse 4 4 √

Adopt gully control and bioengineering 2 3 √

Procure aggregates from already existing

sites

5 5 √

Dispose spoil in designated area 4 5 Quarrying from river bed Change in River Hydrology and River

Morphology Avoid Quarrying/Mining activity in

river/streams for extraction of materials

required for project shall not be done so

that change the river cross sections and

longitudinal profile do not occur

3 4 √

Ensure care so that irrigation canal/channel

are not adversely affected by the project

construction

3 4 √

Ensure care of stone spout in order not to disturb the existing flow.

3 4 √

Page 20: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

3

Project stage

Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Indicate in 1-5 scale

Indicate in 1-5 scale

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Disturbance of drainage Dumping of waste in the river Construct of toilets in the camps Storing of materials in the project area Handling of toxic materials

Dumping of excess materials

Quarry operation

Water Pollution Avoid camping facility within drainage

4 4 √

Prohibition on dumping of wastes in the

water source

4 4 √

Provision of sanitary facility and prohibition on defecation in open areas

3 4 √

Proper storage of construction aggregates, hazardous, and toxic materials and proper disposal of chemical containers, packaging materials, plastic bags provide training to workforce on safe handling of toxic materials

3 4 √

Disposal of waste in the designated area 4 5 √

provide dumping site and waste treatment

facility

2 2 √

Avoid excessive mining from riverbed. 3 4 √

Movement of vehicles

Operation of crusher

Earthworks

Stockpiling of construction waste and construction materials

Air Quality deterioration Spraying of water in dry season at

construction site and disposal site (Three

time a day)

4 5 √

Page 21: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

4

Project stage

Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Indicate in 1-5 scale

Indicate in 1-5 scale

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Limit speed of construction vehicle

4 4 √

Safe place 3 4 √

Regularly maintain equipment and cover the

stockpile

4 4 √

Compliance of vehicles with National Vehicle

Mass Emission Standards, 2056 BS

4 4 √

Arrange proper ventilation in confined

working areas

4 4 √

Movement of vehicles

Operation of crusher

Operation of construction machineries and equipment

Horn honking

Noise and vibration Fit mufflers to control noise

2 3 √

speed limit of construction vehicle 5 5 √

Use light horn in vehicles 5 5 √

Maintenance of equipment 5 5 √

Prohibit the operation of crushing plant

between 7 PM to 6 AM

5 5 √

Compensate the damages caused by

vibration

3 3 √

Page 22: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

5

Project stage

Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Indicate in 1-5 scale

Indicate in 1-5 scale

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Scrapping of top spoil Effect on Soil quality Stockpile reusable top soil properly in safe yard

3 4 √

Storage of fuel, lubricating

oil, chemicals etc.

Project activities producing

wastes such as used tyres,

lubricating oil, exhausted

battery etc

Solid waste problems, health risk Store all materials, toxic, non-toxic and hazardous materials in safe place (warehouse)

3 4 √

Collect, segregate and dispose waste at

designated area

3 4 √

Construction Phase: Biological Environment

Construction Activity vegetation clearance for construction of project structures

Vegetation clearance Cut only marked trees 4 5 √

Fuel wood and NTFPs collection by workforce vegetation clearance for construction of project structures and compensation to them

Loss of vegetation species Prohibit fuel wood and timber collection 3 4 √

Prohibit illegal NTFPs collection and Trade 3 4 √

Provide LPG/kerosene to workforce 3 4 √

Stockpile the felled trees and take

permission from concerned authority for its

use

3 4 √

Plant trees @ 5 times of each felled trees 3 4 √

Compensate for affected trees from private

and community forests

3 4 √

Page 23: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

6

Project stage Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Indicate in 1-5 scale

Indicate in 1-5 scale

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Construction Phase: Socio-Economic Environment

compensation and Rehabilitation as per RAP

Land Intake and compensation to affected people

Avoid involuntary displacement 3 4 √

Compensation, Rehabilitation and

employment opportunity to the affected

people

3 4 √

Provide all possible assistance to the

displaced people until the displaced people

are settled

3 4 √

Provide disturbance and rehabilitation cost 4 5 √

Protect traditional rights of locals 2 3 √

Compensate for any loss of 3 4 √

crops, trees and other natural resources 3 4 √

Establish technical committee to assess

damage caused by vibration for

compensation

3 4 √

Reinstatement of damaged community services and infrastructures

Reinstatement of community services and infrastructures

Compensate or reinstate community assets such as temples, bridges and irrigation canals, electricity poles, telephone lines, drinking water pipes, sewerage lines, roads, trails, cremation sites etc

