215
North Western Railway =kÉ® {ÉʶSÉ¨É ®ä±É´Éä n® ºÉÚSÉxÉÉ G¨ÉÉE ƒ -„ŒŒˆ RATE ADVICE NO. 4 of 2006 t;iqj] …1 fnlEcj] „00ˆ (|ÉnÒ{É ¦É]xÉMÉÉ®) ¨ÉÙJªÉ ´ÉÉÊhVªÉ | ɤÉxvÉE 1

ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

  • Upload
    vukhue

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

North Western Railway

=kÉ® {ÉʶSÉ¨É ®ä±É´Éän® ºÉÚSÉxÉÉ G¨ÉÉE ƒ -„ŒŒˆ

RATE ADVICE NO. 4 of 2006

t;iqj] …1 fnlEcj] „00ˆ (|ÉnÒ{É ¦É]xÉMÉÉ®)

¨ÉÙJªÉ ´ÉÉÊhVªÉ |ɤÉxvÉE

Jaipur, 31ST DECEMBER, 2006 Pradeep Bhatanagar

CHIEF COMMERCIAL MANAGER

1

Page 2: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

RATE ADVICE ASSURANCE SHEET

Rate advice received on date______________________________________________

We, the following staff have gone through the Rate Advice No. ...................... and Noted the content of the same.

Sr. No. Name Designation Signature 1234567891011121314151617181920(Note: This sheet is to be signed by all the concerned Supervisors and Staff for having understood the contents.)

2

Page 3: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

INDEXC.LNo Subject & Authority Page

No.THROUGH RATE CIRCULAR (COACHING)

12 Reorganization of MG services - gauge conversion of AII-COR Section.(Authority: CCM/NWR No.C-175/1 of date 06/12/2006)

19

THROUGH RATE CIRCULAR (GOODS)22 Closure of sidings

(Authority: CCM/NWR No. C-498/3/AiiPart I of date 17/11/2006) 21

23 Distances of new Broad Gauge line of Kolayat – Phalodi to be opened shortly.(Authority: CCM/NWR No. C-541/9/1 of date 23/11/2006)

21

24 Round the clock working at Hissar (MG & BG) goods shed.(Authority: CCM/NWR No. C-491/B & W hrs. of date 28/11/2006)

21-22

25 Freight Incentive Scheme(Authority: CCM/NWR No. C-429/1 of date 29/11/2006)

22

26 Closing of meter gauge NINDHAR BENAR (NDH) station for goods raffic(Authority: COM/NWR No. T-2/Goods/547/1/3 of date 06/12/2006)(Authority: CCM/NWR No. C/498/1/11/Vol II of date 06/12/2006)

22

LOCAL RATE ADVICE (COACHING)31 Schedule of Powers in commercial matter for earning contracts (FM Circular

No.41 of 2006)(Authority: Railway Board’s letter No.99/TC(FM)/10/4 of date 20/09/2006.)(Authority: CCM/NWR No. C-297/0(Policy) of date 05/10/2006)

24

(Corrigendum to LRA 31 of 2006)Schedule of Powers in commercial matter for earning contracts (FM Circular No.41 of 2006)(Authority: CCM/NWR No. C-297/0(Policy) of date 11/10/2006)

24-25

32 Introduction of Compulsory packing condition of “Dry Fish”.(Authority: Railway Board’s letter No. TCII/2046/2006/2 of date 26/07/2006.)(Authority: CCM/NWR No. C-297/0(Policy) of date 12/10/2006)

25

33 Revision of charges for Hospital –on-wheels organized by Impact India Foundation, Mumbai(Authority: Railway Board’s letter No. TCII/2221/91/Impact India /Vol.II of date 18/09/2006.)(Authority: CCM/NWR No. C-175/1 (Policy) of date 19/10/2006)

25-26

34 Rail Travel Concession (Authority: Railway Board’s letter No.TCII/2010/2002/IRT of date 07/09/2006)(Authority: CCM/NWR No. C-76/2/O/Concession/Policy/Vol.II of date 19/10/2006)

26-27

35 Rail Travel Concession (Authority: Railway Board’s letter No. TCII/2066/85/12 of date 06/09/2006)(Authority: CCM/NWR No. C-76/2/O/Concession/Policy/Vol.II of date

27

3

Page 4: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

19/10/2006)36 Amendment in Tatkal Scheme (Commercial Circular No. 83 of 2006)

(Authority: Railway Board’s letter No. 2003/TG-I/20/P/Tatkal /Pt.II of date 09/10/2006.)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 13/11/2006)

27-28

37 Utilisation of one compartment of ‘generator car van’ of Garib Rath Express earmarked for disabled persons.(commercial Circular No. 79)(Authority: Railway Board’s letter No. 2006/TG-I/20/P of date 29/11/2006.)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 13/11/2006)

28

38 Earmarking of seats /berths for physically handicapped persons in SLRD Coaches (Commercial circular No. 74 of 2006)(Authority: Railway Board’s letter No. 2006/TG-I/20/P of date 09/10/2006.)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 13/11/2006)

29

39 Sole rights for Commercial publicity (Commercial Circular No. 90 of 2006)(Authority: Railway Board’s letter No. 2005/TGIV/39/8/EOI of date 23/10/2006.)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 15/11/2006)

29-30

40 Concession to Bharat scouts & Guides.(Authority: Railway Board’s No. TC II/2290/82 of date 02/11/2006). (Authority: C C M/NWR No.C.76/2/0/Concessions/Policy Vol II of date 22/11/2006)

30-31

41 Without waiting for the time limit of three hours (after scheduled departure of the train) to lapse, full refund can be granted at the journey commencing station.(Authority: Railway Board’s No. TC II/2003/98/Rules of date 27/10/2006). (Authority: C C M/NWR No.C.175/1 of date 07/12/2006)

31

42 Booking and carriage of Silver anklets /leg chains /silver jewelry/silver handicrafts in passenger compartment as personal luggage.(Authority: Railway Board’s No. TC II/2077/04/2 of date 22/11/2006). (Authority: C C M/NWR No.C.297/0 of date 07/12/2006)

31

43 Rate for Refrigerated Vans (VPRs) (Authority: Railway Board’s No. 2003/TC(FM)/12/1 of date 21/11/2006). (Authority: C C M/NWR No.C.297/0 of date 07/12/2006)

31-32

44 Transportation of portion in luggage /Brake Van /Parcel Vans of Passenger carrying trains for alumino-thermit welding (Freight Marking Circular No.46 of 2006)(Authority: Railway Board’s No. 2006/TC (FM)/11/14 of date 08/11/2006). (Authority: C C M/NWR No.C.297/0 of date 07/12/2006)

32-33

45 Policy for leasing of parcel space in the Brake Vans (SLRs) by passenger carrying trains and leasing of Parcel Vans on round trip basis. (Amendment No. 6 to Comprehensive Parcel Leasing Policy)(Authority: Railway Board’s No. 2006/TC(FM)/10/8 of date 17/11/2006). (Authority: C C M/NWR No.C.297/0 of date 11/12/2006)

33-35

46 Mela Surcharge.(Authority: Railway Board’s No. TCII/2067/06/Mela Surcharge of date 23/11/2006). (Authority: C C M/NWR No.C.175/1 of date 11/12/2006)

35

4

Page 5: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

47 Rail Travel Coupons. (Commercial Circular No.95 of 2006)(Authority: Railway Board’s No. TCII/2256/88/POL of date 08/11/2006). (Authority: C C M/NWR No.C.175/1 of date 11/12/2006)

35-36

48 Rail Travel Coupons. (Commercial Circular No.98 of 2006)(Authority: Board’s letters TC II/2067/75 of date 25/04/81, 28-30/11/82, 01/06/83, 30/05/84, 26/04/92,14/09/94, 03/10/97, 15/10/97 & 17/07/98)(Authority: Railway Board’s No. TCII/2067/06/Mela Surcharge of date 17/11/2006). (Authority: C C M/NWR No.C.175/1 of date 11/12/2006)

36-37

49 Levy of Mela Surcharge.(Commercial Circular No. 94 of 2006)(Authority: Railway Board’s No. TCII/2256/82/1 /of date 11/12/2006). (Authority: C C M/NWR No.C.175/1 of date 11 /12/2006)

37

50 Modification of packing condition of ‘Iced fish/fresh fish’. (Freight marketing Circular 48 of 2006).(Authority: Railway Board’s No. TCII/2046/2004/6 of date 29/11/2006). (Authority: C C M/NWR No.C.297/0 of date 15/12/2006)

37-38

51 Rail Travel Concession(Authority: Railway Board’s No. TCII/2053/95 of date 05/12/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006)

38

52 Concession admissible to sportspersons participating in tournaments/ championship organized by School Games Federation of India(Authority: Railway Board’s No. TCII/2035/06/School Games of date 08/12/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006)

38-39

53 Collection charges on Terminal Tax /Pilgrim Tax collected on tickets sold by the Railways.(Authority: Railway Board’s No.2003/F(Comml.)/7/1 of date 28/11/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006)

39

54 Super fast surcharge.(Authority: Railway Board’s NoTCII/2910/97/SF /Policy of date 01/12/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006)

39-40

55 HOR facility to Chief Information Commissioner and information Commissioners.(Authority: Railway Board’s No.2006/TG.1/27/3 of date 22/11/2006).(Authority: C C M/NWR No.C.175/1 of date 26/12/2006)

40-41

56 Delegation of powers to CCMs for joint re-weighment of Parcel Vans (VPHs/ VPs/ VPUs) at party’s request.(Authority: Railway Board’s No.2006/TC (FM)/11/16 of date 11/12//2006).(Authority: C C M/NWR No.C.297/0 (Policy)/ of date 26/12/2006)

41

LOCAL RATE ADVICE (GOODS)135 Rebate in freight for traffic transported in wagons owned by M/s National

Aluminium Company (NALCO) Ltd., Bhubaneswar & M/s Andhra Sugars Ltd./Tanauka (Rates Circular No. 78 of 2006)(Authority: Railway Board No.TCR/1644/2006/2 of date 26/09/2006)(Authority: CCM/NWR No. C-433/2 of date 03/10/2006)

43-44

136 Rebate in freight for Ammonia (Anhydrous Liquefied Gas) and Phosphoric Acid transported in privately owned tank wagons.(Authority: Railway Board No.TCR/1644/2006/2 of date 26/09/2006)(Authority: CCM/NWR No. C-433/2 of date 03/10/2006)

44-45

5

Page 6: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

137 Rebate in freight for Liquefied Petroleum Gas (LPG) transported in jointly owned tank wagons of the Railways and Oil Industry.(Authority: Railway Board No.TCR/1644/2006/2 of date 26/09/2006)(Authority: CCM/NWR No. C-433/2 of date 03/10/2006)

45

138 Rationalization of rates for Military Traffic.(Authority: Railway Board No.TC-I/2001/8/6 of date 25/09/2006)(Authority: CCM/NWR No. C-541/1 of date 04/10/2006)

46

139 Dynamic Pricing (Freight Business) (Rate Circular No.81 of 2006)(Authority: Railway Board No.TCR/1078/2006/5 of date 05/10/2006)(Authority: CCM/NWR No. C-423/1 of date 11/10/2006)

46-47

140 Increase in permissible carrying capacity of wagons on CC+8 and CC+6 routes (Rate circular No.82 of 2006)(Authority: Railway Board No.TCR/1394/2004/2 of date 05/10/2006)(Authority: CCM/NWR No. C-176/4 of date 11/10/2006)

47

141 Rebate in freight rates on Alumina traffic transported in the privately owned tank wagons in favour of M/s. Hindalco Industries Ltd (Rate Circular no 85 ) (Authority: Railway Board No.TCR/1644/2006/1 of date 10/10/2006)(Authority: CCM/NWR No. C-433/2 of date 16/10/2006)

48

142 Policy for leasing of Parcel space in the Brake Vans (SLRs) by passenger carrying trains and leasing of parcel Vans on round trip basis (Freight Marketing Circular No. 42 of 2006).(Authority: Railway Board No.2006/TC (FM)/10/1 of date 27/09/2006)(Authority: CCM/NWR No. C-297/0(Policy) of date 16/10/2006)

48-49

143 Restriction on leasing of Assistant Guard’s Cabin by Garib Rath trains (Freight Marketing Circular No. 43 of 2006).(Authority: Railway Board No.2006/TC (FM)/10/1 of date 27/09/2006)(Authority: CCM/NWR No. C-297/0(Policy) of date 16/10/2006)

49

144 Classification of Rock Phosphate Powder.(Rate Circular No. 83 of 2006)(Authority: Railway Board No. No.TCR/1015/2006/15 dated 10/10/2006)(Authority: CCM/NWR No. C-70/1 (Policy) of date 18/10/2006)

49-50

145 Free time for loading/unloading of covered wagons (Rate Circular No. 84 of 2006)(Authority: Railway Board No. No.TC-1/2005/201/2 Pt.D dated 10/10/2006)(Authority: CCM/NWR No. C-299/0 (Policy) of date 18/10/2006)

50

146 Issue of RR after weighment of consignment at weighbridge (Rates Circular No. 86/2006(Authority:Railway Board’s letter No. TC-I/2006/108/4 of date 13/10/2006)(Authority: CCM/NWR No. C-611/0 (Policy) of date 30/10/2006)

51-54

147 Dynamic Pricing (Freight Business)(Authority: Railway Board’s letter No. TCR/1078/2000/5 of date 19/10/2006)(Authority: CCM/NWR No. C-423/1 of date 30/10/2006)

54

148 Haulage Charges of Brake Van utilized by Container Train Operators (Rates Circular No. 87 of 2006)(Authority:Railway Board’s letter No.TCR/2201/2006/1 date 18/10/2006)(Authority: CCM/NWR No. C-78/1/54/CONCOR of date 02/11/2006)

54-55

149 Gauge conversion of Neemuch -Ratlam section - Rating and Routing of Cement traffic. (Rate Circular No.88 of 2006)(Authority:Railway Board’s letter No No.TCR/1125/ 2001/ 2 date 19/10/2006)(Authority: CCM/NWR No. C-432/2 of date 06/11/2006)

55-56

6

Page 7: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

150 Dynamic Pricing (Freight Business) (Rates Circular No. 89 of 2006)(Authority:Railway Board’s letter No.TCR/1078/2006/5 Pt I date 26/10/2006)(Authority: CCM/NWR No. C-423/1 of date 06/11/2006)

56

151 Assignment of classification for Coal for e-auction(Rates Circular No.90 of 2006)(Authority:Railway Board’s letter No.TCR/1015/2006/17 date 27/10/2006)(Authority: CCM/NWR No. C-70/1 of date 10/11/2006)

56-57

152 20% concession on Wheat and 10% concession on Rice when loaded in BOXN wagons. (Rates Circular No. 91 of 2006)(Authority:Railway Board’s letter No.TCR/1618/2006/13 date 27/10/2006)(Authority: CCM/NWR No. C-493/6/431 of date 10/11/2006)

57

153 Freight Incentive Schemes.Authority:Railway Board’s letter No.TCR/1078/2006/4 dated 27/10/2006)(Authority: CCM/NWR No. C-429/0of date 10/11/2006)

58

154 Increase in permissible carrying capacity of wagons on CC+8 /CC+6 routes. (Rate Circular No. 92 of 2006)(Authority:Railway Board’s letter No.TCR/1394/2006/8 date 01/11/2006)(Authority: CCM/NWR No. C-176/4 of date 14/11/2006)

58-59

155 Freight Incentive Schemes –Two leg scheme.(Authority:Railway Board’s letter No.TCR/1078/2006/4 date 27/10/2006)(Authority: CCM/NWR No. C-429/0 of date 14/11/2006)

59

156 Trail running of 25 t axle load train.(Authority:Railway Board’s letter No.TCR/1394/2005/4 Pt. date 12/10/2006)(Authority: CCM/NWR No. C-611/0 of date 14/11/2006)

59-60

157 Methodology in computing the freight charges along with surcharge and concession.(Authority:Railway Board’s letter No.TCR/1078/2006/5 date 01/11/2006)(Authority: CCM/NWR No. C-423/1 of date 14/11/2006)

60

158 Centralised booking scheme at New Bongaigaon for booking of foodgrains by Food Corporation of India.(Rate circular No.94 of 2006)(Authority:Railway Board’s letter No.TCR/107/84/21 date 06/11/2006)(Authority: CCM/NWR No. C-423/1 of date 14/11/2006)

60-61

159 Penalty for false declaration – Rule 126 of Goods Tariff No.41, Part-I (Vol.I).( Rates Circular No. 95 of 2006)(Authority: Railway Board’s letter No. TCR/2210/2006/1 of date 08/11/2006)(Authority: CCM/NWR No. C/176/5 of date 22/11/2006)

61-62

160 Increase in permissible carrying capacity of wagons on CC+8 and CC+6 routes. (Rates Circular No. 96 of 2006).(Authority: Railway Board’s letter No. TCR/1394/2004/2 of date 13/11/2006)(Authority: CCM/NWR No. C-176/4 Vol II of date 22/11/2006)

62

161 Levy of stabling charge/demurrage charge on privately/jointly owned wagons (Rate Circular No. 97)(Authority: Railway Board’s letter No.TC-I/98/201/4 of date 18/11/2006)(Authority: CCM/NWR No. C- 124/0 of date 22/11/2006)

62-63

162 Freight Incentive Schemes: Long term Special Incentive Scheme (Rate Circular No. 98 of 2006)(Authority: Railway Board’s letter No.TCR/1078/2006/8 of date 21/11/2006)(Authority: CCM/NWR No. C- 429/0 of date 23/11/2006)

63-71

163 Amendments in Indian Railway Code for Traffic (Commercial) Department 71-72

7

Page 8: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

and IRCM Vol.II regarding Electronic Payment System.(Rate Circular 99 of 2006)(Authority: Railway Board’s letter No.TC-I/2006/104/3 of date 22/11/2006)(Authority: CCM/NWR No. C- 291/0(E-banking) of date 04/12/2006)

164 CORRIGENDUM-Freight Incentive Schemes (Rates Circular No.100 of 2006) (Corrigendum to Rates Circular No.25 of 2006)(Authority: Railway Board’s letter No.TCR/1078/2006/8 of date 21/11/2006)(Authority: CCM/NWR No. C-429/0 of date 04/12/2006)

72

165 Revision of miscellaneous charges (Rates circular No.101 of 2006)(Authority: Railway Board’s letter No.TCR/2201/2004/1 of date 28/11/2006)(Authority: CCM/NWR No. C-176/5 of date 06/12/2006

73-74

166 Exemption to ‘CC’ commodities (bagged) from weighment (Rates Circular No. 102/2006)(Authority: Railway Board’s letter No.TC-I/2006/108/4 of date 29/11/2006)(Authority: CCM/NWR No. C-611/0(policy) of date 06/12/2006)

74-75

167 Increase in permissible carrying capacity of wagons on CC+8 and CC+6 routes.(Rates Circular No. 103 of 2006)(Authority: Railway Board’s letter No.TCR/1394/2004/2 of date 30/11/2006)(Authority: CCM/NWR No. C-176/4 Vol II of date 06/12/2006)

75

168 Liberalisation of siding rules –cost of electrification.(F.M Circular no. 47 of 2006)(Authority: Railway Board’s letter No.99/TC(FM)/26/1 of date 24/11/2006)(Authority: CCM/NWR No. C-491/1 Vol.II of date 07/12/2006)

75-76

169 Freight Incentive Scheme – Incremental Scheme for Traditional Empty Flow Direction. (Authority: Railway Board’s letter No.TCR/1078/2006/8 of date 23/11/2006)(Authority: CCM/NWR No. C-429/0 of date 08/12/2006)

76

170 Acceptance of sender’s weight for movement of container traffic.(Authority: Railway Board’s letter No.TC-I/2006/103/1 of date 30/11/2006)(Authority: CCM/NWR No. C-78/1/54/ CONCOR Vol.II of date 08/12/2006)

76-77

171 Revision of rates for Railway Material Consignments (RMC). (Rates Circular No.104 of 2006)(Authority: Railway Board’s letter No.TCR/1078/2006/10 of date 04/12/2006)(Authority: CCM/NWR No. C-423/1 Vol II of date 13/12/2006)

77

172 Booking of HSD Oil meant for Railways on ‘To-Pay’ basis (Rates Circular NO. 105 of 2006)(Authority: Railway Board’s letter No. TCR/1078/2006/15 of date 04/12/2006)(Authority:CCM/NWR No.C-423/1 Vol II of date 13/12/2006)

78

173 Demurrage rules (Rates Circular No.106 of 2006)(Authority: Railway Board’s letter No.TC-I/2005/201/2 of date 05/12/2006)(Authority: CCM/NWR No. C-124/0 of date 14/12/2006)

78-84

174 Operation of wagon Investment scheme (WIS).(Authority: Railway Board’s letter No.2004/TC (FM)/4/4 of date 05/12/2006)(Authority: CCM/NWR No. C-88/1 of date 15/12/2006)

84

175 Penalty for false declaration –Rule 126 of Goods Tariff No. 41, Part –I (Vol.I)(Authority: Railway Board’s letter No.TCR/2210/2006/1 of date 07/12/2006)(Authority: CCM/NWR No. C-176/5 of date 18/12/2006)

85

176 Installation of weighbridge in private sidings.(Authority: Railway Board’s letter No.TC-I/2005/108/3–pt. of date 07/12/2006)(Authority: CCM/NWR No. C-616/0 of date 18/12/2006)

85-86

8

Page 9: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

177 Permissible carrying capacity of BOY wagons (Rates Circular No. 107 of 2006)(Authority: Railway Board’s letter No.TCR/1394/2006/7 of date 07/12/2006)(Authority: CCM/NWR No. C-176/4 of date 19/12/2006)

86

178 Free time for unloading of Hopper wagons in the case of steel plants.(Rates Circular No. 109 of 2006)(Authority: Railway Board’s letter No.TC-I/2005/201/2 Pt. D of date 13/12/2006)(Authority: CCM/NWR No. C-299/0 of date 19/12/2006)

86-87

179 Corrigendum to Rates circular No. 82 & 103 of 2006-Increase in permissible carrying capacity of wagons on CC+ 8 and CC+6 routes.(Authority: Railway Board’s letter No.TCR/1394/2004/2 of date 08/12/2006)(Authority: CCM/NWR No. C-176/4 Vol.II of date 19/12/2006)

87

180 Permissible carrying capacity of BOXNHS and BRNHAHS wagons.(Rate circular No.110 of 2006)(Authority: Railway Board’s letter No.TCR/1394/2006/10of date 15/12/2006)(Authority: CCM/NWR No. C-176/4 Vol.II of date 28/12/2006)

87-88

181 Incentives to Cement Industry.(Rate Circular No. 111 of 2006)(Authority: Railway Board’s letter No.TCR/1618/2006/6 Pt.I of date 19/12/2006)(Authority: CCM/NWR No. C-493/6/431 of date 28/12/2006)

88

182 Charging of freight for trainload Indents (Rate Circular No.112of 2006) (Authority: Railway Board’s letter No.TCR/1618/2006/6 Pt. I of date 21/12/2006)(Authority: CCM/NWR No. C-423/1 Vol.II of date 29/12/2006)

89

SUMMARY OF OTHER RAILWAY THROUGH RATE CIRCULAR (COACHING )

NORTH CENTRAL RAILWAY30 Levy of Mela Surcharge during Ardh Kumbh Mela at Allahabad.

(Authority: C C M/N C Rly No. 97/R/NCR/CP/Mela of date 11/09/2006) (Authority: C C M/NWR No.C.175/1 of date 29/09/2006)

91

32 Rationalization of Rates for parcel traffic.(Authority: C C M/N.C Rly No.C 2004/Comml/M&R/156/P.Trains of date 17/10/2006) (Authority: C C M/NWR No.C.175/0 of date 28/11/2006)

91-92

NORTH EASTERN RAILWAY34 1. Closure of Bakshi ka –Talab station for parcel traffic.

(Authority: CCM/N.E Rly’s no. C/539/9/1/Parcel /Pt. IV/Dev of date 23/10/2006)2. Closure of Babina, Belatal and Ghatampur station for Parcel Traffic.(Authority :-CCM/N.E Rly’s no. C/386/2/39/N.C Rly/RCL of date 10/11/2006)(Authority: C C M/NWR No.C.125/0 of date 12/12/2006)

92

SOUTHERN RAILWAY31 Levy of Mela Surcharge during Karthigai Deepam festival at Tiruvannamalai

(Authority: C C M/S.Rly No.C 443/P/Vol.VII of date 22/09/2006) (Authority: C C M/NWR No.C.175/1 of date 11/10/2006)

92-93

SOUTH EASTERN RAILWAY33 Opening of stations for booking of Outward and Inward Parcel traffic at 93

9

Page 10: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Tangerbansli (TGB) and Lohardaga (LAD)(Authority: CC M/S.E Rly No.375/DEV-Parcel Halt/Pt.II of date 26/09/2006) (Authority: C C M/NWR No.C.175/0 of date 28/11/2006)

SOUTH WESTERN RAILWAY35 Temporary closure of LONDA station for Outward & Inward parcel traffic.

(Authority: C C M/SWR No.C.206/Parcel Policy/Vol II of date 28/11/2006)(Authority: C C M/NWR No.C.125/0 of date 18/12/2006)

93

SUMMARY OF OTHER RAILWAY THROUGH RATE CIRCULAR(GOODS )

CENTRAL RAILWAY180 1. Upgradation of loni Good Shed to full rake.

(Authority : CCM/NE Rly No. C/386/2/33/Pt.I /CR/RCL of date 18/8/2006)(Authority: CCM/C.Rly No. ARN No.155 of 2006 (Goods) No. CRB/205/TL.B of date 17/7/06)2. Permissioin to use M/s. Rama Krishi Rasayan Sidign Loni by M/s. Ambuja Cement.(Authority : CCM/NE Rly No. C/386/2/41/9S.C.R (RCL of date 8/8/2006)(Authority: CCM/C.Rly No.C/698/M/925 of date 05/5/2006)(Authority :CCM/NWR No.C .543/1/1 (C Rly) of date 29/11/2006)

95

181 Permission to use M/s. Rama Krishi Rasayan Siding Loni over Central Railway by M/s Gokul Refoils & Solvent Ltd.,(Authority : CCM/SE Rly No. C.RA42 42/10/Pt.VIII/8 of date 04/08/2006)(Authority;CCM/C.Rly No. C/698/M/925 of date 13/07/06)(Authority :CCM/NWR No.C .543/1/1 (C Rly) of date 29/11/2006)

95

182 Opening of private siding of M/s Usha Martin Ltd., served by Gamharia Station.(Authority : CCM/N.E Rly No. C/386/2/33/Pt.I/CR/RCL of date 28/07/2006)(Authority:CCM/C.Rly ARN No. 41/2006 (Goods) No. C/634/R-6/775/2005/SER of date 17/2/2006)(Authority :CCM/NWR No.C .543/1/1 (C Rly) of date 29/11/2006)

96

185 Two point combination for outward traffic at Badnera and Malkapur station over Central Railway.(Authority: CCM/C..Rly’s No. C.RB.205.TLC of date 24/08/2006)(Authority:CCM/SE Rly no.RA.42/10/Pt.VIII/8 of date 13/09/2006)(Authority :CCM/NWR No.C .498/6 of date 29/11/2006)

96

EASTERN RAILWAY175 Inclusion of MEMARI as a half rake handling point for Inward and Outward

general goods traffic.(Authority :CCM/S.E Rly’s NoRA.42/3/Pt.X/IV of date 27/09/2006)(Authority :CCM/NWR No.C .498/6 of date 22/11/2006)

97

191 Full rake handling station.(Authority :CCM/N.Rly No. C.1974-R/Rake Handling /2006 N.R.H.Q.B.H NDLS of date 16/11/2006)(Authority :CCM/NWR No.C .498/6 of date 12/12/2006)

97

205 List of notified two point combination for inward traffic of Eastern Railway.(Authority :CCM/N.Rly No.C1974-R/Rake Handling /2006 N.R.H.Q.B NDLS of date 06/12/2006)(Authority :CCM/NWR No.C .498/6 of date 21/12/2006)

97-98

10

Page 11: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

EAST CENTRAL RAILWAY172 Two Point Combination over EC Railway for covered wagons rakes.

