Environmental Monitoring Report - No. 1 Project Number: 39153 August 2009 PRC: Chongqing-Lichuan Railway Development Project Prepared by: Beijing AOSIS Environmental Protection Technology Co., Ltd. For: Ministry of Railways (MOR) This report has been submitted to ADB by the Ministry of Railways and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB.

Environmental Monitoring Report - No. 1 · Environmental Monitoring Report - No. 1 Project Number: ... Construction roads for Paihuadong tunnel under ... Environmental Monitoring

Embed Size (px)

Citation preview

Environmental Monitoring Report - No. 1

Project Number: 39153 August 2009

PRC: Chongqing-Lichuan Railway Development Project

Prepared by: Beijing AOSIS Environmental Protection Technology Co., Ltd.

For: Ministry of Railways (MOR)

This report has been submitted to ADB by the Ministry of Railways and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB.

New Project Developed with Loan from

Asian Development Bank

Chongqing-Lichuan Railway

Environment Monitoring Report

Beijing OASIS Environmental Protection Technology Co., Ltd.

August 2009

Table of Contents

1. FOREWORD ...................................................................................................................................... 1

1.1 PROJECT INTRODUCTION ................................................................................................................. 1

1.2 OBJECTIVES ..................................................................................................................................... 3

1.3 MONITORING CONTENTS ................................................................................................................. 4

2. PROJECT PROGRESS ..................................................................................................................... 4

2.1 PROJECT IMPLEMENTATION UNITS, CONTRACTORS AND CONSTRUCTION SUPERVISION

COMPANIES OF CHONGQING-LICHUAN RAILWAY .................................................................................. 4

2.2 PROJECT PROGRESS ...................................................................................................................... 5

3. ENVIRONMENTAL CONTROL ..................................................................................................... 7

3.1 ENVIRONMENTAL CONTROL SYSTEM .............................................................................................. 7

3.2 DAILY ENVIRONMENTAL MONITORING SYSTEM .............................................................................. 9

4. PRE-JOB TRAINING ON ENVIRONMENTAL PROTECTION ............................................... 10

5. SUPERVISION AND INSPECTION OF AFFECTED POINTS.................................................. 12

5.1 IMPLEMENTATION STATUS OF ENVIRONMENTAL PROTECTION FOR EACH BID SECTION ................. 13

5.2 RESULTS AND ANALYSIS ................................................................................................................ 32

6. POPULARIZATION-WORTHY MEASURES AS WELL AS PROBLEMS AND SUGGESTIONS ................................................................................................................................... 33

6.1 POPULARIZATION-WORTHY MEASURES ......................................................................................... 33

6.2 EXISTING PROBLEMS AND IMPROVEMENT SUGGESTIONS .............................................................. 33

List of Photos Photo 1: Training on environmental monitoring Photo 2: Construction roads for Paihuadong tunnel under China Railway 12th Bureau Group

Co., Ltd. Photo 3: Construction site of Paihuadong tunnel under China Railway 12th Bureau Group Co.,

Ltd. Photo 4: Slope of construction site of Paihuadong tunnel under China Railway 12th Bureau

Group Co., Ltd. (absence of protection) Photo 5: Guarantee system diagram of environmental protection and water & soil reservation

by China Railway 12th Bureau Group Co., Ltd. Photo 6: Construction site of mixing station under China Railway 12th Bureau Group Co., Ltd. Photo 7: Watering cart of China Railway 11th Bureau Group Co., Ltd. Photo 8: Sedimentation tank for sewage from mixing station at Changshou North under China

Railway 11th Bureau Group Co., Ltd.(messy) Photo 9: Construction site of mixing station at Changshou North under China Railway 11th

Bureau Group Co., Ltd.(messy) Photo 10: Construction site of Huangcaoshan tunnel under China Railway 11th Bureau Group

Co., Ltd. Photo 11: Spoil from Huangcaoshan tunnel under China Railway 11th Bureau Group Co., Ltd.

(absence of protection) Photo 12: Garbage tanks at the construction site of Huangcaoshan tunnel under China Railway

11th Bureau Group Co., Ltd. Photo 13: Protection measures on oil penetration from air compressor at the construction site of

China Railway 11th Bureau Group Co., Ltd. Photo 14: Sedimentation tank for slurry from drilling pile construction under China Railway

11th Bureau Group Co., Ltd. Photo 15: Construction of 9# pier foundation of Hanjiatuo major bridge under China Zhongtie

Major Bridge Engineering Group Co., Ltd. Photo 16: Spoil protection for 22# pier of Caijiagou Super-major bridge under China Zhongtie

Major Bridge Engineering Group Co., Ltd. Photo 17: Construction site of Jianfengding tunnel under China Zhongtie Major Bridge

Engineering Group Co., Ltd. Photo 18: Sedimentation tank for sewage from Shijiapo tunnel under China Zhongtie Major

Bridge Engineering Group Co., Ltd. Photo 19: Garbage tanks at the construction site of Jianfengding tunnel under China Zhongtie

Major Bridge Engineering Group Co., Ltd. Photo 20: Construction roads for Shijiapo tunnel under China Zhongtie Major Bridge

Engineering Group Co., Ltd. Photo 21: Spoil from Fangdoushan tunnel under China Railway Tunnel Group Co., Ltd.

(absence of protection) Photo 22: Temporary protection for spoil from Fangdoushan tunnel under China Railway Tunnel

Group Co., Ltd.

2

Photo 23: Sedimentation tank for sewage from Fangdoushan tunnel under China Railway Tunnel Group Co., Ltd.

Photo 24: Construction roads of China Railway Tunnel Group Co., Ltd. Photo 25: Billboard for environmental protection of China Railway Tunnel Group Co., Ltd. Photo 26: Sedimentation tank for sewage from Guanyinyan tunnel under China Railway Tunnel

Group Co., Ltd. Photo 27: Construction site of Wanshoushan tunnel under China Railway 18th Bureau Group

Co., Ltd. Photo 28: Garbage tanks at the construction site of China Railway 18th Bureau Group Co., Ltd. Photo 29: Sedimentation tank for sewage from Wanshoushan tunnel under China Railway 18th

Bureau Group Co., Ltd. Photo 30: Billboard for environmental protection of China Railway 18th Bureau Group Co., Ltd. Photo 31: Side slope protection along the entrance to 1# transverse gallery of Wanshoushan

under China Railway 18th Bureau Group Co., Ltd. Photo 32: Office at the construction camp of China Railway 18th Bureau Group Co., Ltd. Photo 33: Living quarter at the construction camp of China Railway 18th Bureau Group Co.,

Ltd. Photo 34: Billboard for environmental control system of China Railway No. 5 Engineering

Group Co., Ltd. Photo 35: Billboard for environmental initiatives of pollution prevention and discharge control

by China Railway No. 5 Engineering Group Co., Ltd. Photo 36: Afforestation of construction camp of China Railway No. 5 Engineering Group Co.,

Ltd. Photo 37: Sedimentation tank for sewage from Dutingshan tunnel under China Railway No. 5

Engineering Group Co., Ltd. Photo 38: Side slope protection at the construction site of Dutingshan tunnel under China

Railway No. 5 Engineering Group Co., Ltd. Photo 39: Spoil ground for Dutingshan tunnel under China Railway No. 5 Engineering Group

Co., Ltd. (retaining wall under construction) Photo 40: Categorized collection of garbage at the construction camp of China Railway No. 5

Engineering Group Co., Ltd. Photo 41 Construction camp of China Railway 12th Bureau Group Co., Ltd. Photo 42 Water sprinkling at the construction site of China Railway 12th Bureau Group Co.,

Ltd.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 1

1. Foreword

1.1 Project Introduction

1.1.1 Basis of Preparation

1. Invitation for bid for implementation of monitoring project for environmental impact assessment of the new project of Chongqing-Lichuan Railway developed with the loan from Asian Development Bank (September 2008);

2. Tender document for Implementation of monitoring project for environmental management program of the new project of Chongqing-Lichuan Railway developed with the loan from Asian Development Bank (Beijing OASIS Environmental Protection Technology Co., Ltd. , September 2008);

3. Letter of Acceptance for the environmental monitoring project of Chongqing-Lichuan Railway from Foreign Capital Utilization and Technology Import Center of Ministry of Railways (December 22, 2008);

4. Environmental impact assessment report (EIA report) on the new project of Chongqing-Lichuan railway (China Railway Eryuan Engineering Group Co., Ltd., December, 2007);

5. Reply to EIA report on the New Project of Chongqing-Lichuan Railway from Ministry of Environmental Protection (No. 21 document for environmental review in 2008);

6. Opinions from Preliminary Review of EIA Report on the New Project of Chongqing-Lichuan Railway from Ministry of Railways (No. 1 for letter from railway plan in 2008).

1.1.2 Direction of Railway and Main Technical Standards

Situated in Chongqing Municipality and Enshi Autonomous Prefecture of Hubei province, newly-built Chongqing-Lichuan Railway starts in the west from Chongqing North Station in Yubei District, Chongqing, goes eastward through such administration areas in Chongqing municipality as Jiangbei District, Changshou District, Fuling District, Fengdu County and Shizhu County and ends at Lichuan city, Enshi, Hubei. The 259.5 km-long railway line and Yichang-Wanzhou railway under way link up at Liangwu Station. The line is the west section of Shanghai-Wuhan-Chengdu Railway Express Passageway in the Long and Medium-Term Planning for China's Highway Construction, the most important transverse railway passageway connecting China’s East, Middle and West, starting from Shanghai, through Nanjing, Hefei, Wuhan, Yichuan, Chongqing to Chengdu, crossing 4 provinces (Jiangsu, Anhui, Hubei and Sishuan) and 2 municipalities (Shanghai and Chongqing).

The construction period of this project is 5 years (initiated from 2008, and completed in 2013), with the total investment for this project is RMB 26.183 billion yuan, and design short-term stage shall be in 2020, and 2030 for long-term stage.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 2

The main technical standards for the main line of Chongqing-Lichuan railway:

Grade of railway: State railway, grade one; Number of main lines: double-line railway Target speed of passenger train: 200km/h The minimum radius of curve: 3500m Traction mode: Electric Traction mass: 4000t Track type With ballasted bed; the jointed track is adopted for truck road

diversion, with jointless track for the rest in the hub of Chongqing.

1.1.3 Main Engineering Contents

Along the whole Chongqing-Lichuan line, there are 118 new-built bridges totaling 48386.4 linear meters; 222 culverts with 8108 linear meters in length and 60 tunnels with total length of 166,360 m. Therefore, the overall length of bridges and tunnels is calculated as 214.7 km, accounting for 82.7% of the whole line.

The total volume of earth and stone for the whole line is 5901.1×104 m3 cubic meters, among which, 5425.2 ×104 m3 cubic meters for excavation, 475.7×104 m3 cubic meters for filling and 4967.4×104 m3 for spoil. 93 spoil grounds have been arranged.

7 new railway stations will be built including Miaoxian North Station, Changshou North Station, Fuling North Station, Fengdu Station, Shizhu Station, Shaziguan Station and Liangwu Station; and Chongqing North Station will be expanded along the whole line.

Permanent/temporary occupation of land is 623.7 hm2 and 579.0 hm2 respectively along the line.

New storage and departure yard for MU train will be built in North Chongqing. 16 storage and departure sidings, production and living facilities like train’s finish cleaning, vacuum drainage, signal, comprehensive operation and apartments of train crew will be provided in the near future.

Passenger Train Technology Preparation Facility at Chongqing North Station will be reconstructed.

7 new traction substations will be built including Miaoxian North Station, Changshou North Station, Fuling North Station, Fengdu Station, Shizhu Station, Shaziguan Station and Daxikou Station; and the existing traction substation at Chongqing North Station will be rebuilt along the whole line.

The floor area of the buildings along the line is 127, 920 m2, of which that of houses for living is 2550 m2, and supporting facilities for production and living including water supply and drainage, heating system and air conditioner.