3 4 √

Page 24: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

7

Project stage

Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Indicate in 1-5 scale

Indicate in 1-5 scale

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Influx of outside workforce, money and disharmony activity

Increase in crime and community stress

Instruct Workforce for not to indulge in

Gambling and drinking alcohol

3 4 √

Prohibit Visiting of workers to nearby village

after 7 pm and living outside

3 4 √

Instruct workforce to respect local culture,

tradition, rights etc.

3 4 √

Request police to patrol in the camp site and

adjoining villages

3 4 √

Launch awareness programs concerning the

human trafficking and possibility of spread of

STDs and HIV/AIDS

3 4 √

Project Activities relating to health and safety issues at work areas

Health and hygiene (unsafe working conditions, accidents, fire hazard, transmission of communicable disease)

Provide facilities of health check, proper

sanitation and hygiene, health care, control

of epidemic diseases to workforce

4 5 √

Provide awareness on STD, HIV/AIDS 4 5 √

Place adequate warning system, signboard,

hoarding post and prohibit visiting risky area

as necessary

3 4 √

Make available first aid kits ambulance and

fire fighting gears

4 5 √

Make available protection gears to all

construction workers and compensate for

the loss of life or any type of injuries

4 5 √

Dislocation of archaeological artifacts, if any

Loss of Archaeological and cultural sites

Protect archaeological and cultural sites

In case of relocation, consult local community

3 4 √

Page 25: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

8

Project stage

Project Activity Potential Environmental

Impacts Proposed mitigation measures

Mitigation Compliance

Mitigation Effectiveness

DSC Remarks

Preparation for construction

Indicate in 1-5 scale

Indicate in 1-5 scale

Compliance (C); Non Compliance (NC) Not applicable (NA)

C NC NA

Traffic Congestion For Dharan schedule working hour at night

Provide information about construction schedule to the local people

2 3 √

Demolition of unnecessary structures

Decline in aesthetics and inconvenience to people

Remove all unnecessary structures and reinstall the facilities and others to the original condition

3 5 √

Traffic management at construction sites

Traffic Congestion For Dharan Valley schedule working hour at night

Provide information about construction schedule to the local people

2 3 √

Space for additional remarks (if any):

Prepared by: Ashok Raj Adhikari Submitted to: Team Leader, IUDP, DSC

Contract Manager Date of submission:…………………

Page 26: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

I (UOli8001 8Ljl 8180lPUI

I UOISIi\OJdl 18S881d 'paxiasqo 6UIUa, do

IIS)' S8L1 PJ8A, 6UI)S8::J-8Jd Lj)IM BUOl81 i' / a68w8p AU8) P8UI8)UI8W

pJ8A iuauidinba pU8 iU81d J8LjSnJ:)i jAIJadoJd pU8 sauepunoq 6uOl8

~_ __ --+-- -----r-- -+__ ----lI_:__p_8__:__p_:__'i\_0_J_d~(w~v_Z=,>rc____:jo-u-)_,__,__6c-u7'1P~Jr8~0___,H-~-:-~-J

i I !I! (fiurxuuxusrponlifcaUSOJIinorf 6 a)

siaous 18 Ljjli/I pasojouq] I 1\ I2-S81j1i\1j::J8 6Ulj8JaU86-)snp UI8W'If I-

,aLji pUnOJ8 sarnsopua aJaLji aJ\:j

SI 8::JIi\ap

6UIUOIj::Jun:l! I dU81d

6uIIIOJjUO::J uOljnllod i i' WOJf paIIOJjUO::J a>i0ws >iJ8P sl

o ~ ~II

6 ~!pai\Jasqo SI jU81d jl8LjdS8 WOJ:I a>iowsi

>j081q pU8 P8UI8jUI8W AIJ81nB8J aJ81

p80J Zd3 i8 paj8::J01 pJ8A luaWdlnb3!