(Authority :CCM/E.C Rly’s No. ECR/OPT/GDS/511/10/06 of dated 17.10.06)(Authority :CCM/NWR No.C .70/3 of date 08/11/2006)

98-99

EAST COAST RAILWAY156 Inclusion of Bagadia PII in the Station code list I& II of East Coast Railway in

CUTTACK –PARADEEP Section under Khurda Road Division.(Authority :Sr.S.O/S.E Rly NO. ST /COM/STN.Code/E.Co /655 of date 18/07/2006)(Authority :CCM/SE Rly No. RA.42/Misc/86/5 of date 18/08/06)(Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 13/10/2006)

100

204 The Up-dated list of Stations/Sidings having full/half rake handling capacity and two point combinations on East Coast Railway.(Authority :CCM/N.Rly No.C1974-R/Rake Handling /2006 N.R.H.Q.B NDLS of date 06/12/2006)(Authority :CCM/NWR No.C .498/6 of date 28/12/2006)

100-104

NORTHERN RAILWAY159 1. Notification of TKD goods shed as capable of handling full rakes of all

goods traffic (Authority:CCM:CCM/S&R Letter No.51 –RD/608-R/Opening /DLI of date 17/08/2006)2. Booking of traffic on Trainload class rate.(Authority:CCM/N.Rly No. 1974-R/Rake handling /2006 N.R of date 17/08/2006)(Authority :CCM/NWR No.C 543/5/1 (N. Rly) of date 19/10/2006)

104

160 Notification for Two point combination.(Authority :CCM/N.Rly’s No. 1974-R/Rake Handling/2006 of date 30/8/2006)(Authority :CCM/NWR No.C 543/5/1 (N. Rly) of date 19/10/2006)

104-105

161 Allotment of new code initial for M/s continental carbon India Ltd. Ghaziabad (CCIL)(Authority :CCM/N.Rly’s No. 1-AC/347/Rates/N.R/B.H/NDLS of date 31/08/2006)(Authority :CCM/NWR No.C 543/5/1 (N. Rly) of date 19/10/2006)

105

171 Notification for Two Point combination & full rake handling of goods traffic.(Authority :CCM/N. Rly’s No. 50-T/J.Rake /(TGT) of date 28/09/2006 from GM/(Optg) N. Rly New Delhi)(Authority :CCM/NWR No.C .70/3 of date 08/11/2006)

105-106

184 To Facilitate loading /unloading of PRC Sleepers for USBRL Project over N. Rly.(Authority: CCM/S&R , N.Rly’x XXR No. 1329-R/Opening –closing /X of date 03/8/2006)(Authority:CCM/SE Rly no.RA.42/1A/Pt.X/IV of date 08/09/2006)(Authority :CCM/NWR No.C .543/5/1 (N.Rly ) of date 30/11/2006)

106

186 Notification of Two point combination for originating traffic (Authority: CCM/N..Rly’s No. 1974-R/Rake handling/2006 NRHQBH NDLS of date 03/11/2006)( (Authority :CCM/NWR No.C .498/6 of date 30/11/2006)

106

190 Change in the name of siding from M/s. Oriental Carbon & Chemical Ltd. To M/s. Continental Carbon India Ltd., Ghaziabad.

106-107

11

Page 12: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority :CCM/N.E Rly No. C/386/2/33/Pt.I/CR/RCL of date 18/08/2006)(Authority :CCM/NWR No.C .543/5/1 (N Rly) of date 06/12/2006)

198 Permission to use the siding of M/s. Hari Fertilizers Ltd. Siding Vyas Nagar by M/s. SMJ EXIMP Ltd Chandauli and M/s Singrauli Finlease (P) Ltd., Varanasi for inward traffic of coal.(Authority :CCM/N. Rly No. 1-AC/143/R/NRBHNDLS of date 09/11/2006)(Authority :CCM/NWR No.C .543/5/1 (N. Rly) of date 13/12/2006)

107

207 Capability of Balamau and Sandila stations over Northern Railway.(Authority :CCM/NE Rly’s No. C/386/2/46/NR/RCL of date 14/11/2006)(Authority :CCM/NWR No.C .498/6 of date 29/12/2006)

107

NORTH CENTRAL RAILWAY152 Booking of traffic on Train Load Class rate (revised).

(Authority:CCMN.C Rly No.C292-T/Goods Sdg/NCR of date 26/09/2006)(Authority :CCM/NWR No.C 70/3 of date 10/10/2006)

107-108

179 Re-Opening of Bijauli (BJI) station for Goods loading.(Authority :CCM/N.C Rly’s No.2004/Comml/M&R/242 /FRH of date 13/10/2006)(Authority :CCM/NWR No.C .543/6/1 (N.C Rly) of date 28/11/2006)

108

199 Re-opening of Belanganj (BLGJ) goods shed for Coal traffic.(Authority :CCM/N.C Rly No. 2003/Comml/M&R/201/BLGJ of date 22/11/2006)(Authority :CCM/NWR No.C .543/6/1 (N. C.Rly) of date 13/12/2006)

109

NORTHEASTERN RAILWAY164 Opening of Balod station (BXA) station as a full rake handling point for

outward loading of food grain.(Authority :CCM/N.R Rly No.25-09-R/SEC Rly /2005 of date 21/08/2006)(Authority :CCM/NWR No.C 543/17/1 of date 31/10/2006)

109

165 Opening of Lalkuan (MG) station for outward loading.(Authority :CCM/N.E Rly No.c/147/0/3/PT.IX/TRAIN LOAD/RG of date 25/08/2006)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31/10/2006)

109-110

166 1. Closure of Sasamusa Sugar Works Ltd. Siding served by Sasamusa Railway station of N.E Railway.(Authority CCM/N.E Rly No.C/19/5/2/Pt.II/RS of date 10/08/2006)(Authority: CCM/ N.Rly No.2532-R/N.E Rly /2006, of date 08/09/2006)2. Incusion of Sodepur Goods Shed as a full rake handling point for all commodities except Crane consignment.(Authority:CCM/N.Rly No. 2532-R/N.E Rly /2006, of date 8/09/2006)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31/10/2006)

110

167 Opening of Ghazipur City for full rake handling point (Authorit: CCM/N.E Rly’s No. C/147/0/3/Pt.IX/Train load/RG date 14/08/2006)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31/10/2006)

110-111

168 Up-dated list of Station Goods Sheds /sidings capable of handling full rakes/half rake and two point combination on N.E Railway. (Authority :CCM/S.C. Rly’s No. C.473/990/TL/OR/03/Vol.III date 04/07/2006)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 02/11/2006)

111-112

169 Opening of Mau station of Varanasi division for all loading of description of Goods Traffic in train load.(Authority:CCM/N.E Rly No. C/147/0/3/Pt.VIII/Trainload/RG date 01/09/2006)

112-113

12

Page 13: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 02/11/2006)170 Opening of Farrukhabad (FBD) station of Izzatnagar Division over N.E

Railway.(Authority: CCM/N.E Rly No. C/147/0/3/Pt.IX/Trtain Load/RG date 24/08/2006)

113

194 Opening of Phephna Jn and Yusufpur stations for outward goods traffic.(Authority: CCM/N.E Rly No. C/147/0/3/Pt. IX/TL/RG of date 8/09/2006)(Authority :CCM/NWR No.C .543/7/1 (N.E Rly) of date 12/12/2006)

113-114

195 1. Change in the name of Company from Sharda Sugar & Industries Ltd. To M/s. Bajaj Hindustan Ltd. Siding.(Authority:CCM/NE Rly No. C/19/3/23/Pt.I/RS of date 18/09/2006)2. Opening of Katra Station of Lucknow division for inward coal traffic in train load.(Authority:CCM/NE Rly No. C/147/0/3/PT.IX /Trainload /RG of date 29/09/2006)(Authority :CCM/NWR No.C .543/7/1 (N.E Rly) of date 12/12/2006)

114

197 Opening of Tikunia Station (MG) of Lucknow division for inward traffic of Boulder/stone Ballast only in train load.(Authority: CCM/N.E Rly No. C/147/0/3/PT.IX/Train Load/RG of date 23/10/2006)(Authority :CCM/NWR No.C .543/5/1 (N. Rly) of date 13/12/2006)

114

SOUTHERN RAILWAY173 Movement of Iron Ore booked to Stations /Sidings serving Ports.

(Authority :CCM/S. Rly’s No.C.415/Railway Board/06(FOIS) of date 14/08/2006)(Authority :CCM/NWR No.C .543/9/1 (S.Rly) of date 15/11/2006)

115

174 List of Full rake handling points, Half Rakes handling points and approved two point combinations for booking of rakes of covered wagons like BCX, BCN, BCNA, etc. at train load class rate.(Authority :CCM/S.E Rly’s No.RA.42/5/Pt. XIV of date 28/07/2006)(Authority :CCM/S Rly’s No.C.585/P/Vol.IX of date 22/11/2006)(Authority :CCM/NWR No.C .543/9/1 (S.Rly) of date 14/11/2006)

115-116

176 1. Opening of Morappur (MAP) station for Outward Goods Traffic.(Authority: CCM/S.Rly No. C.37/II/152/ Vol.VI of date 13/09/2006)2. Opening of Angamali for Kaladi on Trivandrum Division for handling half rakes.(Authority: CCM/S.Rly No. C.585/I/Vol.VI of date 09/09/2006)(Authority :CCM/NWR No.C .498/6 of date 22/11/2006)

117

177 1. Opening of Thiruvarur (TVR) (BG) station for Half Rake Goods Traffic. (Authority: CCM/S.Rly No. C.37/II/148/Vol.V of date 28/09/2006)2.Opening of Mayiladuthurai (MY) (BG) station for Half Rake and Full rake Goods traffic.(Authority : CCM/S.Rly No. C.37/II/148/Vol.V of date 19/09/2006)(Authority :CCM/NWR No.C .498/6 of date 22/11/2006)

117

187 Opening of Tondiarpet Marshalling Yard (TNPM) for Goods traffic in Full Rake on Temporary basis.(Authority: CCM/S..Rly’s No. C.37/II/147/Vol. VI of date 03/11/2006)(Authority :CCM/NWR No.C .498/6 of date 30/11/2006)

118

192 Fixing name and code initial of “MANANTHAVADY” out Agency served by Tellicherry Railway Station.

118

13

Page 14: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority: CCM/S.Rly No. C.219/PGT/Mananthavady /Wayned Dist of date22/08/2006)(Authority :CCM/NWR No.C .543/9/1 (S Rly) of date 12/12/2006)

193 Closure of Tirunelveli- Tiruchendur and Villupuram –Mayiladuthurai section –due to Gauge Conversion.(Authority :CCM/S.Rly No. C.478/XIV/New Sec/Vol. V of date 02/11/2006)(Authority :CCM/NWR No.C .543/9/1 (S. Rly) of date 12/12/2006)

118-119

SOUTH CENTRAL RAILWAY178 Revised list of Stations /sidings having full rake /half rake less than half rake

handling capacities and two point combination for movement of covered wagons over S.C Railway. (Authority:CCM/SCRly No.474/990/T.L/2006/Vol.SVI/Part of date 26/09/2006)(Authority :CCM/NWR No.C .498/6 of date 28/11/2006)

119-130

196 1. Opening of Pandarapavani station for handling Inward Coal traffic in Trainloads.(Authority: CCM/ S.C Rly No.C.473/990/TL/2006/Vol.XVI/part of date 07/09/2006)2. Opening of Haddinagundu Station for handling Outward and Inward Goods traffic in Trainloads.(Authority:CCM/NE Rly No. C/473/990/tl/2006/Vol.XVI /Part of date 07/09/2006)3. Opening of Moula-Ali and Kazipet stations for handling inward Steel Traffic in Train Loads.(Authority :CCM/SC Rly No. C.473/990/TL/2006/Vol.XVI/Part. of date 18/09/2006)(Authority :CCM/NWR No.C .543/10/1 (SC Rly) of date 12/12/2006)

131

SOUTH EAST CENTRAL RAILWAY155 Inclusion of the Private siding in the Station code list Sec-I &II of SEC Rly in

Bilaspur and Nagpur Division.(Authority :Sr.S.O/S.E Rly NO. ST /COM/STN/Code/SECR/606 of date 18/07/2006)(Authority :CCM/SE Rly No. RA.42/Misc/86/5 of date 18/8/06) (Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 13/10/2006)

131-132

157 Details of sidings /Goods sheds to handle full rake and half rake over South East Central Railway.(Authority: CCM/NE Rly No. C.386/2/37/WR/RCL of date 25/08/06)(Authority :CCM/NWR No.C 543/12/1 (S.E.C Rly) of date 16/10/2006)

132-136

158 Re-opening of Kusumkasa station for outward Goods traffic.(Authority :CCM/N.E Rly No. C.386/2/37/WR/RCL of date 25/8/06)(Authority :CCM/NWR No.C 543/12/1 (SEC Rly) of date 16/10/2006)

136

SOUTH EASTERN RAILWAY153 1. Loading of full rake at Soro.

(Authority: CCM/SE Rly No. RA.41/Rates/1A/G/Pt.IV/5 of date 08.8.06)2. Closing down of Bhutgoria (BTGA) Station in Adra Div of S.E Railway for booking of goods traffic.(Authority: CCM/SE Rly No. RG.46/1306/ADRA of date 12/09/06)(Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 12/10/2006)

136-137

154 Stations /Sidings serving Ports, on S.E Railway for booking of traffic in Iron 137

14

Page 15: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Ore.(Authority:CCM/SE Rly No. RA.47/710 No. 27 & MGP-48/686 /Freight Adjustment of date 04/08/2006)(Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 13/10/2006)

183 Stations /Sidings capable of handling full rake, Half rake goods shed & two point combinations (covered stock ) on S.E Railway.(Authority: CCM/S.E Rly No. RA.41/Rates /1A/G/Pt.IV/5 of date 26/10/2006)(Authority :CCM/NWR No.C .498/6 of date 29/11/2006)

138-141

202 Opening of Pvt. Siding to serve m/s. Rashmi Metaliks of Barajamda station.(Authority :CCM/SER No.C RG.46/4379 of date 10/11/2006)(Authority :CCM/NWR No.C .543/11/1 (S.E. Rly) of date 19/12/2006)

141-142

206 Opening of Contai Road station (CNT) in KGP Division of S.E. Railway as a half –rake point for inward traffic.(Authority:CCM/S.E .Rly No.Special Rates Circular No. RA.41/ Rates/IA/ G/ Pt.IV /4 of date 11/12/2006)(Authority :CCM/NWR No.C .498/6 of date 29/12/2006)

142

SOUTH WESTERN RAILWAY162 Notification of station under Freight Forwarder Scheme in traditional empty

flow directions.(Authority :CCM/SW Rly No.206/TL/06 (Freight Incentive Scheme) dt. 25/09/2006)(Authority :CCM/NWR No.C 543/13/1 (SW. Rly) of date 30/10/2006)

143

163 Opening of Masarahalli (MSS) station for outward goods traffic.(Authority :CCM/N.E Rly No. C-386/2/32/Pt-I/SECR/RCl of date 11/07/2006)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31/10/2006)

143

188 1. Opening of Kalem (KM ) Station of Hubli Division for Cargo Aggregation Schemes (Authority: CCM/S.W Rly’s No C.206/TL/06 (Freight Incentive Scheme) dtd 29/09/2006)2. Opening of Somalapuram (SLM) station for outward goods traffic.(Authority: CCM/S.W Rly’s No C.206/TL/Vol III of date 12/10/2006)(Authority :CCM/NWR No.C .543/13/1 (SW Rly) of date 06/12/2006)

143-144

189 1. Allotment of Alphabetical Code and Numerical Code for new siding M/s. MSPL –AHB served by Kariganuru Railway Station. (Authority: CCM/S.W Rly’s No C.490/UBL/MSPL/KGW of date 12/10/2006)2. Opening of Belgaum (BGM), Bellary (BAY) and Munirabad (MRB) stations of Hubli Division for Cargo Aggregation Schemes. (Authority: CCM/S.W Rly’s No C.206/TL/06 (Freight Incentive Scheme dtd 11/10/2006) (Authority :CCM/NWR No.C .543/13/1 (SW Rly) of date 06/12/2006)

144

15

Page 16: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

200 1. Extension of Round – the clock working hours of Swamihalli hours of Swamihalli (SMLI) station. (Authority: CCM/SW Rly No. C.37/Goods Shed Working Works of date 20/11/2006)2. Allotment of Alphabetical Code and Numerical code for new Siding M/s. BIOP - served by Bellary Railway station.(Authority :CCM/S.W Rly No. C.490/UBL/BIOP/BAY of date 13/11/2006)3. Opening of Hosur (HSRA) Station for goods traffic.(Authority :CCM/S.W Rly’s no. C.206/TL/05/Vol.III of date 17/11/2006)(Authority :CCM/NWR No.C .543/13/1 (S.W Rly) of date 14/12/2006)

144-145

203 Updated list of station /sidings capable of handling full rake /half rake and two originating points over S.W Rly(Authority :CCM/SWR No.C .206/TL/05 Vol.III of date 30/11/2006)(Authority :CCM/NWR No.C .498/6 of date 19/12/2006)

145-149

WESTERN RAILWAY150 List of full/Half rake of Goods Shed and Sidings on Western Railway.

(Authority: CCM/W.Rly No. C.386/2/37/WR/RCL of date 28/08/2006)(Authority :CCM/NWR No.C 543/14/1 (W. Rly) of date 10/10/2006)

149

151 1. Closure of Neemach-MG, Jaora-MG and Ratlam-MG station for Outward and Inward Goods traffic. (Authority CCM/W.Rly No. C.498/1/8 Vol.III of date 25/09/2006)2. Opening of Champaner Road station for outward Goods traffic(Authority CCM/W.Rly No. C.498/1/7 Vol.III of date 29/09/2006)(Authority :CCM/NWR No.C 543/14/1 (W. Rly) of date 10/10/2006)

150

WEST CENTRAL RAILWAY201 Allotment of Alpha code and Numerical code to sidings on WCR.

(Authority :CCM/WCR No.C .WCR/HQ/GC-237/TMS/Pol of date 17/11/2006)(Authority :CCM/NWR No.C .543/15/1 (W.C Rly) of date 18/12/2006)

150-151

16

Page 17: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

THROUGH RATE CIRCULAR (COACHING)

17

Page 18: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

________________________________________________________________

Para for THROUGH RATE CIRCULAR (COACHING) 12 of 2006________________________________________________________________

Sub: Reorganization of MG services - gauge conversion of AII-COR Section.

Ajmer (AII) – Chittaurgarh (COR) (MG) Section shall remain closed from 00.00 hrs of 15.11.2006 for gauge conversion work. Accordingly all MG trains running on AII-COR section shall remain cancelled.

(Authority: CCM/NWR No.C-175/1 of date 06/12/2006)

18

Page 19: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

THROUGH RATE CIRCULAR ( GOODS)

19

Page 20: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

___________________________________________________________________

Para for THROUGH RATE CIRCULAR 22 (GOODS) of 2006 ___________________________________________________________________________

Sub: Closure of sidings

The competent authority has given sanction for the closure and terminating the agreement of the following siding on AJMER Division of North Western Railway with effect from 14/11/2006.

1. M/s. EDWARD MILLS Ltd BER (MG)2. M/s. NATINAL TEXTILE Mills Ltd BER(MG)3. M/s. MEWAR SUGAR MILLS Ltd Bhupal Sagar

(Authority: CCM/NWR No. C-498/3/AiiPart I of date 17/11/2006)___________________________________________________________________

Para for THROUGH RATE CIRCULAR 23 of 2006

___________________________________________________________________________

Sub: Distances of new Broad Gauge line of Kolayat – Phalodi to be opened shortly.

The following station exists on Kolayat - Phalodi newly constructed BG line to be opened shortly for traffic. The vetted distances and alpha code and numerical codes are given below:A B C D EName of station

Numerical code

Alpha Code

Rounded off Intersectional distance upto two decimal places Ex. Kolayat

Rounded off Inter station distance upto two decimal places Ex. Kolayat

Kolayat 11208163 KLYT 000.00 000.00Diyatra 11208165 DTRD 016.27 016.27Nokhra 11208167 NKRA 038.49 022.22Sird 11208169 SIRD 059.02 020.53Bap 11208171 BAF 076.45 017.43Malar 11208173 MAAR 099.30 022.85Phalodi 11408185 PLC 112.09 012.79

112.09

(Authority: CCM/NWR No. C-541/9/1 of date 23/11/2006)___________________________________________________________________

Para for THROUGH RATE CIRCULAR 24 of 2006

___________________________________________________________________________

Sub: Round the clock working at Hissar (MG & BG) goods shed.

It has been decided to introduce round the clock working at Hissar goods shed of Bikaner Division of North Western Railway with immediate effect.

20

Page 21: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

DRM/BKN is requested to provide adequate infrastructural facilities at Hissar (MG & BG) goods shed such as lighting arrangement, better road surface in circulating area, drinking water arrangements, etc. to avoid hardship to the traders.

This has the approval of competent authority.

(Authority: CCM/NWR No. C-491/B & W hrs. of date 28/11/2006)___________________________________________________________________

Para for THROUGH RATE CIRCULAR 25 (GOODS) of 2006

___________________________________________________________________________

Sub: Freight Incentive SchemeRef: Rly Board’s letter No. TCR/1078/2006/4 of date 28/03/23006 ( Rate Circular No.

25 of 2006 circulated vide this office LRA 45 ( Goods) of 2006 of date 31/03/2006 and TRC 19 (Goods) of 2006 of date 08/08/2006 of this Railway.

As per Railway Board’s directives, the following goods – sheds (BG) is notified on this Railway for Cargo Aggregation and distribution terminal in reference to Cargo Aggregation Scheme with effect from 28/11/2006.

Divisions Goods – sheds(BG)Bikaner MANDI DABWALI - MBY

Wide publicity may kindly be given about the benefit of the scheme to customers and performance to be advised to HQ every month.

This has the approval of competent authority of this railway.

(Authority: CCM/NWR No. C-429/1 of date 29/11/2006)___________________________________________________________________

Para for THROUGH RATE CIRCULAR 26(GOODS) of 2006

___________________________________________________________________________

Sub: Closing of meter gauge NINDHAR BENAR (NDH) station for goods trafficRef: TRC 18 of 2004 of date 29/09/2004, TRC 4 (Goods) of 2005 of date 15/03/2005

& TRC 8 (Goods) of 2006 of date 27/02/2006.

The competent authority has given approval to close NINDHAR BENAR (NDH) station on JP – RGS – SIKR (MG) section of JAIPUR Division of North Western Railway goods traffic, with immediate effect.

(Authority: COM/NWR No. T-2/Goods/547/1/3 of date 06/12/2006)(Authority: CCM/NWR No. C/498/1/11/Vol II of date 06/12/2006)

21

Page 22: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

LOCAL RATE ADVICE (COACHING)

22

Page 23: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

________________________________________________________________________

Para for LOCAL RATE ADVICE (COACHING) 31 of 2006 ________________________________________________________________________

Sub: Schedule of Powers in commercial matter for earning contracts (FM Circular No.41 of 2006)

Ref:-Railway Board’s letter no. 99/TC(FM/10/4 of date 23.10.2000, 1.6.2001,3.6.2004-SOP Circular No.1,2, & 4 (Circular No. 5 to SOP for earning Contracts)

1.0 The Schedule of Powers (SOP) in respect of earning contracts of Commercial department were laid down in terms of Board’s letter No. 99/TC(FM)/10/4 dated 23.10.2000

2.0 The following amendment is made in the SOP:

Tender Committee for dealing with leasing tenders would be constituted as per the revised schedule of powers (SOP) as detailed below. However, it is mentioned that these powers are specifically for leasing of parcel space only and will not be applicable for other earning contracts.

Value of contract Level of Tender Committee Accepting AuthorityUpto Rs. 2 Crs Senior Scale Sr. DCMUpto Rs. 5 Crs. JAG ADRMUpto Rs. 8 Crs JAG DRMUpto Rs. 8 Crs. CCM/FM,FA&CAO/T,CPTM CCM

3.0 All the other conditions will remain unchanged.

4.0 This issues with the concurrence of Finance Directorate of the Ministry of Railways.

( Authority: Railway Board’s letter No.99/TC(FM)/10/4 of date 20/09/2006.)(Authority: CCM/NWR No. C-297/0(Policy) of date 05/10/2006)________________________________________________________________________

Para for LOCAL RATE ADVICE CORRIGENDUM to LRA 31(COACHING) of 2006 ________________________________________________________________________

(Corrigendum to LRA 31 of 2006)Sub: Schedule of Powers in commercial matter for earning contracts (FM Circular

No.41 of 2006)Ref: Railway Board’s letter no. 99/TC(FM/10/4 of date 23.10.2000,

1.6.2001,3.6.2004-SOP Circular No.1,2, & 4 (Circular No. 5 to SOP for earning Contracts)

Following change may be made in this office LRA 31(Coaching) of 2006 dated 05/10/2006

In Para 2.0

23

Page 24: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Value of contract Level of Tender committee Accepting Authority Printed as To be read as CCM/FM,FA&CAO/T,CPTM CCMUpto Rs. 8 Crs Above Rs.8 Crs

(Authority: CCM/NWR No. C-297/0(Policy) of date 11/10/2006)________________________________________________________________________

Para for Local Rate Advice 32 of 2006 (COACHING)________________________________________________________________________

Sub: Introduction of Compulsory packing condition of “Dry Fish”. (FM Circular No.33 of2006)

Ministry of Railways approve of the recommendation contained in CCI’s ResolutionNo. 5915 recorded in their Meeting No. 186 held in February 2006 in Kolkata.

RECOMMENDATION OF THE COMMERCIAL COMMITTEERes. 5915. The Commercial Committee recommends that “Dry Fish” when booked, as parcels should be packed in “Sound Gunny bags” and internally packed in ‘WATER PROOF MATERIAL’. The weight of each bag should be 50 kgs. or less.

( Authority: Railway Board’s letter No. TCII/2046/2006/2 of date 26/07/2006.)(Authority: CCM/NWR No. C-297/0(Policy) of date 12/10/2006)______________________________________________________________________

Para for Local Rate Advice 33 of 2006 (COACHING)________________________________________________________________________

Sub: Revision of charges for Hospital –on-wheels organized by Impact India Foundation, Mumbai

Further to the Ministry of Railway’s instructions issued vide circular letter no. TCII/2221/91/Impact India/Vo.II dated 24.10.2005 on the above subject, the Ministry of Railways have revised various charges to be levied for movement of Hospital-on-wheels as follows:-

i) Haulage Charges : Haulage charges will be recovered at 25% of the actual cost of movement of AC Sleeper Class coaches. These charges will be Rs. 4.54 per vehicle (bogie) Km. for 2005-2006. The charges should be recovered in advance before the movement takes place.

ii) Maintenance charges : Maintenance Charges for the year 2005-06 will be as follows:-a) for non-AC coaches - Rs 2,60,555/- per coachb) for AC Coaches - Rs. 5,21,108/- per coach.

iii) Detention Charges : Detention charges will continue to be collected at the rate of Rs. 5.00 per 8-wheeler vehicle per day.

24

Page 25: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

iv) A revolving lumpsum deposit of Rs. One Lakh thirty thousand (1,30,000) will be maintained with the Central Railway to meet contingent expenses arising on run such as electricity, water, sanitation expenses , etc. Central Railway will deduct these charges on the basis of advice received from the concerned Railway and pass on the credit to them. The Foundation will on demand replenish the amount to the extent required. No other deposit will be collected from the Foundation.

POH interval may continue to be two years to ensure safety.

Other terms and conditions will remain the same.

This issues with the concurrence of the Finance Directorate of Ministry of the Railways.