Newly-built roads for vehicle transport is 139 km, and reconstructed local road is 255 km. There are 1 Beam Fabricated Factory, 4 Concrete Mixing Plants, 4 Material Plants and 4 temporary wharves.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 3

1.1.3 Characteristics of This Project

Chongqing-Lichuan railway line is situated in the parallel mountain ridges and valleys of the transition zone from the northeastern foot of Yungui Plateau to the eastern edge of Sichuan Basin, with a sharply undulating terrain, crossing hill area, low mountain area, middle mountain area and middle mountain haystack area along the whole line. Land along the line is predominantly used as cropland and forestland, with high forest coverage rate and abundant rainfall. Trees will be cut down during the construction, disturbing the native vegetation. The newly-built and reconstructed roads for transportation is 494 km, particularly paying more attention to water and soil loss caused by temporary works in the mountainous area like new construction roads and camps. There are new 60 tunnels along the whole line, totaling 166,360 m in length. The construction of some tunnels in the karst development region is likely to lead to water-leaking and loss of surface water which could exert influence over farmland irrigation, vegetation growth and domestic water of local residents. Therefore, the monitoring on the top of lava tunnel and surface water level fluctuation nearby shall be strengthened throughout the entire construction period and actions shall be taken to prevent the loss of surface water from affecting production and daily life if necessary . The total spoil is 4967.4 × 104m3, of which spoil from tunnel is massive, up to 3318.7× 104m3, accounting for 67% of the total. The establishment and protection of spoil grounds is the key to reduce water and soil loss and protect the ecological environment; in particular, ones in the deep slopes and clough are important; otherwise fragments of stones would slide down due to improper setting and protection in the storm seasons causing river blockage, farmland flood or other natural disasters. There are 118 newly-built bridges along the line with the total length of 48386.4 linear meters. Thereinto Qingxi Yangtze River Major Bridge (Renamed as “Hanjiatuo Yangtze River Major Bridge”) is in the passage for fish migration in Yangtze river basin; nursery ground and spawning ground for fish are in the upstream and downstream of the bridge site. Longxihe Super-major Bridge is located in the upstream of Level II Natural Preservation Zone at the Water intake of Miaoshan Water Plant, Changshou County. Effect on the water quality of the river and fish spawning by the construction of in-water piers and measures shall be focused on during the bridge construction along the whole line. Through Yunfengshan Forest Park in Chongqing in the form of tunnels, bridges and cuttings, and through City-level Forest Park in Nanmuyuan in the form of tunnels, near Xingdoushan Natural-level Natural Preservations Zone and Baiyan Scenic Spot, Zhangguan, Chongqing municipality, the construction of Chongqing-Lichuan railway will have an effect over local ecological environment in these natural preservation zones. Ancient trees thrive at both sides of the line; therefore actions should be taken to protect them. Note: Data of engineering volume referred in the section is the data in feasibility study.

1.2 Objectives

Based on design and EIA of project, this monitoring report is to check the implementation status of environmental protection measures during the construction period of the project, find the existing problems and provide the solutions. Actually, it is a supplement to the environmental impact assessment of the project and the monitoring of implementation of environmental protection measures. It reflects the implementation status of environmental protection work on the construction site during the construction activities to confirm whether the relevant rules and regulations on environmental protection have been satisfied and the requirements of Ministry of Railways and Asian Development Bank have been met. Speaking more accurately, this report is to:

confirm whether the environmental impacts caused in the construction period conforms to those environmental problems in the EIA report;

check the implementation status of environmental protection measures in the EIA report; identify and find out the unanticipated environmental problems and put forward the

solutions;

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 4

Report the environmental protection work on this project to Ministry of Railways, Asian Development Bank and the competent authorities.

1.3 Monitoring Contents The environmental protection work on Chongqing-Lichuan railway shall be undertaken by Beijing OASIS Environmental Protection Technology Co., Ltd. (hereinafter referred simply to as “Beijing OASIS”). The service range shall cover the whole Chongqing-Lichuan railway line. On the basis of the environmental monitoring in the whole construction period for the whole line and in two years after the completion and operation of this project as well as the on-site survey and various monitoring data collected biannually in the construction period and annually within two years after completion of this project, the environmental monitoring report (both Chinese and English versions) shall be submitted to Foreign Capital Utilization and Technology Import Center of Ministry of Railways, Chongqing-Lichuan Railway Construction Co., Ltd., Department of Development Plan of Ministry of Railways and Asian Development Bank. The monitoring report shall include the following contents:

Impacts on the ecological environment from the construction of stations, tunnels, bridges and roadbeds inside the key ecological environmental protection zones such as the natural preservation zones, the scenic spots etc. as well as the recovery and treatment measures;

Arrangement, protection, reclamation and afforestation measures for the spoil ground, impacts on the water and soil conservation facilities, and construction’s disturbance of vegetation as well as the recovery and treatment measures;

Impacts on the ambient environment from the tunnel construction and the implementation status of preventive measures;

Impacts on the surface water body from the bridge construction and the implementation status of preventive measures;

Implementation of preventive measures on roadbed slope and the effects;

Prevention and treatment of noise, sewage water, air environment and solid waste resulting from the construction camps, construction roads, at the temporary engineering sites and in beam construction and storage yards and rail construction bases;

Implementation status of various environmental protection measures adopted by the project (including the noise prevention engineering, sewage water treatment and electromagnetism).

Propaganda for sanitation at the construction camps and health of construction personnel.

2. Project Progress

2.1 Project Implementation Units, Contractors and Construction Supervision Companies of Chongqing-Lichuan Railway

The project implementation unit of Chongqing-Lichuan is Chongqing-Lichuan Railway Construction Co., Ltd., totaling 6 bid sections in the whole railway line. Table 2-1 shows the construction and supervision units for each bid section.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 5

Table 2-1: Construction and Supervision Units for each section of Chongqing-Lichuan Railway

S.N. Bid

section Construction unit Supervision unit

Construction mileage

Length of bid

section (km)

1 I China Railway 12th Bureau

Group Co., Ltd. Chengdu Southwest

Supervision Company DKO+000~

DK36+111.31 36.118

2 II China Railway 11th Bureau

Group Co., Ltd.

Sichuan Tieke Construction Supervision

Company

DK36+111.31~DK86+051.787 49.911

3 III China Zhongtie Major Bridge Engineering Group Co., Ltd.

Sichuan Tieke Construction Supervision

Company

DK86+051.787~DK124+716.25 25.231

4 IV China Railway Tunnel Group

Co., Ltd. China Railway Eryuan Supervision Company

DK124+716.25~D1K199+026.8 77.188

5 V China Railway 18th Bureau

Group Co., Ltd. Changsha Zhongda

Supervision Company D1K199+026.8~

DK233+370.3 34.344

6 VI China Railway No. 5

Engineering Group Co., Ltd. Changsha Zhongda

Supervision Company D1K233+370.3~

DK274+983 41.626

2.2 Project Progress The project of Chongqing-Lichuan railway was kicked off on December 29, 2008. Presently, constructions including tunnel excavation, roadbeds and bridge foundation had been under way. By June 30, 2009, the completed engineering works and the completion status of key engineering are summarized in Tables 2-2 and 2-3.

Table 2-2: Summary of Completed Engineering Works Name Unit Total accumulative

volume completed annually

Total accumulative volume completed ever since kickoff

Completed ratio of design (%)

Investment 104 yuan 142517.8 144529.2 9.6 Incl: Construction and

installation 104 yuan 133257.8 135269.2 9.3

Roadbed cubic meter of earth and stone

104 m3 52470.8 52470.8 3.9

In which: sectional cubic meter of earth and stone

104 m3 1864.1 1864.1 2.3

Cubic meter of earth and stone of station and yard

104 m3 50606.7 50606.7 4.1

Super-major, major and medium bridges

Linear meter 4152.2 4152.2 11.1

Incl: Super-major bridges Linear meter 2063.9 2063.9 15.8 Major bridges Linear meter 1931.6 1931.6 18.5

Medium bridges Linear meter 156.7 156.7 21.4 Culverts Horizontal linear

meter 506.8 506.8 27.1

Tunnels Linear meter 9732.5 9732.5 7.1

By June 30, 2009

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 6

Table 2-3: Summary of Completed Key Engineering

S. N. Name Scale (m)

Total accumulative

volume completed annually

(m)

Total accumulative

volume completed ever since

kickoff (m)

Completed ratio of total

accumulative volume

completed ever since kickoff

Contractor

1 Paihuadong Tunnel 4955 380 380 7.7 China Railway

12th Bureau Group Co., Ltd.

2 Huangcaoshan Tunnel 6663 549.13 549.13 8.24

China Railway 11th Bureau

Group Co., Ltd.

3 Caijiagou Super-major Bridge 2057.4 17.7 17.7 0.86%

China Zhongtie Major Bridge Engineering

Group Co., Ltd.

4 Xinqiao Super-major Bridge 1712.3 17.86 17.86 1.04%

China Zhongtie Major Bridge Engineering

Group Co., Ltd.

5 Hanjiatuo Super-major Bridge 1078.8 130.39 130.39 12.08%

China Zhongtie Major Bridge Engineering

Group Co., Ltd.

6 Jianfengding 1# Tunnel 870 135.29 135.29 15.92%

China Zhongtie Major Bridge Engineering

Group Co., Ltd.

7 Jianfengding 2# Tunnel 1050 225.74 225.74 21.5%

China Zhongtie Major Bridge Engineering

Group Co., Ltd.

8 Daliang Tunnel 10942 337.8 337.8 3.1 China Railway Tunnel Group

Co., Ltd.

9 Hujiapo Tunnel 5475 180.8 180.8 3.3 China Railway Tunnel Group

Co., Ltd.

10 Fangdoushan Tunnel 4870 157.6 157.6 3.2

China Railway Tunnel Group

Co., Ltd.

11 Nanbaidong Tunnel 6935 183.5 183.5 2.6 China Railway Tunnel Group

Co., Ltd.

12 Changhongling Tunnel 13287 372.2 372.2 2.8

China Railway Tunnel Group

Co., Ltd.

13 Jinzhutan Longhe Major Bridge 478.07 92 92 19.2

China Railway Tunnel Group

Co., Ltd.

14 Fangjiaya

Super-major Double-track Bridge

681.98 99 99 14.5 China Railway Tunnel Group

Co., Ltd.

15 Wanshoushan Tunnel 13474 596 596 4.4%

China Railway 18th Bureau

Group Co., Ltd.

16 Shaziguan Tunnel 9252 478 478 5.2% China Railway

18th Bureau Group Co., Ltd.

17 Xiangjiaba Tunnel 6510 257 257 3.9% China Railway

18th Bureau Group Co., Ltd.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 7

S. N. Name Scale (m)

Total accumulative

volume completed annually

(m)

Total accumulative

volume completed ever since

kickoff (m)

Completed ratio of total

accumulative volume

completed ever since kickoff

Contractor

18 Xinwu Tunnel 793 109 109 13.7% China Railway

18th Bureau Group Co., Ltd.

19 Qingshiyan Major Bridge 415.67 54 54 13%

China Railway 18th Bureau

Group Co., Ltd.

20 Tuntianba Major Bridge 191.1 18 18 9.4%

China Railway 18th Bureau

Group Co., Ltd.

21 Xiangjiaba Major Bridge 292 0 0 0%

China Railway 18th Bureau

Group Co., Ltd.

22 Dutingshan

Double-track Tunnel

9739 420 420 4.31

China Railway No. 5

Engineering Group Co., Ltd.

23 Yujia Double-track Tunnel 3491 201 201 5.76

China Railway No. 5

Engineering Group Co., Ltd.

24 Fubaoshan Tunnel 6223 280 280 4.5

China Railway No. 5

Engineering Group Co., Ltd.

25 Qingjiang Overline

Double-track Super-major Bridge

2614.05 47.9 47.9 1.84

China Railway No. 5

Engineering Group Co., Ltd.

