i Environmental Management Plan Flood Protection Project in Bosnia and Herzegovina Sub-project Foca-Ustikolina (Kosovska) January, 2014 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized

Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

i

Environmental Management Plan

Flood Protection Project in Bosnia and Herzegovina Sub-project Foca-Ustikolina (Kosovska)

January, 2014

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

Pub

lic D

iscl

osur

e A

utho

rized

wb371432
Typewritten Text
E4430 V3
wb371432
Typewritten Text
wb371432
Typewritten Text
Page 2: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

i

CONTROL SHEET

Client: Federal Ministry of Agriculture, Water Management and Forestry

RS Ministry of Agriculture, Forestry and Water Management

Project: Development of the Environmental Impact Assessment Study and Environmental Management Plan (EMP) (for the purpose of Flood Protection Project)

Title: Environmental Management Plan (EMP) – Sub-project Foča-Ustikolina (Kosovska)

Status: Final draft report

Accounting Code: D-1151

Registry No.: TO-10-106/14

Other Documents Related to the Contract:

Registry No.: Title:

TO-10-107/14 Environmental Assessment (EA) report

TO-10-106/14-1 Environmental Management Plan (EMP) – Sub-project Pale-Prača

TO-10-106/14-2 Environmental Management Plan (EMP) – Sub-project Pale-Prača (Hrenovica)

TO-10-106/14-3 Environmental Management Plan (EMP) – Sub-project Foča-Ustikolina

TO-10-106/14-4 Environmental Management Plan (EMP) – Sub-project Goražde

Project manager: Internal control: Director:

Name and surname, title

Dr Sanda Midžić Kurtagić,

B.Sc.C.E.

Dr Irem Silajdžić,

B.Sc.Envtl.Eng.

Prof. dr Tarik Kupusović, B.Sc.C.E.

DATE SIGNATURE SIGNATURE SIGNATURE

January 20, 2014

Page 3: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

ii

GENERAL DATA

Consultant: Hydro-Engineering Institute of Civil Engineering Faculty Sarajevo

Stjepana Tomića 1 71000 Sarajevo tel: + 387 33 212 466/7 fax: + 387 33 207 949 E-mail: [email protected] Web: http://www.heis.com.ba

Project team: Ph.D Sanda Midžić Kurtagić, B.Sc.C.E. Ph.D Admir Ćerić B.Sc.C.E. Ph.D Irem Silajdžić, B.Sc.Envt.E. Muhamed Vajnaga, B.Sc.Geodezy. Admir Alađuz, B.Sc Biology Maja Kurtagić, MA Selma Osmanagić Klico, B.Sc. Law.

Page 4: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

iii

ABBREVIATIONS AND ACRONYMS

BiH – Bosnia and Herzegovina EMF – Environmental Management Framework EMP – Environmental Management Plan EU – European Union FBiH – Federation of Bosnia and Herzegovina OP – Operational policy WB – World Bank PIU – Project Implementation Unit

Page 5: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

iv

EXECUTIVE SUMMARY

In the Municipality of Foca-Ustikolina, the 1-in-100 floodings have endangered 1505 m2 of residential area and 239 m2 of area of public facilities. Agricultural, commercial and religious interests have not been threatened by floods so far. In general, all negative impacts in the phase of construction are temporary and can be mitigated by applying good construction practices. The adopted technical solution was evaluated unfavourable from the environmental point of view, and therefore it is recommended to development a new design solution based on the use of environmentally sound techniques, that is, gabions and reno mattresses, with the application of native vegetation upon completion of construction works. The construction of flood protection structures is based on the river bank regulation; it is about preventing the flooding of relatively small areas of urban zones, and at relatively shallow depths. Thus, the volume of the retained water that could possibly influence the natural wave retardation in the river is negligible, compared to the volume of water wave, therefore the downstream impact on other users is negligible. To accurately determine the aforementioned impact, it is necessary to conduct hydraulic modelling. Participants of the public consultation process agreed on the need to develop an updated design solution. There were no objections to the content of the EMP. No special training will be needed for purposes of the implementation of this Plan. The Supervisory body exercising the monitoring of this Plan should possess the appropriate professional qualifications: B.Sc. in Civil Engineering and at least 5 years of experience in performing the duty of Supervisory body. Water Management Inspector shall perform supervision in the operational phase, in accordance with the powers invested in him. Special training and provision of equipment will not be needed. For functional use of the flood control system and effective flood protection, the purchase of equipment necessary for the cantonal and operational centres of civil protection is required, as well as the purchase of means for communication, detection and warning that should be available to all flood protection participants

Page 6: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

v

TABLE OF CONTENTS

1 BACKGROUND 1

1.1 INTRODUCTION 1 1.2 HISTORICAL FLOOD EXPERIENCE 2 1.3 EXISTING FLOOD PROTECTION SYSTEM 3 1.4 BASIC PROJECT INFORMATION 3 1.5 LOCATION CHARACTERISTICS 4