(Authority: Railway Board’s letter No. TCII/2221/91/Impact India/Vol.II of date 18/09/2006.)(Authority: CCM/NWR No. C-175/1 (Policy) of date 19/10/2006________________________________________________________________________

Para for Local Rate Advice 34 of 2006 (COACHING)________________________________________________________________________

Sub: Rail Travel Concession

Ministry of Railways have agreed, as a special case, to grant 50% concession in Second /Sleeper class Mail /Express fares to students appearing in Final Examination of the four Diploma Courses being conducted by the Institute of Rail Transport i.e (i) Diploma Course in Transport Economics & Management –during February 2007 at Delhi, Chennai, Lucknow & Mumbai (ii) Diploma course in Multi-Model Transport (Containerization) & Logistics Management –during April 2007 at Delhi, Mumbai, Chennai & Lucknow (iii) Diploma course in Rail Transport & Management –during May -2007 at Delhi, Mumbai, Chennai, Kolkata, Secunderabad & Lucknow and (iv) Diploma Course in Port Development & Management –during May 2007 at Delhi, Mumbai, Chennai & Kolkata. Concession will be granted on production of the requisite certificate signed by Executive Director /Manager/Registrar of Institute of Rail Transport, New Delhi. This concession has been granted as a very special case and should not be quoted as precedent. This issues with the concurrence of Finance Directorate of Ministry of Railways.

(Authority: Railway Board’s letter No. TCII/2010/2002/IRT of dated 07.09.2006.)(Authority: CCM/NWR No. C-76/2/O/Concession/Policy/Vol.II of date 19/10/2006)________________________________________________________________________

Para for Local Rate Advice 35 of 2006 (COACHING)________________________________________________________________________

Sub: Rail Travel Concession

Ministry of Railways have agreed, to grant concession appearing in S.No. 18(2) of Annexure to rule 101 of IRCA Coaching Tariff No. 25 Part I (Vol.II) in Second /sleeper class to persons with earnings / emoluments of not more than Rs. 5000/- per month

25

Page 26: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

attending the Annual Conference being organized by Akhil Bharat Rachanatmak Samaj at Triupati (Andhra Pradesh) during November 2006. This concession has been granted as a very special case and should not be quoted as a precedent. This concession is admissible only in normal train services and not for booking of Special Trains /Coaches. The concessional return journey tickets may be issued on payment of one single journey second / sleeper class Mail/Express fares, to persons traveling more than 300 Kms from journey commencing station to station serving the place of Conference on production of the requisite certificate from the secretary of the above mentioned organization.

This issues with the concurrence of Finance Directorate of Ministry of Railways.

( Authority: Railway Board’s letter No. TCII/2066/85/12 of dated 06.09.2006.)(Authority: CCM/NWR No. C-76/2/O/Concession/Policy/Vol.II of date 19/10/2006)________________________________________________________________________

Para for Local Rate Advice 36 of 2006 (COACHING)________________________________________________________________________

Sub: Amendment in Tatkal Scheme (Commercial Circular No. 83 of 2006)

As per extant instructions, following accommodation is earmarked under Tatkal Scheme in different classes:-

Class Number of berths to be earmarked in trains with average occupancy level of Less than 80% More than 80%

2A 4 berths per coach 10 berths per coach 3A 6 berths per coach 16 berths per coachAir Conditioned Chair Car 6 Seats per coach 16 Seats per coachSleeper Class 10% of accommodation or

one coach whichever is less.20% of the available accommodation

2) Keeping in view the utilization of Tatkal Scheme in various trains the matter regarding extent of Tatkal accommodation to be earmarked in different trains has been reviewed and it has been decided that:

i) In those trains where although the average utilization of Tatkal accommodation earmarked in sleeper class is more than 80% the same should be enhanced to 30% of the available accommodation.

ii) In those trains where although the average utilization of Tatkal accommodation is less than 80% yet there is demand during certain specific periods, Tatkal accommodation to be earmarked during such identified specific periods will be as under:-

iii)Class Number of berths per coach2AC 10 berths 3AC 16 berths AC Chair 16 Seats Sleeper 30% of the available accommodation

26

Page 27: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Note : Such period will be identified by the zonal Railway(iii) Tatkal accommodation will also be earmarked in the additional coach (es)

attached on regular basis during peak rush periods as per norms given above.

This issues with the concurrence of Finance Directorate of Ministry of Railways.

( Authority: Railway Board’s letter No. 2003/TG-I/20/P/Tatkal /Pt.II of date 09/10/2006.)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 13/11/2006) ________________________________________________________________________

Para for Local Rate Advice 37 of 2006 (COACHING)________________________________________________________________________

Sub: Utilisation of one compartment of ‘generator car van’ of Garib Rath Express earmarked for disabled persons.(commercial Circular No. 79)

Ministry of Railways have decided that one compartment earmarked for disabled persons in the ‘Generator car van’ Garib Rath Express train scheduled to run between Amritsar and Saharsa, may be utilized for keeping the catering items for supply to passengers.

( Authority: Railway Board’s letter No. 2006/TG-I/20/P of date 29/112006)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 13/11/2006)________________________________________________________________________

Para for Local Rate Advice 38 of 2006 (COACHING)________________________________________________________________________

Sub: Earmarking of seats /berths for physically handicapped persons in SLRD Coaches (Commercial circular No. 74 of 2006)

Please refer to Board’s letter No. 91 /TG-I/20/71 dated 07.9.1995 regarding earmarking of two berths in sleeper Class in all trains running on non-suburban section for handicapped persons performing their journey on handicapped concession ticket.

Some SLR coaches have been modified and provided with specially designed compartment having four berths, two lower and two upper, for handicapped persons (named SLRD coaches) and have been provided in Mail/Express trains. More such coaches are being put on trains. It has been decided that on trains where SLRD coaches have been provided in the trains’ composition, the SLRD may be defined in the PRS system for booking of berths by handicapped persons and their escort traveling on handicapped concessional ticket. In these trains the existing handicapped quota of two Sleeper Class berths (lower berth for handicapped person and upper berth for their escort) shall be withdrawn and merged with the general reservation quota. The unutilized handicapped quota in the SLRD coach should be released to the general passengers at the time of preparation of charts.

CRIS will make necessary software modification for this purpose and inform al concerned.

27

Page 28: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority: Railway Board’s letter No. 2006/TG-I/20/P of date 09/10/2006.)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 13/11/2006)________________________________________________________________________

Para for Local Rate Advice 39 of 2006 (COACHING)________________________________________________________________________

Sub:-Sole rights for Commercial publicity (Commercial Circular No. 90 of 2006)Ref: Railway Board’s letter No. 2005/TGIV/39/8 /EOI dated 1.5.2006. (Commercial

Circular No. 36 of 2006)

Railways have been advised vide Board’s letter referred to above for awarding sole advertisement rights on an entire division. The divisions on which the pilot project was to be implemented were also identified. However, some railways have expressed inability in getting response for sole advertising rights for the entire nominated division. Board has re-examined the issue in the light of response from the zonal railways & the following changes/modifications have been approved.

1. In case there has been no response to sole advertisement rights for the nominated division either on inviting tenders or on contracting the advertisers, CCM may nominate any other division which has the potential for award of sole advertisement rights.

2. In case the entire division can not be nominated for award of sole advertisement rights, a cluster of stations may be selected for award of sole advertisement rights. In case advertisement rights cannot be given for even a cluster of stations. station as a whole may be given for sole advertisement rights. For large stations, where it has been experienced that it is not possible to give the entire station on sole advertisement rights, the station may be divided into convenient zones. The size of a zone for this purpose, however, should not be less than one platform.

3. The period of contract for piecemeal advertisement rights should be 3 to 5 years as per guidelines issued vide policy circular No.24 dated 9.5.2000 on commercial publicity.

4. In order to avoid delay in finalization of reserve price, the divisions are empowered to fix the highest annual earning realized from the zone /station/cluster of stations during the preceding 3 years as the reserve price for that zone /station/cluster of stations. However, in case it felt that the potential of the zone /station/cluster of station is higher, the reserve price can be fixed higher than the highest annual earning as mentioned above.

5. An escalation clause of 10% every year should be built-in all the agreements for contracts other than sole advertisement rights for entire division. In case, the Zonal Railways feel that the escalation clause can be kept higher due to the potential of the area being given for advertisement, the same may be revised upwards.

Other instructions contained in circular under reference will remain applicable.

This issues with the concurrence of Finance Directorate of the Ministry of Railways.

28

Page 29: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

( Authority: Railway Board’s letter No. 2005/TGIV/39/8/EOI of date 23/10/2006.)(Authority: CCM/NWR No. C-436/Resvn Quota /06 of date 15/11/2006 ________________________________________________________________________

Para for LOCAL RATE ADVICE 40 of 2006 (COACHING)________________________________________________________________________

Sub: Concession to Bharat scouts & Guides.

As per S.No. 12 of Annexure to rule 101 of IRCA Coaching Tariff no. 25 Part I (Vol II), Bharat Scouts & Guides are eligible for 50% concession in Second/sleeper class fares of normal train services. In relaxation of the normal rule, Ministry of Railways have agreed as a special case to grant 50% concession in second /sleeper class to Bharat Scouts & Guides by Special Trains /coaches and exempt detention charges for these trains/ coaches run under rule 301 & 401 of IRCA Coaching Tariff No. 25, Part I (Vol I) for the “Special National Jamboree – 2007 for Centenary Year of Scout Movement” at Rajarhat, Kolkatta (West Bengal) during, 2007. All other charges will be recovered in full as per rules. This concession has been granted as a very special case and should not be quoted as a precedent.

(Authority: Railway Board’s No. TC II/2290/82 of date 02/11/2006). (Authority: C C M/NWR No.C.76/2/0/Concessions/Policy Vol II of date 22/11/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 41 of 2006 (COACHING)________________________________________________________________________

Sub: Without waiting for the time limit of three hours (after scheduled departure of the train) to lapse, full refund can be granted at the journey commencing station.

As per rule 213.11 (1) of IRCA Coaching Tariff No 25, Part I (vol.I), if journey is not undertaken due to late running of train by more than three hours, full fare is refunded to reserved, RAC and waitlisted ticket holders on surrendering the ticket upto certain time limits at journey commencing station. Based on Recommendation No. 5936 –C made by Commercial Committee in its Meeting No. 186 (Feb.2006), Ministry of Railways have decided that, without waiting for the time limit of three hours (after scheduled departure of the train) to lapse, full refund can be granted at the journey commencing station immediately after obtaining confirmation from the Station Manager or Control Office that the train is reaching the journey commencing station more than three hours late.

(Authority: Railway Board’s No. TC II/2003/98/Rules of date 27/10/2006). (Authority: C C M/NWR No.C.175/1 of date 7/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 42 of 2006 (COACHING)________________________________________________________________________

Sub: Booking and carriage of Silver anklets /leg chains /silver jewelry/silver handicrafts in passenger compartment as personal luggage.

29

Page 30: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Booking and carriage of Silver anklets /leg chains /silver jewelry/silver handicrafts in passenger compartment as personal luggage have been permitted vide Board’s letters of even number dated 9.5.2005 and 9.8.2005 and these items may be excluded from merchandized items.

(Authority: Railway Board’s No. TC II/2077/04/2 of date 22/11/2006). (Authority: C C M/NWR No.C.297/0 of date 7/12/2006)________________________________________________________________________

Para for LOCAL RATE ADVICE 43 of 2006 (COACHING)________________________________________________________________________

Sub: Rate for Refrigerated Vans (VPRs)

In this context, attention is invited to para (p) 4 of Freight Marketing Circular No. 44 of 2006 issued under Board’s letter No. 2006/TC (FM)/10/8 dated 17/11.2006 as per which reserve price for leasing of round trip Refrigerated Vans (VPRs) on all zonal railways including NF Railway will be 1.25 times of single journey freight for Refrigerated Van i.e (1.25 x1.5 times of Scale-P). Further, leasing of Refrigerated Vans (VPRs) for one way is not permitted. The supply will be according to availability of Refrigerated Vans (VPRs) with one way.

The rates for transportation of perishable commodities in full load of Refrigerated Van (VPR) is 1.5 times the Scale-P as stipulated in para 3.0 of Board’s letter No. 2003/TC(FM)/12/1 dated 19.03.2004, which is applicable for full load of VPR for all types of Mail/Express trains including Mail/Exp. Trains under the category of Standard Parcel Service.

It is clarified that piecemeal booking of perishable traffic through Railway by various rail-users for transportation by Refrigerated Van (VPR) is not permitted.

This is for information and further necessary action. Efforts should be made to lease out Refrigerated Vans (VPRs) on round trip by long distance trains for long term.

(Authority: Railway Board’s No. 2003/TC(FM)/12/1 of date 21/11/2006). (Authority: C C M/NWR No.C.297/0 of date 07/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 44 of 2006 (COACHING)________________________________________________________________________

Sub: Transportation of portion in luggage /Brake Van /Parcel Vans of Passenger carrying trains for alumino-thermit welding (Freight Marking Circular No.46 of 2006)

A general restriction was imposed upon carriage of inflammable materials by passenger

carrying trains. However, transportation of ‘Portion’ for alumino-thermit welding in luggage/Brake Van/Parcel Vans of passenger carrying trains may be permitted subject to fulfillment of packing conditions prescribed in rules 407.1 to 407.3 of IRCA Red Tariff No.

30

Page 31: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

20 with added stipulation that the consignment must be accompanied by authorized staff of Civil Engineering Department in Guard’s Brake Van.

While transporting “Portion’ for alumino- thermit welding from PWIs depots to welding sites, they may be carried by brake vans of goods trains whereas primary transportation from manufacturers’ factory premises to PWIs depots may be organized by Road. In case requirements of 2-3 adjoining depots can be combined, a single truck can be hired for transporting the total consignment of 9-12 tonnes from manufacturers factory premises to depots of respective PWis.

This issues in concurrence with Track, Safety Directors of Ministry of Railways,

(Authority: Railway Board’s No. 2006/TC(FM)/11/14 of date 8/11/2006). (Authority: C C M/NWR No.C.297/0 of date 7/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 45 of 2006 (COACHING)________________________________________________________________________

Sub: Policy for leasing of parcel space in the Brake Vans (SLRs) by passenger carrying trains and leasing of Parcel Vans on round trip basis. (Amendment No. 6 to Comprehensive Parcel Leasing Policy)

Ref: Freight Marketing Circular No. 12,21, 24 and 35 of 2006 circulated vide Board’s letter No. 2006/TC(FM)/10/1 dated 28.03.2006, 03.05.2006, 09.05.2006 and 02.08.2006 respectively.

1.0 Doubts have been raised by the zonal railways in regard to fixation of reserve price for leasing of Parcel Vans as stipulated in ‘Comprehensive Parcel Leasing Policy’ (CPLP).

2.0 With a view to simplify the rules, it has been decided to amend the following paras of ‘Comprehensive Parcel Leasing Policy’ as under:-

Para B (4) is deleted.

Para ( C)11-May be read as : Leasing of VPRs can be done only on round trip basis.

Para (G) 4-(IV)- May be replaced to read as:- Attaching /detaching (Shunting) of Parcel Vans from one train to another train is permission at one enroute Junction station on the jurisdiction of any zonal railway. However , in such cases operational clearance/NOC must be obtained from the concerned zonal railway of enroute station where shunting is required to be done before leasing of Parcel Vans on round trip basis. The zonal railways of that enroute station must reply /give its clearance by return fax within 7 (seven ) days after receipt of the letter from the zonal railway seeking NOC.

Now sub-para may be added below para (J) 2, (J)3 and (K) 3 as under:

However, in case of tenders floated for leasing Parcel Vans (VPs) on round trip basis, registered leaseholders at both the originating as well as the destination

31

Page 32: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

stations of the train can participate in the tenders floated without any fresh registration.

Para (N) 2- Delete word :”Parcel Vans (Parcel Vans)” from 2nd line of Para (N)

New line may be added :- (The reserve price stipulated in this para will not be applicable for leasing of Parcel Vans).

Para (N) 8- May be replaced as:- The Zonal railways, while issuing tender notification for leasing of parcel space, will publish one day’s reserve price for the parcel space to be leased out. The highest bid will be determined on the basis of total annual value of the contract (amount offered by the tenderer X number of days). The tenderer whose annual value of contract is the highest among the participants will be treated as the highest bidder:-

Para (P)1, (P) 2, (P)3, (P)4,(P)5, (P) 6 may be replaced as follows :-Para (P)1 :- The reserve price for leasing of Parcel Vans shall be applicable to all types of services except Shatabdi and Rajdhani Express trains.

Para (P) 2:-Reserve price for leasing of Parcel Van for Single Journey from /to N.F Railway.

Applicable for Reserve Price(i) Parcel Vans towards NFR 1.25 the Scale-P(ii) From NFR to destinations over other zonal

railways 0.4 times the Scale-P

Para (P) 3:-Reserve price for leasing of Parcel Van on Round trip basis.

Applicable for Reserve Price(i) For all origin-destinatins (except from/to

NFR) 1.25 times of single journey freight at Scale-P

(ii) From/ to NFR(whether Parcel Vans are leased out by NFR or other zonal railways)

1.65 times of single journey freight at Scale-P

Para (P) 4:- Reserve price applicable for leasing of round trip Refrigerated Vans (VPRs) on all zonal railways including NF Railway will be as under :-

Applicable for Reserve Price(i) For round trip 1.25 times of single journey

freight for Refrigerated Van i.e (1.25 X 1.5 times of Scale –P)

Leasing of Refrigerated Vans (VPRs) can be done only on round trip basis.

Para (P) 5:- Above Reserve Prices stipulated in Paras (P)2, (P)3 & (P) 4 will be applicable only for Long Term or Medium Term of Short Term Lease of 1 year or more. These rates will not be applicable for either Temporary Lease of 30 days or for

32

Page 33: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Day –to-Day lease. For Temporary Lease or for Day-to-Day lease, the Reserve Price will continue to be the normal parcel rate.New sub-para may be added below para (Z) s as under S as under:-

In case of non loading of leased VPs due to leave, if the leaseholder, later on, desires to load the VP, he may be allowed to do so on any other subsequent day within a period of 30 days from the date of non –loading with the approval of CCM. In such cases, VP will be attached by the same train (if room is available ) or any other train in which room is available. 15% of the lumpsum leased freight of VP already collected towards non loading will be adjusted in the lumpsum leased freight.

3.0 Instructions contained in Freight Marketing Circular No. 23 of 2006 issued vide Board’s letter No.TCII/2046/06/1 dated 04.05.2006 are applicable to non leased parcel traffic booked through Railway by various rail-users for transportation of their piecemeal consignments through train service Brakevans or Parcel Vans (non-leased ).

4.0 This issues with concurrence of Finance Directorate of the Ministry of Railways

(Authority: Railway Board’s No. 2006/TC(FM)/10/8 of date 17/11/2006). (Authority: C C M/NWR No.C.297/0 of date 11/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 46 of 2006 (COACHING)________________________________________________________________________

Sub: Mela Surcharge.

Ministry of Railways have decided that Mela Surcharge, for the remaining days of Cattle Fair going on in Sonepur, will not be levied on Second and sleeper class tickets. The surcharge will continue to be levied on tickets of other classes. The amount of surcharge already collected will not be refunded. This exemption has been granted as a very special case and should not be quoted as precedent.

This issues with the concurrence of Finance Directorate of this Ministry.

(Authority: Railway Board’s No. TCII/2067/06/Mela Surcharge of date 23/11/2006). (Authority: C C M/NWR No.C.175/1 of date 11/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 47 of 2006 (COACHING)________________________________________________________________________

Sub: Rail Travel Coupons. (Commercial Circular No.95 of 2006)

As per rules contained in IRCA Coaching Tariff No. 25, Part I (Vol. I), the facility of purchasing tickets in exchange of Rail Travel Coupons is available to Members & ex-Members of certain State Legislatures and coupons books are issued in the name of the concerned Member/ex-Member. They can also purchase tickets against coupons for the eligible persons accompanying them. It is clarified that in cases where the concerned

33

Page 34: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Member/ex-Member has purchased tickets against coupons for himself /herself and the eligible persons accompanying him/her but the Member/ex-Member does not travel for any reason, the persons supposed to accompany the concerned Member/ex-Member are also not eligible to travel. If some person is found traveling without the concerned Member/ex-Member, he/she will be charged accordingly. Zonal Railways may advise the position to concerned Secretariats of Legislative Assemblies so the Hon’ble Members/ex-Members are aware of this position.

(Authority: Railway Board’s No. TCII/2256/88/POL of date 08/11/2006). (Authority: C C M/NWR No.C.175/1 of date 11/12/2006)________________________________________________________________________

Para for LOCAL RATE ADVICE 48 of 2006 (COACHING)________________________________________________________________________

Sub: Rail Travel Coupons. (Commercial Circular No.98 of 2006)

In the past, a number of instructions have been issued on the levy of Mela surcharge. The instruction issued in the past on the above subject have been compiled and a copy of the same is given below:

Levy of Mela Surcharge :

(1) Zonal Railways should in consultation with their FA7CAO, make list of major melas in respect of which special arrangements are required to be made and levy the prescribed class-wise flat Mela Surcharge (introduced from 1.1.83)

(2) The special arrangements mentioned above will be such as opening of additional booking counters, erection of pilgrim sheds, running of Mela Specials etc. This additional surcharge has necessarily to be with reference to themagnitude of traffic handled , arrangements made and the level of expenditures such as those mentioned above, are not made to clear the extra rush.

(3) The Rate of Mela Surcharge is as under:

Class Mela Surcharge per passenger

Class Mela Surcharge per passenger

Second Rs.3/- First Rs.10/-Sleeper Rs. 5/- A.C. 2 –tier Rs.10/-A.C.Chair Car Rs. 7/- A.C First Rs. 15/-A.C.3 tier Rs.7/-

(4) The surcharge will be levied for the duration of the Mela, which will be worked by the Zonal Railway administrations. This surcharge will be levied directly by Zonal Railways irrespective of whether the passenger travels by Mela specials or other scheduled trains.

(5) Mela surcharge will levied in respect of following type of tickets:

(i) Outward tickets issued form Mela stations.(ii) Return tickets to Mela stations and back.

34

Page 35: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(iii) Mela surcharge will levied in respect of tickets costing more than Rs. 15 /-(basic fare). This surcharge will not be levied on tickets costing upto Rs. 15/- (basic fare).

(iv) This surcharge will not be levied on single journey tickets issued from various stations on Indian Railways to Mela Stations.

(6) No Part of Mela Surcharge is reimbursed to the State Government/Municipalities.

(Authority: Board’s letters TC II/2067/75 dated 25.4.81, 28/30.11.82, 01.06.83, 30.5.84, 26.4.92,14.09.94,3.10.97,15.10.97 & 17.7.98)(Authority: Railway Board’s No. TCII/2067/06/Mela Surcharge of date 17/11/2006). (Authority: C C M/NWR No.C.175/1 of date 11/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 49 of 2006 (COACHING)________________________________________________________________________

Sub: Levy of Mela Surcharge.(Commercial Circular No. 94 of 2006)

As per rule 250 of IRCA Coaching Tariff No. 25, Part I (Vol.I ) the Members and ex-Members of Bihar State Legislature are entitled to purchase tickets through Coupons for Second, Sleeper, First, AC-2-tier and AC 3-tier classes, subject to certain conditions. On request from Bihar Vidhan Sabha, Ministry of Railways have decided that tickets against coupons may be issued to Members & ex- Members of Bihar State Legislature , for travel anywhere within India, by trains in AC First, AC 2-tier and AC 3 tier classes only.

This is for information and necessary instructions may please be issued to all concerned. Please acknowledge receipt of this letter.

(Authority: Railway Board’s No. TCII/2256/82/1 /of date 11/12/2006). (Authority: C C M/NWR No.C.175/1 of date 11 /12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 50 of 2006 (COACHING)________________________________________________________________________

Sub: Modification of packing condition of ‘Iced fish/fresh fish’. (Freight marketing Circular 48 of 2006).

The recommendation of CCI contained in their Resolution No. 5936 E recorded in heir meeting No 186 held in Feb. 2006 has been examined. Ministry of Railways have decided that ‘Fish Fresh/ Iced Fish’ must be packed in thermo Cole Boxes not exceeding 40 Kgs in weight subject to trail basis.

Confirmed Resolution – Meeting No 186 (Feb. 2006)

Min. 5936E – Proposal for review of packing condition of ‘Iced Fish’.

Recommendation of the Rates Managers’ Sub Committee:-

35

Page 36: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Rates Managers’ Sub Committee recommend that ‘ Fish Fresh/Iced Fish’ must be packed in Thermo Cole boxes not exceeding 40 Kgs in weight and the rule No 203 of IRCA Coaching Tariff No 25 Part I (Vol III) be amended.

Reasons: Since Thermo Cole boxes are durable, bad conductor of heat, cheaper than plastic box, fish remain good up to 72 hours and further it will not damage other conditions and free from obnoxious smelling.

(Authority: Railway Board’s No. TCII/2046/2004/6 of date 29/11/2006). (Authority: C C M/NWR No.C.297/0 of date 15/12/2006)________________________________________________________________________

Para for LOCAL RATE ADVICE 51 of 2006 (COACHING)________________________________________________________________________

Sub: Rail Travel Concession

Ministry of Railways have agreed, as a special case, to grant 50% concession in second /sleeper class Mail/Express fares to persons going to Dharmavaram to attend the celebrations of Shri Sathya Sai Seva Organisation, Prasanthi Nilayam during (1) Christmas in December 2006 (2) Mahashivaratri in February 2007, (3) Guru Purnima in July 2007 (4) Onam in August 2007, (5) Krishna Janmashthami in September 200, (6) Dussehra in October 2007 and (7) Deepavali in November 2007 and back. The concessional return journey ticket, valid for one month from the date of commencement of outward journey, shall be issued directly by the Station Masters on production of a certificate from the concerned State President of Sri Sathya Sai Seva Organisation to the effect that the concerned person is going to attend the celebrations organized by the above mentioned organization during the concerned festival. This concession shall be granted without any minimum distance of travel.This issues with the concurrence of Finance Directorate of Railway Board Ministry.

(Authority: Railway Board’s No. TCII/2053/95 of date 5/12/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 52 of 2006 (COACHING)________________________________________________________________________

Sub: Concession admissible to sportspersons participating in tournaments/ championship organized by School Games Federation of India

Vide Ministry of Railways telemax of even number dated 16.5.06, the concession admissible to sportspersons participating in tournaments/ championship organized by School Games Federation of India was withdrawn. In pursuance of the orders dated 25.8.06, 4.10.06, 7.12.06 of Hon’ble High Court, Allahabed in case No.44107 & 4088 of 2006, It has been decided to restore the above mentioned concession with immediate effect, pending final outcome of the case.

(Authority: Railway Board’s No. TCII/2035/06/School Games of date 8/12/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006)

36

Page 37: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

_______________________________________________________________________

Para for LOCAL RATE ADVICE 53 of 2006 (COACHING)________________________________________________________________________

Sub: Collection charges on Terminal Tax /Pilgrim Tax collected on tickets sold by the Railways.

The Ministry of Railway had last revised the rate of collection charges on Pilgrim Tax to 31 % vide Board’s letter of even number dated 28/04/2004 which was valid upto 31/03/2005. it has now been decided that rate as advised shall continue to remain applicable for a for a further period of three years effective from 01/04/2005.

(Authority: Railway Board’s No.2003/F(Comml.)/7/1 of date 28/11/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006) ________________________________________________________________________

Para for LOCAL RATE ADVICE 54 of 2006 (COACHING)________________________________________________________________________

Sub: Super fast surcharge.

In the past, a number of instruction have been issued on the criteria on declaration of trains as superfast, amount of superfast surcharge, when it is to be levied, etc. The instructions issued in the past on the above subject have been compiled and a copy of the same is given below

Superfast trains and surcharge:1) For declaring Mail/Express trains as superfast trains for the purpose of levy of

supplementary charge( i.e. superfast surcharge), only the average speed of the trains/ train is taken into consideration. For this purpose, the average speed of the train will be 55 Kmph or more on Broad Gauge trains and 45 Kmph or more on Metre Gauge trains. The average speed is calculated by dividing the end to end distance by total journey time. The average speed criteria need to be satisfied in both up and down directions for a particular pair of train. Zonal Railways themselves declare the train as superfast when it fulfils the requisite speed criteria. As an exception, Howrah – Kalka Mail has been categorized as a superfast train for travel between Delhi and Howrah only.