26 Longdong

Super-major Double-track Bridge

780.64 46.95 46.95 6.01

China Railway No. 5

Engineering Group Co., Ltd.

By June 30, 2009

3. Environmental Control 3.1 Environmental Control System Chongqing-Lichuan Railway Construction Co., Ltd., the implementation unit for this railway line, is held responsible for the environmental protection of this section and the Environmental Protection Adiministrations of Chongqing municipality (Including Jiangbei District, Yubei District, Fuling District, Fengdu County and Shizhu County) and Lichuan City, Hubei Province are responsible for supervision and management of environmental protection in their respective jurisdiction regions. Environmental monitoring for Chongqing-Lichuan Railway shall be undertaken by Beijing OASIS. The construction and supervision units take responsibility for daily monitoring and supervision during construction period. The implementation unit and OASIS are to collect monitoring data, and then OASIS shall prepare the environmental monitoring report and submit it to the MOR and Asian Development Bank. The environmental monitoring procedures for this railway line are shown in block diagram 3-1.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 8

Diagram 3-1: Block diagram for environmental monitoring procedures

Notes: Chongqing-Lichuan Railway Construction Co., Ltd.: as the project implementation unit, it entrusts and assists the monitoring units to complete the monitoring work, and when the contract is awarded, it signs the contract containing environmental protection requirements with the construction and supervision units. Construction Units: it executes the project and completes the environmental protection work according to the contractual requirements. Supervision Units: it supervises the engineering quality and environmental protection processing according to contractual requirements. Environmental monitoring units: as an external monitor units, it supervises the implementation of environmental engineering and submits the monitoring reports to Chongqing-Lichuan Railway Construction Co., Ltd. , the MOR and Asia Development Bank. Based on the characteristics of this project and the environmental problems with high-frequent occurrence during the construction, the monitoring units shall require the relevant units to build up an environmental protection system in the following aspects:

Each unit concerned is required to have the professional environmental protection staff who shall receive the special pre-job training on environmental protection, be responsible for supervision and control of environmental problems that occur during its own construction and assist the environment control department with environmental control work;

Each construction unit is required to fulfill the correspondent environmental protection promises in the construction contract, make the relevant environmental protection measures in accordance with requirements for environmental protection work in the design documents to protect the environment of construction site and avoid and reduce the pollution and damage to the environment due to improper construction. Once the environment-affecting events occur, they should take active countermeasures. If they can not solve it, it is necessary to ask the relevant experts and units for help as soon as possible;

It is required to be responsible for daily environmental monitor work in accordance with the environmental protection requirements in the construction contract. Once an environmental

Consultation services

Entrustment and assistance

Environment Monitor Units

Contract awarding

Contracting

Construction units Engineering supervision units

Implement Supervise

Construction of Chongqing-Lichuan Railway Project

Supervise the implementation of

project

Chongqing-Lichuan Railway Co., Ltd.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 9

problem occurs during the construction, it should supervise and urge its timely solution and include the environmental protection into the engineering quality supervision system.

3.2 Daily Environmental Monitoring System The daily monitoring of water, gas and noise in the construction period shall be conducted by the construction and supervision units and the periodical monitoring of water, gas and noise can be entrusted to the railway bureaus or the environmental monitoring stations of cities along the line in accordance with the actual needs. Beijing OASIS shall assist the completion of entrustment of environmental monitoring work in accordance with the requirements from Chongqing-Lichuan Railway Construction Co., Ltd.. The monitoring data shall be collected by Chongqing-Lichuan Railway Construction Co., Ltd. and Beijing OASIS, included in the environmental monitoring report and submitted to the MOR and Asian Development Bank. Chongqing-Lichuan Railway Construction Co., Ltd. has professional environmental protection engineers set up inside its engineering management division to be in charge of the daily management and supervision of environmental protection in the construction period and professional full-time (part-time) environmental protection engineers are arranged for each bid section to supervise and check the environmental protection work in its bid section. Compilation of Management System of Standardization of Chongqing-Lichuan Railway (Tentative) (CLTC [2009] No. 4 Document) was issued by Chongqing-Lichuan Railway Construction Co., Ltd. on January 8, 2009, including Measures for Administration of Environmental Protection and Measures for Administration of Water and Soil Conservation. A leading group for management of environmental protection composed of general manager of the company (group leader), other leaders (deputy leaders) as well as directors in charge of each department, project managers of construction units, the chief supervision engineers and the general designers (members) and Engineering Management Division of the company (responsible for daily work) has been built. It has defined the duties and responsibilities of the company, design units, construction units and consultation units in the aspects of environmental protection and water and soil conservation in Measures for Management of Environmental Protection and Management of Water and Soil Conservation and put forward the key points for environmental protection and water and soil conservation as well as the inspection and acceptance system. In this survey, we found that ‘Measures on Management of Environmental Protection, Water and Soil Conservation during the Construction of I Bid Section of Chongqing-Lichuan Railway’ was made by China Railway 12th Bureau Group Co., Ltd.; a leading group composed of project manager, the chief engineer, head of Division of Security and Quality, head of Division of Engineering Technology and the engineers for water, environmental protection was established; the block diagram for environmental and water protection system for construction was provided, each branch division and construction unit had been required to arrange its own specialized environmental protection engineers and the detailed measures for water, environmental protection were made. Besides, ‘Measures on Environmental Protection during the Construction of the Tunnel’ was made by China Railway 11th Bureau Group Co., Ltd. and Diagram for Environmental Protection and Water and Soil Conversation and Assurance System was established. China Zhongtie Major Bridges Engineering Group Co., Ltd. found a leading group for environmental protection led by the project manager and signed Responsibilities for Environmental Protection Objectives with its subordinated branches, and ‘Leading group for environmental protection’, ‘Environmental protection system’, ‘Organizational chart of SHEQ’ and ‘Objectives of environmental management’ are available; Project Department of China Railway Tunnel Group Co., Ltd. had established the ‘System Diagram of Responsibilities for Environmental and Water Protection’, clarifying the responsibilities of leading group and relevant departments like Engineering, Safety and Quality, with ‘Objectives of Environmental Protection’ available; Wanshoushan Tunnel Bid Section under China Railway 18th Bureau Group Co., Ltd. had established ‘Leading Group for Environmental Protection’, ‘System Block Diagram of Environmental Protection and Water and Soil Preservation’, defining measures organizationally, systematically, technically and economically, specifying the responsibilities of Environmental Protection and Water and Soil Preservation Department and PE Department; China Railway No. 5 Engineering Group Co., Ltd. had made ‘Scheme on Implementing Environmental Protection for

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 10

VI Bid Section of New Chongqing-Lichuan Railway’ and ‘Scheme on Implementing Water and Soil Preservation for VI Bid Section of New Chongqing-Lichuan Railway’, defining leading group for environmental protection led by project manager, with project secretary, general manager and deputy manager as deputy chief of the group, and Safety and Quality Department is charge of implementation.

4. Pre-job Training on Environmental Protection In accordance with the regulations in the bidding/tendering documents for this project, Beijing OASIS assisted Chongqing-Lichuan Railway Construction Co., Ltd. with the training class opened on March 26, 2009 for environmental monitoring. The teaching materials are Training Material for Railway Environmental Management compiled by Environmental Protection Committee, China Railway Association and Supplementary Training Material for Environmental Protection during the Construction Period of Chongqing-Lichuan Railway Project Developed with the Loan from Asian Development Bank self-compiled by Beijing OASIS. The trainees are those people in charge of construction units and supervision units as well as the professional and part-time environmental protection personnel. Mr. Jia Guoquan, researcher from Beijing OASIS made detailed explanations. The main contents for training include: Laws, rules and regulations for management of environmental protection. He emphatically introduced the contents relevant to laws on environmental protection, rules and regulations for management of environmental protection of construction projects and measures for management of environmental protection of completed construction projects etc. as well as the contents relevant to laws and regulations for environmental protection made by Chongqing municipality and Hubei province; Environmental impacts from the railway construction projects and the environmental protection measures in the construction period. Explanations were made in phases of preparation for construction, construction and completion; Main environmental monitoring contents and key environmental monitoring points of this project, a project developed the loan from Asian Development Bank; Opinions made by the MOR after its pre-examination of EIA report for this project and water and soil conservation programs as well as the replies from Ministry of Environmental Protection and Ministry of Water Resources to the EIA report and the water and soil conservation programs. He introduced and explained the above-mentioned documents approved and delivered these documents as the attachments to the supplementary teaching materials so that the construction and supervision units could grasp the requirements from the approved documents. The participants for the training are listed in Table 4-1.

Table 4-1: Participants for the training on environmental monitoring of Chongqing-Lichuan Railway

S.N. Name Unit Post 1 Yuan Bude Chongqing-Lichuan Railway Construction Co., Ltd. Head of Division 2 Xiao Bin Chongqing-Lichuan Railway Construction Co., Ltd. Deputy Head of Division 3 Fu Chao Chongqing-Lichuan Railway Construction Co., Ltd. Senior Engineer 4 Fu Xinping Chongqing-Lichuan Railway Construction Co., Ltd. Engineer 5 Wang Jun Chongqing-Lichuan Railway Construction Co., Ltd. Engineer 6 Li Tao Chongqing-Lichuan Railway Construction Co., Ltd. Engineer 7 Zhang Guodi Chongqing-Lichuan Railway Construction Co., Ltd. Engineer

8 Yang Chunhua

Chongqing-Lichuan Railway Construction Co., Ltd. Engineer

9 Xu Zeyi China Railway 12th Bureau Group Co., Ltd. Deputy Manager of Construction Site of the Project

10 Li

Shousheng China Railway 12th Bureau Group Co., Ltd. Deputy Manager of Construction

Site of the Project

11 Zhao

Haishan China Railway 12th Bureau Group Co., Ltd. Deputy Head of Safety and

Quality Division

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 11

S.N. Name Unit Post

12 Tang Xiaoqi China Railway 12th Bureau Group Co., Ltd. Deputy Head of Safety and Quality Division

13 Kong Biao China Railway 12th Bureau Group Co., Ltd. Director-General of Safety 14 He Lin China Railway 12th Bureau Group Co., Ltd. Director-General of Safety

15 Ming Jianlong

China Railway 12th Bureau Group Co., Ltd. Safety and Quality Department

16 Song Yongling

China Railway 12th Bureau Group Co., Ltd. Safety and Quality Department

17 Qi Wansheng

China Railway 12th Bureau Group Co., Ltd. Technician

18 Chen Weishi China Railway 12th Bureau Group Co., Ltd. Quality Inspector 19 Li Dahai China Railway 12th Bureau Group Co., Ltd. Technician 20 Yu Xiaoqi Chengdu Southwest Supervision Company Deputy Director-General

21 Yang Huihong

Chengdu Southwest Supervision Company Deputy Director-General

22 Ni Zhijun Chengdu Southwest Supervision Company Leader of Supervision Team

23 Yang Yaxiong

Chengdu Southwest Supervision Company Engineer

24 Li Yinglai Chengdu Southwest Supervision Company Engineer 25 Xiang Yang Chengdu Southwest Supervision Company Engineer

26 Gong Jianyong

China Railway 11th Bureau Group Co., Ltd. Head of Safety and Quality Division

27 Guan Ye China Railway 11th Bureau Group Co., Ltd. Director-General of Safety

28 Wu Jianxing China Zhongtie Major Bridge Engineering Group Co., Ltd.

Manager of Construction Site of the Project

29 Li Guohui China Zhongtie Major Bridge Engineering Group Co., Ltd.

Deputy Manager of Construction Site of the Project

30 Zheng Fayuan

China Zhongtie Major Bridge Engineering Group Co., Ltd.

Deputy Manager of Construction Site of the Project

31 Ai Minguo China Zhongtie Major Bridge Engineering Group Co., Ltd.

Assistant Chief Engineer

32 Zhang Xiaoping

China Zhongtie Major Bridge Engineering Group Co., Ltd.