I(UOlj8::J°1 pU8 iuawdlnba/lU8ld

I 8lj) al8::Jlpul aS881d 'pa!\Jasqo

I

f' 8>i0WS >j::J8Iq AU8) W8UI8lUI8W

118M iusuidmba pU8 IU81d aJ\:j

2-6UI>i8aJq

>j::JOJ JO 6uIIIUP ai\lssn::JJ8d

Buunp pauo.auoo isnp 8J\:j

I

I

9 ~iI q81si

IJ8i\0:) Lll8d IJl18[fJ 'jU8PIS8J 0) sS8::J081

i:):)d/88d 'p801:j >jJ8d UaJPIILl8!

2-J8)8M LjllM p8A8Jds

JO/PU8 p8i\8d Sp80J Alsnp 8J\:j

iI

!iyvrponljdcYVUOJID

V ~ I

I

S •

paJ8i\0::J

lSI P81Id>j::JOjS sI81J8l8W :10 AIIUI:)I/\

: )18P 8 8:)IMI JO 8::JUO p8J8j8M aJ8

!

I

Ljj8d IJj18[fJ pU8 P80d >jJ8d U8JPIILj8

'Ljj8d >j8U8r 'p801:j mdA8pn a>jli saliS

(SUOIj::J8 ai\118jU8i\8J, d/8i\IPaLI0::J'1

pasodord JO/PU8 AjIWJ0:luo::Juou

).0 asneo 81qlssod 'pai\Jasqo w8Iqo_ld:

,S8::JIP8Jd pooB 'UOlj8::J01 A:ll::Jads a 1)1

, S'1J8W81:j1

II

(J8lj88Jq BUisn Aq

saqli\Ij::J8 BUlwwui B 8) waJ8j8M

seam >jJOM uouqou.ap aJ\:f

I

\:fIN

urps 8Ljj BUI1I8al 0)

roud J8i\0 p8J8IeM/paJ8i\0:) sP801

Alsnp 6UIAJJ8:) saplLjai\ 118 8J\:f

S88J8 paJallaljs UI uaxauspun

ssscord BUIBB8qap luawa8

2-paJa)8M JO paiaxco (iuaurao

IS68q DZ U8lj) aJOW ljllM azis)

iSl8uaj.8w AjSnp :10 s8[1dlj::JOiS 8J\:j

I2-paj8Jaua6

isnp aZIWIUIW OJ paJaj8M

IS8j'S uoucnnsuoo aljl aJ\:j

IOJfU08 uoqnllodtJ J!'\t

Ii!!

~ ~i

, JaLneaM jU(ilSIO[,-)L }t; ~l]ji Aq papadsul---~------~----~-------~-------~

l!\J\i 00 l L aLull uouoadsu]l tCUlIG /1[[1 aleo uouoadsu]~--------------- ---------~---------------~--~-------------~

[Q-'(fi]J/N,GS;lY'G/JUrlJ ON P8J)uoJicDlIG7>.JJd 5'17 /!j)OrY) JBmIlLuG'

) JJ{o!cD-dn:;pvoy, 11179-' 7_ ,)8L'IIWIG_1Jj~1'2- IlUOJ:;! uonoadsui 6uunp srueis ! a68ls UOlpIlJ1-SUOJIllJUldO]J{iJG; plW JIIJlIIJ .oidiu] 'al)ll P8J)uo:)i

dl1;)V'NI1I-UdV'HOOIS ;don I

Page 27: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

10.J].uo:) aSloN

I

I

II

iII

1-=

I!

II (!iJ.I::Jads aS8ald) SJ8lHO 6 CiI i-_.

i IGS~8110~18::JIW8lP JO S>1U8~oudassrqponliedcaOMLJI

8 cli'I o~ p8paJIp la+8M ousourop sl

I iI

(,18+8M

Ii !ippnw )0 aal) pU8 U88p +d8>1I f'