2) i) The rate of superfast surcharge, effective from 20/06/1998 is as under:

Class Superfast surcharge (Rs)Second 10Sleeper 20AC chair Car 30AC 3 tier 30First 30AC 2 tier 30AC first 50

37

Page 38: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

iv) The charges for monthly & quarterly superfast surcharge tickets (for season ticket holders), as revised from 15/02/2006 are as under:

Class Monthly superfast surcharge ticket Quarterly superfast surcharge ticketFirst and Second

Equivalent to superfast surcharge for 15 single journeys in the concerned class

Equivalent to superfast surcharge for 45 single journeys in the concerned class

3) Superfast surcharge is levied on all passengers, irrespective of distance, separately for each journey. On tickets involving more than one journey , i.e. where break journey is involved and circular journey tickets, superfast surcharge will be levied only once ( and not separately for each leg of journey).

4) In the case of Season tickets, superfast surcharge is levied subject to the provisions contained in the Season ticket rule.

Copy IRCA: for issue of necessary correction slip to IRCA Coaching Tariff No. 25 Part I (Vol I). A new rule may be incorporated after rule 204 and shown in the index also.

Besides, the words “The cost of this ticket is equivalent to the superfast surcharge for 15 single journeys in the case of Monthly Superfast Surcharge Tickets and 45 single journeys in the case of Quarterly Superfast Surcharge Tickets.” Appearing in rule 242 (vi) may be deleted.

(Authority: Railway Board’s NoTCII/2910/97/SF /Policy of date 1/12/2006). (Authority: C C M/NWR No.C.175/1 of date 18/12/2006) ______________________________________________________________________

Para for LOCAL RATE ADVICE 55 of 2006 (COACHING)________________________________________________________________________

Sub: HOR facility to Chief Information Commissioner and information Commissioners.

Ministry of Railways (Railway Board) have decided that Chief Information Commissioner and four Information Commissioners in the Central Information Commission, New Delhi who have been given all the facilities equal to that given to Chief Election Commissioner / Election Commissioners, may avail HOR facility while traveling on official duty equivalent to the facilities admissible to Chief Election Commissioner/Election Commissioners.

(Authority: Railway Board’s No.2006/TG.1/27/3 of date 22/11/2006).(Authority: C C M/NWR No.C.175/1 of date 26/12/2006)________________________________________________________________________

Para for LOCAL RATE ADVICE 56 of 2006 (COACHING)________________________________________________________________________

Sub: Delegation of powers to CCMs for joint re-weighment of Parcel Vans (VPHs/ VPs/ VPUs ) at party’s request.

38

Page 39: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Some instances of dispute about correctness of weighment done by the Railways on in – motion weighbridge at enroute station for the consignment loaded in Parcel Vans ( VPHs/ VPs/ VPUS) have come to the notice of Railway Board which led to Court interventions.

The matter has been examined and it has been decided that if any party requests for second re – weighment at destination station against the result of in – motion weighbridge carried out by railway at enroute station, the Chief Commercial Manager of the zonal railway may permit second re – weighment of the consignment loaded in Parcel Vans at destination on weighing Scale at party’s own cost

(Authority: Railway Board’s No.2006/TC (FM)/11/16 of date 11/12//2006).(Authority: C C M/NWR No.C.297/0 (Policy)/ of date 26/12/2006)

39

Page 40: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

LOCAL RATE ADVICE (GOODS)

40

Page 41: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

______________________________________________________________________

Para for Local Rate Advice 135 of 2006 (GOODS)_________________________________________________________________________

Sub: Rebate in freight for traffic transported in wagons owned by M/s National Aluminium Company (NALCO) Ltd., Bhubaneswar & M/s Andhra Sugars Ltd./Tanauka (Rates Circular No. 78 of 2006)

Ref: 1. Board’s letter no.TCR/1644/2004/1(A) dated 29.9.2005 (Rates Circular No.55 of 2005 circulated vide this office LRA 92 (Goods) of 2005 of date 07/10/2005).2. Board’s letter no.TCR/1644/2004/1 dated 10.2.2006 (Rates Circular No.13 of 2006 circulated vide this office LRA 24 (Goods) of 2006 of date 22/02/2006).

Sanction of the Central Government is hereby accorded to grant rebate in freight for Caustic Soda/Caustic Soda Lye/ Caustic Soda Liquor, Alumina & Furnace Oil when loaded and transported in privately owned wagons as under:

Commodity Name of the Station to Station from Percentage rebate to beCompany given on normal tariff

rates for loading in

Wagonloads Trainloads

Caustic NALCO Vizag Port NALCO’s exchange 10.2% 10.9%Soda/Caustic yard at DamanjodiSoda Lye/ (NLOD)Caustic SodaLiquor

Alumina NALCO NALCO’s Vizag Port 8.0% 8.5%exchange yardat Damanjodi(NLOD)--do-- Budhapank

Furnace Oil NALCO -- -- 6.9% 6.9%

Caustic Soda M/s Andhra M/s Andhra NALCO/Damanjodi 10.2% 10.9%Lye Sugars Ltd Sugars Ltd.’s

/Tanauka siding served byKovvuru Station.

The percentage rebate indicated above would remain in force from 01.10.2006 to 30.9.2007. The rebate in case of Furnace Oil will be applicable for the stream(s) notified bythe Operating Department of the Zonal Railways in consultation with Traffic Transportation Directorate in the Ministry of Railways.

41

Page 42: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

It may be ensured that before the rebate in freight indicated above is notified, necessary agreement for the transport of traffic in privately owned wagons is entered intoby the party with the Railways.

This issues with the concurrence of the Finance Directorate in the Ministry ofRailways.

(Authority: Railway Board No.TCR/1644/2006/2 of date 26/09/2006)(Authority: CCM/NWR No. C-433/2 of date 03/10/2006)_________________________________________________________________________

Para for Local Rate Advice 136 of 2006 (GOODS)_________________________________________________________________________

Sub: Rebate in freight for Ammonia (Anhydrous Liquefied Gas) and Phosphoric Acid transported in privately owned tank wagons.

Further to Board’s letter, No.TCR/1644/2004/1(B) dated 29.09.2005 (Rates Circular No.56 of 2005 circulated vide this office LRA 93 (Goods) ) of 2005 of date 07/10/2005), sanction of the Central Government is hereby accorded to grant rebate in freight for Ammonia (Anhydrous Liquefied Gas) and Phosphoric Acid when transported in privately owned wagons as under:

Commodity Percentage rebate to be given on normal tariff rates for loading in

Wagonloads Trainloads

Ammonia 6.9% 6.9%(Anhydrous Liquefied Gas)

Phosphoric Acid 6.9% 6.9%

The percentage rebate indicated above would remain in force from 01.10.2006 to30.09.2007. The rebate will be applicable for the streams notified by the Operating Department of the Zonal Railways in consultation with Traffic Transportation Directoratein the Ministry of Railways from time to time.

The rebate in freight charges for both Ammonia (Anhydrous Liquefied Gas) and Phosphoric Acid in privately owned tank wagons may be allowed at the time of booking in respect of those parties who have paid the annual maintenance charges in advance at the commencement of the year. The transfer of tank wagons from owners of such wagons to parties hiring such tank wagons for transportation of the commodities should have the prior approval of Traffic Transportation Directorate in the Ministry of Railways. Prior to notification of the rebate in freight to parties involved, the Railways may enter into an agreement with the parties for the transportation of the above-mentioned commodities in privately owned wagons.

This issues with the concurrence of the Finance Directorate in the Ministry ofRailways.

42

Page 43: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority: Railway Board No.TCR/1644/2006/2 of date 26/09/2006)(Authority: CCM/NWR No. C-433/2 of date 03/10/2006)_________________________________________________________________________

Para for Local Rate Advice 137 of 2006 (GOODS)_________________________________________________________________________

Sub: Rebate in freight for Liquefied Petroleum Gas (LPG) transported in jointly owned tank wagons of the Railways and Oil Industry.

Further to Board’s letter no.TCR/1644/2004/1(C) dated 29.09.2005 (Rates Circular No.57 of 2005 circulated vide this office LRA 94 (Goods) of 2005 of date 07/10/2005), sanction of the Central Government is hereby accorded to grant rebate in freight for Liquefied Petroleum Gas (LPG) transported in jointly owned wagons as under:

Commodity Percentage rebate to be given onnormal tariff rates for loading in

Wagonloads Trainloads

Liquefied Petroleum Gas (LPG) 4.0% 4.2%

The percentage rebate indicated above would remain in force from 01.10.2006 to 30.9.2007.

The rebate admissible in freight will be granted at the time of booking provided the stipulations contained in Board’s letters No.TCR/1644/83/4 dated 07.12.1983 & No.TCR/1644/96/4 dated 20.03.1998 are complied by the Oil Companies. The rebate will not be granted in case of default in payment of maintenance charges for the underframe by the Oil Companies.

It may be ensured that details of such jointly owned LPG tank wagons are available with the booking staff so that the rebate in freight is restricted to movements in jointly owned LPG tank wagons only.

Before the rebate in freight indicated above is notified, necessary agreement for the transport of LPG in jointly owned tank wagons be entered into by the party with the Railways.

This issues with the concurrence of the Finance Directorate in the Ministry of Railways.

(Authority: Railway Board No.TCR/1644/2006/2 of date 26/09/2006)(Authority: CCM/NWR No. C-433/2 of date 03/10/2006)_________________________________________________________________________

Para for Local Rate Advice 138 of 2006 (GOODS)_________________________________________________________________________

Sub: Rationalization of rates for Military Traffic.

43

Page 44: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Ref: Rate Circular 21 of 2006 of date 14/03/2006 circulated vide this office LRA 40 (Goods) of 2006 of date 28/03/2006.

The matter has been examined and it has advised that in case of mixed trains, freight should be levied for actual number of coaches / wagons at coaching vehicle rates, subject to minimum charge for 25 bogie wagons and 5 coaching vehicles. Illustration is given below for guidance:

Composition of mixed trains. Charges to be levied for20 bogie wagon + 1 coaching vehicle 25 bogie wagon + 5 coaching vehicle30 bogie wagon + 1 coaching vehicle 30 bogie wagon + 5 coaching vehicle30 bogie wagon + 10 coaching vehicle 30 bogie wagon + 10 coaching vehicle24 bogie wagon + 6 coaching vehicle 25 bogie wagon + 6 coaching vehicle

(Authority: Railway Board No.TC-I/2001/8/6 of date 25/09/2006)(Authority: CCM/NWR No. C-541/1 of date 04/10/2006)_________________________________________________________________________

Para for Local Rate Advice 139 of 2006 (GOODS)_________________________________________________________________________

Sub:-Dynamic Pricing (Freight Business) (Rate Circular No.81 of 2006)

Busy Season Pricing: Sanction of the Central Government is accorded to levy Busy Season Surcharge on freight charges at the rates mentioned in the Table below during the Busy Season extending from 1st November, 2006 to 31st March 2007. This surcharge will be levied on the applicable Base Freight Rates published in the Goods Tariff No. 44 Pt.II

Commodities Rate of SurchargeCommodities in Coal& Coke Group 4%Commodities in Class 160 and below except Coal & coke Group

6%

Commodities in class 170 4%Commodities in classes above class 170 NIL

Normal Tariff Rate (NTR): Normal Tariff Rate for commodities will be the Base Freight Rate as published in Goods Tariff No. 44 (Pt.II) plus Busy Season Surcharge, if applicable. Other charges like punitive charges, surcharge specified in Consignment Volume Based Scheme (as mentioned in Rate Circular No. 25 of 2006) etc as well as freight concessions/ discounts /rebates will be levied on NTR.

This issues with the concurrence of the Finance Directorate in the Ministry of Railways.

(Authority: Railway Board No.TCR/1078/2006/5 of date 05/10/2006)(Authority: CCM/NWR No. C-423/1 of date 11/10/2006)_________________________________________________________________________

Local Rate Advice 140 of 2006 (GOODS)_________________________________________________________________________

44

Page 45: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Sub: Increase in permissible carrying capacity of wagons on CC+8 and CC+6 routes (Rate circular No.82 of 2006)

Ref: Rate Circular 41of 2006, Corrigendum to Rates Circular No. 41 of 2006 and Rates circular No.51 of 2206.

1.0 In continuation of Rates Circulars referred above, Ministry of Railways has decided to include following CC+6 routes for running of BOXN /BOXNHS /BOBR/BOBRN/BCN/BCNA/BCNAHS/BOST wasons in the pilot project.

S.No. Railways Routes1 CR Itarsi-Ghoradongri2 ER Panskura –Kolkata area terminals of ER via Dankuni3 SCR BPQ-Manchiryal including MAGH-GDCR Branch4 SCR SYI-Karepalli5 SCR Pandekallu-Gooty6 SCR Jaggayapet-Motumarri7 SER Mohuda-Gomoh8 WCR Chheoki-Manikpur9 WCR Satna –Rewa10 WCR Jabalpur-Itarsi

2.0 All the terms and conditions mentioned in Rates Circulars No. 41 and 51 of 2006 will remain unchanged.

3.0 These instructions will come into force w.e.f 14.10.2006.

4.0 This issues in consultation with Traffic Transportation, Mechanical, and Civil Engineering Directorates and with the concurrence of Finance Directorate in the Ministry of Railway.

(Authority: Railway Board No.TCR/1394/2004/2 of date 5/10/2006)(Authority: CCM/NWR No. C-176/4 of date 11/10/2006)_________________________________________________________________________

Para for Local Rate Advice 141 of 2006 (GOODS)_________________________________________________________________________

Sub: Rebate in freight rates on Alumina traffic transported in the privately owned tank wagons in favour of M/s. Hindalco Industries Ltd (Rate Circular no. 85 of 2006).

Sanction of the Central Government is hereby accorded to grant rebate in freight on Alumina when loaded and transported in privately owned wagons as under:

Commodity Name of the Company

Station from

Station to Percentage rebate to be given on normal tariff rates for loading inWagonload Trainload

Alumina M/s. Hindalco Industries Ltd

Hindalco siding, Muri

Hindalco siding, Hirakud and renukot

8.09% 8.5%

45

Page 46: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

The percentage rebate indicated above will come into force with immediate effect and will remain valid till 30/09/2007. It may be ensured that before the rebate in freight indicated above is notified, necessary agreement for the transport of traffic in privately owned wagons is entered into by the party with the Railways.

This issues with the concurrence of the Finance Directorate in the Ministry of Railways.

(Authority: Railway Board No.TCR/1644/2006/1 of date 10/10/2006)(Authority: CCM/NWR No. C-433/2 of date 16/10/2006)_________________________________________________________________________

Para for Local Rate Advice 142 of 2006 (GOODS)_________________________________________________________________________

Sub: Policy for leasing of Parcel space in the Brake Vans (SLRs) by passenger carrying trains and leasing of parcel Vans on round trip basis (Freight Marketing Circular No. 42 of 2006).

1. A doubt has been raised by Central Railway whether under para ‘Z’ of ‘Comprehensive Parcel Leasing Policy’ circulated under Freight Marketing Circular No. 12 of 2006, leave can be availed only on National holidays and Regional holidays or it can be availed of by the lease holder as per his choice and requirement without linking it to Natinal holidays/ Regional holidays.

2. It is clarified that leave can be availed of by lease holder as per his need and requirement at the rate of maximum one day per 30 days’ of operation which can be accumulated and availed of at one time also till expiry of one year period irrespective of the fact that leave availed falls on National holidays Regional holidays/ festivals or not. Other terms and conditions will remain unchanged.

3. This issues with the concurrence of Finance Directorate of the Ministry of Railways.

(Authority: Railway Board No.2006/TC (FM)/10/1 of date 27/09/2006)(Authority: CCM/NWR No. C-297/0(Policy) of date 16/10/2006) _________________________________________________________________________

Para for Local Rate Advice 143 of 2006 (GOODS)_________________________________________________________________________

Sub: Restriction on leasing of Assistant Guard’s Cabin by Garib Rath trains(Freight Marketing Circular No. 43 of 2006).

1. As per para ( C ) 3 (iii) and para ( H ) of ‘Comprehensive Parcel Leasing Policy’ issued vide Board’s letter No. 2006/TC(FM)/10/1 dated 28/03/2006 under Freight Marketing Circular No. 12 of 2006, the zonal railways may lease out 1 tonne parcel space in the Assistant Guard’s cabin of Passenger carrying trains.

46

Page 47: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

2. It has been decided by Board that the parcel space of assistant Guard Cabin of Garib Rath Express trains, which will be introduced shortly, will not be leased out for parcel traffic. The parcel space of Assistant Guard Cabin of Garib Rath Express will be utilized for storage of Bed rolls.

3. This issues with the concurrence of Finance Directorate of the Ministry of Railways.

(Authority: Railway Board No.2006/TC (FM)/10/1 of date 27/09/2006)(Authority: CCM/NWR No. C-297/0(Policy) of date 16/10/2006) _________________________________________________________________________

Para for Local Rate Advice 144 of 2006 (GOODS)_________________________________________________________________________

Sub: Classification of Rock Phosphate Powder.(Rate Circular No. 83 of 2006)Ref: Board’s letter No.TCR/1078/2006/3 dated 10.3.2006 (Rates Circular No.20 of

2006).

Reference has been received seeking clarification in regard to classification of Rock Phosphate Powder. It is clarified that Rock Phosphate Powder falls under commodity head “Chemical Manures”. As such, it should be charged in class -120 for trainload class rate.

It has been further decided that following should be inserted below NPK Fertilizers under the main commodity head ‘Chemical Manures’ at S.No.6 of Goods Tariff No.44 Pt. IVol. II with immediate effect :

Rock Phosphate (in bag) CC P1 Rock Phosphate (loose) Enhanced CC P2(a)

This issues with the concurrence of Finance Directorate in the Ministry of Railways.(Authority: Railway Board No. No.TCR/1015/2006/15 dated 10/10/2006)(Authority: CCM/NWR No. C-70/1 (Policy) of date 18/10/2006) _________________________________________________________________________

Para for Local Rate Advice 145 of 2006 (GOODS)_________________________________________________________________________

Sub: Free time for loading/unloading of covered wagons (Rate Circular No. 84 of 2006)

Ref: Railway Board’s letter No. TC-I/2005/201/2 dt. 19.12.2005 (circulating Rates Circular No.74 of 2005 circulated vide this office LRA 1/2006 (Goods) dtd 03/01/2006)

In partial modification to the Board’s Circular mentioned above, it has been decided to revise the free time for manual loading/unloading of covered wagons. The revised free time for loading/unloading of covered wagons will be as under:

Type of wagons Permissible Free Time (in hours & minutes)MECHANIZED MANUAL

47

Page 48: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Loading Unloading Loading UnloadingCovered wagonslike BCN, BCNA,BCNHS,BCNAHS, BCX,BCXN etc.

N.A. N.A.

5:00(1to 20 wagons)

7:00(21 to 30 wagons)

9:00(31 wagons & above )

5:00(1to 20 wagons)

7:00(21 to 30 wagons)

9:00(31 wagons & above )

2.0 Accordingly Para 2.2 of Rates Circular No.4 of 2005 (circulated vide this office LRA 13 of 2005 (Goods) dtd 03/12/05) stands modified. Other instructions will remain unchanged.

3.0 These instructions will be effective w.e.f. 24.10.2006.

4.0 This issues with the concurrence of the Finance and Traffic Transportation Directorates in the Ministry of Railways.

(Authority: Railway Board No. No.TC-1/2005/201/2 Pt.D dated 10/10/2006)(Authority: CCM/NWR No. C-299/0 (Policy) of date 18/10/2006) _________________________________________________________________________

Para for Local Rate Advice 146 of 2006 (GOODS)_________________________________________________________________________

Sub: Issue of RR after weighment of consignment at weighbridge (Rates Circular No. 86/2006

Instructions regarding issue of RR and weighment of rakes/wagons have been reviewed in Board’s office and it has been decided that Zonal Railways should follow the instructions/procedure as given below for weighment of rakes/wagons and issue of RR:-

A. Instructions

1. COM of each Railway will immediately notify the Associated weighbridge(s) at which rakes loaded at each loading point for each stream are required to be weighed and advise the same to all Zonal Railways and Board’s office. Approval of the COM of the concerned Zonal Railway should be taken if the Associated weighbridge lies in other Zonal Railway. Weighbridges which have been planned or are being planned, but are yet to be installed may also be notified. Weighment of loading done at stations served by these weighbridges till these become operational, will be done at an alternative weighbridge only if it is operationally not inconvenient as certified by COM of the Railway.

2. COM of each Railway will also notify Alternate Associated Weighbridge where weighment will be done if the Associated weighbridge is defective and advise the same to all Zonal Railways and Board’s office. Approval of the COM of the concerned Zonal Railway should be taken if the Alternate Associated weighbridge lies in other Zonal Railway. Weighbridges which have been planned or are being planned, but are yet to be installed may also be notified.

48

Page 49: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

3. A reliable means of communication should be set up between the Associated and Alternate Associated weighbridges and the corresponding loading point for communicating results of the weighment to the loading point.

4. Means of communication mentioned above could be a FAX to begin with. Eventually, it has to be upgraded to inter-system communication between the weighbridge and the TMS module of FOIS. FOIS will provide TMS terminal at every weighbridge location. Railway should advise the commissioning of communication system at the weighbridge station, immediately after its commissioning.

4.1 However, if FOIS terminal is provided at the weighbridge station but interface between weighbridge and TMS is not developed, weighbridge staff should enter the weighment of wagons/rakes manually in the TMS module of FOIS provided at weighbridge station.

5. FOIS will develop an interface between the weighbridge and TMS so that the weighment information is directly transmitted from weighbridge to the TMS system.

B. Procedure for weighment of wagons/rakes and issue of RR

1. Loading point will prepare Vehicle Guidance (VG) in duplicate duly indicating the wagon No., CC, Tare, Consignor, Consignee etc and will hand over to the guard. This will be ensured by Station Supervisor / Goods supervisor of the concerned loading point.

2. The guards of the train will handover one copy of Vehicle Guidance (VG) to weighbridge clerk at weighment point. The weighbridge clerk will weigh the wagons duly indicating all the records of CC, Tare etc. The result of the weighment should be communicated to the loading point.

3. Weighment information from the Associated weighbridge location will be furnished to the loading point immediately. RR should be prepared in terms of Para 1451(c) of IRCM, Vol. II. which is being modified and Para 1451(d) of IRCM, Vol. II which is being inserted as under:

1451(c)

“ There should be no undue delay in the issue of Railway Receipts to consignors. Railway Receipts should normally be made over to the consignor within 24 hours from loading of the consignment. Concerned DCM/Sr. DCM of the loading points may however permit issuance of Railway Receipt not later than 48 hours from the time of completion of loading of goods to ensure that Railway Receipt is prepared on actual weighment details. If it is not possible to make over Railway Receipt within the above period as per actual weighment details, Railway Receipt should be prepared on the basis of Sender’ s Weight.”

1451(d)

“ However, in case of continuous Bank Holidays, force majeure conditions etc., DRM may allow further extension of time for issue of RR up to the next working day of the bank through a written authority.”

49

Page 50: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

An advance correction slip No. 30 to IRCM Vol.II is enclosed for information and necessary action.

4. Remaining loading points will progressively switch over to issuing of RR only as per actual weighment details as and when their Associated weighbridges get commissioned. In case of those weighment points where FOIS terminal is not provided or out of order , possibility of feeding of data of weighment of rakes in nearby FOIS terminals, preferably on same division, may be explored.

5. An endorsement will be made in the RR indicating whether it has been prepared on the basis of sender’ s weight or actual weighment.

6. Punitive charges for overloading, if any, should be realized at the originating point itself and it should be mentioned in RR that rake has been weighed and all the charges including punitive charges collected. There should be some indication in FOIS against this train that it has been weighed. Re-weighment of such wagons/rakes at en-route/destination should normally not be done.

7. Since the information regarding weighment of the rake will be available in FOIS, the divisional control will ensure that all those rakes, which have not been weighed earlier, are positively weighed. Similarly, the rakes, which have been weighed earlier, should be reweighed only under special instructions of an authority not lower than DRM or under the instructions from officers of Vigilance department.

8. There may be cases where despite the weighbridge being functional, it is not possible to communicate the actual weighment details due to defective/failed communication network. In such cases, the concerned Railway will continue to issue RR on sender’ s weight and take necessary remedial measure.

8.1 CCM of Zonal Railway should monitor the cases of issue of RR on Sender’ s weight. DRMs, CCMs, CMEs and GMs should monitor defective weighbridges and put them right at the earliest.

9. If there are any loading points from which loaded rakes, cannot be weighed at any weighbridge, the concerned Railway will advise Railway Board accordingly and continue to issue RR on senders’ weight.

10. Weighment of rakes/wagons at associate weighbridge/alternate associate weighbridge conducted under these instructions shall be treated as weighment at forwarding station for all purpose.

11. The monthly progress report of compliance of these instructions should be sent to Board in MCDO.

These instructions will come into force w.e.f . 01.11.2006.

This issues with the concurrence of the Traffic Transportation, C&IS and Finance Directorates in the Ministry of Railways. (Authority:Railway Board’s letter No. TC-I/2006/108/4 of date 13-10-2006)

50

Page 51: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority: CCM/NWR No. C-611/0 (Policy) of date 30/10/2006)

INDIAN RAILWAY COMMERCIAL MANUAL VOLUME-II -1991

CHAPTER XIV – BOOKING OF GOODS TRAFFIC

Advance Correction Slip No. 30

Para 1451(c) of IRCM, Vol. II. may be revised as under:

1451(c)“ There should be no undue delay in the issue of Railway Receipts to consignors. Railway Receipts should normally be made over to the consignor within 24 hours from loading of the consignment. Concerned DCM/Sr. DCM of the loading points may however permit issuance of Railway Receipt not later than 48 hours from the time of completion of loading of goods to ensure that Railway Receipt is prepared on actual weighment details. If it is not possible to make over Railway Receipt within the above period as per actual weighment details, Railway Receipt should be prepared on the basis of Sender’ s Weight.”

Para 1451(d) of IRCM, Vol. II may be inserted below to Para 1451(c) as under:

1451(d)“ However, in case of continuous Bank Holidays, force majeure conditions etc., DRM may allow further extension of time for issue of RR up to the next working day of the bank through a written authority.”

(Authority Railway Board’s letter NoTC-I/2006/108/4 13 -10-2006).(Rates circular No. 86/2006)_________________________________________________________________________

Para for Local Rate Advice 147 of 2006 (GOODS)________________________________________________________________________

Sub: Dynamic Pricing (Freight Business)Ref: 1. Railway Board’s letter No. TCR/1078/2006/5 dated 5.10.2006 (Rates circular

No. 81 of 2006 circulated vide this office LRA No. 139 of 2006 (Goods) dated 11-10-2006 )

2. Railway Board’s letter No. TCR/1015/2006/8 dated 24.5.2006 (Rates Circular No. 45 of 2006 circulated vide this office LRA No. 72 of 2006 (Goods) dated 26-5-2006.

The commodities Head Food grains, Chemical Manures, Salt for Human Consumption and Flours were exempted from Busy Season Surcharge in terms of Board’s letter at (ii) above.

However, these commodities have not been exempted from the purview of levy of busy season charges as notified vide Rates circular No. 81 of 2006 referred to in (i) above it is clarified that busy season charges will also be leviable on all commodities falling under commodity head Food grains, Chemical Manures, Salt for Human Consumption and Flours.

51

Page 52: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority:Railway Board’s letter No. TCR/1078/2000/5 of date 19/10/2006)(Authority: CCM/NWR No. C-423/1 of date 30/10/2006)_________________________________________________________________________

Para for Local Rate Advice 148 of 2006 (GOODS)_________________________________________________________________________

Sub: Haulage Charges of Brake Van utilized by Container Train Operators (Rates Circular No. 87 of 2006)

Private operators (other than CONCOR) have been permitted operation of container trains. Private operators are required to procure their own rolling stock including brake vans. Some of the operators, however, have procured only wagons and not brake vans. It has been decided that such operators will be permitted to utilize brake vans owned by Railways to operate their trains as a temporary measures subject to the operators giving a commitment to procure their own brake vans before 31.3.2007.