2 POTENTIAL ENVIRONMENTAL IMPACTS 5

2.1 POTENTIAL ENVIRONMENTAL IMPACTS ASSOCIATED WITH FLOODING AND FLOOD

PROTECTION SYSTEMS 5 2.2 POTENTIAL IMPACTS OF THE PROJECT 6

3 ENVIRONMENTAL MANAGEMENT PLAN 7

3.1 RESPONSIBILITIES AND MITIGATION MEASURES PLAN 7 3.2 ENVIRONMENTAL MONITORING PLAN 11

4 CAPACITY DEVELOPMENT AND TRAINING NEEDS 16

5 ALTERNATIVES 19

6 PUBLIC DISCLOSURE AND PUBLIC CONSULTATION PROCESS 19

Page 7: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

vi

LIST OF TABLES Table 1 Technical characteristics of the sub-project ......................................................................................... 3

Table 2 Project impacts by phases ............................................................................................................................ 6

Table 3 Responsibilities and Mitigation Measures Plan ................................................................................... 7

Table 4 Environmental Monitoring Plan in the construction and operational phase ....................... 12

Table 5 General requirements - Checklist ........................................................................................................... 13

Table 6 Construction Site Organization - Checklist ......................................................................................... 14

Table 7 Organization of Construction Site after Completion of Works - Checklist ............................ 16

Table 8 Material and technical resources needed for flood protection of the Foča Ustikolina

Municipality ..................................................................................................................................................................... 17

Table 9 Specification of equipment for Cantonal and Municipal operating centres and flood

protection managers ................................................................................................................................................... 18

LIST OF FIGURES

Figure 1 Flooded area in Foča-Ustikolina and Foča Ustikolina(Kosovska) .............................................. 3

Figure 2 Flood area in Foča-Ustikolina and the position of the designed river training and

embankments ..................................................................................................................................................................... 4

Page 8: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

1

1 BACKGROUND

1.1 INTRODUCTION

Different forms of flooding present different forms and degrees of danger to people, property and the environment, due to varying depth, velocity, duration, rate of onset and other hazards associated with flooding. Assets at risk from flooding can include housing, transport and public service infrastructure, commercial and industrial enterprises, agricultural land and the environmental and cultural heritage. In short, negative impacts of flooding can be summarised as: Impacts on people: Flood can cause physical injury, illness and loss of life. The risks

increase if the floodwater is carrying debris. Floodwater contaminated by sewage or other pollutants (e.g. chemicals stored in garages or commercial properties) is particularly likely to cause illnesses, either directly as a result of contact with the polluted floodwater or indirectly as a result of sediments left behind. The impact on people and communities as a result of the stress and trauma of being flooded, or even of being under the threat of flooding, can be immense.

Impacts on property: Floodwater is likely to cause structural damage. The damage flooding can cause to businesses and infrastructure, such as transport or utilities like electricity and water supply, can have significant detrimental impacts on local and regional economies.

Impacts on the environment: Significant detrimental environmental effects of flooding can include soil erosion, bank erosion, land sliding and damage to vegetation as well as the impacts on water quality, habitats and flora and fauna caused by bacteria and other pollutants carried by flood water. Flooding can however play a beneficial role in wetland habitats which are dependent on annual flooding.

The management of floods aims to reduce the above-mentioned potential risks by using a variety of techniques. Any flood management structure unquestionably has a positive impact on people, property and the environment. However, various structural measures which include different types of works and interventions for flood control might also have negative impacts on natural hydrological and consequently ecological processes in the river ecosystem. The World Bank is providing assistance to the Government of Bosnia and Herzegovina for the Drina Flood Protection Project (DFP). The objective of the project would be to provide protection against 1-in-100 flooding to agricultural, residential and commercial interests in the Federation of Bosnia and Herzegovina, in the municipalities of Gorazde (2 locations), Foca-Ustikolina (2 locatons), Pale-Praca (2 locations). This objective would be achieved through (a) construction, rehabilitation and modernization of the flood protection infrastructure, (b) institutional development through strengthening the flood forecasting and early-warning facilities. Majority of project funds will be used for targeted investments in rehabilitation, modernization and improvement of existing flood protection systems in a phased approach. For the investments that will become identified during Project implementation, all of the environmental assessment requirements both of Bosnia and Herzegovina and the World Bank will apply.