iI

6UlP180Ll aus pU8 a::JU8J+U8 a~ls II I8Ll+ pUnOJ8 8818/P801 ::Jllqnd aLl~ sl

I

L I Lcl

I II

GP8f10W8J

if' pU8 !ieq 6UILlS8M la8LlMI

UI ino p8m8S +lis pU8 PU8S sl 9 ci

I

!i

dU8WlP8S 6ulpooIJ iI

i,'- I 'MoljJaflo ~U8A8Jd o; P8UI8+UI8W

sci118M S8Ijlll::J8j. 6UILlS8M la8LlM 8N

I aus aLl~ OJ 6UIAeal roud P8U88j::J!G8jlS 8Ll~ 6ulfl881 aJO)8q I

IS!i8MI8 aJ8 PJ8!i jU81d pU8 lU8wdlnb8i f' I

IWOJ) 6uluunJ siuejd pU8 S8plLj8/\iP8U88j::J SjU81d pU8 S8i::J1Lj8A 8N

VCI

IGLlj8dlOOJ I

! pU8 p80J ouqnd 'jldLj::J~e::J 'suieip I

t, O~ J8j8M8~S8M pU8 lIIS/PU8S j.0

I!i8Me 6UILjS8M ~U8f18Jd 0+ paidope

;_ ipunq LllJ8a/s68qpues aN '2 c!

I(SI8UU8Ll::J-n / spunq LjjJ88

! apixoid 6 a) GS8Ijlll::J8) 18f10W8J i

i' jilS OJ luanIH8 pallp !iIJadoJd !I

!

I

papixord zz]! I 01 S8JnS88W aN

! SUI8JP:I I Lpa,80"1 6",oq )a,8MalsoM a41 sl !I

IW10lS l8 p86J8Ll::JSIP 818 salS8M!

I

f' GsuleJp WJ01S aLjj 0) p86J8Lj::JSIP

IWOO.lLjl8q pU8 S8~S8M u8Lj::Jll>j !iluOt J8j8M8lS8M !iU8 81aLj~ 81\j ~ ci

GSJnOLl p8pulsal

1

6UIJnp >jlOM lOt PII8A (llWlad

8sION uOlpnJ~suoJ) dNJ aLll sl

-----r-I

I

l0.l].uo:) uoqnllod Ja].eM .2:!

i: ::Jl8 'UOIS18f1IP 'iI . . I

[llWII paads 'IOJ1UO::J::J1j.J8J)J0i- pasn 8J81

!SJ811J8q ooqu.aq pU8 suirup u8wnll81! ' . I

dN8 '>10S\j 't,J:Jd\j 'IJ\JO:Jl 'Ljledi

Ull81!\1 'Lll8d >j8U8r 'peed JndA8pni

la>jll LI::J)8J1S 6UI>jJOM pU8 suolpunr 11\j!

(SUOlp8 aflll8~UaflaJd/8/\IP8_1jO::J I

[pasodord JO/PU8 !illWJOjuO::Juoui

(jO 8sn8::J 81qlssod 'p8f1J8sqo uisjqord]

1 ssouoa.d poof UOll8::J0! AjI::J8ds 8 I)'I

(ufus llwll paads 68) GP8'idde

iS8JnS88LU 10J)uo::J P88ds 8J\j G ~ ~!

surai] uouoodsujV/N

::I11:JI1N'lfHli:JVHOOIS'doni

Page 28: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

IUOP, SIDDHARTHANAGAR

Inspection Items

:32, Are copres of the valid

Construction NOise Permits

posted at site entrance/exit?

Environmental Site Inspection Checklist

Implemented?IRemarks!sqeNFA:(1 e specify location, good practices i

:problem observed, possible cause ofI ,

[nonconforrnity and/or proposed I

I corrective/preventative actions) i, ,

, I

!

N/A

Yes No'

[3 3 Do air compressors andl

generators operate with doors, Yclosed? !

i

'34 Is idle plant/equipment turned off!,

[Turned off and placed at their:Y,

1 . ,

or throttled down? i :respective yard s I135 Do and hand-

I

air compressors

I

I

:held valid ,;

I

II breakers have norse

i,emission labels (NEL)?

,I I

136 Any noise mitigation measures !I

!I

adopted (e, g use noise barrier /[ ,;I

II,

enclosure )?I

:37 Are silenced equipment utilized? I ,;I i i,

13 8 Others (please specify) II

i II

I

I

I

Ii

,,

I14. Waste Management

14 1

i!