It has been further decided to charge haulage charges for utilization of railway owned brake vans by container operators. Rate for such haulage charge will be equal to the rate for haulage of a TEU (upto 20 MT), issued vide Board’ letter No.2006/TTIII/73/12 dated 29.9.2006.

The above charges will come in force with immediate effect and will remain valid up to 31.3.2007.

This issue with the concurrence of the Finance Directorate in the Ministry of Railways.

(Authority:Railway Board’s letter No.TCR/2201/2006/1 dated 18.10.2006)(Authority: CCM/NWR No. C-78/1/54/CONCOR of date 2/11/2006)

_

Para for Local Rate Advice 149 of 2006 (GOODS)_________________________________________________________________________

Sub: Gauge conversion of Neemuch -Ratlam section - Rating and Routing of Cement traffic. (Rate Circular No.88 of 2006)

1.0 The block for conversion of Neemuch -Ratlam sect ion from MG to BG on Western Railway has been started from 01.10.2006. During the period of conversion , the cement traffic, which was earlier moving via MG section , will move via Kota BG route, which is a longer route.

2.0 The matter has been examined. Sanction of the Central Government is hereby accorded to allow a concession of 32% (Thirty two percent) in freight for Cement traffic from this area for local destinations of Ratlam Division viz. Indore, Ujjain , Ratlam,Bhopal, Shajapur and Ranoli booked via longer Kota BG route.

52

Page 53: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

3.0 This 32% concession in freight will be valid only where the traffic route is diverted on a longer route purely because of conversion and shall not cover any such traffic which is being moved even now via longer route due to any factor other than MG conversion .

4.0 However , no other concession will be admissible to this traffic.

5.0 These instructions will come in to force w.e.f. 14.10.2006 a n d strictly for the period of conversion i.e. upto 31s t December , 2006 or upto the date by which conversion will be completed, which ever is earlier . Western Railway is hereby advised to expedite the conversion of Neemuch –Ratlam section .

6.0 This issues with the concurrence of Finance Dte. in the Ministry of Railways .

(Authority:Railway Board’s letter No No.TCR/ 1125/ 2001/ 2 dated 19/10/2006)(Authority: CCM/NWR No. C-432/2 of date 6/11/2006) _________________________________________________________________________

Para for Local Rate Advice 150 of 2006 (GOODS)_________________________________________________________________________

Sub: Dynamic Pricing (Freight Business) (Rates Circular No. 89 of 2006)

Busy Season Pricing: In continuation of Board’s letter of even number dated 05.10.2006(Rates Circular No.81 of 2006 circulated vide this office LRA 139(Goods) of 2006 dated 11/10/2006sanction of the Central Government is hereby accorded to levy 4% (four percent) Busy Season Surcharge on freight charges on commodities in Class-180 for the period 1st November, 2006 to 31st March, 2007. This surcharge will be levied on the applicable Base Freight Rates published in the Goods Tariff No.44 Pt.II.

Container traffic will be exempted from the levy of Busy Season Surcharge for the period 1st Nov, 2006 to 31st March, 2007 as a special case in view of the revised haulage charges for container traffic effective from 01.11.2006. Normal Tariff Rate (NTR): Normal Tariff Rate for commodities will be the Base Freight Rate as published in Goods Tariff No.44 (Pt.II) plus Busy Season Surcharge, if applicable. Other charges like punitive charges, surcharges specified in Consignment Volume Based Scheme (as mentioned in Rate Circular No.25 of 2006) etc. as well as freight concessions/discounts/rebates will be levied on NTR.

This issues with the concurrence of the Finance Directorate in the Ministry of Railways.

(Authority:Railway Board’s letter No.TCR/1078/2006/5 Pt I dated 26/10/2006)(Authority: CCM/NWR No. C-423/1 of date 6/11/2006)_________________________________________________________________________

Para for Local Rate Advice 151 of 2006 (GOODS)_________________________________________________________________________

Sub: Assignment of classification for Coal for e-auction(Rates Circular No.90 of 2006)

53

Page 54: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Sanction of the Central Government is hereby accorded to assign the classification of Coal for e-auction as Class-160 (Trainload).

2. Accordingly, “*Coal for e-auction” be inserted below “Coal Dust” under main commodity head ‘Coal & Coke’ at S.No.8 page No.3 of Goods Tariff No.44 Pt. I Vol. II. Following note may be added below “Washed Coal”:

“*Coal for e-auction will be charged at Class-160”

This issues with the concurrence of the Finance Directorate in the Ministry of Railways. The instruction will come into force with effect from 10.11.2006.

(Authority:Railway Board’s letter No.TCR/1015/2006/17 dated 27/10/2006)(Authority: CCM/NWR No. C-70/1 of date 10/11/2006)_________________________________________________________________________

Para for Local Rate Advice 152 of 2006 (GOODS)_________________________________________________________________________

Sub: 20% concession on Wheat and 10% concession on Rice when loaded in BOXN wagons. (Rates Circular No. 91 of 2006)

.1.0 Sanction of the Central Government is hereby accorded to grant 20% concession in freight rates on Wheat and 10% concession in freight rates on Rice when loaded in BOXN wagons subject to the following conditions:

(i) This concession would be admissible when loaded in block rakes of BOXN wagons.(ii) The concession would be granted at the time of booking.(iii) The tarpaulins for covering the BOXN wagons are provided by the consignors at their

own cost.(iv) An undertaking is furnished on the forwarding note by the consignors that they give their

consent to loading in BOXN wagons and would bear full risk for damage/pilferage of their consignments.

2.0 The concession of 20% on Wheat and 10% on Rice mentioned in Para(1) above will not be applicable concurrently with any other type of concessions.

3.0 Railway’s liability on such bookings would be governed by Sec. 104 of the Railways Act, 1989.

4.0 These instructions will be effective from 01.11.2006 and will remain valid till 31.3.2007. This issues with the concurrence of Finance Directorate in the Ministry of Railways. (Authority:Railway Board’s letter No.TCR/1618/2006/13 dated 27/10/2006)(Authority: CCM/NWR No. C-493/6/431 of date 10/11/2006)

54

Page 55: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

________________________________________________________________________

Para for Local Rate Advice 153 of 2006 (GOODS)_________________________________________________________________________

Sub: Freight Incentive Schemes.

. Query has been raised whether benchmark would be fixed on the basis of total earnings of multi commodities or single commodity from a terminal under the Incentive scheme for incremental Traffic. It is clarified that bench mark would be fixed on terminal basis and separate benchmark should not be fixed for different commodities. Therefore, benchmark should be fixed on the basis of total earnings/volume from terminal under the Incentive Scheme for Incremental Traffic irrespective of the commodities booked. (Authority:Railway Board’s letter No.TCR/1078/2006/4 dated 27/10/2006)(Authority: CCM/NWR No. C-429/0of date 10/11/2006)_________________________________________________________________________

Para for Local Rate Advice 154 of 2006 (GOODS)_________________________________________________________________________

Sub:Increase in permissible carrying capacity of wagons on CC+8 /CC+6 routes. (Rate Circular No. 92 of 2006)

Ref: This office LRA No. 68, 81 and 140 of 2006 (Goods)

1.0 Attention is invited to Board’s instructions contained in Rates Circular No. 41, 51 and 82 of 2006, wherein running of wagons with increased permissible carrying capacity on identified CC+8 and CC+6 routes as a pilot project, were communicated. On these identified CC+8 and CC+6 routes, increased permissible carrying capacity has been notified separately.

2.0 Instances have come to the notice of the Board that Railways are experiencing difficulty in determining the chargeable weight when two or more different type of routes viz. normal routes , CC+6 routes and CC+8 routes are involved in transportation.

3.0 The matter has been examined in Board’s office. It is to clarify that in cases when traffic is booked via routes which involves two or more of different routes viz. normal routes, CC+6 routes and CC+8 routes, the chargeable weight will be the permissible carrying capacity of the route for which is permissible carrying capacity is most restrictive.Illustration

. Normal route CC+8 route Normal route CC+ route*--------------------------*---------------------------*-------------------------*----------------------*A B C D E

F

55

Page 56: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Chargeable weight for A to F = PCC of normal routesChargeable weight for B to F = PCC of CC+6 routesChargeable weight for B to C = PCC of CC+8 routesChargeable weight for B to E = PCC of normal routes

This issues with the concurrence of Finance Dte. in the Ministry of Railways.

(Authority:Railway Board’s letter No.TCR/1394/2006/8 dated 01/112006)(Authority: CCM/NWR No. C-176/4 of date 14/11/2006)_________________________________________________________________________

Para for Local Rate Advice 155 of 2006 (GOODS)_________________________________________________________________________

Sub: Freight Incentive Schemes –Two leg scheme.

Queey has been raised regarding applicability of Busy Season Surcharge on freight payment under Two Leg Scheme. It is clarified that Busy Season Surcharge is leviable on traffic booked under all the schemes of the Cargo Aggregation Scheme including Two Leg Scheme.

(Authority:Railway Board’s letter No.TCR/1078/2006/4 date 27102006)(Authority: CCM/NWR No. C-429/0 of date 14/11/2006)_________________________________________________________________________

Para for Local Rate Advice 156 of 2006 (GOODS)_________________________________________________________________________

Sub: Trail running of 25 t axle load train.

1.0 References have been received from Zonal Railways for grant of permission to conduct loadability trials without levying penal charges for overloading, which may be found during these trials.

2.0 The matter has been examined. It has been decided to authorize General Managers of Zonal Railways to exempt levy of punitive charges arising due to overloading while conducting loadability trials for increasing loadability /axle load. However, such powers should be exercised prior to conducting these trials and should not be delegated further. Normal freight shall be charged for overloaded quantity found during these trials.

3.0 While exercising the powers as mentioned above, General Manager should keep their Financial Advisor (T) and the destination Railways informed in this regard so that undercharges are not raised.

4.0 This issues with the concurrence of Finance Dte. in the Ministry of Railways.

(Authority:Railway Board’s letter No.TCR/1394/2005/4 Pt. date 12/102006)(Authority: CCM/NWR No. C-611/0 of date 14/11/2006)

56

Page 57: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

_________________________________________________________________________

Para for Local Rate Advice 157 of 2006 (GOODS)_________________________________________________________________________

Sub: Methodology in computing the freight charges along with surcharge and concession.

Ref: Railway Board’s Circular No. 26 of 2006 circulated vide this office LRA 42 of date 30/3/2006.

In terms of Board’s Rates circular No. 26 of 2006, Busy Season Surcharge and Busy Route Surcharge have been levied subject to certain conditions.

Certain Railways have sought clarification about the Leviability of Busy Season Surcharge vis-à-vis grant of concession while calculating freight charges. The matter has been examined and it is clarified that Surcharge should be added to the Base Freight first. The rate so arrived is called Norma Tariff Rate. Any concession should be given at the Normal Tariff Rate.

This issues with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority:Railway Board’s letter No.TCR/1078/2006/5 dated 01/11/2006)(Authority: CCM/NWR No. C-423/1 of date 14/11/2006)_________________________________________________________________________

Para for Local Rate Advice 158 of 2006 (GOODS)_________________________________________________________________________

Sub: Centralised booking scheme at New Bongaigaon for booking of foodgrains by Food Corporation of India.(Rate circular No.94 of 2006)

In terms of the Board’s letter No. TCR/1078/84/21 dt. 21.2.1994, Centralised Booking Scheme of Foodgrains at New Bongaigaon by Food Corporation of India notified in Board’s letter No. TCR/1078/84/21/ dt. 25.9.1986 was last extended upto 30.9.1994.

2. Post facto Sanction of the Central Government is hereby accorded to extend the Centralised Booking Scheme of Foodgrains at New Bongaigaon for booking of foodgrains by Food corporation of India for the period beyond 30.9.1994 subject to the terms and conditions laid down in Board’s letters of even number dt. 25.9.1986 and 22.10.1992. The scheme will continue upto 31.3.2007 on the same terms and conditions.

3. This scheme shall also be applicable to booking of Wheat and raw Rice (not boiled Rice) by FCI to the terminals in the state of Tripura with effect from 15.11.2006.

4. The scheme shall not be made operational beyond 31.3.2007 until & unless specifically approved by Board.

5. This issues with the concurrence of Finance Directorate in the Ministry of Railways.

57

Page 58: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority:Railway Board’s letter No.TCR/107/84/21 dated 06/11/2006)(Authority: CCM/NWR No. C-423/1 of date 14/11/2006)_________________________________________________________________________

Para for Local Rate Advice 159 of 2006 (GOODS)_________________________________________________________________________

Sub: Penalty for false declaration – Rule 126 of Goods Tariff No.41, Part-I (Vol.I).( Rates Circular No. 95 of 2006)

Rule 126(1) (a) mentions penalty for misdeclaration of Goods. Sanction of the Central Government is hereby accorded to the modification of the penalty clause of Rule 126 (1) (a) as follows:

(a) If, on arrival at destination, it is found that goods have been improperly described and that a lower rate than that correctly applicable has been thereby obtained, charges at four times the applicable freight rate will be levied by the booked route as shown on the related invoice. These penal charges will be in addition to the freight already paid and the freight already paid shall not be deducted.

(b) If, in a consignment of packages chargeable at different rates, a group of packages chargeable at a particular rate is improperly described and thereby a lower rate obtained, the charge at four times the applicable freight rate referred to in sub-clause (a) above, shall apply only to the group of packages in the consignment improperly described and not to the entire consignment. These penal charges will be in addition to the freight already paid and the freight already paid shall not be deducted.

(c) If the weight of a consignment loaded in container is improperly described and thereby a lower rate than that correctly applicable has been obtained, charges at four times the applicable haulage rate will be levied. These penal charges will be in addition to the freight already paid and the freight already paid shall not be deducted.

(d) In case of false declaration of goods restricted for movement in containers, charges at four times the highest haulage rate will be levied. These penal charges will be in addition to the freight already paid and the freight already paid shall not be deducted.

This issues with the concurrence of the Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No. TCR/2210/2006/1 of date 08/11/2006)(Authority: CCM/NWR No. C/176/5 of date 22/11/2006)_________________________________________________________________________

Para for Local Rate Advice 160 of 2006 (GOODS)_________________________________________________________________________

Sub: Increase in permissible carrying capacity of wagons on CC+8 and CC+6 routes. (Rates Circular No. 96 of 2006).

58

Page 59: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Ref: Rates Circular No.41 of 2006 & corrigendum to Rates Circular No.41 of 2006 circulated vide this office LRA 68 of 2006(Goods) of date 22/05/2006, Rates Circular No.51 of 2006 circulated vide this office LRA 81 of 2006(Goods) of date 12/06/2006 and Rates Circular No.82 of 2006 circulated vide this office LRA 140 of 2006(Goods) of date 11/10/2006.

1.0 In continuation of Rates Circulars referred above, Ministry of Railways has decided to include following CC+6 routes for running of BOXN/BOXNHS/BOBR/BOBRN/BCN/BCNA/ BCNAHS /BOST wagons in the pilot project.

S.No. Railways Routes(i) CR Nasik - Kalyan section(ii) CR Wadi to NGSM via Pune including Pune - Saswad block section(iii) SCR Dornakal - Vjayawada(iv) SECR Kirodimal Nagar - Ajni

2.0 All the terms and conditions mentioned in Rates Circulars under reference will remain unchanged.

3.0 These instructions will come into force w.e.f. 20.11.2006. This issues in consultation with Traffic Transportation, Civil Engineering Directorates and with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No. TCR/1394/2004/2 of date 13/11/2006)(Authority: CCM/NWR No. C-176/4 Vol II of date 22/11/2006)_________________________________________________________________________

Para for Local Rate Advice 161 of 2006 (GOODS)_________________________________________________________________________

Sub: Levy of stabling charge/demurrage charge on privately/jointly owned wagons (Rate Circular No. 97)

Ref: Board’s letter even number dt.11.8.1999

In supersession of all earlier instructions on the subject, it has been decided to revise the instructions regarding levy of stabling charge/demurrage charge on privately/jointly owned wagons. Accordingly, revised guidelines on the subject are as follows:

2.0 Guidelines for levy of Stabling charge on privately owned stock

2.1 Stabling charge is levied for detention of privately owned stock at a railway premise in any of the following circumstance:

when party is unable to receive such stock in their sidingwhen party declines to accept such stock in their siding

2.2 Privately owned wagons include wagons procured under “Own Your Wagon Scheme (Category-C)”, Defence owned stock, wagons owned by container operators, etc.

59

Page 60: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

2.3 Rate of stabling charge will be Rs.200/- per wagon per day or part of a day, from the time of arrival to the time of removal.

2.4 The rate of stabling charge will be uniform for all types of wagons (either BG/MG or 4-wheeled/6 wheeled/8 wheeled/12 wheeled etc.).

2.5 When privately owned stock is detained in the private siding or in a railway siding meant for handling such stock, no Stabling/Demurrage charge will be levied.

3.0 Guidelines for levy of demurrage charge on wagons procured under “Own Your Wagon Scheme (Category-A & B)” or jointly owned wagons.

3.1 WAGONS PROCURED UNDER “OWN YOUR WAGON SCHEME (CATEGORYA& B)” or UNDER “WAGON INVESTMENT SCHEME (WIS)”

In the case of wagons procured under “Own Your Wagon Scheme (Category-A &B)” or under “Wagon Investment Scheme(WIS)”, extant free time & demurrage rules as applicable for detention of railway owned stock by normal rail users (i.e. other than steel plants) will be applicable.

3.2 JOINTLY OWNED WAGONSIn the case of jointly owned wagons, extant free time & demurrage rules as

applicable for detention of railway owned stock by normal rail users (i.e. other than steel plants) will be applicable. However, demurrage charge will be levied @ 50% of the rate of demurrage charge as applicable to normal Rail users (i.e. other than steel plants).

4.0 These instructions will be effective w.e.f.01.12.2006.

5.0 This issues with the concurrence of the Finance and Traffic Transportation

(Authority: Railway Board’s letter No.TC-I/98/201/4 of date 18/11/2006)(Authority: CCM/NWR No. C- 124/0 of date 22/11/2006)_________________________________________________________________________

Para for Local Rate Advice 162 of 2006 (GOODS)_________________________________________________________________________

Sub: Freight Incentive Schemes: Long term Special Incentive Scheme (Rate Circular No. 98 of 2006)

Ref: Board’s letter of even number dated 19/05/2006 (Rate Circular 44 of 2006). (Circulated vide LRA (Goods) 74 of 2006 dated 31-5-06)

Following changes may be made in Board’s letter No. TCR/1078/2006/4 dated 19/05/2006 (Rate circular No. 44 of 2006).

I. After the first para, following may be added.

Objective: These concessions would be granted if circumstances so warrant with the objective of sustaining as well as increasing the rail borne traffic of a customer. The

60

Page 61: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Zonal railways should utilize this scheme depending upon the merit of the case with the sole objective of getting substantial traffic and resultant additional earnings vis – vis concessions offered. Flexibility has been built to enable framing suitable marketing strategies under widely varying circumstances.

II. Existing conditions mentioned in Rates circular 44 (under the “Condition” clause on page 2) shall be deleted and following conditions shall be added.

(a)  Concession under this scheme can be given for a period up to three years and, therefore, can also be given for a minimum period of one year

In cases where concession has been granted for more than one year     based on the commitment of the net freight earning and the corresponding concession in each year, the scheme shall be operated for each year separately independent of the performance in proceeding/following year.

The earning performance should be measured against the targets fixed for the concerned year at the time of initial notification of concession. The commitment of net freight earning in each year is required to be equal to or higher than the corresponding commitment in the previous year.

To illustrate, a customer commits to give net freight earning of Rs.70/- Crore in first year. In the subsequent years, the commitment of net freight earning can not be less than Rs.70/- crore. Now, say, the target for 1st

year and 2nd year been fixed at Rs.70/- crore and Rs.75/- crore respectively. If the customer gives net freight earning of Rs.90/- crore in the 1st year, the target of 2nd year will continue to remain at Rs.75 crore. However, if the customer does not give net freight earning of Rs.70 crore in the 1st year he will not get concession in the 1st year. But he will earning to be eligible for availing concession in 2nd year as per the target for the 2nd year.

(b) Eligibility in terms of freight earnings of Rs.50 crore in any year (12 months period) of contractual period will be decided based on the total net freight committed by a customer and will exclude all sorts of concession discount. For Example, if the gross freight committed by a customer is Rs.53 crore for a particular year (12 months period), the concession mentioned in clause (i) of Benefit shall be granted in such a manner that concessions/rebate etc is not less than Rs.50 crore in that year of the contractual period.

In case, the net freight earning committed by customer in any year of contractual period is less than Rs.50 crore, concession can be given only under clause (ii) of benefit mentioned in the scheme.

(c ) Total committed earnings of a specific customer from one or more terminals in the same zone may be taken into account to determine whether he fulfills the criterion of net freight earnings of Rs.50 crore.

61

Page 62: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(d) Net freight earning from only outward traffic of all commodities shall be reckoned for determining earning as well as for the purpose of grant of any freight concession. Inward traffic shall not be considered for the above purpose.

(e) Freight concession can be given either on incremental or entire traffic offered by customer depending on the situation, with the purpose of maximizing net earnings and increasing rail co-efficient. Such concessions can be given either at a suitable uniform rate for the entire period or at graded (differential) rates. The graded rates could be on the basis of quantum of traffic, Periods of the contract or any other parameter considered suitable singly or in combination. However, concession on entire volume of traffic should be given only in exceptional circumstances where such incentives are considered justified.

(f) If the tariff rate changes after the finalization of the concession and issue of notification, the freight earnings target shall be modified as under:

(i) If the tariff rate decreases, there will be no change in freight earning targets.

(ii) If the tariff rate increase, the freight earning target shall be revised using following formula.

Original Freight Earning Target X Revised Tariff Rate-----------------------------------------------------------------------

Original Tariff RateThis condition should be suitably incorporated in the notification/

agreement.

(g) A customer can avail of incentives under more than one Scheme (Long Term special Incentive Scheme, Incentive Scheme for incremental traffic, Loyalty Scheme and Traditional Empty Flow Direction Scheme or any other such scheme). However, conditions for each scheme will have to be separately fulfilled. For instance, a customer offering a commitment of total net freight earning of Rs. 70 Crores (exclusive of all freight concessions) may choose to offer traffic equivalent to net earning of Rs. 50 Crore to be considered under Long Term Special Incentive Scheme and the remaining traffic under Incentive Scheme for Incremental Traffic. In order to be eligible for consideration for concessions under clause (i) of Benefit as mentioned in this scheme, the customer will have to offer a commitment of net freight earning of at least Rs 50 Crore in twelve month period exclusively for this scheme. In no case, the same volume of originating traffic will avail concessions under more than one scheme unless and until such concurrent benefit has been permitted specifically vide parta on concurrency indicated earlier.

(h) In case of rebate, refund will be calculated & granted after end of every 12months of the contractual period.

62

Page 63: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(i) These concessions would be subject to the condition that the discounted /rebated freight rates would not be lower than Class LR1 in Lean Season and Class 100 in the Busy season.

(j) For the purpose of reckoning fulfillment of target under this scheme loading and freight earning will deemed to have been accrued if the empties (wagons) have been placed against indents for free destinations before the completion of the contractual period, subject to the condition that such wagons are actually loaded without any forfeiture or cancellation.

III Existing formulation mentioned in Rates Circular 44 (under the “Benefit “ clause on page 2 ) shall be replaced with the followings.

Freight concession in accordance with following scales can be granted to customers subject to fulfillment of customers commitment regarding freight.

(i) For customer who commits to give net freight earning of more than Rs 50 Crore in each year ( 12 months period ) of the contractual period.Discount /rebate in freight rates may be granted up to 10 % in the Busy Season and up to 20% in Lean Season for duration upto 3 years.

(ii) All other customers including new customers

Discount /rebate in freight rates may be granted up to 5% in the Busy Season and upto 10% in Lean Season for durations upto 3 years.

These instructions will come into force w.e.f 21.11.2006

Revised Long Term Special Incentive Scheme is enclosed as Annexure-I

This issue with the concurrence of Finance Directorate of Railway Board.

Annexure –ILong Term Special Incentive Schemes

In Special cases, concession by way of discount on rebate may be granted for periods up to 3 years in accordance with the following:

Objective : These concessions would be granted if circumstances so warrant with the objective of sustaining as well as increasing the rail borne traffic of a customer. The Zonal Railways should utilize this scheme depending upon the merit of the case with the sokle objective of getting substantial traffic and resultant additional earnings vis-à-vis concessions offered. Flexibility has been built to enable framing suitable marketing strategies under widely varying circumstances.

Applicability All customers.

Exclusion Coal (except from NF Railway in Covered Wagons) , Raw Material to Steel Plants and iron ore.

63

Page 64: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Eligible Lead No restrictions.

Elligible Wagons No restrictions

Availability Available throughout the year.

Concurrency All Investment Reimbursement Discounts and All consignment Volume Bases Schemes.

Procedure 1. Proposals under the scheme would be scrutinized by DEC and the same may be forwarded to CCM of concerned Zonal Railway.2. CCM would examine the proposal in consultation with COM for vetting of FA& CAO and personal approval of General Manager, subject to the conditions of the scheme.3. Proposals for concessions beyond the permitted limits and /or for durations longer than the permitted period should be forwarded to Railway Board along with concurrence of FA& CAO and personal approval of General Manager.

Benefit Freight concession in accordance with following scales can be granted to customers subject to fulfillment of customers commitment regarding freight.

(i) For customer who commits to gives net freight earning of more than Rs 50 Crore in each year (12 months period) of the contractual period.

Discount /rebate in freight rates may be granted upto 10% in the Busy Season and upto 20% in Lean Season for durations up to 3 years.

(ii) All other customers including new customers

Discount /rebate in freight rates may be granted upto 5% in the Busy Season and upto 10% in Lean Season for durations up to 3 years.

Conditions:(a) Concession under this scheme can be given for a period

up to three years and therefore can also be given for a minimum period of one year.

In cases where concession has been granted for more than one year based on the commitment of the net freight earning and the corresponding concession in each year, the scheme shall be operated for each year separately independent of the performance in preceding /following year.

The earning performance should be measured against the targets fixed for the concerned year at the time of initial notification of concession. The commitment of net freight earning

64

Page 65: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

in each year is required to be equal to or higher than the corresponding commitment in the previous year.

To illustrate, a customer commits to give net freight earning of Rs. 70 crore in first year. In the subsequent years, the commitment of net freight earning can not be less than Rs. 70 crore. Now say, the target for 1st year and 2nd year has been fixed at Rs. 70 crore and Rs. 75 crore respectively. If the customer gives net freight earning of Rs 90 crore in the 1st year, the target of 2nd year will continue to remain at Rs 75 crore. However if the customer does not give net freight earning of Rs. 70 crore in the 1st year, he will not get concession in the 1st year. But he will continue to be eligible for availing concession in 2nd year as per the target for the 2nd year. (b) Eligibility in terms of Freight earnings of Rs. 50 Crore in

any year (12 months period) of contractual period will be decided based on the total net Freight committed by a customer and will exclude all sorts of concessions/discount. For Example, if the gross freight committed by a customer is Rs 53 Crore for a particular year (12 months period) the concession mentioned in clasue (i) of Benefit shall be granted in such a manner that the net freight earning from the customer after deducting concessions /rebate etc is not less than Rs. 50 Crore in that year of the contractual period.

In case, the net freight earning committed by customer in any year of contractual period is less than Rs. 50 Crore, concession can be given only under clause (ii) of the Benefit mentioned in the scheme.

(c) Total committed earnings of a specific cust6omer from one or more terminals in the same zone may be taken into account to determine whether he fulfills the criterion of net freight earnings of Rs. 50 Crore.

(d) Net freight earning from only outward traffic of all commodities shall be reckoned for determining earning as well as for the purpose of grant of any freight concession. Inward traffic shall not be considered for the above purpose.