Page 9: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

2

1.2 HISTORICAL FLOOD EXPERIENCE

Drina shows a typical nival-pluvial runoff regime (“snow-rain-regime”), comprising a primary maximum in April and a secondary maximum in December. As the main part of the river basin is of mountainous character (the upper part even of high-mountainous character), the headwaters of Drina are abundant with water due to snowmelt and high precipitation. Before the construction of several dam reservoirs, Drina was known for extreme floodwaters. The most famous occurred on 27 March 1896, when the combination of heavy rainfall and snowmelt resulted in a flow of approx. 9500 m³/s in the middle course of Drina (for comparison: mean water of Danube in Belgrade: 5600 m³/s), which led to the destruction of several settlements. Among others, the town of Ljubovija was destroyed. The famous Mehmed Pasa Sokolovic Bridge in Visegrad was fully submerged. The maximal discharge for the Visegrad profile (A=13.934 km2) in the year 1896 was nearly two-times higher than the average discharge on the Danube river profile in Belgrade (A=525.000 km2) and more than six-times higher than the discharge on the Sava River profile with an area of A=88.000 km2. 1 In begin of December 2010, in Drina, Lim and further tributaries occurred the highest flood since more than hundred years. Numerous settlements, including Foca, Goražde, Višegrad, Bratunac, Zvornik and parts of Bijeljina, were flooded to a big extent. At the end of November to the beginning of December 2010, heavy rains (in three days from 100 to 200 mm) on the territory of Montenegro and Bosnia & Herzegovina simultaneously caused a high rise in the water level over the whole Drina River Basin. On the tributaries of the Drina (the Piva, the Cehotina, the Lim and the Jadar) as well as on the Drina itself, the flood wave lasted from the end of November until the end of the first decade of December 2010. The flood wave was of great scale, partly because the accumulations on the Drina Basin could not accept the immense quantity of water; hence, the water surged out during the time of wave peak, but not before it. Conditional warning levels were exceeded on all the rivers of the basin and at the hydrological station Radalj on the Drina (in Serbia), the water level of 659 cm, recorded on 3 December 2010, represented the absolute historical maximum. The high level wave in the Drina Basin caused floods on the territories of Montenegro, Bosnia and Herzegovina and Serbia with consequential significant material damage.2 In the Municipality of Foca-Ustikolina, the 1-in-100 floodings have endangered 1505 m2 of residential area and 239 m2 of area of public facilities. Agricultural, commercial and religious interests have not been threatened by floods so far.

1 Source: “FLOOD ON THE DRINA RIVER IN THE YEAR 1896 - POINTS FOR THE CHANGE OF THE EUROPEAN FLOOD HISTORY”; Zoran M Radic 2011-11-29; (Project No. III-433007). 2 Source: „CASE STUDY 1: FLOODS IN THE DRINA RIVER BASIN (NOVEMBER – DECEMBER 2010)” REPUBLIC OF SERBIA Republic Hydrometeorological Service and Ministry of Interior Sector for Emergency Management“ presented at Regional Meeting for Strengthening Regional Cooperation in Meteorology, Hydrology and Climate Services for Disaster Risk Management, Sarajevo, 28 – 29 March 2011.

Page 10: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

3

Figure 1 Flooded area in Foča-Ustikolina and Foča Ustikolina(Kosovska)

1.3 EXISTING FLOOD PROTECTION SYSTEM

There are no flood control structures built on the Kosovska River.

1.4 BASIC PROJECT INFORMATION

Table 1 Technical characteristics of the sub-project

Municipality Foča-Ustikolina (Kosovska)

Project title River Training of river Kosovska – Detailed design Planned flood control structures Dike made of rock in concrete (215.5 m length, average

height 1,95 m) with concrete channel lining Parapet wall (25 m in length, 20 cm width, average height 70 cm) Concrete sills in the river bed (5 sills, one each 50 m)

Impacts on retention and groundwater regime

Minor

Protection effect / level 1/100

Accuracy of flood data Average

Design state Detailed design (review, adaptation needed)

Permits obtained / required All respective permits still required Border problems (state/entity) None

Page 11: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

4

Figure 2 Flood area in Foča-Ustikolina and the position of the designed river training and embankments

1.5 LOCATION CHARACTERISTICS

Flora Kosovska River flows through urban part of settlement Ustikolina. In the end of this settlement it flows into the Drina River. In coast area dominant vegetation in past was vegetation of oak and Turkey oak (Quercetum conferatae-cerris) and vegetation of alder and willows (Populetalia albae) which was developed in coastline part of this river. Fragments of this vegetation still exist. Area along the mouth of Kosovska River is highly urbanized and Kosovska River today is a part of Ustikolina settlement. River is under influence of different anthropogenic pressure. Dominant plant communities in mouth of this river are nithrophillous plant communities (Chenopodietea). Fauna Kosovska River is inhabited by different groups of insects like Ephemeroptera i Trichoptera In this river can be found some fish species like: barbel (Barbus barbus (Linnaeus, 1758)), common nase (Chondostoma nasus (Linnaeus, 1758)), chub (Squalius cephalus (Linnaeus, 1758)) and common roach (Rutilus rutilus (Linnaeus, 1758)). Vicinity of urbanized settlement does not attracts many animal species so this place is only inhabited by animal species that can survive in constant presence of humans like: forest mouse (Apodemus silvaticus (Linnaeus, 1758)), red squirrel (Sciurus vulgaris Linnaeus, 1758), black rat (Rattus rattus (Linnaeus, 1758)) and mole (Talpa europaea Linnaeus, 1758). Bigger animals, because of constant human activity do not inhabit mouth of Kosovska River.