Is the site kept

(e.q litter

housekeeping)

clean and tidY?1

free, gOOdl

i

!Regular cleaning of sites IS carriedl

lout before leaving from the site in the

l'

[everunq

i4 2 Are separate chutes used for

! Inert and non-inert wastes? I Ii~3 Are separated labelled containers

I/ areas provided for facilitating

recycling and waste segregation? Ii

II

!I

i

j4 5 Are construction wastes collected

: and disposed of properly by

i licensed collectors? I I 'I'rLr-~---------------------------r-----+------~---~14 6 Are chemical wastes, if any, i I

Icollected and disposed of ,;

I, properly by licensed collectors? I I I

F Does chemical waste producer I I,I At Plant yard

I license covers all major chemicali 'i I

i wastes produced on site? I

!'4s- Are chemical wastes properly ,; I I

I stored and labelled? i I

:4 9 Are oil drums and ! I

: plants/equipment provided with ,; I ,I I

iL d~r~ip~tr~a~y~s~? LI ii! ~i _L ~__ ,_~ ~ ~ _j

144 Are construction wastes /

! recyclable wastes and generalii refuse removed off site regularly?

,

! .I

iUdaYPUr Road, LGDM, Maitri Path

Page 29: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

!UDP, SIDDHARTHANAGAR Environmental Site Inspection Checklist

Inspection Items

'RemarksImplemented?

(i. e. specify location, good practices, I

problem observed, possible cause ot]

nonconformity and/or proposed]

[corrective/preventative actions) I

N/A

Yes No'

!Maintainance of these IS done at[

lPlant yard .tljLJJtAt Plant yard I

I I1

,4 '10 Are drip trays free of oil and

: water?l------------------+----t--------~--

Is there any oil spillage? Clean-

up the contaminated soil

Immediately?

,I

:I

412 Is litter, foam or otherl

objectionable matters in nearby];

I water drain/sewer cleaned?

~.'13 Are asbestos wastes handled by

i registered professionals?

1414. Others (please specify)Ii

i

15. Storage of Chemicals and Dangerous GoodsI

!5 'I Does storage of DG comply withJ I

Ilicense conditions (include types

I

Iand quantities if DG store is

"i

I i

I available, check the DG store i

---II

license)?

5.2. Are proper measures to control

Ioil spillage during maintenance or

"to control other chemicals

i spillage? (e.g. provide drip trays)

15 3 Are spill kits / sand / saw dust

used for absorbing chemical I "I

II- spillage readily accessible? I i

I

[5A Others (please specify)

I

I

IiI

I

I

iII

iProtection of Flora, Fauna and Historical Heritage

16.

16 '1 Are disturbance to terrestrial flora I iJ,anak Path (Pipal Tree)

minimized (e.q. plants to be

preserved)?

162 Are disturbance to terrestrial

I fauna minimized (if rare species "

I Identified)? Not Identified~~-~~~-----------~-~----~------~~-----~6.3 Any historical heritage exists on

site? If yes, ensure appropriate,

measures taken to preserve it

Others (please specify) ,

~__l____L_ _ _L j_64.

Page 30: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

IUDP, SIODHARTHANAGAR Environmenta! Site Inspection Checklist

Implemented?

Inspection Items

Yes I No*N

N//1,

iRemarksytLJ

1(1 e specify location. good practices.:

iproblem observed, possible cause ofi

inonconform .ty and/or proposed I

[corrective/preventative actions) JI

17_ Resource Conservation

~·~I-s---w-a-te-r---r-e-C-y-C-Ie-d---W-h-e-r-e-v-e'r------'-------,------,----------------------------

I -., possible for dust suppression? ~

172 Is water pipe leakage and:

wastage prevented? !

Udaypur Road. Janak Path, Khajanal

Path

17 3,

Are diesel-powered plants and'i

equipment shut off while not in

use to reduce excessive use? I lUnused plants and equrprnents1i--7-4---A--re-----e-n-e-r-g-y-----co-n-s-e-r-v-a-ti-o-n+-I--~----+---------+------~lsent to th e rr res pective ya rd s

Ipractices adopted?

! -+175 Are metal or other alternatives,1I

I!used to minimize the use of ~ I

I !

iII . I

ii timber? I

1

76 Are materials stored in goodI

jMaterial store yard at on-site and off-i

lcondition to prevent deterioration

~ISlte ,

and wastage (e g. covered,1

iI

separated)? I

177Are pesticides used under the

requirement of Agriculture,~

I Fishers and Conservation

I Department? I !

i7.8 Others (please specify)

I,

I iI II

iI

J

! I

1- - Eme'gency Pmpamdness and Response

~. Are fire extinguishers / fighting

I facilities properly maintained and

'I not expired? Escape not blocked

, / obstructed?