(e) Freight concession can be given either on incremental or entire traffic offered by customer depending on the situation with the purpose of maximizing net earnings and increasing rail co-efficient. Such concessions can be given either at a suitable uniform rate for the entire period or At graded (differential ) rates. The graded rates could be on the basis of quantum of traffic periods of the contract or any other parameter considered suitable

65

Page 66: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

singly or in combination. However, concession on entire volume of traffic should be given only in exceptional circumstances where such incentives are considered justified.

(f) If the tariff rate changes after the finalization of the concession and issue of notification, the freight earnings target shall be modified as under:

i) If the tariff rate decreases, there will be no change in freight earning targets.

ii) If the tariff rate increases, the freight earning target shall be revised using following formula.

Original Freight Earning Target X Revised Tariff RateOriginal Tariff Rate

This condition should be suitably incorporated in the notification/ agreement.

(g) A customer can avail of incentives under more than one Scheme (Long Term Special Incentive Scheme, Incentive Scheme for Incremental traffic, Loyalty Scheme and Traditional Empty Flow Direction Scheme or any other such scheme). However, conditions for each scheme will have to be separately fulfilled. For instance, a customer offering a commitment of total net freight earning of Rs 70 Crores (exclusive of all freight concessions) may choose to offer traffic equivalent to net earning of Rs 50 Crore to be considered under Long Term Special Incentive Scheme and the remaining traffic under Incentive Scheme for Incremental Traffic. In order to be eligible for consideration for concessions under clause (i) of Benefit as mentioned in this scheme, the customer will have to offer a commitment of net freight earning of at least Rs 50 Crore in twelve month period exclusively for this scheme. In no case, the same volume of originating traffic will avail concessions under more than one scheme unless and until such concurrent benefit has been permitted specifically vide para on concurrency indicated earlier.

66

Page 67: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(h) In case of rebate, refund will be calculated & granted after end of every 12 months of the contractual period.

(i) These concessions would be subject to the condition that the discounted/rebated freight rates would not be lower than Class LR1 in Lean Season and Class 100 in the Busy Season.

(j) For the purpose of reckoning fulfillment of target under this scheme, loading and freight earning will deemed to have been accrued if the empties (wagons) have been placed against indents for free destinations before the completion of the contractual period, subject to the condition that such wagons are actually loaded without any forfeiture or cancellation.

(Authority: Railway Board’s letter No.TCR/1078/2006/8 of date 21/11/2006)(Authority: CCM/NWR No. C- 429/0 of date 23/11/2006)_________________________________________________________________________

Para for Local Rate Advice 163 of 2006 (GOODS)_________________________________________________________________________

Sub: Amendments in Indian Railway Code for Traffic (Commercial) Department and IRCM Vol.II regarding Electronic Payment System.(Rate Circular 99 of 2006)

Ref: Railway Board’s Rates circular No. 65/2006 dated 25.07.2006 circulating Guidelinesfor Electronic Payment system (circulated vide this office LRA 105 (Goods of 2006) dtd 8/8/06

Northern Railway has sought certain clarifications regarding E-payment system.

2.0 The matter has been examined and it is advised that to have a provision for payment of freight through E-payment system and issue of E-RR under E-payment system, Para 1201 of Chapter XII, Indian Railway Code for Traffic (Commercial) Department regarding mode of payment of Railway freight and other Railway dues, may be amended and a new Para 1442(d) below Para 1442(c) of IRCM (Vol.II) may be inserted as under with immediate effect:

Indian Railway Code for Traffic (Commercial) Department- revised edition 1993“1201. Payment of railway dues on public traffic is required to be made in cash only except where under special circumstances, payment of freight by cheques, bank drafts, Credit Notes, E-payment or under “Weight only” system is authorized by the Railway Administrations.”

Indian Railway Commercial Manual Vol.II (1991)“1442(d). In case of Electronic payment system, a separate category of Railway Receipts (RR) called “E-RR”, which may be ‘Paid’ or ‘To Pay’, will be issued. The guidelines

67

Page 68: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

regarding E-Payment system which are issued/applicable from time to time may be followed.”

3.0 Accordingly, advance correction slips No.16 to Indian Railway Code for Traffic (Commercial) Department (revised edition 1993) and No.31 to Indian Railway Commercial Manual Vol.II (1991) are enclosed for information and necessary action.

4.0 This issues with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TC-I/2006/104/3 of date 22/11/2006)(Authority: CCM/NWR No. C- 291/0(E-banking) of date 4/12/2006)INDIAN RAILWAY CODE FOR TRAFFIC (COMMERCIAL) DEPARTMENT - REVISED EDITION 1993.

CHAPTER XII – MODE OF PAYMENT OF RAILWAY FREIGHT AND OTHER RAILWAY DUES.

Advance Correction Slip No.16

Para 1201 of chapter XII may be modified as under:

“Payment of railway dues on public traffic is required to be made in cash only except where under special circumstances , payment of freight by cheques, bank drafts, Credit Notes, E-payment or under “Weight only” system is authorised by the Railway Administrations.”

(Authority Railway Board’s letter No.TC-I/2006/104/3 dated 22-11-2006).

INDIAN RAILWAY COMMERCIAL MANUAL VOLUME-II -1991

CHAPTER XIV – BOOKING OF GOODS TRAFFIC

Advance Correction Slip No.31

Para 1442(d) may be inserted below to Para 1442(c) of IRCM, Vol. II. as under:

1442(d)“In case of Electronic payment system, a separate category of Railway Receipts (RR) called“E-RR”, which may be ‘Paid’ or ‘To Pay’, will be issued. The guidelines regarding EPaymentsystem which are issued/applicable from time to time may be followed .”

(Authority Railway Board’s letter No.TC-I/2006/104/3 dated 22-11-2006)._________________________________________________________________________

Para for Local Rate Advice 164 of 2006 (GOODS)_________________________________________________________________________

Sub: Freight Incentive Schemes (Rates Circular No.100 of 2006) (Corrigendum to Rates Circular No.25 of 2006)

Ref: Board’s letter of even number dated 28.03.2006

68

Page 69: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Rates Circular No.25 of 2006 circulated vide this office LRA 45 (Goods ) of 2006 of date 31/3/06)

Following changes may be made in Board’s letter No TCR/1078/2006/4 dated 28.03.2006 (Rate Circular No 25 of 2006).

(i) The word “Discount” appearing in the table given under benefit clause of Loyalty Scheme shall be replaced by the word “Rebate”.

(ii) The conditions number 9 & 10 of Freight Forwarder Scheme in Empty Flow Direction shall be replaced with the following:

Condition No 9. ‘Not more than 25% of the loaded (rounded off to next integer) wagons should be loaded with the same commodity.’

Condition No 10. ‘ Not more than 25% of the loaded (rounded off to next integer) wagons should be loaded with multiple commodities.’

This instruction will come into force w.e.f. 21.11.2006.

This issues with the concurrence of Finance Directorate of Railway Board.

(Authority: Railway Board’s letter No.TCR/1078/2006/8 of date 21/11/2006)(Authority: CCM/NWR No. C-429/0 of date 4/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 165 of 2006 (GOODS)_________________________________________________________________________

Sub: Revision of miscellaneous charges (Rates circular No.101 of 2006)

Sanction of the Central Government is hereby accorded to revise the rates of the various miscellaneous charges as given against each of them as under:

S.No.

Name of the charge Revised Rates

Guard / Dummywagon charges:( Rule No.171 ofIRCA Goods tariffNo.41 Pt.I Vol.I)

Rs.18 per kilometer per wagon irrespective of whether the wagon is MG, BG or NG subject to a minimum of Rs.1800.00 per wagon. No supplementary charges will be leviable in addition.

2 Crane haulagecharges: (RuleNo.130(2) of IRCAGoods Tariff No.41Pt.I Vol.I)

Description of Cranes Haulage Rates per kilometer per crane

4 wheeled Rs.22.006/8 wheeled Rs.44.0010 wheeled and above Rs. 84.00

69

Page 70: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

The above rates are applicable for all cranes whether of BG, MG or NG and are subject to minimum distance for charge of 100 kilometer. Zonal Railways will furnish the information regarding phasing out and cranes leased or sold out to private parties.

3 Infringementcharges: (RuleNo.119(2) (a) ofIRCA Goods TariffNo.41 Pt.I Vol.I)

Class ODC Calculated RatesA Rs.18 per kilometer per wagon

subject to a minimum of Rs.1800.00.B Rs.26 per kilometer per wagon

subject to a minimum of Rs.2600.00.C Rs.156.00 per kilometer per wagon

subject to a minimum of Rs.15600.00.4 Crane charges (Rule

No.130 (i) of IRCA Goods Tariff No. 41 Pt.I Vol.I

Description of Cranes Lifting capacityof the cranes (inTonnes)

Rates per houror part of an hour (in Rupees)*

(a) Fixed hand cranes Of all liftingcapacities

101.00

(b) Traveling hand cranes

1 to 10 405.00

11 to 20 607.00(c) Fixed or travellingSteam/Petrol/Electriccranes:

1 to 10 607.0011 to 20 803.0021 to 30 958.0031 to 100 1000.00101 and above 1750.00

d) Fixed or traveling Diesel cranes:

31 to 50 1000.0051 to 70 1209.0071 to 100 1553.00101 to 120 1750.00121 and above 2427.00* These rates are applicable for all cranes whether BG, MG or NG

5 Engine haulage charges for the movement of engines on private account (Rule No. 199 D of IRCA Goods Tariff No. 41 Pt. I Vol.I)

Description of engines Haulage Rates per engine per kilometer*

(a) For engines ownedby or loaned to privateparties when hauled byscheduled goods trains

Rs.65 per engine per kilometer subject to a minimum charge ofRs.6500.00 per engine per trip.

(b) For engines ownedby or loaned to privateparties when hauledseparately.

Rs.129 per engine per kilometer subject to a minimum charge ofRs.12900.00 per engine per trip.

(c) For engines ownedby or loaned to privateparties when workedby their own power(including crew)

Rs.65 per engine per kilometer subject to a minimum charge of Rs.6500.00 per engine per trip.* Siding charges, if any, are to be levied in addition to the above rates.

70

Page 71: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

All the above rates for various miscellaneous charges will come into force w.e.f. 15.12.2006.

This issues with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/2201/2004/1 of date 28/11/2006)(Authority: CCM/NWR No. C-176/5 of date 6/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 166 of 2006 (GOODS)_________________________________________________________________________

Sub: Exemption to ‘CC’ commodities (bagged) from weighment (Rates Circular No. 102/2006)

In continuation of Board’s Control Message of even number dated 24.11.2006, it has been hereby decided to exempt all ‘CC’ commodities (bagged) from weighment.

2.0 These instructions will come into force with immediate effect and will be valid till 23.01.2007 or further advice whichever is earlier.

3.0 This issues with the consultation of the Traffic Transportation Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TC-I/2006/108/4 of date 29/11/2006)(Authority: CCM/NWR No. C-611/0(policy) of date 06/12/2006) _________________________________________________________________________

Para for LOCAL RATE ADVICE 167 of 2006 (GOODS)_________________________________________________________________________

Sub: Increase in permissible carrying capacity of wagons on CC+8 and CC+6 routes.(Rates Circular No. 103 of 2006)

Ref: Rates Circular No.41 of 2006(LRA 68 - Goods of 2006), corrigendum to Rates Circular No.41 of 2006, Rates Circulars No.51 of 2006( LRA 81 - Goods of 2006), 82 of 2006 (LRA 140 – Goods of 2006)and 96 of 2006(LRA 160 – Goods of 2006).

1.0 In continuation of Rates Circulars referred above, Ministry of Railways has decided to include following CC+6 routes for running of BOXN/ BOXNHS/BOBR/ BOBRN /BCN /BCNA /BCNAHS /BOST wagons in the pilot project.

S.No. Railways Routes(i) NCR Aligarh-Harduaganj(ii) NCR GMC(Kanpur)-Paricha-Jhansi(iii) WCR Manikpur-Banda-GMC(Kanpur)- Lucknow(LKO)(iv) SECR Raipur-Vijaynagaram (VZM)(v) NWR Rohtak-Bhiwani

71

Page 72: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

2.0 All the terms and conditions mentioned in Rates Circulars under reference will remain unchanged.

3.0 These instructions will come into force w.e.f. 11.12.2006. This issues in consultation with Traffic Transportation, Civil Engineering Directorates and with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/1394/2004/2 of date 30/11/2006)(Authority: CCM/NWR No. C-176/4 Vol II of date 06/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 168 of 2006 (GOODS)_________________________________________________________________________

Sub: Liberalisation of siding rules –cost of electrification.(F.M Circular no. 47 of 2006)

In Supersession to Board’s instructions issued vide letters dated 29.9.2000, 31.3.2005, 31.5.2005 and 29.9.2005, it has been decided that the new guidelines will be as follows:

New Sidings : Existing Sidings:For a new siding in the electrified territory or the territory approved for electrification, the capital cost of OHE should be borne by the siding owner. This will also apply to the Military sidings.

It has been decided that the railways will bear the cost of electrification of existing sidings as per 1826 –E provided the ROR is at least 14% on traffic offered in the previous 24 months. In cases where the project is not financially justified, the siding owner will bear the full cost or arrange a diesel loco to work the loads to his premises.

This issues with the concurrence of Finance Directorate of Ministry of Railways.

(Authority: Railway Board’s letter No.99/TC(FM)/26/1 of date 24/11/2006)(Authority: CCM/NWR No. C-491/1 Vol.II of date 07/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 169 of 2006 (GOODS)_________________________________________________________________________

Sub: Freight Incentive Scheme – Incremental Scheme for Traditional Empty Flow Direction.

Reference is invited to this office DO letter No. C.429/1 /Misc (loose) dt. 08.08.2006 seeking clarification whether bench- mark for Incremental Scheme for Traditional Empty Flow Direction should be fixed by taking loading /earnings during the corresponding month of the previous year of a particular destination of notified zone only or of the proposed notified zone or both.

It is clarified that fixation of bench –mark for the above scheme shall be on the notified Inter –Zonal Railway basis as clearly mentioned in para 5 and 6 of the conditions given in the scheme.

72

Page 73: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority: Railway Board’s letter No.TCR/1078/2006/8 of date 23/11/2006)(Authority: CCM/NWR No. C-429/0 of date 08/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 170 of 2006 (GOODS)_________________________________________________________________________

Sub: Acceptance of sender’s weight for movement of container traffic.

It has come to the notice of Board that container train operations are facing problem as Railways are not accepting the weight declared by operators, and are detaining the rakes, Moreover, Railways are demanding the highest haulage rate applicable for maximum weight.

Attention is invited to Para 4.5 of Board’s letter No. 2006/TT-III/73/12 dt.11.10.2006 (circulated vide letter no. C/78/1/54/CONCOR /Vol.II dtd 23.10.06 ) which read as under:

“The RR for recovery for haulage charges will be prepared by Railway staff posted at ICD /Port /railway terminal on the basis of summary given by the operator of ICD indicating weight of consignment including the tare weight of container”.This instruction should be followed rigidly.

Moreover, in case of detection of misdeclaration, the extant commercial rules regarding penalty for misdeclaration shall be applied as per Para 2.7 of aforementioned instruction. The container train operator will be liable to pay penal charges in terms of Rule 126 of Goods Tariff No.41 Part-I (vol.I) as circulated vide Rates Circular No. 95 of 2006 dt. 8.11.2006.(circulated vide LRA No. 159 (Goods) of 2006 dtd 22/11/2006)

This issues with the concurrence of Finance and Traffic Transportation Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TC-I/2006/103/1 of date 30/11/2006)(Authority: CCM/NWR No. C-78/1/54/ CONCOR Vol.II of date 08/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 171 of 2006 (GOODS)_________________________________________________________________________

Sub: Revision of rates for Railway Material Consignments (RMC). (Rates Circular No.104 of 2006)

Ref: Board’s letter no.TCR/1078/2006/6 dated 01.5.2006 (Rates Circular No.34 of 2006 circulated vide LRA 60 of 2006 (Goods) of date 09/05/06)

In terms of Rates Circular No.34 of 2006 referred above, charging of Railway Material Consignments was conveyed. The matter has been reviewed. Sanction of the Central Government is hereby accorded for the charging of all types of Railway Material Consignments (including Ballast) in general service wagons at Class-180. This transportation will be subject to all the relevant rules and regulations in respect of free time, demurrage, wharfage, chargeable distance, chargeable weight and other commercial matters.

73

Page 74: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

The instruction will come into force w.e.f. 15.12.2006. This issues with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/1078/2006/10 of date 04/12/2006)(Authority: CCM/NWR No. C-423/1 Vol II of date 13/12/2006) _________________________________________________________________________

Para for LOCAL RATE ADVICE 172 of 2006 (GOODS)_________________________________________________________________________

Sub: Booking of HSD Oil meant for Railways on ‘To Pay’ basis. (Rates Circular No 105 of 2006)

Reference para 5.2 of Rates Circular No.20 of 2006 circulated vide letter no.TCR/1078/2006/3 dated 10.3.2006(circulated vide LRA 39 (Goods) of 2006 dated 27.3.2006) whereby it has been stated that “condition of ‘pre-payment of freight compulsory’ has been denoted with alphabet ‘p’ in the Column ‘Payment of freight’ against the commodity”. Group 18 of the Goods Tariff No.44 Part-I Vol. II containing commodity head “Petroleum Products & Gases” including HSD Oil are commodities where pre-payment of freight has been made compulsory. In partial relaxation to this, sanction of the Central Government is hereby accorded to the booking of HSD Oil meant for Railways own use on ‘To Pay’ basis and exempting the same from levying of “To Pay” surcharge.

2. Accordingly, HSD oil when consigned to Railways will be exempted from the condition of repayment of freight and will be booked as freight “To Pay” without levy of “To Pay” surcharge on freight at destination.

3. Other surcharges, wherever applicable, shall also be leviable.

4. The instruction will come into force w.e.f. 16.12.2006.

5. This issues with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/1078/2006/15 of date 04/12/2006)(Authority: CCM/NWR No. C-423/1 Vol II of date 13/12/2006) _________________________________________________________________________

Para for LOCAL RATE ADVICE 173 of 2006 (GOODS)_________________________________________________________________________

Sub: Demurrage rules (Rates Circular No.106 of 2006)Ref: Board’s letters No. TC-I/2005/201/2 dt. 19.12.2005 (circulating Rates Circular

No. 74 of 2005) and No.TC-I/95/201/2 dt.23.11.1995.

FOIS has sought certain clarification regarding reckoning of free time in Goods Sheds etc.

2.0 The matter has been examined and it has been decided:-

74

Page 75: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

” to do away with the instructions prescribed vide Paras 2.2.2 & 2.2.3 of RatesCircular No.74 of 2005 and Board’s letter No.TC-I/95/201/2 dt.23.11.1995, and

“ to incorporate new Paras 2.2.2 & 2.2.3 in Rates Circular No.74 of 2005 as mentioned below:

“2.2.2 Reckoning of free time in goods sheds, Railway sidings and such private /assisted sidings where placement/release of rake is done through Railway’s loco

(a) If a rake is placed in one spur in one placement:

Free time will be reckoned from the time of placement of the rake. Demurrage will be charged on excess detention which will be calculated as under:

‘Excess detention = (time of release – time of placement) - free time’(refer Illustration No.1 at Annexure)

(b) If a rake is placed in one spur in multiple placements:

The free time will start with the placement of 1st part of the rake. However, intervening periods between the time of completion of loading/unloading of the 1st part and time of placement of 2nd part of the same rake for loading/unloading, between the time of completion of loading/unloading of the 2nd part and time of placement of 3 rd part of the same rake for loading/unloading and so on, should be treated as dies-non.

Demurrage will be charged on excess detention which will be calculated as under:

‘Excess detention = (time of release of the last part – time of placement of first part) – free time – total period of dies non’

(refer Illustration No.2 at Annexure)

(c) If a rake is placed in more than one spurs:

Free time for the entire rake will commence from the time of placement of firstpart of the rake.

Demurrage charges will be calculated on the basis of deemed released time of the rake (after adjustment of dies non period). A rake will be deemed to have been released at the time at which the last wagon is released irrespective of the group/spur in which this wagon was placed.

If the time interval between first placement and subsequent placements (i.e. between 1st placement & 2nd placement, between 1st placement & 3rd placement, and so on) is more than two hours, then such excess time interval of over two hours shall be treated as dies non. This dies non period, wherever applicable, will be deducted from the actual release time of the respective placements to arrive at deemed release time.

Demurrage will be charged on excess detention which will be calculated as under:

‘Excess detention = (deemed release time of the rake – time of 1st placement) – free time’

75

Page 76: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Deemed release time of a placement will be calculated as under:

‘Deemed release time of a placement = actual release time of that placement – dies non, if applicable’

Deemed released time of the rake will be the time at which the last wagon of the rake has been deemed to be released. For example, if the deemed released time of first placement is 1200 Hours, second placement is 1400 Hours and third placement is 1300Hours, then 1400 Hours will be the deemed release time of that rake.

(refer Illustration No.3 at Annexure)

2.2.3 Demurrage rule in case of private/assisted sidings where placement/release of arake from/to interchange point is done through siding owner’s loco.

In addition to permissible free time for loading/unloading of wagons, Bunching Allowance of 3(three) hours will be permissible as per following conditions:

Bunching allowance will be allowed for both loading as well as unloading stream of traffic (commodity wise). It will be granted to such rakes which have arrived in bunched manner in excess of the handling capacity of the siding. It will be permitted for calendar day only and will not have cumulative effect i.e. not extendable beyond odd hours. The allowance should be calculated on actual arrival basis.

(refer Illustration No.4 at Annexure)

Handling capacity of a siding will be fixed as under:

“Existing siding: Handling capacity of an existing siding will be the actual handling capacity or deemed handling capacity, whichever is higher. Deemed handling capacity is the average consumption of rakes per day during 1st January to 30th April escalated by 1.5 times & rounded off to the next integer. (refer IllustrationNo.5 at Annexure)

“New siding: Handling capacity will be fixed provisionally keeping in view the handling system, production capacity, linkage, deemed handling capacity of similar type of siding etc.

“Handling capacity of a siding thus fixed should be reviewed every year in the Month of May & will be notified for the next year starting from July to June, or at the time of change in infrastructure including handling system, consumption pattern or linkage of the siding, whichever is earlier.

“However, for the period from 1.1.2007 to 30.6.2007, handling capacity of sidings should be fixed before 1.1.2007 keeping in view the actual handling capacity and the deemed handling capacity. Deemed handling capacity will be computed on the basis of average consumption per day during 1.1.2006 - 30.4.2006.

Demurrage on a rake will be charged after allowing the permissible free time for loading/ unloading of wagons and bunching allowance, wherever applicable. Grant of free time and levy of demurrage on a rake will be linked with the handling capacity of the siding ”

76

Page 77: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

3.0 These instructions will be effective w.e.f. 1.1.2007.

5.0 This issues with the concurrence of the Finance and Traffic Transportation Directorates in the Ministry of Railways.

AnnexureIllustration No.1

Particular ofrake

Time ofarrival

Time ofplacement

Time forreckoning offree time

Time ofrelease

Excess detention= (time of release – timeof placement) - free time

A BOXN rake is placed in one spur in one placement

1000 1000 1000 2000 (2000 – 1000) – 9 hrs. =1 hr.

A BCN rake is placed in one spur in one placement

1155 1200 1200 2300 (2300 - 1200) – 9 hrs. =2 hrs.

Illustration No.2Particular ofrake

Time ofarrival

Time ofplacement

Time of release Period of dies non

Excess detention= (time of release of the last part – timeof placement of first part) - free time-total period of dies non

Part Time Part TimeA BCN rake isplaced in onespur in threeplacements atgoods shed ‘X’

0600 1st part 0645 1stpart

1215 - (2400 – 0645) - 9 hrs. – 40min. = 7hrs. 35 min.2nd part 1230 2nd

part1700 1230 - 1215

= 15 min.

3rd part 1725 3rd part

2400 1725-1700=25 min.

Total period of dies non 15 min +25 min =40 min

A BOXN rakeis placed in onespur in twoplacements atsiding ‘Y’

1000 1st part 1015 1stpart

1715 (2300 – 1015) - 9 hrs. – 15min. = 3hrs. 30 min.

2nd part 1730 2nd part

2300 1730 - 1715= 15 min.

Total period of dies non 15min

Illustration No.3Particularsof the rake

Timeofarrival

Time ofplacement

Actualreleasetime

dies non=(time ofsubsequentplacement– time of 1st

placement)– 2 hrs.

Deemed releasetime= actual releasetime – dies non

Excess detention=(deemed release time of the rake - timeof placement of1st part) – freetime

Spur Time Spur Time Spur TimeA rakeconsisting of58 BOXNwagons isplaced inthree spurs at

0600 1st

spur0630 1st

spur1215 - 1st

spur1215 (1815 - 0630) –

9 hrs.= 2 hrs. 45 min.

2nd spur

0700 2nd spur

1700 0as (0700 –

2nd

spur1700-0=1700

77

Page 78: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

goods shed‘A’

0630) <2hrs.

3rd spur

1015 3rd spur

2000 1 hr. 45min.as (1015 –0630) - 2hrs. = 1 hr.45 min.

3rd spur

2000 -1hr.45 min= 1815

A rake consisting of45 BCNwagons isplaced in twospurs atgoods shed‘B’

0800 1stspur

0830 1stspur

2000 - 1stspur

2000 (2000 – 0830) –9 hrs.= 2 hrs. 30 min.

2nd spur

0900 2nd spur

1700 0as (0900 –0830) <2hrs.

2nd spur

1700 – 0= 1700

A rakeconsisting of45 BCNwagons isplaced inthree spurs atgoods shed‘C’

0615 1stspur

0630 1stspur

1700 --- 1stspur

1700 (1830 – 0630) –9 hrs.= 3 hrs.2nd

spur0900 2nd

spur1900 30 min.

as (0900 –0630) – 2hrs. = 30min.

2nd spur

1900 – 30 min= 1830

3rd spur

1000 3rd spur

1800 1 hr. 30min.as (1000-0630) – 2hrs. = 1 hr.30 min.

3rd spur

1800 –1 hr. 30min= 1630

Illustration No.4(a) In case five rakes have arrived for unloading at siding ‘P’ whose handling capacity is one rake per day. The made-over time of trains after granting bunching allowance would be as under:

Number ofrakes

Actual arrivaltime(in Hours)

affecting bunching allowance Due made-over time

1st 1600 Nil 16002nd 1800 1600+3 hrs.=1900 19003rd 1900 1800+3 hrs.=2100 21004th 2230 1900+3 hrs.=2200 22305th 2300 2230+3 hrs.=0130 (next day) 2400

(b) In case six rakes have arrived at siding ‘Q’ whose handling capacity is two rakes per day, then no bunching allowance will be granted to the 1st two rakes. Subsequent rakes will be distributed among two tipplers and bunching allowance will be granted tippler-wise thereafter subject to arrival of rakes in bunched manner as under:

(c)Rake No. Actual arrival time ( In

Hours)Rake distribution affecting bunching

allowanceDue made-over time

1st 0600 Tippler No.1 Nil 06002nd 0700 Tippler No.2 Nil 07003rd 0800 Tippler No.1 0600+3 hrs.=0900 0900

78

Page 79: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

4th 0900 Tippler No.2 0700+3hrs.=1000 1000 5th 1200 Tippler No.1 0800+3hrs.=1100 1200 6th 1400 Tippler No.2 0900+3hrs.=1200 1400

(d) In case eight rakes have arrived at siding ‘R’ whose handling capacity is four rakes per day. No bunching allowance will be granted to the 1st four rakes. Subsequent rakes will be distributed among four handling points and bunching allowance will be granted handling points-wise thereafter subject to arrival of rakes in bunched manner as under:

RakeNo.