Head of Safety and Quality Division

33 Xiong Yunbo

China Zhongtie Major Bridge Engineering Group Co., Ltd.

Head of Safety and Quality Division

34 Zhou Min China Zhongtie Major Bridge Engineering Group Co., Ltd.

Head of Safety and Quality Division

35 He Jie China Zhongtie Major Bridge Engineering Group Co., Ltd.

Head of Safety and Quality Division

36 Hao Jieqing China Zhongtie Major Bridge Engineering Group Co., Ltd.

Engineer

37 Jiang Peixian

China Zhongtie Major Bridge Engineering Group Co., Ltd.

Engineer

38 Huang Yuzhe

Sichuan Tieke Construction Supervision Company Deputy Director-General

39 Xian Wei Sichuan Tieke Construction Supervision Company Deputy Director-General

40 Luo Zhongjun

Sichuan Tieke Construction Supervision Company Leader of Supervision Team

41 Zhang Weihua

Sichuan Tieke Construction Supervision Company Engineer

42 Chen Wu Sichuan Tieke Construction Supervision Company Supervisory Engineer 43 Yu Hua Sichuan Tieke Construction Supervision Company Supervisory Engineer 44 Qin Shaoyun Sichuan Tieke Construction Supervision Company Supervisory Engineer

45 Sun Baoquan

China Railway Tunnel Group Co., Ltd. Manager

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 12

S.N. Name Unit Post

46 Chen Hongyu

China Railway Tunnel Group Co., Ltd. Manager

47 Geng Wei China Railway Tunnel Group Co., Ltd. Deputy Manager

48 Zou Yangli China Railway Tunnel Group Co., Ltd. Head of Safety and Quality Division

49 Yan Ruiguang

China Railway Tunnel Group Co., Ltd. Director

50 Fu Qingzhou China Railway Tunnel Group Co., Ltd. Head of Safety and Quality Division

51 Li Jun China Railway Tunnel Group Co., Ltd. Head of Safety and Quality Division

52 Zheng Zijie China Railway Tunnel Group Co., Ltd. Director-General of Safety

53 Zhou Qiangbo

China Railway Tunnel Group Co., Ltd. Safety Supervisor

54 Ni Qing China Railway Tunnel Group Co., Ltd. Assistant Engineer 55 Li Delin China Railway Eryuan Supervision Company Deputy Director-General

56 Wang Daxian

China Railway 18th Bureau Group Co., Ltd. Manager

57 Liu Wenyou China Railway 18th Bureau Group Co., Ltd. Deputy Manager 58 Yang Hanfu China Railway 18th Bureau Group Co., Ltd. Deputy Manager 59 Liu Xiaoyou China Railway 18th Bureau Group Co., Ltd. Deputy Manager

60 Hu Wei China Railway 18th Bureau Group Co., Ltd. Head of Environmental Protection Department

61 Jia Baojun China Railway 18th Bureau Group Co., Ltd. Leader of Project Department

62 Wang Chansgjun

China Railway 18th Bureau Group Co., Ltd. Head of Safety and Quality Division

63 Zhou Heping China Railway 18th Bureau Group Co., Ltd. Safety and Quality Division 64 Bai Huajun China Railway 18th Bureau Group Co., Ltd. Leader of Project Team

65 Sun Yingchun

China Railway No. 5 Engineering Group Co., Ltd. Deputy Manager

66 Wang Man China Railway No. 5 Engineering Group Co., Ltd. General Engineer

67 Tang Taowen

China Railway No. 5 Engineering Group Co., Ltd. General Engineer

68 Deng Minggao

China Railway No. 5 Engineering Group Co., Ltd. Head of Safety and Quality Division

69 Zhong Qicun China Railway No. 5 Engineering Group Co., Ltd. Director-General of Safety 70 Wu Jianfen China Railway No. 5 Engineering Group Co., Ltd. Safety and Quality Division 71 Hu Lianhua China Railway No. 5 Engineering Group Co., Ltd. Safety Supervisor 72 Lu Zhanhai Changsha Zhongda Supervision Company Deputy Director-General

73 Geng Yourong

Changsha Zhongda Supervision Company Special supervisor of Environmental Protection

74 Zhang Jingbo

Changsha Zhongda Supervision Company Director of Lab

5. Supervision and Inspection of Affected Points

In August 2009, project team members of our company are accompanied by the personnel for management of environmental protection from Chongqing-Lichuan Railway Construction Co., Ltd., made a sample check of construction sites for each section of this railway line. The on-site investigation made this time is to check the work contents of construction unit in the following several aspects: 1. To know about the internal management of environmental protection and water conservancy

work from the construction units;

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 13

2. To understand the implementation of environmental protection measures in the tunnel construction;

3. To find out the implementation of environmental protection measures at construction sites; 4. To make out the implementation of environmental protection measures during the bridge

construction; 5. To know about the preventive measures for construction roads.

5.1 Implementation Status of Environmental Protection for Each Bid Section The implementation status of environmental protection for each bid section is shown in Tables 5-1 ~ 5-6.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 14

Table 5-1: Implementation Status of Environmental Protection for I Bid Section

Construction unit: China Railway 12th Bureau Group Co., Ltd.

Supervision unit: Chengdu Southwest Supervision Company

Major C

onstruction camps

Location Garbage Treatment Measures Sewage

Treatment Measures

Billboard of Environmental

Protection Remarks

Dazhulin Town in New Zone of the north of

Chongqing

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 100 staff members.

Camp self-built

Paihua Village, Longxing Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 140 staff members.

Camp self-built

Taihongchang, Luoqi Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 108 staff members.

Camp self-built

Tiangongdian Road in New Zone of the north

of Chongqing

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available

150 staff members.

Camp self-built

Tunnel more than 1000m in

length

Name Mileage Construction progress Remarks

Paihuadong Tunnel

DK30+320~DK35+285 Cavitation completed: 315

m

Spoil grounds for the entrance and exit to Paihuadong Tunnel

Yufengshan Tunnel

DK15+924~DK19+146 Cavitation completed: 75

m Official drawing not

available yet

Huofengshan Tunnel

HLZDK12+880~HLZDK22+295 HLYDK13+165~HLYDK22+295

No progress made, because the construction roads for the exit to tunnel and 2#

inclined shaft being under way

Official drawing not available yet

Yanwo Tunnel

DK8+251~DK10+673 Cavitation completed: 260

m /

Dashiba Tunnel

DK23+485~DK25+120 / Official drawing not

available yet Moyubao Left Line

(Single-track) HLZDK25+526~HLZDK27+830

Cavitation completed: 80 m

/

Moyubao Right Line

HLYDK25+815~HLYDK28+410 Cavitation completed: 75

m /

Super-major and major

bridges

Name Mileage Construction progress Remarks Julong Super-major Double-track Bridge

LTSK33+991.19~ LTSK35+455.43

8 piers and 1 bearing platform completed

/

Liangchanghe Left Line Super-major Bridge

LTSDK31+404.5 Construction roads under way Drawing not

available now Liangchanghe Right Line

Super-major Bridge LTXDK31+416 Construction roads under way

Drawing not available now

Cuntan Super-major Bridge

HLZDK23+161 Construction not started yet Drawing not

available now Wangjiahe Super-major

Bridge HLYDK11+033 Construction not started yet

Drawing not available now

Jinzhou Dadao Overline HLYDK12+311.1 Construction not started yet Drawing not

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 15

Super-major Bridge available now Cuntan Super-major Double-track Bridge

DK6+592 Construction roads under way Drawing not

available now Longjingou Super-major

Double-track Bridge D1K27+888 Construction not started yet /

Yulinhe Super-major Double-track Bridge

D1K28+836 4 piers, 2 bearing platforms and

435-linear meter excavation pile completed

/

Main borrow pits /spoil grounds

Location mileage Designed soil-borrowing and spoiling quantity and measures

Progress Implementation

status Remarks

Spoil ground of Yanwo Tunnel

Total discarded waste slag of 35×104m3, occupying dry land

of 60 mu (1 mu=0.0667 hectares) and less-occupied

forest land restored to vegetation after completion

2.5×104m3 Retaining wall

under construction

At 100 m to the right

side of Moyubao

Tunnel entrance

Entrance of Yufengshan Tunnel

Total discarded waste slag of 22.2×104m3, occupying land of

35.1 mu 0.06×104m3

Retaining wall under

construction

Exit of Yufengshan

Tunnel

Spoil ground of Yanwo Tunnel

Total discarded waste slag of 16.9×104m3, occupying dry

land of 40 mu and less-occupied forest land and

cropland restored to vegetation after completion

2×104m3 Retaining wall

under construction

Exit of Yanwo Tunnel

Spoil ground of Yufengshan Tunnel

Total discarded waste slag of 22×104m3, occupying dry land

of 45 mu and less-occupied forest land and cropland

restored to vegetation after completion

1.2×104m3 Retaining wall

under construction

Entrance of Yufengshan

Tunnel

Spoil ground of entrance and exit of Paihuadong Tunnel

Total discarded waste slag of 43.5×104m3 for both entrance

and exit, and the area of entrance and exit is 100 mu

respectively.

4.6×104m3 Retaining wall

under construction

Spoils from Paihuadong

Tunnel

Renhe Dashi Spoil ground

Owner designated spoil ground with discarded waste slag of

300×104m3 20×104m3 Under use

Renhe Dashi Spoil

ground

Yuanyang D61 Spoil ground

Owner designated spoil ground with discarded waste slag of

300×104m3 /

No delivery for use yet

Yuanyang D61 Spoil

ground

Noise-sensitive points

Name Mileage Design

measures Implementation

status Remarks

Remarks

1. Fugitive dust from construction site and roads has been resolved by sprinkling water at construction site and if more dust at construction site, conduct the sealing treatment (e.g. Mixing station) with more-frequently watering to keep ground surface wet. Another way to reduce dust adopted is the hardening treatment of site roads and construction site.

2. Leaking water of tunnels shall be flowed into sedimentation tank and then discharged up to the standard. 3. Spoil of tunnel shall be discarded at spoil grounds along which retaining walls are being constructed. 4. No cultural relics have so far been found at the whole zone of piping construction. 5. Color-bar cloth shall be used to cover materials entering the site.

On-site investigation results of

The on-site investigation results of monitoring are: Paihuadong tunnel: the construction roads appear tidy, convenient and clear; billboard of environmental protection erected; air compressor stored inside air compressor room; no protection and water interception and

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 16

monitoring drainage facility is available at the border of spoil ground, which is prone to cause water and soil loss; only Level I sewage sedimentation tank not cleaned immediately shall be cleared without delay. Liangchanghe Mixing station: sedimentation tank for sewage from production is available; garbage bin and waste collection pool have been set up for centralized collection and uniform disposal by local environmental sanitation department; there are watering cart; and rinsing water from mixing plant after settling in sedimentation tank which is suggested to be established shall be recycled for dust removal at the construction site and roads. Engineering at the natural reservation zone and scenic spot has not been started yet.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 17

Table 5-2: Implementation Status of Environmental Protection for II Bid Section

Construction unit: China Railway 11th Bureau Group Co., Ltd.

Supervision unit: Sichuan Tieke Supervision Company

Construction cam

ps

Location Garbage Treatment Measures Sewage Treatment Measures

Billboard of Environmental

Protection Remarks

Duzhou Village, Duzhou Town, Changshou District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available at station

135 staff members. Camp

self-built

Fengsheng Village, Duzhou Town,

Changshou District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available at station

158 staff members. Camp

self-built

Lidu Town, Fuling District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available at station

189 staff members. Camp

self-built and rent local

houses

Baohua Village, Luoqi Town, Yubei District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available at station

129 staff members.

Camp self-built and rent local

houses

Tunnel more than 1000m in

length

Name Mileage Construction progress Remarks

Gaoshipan Tunnel

DK58+105~DK60+834.67

Entrance not started yet due to removal of houses; At exit, excavation of top heading

completed 16 m.