Page 12: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

5

Cultural and historical heritage There isn't any cultural and historical heritage registered in the works zone.

2 POTENTIAL ENVIRONMENTAL IMPACTS

2.1 POTENTIAL ENVIRONMENTAL IMPACTS ASSOCIATED WITH FLOODING AND FLOOD PROTECTION SYSTEMS

Flood control measures on the Drina River and its tributaries include the enhancement of the river corridor by constructing embankments, concrete sills, parapet walls, earth dikes and cutting meanders. Detailed design of the Kosovska river training foresees a flood control system based on the construction of a dike made of rock in concrete with concrete channel lining, river bed in concrete with concrete sills in the river bed, parapet wall, etc. The existing design solution does not respect the natural characteristics of the watercourse. Whenever possible, design solutions should be based on techniques with low impact on the environmental aspects of river habitat and landscape. Therefore, whenever possible, the use of plant species (bioengineering methods) and natural material covers should be basic. Such solutions mitigate the consequences of engineering interventions in the living world, and help to maintain the natural corridors. The envisaged design solution significantly changes the natural characteristics, which may have adverse impacts on the river ecosystem. Considering the nature of the proposed project, it is anticipated that adverse environmental impacts can be expected in the construction phase mainly. It is to be noted that parts of the construction work are taking place in an urban environment, however in all parts in an environment already strongly influenced by human activities. Broadly, the impacts in the construction phase can be of the following types:

Soil Erosion and Dust Emissions: possible occurrence of soil compaction and dust emissions in the area of construction works due to movement of construction machinery and earthworks.

Noise Levels: the operation of equipment on construction sites such as excavators, diggers, bulldozers, dumper trucks, rollers, stone crushers and controlled rock blasting may result in noise generated well above the ambient noise levels.

Soil and Water Pollution: during construction activities, when using machinery, there is a possibility of soil contamination due to accidental spills of oils and fuel from construction machinery. In the area of construction works, construction waste is generated which, if not properly disposed of, may result in adverse impacts. The construction works carried out inside the river bed results in a temporary blur of the watercourse.

Flora and fauna: construction works in the river bed along with the temporary blurring of the watercourse threaten freshwater habitats. Impacts on other habitats are not expected.

Cultural and historical heritage: if there are any cultural and historical findings within the construction zone, they may be threatened by the construction works.

Water regime: Structures on the riverbed cause changes in the water regime by increasing permeable capacity. They reduce the riverbed retention capabilities (increase

Page 13: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

6

in maximum flow, reduction in the duration of the water waves, reduction in the minimum flow downstream of the intake). The change of the water regime is only a result of riverbed training and may adversely affect flooding downstream of the intake.

2.2 POTENTIAL IMPACTS OF THE PROJECT

In general, all negative impacts in the phase of construction are temporary and can be mitigated applying good construction practices. The envisaged design solution significantly changes the natural characteristics, which may have adverse impacts on the river ecosystem. It requires changes in terms of replacing concrete lining with stone rip rap, and regulation of riverbed by applying bioengineering techniques instead of concrete. With the application of the proposed changes in the design solution, no significant adverse impacts on the natural environment are expected in the operational phase. Table 2 Project impacts by phases

Phase Type of impact

Construction phase Soil compaction and erosion Dust emission Noise Soil and water pollution Impact on aquatic ecosystem

Operational phase Flood protection of the endangered area. Concrete lining of the river bed might have negative impact on the river habitat. The section of the river where flood control structures are to be built is located on the outskirts of the urban area. No significant impact on the natural surroundings in the area along the river.

Degree of negative impact Minimum if mitigation measures are applied

Construction of flood protection structures is based on the river bank regulation; it is about preventing the flooding of relatively small areas of urban zones, and at relatively shallow depths. Thus, the volume of the retained water that could possibly influence the natural wave retardation in the river is negligible, compared to the volume of water wave, therefore the downstream impact on other users is negligible. To accurately determine the aforementioned impact, it is necessary to conduct hydraulic modelling.

Page 14: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

7

3 ENVIRONMENTAL MANAGEMENT PLAN

3.1 RESPONSIBILITIES AND MITIGATION MEASURES PLAN

Although the ultimate responsibility for the implementation of EMP remains on the level of project unit, to which the World Bank requirements in terms of environmental protection will be conveyed, tender and contract documents will be used in order to transfer the aforementioned responsibility from the implementation unit to the contractor. As part of the implementation unit, the task of monitoring the implementation of this document will be assigned to one of the existing functions. It is preferable to choose a supervisory body which will be familiar with the environmental protection measures and environmentally sound practices in terms of construction, which will hold a short training for the employees of the contractor prior to the commencement of works, intended for better implementation of the EMP requirements. Table 3 Responsibilities and Mitigation Measures Plan

Mitigation measures Responsibilities Costs

Amend the existing design solution: instead of river training based on the concrete channel, perform river training based on the application of biotechnical measures (gabions and wooden anti-erosive sills)

Specified by the Municipality of Foča Ustikolina within Terms of Reference

100.000

Saving of the riparian vegetation (rhizomes, root stock, whole grove), proper storage and integration in new embankment structures, as far as possible. Restoration of riparian vegetation destroyed during construction.