Actual arrivalTime (in Hours)

Rake distribution Affecting bunchingallowance

Due made-overtime

1st 0600 Handling point No.1 Nil 06002nd 0700 Handling point No.2 Nil 0700 3rd 0800 Handling point No.3 Nil 08004th 0900 Handling point No.4 Nil 0900 5th 0930 Handling point No.1 0600+3hrs.=0900 09306th 1000 Handling point No.2 0700+3hrs.=1000 1000 7th 1045 Handling point No.3 0800+3hrs.=1100 1100 8th 1100 Handling point No.4 0900+3hrs.=1200 1200

Illustration No.5(i) Say, handling capacity of a siding “A” is to be fixed in July 2007. Actual handling capacity of the siding is one rake per day.

Consumption details of the siding “A” reveals that 100 rakes (say) were consumed during 1.1.2007 – 30.4.2007. Then the deemed handling capacity of the siding will be 2 rakes per day as computed below:

Total number of rakes consumed during 1.1.2007-30.4.2007/120 days

(i.e 100/120) =0.83

0.83 multiplied by 1.5 (i.e. 0.83*1.5) = 1.31.3 rounded off to the next integer = 2Deemed handling capacity of the siding “A” =2

Handling capacity of the siding “A” will be fixed as two rakes per day.

(ii) In case handling capacity of other siding “B” is to be fixed in July 2008. Actual handling capacity of the siding is 5 rakes per day.

Consumption details of siding “B” reveals that 250 rakes (say) were consumed during 1.1.2008 – 30.4.2008. Then the deemed handling capacity of the siding will be 4 rakes per day as computed below:

Total number of rakes consumed during1.1.2008 – 30.4.2008/121 days (i.e. 250/121)

= 2.07

2.07 multiplied by 1.5 (i.e. 2.07*1.5) = 3.113.11 rounded off to the next integer = 4Deemed handling capacity of the siding “B” = 4

Handling capacity of the siding “B” will be fixed as five rakes per day.

79

Page 80: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority: Railway Board’s letter No.TC-I/2005/201/2 of date 05/12/2006)(Authority: CCM/NWR No. C-124/0 of date 14/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 174 of 2006 (GOODS)_________________________________________________________________________

Sub: Operation of wagon Investment scheme (WIS).

Some of the railways have been finding it difficult to handle fresh/pending applications under wagon Investment Scheme (WIS), especially for iron ore traffic, due to apprehensions about ability to handle committed traffic. Wagon Investment Scheme has an inbuilt incentive for the customer to stay with the railways and investment under it should be most welcome. However, if it becomes inescapable to make a choice then following guidelines should be followed:

i) Domestic traffic, which necessarily includes CBT customers, to get preference over export traffic.

ii) Within domestic traffic, CBT customers to get preference over non-CBT customers.

iii) At the same station if loading / unloading (in that order) is from a siding, it will get preference over another person handling from general goods-shed line.

Period of permission for procuring the rake(s) be explicitly stated as only one year. It should automatically expire after one year, unless specific prior extension is given based on proof of financial commitment for purchase of rake.

This issues with approval of Traffic Transportation directorate of Railway Board.

(Authority: Railway Board’s letter No.2004/TC (FM)/4/4 of date 05/12/2006)(Authority: CCM/NWR No. C-88/1 of date 15/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 175 of 2006 (GOODS)_________________________________________________________________________

Sub:Penalty for false declaration –Rule 126 of Goods Tariff No. 41, Part –I (Vol.I)

Reference Board’s letter of even number dated 08.11.2006 (Rates Circular No. 95 of 2006 circulated vide this office LRA 159 (Goods) of 2006 of date 22/11/06 ) on the above subject. Item ‘c’ and ‘d’ of the above letter are reproduced below:

(c) If the weight of a consignment loaded in container is improperly described and thereby a lower rate than that correctly applicable has been obtained, charges at four times the applicable haulage rate will be levied. These penal charges will be in addition to the freight already paid and the freight already paid shall not be deducted.

80

Page 81: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(d) In case of false declaration of goods restricted for movement in containers, charges at four times the highest rate will be levied. These penal charges will be in addition to the freight already paid and the freight already paid shall not be deducted.

It is clarified that if both the situation ‘c’ and ‘d’ as stated above, exist in a case, the penal charges will be levied four times the highest haulage rate once only and both these clauses will not be applicable simultaneously.

(Authority: Railway Board’s letter No.TCR/2210/2006/1 of date 07/12/2006)(Authority: CCM/NWR No. C-176/5 of date 18/12/2006)

_________________________________________________________________________

Para for LOCAL RATE ADVICE 176 of 2006 (GOODS)_________________________________________________________________________

Sub: Installation of weighbridge in private sidings.

Please refer to Board’s letter No. 2002/CE-1/SP/1 of date 12/07/2005 vide which revised standard form of Agreement for Private Sidings was issued. As per clause No. 9 of the above said agreement, the applicant (private siding holders) shall provide and maintain at their own cost and expertise a suitable electronic weighbridge.

Central Railway have stated that there are number of sidings established since long and they are not having any weighbridge. However, no cases related with overloading has been detected so far, for the commodities loaded from these sidings and suggested that the provision of weighbridge should be applicable for the new siding and not for existing sidings.

The matter has been examined. Board have decided that clause 9 of above said agreement for installation of suitable electronic weighbridge should be mandatory for new private sidings and in case of old sidings installation of weighbridge may not be mandatory. However, efforts should be made to install a suitable weighbridge in case of old sidings.

(Authority: Railway Board’s letter No.TC-I/2005/108/3 – pt. of date 07/12/2006)(Authority: CCM/NWR No. C-616/0 of date 18/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 177 of 2006 (GOODS)_________________________________________________________________________

Sub: Permissible carrying capacity of BOY wagons (Rates Circular No. 107 of 2006)Ref- Rates Circular No. 31 of 2004 and Rates Circular No. 48 of 2004.

1.0 Sanction of the Central Government is hereby accorded to fix the permissible carrying capacity (PCC) BOY wagons as CC+1 tonnes with an additional loading tolerance of 1 (one) tonne.

81

Page 82: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

2.0 The above permissible carrying capacity will be applicable for loading of CC and Enhanced CC commodities both.

3.0 Necessary amendment in Punitive Charges of Overloading Rules will be made separately.

4.0 These instructions will come into force w.e.f 15.12.2006.

5.0 This issues in consultation with Mechanical Engineering, Civil Engineering Directorates and with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/1394/2006/7 of date 07/12/2006)(Authority: CCM/NWR No. C-176/4 of date 19/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 178 of 2006 (GOODS)_________________________________________________________________________

Sub: Free time for unloading of Hopper wagons in the case of steel plants.(Rates Circular No. 109 of 2006)

Ref: Railway Board’s letter No. TC-I/2005/201/2 dt. 19.12.2005 (circulating Rates Circular No. 74 of 2005 circulated vide this office LRA 1 of (Goods) of 2006 of date 03/1/06

In partial modification to the Board’s Circular mentioned above, it has been decided to revise the free time for unloading of Hopper wagons in the case of steel plants.

2.0 In case of steel plants including seven old steel plants, permissible free time for unloading of Hopper wagons will be 2 ½ hours.

3.0 Accordingly Paras 2.3 and 2.4 of Rates Circular No. 74 of 2005 stands modified. Other instructions remain unchanged.

4.0 These instructions will be effective w.e.f 1.4.2007.

5.0 This issue with the concurrence of the Finance and Traffic Transportation Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TC-I/2005/201/2 Pt. D of date 13/12/2006)(Authority: CCM/NWR No. C-299/0 of date 19/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 179 of 2006 (GOODS)_________________________________________________________________________

Sub:-Increase in permissible carrying capacity of wagons on CC+ 8 and CC+6 routes. (Corrigendum to Rates circular No. 82 & 103 of 2006)

Ref: Rates Circulars No. 82 (circulated vide LRA 140 of 2006 dtd 11/10/06) and 103 of 2006 (circulated vide LRa 167 of 2006 dtd 06/12/06)

82

Page 83: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

1.0 In the Rates circular mentioned above, the routes Chheoki –Manikpur and Manikpur –Banda-GMC (Kanpur)-Lucknow (LKO) were incorrectly mentioned on West Central Railway. It is clarified that Chheoki-Manikpur is on North Central Railway (NCR) and Manikpur –Banda-GMC (Kanpur)-Lucknow (LKO) is also on NCR upto Kanpur, beyond Kanpur,it is on Northern Railway.

2.0All the terms and conditions mentioned in Rates Circulars under reference will remain unchanged.

(Authority: Railway Board’s letter No.TCR/1394/2004/2 of date 08/12/2006)(Authority: CCM/NWR No. C-176/4 Vol.II of date 19/12/2006)

_________________________________________________________________________

Para for LOCAL RATE ADVICE 180 of 2006 (GOODS)_________________________________________________________________________

Sub: Permissible carrying capacity of BOXNHS and BRNHAHS wagons.(Rate circular No.110 of 2006)Ref: Rates Circular No.31 of 2004 (circulated vide LRA 76 of 2004 dtd 23/9/04) and Rates Circular No.48 of 2004 circulated vide LRA 110 of 2004 dtd 19/11/04)

1.0Sanction of the Central Government is hereby accorded to fix the permissible carrying capacity (PCC) BOXNHS and BRNAHS wagons as under:

Wagon Permissible Wagons carrying capacityCC commodities Enhanced CC commodities

BOXNHS 59.00 tonne 63.00 tonneBRNAHS 60.00 tonne 62.00 tonne

2.0 These instructions will come into force w.e.f. 01.01.2007.

3.0 The above-mentioned PCC will be applicable on normal routes only. On CC+8/CC+6 routes, the permissible carrying capacity notified in terms of Rates.Circular No.41 and 51 of 2006 will continue to apply unchanged.

3.0 This issues in consultation with Mechanical Engineering Directorate and with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/1394/2006/10of date 15/12/2006)(Authority: CCM/NWR No. C-176/4 Vol.II of date 28/12/2006)_________________________________________________________________________

Para for LOCAL RATE ADVICE 181 of 2006 (GOODS)_________________________________________________________________________

Sub:- Incentives to Cement Industry.(Rate Circular No. 111 of 2006)

83

Page 84: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

1.0 In terms of Board’s letter No TCR/1618/2006/6 dt 16.05.2006 ( Rate Circular No 43 of 2006 circulated vide LRA 67 of 2006 dtd 19/5/06), 15% ( fifteen percent) concession was granted for loading of Cement in BOXN wagons. Trainload rate benefit was given for loading of Cement in 49 BOXN wagons and remaining wagons ( maximum 9 ) were allowed to move empty with rake in rear without any shunting.

2.0 The matter has been reviewed and it has been decided that loading of Cement in 49 BOXN wagons will continue to get trainload benefit . However, if the party desires to load remaining wagons , freight will be charged for these wagons at Class 100 instead of the existing Class 140 of Cement.

3.0 All other terms and conditions mentioned in Rates Circulars 43 of 2006 will remain unchanged.

4.0 These instructions will come into force w.e.f. 29.12.2006.

5.0 These issue with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/1618/2006/6 Pt. I of date 19/12/2006)(Authority: CCM/NWR No. C-493/6/431 of date 28/12/2006_________________________________________________________________________

Para for LOCAL RATE ADVICE 182 of 2006 (GOODS)_________________________________________________________________________

Sub: Charging of freight for trainload Indents (Rate Circular No.112of 2006)Ref: i)Rate circular No.25 of 2006 (circulated vide LRA 45 of 2006) ii) Rate circular No.43 of 2006 (circulated vide LRA 67 of 2006)

iii) Rate circular No.50 of 2006 (circulated vide LRA 80 of 2006)

In partial relaxation to sub paras 2 and 3 of Para C.1 Block Rakes contained in Rates Circular No. 25/2006, it has been decided that the rail user should indent and load a minimum 49 BOXN wagons for availing trainload benefit as prescribed under Rate Circular No. 43 & 50 of 2006.

These instructions will come into force w.e.f 01.01.2007. This issues with the concurrence of Finance Directorate in the Ministry of Railways.

(Authority: Railway Board’s letter No.TCR/1618/2006/6 Pt. I of date 21/12/2006)(Authority: CCM/NWR No. C-423/1 Vol.II of date 29/12/2006)

84

Page 85: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

SUMMARY of OTHER RAILWAY THROUGH RATE

CIRCULAR (COACHING)

85

Page 86: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

_________________________________________________________________________ Para for SORTRC 30 (Coaching) of 2006 from NORTH CENTRAL RAILWAY

_________________________________________________________________________

Sub: Levy of Mela Surcharge during Ardh Kumbh Mela at Allahabad. Ardh Kumbh Mela will be held at Allahabad from 01/01/2007 to 28/02/2007. Mela

Surcharge will be levied at Allahabad, Naini, Subedarganj and Bamhrauli stations during the mela period.

As per instruction issued by Railway Board’s letter no. TC-II/2067/75 of date 3-10-97, 15-10-97 Mela surcharge is levied at the following rates:-

1. Second Class (Ordinary /Mail Express) Rs. 3/- (Three)2. Sleeper Class (Ordinary /Mail Express) Rs.5/-(Five)3. AC Chair Car /AC-3 tier Rs. 7/- (Seven)4. First Class /AC-2 tier Rs. 10/-(Ten)5. AC 1st Class Rs. 15/-(Fifteen)

The Mela surcharge will be levied only in respect of tickets issued from Mela station. It will also be levied on the return journey tickets to the mela stations and back. This surcharge will not be levied on single journey tickets from various stations on the Indian railways to the mela station.

This surcharge is to be levied only on those tickets whose basic fare is more than Rs. 15 (and not on those tickets whose basic fare is up to Rs. 15/-) in connection with the Mela period. (Authority: C C M/N C Rly No. 97/R/NCR/CP/Mela of date 11/09/2006) (Authority: C C M/NWR No.C.175/1 of date 29/09/2006)________________________________________________________________

Para for SORTRC 32 (Coaching) of 2006 from NORTH CENTRAL RAILWAY

________________________________________________________________

Sub:-Rationalization of Rates for parcel traffic.Ref: Rly Board’s letter No. TC-II/2046/06/1 dt. 04.5.2006

In reference to para 2.0 of Board’s above quoted letter, following mail/express /passengers trains originating from North Central Railway, are notified as Premier Parcel Service trains. Charging of Parcel booked & loaded by these trains must be ensured at scale ‘P’.S.No. Train No. Station from Station to1 2417 Allahabad (ALD) New Delhi (NDLS)2 2451 Kanpur (CNB) New Delhi (NDLS)3 2162 Agra Cantt(AGC) Lokmanaya Tilak(LTT)4 2178 Agra Cantt(AGC) Howraha(HWH)5 2988 Gwalior (GWL) Jaipur (JP)6 1340 Agra Cantt (AGC) Jhansi (JHS)7 282 JAB Nimach (NMH)

86

Page 87: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

All Divisions are requested to ensure charging of Parcels booked by above mentioned trains at scale ‘P’.

(Authority: C C M/N.C Rly No.C 2004/Comml/M&R/156/P.Trains of date 17/10/2006) (Authority: C C M/NWR No.C.175/0 of date 28/11/2006)________________________________________________________________

Para for SORTRC 34 (Coaching) of 2006 from NORTH EASTERN RAILWAY

________________________________________________________________

1. Sub: Closure of Bakshi ka –Talab station for parcel traffic.

It has been decided by the competent authority to close Bakshi-ka-Talab station with code initial BKT situated on Aishbagh Jn-Sitapur Jn. (MG) Section in Lucknow Division of N.E Railway with immediate effect for all description of outward /inward parcel traffic both in local and through booking.

(Authority :-CCM/N.E Rly’s no. C/539/9/1/Parcel /Pt. IV/Dev of date 23/10/2006)

2. Sub: Closure of Babina, Belatal and Ghatampur station for Parcel Traffic.

The competent Authority has accorded approval for closure of the following stations over Jhansi Division for parcel traffic with immediate effect (1) Babina (BAB) (2) Belatal (BIK) (3) Ghatampur (GTM)

(Authority :-CCM/N.E Rly’s no. C/386/2/39/N.C Rly/RCL of date 10/11/2006)(Authority: C C M/NWR No.C.125/0 of date 12/12/2006) ________________________________________________________________

Para for SORTRC 31 (Coaching) of 2006 from SOUTHERN RAILWAY

________________________________________________________________

Sub: Levy of Mela Surcharge during Karthigai Deepam festival at Tiruvannamalai

As advised by the Temple authorities of Shri Arunachalaswarer Thiru Kovil, Tiruvannamalai, the Karthigai Deepam Festival at Tiruvannamalai commences on 24.11.2006 and closes on 03.12.2006. Mela Surcharge will levied at Tiruvannamalai station during the period as follows:

1. Second Class (Ordinary & Mail Express) Rs. 3/- (Three)2. Sleeper Class (Ordinary /Mail Express) Rs.5/-(Five)3. AC Chair Car /AC-3 tier Rs. 7/- (Seven)4. First Class /AC-2 tier Rs. 10/-(Ten)5. AC First Class Rs. 15/-(Fifteen)

Mela surcharge will be levied only in respect of tickets issued from Mela station and also on return tickets to the Mela Station and back. This surcharge will not be levied on single journey tickets issued from various stations on the Indian Railways to the Mela station. Mela surcharge indicated above will be levied in respect of tickets costing more than

87

Page 88: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Rs. 15/- (basic fare). This surcharge will not be levied on tickets costing up to Rs. 15/- (basic fare)

(Authority: C C M/S.Rly No.C 443/P/Vol.VII of date 22/09/2006) (Authority: C C M/NWR No.C.175/1 of date 11/10/2006________________________________________________________________

Para for SORTRC 33 (Coaching) of 2006 from SOUTH EASTERN RAILWAY

________________________________________________________________

Sub: Opening of stations for booking of Outward and Inward Parcel traffic at Tangerbansli (TGB) and Lohardaga (LAD)

With the approval of the competent authority the following stations in RNC division of S.E Railway are being opened for booking of parcel traffic both for inward & outward with effect from 01.10.06.

SL No. Station Code1 TANGERBANSLI TGB2 LOHARDAGA LAD

(Authority: C C M/S.E Rly No.375/DEV-Parcel Halt/Pt.II of date 26/09/2006) (Authority: C C M/NWR No.C.175/0 of date 28/11/2006) _________________________________________________________________________

Para for SORTRC 35 (Coaching) of 2006 from SOUTH WESTERN RAILWAY

________________________________________________________________

Sub: Temporary closure of LONDA station for Outward & Inward parcel traffic.

Londa station of Hubli division is temporarily closed for both outward & inward parcel traffic for aperiod of six months from 01/12/2006 to 31/05//2007.

(Authority: C C M/SWR No.C.206/Parcel Policy/Vol II of date 28/11/2006)(Authority: C C M/NWR No.C.125/0 of date 18/12/2006)

88

Page 89: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

SUMMARY of OTHER RAILWAY THROUGH RATE

CIRCULAR (GOODS)

89

Page 90: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

_________________________________________________________________________

Para for SORTRC 180 (GOODS) of 2006 from CENTRAL RAILWAY______________________________________________________________________

1. Sub: Upgradation of loni Good Shed to full rake.

Loni Goods Shed has been included in the list of full rake handling capacity instead of half rake list.

This has the approval of competent authority.

(Authority : CCM/NE Rly No. C/386/2/33/Pt.I /CR/RCL of date 18/8/2006)(Authority: CCM/C.Rly No. ARN No.155 of 2006 (Goods) No. CRB/205/TL.B of date 17/7/06)

2. Sub: Permissioin to use M/s. Rama Krishi Rasayan Sidign Loni by M/s. Ambuja Cement.

With effect from 5.5.2006, permission is granted to M/s. Ambuja Cement to use the siding of M/s. Ram,a Krishi Rasayan Ltd., siding served by Loni for full rake load traffic for loading /unloading facility for a period of 06 months (six months) i.e upto 4.10.2006 on experimental basis.

(Authority : CCM/NE Rly No. C/386/2/41/9S.C.R (RCL of date 8/8/2006)(Authority: CCM/C.Rly No.C/698/M/925 of date 05/5/2006)(Authority :CCM/NWR No.C .543/1/1 (C Rly) of date 29/11/2006)______________________________________________________________________

Para for SORTRC 181 (GOODS) of 2006 from CENTRAL RAILWAY

______________________________________________________________________

Sub: Permission to use M/s. Rama Krishi Rasayan Siding Loni over Central Railway by M/s Gokul Refoils & Solvent Ltd.,

With effect from 13.07.2006, permission is granted to M/s. Gokul Refoils & Solvent Ltd. to use the siding of M/s. Rama Krishi Rasayan Ltd., siding served by Loni for full rake load traffic for loading /unloading facility for a period of 03 months (Three months) i.e upto 12.10.2006 on experimental basis.

(Authority : CCM/SE Rly No. C.RA42 42/10/Pt.VIII/8 of date 04/8/2006)(Authority;CCM/C.Rly No. C/698/M/925 of date 13/7/06)(Authority :CCM/NWR No.C .543/1/1 (C Rly) of date 29/11/2006)______________________________________________________________________

Para for SORTRC 182 (GOODS) of 2006 from CENTRAL RAILWAY

______________________________________________________________________

90

Page 91: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Sub: Opening of private siding of M/s Usha Martin Ltd., served by Gamharia Station.

The private siding of M/s. Usha Martin Ltd. Served by Gamharia station has been opened for booking of Inward /Outward Goods Traffic in rake load on through distance basis. The traffic of the siding will be directly entered into/exist. To/from the siding without being dealt with at serving station i.e Gamharia station. For movement of such traffic, no siding charge is leviable but freight should be calculated on continuous distance basis up to the serving station by recknoning the distance of Gamharia +2.08 Kms (upto 2 decimal point).

In case of shunting operation is involved by Railway locomotive inside the siding necessary siding charges will also be levied as per extant rules.

For movement of piecemeal wagon load traffic in any, the rate of siding charges will be notified later on.

This will take with immediate effect.

(Authority : CCM/N.E Rly No. C/386/2/33/Pt.I/CR/RCL of date 28/07/2006)(Authority:CCM/C.Rly ARN No. 41/2006 (Goods) No. C/634/R-6/775/2005/SER of date 17/2/2006) (Authority :CCM/NWR No.C .543/1/1 (C Rly) of date 29/11/2006) ______________________________________________________________________

Para for SORTRC 185 (GOODS) of 2006 from CENTRAL RAILWAY

______________________________________________________________________

Sub: Two point combination for outward traffic at Badnera and Malkapur station over Central Railway.

Badnera and Malkapur station over C. Rly has been added to the rake list of two point combinations for outward traffic.

This has the approval of competent authority of C.Rly.

(Authority: CCM/C..Rly’s No. C.RB.205.TLC dtd 24.8.2006)(Authority:CCM/SE Rly no.RA.42/10/Pt.VIII/8 of date 13.9.06)(Authority :CCM/NWR No.C .498/6 of date 29/11/2006______________________________________________________________________

Para for SORTRC 175 (GOODS) of 2006 from EASTERN RAILWAY

______________________________________________________________________

Sub: Inclusion of MEMARI as a half rake handling point for Inward and Outward general goods traffic.

Ref: This office SORTRC no.30 goods date 07.3.2006

Competent authority of Eastern Railway declared that MEMARI goods shed under Howrah Division of Eastern Railway may be included in the list of half rake handling point in respect of general goods traffic.

91

Page 92: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority :CCM/S.E Rly’s NoRA.42/3/Pt.X/IV of dated 27/09/2006)(Authority :CCM/NWR No.C .498/6 of date 22/11/2006)______________________________________________________________________

Para for SORTRC 191 (GOODS) of 2006 from EASTERN RAILWAY

______________________________________________________________________

Sub: Full rake handling station.

Chitpur (CP) station of Eastern Railway is opened as a rake handling point for all commodities except inward traffic in loose. Chitpur (CP) station of E.Rly may be included in the list of stations open for handling full rake of goods traffic.

These instructions will be effective from 25.11.2006.

(Authority :CCM/N.Rly No. C.1974-R/Rake Handling /2006 N.R.H.Q.B.H NDLS of date 16/11/2006)(Authority :CCM/NWR No.C .498/6 of date 12/12/2006)______________________________________________________________________

Para for SORTRC 205 (GOODS) of 2006 from EASTERN RAILWAY

______________________________________________________________________

Sub: List of notified two point combination for inward traffic of Eastern Railway.

The list of two point combination for inward traffic which are operationally convenient for Eastern Railway is given beow:-

Sealdah Division

Two Point Combination (for inward traffic only)

DDC+BNJ (20/20)KNJ+CSZ(20/20)BPQ+KNJ (20+20)BPC+CSZ (20+20)

Howrah Division

RIS +SRP (20+20)BHC+SRP (20/20)

Malda Division

Two point combination (for inward traffic only)

BGP+SBG(20/20)JMP +BGP (10/30 for FCI traffic)

92

Page 93: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Handling of two point rakes at combination of destinations other than the ones is difficult due to operational constraints. All division may therefore be requested to load two point combination rakes for Eastern Railway in covered wagons as mentioned above.

These instructions will be effective from 15.12.2006.

(Authority :CCM/N.Rly No.C1974-R/Rake Handling /2006 N.R.H.Q.B NDLS of date 06/12/2006)(Authority :CCM/NWR No.C .498/6 of date 21/12/2006) ______________________________________________________________________

Para for SORTRC 172 (GOODS) of 2006 from EAST CENTRAL RAILWAY

______________________________________________________________________

Sub: Two Point Combination over EC Railway for covered wagons rakes. Ref: Rly Bd letter No. TCR/1017/2001/9 dated 25.10.05 In terms of Railway Board Letter No. TCR/1017/2001/9 dated 25.10.05 & Rate

circular No. 63 of 2005 Two Point Combination over E.C Railway (Other than steel Traffic) for Covered wagons Rake only is furnished for slack season & Peak season.

Two Point combination of covered Wagons Rake over ECR in Peak seasonSl.No.

POINT –I CODE + POINT –II CODE

1 ARA ARA + DANAPUR DNR2 BUXAR BXR + ARA ARA3 FATUHA FUT + BIHAR SHARIF BEHS4 JAMUI JMU + WARSHALIGANJ WRS5 GAYA GYA + JEHANABAD JHD6 GAYA GYA + WARSHALIGANJ WRS7 SASARAM SSM + DEHRI-ON-SONE DOS8 DHANBAD DHN + HAZARIBAGH ROAD HZD9 DHANBAD DHN + KODERMA KQR10 HAZARIBAGH ROAD HZD + KODERMA KQR11 BARAUNI BJU + BEGUSARAI BGS12 SEMAPUR SMO + KURSELA KUE13 NARAYANPUR ANANT NRPA + KARPURIGRAM KPGM14 MOTIHARI MKI + BETTIAH BTH15 CHAKIA CAA + MOTIHARI MKI16 CHAKIA CAA BETTIAH BTH

Following Combination with Luckeesarai on Wagon Load permitted1 Luckeesarai (Max.12 BCN) LKR + JAMUI (Min -28 BCN) JMU2 Luckeesarai (Max.12 BCN) LKR + WARSHALIGANJ (Min-

28 BCN)WRS

3 Luckeesarai (Max.12BCN) LKR + KEIUL(Min -28 BCN) KEU

The combination with LKR will be allowed when LKR Load will be uptp 12 Wagons Only.Following Combination with Anugraha Narayan Road on Wagon Load permitted in Peak

Season

93

Page 94: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

1 ANUGRAHA NARAYAN ROAD (Max 10 BCN)

AUBR + SASARAM (Min-30 BCN) SSM

2 ANUGRAHA NARAYAN ROAD (Max 10 BCN)

AUBR + DEHRI-ON-SONE (Min 30 BCN)

DOS

The combination with AUBR will be allowed when AUBR Load will be up to 10 Wagons Only.

Following Two Point Combinations will be included in Lean Season1 GAYA GYA + SASARAM SSM2 GAYA GYA + KODERMA KQR3 GAYA GYA + DEHRI-ON-SONE DOS4 KHAGARIA KGG + KURSELA KUE5 MANSI MNE + NAUGACHIA NNA6 MANSI MNE + KURSELA KUE7 MANSI MNE + SEMAPUR SMO8 SAHARSA SHC + KHAGARIA KGG

Following combination with Anugraha Narayan Road on Wagon Load permitted1 ANUGRAHA NARAYAN

ROAD (Max 10 BCN)AUBR + GAYA(Minimum-30 BCN) GYA

The combination with AUBR will be allowed when AUBR Load will be upto 10 Wagons Only.