Spoil ground planned to be set up both at entrance and

exit respectively

Shaping Tunnel DK70+837`DK73+653 Cavitation completed 46.8 m at entrance; and 149.2 m at exit.

Spoil ground planned to be set up both at entrance and

exit respectively

Huangcaoshan Tunnel

DK79+290~DK85+953 Cavitation completed 376.93 m at entrance; and 172.2 m at exit.

Spoil ground planned to be set up both at entrance and

exit respectively

Super-major and major

bridges

Name Mileage Progress Remarks

Fangjiawan Super-major Bridge

DK36+629~DK37+363 106 piles of pile foundation have been formed, 5 bearing platforms and spread

foundation /

Yaojiaju Super-major Bridge

DK38+268.8~DK39+040.8 38 piles of pile foundation have been

formed, 3 bearing platforms and 2 pier shafts completed

/

Wujiagou Super-major Bridge

DK50+448.7~DK51+540.2 33 piles of pile foundation have been

formed, 3 bearing platforms and 2 pier shafts completed

/

Zhouxinhe Super-major Bridge

DK56+765~DK57+550 56 piles of pile foundation have been formed, 9 bearing platforms, spread

foundation and 1 pier shaft completed /

Longxihe Super-major Bridge

DK75+194~DK76+360 Excavation of pile foundation for pore-creating 308 m

/

Mengziwan Super-major Bridge

DK77+369~DK77+833 67 piles of pile foundation have been

formed, 7 bearing platforms and spread foundation

/

Zhangjiawan DK77+955~DK78+998 58 piles of pile foundation have been /

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 18

Super-major Bridge formed, 3 bearing platforms and spread foundation

Main borrow pits /spoil grounds

Location mileage Designed soil-borrowing and spoiling quantity and measures

Progress Implementation

status Remarks

Spoil ground of the exit to Gaoshipan

Tunnel

Total discarded waste slag of 18×104m3, occupying dry land of 23 mu, reclamation of 10 mu and

vegetation of 13 mu.

5×103m3 Retaining wall

under construction /

Spoil ground of the entrance to Shaping

Tunnel

Total discarded waste slag of 23×104m3, occupying dry land of 25 mu, reclamation of 10 mu and

vegetation of 14 mu.

1.6×104m3 Retaining wall

under construction /

Spoil ground of the exit to Shaping

Tunnel

Total discarded waste slag of 18×104m3, occupying dry land of 15.3 mu, reclamation of 2 mu and vegetation of 2 mu; retaining wall

set up and spoil ground leveled mechanically

2.5×104m3 Retaining wall

under construction /

Spoil ground of the entrance to Mayiling

Tunnel

Total discarded waste slag of 15×104m3, occupying dry land of 57.5 mu, reclamation of 22.9 mu

and vegetation of 34.6 mu.

2.1×104m3 Retaining wall

under construction /

Spoil ground of Dashanpo Tunnel

Total discarded waste slag of 8×104m3, occupying dry land of 20

mu, reclamation of 4 mu and vegetation of 16 mu.

3×104m3 Retaining wall

under construction /

Spoil ground of the entrance and exit to

Huangcaoshan Tunnel

Total discarded waste slag of 83×104m3, occupying land of 135 mu totaled by both spoil grounds of which 73 mu of forest land and

60 mu dry land and plan to implement protection and

vegetation measures.

7.5×104m3 Retaining wall

under construction /

Spoil ground of inclined shaft of

Huangcaoshan Tunnel

Total discarded waste slag of 4×104m3, occupying dry land of 35

mu, reclamation of 10 mu and vegetation of 25 mu.

2.1×104m3 Retaining wall

under construction /

Remarks

1. Fugitive dust from construction site and roads has been resolved by sprinkling water at construction site and if more dust at construction site, conduct the sealing treatment (e.g. Mixing station) with more-frequently watering to keep ground surface wet. Another way to reduce dust adopted is the hardening treatment of site roads and construction site.

2. Leaking water of tunnels shall be flowed into sedimentation tank and then discharged up to the standard. 3. There is no roadbed construction for this bid section; spoil of tunnel shall be discarded at spoil grounds along

which retaining walls are being constructed. 4. No cultural relics have so far been found at the whole zone of piping construction. 5. Color-bar cloth shall be used to cover materials entering the site.

On-site investigation results of monitoring

The on-site investigation results of monitoring are: Huangcaoshan tunnel: the construction site appears tidy and orderly; Guarantee system diagram of environmental protection and water & soil reservation and billboard of environmental protection are available; garbage bins have been set up; no sedimentation tank for sewage; no protection and water interception and drainage facility is available at spoil ground, which is prone to cause water and soil loss and immediate correction is necessary. Changshou North Mixing station: the construction site is messy; sedimentation tank for sewage from production is available and being cleaned; garbage bin and waste collection pool have been set up for centralized collection and uniform disposal by local environmental sanitation department; there are watering cart. Construction of the piers in the water has not yet started for Longxihe Super-major bridge.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 19

Table 5-3: Implementation Status of Environmental Protection For III Bid Section

Construction unit: China Zhongtie Major Bridge Engineering Group Co., Ltd.

Supervision unit: Sichuan Tieke Supervision Company

Construction cam

ps

Location Garbage Treatment Measures Sewage Treatment Measures

Billboard of Environmen

tal Protection

Remarks

Nitrogenous Fertilizer Plant of Hanjia Village, Jiangbei Office, Fuling

District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available /

Ma’an Zhaohua Science Park, Lidu Town, Fuling

District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available /

Chuandong Shipyard, Fuling District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available /

Lailong Village, Huangqi Town, Fuling District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available /

Nitrogenous Fertilizer Plant of Hanjia Village, Jiangbei Office, Fuling

District

Set up garbage bin for centralized collection and uniform disposal by local environmental sanitation

department

Sedimentation tank, septic tank and

drainage facility established

Available /

Tunnel more than 1000m in

length

Name Mileage Construction progress Remarks

Banpo Tunnel DK87+315.5 Top heading tunneling 180 m, bottom heading tunneling 52 m and inverted arch completed is

42 m /

Bajiaoshu Tunnel

DK106+322.5

Top heading tunneling 45 m, bottom heading tunneling 130 m and left and right sides of

timbering in the open excavation completed are 12 m respectively

/

Jianfengding Tunnel

D3K110+543 Upper bench excavation completed is 32 m /

Shijiapo Tunnel D3K115+960 Top heading tunneling 171 m, bottom heading

tunneling 133 m and inverted arch completed is 104 m

/

Ma’anshan Tunnel

DK121+557.5 Upper bench is excavated 130 m, lower bench 81 m and inverted arch completed is 7m

/

Super-major and major

bridges

Name Mileage Progress Remarks

Daqinggou Major Bridge

DK88+694.00 3 piers and 1 bearing platform have been completed, and pile foundation

has excavated 282 linear meter. /

Xiaranfang Major Four-track Bridge

DK103+506.18 / Construction drawing is

unavailable. Caijiagou D3K108+416 24 pile foundations and bearing /

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 20

Super-major Bridge platform are under construction. Youcaowan Major

Bridge D3K111+820 2 file foundations have been

completed. /

Xinqiao Super-major Bridge

D3K113+192.00 10 file foundations have been completed.

/

Shiyuanzi Major Bridge

D3K114+090.00 7 file foundations have been

completed and bearing platform is under construction.

/

Hanjiatuo Yangtze River Super-major

Bridge D3K118+161.00 5 file foundations and 2 bearing

platforms have been completed /

Lishizi Super-major Double-track Bridge

DK124+628.00 Construction drawing is

unavailable.

Main borrow pits /spoil grounds

Location mileage Designed soil-borrowing and spoiling quantity and measures

Progress Implementati

on status Remarks

Spoil ground of the entrance to Banpo

Tunnel DK85+700

Total discarded waste slag of 18×104m3, occupying land of 50 mu, and carrying out reclamation

and vegetation.

1.8×104m3 Retaining wall under

construction /

Spoil ground of the exit to Banpo Tunnel

DK88+456

Total discarded waste slag of 18×104m3, occupying land of 60 mu, and carrying out reclamation

and vegetation.

/ / No

construction started

Spoil ground of the entrance to Bajiaoshu

Tunnel DK105+200

Total discarded waste slag of 18.5×104m3, occupying land of

60 mu, and carrying out reclamation and vegetation.

0.45×104m3 Retaining wall under

construction /

Spoil ground of 1# exit to Jianfengding

Tunnel D3K110+500

Total discarded waste slag of 20×104m3, occupying land of 36 mu, and carrying out reclamation

and vegetation.

0.55×104m3 Retaining wall under

construction /

Spoil ground of 2# exit to Jianfengding

Tunnel D3K111+550

Total discarded waste slag of 20×104m3, occupying land of 40 mu, and carrying out reclamation

and vegetation.

0.06×104m3 Retaining wall under

construction /

Entrance to Shijiapo Tunnel

D3K114+200

Total discarded waste slag of 26×104m3, occupying land of 70 mu, and carrying out reclamation

and vegetation.

1.15×104m3 Retaining wall under

construction /

Exit to Shijiapo Tunnel

Total discarded waste slag of 26×104m3, occupying land of 50 mu, and carrying out reclamation

and vegetation.

1.55×104m3 Retaining wall under

construction /

Exit to Ma’anshan

Total discarded waste slag of 13×104m3, occupying land of 23 mu, and carrying out reclamation

and vegetation.

1.25×104m3 Retaining wall under

construction

Remarks

1. Fugitive dust from construction site and roads has been resolved by sprinkling water at construction site and if more dust at construction site, conduct the sealing treatment (e.g. Mixing station) with more-frequently watering to keep ground surface wet. Another way to reduce dust adopted is the hardening treatment of site roads and construction site.

2. Leaking water of tunnels shall be flowed into sedimentation tank and then discharged up to the standard.

3. Retaining wall shall be built prior to discarding spoil from tunnel at spoil grounds 4. At present, there is no cultural relics found and no sensitive point such as Natural Preservation Zone

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 21

in the whole zone of piping construction. 5. Color-bar cloth shall be used to cover materials entering the site.

On-site investigation results of monitoring

The on-site investigation results of monitoring are: Jianfengding tunnel: the construction site appears tidy and orderly with entrance to the tunnel cave harmonized with natural landscape; construction roads are arranged neatly with distinct border; leading group of environmental protection has been established with billboard of environmental protection erected; garbage bins have been set up; sedimentation tank for sewage from production is available; no protection and water interception and drainage facility is available at spoil ground, which is prone to cause water and soil loss. Hanjiatuo Yangtze River Super-major Bridge: construction roads are arranged neatly with distinct border; watering carts are available; and construction of excavation pile fulfill the relevant requirements. Sedimentation tank for slurry is setup in the construction of excavation piles, and pier construction in the water has not started yet.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 22

Table 5-4: Implementation Status of Environmental Protection for IV Bid Section

Construction unit: China Railway Tunnel Group Co., Ltd.

Supervision unit: China Railway Eryuan Supervision Company

Construction cam

ps

Location Garbage Treatment Measures Sewage

Treatment Measures

Billboard of Environmental Protection

Remarks

Baimuyuan Village, Longhe Town, Fengdu County

Set up garbage bin for centralized collection and uniform disposal at

regular intervals

Sedimentation tank, septic tank

and drainage facility

established

Available 250 staff

members. Camp self-built

Jiangchi Town, Fengdu County

Set up garbage bin for centralized collection and uniform disposal at

regular intervals

Sedimentation tank, septic tank

and drainage facility

established

Available 290 staff

members. Camp rent

Wusong Village, Wulong Township, Jiangchi Town,

Fengdu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 160 staff

members. Camp self-built

Lvcunba Village, Sanjian Township, Fengdu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 114 staff members.

Camp self-built

Xiaojing Village, Anning Township, Fengdu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 172 staff members.

Camp self-built

Liaojiaba Village, Sanjian Township, Fengdu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 152 staff members.