Specified by the Municipality of Foča Ustikolina within Terms of Reference

No additional costs, the latter are included in the cost of the development of new project documentation

Apply good construction practices

Contractor No additional costs

Avoid construction in the spawning season (February-May) and during minimum flows. Preferably carry out construction works in the period September-February.

Contractor No additional costs

Control the quality of drinking water

Cantonal Institute for Public Health

Within regular monitoring

Conduct hydraulic modeling of river Drina

Agency for the Sava River Basin

150.000

Page 15: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

8

Environmental Management Plan (EMP), as well as good construction practices enclosed within this document, shall make an integral part of the tender documentation and contract with the Contractor and Supervisory body. This will ensure the Contractor's responsibility for the implementation of specific measures, whilst the Supervisory body is to determine whether the contractor has implemented the aforementioned measures. Good construction practices requirements to be included in the Construction Works Contract are as follows: General requirements

Contractors are obliged to apply good environmental construction practice during all construction activities, and to reduce the damage caused to vegetation, soil, groundwater, surface water, landscape, as well as disturbance of settlements and local communications to the lowest possible extent.

Application of environmental protection and mitigation measures, as well as monitoring, will be implemented in parallel with the construction activities. They start at the time when workers, equipment and/or material are mobilized to the construction site, and end with the completion of construction works when all workers, equipment and/or material leave the construction site and upon completion of the environmental reinstatement activities.

The contractor is obliged to appoint a Health, Safety and Environment Coordinator, responsible for the compliance with the laws and objectives of the environmental protection, occupational safety and fire protection.

The Contractor needs to ensure order, discipline and professional responsibility of all employees on the construction sites. Work and residence must be restricted exclusively to the construction works zone and damage to private property, land and crops must be avoided. The Contractor shall provide regular contact with the local population representatives (local community council) to enable information exchange or find solutions to possible disputes (originating from violation of ownership rights, damage caused during construction works, etc.).

Supply and Transport of Materials

When purchasing materials for the construction, the Contractor shall select the manufacturer/supplier who performs in compliance with the valid environmental permit, if required pursuant to the Law on Environmental Protection of the Federation of B&H, or other environmental standards recognized in Bosnia and Herzegovina/or EU.

Aiming at prevention of dust emissions, the Contractor shall transport construction material in trucks provided with tarpaulin covers. Transport of stone and gravel shall be carried out in moist condition. Driving speed shall not exceed 30 km/h. The Contractor shall avoid unnecessary driving of vehicles.

Construction Site Organization

Construction should start (if possible) at the time of the year when dry soil advantages can be utilized, i.e. when compacting and degradation throughout the works are minimum.

Adequate machines and/or protection plates shall be used to prevent compaction during soil removal, for example with rails or low pressure pneumatics on locations

Page 16: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

9

implying compaction possibility. Adequate procedures for separate removal, handling, storage and replacement of humus and subsoil shall be applied.

The contractor shall establish temporary disposal sites for construction materials, provide space for rinsing of concrete pumps and mixers, as well as space for washing of vehicle tires with adequate cleaning agent. Temporary disposal sites for excavation material (topsoil) shall be reduced to maximum 2 m of height, in order to prevent compaction caused by the soil weight, and the storage time is to be reduced to minimum.

The Contractor shall ensure that all construction equipment has been licensed and approved in accordance with local regulations, and if possible, certified in compliance with the EU standards.

The Contractor shall use modern machines and vehicles that meet environmental standards in terms of emission of harmful gases (complete combustion).

The Contractor shall use modern machines and vehicles producing noise (engines, exhaust system). This mainly entails the supply of new machines or measures for installation of additional sound insulation, as well as constant maintenance. In addition, it is recommended that the machines operate only in the period from 7 a.m. – 5 p.m. in all sections of the route distanced less than 60 m from the nearest residential facility.

The Contractor shall use biodegradable lubricants and gear oils. Maintenance, filling and cleaning of machines must be carried out off the site and outside the area applying surface water.

The Contractor shall specify and follow control measures for the dust generated throughout equipment handling and/or rehabilitation works. The Contractor must submit the plan proposing material transport roads, and shall also provide statements on the proposed dust control method in places where transport through the settlements is unavoidable.

Develop construction site organization design with appropriate solutions for drainage and treatment of sanitary wastewater, as well as storm water, from the construction site zone. Use appropriate sewage systems to discharge wastewater from the site, and if necessary, collect it in waterproof tanks and treat it pursuant to the prescribed method (whether on-site, or at a remote location) prior to the discharge into the recipient or the urban sewage system.