8_2 Are accidents and incidents 1

reported and reviewed, and ~

corrective & preventive actions I

identified and recorded?

18 3 Are Workers provided with

i personal protective Equ ipment

I like boot, gloves helmet etc?

I~ I

.184 Is First Aid Kit maintained at

I Site? ~ II1--

I I~

~~

18 5 Others (please specify)

I

L_____

Signature of Site Inspector

II

arel

IShantinagar Office, Equipment yard

II

I I

Date

Page 31: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Nepalgunj Sub metropolitan City, NepalgunJ Environmental Site inspection Cheddijst

Integrated Urban Development Project (IUDP)

Improvement and Development of Storm Water Drainage and Urban Road Sub Project

Site/Location s, t-. L

Construction Stage/ Status During Inspections

Inspection TimeInspection Date

WeatherInspected By Contractor (CTCE/Kalika J.V.)

I----------------------~-----------,-------------.-------,------------------------------------

RemarksImplemented?

(i.e specify location, good practices,

Inspection Items N/ A problem observed, possible cause of

nonconformity and/or proposed

corrective/preventative actions)

Yes No*

1. Air Pollution Controlr~------------------------------------,'-----,------,-------.---------------------------------~

1.1. Are the construction sites watered to

minimize dust generated?

1.2. Are stockpiles of dusty materials (size

with more than 20 bags cement) covered or

watered?

1.3. Cement debagging process undertaken

in sheltered areas~-----------------------------------~--------------.-+------~--~----------------.------------~

1.4. Are all' vehicles carrying dusty loads -tsdaYPOJAP»-Y vYlcJ:-e Y;c ..J L·J 2d-<:-O~~d

covered/watered over prior to leaving the

site?

1.5. Are demolition work areas watered?

(e.g. trimming activities by using breaker)

1.6. Are dusty roads paved and/or sprayed

with water?

1.7. Are dust controlled during percussive '

drilling or rock breaking?

1.8. Are plant and equipment well

maintained! (any black smoke observed,

please indicate the plant/equipment and

location)

1.9. Is dark smoke controlled from plant? ~.---

1.10 Are there enclosures around the main

dust-generating activities!

(e.g. grout mixing)

1.11. Hoarding (not <2Am) provided along

boundaries and properly maintained (any

damage / opening observed, please indicate

the location).r---------~--------.-----------------+-------r_-----+_------~-----------------------------------

1.12. Are speed control measures applied? - -t (ecYLI(L - i

, ' --''''---' ----''--'-- +--_'0,/'' + --+____ .-",-3' ~ Y\ r~ cc 'Y'(I tA~ c e), at ,sa ('~eg speed limit sign) _) 1-

1.13. Others (please specify) J

!d

Page 32: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Nepalgunj Sub metropolitan City, Nep alg unj Environmental Si[e I

Integrated Urban Development Project (IUDP)

Improvement and Development of Storm Water Drainage and Urban Road Sub Project

ChecklistvrokjfbYVJC

! IRemarks

.-~

'*Implemented? I

1(1e specify location, good practices,

Inspection Items N/A problem observed, possible cause of

Yes No* nonconformity and/or proposed

correct: vel preventative actions)

_. -------------_----_--

2.3. Are sandbags/earth bund adopted to

prevent washing away of sand/silt and

}j/11tv1\ oJ-~",'d.l. 50

wastewater to drains, catchpit, public road

and footpath)

2.4. Are vehicles and plants cleaned before

leaving the site?,~

2.5. Are wheel washing facilities well

maintained to prevent overflow, flooding ~sediment?

2.6. Is sand and silt settled out in wheel ~-washing bay and removed)

2.7. Is the public road/area around the site

entrance and site hoarding kept clean and~.

free of muddy water)

2.8. Is domestic water directed to septic~-

~k" bVYv~tanks or chemical toilets?

2.9. Others (please specify) I--

3. Noise Control

3.1. Is the CNP (Construction Noise Permit)

valid for work during restricted hours?V----"

3.2. Are copies of the valid Construction

Noise Permits posted at site entrance/exit? \-----

3.3. Do air compressors and generators~.

operate with doors closed?