Camp self-built

Shiban Hydropower Station, Fengdu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 149 staff members.

Camp self-built

Wanshoufang, Chengnanyizidong, Nanbin

Town, Shizhu County, Chongqing

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Municipal sewage piping

network Available

123 staff members. Camp rent

Chengdong Village, Nanbin Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 164 staff members.

Camp self-built

Jintian Village, Nanbin Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 172 staff members.

Camp self-built

Youhao Village, Xialu Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 102 staff members.

Camp self-built

Fangjiaya Village, Xialu Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

Available 151 staff members. Camp rent

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 23

established

Shiba Village, Qingxi Town, Fuling District, Chongqing

Set up garbage bin for centralized collection and uniform disposal at

regular intervals

Sedimentation tank for sewage and toilet with

septic tank established

Available 126 staff members.

Camp self-built

Qinglong Village, Qingxi Town, Fuling District,

Chongqing

Set up garbage bin for centralized collection and uniform disposal at

regular intervals

Sedimentation tank for sewage and toilet with

septic tank established

Available 132 staff members.

Camp self-built

Longju Village, Nantuo Town, Fuling District, Chongqing

Set up garbage bin for centralized collection and uniform disposal at

regular intervals

Sedimentation tank for sewage and toilet with

septic tank established

Available 325 staff members.

Camp self-built

Niulankou, Xialu Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 130 staff members.

Camp self-built

Major Bridges Group of Shangjin Village, Xialu Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available 160 staff members.

Camp self-built

Tunnel more than 1000m in

length

Name Mileage Construction progress Remarks

Dingzishan Tunnel D1K196+994~D1K198+440 Upper bench completed 42.8 m

Spoil ground of Entrance to Dingzishan Tunnel

Anzishan Tunnel D1K193+870~D1K194+978

Excavation of open slot completed 189 m

Spoil ground of Entrance to Anzishan Tunnel

Zhaiziling Tunnel D1K189+355~D1K 190+725 Upper bench completed 65.2 m

Spoil ground of Exit to Zhaiziling Tunnel

Changhongling Tunnel

DK170+300~DK175+000

Tunnel excavation at the Entrance completed 280 m

Spoil ground of Entrance to Changhongling Tunnel and Exit

to Nanbaidong Transverse Gallery of Changhongling

Tunnel

HDK1+720~ HDK0+0

Timbering excavation completed 400 m

Spoil ground of Transverse Gallery of Changhongling

Tunnel Exit to

Changhongling Tunnel

DK170+300~ DK183+594

Tunnel excavation completed 190 m

Spoil ground of Exit to Changhongling Tunnel

2# Inclined Shaft of Changhongling

Tunnel

XD2K0+000~XD2K0+370

Tunnel excavation completed 370 m

Spoil ground of Exit to Changhongling Tunnel

1# Inclined Shaft of Changhongling

Tunnel

XD1K0+000~XD1K1+300

Tunnel excavation completed 460 m

Spoil ground of 1# Inclined Shaft of Changhongling Tunnel

Exit to Fangdoushan

Tunnel

D8K163+430~ D8K160+976

Tunnel excavation completed 80 m

Gravel Plant at Exit to Fangdoushan Tunnel

Huayuan Tunnel in Fengdu County

D5K154+237

Excavation progress of 381 m, inverted arch completed 308 m and secondary lining completed

130 m

Spoil ground of Huayuan Tunnel

Xiongjialing Tunnel D5K148+026~D5K1

48+455 Tunnel excavation completed

170 m Temporary spoil ground of

Xiongjialing Tunnel

Entrance to D5K149+796~D5K153+260 Tunnel excavation completed Temporary spoil ground of

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 24

Shigangpo Tunnel 16 m Shigangpo Tunnel Exit to Shigangpo

Tunnel D5K153+250 0 m

Construction of main cave not started

Liziping Tunnel D5K156+904~D5K 158+360 D5K156+904~D5K157+292

Excavation of tunnel (1456 m in length) completed 368 m

Entrance to Fanddoushan

Tunnel

D8K158+512~ D8K160+971

Full-section primary support completed 125 m

Spoil ground of Xiaojin Village

Entrance to Nanbaidong Tunnel

D8K165+965~D8K 169+435

Full-section primary support completed 152 m

Spoil ground of Liaojiaba

Exit to Nanbaidong Tunnel

D8K172+960~D8K 169+465

Full-section primary support completed 186 m

Spoil ground of Exit to Nanbaidong Tunnel

Hujiapo Tunnel DK135+725~DK141+196

Transverse gallery completed 255 m, main cave at transverse gallery 50 m, and main cave at

the Exit 273 m

Transverse gallery spoil ground set for Entrance and Transverse

Gallery; one common spoil ground used for Exit and

Guanyinyan

Guanyinyan Tunnel DK141+330~DK145+720

Tunnel excavation at the Entrance completed 306 m,

main cave at the Exit not started construction

Entrance and Hujiapo using one spoil ground together, but spoil

ground of Exit not available.

Entrance to Daliang Tunnel DK124﹢720

Tunnel excavation completed 71.5 m

Spoil ground of Entrance

Inclined Shaft of Daliang Tunnel DK128﹢300 Timbering excavated 664 m Spoil ground of Inclined Shaft

Main Cave at the Exit to Daliang

Tunnel DK135﹢665

Tunnel excavation completed 269 m

Spoil ground of Exit

Parallel Heading at the Exit to Daliang

Tunnel DK135﹢662 Timbering excavated 559 m Spoil ground of Exit

Entrance to Zhoujiaping Tunnel DK183+865

Full-section excavated 90 m /

Exit to Zhoujiaping Tunnel DK187+705

Full-section excavated 280 m Beside Fangjiaya Super-major

Bridge

Super-major and major

bridges

Name Mileage Progress Remarks Fangjiaya 1# Major Double-track Bridge

DK188+548 3 bearing platforms completed and piling 620 m

/

Chenjiabao Longhe Major Double-track Bridge

D1K189+202 Construction not started Entering construction site

shortly Songziba Nanbinhe Major

Double-track Bridge D1K190+855 Construction not started Drawing unavailable

Huafeng Major Double-track Bridge

D1K195+576 Construction not started Drawing unavailable

Jiangchi Longhe Major Double-track Bridge

DK183+725 Construction not started Entering construction site

shortly

Shizhu Station 1# Major Four-track Bridge

D1K191+955 Construction not started Drawing unavailable

Shizhu Station Arrival and Departure 1# Major Four-track Bridge

Dd191+939 Construction not started Drawing unavailable

Shizhu Station 3# Major Four-track Bridge

D1K192+804 Construction not started Drawing unavailable

Shizhu Station 4# Major Four-track Bridge

D1K193+768 Construction not started Drawing unavailable

Tuzhuyan Major D1K196+915 Piling of manual-excavation /

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 25

Double-track Bridge piles 60 m Double-track Bridge at Fengdu Station, Fengdu

County

DK147+137.5~ DK147+837.95

4 bearing platforms completed and piling 350 m

/

Jinzhutan Major Bridge of Fengdu County

D5K153+262.60~D5K153+740.6

7 bearing platforms completed and piling 560 m

/

Longhe Major Bridge, Daqiaoshiban, Sanjian

Township, Fengdu County

D8K172+915.7~D8K173+136.85

Bearing platforms for 1# and 3# piers completed

/

Major Bridge of Sanjian Township, Fengdu County

D8K164+832.4~D8K165+086.79 Construction not started /

Lvchunba Major Bridge of Sanjian Township, Fengdu

County

D9K182+147.4~D9K183+037.42 Construction not started Drawing unavailable

Main borrow pits /spoil grounds

Location mileage Designed soil-borrowing and spoiling quantity and measures

Progress Implementation

status Remarks

Spoil grounds of various tunnel caves and inclined

shaft / 12×104m3

Protection engineering has not been started due to absence

of design drawing.

Tunnel spoil

Noise-sensitive points

Name Mileage Design

measures Implementation

status Remarks

Remarks

Acceptance inspection of expropriation of land has been completed for all construction sites. It is required to strengthen cleaning and water sprinkling to reduce fugitive dust emission from construction roads. Water leaking from tunnel shall be discharged after three-stage sedimentation in sedimentation tank. Environmental protection measures like vegetation protection at spoil ground have been implemented well. Up to now, no cultural relics have been found during the construction.

On-site investigation results of monitoring

The on-site investigation results of monitoring are: Fangdoushan tunnel: the construction site appears tidy and orderly; construction roads are arranged neatly with distinct border; billboards of environmental protection are available; garbage bins have been set up; three-stage sedimentation tank for sewage from production is available; there is only temporary protection, but on the whole no protection and water interception and drainage facility is available at spoil ground, which is prone to cause water and soil loss. Guanyinyan Tunnel: the common spoil ground is used for both Entrance to Guanyinyan Tunnel and Hujiapo Tunnel; absence of protection and water interception and drainage facility; sedimentation tank for sewage is available; there is guarantee system diagram of environmental protection and water & soil reservation; garbage bins and pools available for collection of garbage; and billboard of environmental protection has been erected.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 26

Table 5-5: Implementation Status of Environmental Protection for V Bid Section

Construction unit: China Railway 18th Bureau Group Co., Ltd.

Supervision unit: Changsha Zhongda Supervision Company

Construction cam

ps

Location Garbage Treatment Measures Sewage

Treatment Measures

Billboard of Environmental

Protection Remarks

Shuangqing Village, Nanbin Town, Shizhu

County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department at regular intervals

Sedimentation tank, septic tank

and drainage facility

established

Available 150 staff

members. Camp self-built

Shiping Group, Shazi Village, Shazi Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department at regular intervals

Sedimentation tank, septic tank

and drainage facility

established

Available 210 staff

members. Camp self-built

Malanba Group, Xinglong Village, Shazi

Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department at regular intervals

Sedimentation tank, septic tank

and drainage facility

established

Available 130 staff

members. Camp self-built

Xiangshixi, Xinglong Village, Shazi Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department at regular intervals

Sedimentation tank, septic tank

and drainage facility

established

Available 160 staff

members. Camp self-built

Taoyuan Village, Shazi Town, Shizhu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department at regular intervals

Sedimentation tank, septic tank

and drainage facility

established

Available 280 staff

members. Camp self-built

Longyuan Village, Shazi Town, Shizhu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank

and drainage facility

established

Available

180 staff members.