The Contractor shall ensure that machines and vehicles parking lots as well as labor accommodation containers are not located inside the forest areas, and do not impact watercourses or affect endangered flora and fauna.

The Contractor shall ensure protection of areas sensitive to erosion by means of stabilization agents (temporary banks, fences, ditches) and replanting upon the completion of construction works.

Execution of Construction Works

During earthworks, humus layer shall be deposited in piles not exceeding 2 m in height and protected from pollution to maintain its fertility.

In order to reduce adverse impacts on the river and river banks to the minimum, construction activities located in or near surface water bodies, shall be carried out during low water season, or most often in the period from July to September. It is recommended to take this into account during the preparation of the activity timetable.

All manipulations with oil and its derivatives in the process of construction and supply of machinery shall be performed with maximum protection measures to avoid spillages. All packaging for oil and other oil derivatives must be collected and transported to the controlled Contractor’s landfill, and further disposed by the competent municipal enterprise. In case of accidents, fuel or lubricant spillages in the environment, urgent

Page 17: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

10

interventions pursuant to the procedures for the discharge of fuel and lubricants are required.

Washing of machines and vehicles shall not be carried out within the construction works zone.

Wastewater from the on-site toilets shall not be discharged into the ground or water streams.

Waste management shall comply with the Waste Management Plan (details given below).

Deposition of excavated material and any other solid waste in water bodies shall be forbidden.

Driving machines inside rivers, streams, or onto their banks should not be allowed except in situations when it cannot be avoided due to construction of a special structure.

River bed bottoms shall be protected and not completely blocked during trenching in order to protect existing water-corridors for uninterrupted communication between the species living at the bottom and the species freely swimming in the water. Further natural restoration of existing banks is to be ensured through covering damaged areas with suitable vegetation.

The Contractor shall implement adequate traffic control measures, in accordance with the law, during the Contract duration, and the measures must first be approved by the Supervision Engineer. Traffic safety management measures shall include temporary illumination and adequate signalization during trenching and rehabilitation works.

The Contractor needs to appoint permanent staff to be engaged on traffic safety issues, and be responsible for the implementation of traffic safety measures and traffic measures prescribed by the national laws, including: (I) inspection of the condition and position of the equipment for traffic control in use; (II) design review – part related to traffic control equipment necessary to provide safe and efficient traffic flow; (III) correction of all traffic deficiencies where applicable; (IV) inspection of work sites, equipment handling and storage, material handling and storage related to traffic safety.

The Contractor shall not leave trenches unattended and shall fence and signalize all open trenches to prevent accidents.

Organization of Construction Site after Completion of Works

The Contractor must also remove all special structures and sites used to support construction works including temporary buildings and their foundations, temporary installations (electric power, water, sewage) and equipment (sedimentation tank), temporary roads reinstatement (especially in the forest area and on private properties) and working plateaus reinstatement, removal of fences, signs and notices.

The Contractor shall remove all construction waste.

All construction sites and other influential areas affected by construction activities shall be reinstated depending on the future land use.

Reinstatement activities shall start immediately after pipe burying.

Construction area shall be seeded with species preserved in topsoil and supplemented by adequate material if needed.

Within the regular reporting from the site, the Supervisory body shall submit an overview of the implementation of the measures listed in the monitoring table.

The ultimate responsibility for the implementation of this EMP document remains on the project implementation units (PIUs), that is, on the implementation unit of the Federal Ministry of Agriculture, Water Management and Forestry.

Page 18: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

11

3.2 ENVIRONMENTAL MONITORING PLAN

Monitoring of compliance with the conditions given in the guidelines for good construction practices is performed in the construction phase. Compliance verification is carried out by the Supervisory body, on the basis of checklists given in Tables 5, 6 and 7. These lists include a detailed specification of measures which are subject to monitoring.

Page 19: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

12

Table 4 Environmental Monitoring Plan in the construction and operational phase Phase Subject to

monitoring Where? How? When? COST RESPONSIBILITY

Install Operate Install Operate

Construction

Whether the site meets the requirements of the guidelines on good construction practices

On the site Visual monitoring,access to documents

During the execution of works

n/a n/a Supervisory body Supervisory body

Operational

Maintenance of the flood control structures

At the project site

Visual monitoring,access to documents

Yearly n/a n/a Water management Inspector

Water management Inspector

Page 20: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

13

Within tender documentation for the selection of Supervisory body, Project Implementation Unit shall specify the obligation to exercise monitoring over the Environmental Management Plan as well, and shall attach checklists to be filled in by the Supervisory body during monitoring activities, that is during exercising supervision. Table 5 General requirements - Checklist

Measure Responsibility Implementation Verification Appoint a Health, Safety and Environment Coordinator, responsible for the compliance with the laws and objectives of the environmental protection, occupational safety and fire protection.