3.4. Is idle plant/equipment turned off or,

throttled down)v-

3.5. Do air compressors and hand-held

breakers have valid noise emission labels \_./-

(NELj)

3.6. Any noise mitigation measures

adopted (e.g. use noise barrier / enclosure) '--

3.7. Are silenced equipment utilized) \_..//

~LM<'YA-hV

3.8. Others (please specify) - I

4. Waste Management

4.1. Is the site kept clean and tidy) (e.g.

litter free, good housekeeping) ..>.- - f---

4.2. Are separate chutes used for inert and\./

non-inert wastes)

/'r-

4.3. Are separated labelled containers

areas provided for facilitating recycling and~

waste segregation)

4.4. Are construction wastes / recyclable

wastes and general refuse removed off sitelv

regularly) ~----"-r---' ..-

4.5. Ace construction wastes collected '] v/

Ii,-vt ~ r v \"",C1disposed of pr operlv by licensed collectors? _1:: __----_._- --~---.--~- ----~-~~----------

4.6. Are chemical wastes, If any, collected

N/~land disposed of properly by licensed

collectors? 1___ ----~ __._ _J__.------~-------

Page 33: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

"

,xusrqponjiedaSL

r----------------------,,--------,-----,---~--------'-'-------------

(kfiJads aseald) sJaLj+O v'gr-------------------4-------r------~----,~--------------------~

~I aAJasaJd

oi ua>le~ sarnseatu a~elJdoJdde amsus 'saA

fl (a~ls uo s~slxa aile~lJaLjleJlJo~sILj AuV 'E'9

((paIJquapl salJads aJeJ fl) paz.ununu

eunej lelJ~saJJal oi aJueqJnlslpvlfaNLIaN 'c'g

~,-----------------+-

\lINdpaAJaSaJd aq 01 SlUeld il-a) pazuuiunu

eJolJ leIJ1SaJJal 01 aJueqJn~slp aN '1'9

(alqlssaJJe

AllpeaJ agel lids leJlwa4J ilulqJosqe

JOt pasn isnp Mes I pues I Sll>l Ilids aN 'V'S

I

'I

I

/\.'

(sAeJl

dup aplAoJd 'g'a) (aileilids sleJlwaLjJ Ja4~0

10JlUOJ oi JO aJueua~Ulew ilulJnp aileilids

110 10JlUOJ oi samseaui rado rd aN '10'5

daSUaJ11 aJ01S 90

ClLjl >iJa4J 'alqelleAe 51 aJ01S 90 tl ssuuuenb

pue sad A:) apnpui] SUOl:)lpUOJ asuaJ!1

Lj:)!M AldwOJ 90 to aileJo~s saorj 'c'S

(AIJadoJd

pallaqel pue paiois SleJlwClLjJ aNTS

SP009 SnOJa13uea pue sleJ!tua4J }O a13eJOlS 'S

l';fIN

(sleuOlssCltOJd paJa:)'slgaJ

Aq pajpue q salseM so isaqse aJ'cj U v(paueClp JaMas/u!eJp JClleM AqJeau UI sraueui

CllqeUOI:)Jafqo Ja410 JO uieo, 'Janq 51 I[,v

(Ala:)elpawwl IIOS pClleUIWewoJ

a4:) dn-ueaJJ (aileilids 110 Aue aJa41 51 T['v

(sAeJl dup LjllM paprxo id

iuaurdrnba/siuejd pue suirup 110 aN '6'v

(alls

uo paonpo.id salseM leJIWCl4J roletu lie SJaAOJ

ClSUClJIIJaJnpoJd a:)seM leJlwClLjJ saoo L\7r---------------------~-----~---r--~r_------------------~