Camp self-built

Tunnel more than 1000m in

length

Name Mileage Construction progress Remarks Wanshoushan

Tunnel DK199+480~DK212+954 Excavation of tunnel

completed: 539 m 4 spoil grounds are available for spoil disposal respectively

Shaziguan Tunnel

DK213+160~DK219+128 Excavation of tunnel completed: 210 m

2 spoil grounds are available for spoil disposal respectively

Exit to Shaziguan

Tunnel DK222+412~DK219+128 Excavation of tunnel

completed: 280 m Xiangshixi, Xinglong Village, Shazi Town

Xinwu Tunnel

DK222+459~DK223+253 Excavation of tunnel completed: 172 m

Malanba, Xinglong Village, Shazi Town

Entrance to Xiangjiaba

Tunnel

DK223+545~DK2226+800 Excavation of tunnel

completed: 100 m Shiping Group, Xinglong

Village, Shazi Town

Exit to Xiangjiaba

Tunnel

DK226+800~D1K233+370 Full-section timbering tunneling 220 m, and lining 12

m

Spoil ground of Taoyuan Village, Shazi Town, Shizhu

County Dazhaiping

Tunnel D1K230+163~D1K232+660 Construction not started Drawing not available now

Super-major and major

bridges

Name Mileage Construction progress Remarks Qingshiyan Major

Double-track Bridge DK199+026.83~DK199

+442.5 8 pile foundations poured /

Tuntianba Major Double-track Bridge

DK212+959.55~DK213+150.55 3 pile foundations poured /

Xiangjiaba Major Bridge DK223+253~DK223 +545 Construction not started Drawing not

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 27

available now

Xiaohekou Major Bridge D1K232+849~ D1K233+214

4 dig piles completed without pouring

/

Main borrow pits /spoil grounds

Location mileage Designed soil-borrowing and

spoiling quantity and measures

Progress Implementation

status Remarks

DK199+500

Total discarded waste slag of 52×104m3, occupying land of

55 mu and retaining wall available

3×104m3 Waiting for the

drawing of retaining wall

Spoil from Entrance to

Wanshoushan Tunnel

DK212+150

Total discarded waste slag of 60×104m3, occupying land of 129.2 mu and retaining wall

available

To be expropriated

Construction not started yet

Spoil from 1# Transverse Gallery of

Wanshoushan Tunnel

DK208+400

Total discarded waste slag of 50×104m3, occupying land of 56.5 mu and retaining wall and drainage ditch available

0×104m3 Waiting for the

drawing of retaining wall

Spoil from 2# Transverse Gallery of

Wanshoushan Tunnel

DK213+300

Total discarded waste slag of 26.3×104m3, occupying land of 45.8 mu and retaining wall

available

3.5×104m3 Waiting for the

drawing of retaining wall

Spoil from Exit to Wanshoushan

Tunnel

DK213+350DK212+940

Total discarded waste slag of 41.7×104m3, occupying land of 60 mu and retaining wall

available

To be expropriated

Construction not started yet

Spoil from Exit to Wanshoushan

Tunnel

DK213+900

Total discarded waste slag of 45×104m3, occupying land of 70 mu and retaining wall and

drainage ditch available

To be expropriated

Construction not started yet

Spoil from Entrance to Shaziguan

Tunnel

DK216+500

Total discarded waste slag of 42.5×104m3, occupying land of 80 mu and retaining wall and drainage ditch available

3.0×104m3 Waiting for the

drawing of retaining wall

Spoil from Inclined Shaft of

Shaziguan Tunnel

Spoil ground of Exit to Shaziguan Tunnel

Total discarded waste slag of 42.6×104m3, occupying land of 73.708 mu and retaining

wall available to be removed after completion

3.6×104m3 Retaining wall

under construction

Spoil ground of Shaziguan Exit

Spoil ground of Xinwu Tunnel

Total discarded waste slag of 11×104m3, occupying land of 26.095 mu and retaining wall available to be removed after

completion

2.2×104m3 Retaining wall

under construction

Spoil ground of Xiwu Tunnel

Slag yard of Exit to Xiangjiaba Tunnel

Total discarded waste slag of 44×104m3, occupying land of 77.791 mu and retaining wall available to be removed after

completion

3.1×104m3 Retaining wall

under construction

Spoil ground of Xiangjiaba Entrance

Spoil ground of Exit to Xiangjiaba Tunnel

Total discarded waste slag of 58.5×104m3, occupying land of 59.8 mu, reclamation of 21.8 mu, vegetation of 38.0

mu

Excavation of foundation

started at spoil ground

Retaining wall under

construction

Spoil from Exit to Xiangjiaba

Tunnel

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 28

Dazhaiping Tunnel

Total discarded waste slag of 44×104m3, of which

15×104m3 at Entrance shall be discarded at Taoziyuan spoil ground, and spoil ground for Exit not to be determined yet.

The spoil ground shall be restored after completion.

Spoil ground not put into use

yet /

Construction drawing

unavailable

Slag yard of 1# and 2# Taoziyuan Tunnel

Total discarded waste slag of 5×104m3, occupying land of 13 mu and shall be restored

after completion

Excavation of foundation

started at spoil ground

/

Noise-sensitive points

Name Mileage Design

measures Implementation

status Remarks

Remarks

Acceptance inspection of expropriation of land has been completed for all construction sites. It is required to strengthen cleaning and water sprinkling to reduce fugitive dust emission from construction roads. Water leaking from tunnel shall be discharged after three-stage sedimentation in sedimentation tank. Environmental protection measures like vegetation protection at spoil ground have been implemented well. Up to now, no cultural relics have been found during the construction.

On-site

investigation results of

monitoring

The on-site investigation results of monitoring are: Wanshoushan tunnel: the construction site appears tidy and orderly; construction roads are arranged neatly with distinct border; watering carts are provided; air compressor stored inside air compressor room; billboards of environmental protection are available; garbage bins have been set up at construction site; three-stage sedimentation tank for sewage from production is available; no protection and water interception and drainage facility is available at spoil ground, which is prone to cause water and soil loss. Construction camp of Wanshoushan tunnel: standardization construction of construction camp goes well; there is billboard of environmental control system; garbage bins and pools available for collection of garbage; and septic tank available for treatment of sewage.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 29

Table 5-6: Implementation Status of Environmental Protection for VI Bid Section

Construction unit: China Railway No. 5 Engineering Group Co., Ltd.

Supervision unit: Changsha Zhongda Supervision Company

Construction cam

ps

Location Garbage Treatment Measures Sewage Treatment Measures

Billboard of

Environmental

Protection

Remarks

Longyuan Village, Shazi Town, Shizhu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, and drainage facility

established Available

422 staff members.

Camp self-built

Tuanbazi, Tianhe Village, Lengshui Township, Shizhu

County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

144 staff members.

Camp self-built

Balong Village, Lengshui Township,

Shizhu County

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

161 staff members.

Camp self-built

Shiyu Village, Fengmu Township, Chongqing

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

240 staff members.

Camp self-built

Eighth Group, Baiyang Tang Village, Wangying

Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

260 staff members.

Camp self-built

Liaojiacao Village, Wangying Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

185 staff members.

Camp self-built

Qingjiangyuan Village, Wangying Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

420 staff members.

Camp self-built

Jiaoyitai Village, Wangying Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

150 staff members.

Camp self-built

Hujiaba Village, Wangying Town

Set up garbage bin for centralized collection and uniform disposal by

local environmental sanitation department

Sedimentation tank, septic tank and

drainage facility established

Available

120 staff members.

Camp self-built

Working crew from Xiushui Village, Wangying Town,

Lichuan City

Set up garbage bin for centralized collection and uniform disposal by

logistic personnel

Sedimentation tank, septic tank and

drainage facility established

Available 125 staff members. Camp rent

Working crew from Xiangshu Village, Wangying Town,

Lichuan City

Set up garbage bin for centralized collection and uniform disposal by

logistic personnel

Sedimentation tank, septic tank and

drainage facility established

Available 136 staff members. Camp rent

No. 3 working crew from Liangwu Township,

Lichuan City

Set up garbage bin for centralized collection and uniform disposal by

logistic personnel

Sedimentation tank, septic tank and

drainage facility established

Available 128 staff members. Camp rent

Tunnel more than 1000m in

length

Name Mileage Construction progress Remarks

Dutingshan Tunnel

DK236+211- DK244+100

Excavation of tunnel completed for Entrance 219.4 m, 39.9 m for 1# inclined shaft and

47.31 m for 2# inclined shaft.

Spoil ground of Dutingshan Tunnel Entrance, 1# and 2#

Inclined Shafts Dutingshan DK244+100- Excavation of tunnel completed at Exit 100.9 Spoil ground of Exit to

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 30

Tunnel DK245+950 m Dutingshan Tunnel

Liziba Tunnel DK246+040- DK248+249

Excavation of tunnel completed at Entrance 68.1 m

Excavation of tunnel completed at Exit 41.7 m

Spoil ground of Exit to Yujia Tunnel

Entrance to Yujia Tunnel

DK248+874- DK252+365

Excavation of tunnel completed at Entrance 105.3 m

Excavation of tunnel completed at Exit 88.3 m

Spoil ground of Entrance to Fubaoshan

Tunnel

Fubaoshan Tunnel

DK254+983- DK261+207

Excavation of tunnel completed at Entrance 167 m

Excavation of tunnel completed at Exit 87 m

Spoil ground of Exit to Fubaoshan Tunnel

Super-major and major

bridges

Name Mileage Construction progress Remarks Tongguping Major

Double-track Bridge D1K233+377.97- D1K233+610.50

40 pile foundations and 3 bearing platforms completed

/

Shaziguan 1# Major Double-track Bridge

D1K233+707.95- D1K233+910.95

48 pile foundations, 5 bearing platforms and 2 piers completed

/

Shaziguan 2# Super-major

Four-track Bridge

DK234+218.20- DK234+785.8 Construction not started

Drawing not available now

Longdong Super-major Bridge

DK252+745.96- DK253+526.73

54 bored piles and 2 bearing platforms completed

/

Tangjiayuanzi Major Bridge

DK254+540.65- DK254+867.3

14 bored piles and 1 bearing platform completed

/

Huodiping Super-major

Double-track Bridge

DK261+962.77- DK263+598.18

380 bored piles and 1 bearing platform completed

/

Cunjiayuanzi 1# Major Double-track

Bridge

DK264+383- DK265+042-

44 pile foundations and 2 bearing platforms completed

/

Cunjiayuanzi 2# Major Double-track

Bridge

DK264+801- DK265+247

62 pile foundations and 2 bearing platforms completed

/

Huangshangou Major Double-track Bridge

DK265+250- DK265+820 8 pile foundations completed /

Jiangjiadayuanzi Super-major

Double-track Bridge

DK265+827- DK266+145 43 pile foundations completed /

Lijiagou Major Double-track Bridge

DK266+617- DK267+302 Hole forming 200 m /

Daping Major Double-track Bridge

DK267+164 DK267+951 Hole forming 360 m /

Main borrow pits /spoil grounds

Location mileage Designed soil-borrowing and spoiling quantity and measures

Progress Implementation

status Remarks

Spoil ground of DK233+8001

Roadbed

Total discarded waste slag of 30×104m3, and restoring native

vegetation after completion 3.15×104m3

Construction not started

No construction drawing

Spoil ground of DK234+2002

Roadbed

Total discarded waste slag of 20×104m3, and restoring native

vegetation after completion 1.67×104m3

Construction not started

No construction drawing

Spoil ground of Entrance to

Dutingshan Tunnel DK236+100

Total discarded waste slag of 45×104m3, and restoring native

vegetation after completion 2.95×104m3

Temporary retaining wall

built

No construction drawing

Spoil ground of 1# Inclined Shaft of

Total discarded waste slag of 34×104m3, and restoring native

2.34×104m3 Construction not started

No construction drawing

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 31

Dutignshan Tunnel vegetation after completion Spoil ground of 2# Inclined Shaft of

Dutignshan Tunnel

Total discarded waste slag of 47×104m3, and restoring native

vegetation after completion 4.51×104m3

Construction not started

No construction drawing

Spoil ground of Exit to Dutignshan Tunnel

Total discarded waste slag of 40×104m3, with filling 8 m. Less farmland is occupied, building retaining wall and restoring native vegetation

after completion

3.5×104m3 Retaining wall

under construction

Spoil from Exit to Dutingshan

Tunnel and Entrance to

Liziba Tunnel

Spoil ground of Entrance to Yujia

Tunnel

Total discarded waste slag of 30×104m3, with filling 7 m. Less farmland is occupied, building retaining wall and restoring native vegetation

after completion

3.2×104m3 Retaining wall

under construction

Spoil from Entrance to

Yujia Tunnel and Exit to

Liziba Tunnel

Spoil ground of Exit to Yujia Tunnel

Total discarded waste slag of 25×104m3, with filling 8 m. Less farmland is occupied, building retaining wall and restoring native vegetation

after completion

3.0×104m3 Retaining wall

under construction

Spoil from Exit to Yujia Tunnel and Zhoujiawan

Tunnel

Spoil ground of Entrance to

Fubaoshan Tunnel

Total discarded waste slag of 35×104m3

2.65×104m3 Retaining wall

under construction

Spoil from Entrance to Fubaoshan

Tunnel

Spoil ground of Exit to Fubaoshan Tunnel

Total discarded waste slag of 26×104m3

1.7×104m3 Retaining wall

completed

Spoil from Exit to Fubaoshan

Tunnel

Spoil ground of Inclined Shaft of

Fubaoshan Tunnel

Total discarded waste slag of 19.8×104m3

0.32×104m3 Retaining wall

under construction

Spoil from Inclined Shaft of Fubaoshan

Tunnel

Spoil ground of Yaojia Tunnel

Total discarded waste slag of 12.6×104m3

0.18×104m3 Retaining wall

under construction

Spoil from Exit to Yaojia Tunnel

Exit to Yejiangou Tunnel

DK264+280

Total discarded waste slag of 2.5×104m3, occupying land of 10 mu with filling 8 m. Less forestland and farmland is

occupied, and restoring native vegetation after completion

0.3×104m3 Retaining wall

under construction

Spoil from Entrance to Yejiangou Tunnel and

Major Bridge

DK272+850 Spoil Ground

Total discarded waste slag of 12×104m3, occupying dry land of 8.3 mu. Building retaining

wall and restoring native vegetation after completion

7.5×104m3

Retaining wall under

construction and drainage

ditch completed

Spoil from clearing roadbed

DK270+400 Spoil Ground

Total discarded waste slag of 8×104m3, occupying dry land of 12 mu. Building retaining

wall and restoring native vegetation after completion

1.9×104m3

Retaining wall under

construction and drainage

ditch completed

Spoil from Pengjiapo

Tunnel

Noise-sensitive points

Name Mileage Design

measures Implementation

status Remarks

Remarks 1. Fugitive dust from construction site and roads has been resolved by sprinkling water at construction site

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 32

and if more dust at construction site, conduct the sealing treatment (e.g. Mixing station) with more-frequently watering to keep ground surface wet. Another way to reduce dust adopted is the hardening treatment of site roads and construction site.