Contractor Yes No

Decision on appointment

Hold regular meetings with the local population representatives (local community council) to familiarize them with the commencement of construction works, enable information exchange or find solutions to possible disputes (originating from violation of ownership rights, damage caused during construction works, etc.).

Contractor Yes No

Minutes from the meetings with attached list of participants and photographs.

Construction material (asphalt and stone) should be purchased from the manufacturer/supplier who performs in compliance with the valid environmental permits.

Contractor Yes No

Procurement contract with the attached environmental permit.

Construction equipment has been licensed and approved in accordance with local regulations, and if possible, certified in compliance with the EU standards.

Contractor Yes No

Copies of licenses

Construction machinery and transport vehicles meet environmental standards in terms of emission of harmful gases (complete combustion).

Contractor Yes No

Copy of the Technical Soundness Certificate with the emission measurement

Page 21: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

14

Table 6 Construction Site Organization - Checklist

Measure Responsibility Implementation Verification Develop construction site organization design.

Contractor Yes No

Copy of the construction site organization design.

Within the design, develop appropriate solutions for sanitary facilities, mobile or fixed, and provide connection to the appropriate sewage systems or waterproof tanks.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Machines and vehicles parking lots as well as labor accommodation containers are not located inside the forest areas, and do not impact watercourses or affect endangered flora and fauna.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Establish temporary disposal sites for construction materials.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Provide space for rinsing of concrete pumps and mixers, as well as space for washing of vehicle tires with adequate cleaning agent.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Establish temporary disposal sites for excavation material, maximum 2 m of height, in order to prevent compaction caused by the soil weight. Deposition of excavated material and any other solid waste in water bodies shall be forbidden.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Develop a plan of transport routes, proposing material transport roads. Avoid transport through the settlements. Setting of

Contractor

Yes No

Copy of the construction site organization design. Visual

Page 22: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

15

Measure Responsibility Implementation Verification appropriate traffic signs should be envisaged in the project.

verification on the site.

Fence and signalize all open trenches to prevent accidents.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Develop procedures for the discharge of oil and lubricants in case of accidental spillages.

Contractor Yes No

Copy of the procedure for the discharge of oil and lubricants

Procure sandbags to absorb the accidentally spilled oils and lubricants, keep them in a clearly visible and marked place on the cinstruction site.

Contractor Yes No

Visual verification on the site.

In order to reduce adverse impacts on the river and river banks to the minimum, construction activities located in or near surface water bodies, shall be carried out during low water season, or most often in the period from July to September. It is recommended to take this into account during the preparation of the activity timetable.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Construction activities in river bed bottoms shall be executed using cofferdams in order to protect existing water-corridors for uninterrupted communication between the living as well as to prevent erosion.

Contractor Yes No

Copy of the construction site organization design. Visual verification on the site.

Develop Waste Management Plan for the management of construction waste.

Contractor Yes No

Copy of the Waste Management Plan

Page 23: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

16

Table 7 Organization of Construction Site after Completion of Works - Checklist

Measure Responsibility Implementation Verification All construction sites and other influential areas affected by construction activities shall be reinstated.

Contractor Yes No

Measurement book Visual inspection

Remove all special structures and sites used to support construction works (temporary buildings, roads, signs and notices).

Contractor Yes No

Measurement book Visual inspection

Construction areas where vegetation has been removed due to construction activities shall be re-cultivated.

Contractor Yes No

Measurement book Visual inspection

4 CAPACITY DEVELOPMENT AND TRAINING NEEDS No special training will be needed for purposes of the implementation of this Plan. The Supervisory body exercising the monitoring of this Plan should possess the appropriate professional qualifications: B.Sc. in Civil Engineering and at least 5 years of experience in performing the duty of Supervisory body. Water Management Inspector shall perform supervision in the operational phase, in accordance with the powers invested in him. Special training and provision of equipment will not be needed. For functional use of the flood control system and effective flood protection, the purchase of equipment necessary for the cantonal and operational centres of civil protection is required, as well as the purchase of means for communication, detection and warning that should be available to all flood protection participants. Table 8 gives an overview of additional material and technical resources (equipment) that make integral part of the document development and field visits, identified as a need for further flood protection of the Foča Kosovska Municipality.

Page 24: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

17

Table 8 Material and technical resources needed for flood protection of the Foča Ustikolina Municipality No. Item title Quantity

Pcs No. Cost

KM Item title Quantity

Pcs Cost KM

1 Sandbags 2000 24. 4000 Pulley (up to 1000 kg)

2 1800

2 Sand (for sandbag filling)

50 m3 25. Fire hose ø 50 10 2300

3 Rubber boots 50 26. 2500 Military tent, capacity 50 beds

2 2000

4 Rubber (fisherman's) boots

30 27. 1500 Megaphone 3 100

5 Raincoat 50 28. 1800 Off-road vehicle for evacuation

1 21.500 (Lada Niva)