(sLiOIlJe aAqelLiClAClJd/aAlpaJJoJ

pasodo.ro JO/pue A~ILUJOtUOJUOU

jo ClSneJ sjqissod 'pClAJasqo wCllqoJd

'saJlpeJd POOE 'uol:)eJol A:lIJClds Cl'I) L_______

5>iJeWCl~, L_l_p_a_l_u_a_w_Cl_I_d_tu_I_L ~

(pallaqel pue

parers AIJadoJd salseM leJlwaLjJ aN '~r\7

suiau uouoadsuj

pa[OJd qnS pe0t! ueqJn pue ageuleJO JaleM WJOfS JO lUawdolal\aa pue lUaWal\oJdwl

(doni) pafoJd ,u<lwdOI2Aao ueq.rrj pa.eJila.ul

Page 34: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

,--------

(AJI)ads aseald) sJaLj~O C; 8

~(,'lIS ~e paUle~ulew +1>1 plV ~SJI::lSl j"-8

(J~a ~awlaLj sallolg

__.-/' 'iccq a>jll iuaurdtnb j alllpalOJd leUosJad

Ljl!M paprxo.id SJa>jJOM aN r8

- '1-):_."-""-t_.;:.I '--'\..<\ "~1-f L, I rnA (papJOJaJ

//-'\pue palJlwapl suou.ie alllluallaJd

J.,~~CvI +5 icC) (At 'i? allq)aJJO) pue 'paMalllaJ pue pauodai

sruappui pue siuappoe aN I8

,~

(papnJlsqo / pa>j)olq lOU ade)S3 (paJldxa

lOU pue paule~ulew AIJadoJd saqlll)e]

gu llLjg!J / sJaLjSlngul~xa aJ!J aN T8

asuodsag pue ssaUpaJedClJd AJua13JaW3 '8

(AJI)ads aseald) sJaLjW '8 LVNLE

V/Nouaw~Jedao UOI~eIlJaSUO)

pue sJaLjsl::l 'am~ln)iJgv JO iuaurannbar

aLj~ Japun pasn sappusad aJV LL

dpaleJedas 'paJallo) 'g'a) age~seM

_/'\ pue uoue iouaiap ~uallaJd 01 uouipuco

r;) I' (

,

poog UI paJ01S sleucl1ew aN 9LC"') -,~l (yvrpjfVLJA

VALf I'd o~S','iiV~ 'b~ ~J1 ',:?,\_)-<) C>'l

/\ (Jaqwq JO asn aLj1 azuuruuu 01 pasn

\ i salllleUJalle JaLjlo JO lelaw aN C;LIL

S-f" ~)P I~c'h"i J(paldope

(/',-.pvy,) ..)-2_r

j,_,),,"1,'.../\ ::> -J'-y ft) v.,-")/

sa)qJeJd UOI~eIlJaSUO) AgJaua aN vL

L <,""p lei/,)

(as n allISSa)Xa a) n paJ

( 5 }_0-l'V),".J-l'" ~o~ asn UI lOU allLjM HO inus iuaurdmoa

--/\

pue sruerd paJaMod-lasalp aN EL._-

/""- (palUallaJd

age~seM pue age>jeal adid JaleM sl Z L-------

I \j/~ 2. uorssa.ddns ~snp JOJ

-- _1alqlssod JaAaJaLjM pal)A)aJ Ja~eM Sl IL

-- - --_---------------- .._-_---

LUOlleAJClSUO) Cl)JnOSCll:j 'L

-------_ ..

pafoJd qnS peol:! ueqJn pue ageule..lO )c31elV\ W..lO~SJO wawdolal\ao pue iuauraxo.idun

(doni) paioJd 1.Uawdolallao ueqJn pa1eJ:'la1ul

lungleda" 'All) Ue\'lodoJ\aw qnS fun~ledaN

Page 35: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

ANNEX-III

Photographs

Page 36: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Annex-III Photographs

Earthen Drain at Rataiya Outlet , Nepalgunj GNDN Nala Construction, Siddharthanagar

Brick Masonry: ASDK Nala, Siddharthanagar Municipality

Trafic Management, Railway Distribution System at Dharan SMC

Pindeswor (900 cum) RVT wall Concrete work, Dharan SMC

Community Toilet construction in Haatbazar – 5, Siddharthanagar

Page 37: Environmental Compliance Monitoring Report · consolidate quarterly environmental monitoring reports from PIUs and submit semi-annual environmental monitoring report to ADB; ensure

Cleaning Road after pipe laying work, Dharan

Abutment Capping at Siddharthanagar Municipalitiy, Lack of Safety tools

Construction of Udaypur Road Pavement

Work ,Siddharthanagar SLF Site: Discussion and Meeting with locals

and start of joint survey work, Siddharthanagar

ADB Mission site visit at Dharan SMC Awareness about Health and Hygiene, and

Distributing hygiene material to the cluster

childrens, Nepalgunj