2. Leaking water of tunnels shall be flowed into sedimentation tank and then discharged up to the standard. 3. Spoil of tunnel shall be discarded at spoil grounds along which retaining walls are being constructed. 4. No cultural relics have so far been found at the whole zone of piping construction. 5. Color-bar cloth shall be used to cover materials entering the site or placed in storehouse.

On-site investigation results of monitoring

The on-site investigation results of monitoring are: Dutingshan tunnel: the construction site appears tidy and orderly; construction roads are arranged neatly with distinct border; watering carts are provided; air compressor stored inside air compressor room; billboards of environmental protection are available; garbage bins have been set up at construction site; three-stage sedimentation tank for sewage from production with billboards is available; temporary retaining wall is being built at spoil ground. Living areas and offices of 1# Inclined Shaft Team of Dutingshan Tunnel: standardization construction of construction camp goes well; there is billboard of environmental control system; carrying out greening; garbage bins and pools available for categorized collection of garbage; and septic tank available for treatment of sewage.

5.2 Results and Analysis (1) Internal management Each construction unit has established the internal management system in accordance with the requirements, set up the organizational structure and measures for environmental protection, arranged the full-time/part-time environmental protection management personnel and defined the duties and responsibilities of each department. (2) Construction of tunnel Of the construction of tunnel, the main issues are the disposal of dreg from the tunnel and the protection of construction platform. (3) Construction of bridge Most of the bridges have not started their construction and are still in preparation stage. Each unit has arranged the slurry sedimentation tank for the bored piles. (4) Protection of construction pavements The construction pavements set up by each construction unit are normal and are maintained by specially-assigned people. Water spraying vehicles are equipped by the construction units to prevent the dust pollution. (5) Construction camp site Garbage bins and tanks are arranged for each construction camp site. The domestic garbage is collected and sent to the local environment sanitation administrative department for treatment. The railway line is situated in the mountainous regions with many bridge-tunnel connection sections. Pay attention to the protection of side slope at construction camp sites and the construction sites. (6) Bulletin board All construction units have set up Bulletin boards at the construction camp sites and the construction sites, but they limit themselves to the propaganda of measures for environmental protection and administrative system of environmental protection and have not arranged the signs that can let the public around know about the person in charge of the environment protection for this construction section and the telephone number for complaint of environmental protection.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 33

6. Popularization-worthy Measures as well as Problems and Suggestions

6.1 Popularization-worthy Measures (1) The setup of roads and construction sites is standard and the boundary is clear for Paihuadong

Tunnel and Liangchanghe Mixing Station under China Railway 12th Bureau Group Co., Ltd.. (2) Side slope had been protected by hydroseeding at the construction site of Huangcaoshan

Tunnel under China Railway 11th Bureau Group Co., Ltd., combining slope setup with planting.

(3) The setup of the construction site of Jianfengding Tunnel under China Zhongtie Major Bridge Engineering Group Co., Ltd. is standard, harmonizing with natural landscape; Retaining wall was under construction for Caijiagou Super-major Bridge to prevent water and soil loss effectively.

(4) Categorized collection of garbage is adopted by China Railway Tunnel Group Co., Ltd. for the construction site of Fangdoushan tunnel.

(5) The setup of the construction site of Wanshoushan Tunnel under China Railway 18th Bureau Group Co., Ltd. is standard, and posters of environmental protection are put up at the construction camp.

(6) Retaining wall and water interception and drainage facility were under construction for spoil ground of Dutingshan Tunnel under China Railway No. 5 Engineering Group Co., Ltd., and slope was protected by combing the slope setup with planting; large coverage area of forestation is available.

6.2 Existing Problems and Improvement suggestions (1) Each unit has not defined the person in charge of the environmental protection and the

supervision telephone number on the billboards on the construction site. It is suggested that they should be publicized on billboards as soon as possible so that the public can make supervisions.

(2) It is found during this on-site inspection that no retaining walls or water interception and drainage facilities have been arranged for the spoil of each tunnel. Each unit is required to make retaining walls before the disposal of spoil from each tunnel and enhance the retaining walls and water interception and drainage facilities of spoil grounds.

(3) It is suggested that oil tanks out of use be removed from the construction sites; harden the ground surface on which oil tanks are placed and set cofferdam and devices for collecting used oil; oil tanks be placed together on the hardened surface with cofferdam, and oil groove provided for temporary use of oil tanks; shelters are available for these places so as to prevent pollution caused by loss of used oil in the rain.

(4) Chongqing-Lichuan Railway Construction Co., Ltd. is suggested to require the construction units to setup billboards of environmental protection at the construction boundary prior to the construction at key ecological environmental protection zones including water resource protection zones, natural preservation zones and scenic spots, with the purpose to remind the construction staff of entering the environment-sensitive regions, and put forward precautions on environmental protection.

(5) It is suggested that Chongqing-Lichuan Railway Construction Co., Ltd. push forward the supervision units and construction units for the project to carry out the self-checks of side slope protection for the spoils of tunnel, construction sites and camps so as to reduce water and soil loss.

(6) In accordance with the requirements from Ministry of Environmental Protection, it is suggested that Chongqing-Lichuan Railway Construction Co., Ltd. request the supervision units of this project to report the environmental protection supervision work periodically and submit the summary report of environmental protection supervision after completion of this project.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 34

Photo 1: Training on environmental monitoring Photo 3: Construction site of Paihuadong tunnel under China Railway 12th Bureau Group Co., Ltd. Photo 5: Guarantee system diagram of environmental protection and water & soil reservation by China Railway 12th Bureau Group Co., Ltd

Photo 2: Construction roads for Paihuadong tunnel under China Railway 12th Bureau Group Co., Ltd. Photo 4: Slope of construction site of Paihuadong tunnel under China Railway 12th Bureau Group Co., Ltd. (absence of protection) Photo 6: Construction site of mixing station under China Railway 12th Bureau Group Co., Ltd

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 35

Photo 7: Watering cart of China Railway 11th Bureau Group Co., Ltd Photo 9: Construction site of mixing station at Changshou North under China Railway 11th Bureau Group Co., Ltd.(messy)

Photo 11: Spoil from Huangcaoshan tunnel under China Railway 11th Bureau Group Co., Ltd. (absence of protection)

Photo 8: Sedimentation tank for sewage from mixing station at Changshou North under China Railway 11th Bureau Group Co., Ltd.(messy) Photo 10: Construction site of Huangcaoshan tunnel under China Railway 11th Bureau Group Co., Ltd Photo 12: Garbage tanks at the construction site of Huangcaoshan tunnel under China Railway 11th Bureau Group Co., Ltd.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 36

Photo 13: Protection measures on oil penetration from air compressor at the construction site of China Railway 11th Bureau Group Co., Ltd

Photo 15: Construction of 9# pier foundation of Hanjiatuo major bridge under China Zhongtie Major Bridge Engineering Group Co., Ltd. Photo 17: Construction site of Jianfengding tunnel under China Zhongtie Major Bridge Engineering Group Co., Ltd

Photo 14: Sedimentation tank for slurry from drilling pile construction under China Railway 11th Bureau Group Co., Ltd Photo 16: Spoil protection for 22# pier of Caijiagou Super-major bridge under China Zhongtie Major Bridge Engineering Group Co., Ltd Photo 18: Sedimentation tank for sewage from Shijiapo tunnel under China Zhongtie Major Bridge Engineering Group Co., Ltd

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 37

Photo 19: Garbage tanks at the construction site of Jianfengding tunnel under China Zhongtie Major Bridge Engineering Group Co., Ltd. Photo 21: Spoil from Fangdoushan tunnel under China Railway Tunnel Group Co., Ltd. (absence of protection) Photo 23: Sedimentation tank for sewage from Fangdoushan tunnel under China Railway Tunnel Group Co., Ltd.

Photo 20: Construction roads for Shijiapo tunnel under China Zhongtie Major Bridge Engineering Group Co., Ltd. Photo 22: Temporary protection for spoil from Fangdoushan tunnel under China Railway Tunnel Group Co., Ltd Photo 24: Construction roads of China Railway Tunnel Group Co., Ltd.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 38

Photo 25: Billboard for environmental protection of China Railway Tunnel Group Co., Ltd Photo 27: Construction site of Wanshoushan tunnel under China Railway 18th Bureau Group Co., Ltd Photo 29: Sedimentation tank for sewage from Wanshoushan tunnel under China Railway 18th Bureau Group Co., Ltd

Photo 26: Sedimentation tank for sewage from Guanyinyan tunnel under China Railway Tunnel Group Co., Ltd. Photo 28: Garbage tanks at the construction site of China Railway 18th Bureau Group Co., Ltd. Photo 30: Billboard for environmental protection of China Railway 18th Bureau Group Co., Ltd.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 39

Photo 31: Side slope protection along the entrance to 1# transverse gallery of Wanshoushan under China Railway 18th Bureau Group Co., Ltd Photo 33: Living quarter at the construction camp of China Railway 18th Bureau Group Co., Ltd. Photo 35: Billboard for environmental initiatives of pollution prevention and discharge control by China Railway No. 5 Engineering Group Co., Ltd

Photo 32: Office at the construction camp of China Railway 18th Bureau Group Co., Ltd Photo 34: Billboard for environmental control system of China Railway No. 5 Engineering Group Co., Ltd. Photo 36: Afforestation of construction camp of China Railway No. 5 Engineering Group Co., Ltd.

Environmental Monitoring Report on the New Chongqing-Lichuan Railway Development Project (2009.8)

Beijing OASIS Environmental Protection Technology Co., Ltd. 40

Photo 37: Sedimentation tank for sewage from Dutingshan tunnel under China Railway No. 5 Engineering Group Co., Ltd. Photo 39: Spoil ground for Dutingshan tunnel under China Railway No. 5 Engineering Group Co., Ltd. (retaining wall under construction) Photo 41 Construction camp of China Railway 12th Bureau Group Co., Ltd

Photo 38: Side slope protection at the construction site of Dutingshan tunnel under China Railway No. 5 Engineering Group Co., Ltd. Photo 40: Categorized collection of garbage at the construction camp of China Railway No. 5 Engineering Group Co., Ltd Photo 42 Water sprinkling at the construction site of China Railway 12th Bureau Group Co., Ltd.