6 Rain suits 50 29. 3000 Rechargeable lamp 3 300

7 Life vest 15 30. 3000 Power generator 4 – 6 Kw

2 900

8 Rubber gloves 100 31. 300 Sleeping bags 30 4500

9 Cleaning Tool 50 sets

32. Radio base station FM

1

10 Water canister 10 l

50 33. 250 Water canister 20 l 20 150

11 5 person inflatable boat with motor

2 34. 8000 Blankets 100 3000

12 Water pump with suction hose ø 50

2 35. 1400 Portable radio 10

13 Mud pump 3 36. 2100 Folding bed 50

14 Metal fire escape hook ladder

1 37. 200 Folding stretcher 5

15 Metal fire escape extention ladder

1 38. 200 Chainsaw 3 900

16 Pulling rope ø12 mm

5 39. 375 Cutlery 50 sets

17 First aid kit 5 40. 50 Coveralls 50 2500

18 Motorne sanke 1 41. 10000 Handcart 10

19 Tilt hammer 5 kg 2 42. 100 Concrete and iron cutting chainsaw

2 6000

20 Boat hook 5 43. 50 Fire axe 5

21 Axe 5 44. 75 Billhook 5

22 Boat trailer 1 45. 1500 PVC water tank 1000l

3 450

23 PVC foil 50 kg 46. 2500 Machinery for engagement on flood protection

Table 9 gives an overview of the equipment necessary for independent communication and alerting flood hazards for the entire Canton.

Page 25: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

18

Table 9 Specification of equipment for Cantonal and Municipal operating centres and flood protection managers No. Item description Quantity Unit cost

KM Total cost

KM Beneficiary

1 Professional VHF Base Station

5 2600,00 13000,00 Ministry of Economy of the Bosnia- Podrinje Canton

Cantonal headquarters of civil protection,

Municipal Headquarters of Civil Protection

2 Professional VHF base repeater

1 8000,00 8000,00 Ministry of Economy of the Bosnia-Podrinje Canton

Cantonal headquarters of civil protection,

Municipal Headquarters of Civil Protection

3 Professional handheld VHF radio station

18 1800,00 36000,00 Minister - Chief manager of the flood protection

Manager of the Cantonal headquarters of civil protection

Mayor of the municipality - Chief manager of the flood protection

Branch manager of the flood protection (for individual floodplains)

4 Stationary Phone / Fax machine

5 200,00 1000,00 Ministry of Economy of the Bosnia-Podrinje Canton

Cantonal headquarters of civil protection,

Municipal Headquarters of Civil Protection

5 Pentium-class computer and printer (set)

5 2000,00 10000,00 Ministry of Economy of the Bosnia-Podrinje Canton

Cantonal headquarters of civil protection,

Municipal Headquarters of Civil Protection

6 Mobile phone 15 300,00 4500,00 Minister - Chief manager of the flood protection

Head of Cantonal headquarters of civil protection,

Mayor of the municipality - Chief manager of the flood protection

Regional Head of flood protection for individual flood areas

7 Internet conncetion (equipment provided by service provider-telecom or other operator)

5 Ministry of Economy of the Bosnia-Podrinje Canton

Cantonal headquarters of civil protection,

Municipal Headquarters of Civil Protection

Page 26: Environmental Management Plan - World Bank · 2016. 7. 15. · Foča. Ustikolina(Kosovska) 1.3 EXISTING FLOOD PROTECTION SYSTEM . There are no flood control structures built on the

19

5 ALTERNATIVES It is not known whether alternatives to the selected design solution have been considered in the phase of Conceptual Design development. The Detailed design of the rivertraining of River Kosovska contains a description of the adopted technical solution.

The adopted technical solution was evaluated unfavourable from the environmental point of view, and therefore it is recommended to development a new design solution based on the use of environmentally sound techniques, that is, gabions and reno mattresses, with the application of native vegetation upon completion of construction works.

6 PUBLIC DISCLOSURE AND PUBLIC CONSULTATION PROCESS

Public consultation process was held on 16th of January, 2014 in Gorazde, at 11 am.

Public consultation documents are available to the public in electronic version on the website of the Federal Ministry of Agriculture, Water Management and Forestry http://www.fmpvs.gov.ba, as well as on the website of the PIU Forestry and Agriculture http://portal.piusum.ba, and a hard copy is to be found in the premises of the PIU Forestry and Agriculture (address: Trampina 4, first floor, 71000 Sarajevo).

Targeted invitations were sent to the previously identified stakeholders from various level institutions dealing with environmental and civil sector.

Deadline for the submission of comments, opinions and suggestions (in writing) regarding the EA and the EMP was January 18, 2014.

Representatives of the Foca-Ustikolina Municipality agreed with the necessity for the re-design of the project solution, but expressed their concerns regarding the suspension of works, since the municipality has no funds for the procurement of design services. Mr. Dunđer stated that these needs are to be considered within the project led by the PIU, and therefore there should be no delay in the implementation of this urgent project.