It superceded all previous notification of this Railway for Two Point Combinations of Covered Wagons rake over EC Railway.

(Authority :CCM/E.C Rly’s No. ECR/OPT/GDS/511/10/06 of dated 17.10.06)(Authority :CCM/NWR No.C .70/3 of date 08/11/2006) _________________________________________________________________________

Para for SORTRC 156 (GOODS) of 2006 from EAST COAST RAILWAY

_________________________________________________________________________

Sub: Inclusion of Bagadia PII in the Station code list I& II of East Coast Railway in CUTTACK –PARADEEP Section under Khurda Road Division.

As per order of Chief Commercial Manager (FS) /East Coast Railway, the following PH may please be including in the station code list Sect I & II of East Coast Railway in CUTTACK-PARADEEP Section under Khurda Road Division.

ADDITION

SL No.

Name of the siding

Code initial

Numerical code No.

Gauge Section of via

1 BAGADIA PH - 12121036 BG 08

(Authority :Sr.S.O/S.E Rly NO. ST /COM/STN.Code/E.Co /655 of date 18/07/2006)

94

Page 95: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority :CCM/SE Rly No. RA.42/Misc/86/5 of date 18/08/06)(Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 13/10/2006)

______________________________________________________________________

Para for SORTRC 204 (GOODS) of 2006 from EAST COAST RAILWAY______________________________________________________________________

Sub: The Up-dated list of Stations/Sidings having full/half rake handling capacity and two point combinations on East Coast Railway.

The up-dated list of stations/Sidings having full/half rake handling capacity and two point combinations on East Coast Railway is given below:

EAST COAST RAILWAY

KURDA ROAD DIVISIONFULL RAKE GOODS SHEDS

Sl No. Goods Shed Code Commodity1 Bhadrak BHC Bagged Traffic2 Kenduapada KED All Commodities except POL3 Jaipur Keonjhar

RoadJJKR All Commodities except POL

*4 Jakhapura JKPR All Commodities except POL*5 Sukinda Road SKND All Commodities except POL6 Daitari DATR All Commodities except POL7 Tomka TMKA All Commodities except POL8 Dhanmandal DNM Bagged Traffic *9 Nergundi NRG All Commodities except POL10 Cuttack CTC Bagged Traffic 11 Charbatia CBT All Commodities except POL12 Bhubaneswar BBS All Commodities except POL13 Brahmapur BAM Bagged Traffic*14 Hindol Road HND All Commodities except POL15 Dhenkanal DNKL All Commodities except POL*16 Rajathgarh RJGR All Commodities except POL

HALF RAKE GOODS SHEDS*1 Jagannathpur JNP All Commodities except POL*2 Khurda Road KUR All Commodities except POL3 Surla Road SLRD O/W Concrete Sleepers 4 Kaipadar Road KPXR O/W Concrete Sleepers

Full Rake Goods SidingsSl.No. Sidings Code Serving Stations*1 Talcher Thermal Power Station (TTPS) TTST Tlacher*2 TSTPS/NTPC/Kaniha’s Exch.Yard NEYT Tlacher3 Talcher Colliery Sdg. TICT Talcher

95

Page 96: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

4 South Balanda, Colliery Sdg. SBCT Talcher*5 NALCO - Budapank*6 Indian Charge Crome Ltd. ICCC Charbatia7 Oil siding Cuttack - Cuttack8 Paradeep Phosphate Ltd PRPL Paradeep*9 Cargo Berth Sdg.Paradeep CBSP Paradeep*10 ADB Coal Handling Plant PPAP Paradeep11 IOC, Paradeep - Paradeep12 HPCL,Paradeep - Paradeep13 IOC, Khurda - Khurda Road14 LPG Siding, Khurda Khurda Road*15 Neelachal Ispat Nigam NINS Sukinda16 Indian Rare Earth Ltd. IREL Chhatrapur

Half Rake Sidings1 Jayshree Chemicals , Ganjam JCLG Ganjam2 FCI, Khurda Road - Khurda Road

* Stations are open for INWARD COAL

WALTAIR DIVISIONFULL RAKE GOODS SHEDS

S.NO. Goods Shed Code COMMODITIES*1 Duvvada DVD All commodities except POL2 Visakhapatnam New Goods Complex VNCW All commodities except POL3 Simhachalam SCM All commodities except POL*4 Kantakapalli KPL All commodities except POL5 Kotabommali KBM All commodities except POL6 Vizianagram VZM Bagged Traffic7 Srikakulam Road CHE All commodities except POL*8 Rayagada RGDA All commodities except POL9 Jaypore JYP All commodities except POL*10 Koraput KRPU All commodities except POL*11 Jagadalpur JDB All commodities except POL

Half Rake Goods Sheds1 Chipurupalle CPP All Commodities except POL2 Bobbilli VBL Bagged Traffic

Full Rake SidingsS.No Goods Shed Code Serving Stations*1 NTPC /Simhadri Thermal power

PlantSTDV Duvvada

2 Andhra Cement Co. Ltd PSAS Simhachalam North*3 Visakhapatnam Steel Plant

Siding VSPS Visakhapatnam Steel Plant Siding

*4 Visakhapatnam Port VZP Visakhapatnam Port5 Visakhapatnam Port West VZPW Visakhapatnam Port6 VZP Hindustan Zinc Ltd. VZPZ Visakhapatnam Port7 VZP Food grain Siding –I VZPF Visakhapatnam Port8 VZP Food grain Siding –II VZPG Visakhapatnam Port9 VZP FCI New Siding FCIG Visakhapatnam Port

96

Page 97: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

10 Coromandal Fertilizer Ltd. Siding CFVS Visakhapatnam Port11 IOC, Visakhapatnam VZPB Visakhapatnam Port12 HPCL, Visakhapatnam HPCV Visakhapatnam Port13 VZP SAIL Siding VZPS Visakhapatnam Port14 Container Freight Stn.,

VisakhapatnamCFCV Visakhapatnam

15 Ferro Manganese Plant Siding, Garividi

- Garividi

*16 Gold Star Aloys Ltd., Mallividu PGSA Mallividu17 NMDC, Bacheli - Bacheli18 NMDC, Kirandul - Kirandul*19 Nalco, Damonjodi NLOD Damonjodi*20 M/s. Straw Product Siding PSPG Singapuram Road

* Stations are open for INWARD COAL

SAMBALPUR DIVISIONFull Rake Goods Sheds

Sl.No. Goods Shed Code Commodity1* Mandirhasaud MNDH All Commodities except POL2 Mahasamud MSMD All Commodities except POL3 Kesinga KSNG All Commodities except POL4 Balangir BLGR All Commodities except POL5 Bagbahra BGBR All Commodities except POL6 Bargarh Road BRGA All Commodities except POL7* Lapanga LPG All Commodities except POL8* Hirakud HKG All Commodities except POL9* Sambalpur City SBPY All Commodities except POL10 Daikallu DKLU All Commodities except POL

HALF RAKE GOODS SHED1 Sambalpur SBP All Commodities2 Kantabanji KBJ All Commodities except POL3 Khariar Road KRAR All Commodities except POL

FULL RAKE SIDINGSSl.No. Goods Shed Code Serving Stations1* Indian Metal & Ferro Alloys Ltd IMFT Theruvali2* The A.C.C. Limited /Baragarh Cement

Works CFDS Bargarh Road

3 Hira Industrial Works Ltd. SBP HIWS Sambalpur4 Ordinance Factory Sidings OFB Budmal5* Monnet Ispat LTd., Mahasamund - Mandirhasaud6 FCI Sdg, Mandirhasaud - Mandirhasaud7 POL Sdg. Mandirhasaud - Mandirhasaud8 LPG Bottling plant Mandirhasaud LBPM Mandirhasaud

HALF RAKE SIDINGS1 POL Sdg, Sambalpur - Sambalpur

* Stations are open for INWARD COAL.

97

Page 98: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Two Point combination –FULL yearSl.No. Point I Point II1 Sambalpur + Bargarh Road2 Bagbahara + Mahasumund

Two Point Combination -SLACK SEASON1 Brahmapur + Jagannathpur2 Brahmapur + Khurda Road3 Jagannathpur + Khurda Road4 Jaipur Keonjhar Road + Bhadrak 5 Srikakulam Road + Chipurupalle6 Vizanagram + Chipurupalle7 Vizanagram + Kantkapalli8 Rayagada + Bobbili9 Rayagada + Kesinga10 Visakhapatnam Port + Visakhapatnam New Goods Complex11 Simhachalam + Visakhapatnam New Goods Complex12 Jaypore + Jagdalpur13 Kesinga + Kantabanji14 Kesinga + Khariar Road15 Kesinga + Balangir 16 Kantabanji + Khariar Road

These instructions will be effective from 15.12.2006.

(Authority :CCM/N.Rly No.C1974-R/Rake Handling /2006 N.R.H.Q.B NDLS of date 06/12/2006)(Authority :CCM/NWR No.C .498/6 of date 28/12/2006______________________________________________________________________

Para for SORTRC 159 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

1.Sub: Notification of TKD goods shed as capable of handling full rakes of all goods traffic

The competent authority has accorded administrative approval for notification of TKD goods shed as capable of handling full rakes of all goods traffic except POL,LPG & Coal w.e.f 17.8.2006.(Authority:CCM:CCM/S&R Letter No.51 –RD/608-R/Opening /DLI of date 17/08/2006)

2.Sub:- Booking of traffic on Trainload class rate.

On account of Operational constraints at Luckesarai Goods shed, it is hereby instructed that all the Divisions, hence forth , be loading only upto 12 wagons for this station in two combination loading.

Advise to all concerned accordingly.(Authority:CCM/N.Rly No. 1974-R/Rake handling /2006 N.R of date 17/08/2006)(Authority :CCM/NWR No.C 543/5/1 (N. Rly) of date 19/10/2006)

98

Page 99: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

______________________________________________________________________

Para for SORTRC 160 (GOODS) of 2006 from NORTHERN RAILWAY______________________________________________________________________

Sub:- Notification for Two point combination.

Following two point combinations for originating loading over Northern Railway from where covered rakes can be booked at Trainload Class rates:-

S.No. Station Name Station code1 Abohar +Giddarbha ABS+GDB2 Malout+Giddarbha MOT+GDB3 Malout+Abohar MOT+ABS4 Bathinda + Rampuraphul BTI+PUL5 Barnala + Bhatinda BNN+BTI6 Bhatinda +Tapa BTI+TPA7 Tapa +Barnala TPA +BNN

These instructions will be effective from 8.9.2006.

(Authority :CCM/N.Rly’s No. 1974-R/Rake Handling/2006 of date 30/08/2006) (Authority :CCM/NWR No.C 543/5/1 (N. Rly) of date 19/10/2006)______________________________________________________________________

Para for SORTRC 161 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

Sub:- Allotment of new code initial for M/s continental carbon India Ltd. Ghaziabad (CCIL)

Consequent upon the change in the name of the siding from M/s oriental carbon & Chemicals Ltd to M/s. continental carbon India Ltd. Vide N.R Rates (Sdg.) circular No. (4) of 2006. The code initial has also been changed from OCCL to CCIL. (Authority :CCM/N.Rly’s No. 1-AC/347/Rates/N.R/B.H/NDLS of date 31/08/2006) (Authority :CCM/NWR No.C 543/5/1 (N. Rly) of date 19/10/2006______________________________________________________________________

Para for SORTRC 171 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

Sub: Notification for Two Point combination & full rake handling of goods traffic.

The following two point combination rakes for originating loading over Northern Railway from where covered rakes loading over Northern Railways from where covered rakes can be booked at Trainload Class rate:-

99

Page 100: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

S.No. Station Name Station Code1 Sitapur City + Balamau SPC+BLM2 Beniganj+ Hardoi BEJ+HRI3 Sandilla+Hardoi SAN+HRI4 Beniganj+Sandilla BEJ+SAN5 Clutterbuckganj+Dhamora CBJ+DAM6 Beniganj+Balamau BEJ+BLM7 Rampur +Tilhar RMU+TLH8 Rosa+Bareilly ROZA+BE9 Sahajahanpur+Bareilly SPN+BE10 Sehara Sugar Mill

Sdg.+Dhampur sugar Mill Sdg.SEO+DPR

These instructions will be effective from 08/10/2006

(Authority :CCM/N. Rly’s No. 50-T/J.Rake /(TGT) dt. 28.9.2006 from GM/(Optg) N. rly New Delhi)(Authority :CCM/NWR No.C .70/3 of date 08/11/2006) ______________________________________________________________________

Para for SORTRC 184 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

Sub: To Facilitate loading /unloading of PRC Sleepers for USBRL Project over N. Rly.

The competent authority of N. Rly has approved use of line No. 10 at Udhampur Yard as Engineering siding temporarily to facilitate loading /unloading of PRC Sleeper for USBRL project for a period of Six month only with effect from 3.8.2006.

(Authority: CCM/S&R , N.Rly’x XXR No. 1329-R/Opening –closing /X dt. 3.8.2006)(Authority:CCM/SE Rly no.RA.42/1A/Pt.X/IV of date 8.9.06)(Authority :CCM/NWR No.C .543/5/1 (N.Rly ) of date 30/11/2006 ______________________________________________________________________

Para for SORTRC 186 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

Sub:- Notification of Two point combination for originating traffic

Ropar and Kiratpur Sahib goods shed may be notified of Two Point combination for originating traffic in covered rakes, so that rakes can be booked at train load lass rate.These instructions will be effective from 10.11.2006.

(Authority: CCM/N..Rly’s No. 1974-R/Rake handling/2006 NRHQBH NDLS dtd 3.11.06)( (Authority :CCM/NWR No.C .498/6 of date 30/11/2006) ______________________________________________________________________

Para for SORTRC 190 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

100

Page 101: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Sub: Change in the name of siding from M/s. Oriental Carbon & Chemical Ltd. To M/s. Continental Carbon India Ltd., Ghaziabad.

The name of the siding known as M/s. Oriental Carbon and Chemical Ltd., Siding Ghaziabad as appearing at page 448 Chapter-IX of IRCA Alphabetical list of Railway stations in India corrected upto 31 March 1995 has been changed to M/s. Continental Carbon India Ltd., Ghaziabad Goods intended for /from the continental Carbon India Ltd., Ghaziabad should therefore be accepted for booking from and to this siding however, other condition will continue to apply. (Authority: CCM/N.E Rly No. C/386/2/33/Pt.I/CR/RCL of date 18/8/2006)(Authority: CCM/NWR No.C .543/5/1 (N Rly) of date 6/12/2006______________________________________________________________________

Para for SORTRC 198 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

Sub: Permission to use the siding of M/s. Hari Fertilizers Ltd. Siding Vyas Nagar by M/s. SMJ EXIMP Ltd Chandauli and M/s Singrauli Finlease (P) Ltd., Varanasi for inward traffic of coal.

It is notified for the information of all concerned that M/s. SMJ EXIMP Ltd., Chanduauli and M/s Singrauli Finlease (P) Ltd., Varanasi have been permitted to use the siding of M/s HariFertilizers Ltd. Siding Vyasnagar for inward traffic of coal. The same siding charge as payable by the owner of the siding will be payable by the users. The siding charges are recoverable locally and should not be shown on RRS and invoice.

(Authority :CCM/N. Rly No. 1-AC/143/R/NRBHNDLS of date 9-11-2006)(Authority :CCM/NWR No.C .543/5/1 (N. Rly) of date 13/12/2006) ______________________________________________________________________

Para for SORTRC 207 (GOODS) of 2006 from NORTHERN RAILWAY

______________________________________________________________________

Sub:- Capability of Balamau and Sandila stations over Northern Railway.

The competent authority has accorded administrative approval for Balamau (BLM) & Sandila (SAN) station of Moradabad division are capable to handling full rake of Goods traffic w.e.f 28.9.2006.

The name of these stations may please be added in the list of stations /sidings for full/half rake capacity circulated vide N.E. Rly’s rates circular (Goods) No. 111 of 2006.

(Authority :CCM/NE Rly’s No. C/386/2/46/NR/RCL of date 14-11-2006) (Authority :CCM/NWR No.C .498/6 of date 29/12/2006) ________________________________________________________________

Para for SORTRC 152 (GOODS) of 2006 from NORTH CENTRAL RAILWAY

________________________________________________________________

101

Page 102: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Sub:- Booking of traffic on Train Load Class rate (revised).

Ref:- 1. EDTT (S) Railway Board L.No. TCR/1017/2001/9 dated 25.10.05 (circulated vide this office LRA no. 101 of 2005)

2. N.C Rly office letter no. 292-T/GoodsSdg/NCR of date 09/11/05 & 16/11/05 (Circulated vide this office SORTRC No. 02 of 2006 & SORTRC No. 70 of 2006)

In continuation to N.C Rly office letters referred at Sr. No. 2, following revised combination of Two point stations for originating loading are notified from where covered rakes can be booked at train load class rate.

GWL+DBA Gwalior + DabraDBA+DAA Dabra + Datia DBA+LAR Dabra +LalitpurBNDA+MBA Banda+MahobaKBR+BNDA Kabrai +BandaIDGJ+NYN Iradat Ganj+ NainiJAB+ETH Yamuna Bridge+EtahETH+HRF Etah+Hathras FortETH+MNQ Etah+MainpuriSKB+MNQ Shikohabad +MainpuriFKD+MNQ Farukhabad+MainpuriFTP+CPC Fatehpur +Kanpur Central Goods ShedETW+CPC Etawa +Kanpur Central Goods ShedNYN+MZP Naini +MirzapurMZP+CAR Mirzapur+ChunarKSV+MTJ Kosikalan +MathuraMTJ+JAB Mathura +Yamuna BridgeHDL+KSV Hodal +KosikalanKL+NBI Kherli +NadbaiNBI+MURD Nadbai +Mandawar Mahuwa RoadKL+MURD Kherli +Mandawar Mahuwa RoadMRA+DDA Morena +DatiaGWL+DAA Gwalior +Datia

This is for information and necessary instructions may please be issued to all concerned. Please acknowledge receipt of this letter. (Authority:CCMN.C Rly No.C292-T/Goods Sdg/NCR of date 26.09.2006)(Authority :CCM/NWR No.C 70/3 of date 10.10.2006) ______________________________________________________________________

Para for SORTRC 179 (GOODS) of 2006 from NORTH CENTRAL RAILWAY

______________________________________________________________________

Sub: Re-Opening of Bijauli (BJI) station for Goods loading.

102

Page 103: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

The Bijauli Station of Jhansi Division on N.C Railway will be opened for outward goods loading W.e.f 15-10-2006 to 30-04-2007.

This has the approval of competent authority.

(Authority :CCM/N.C Rly’s No.2004/Comml/M&R/242 /FRH of dated 13.10.06)(Authority :CCM/NWR No.C .543/6/1 (N.C Rly) of date 28/11/2006)______________________________________________________________________

Para for SORTRC 199 (GOODS) of 2006 from NORTH CENTRAL RAILWAY

______________________________________________________________________

Sub: Re-opening of Belanganj (BLGJ) goods shed for Coal traffic.

The Belanganj goods shed of Agra Division on N. C Railway will be opened for Coal traffic only on an experimental basis from 25-11-2006 to 30-04-2007.

This has the approval of competent authority.

(Authority :CCM/N.C Rly No. 2003/Comml/M&R/201/BLGJ of date 22-11-2006)(Authority :CCM/NWR No.C .543/6/1 (N. C.Rly) of date 13/12/2006)______________________________________________________________________

Para for SORTRC 164 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

Sub:- Opening of Balod station (BXA) station as a full rake handling point for outward loading of food grain.

Ref:- N.E Rly Rates Circular (Goods) No. 31 of 2006

Reference N.E Rly Rates Circular (Goods) No. 31 of 2006, under wherein BXA station was notified for handling full Rake outward Food grains traffic upto 30.9.2005.

It is clarified here that this Goods shed is a half rake point. It has now been decided to open this goods shed for inwards food grains & Fertilizers traffic also.

(Authority :CCM/N.R Rly No.25-09-R/SEC Rly /2005 dt. 21.8.2006)(Authority :CCM/NWR No.C 543/17/1 of date 31.10.2006) ______________________________________________________________________

Para for SORTRC 165 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

Sub:-Opening of Lalkuan (MG) station for outward loading. Ref:- N.E Rly Rates Circular (Goods) No. 109 of 2005

Lalkuan (MG) Station situated on Izzatnagar division over N.E. Railway is already opened as full rake loading point for RMC only.

103

Page 104: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Now, it has been decided by the competent authority to open Lalkuan (MG) Goods shed with immediate effect as a full rake handling point for all commodities excrept Coal and POL.

(Authority :CCM/N.E Rly No.c/147/0/3/PT.IX/TRAIN LOAD/RG dt. 25.8.2006) (Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31.10.2006)______________________________________________________________________

Para for SORTRC 166 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

1.Sub:-Closure of Sasamusa Sugar Works Ltd. Siding served by Sasamusa Railway station of N.E Railway.

The Sasamusa Sugar Works Ltd. Siding Sasamusa, served by Sasamusa Railway station of N.E Railway having code initial SSU with numerical code 42350 appearing at SL No. 110 at page No. 145 of N.E Rly. Goods Tariff No. 2 and page No. 487 of Chapter IX and page No. 264 of Chapter VII of IRCA Alphabetical list of Railway Stations in India (Corrected upto 31th March 1995) should be treated as closed with effect from 01.12.2003. As a result of this closure, no traffic shall be booked either in wagon loads or in train loads on account of the Mill to or from the above siding.

(Authority CCM/N.E Rly No.C/19/5/2/Pt.II/RS dt.10.8.06)(Authority: CCM/ N.Rly No.2532-R/N.E Rly /2006, of date 8/09/2006)

2.Sub:-Incusion of Sodepur Goods Shed as a full rake handling point for all commodities except Crane consignment.

The works relating to augmentation of Goods Shed Capacity has been completed at Sodepur. It is now capable of handling full rake load of 40 BCN/41 BCNA for all commodities except crane consignment.

(Authority:CCM/N.Rly No. 2532-R/N.E Rly /2006, of date 8/09/2006) (Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31.10.2006)______________________________________________________________________

Para for SORTRC 167 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

Sub:- Opening of Ghazipur City for full rake handling point Ref:- N.E Rly’s Rates Circular (Goods) No. 109 of 2005

Ghazipur City Goods shed (BG) situated under Varanasi Division over N.E Railway was opened as a half rake point for both inward and outward bagged consignments only vide N.E Railway’s Circular referred above.

Now the full rake handling capacity at Ghazipur City has been developed.

It has been decided by the competent authority to open Ghazipur City Goods shed with immediate effect as a full rake handling point for all commodities except Coal, Mineral and POL, both for outward and inward Goods Traffic.

104

Page 105: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Authority :CCM/N.E Rly’s No. C/147/0/3/Pt.IX/Train load/RG date 14.08.06)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31.10.2006)

______________________________________________________________________

Para for SORTRC 168 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

Sub:- Up-dated list of Station Goods Sheds /sidings capable of handling full rakes/half rake and two point combination on N.E Railway.

An up-dated /fresh list of stations Goods sheds/sidings having full rake, half rake and

two point combination handling capacity on N.E Railway is given below:

List of Stations /Sidings capable of handling train load traffic.

FULL RAKE S.No. Name of

Stations/sidingCode Capacity Commodity

1 Basti BST Full rake All commodities except POL & COAL2 Gonda GD Full rake All commodities except COAL3 Nakaha Jungle JEA Full rake All commodities except POL4 Mahmudabad MMB Full rake Outward all commodities except POL

& Coal5 Biswan BVN Full rake Outward all commodities except POL

& Coal6 Tahsil Fatehpur TSF Full rake Outward all commodities except POL

& Coal7 Parsendi PSN Full rake Outward all commodities except POL

& Coal8 Gonda Katcheri GDK Full rake Inward Stone Chips9 Katra KEA Full rake Inward Stone Chips10 Mau MAU Full rake Bagged consignment only11 Indara IAA Full rake All Commodities except POL12 Deoria Sadar DEOS Full rake All Commodities except POL& COAL13 Kushmi KHM Full rake Inward all commodities except POL14 Siwan SV Full rake All commodities except POL15 Chhapra CPR Full rake All commodities except POL & COAL16 Azamgarh AMH Full rake Bagged Commodities only17 Madhosingh MBS Full rake Outward Railway ballast 18 Varanasi City BCY Full rake Outward all commodities except POL

& COAL19 Kashipur KPV Full rake All commodities except POL20 Rudrapur City RUPC Full rake All commodities except POL21 Belaspur Road BLOR Full rake All commodities except POL22 Haldi Road HLDD Full rake All commodities except POL23 Haldwani HDW Full rake Military Traffic Only

105

Page 106: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

TWO POINT COMBINATION (FOR OTHER THAN STEEL TRAFFIC FULL YEAR)

S.No. Name of Stations/siding CodeName

Name of Stations /siding

Code Name

1 Ballia BUI Ghazipur City GCT2 Chauri Chaura CC Deoria Sadar DEOS3 Indara IAA Phephna PEP4 Khalilabad KLD Basti BST5 Ballia BUI Chhapra CPR6 Mau MAU Azamgarh KMH7 Siwan SV Chhapra CPR8 Mau MAU Balllia BUI9 Rampur RMU Rudrapur City RUPC10 Rudrapur City RUPC Kashipur KPV11 Gola Gokarannath (MG) GK Paliakalan (MG) PLK

TWO POINT COMBINATION (FOR OTHER THAN STEEL TRAFFIC FULL YEAR)(Slack Season)

S.No. Name of stations/Siding Code Name Name of Stations /siding

Code Name

1 Tahsil Fatehpur TSF Biswan BVN2 Mahumdabad MMB Parsandi PSN3 Gonda GD Basti BST4 Basti BST Nakaha Jungle JEA

(Authority :CCM/S.C. Rly’s No. C.473/990/TL/OR/03/Vol.III date 4.07.06)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 2.11.2006) ______________________________________________________________________

Para for SORTRC 169 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

Sub:- Opening of Mau station of Varanasi division for all loading of description of Goods Traffic in train load.

Ref:- N.E Rly’s Rates Circular (Goods) No. 109 of 2005 dated 27.7.2005. The Mau station (MAU) on Varanasi division of N.E Railway is open for loading of

bagged consignments in full rake vide N.E Rly’s Rates Circular under reference.

It has now been decided to open this station for loading of all description of Goods Traffic in full rake except Coal and POL with immediate effect.

(Authority :CCM/N.E Rlys No. C/147/0/3/Pt.VIII/Train load/RG date 01.09.06)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 2.11.2006)______________________________________________________________________

Para for SORTRC 170 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

106

Page 107: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Sub:- Opening of Farrukhabad (FBD) station of Izzatnagar Division over N.E railway.

After gauge conversion Kanpur Central –Kanpur Anwarganj-Farrukhabad, BG section of Izzatnagar division over N.E Railway was opened for traffic from 19.5.2006 vide GM (Optg),N.E Railway, Gorakhpur’s letter No. T/195/0/2 dated 20.5.06.

Vide N.E Rly’s Rates Circular (General) No. 23 of 2006. Farrukhabad station (BG) is under the complete control of N.E Railway.

Farrukhabad station while in control of N.C Rly with code-FKD was notified for handling of full rake, by N. C Rly which was circulated vide N.E Rly’s Rate Circular No. 78 of 2006 (Annexure-A item No. 12)

As the Farrukhabad station has already been notified by N. C Rly as a full rake handling point, in order to keep continuity in status of Farrukhabad (BG) Goods Shed FBD is deemed open with effect from 4.7.2006 i.e the date on which Rly Boar issued order for transferring the jurisdication over this station from N.C Rly to N.E Rly, as full rake handling point for inward and outward Goods traffic except POL & Coal.

(Authority :CCM/N.E Rly’s No. C/147/0/3/Pt.IX/Trtain Load/RG date 24.08.06)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 2.11.2006)______________________________________________________________________

Para for SORTRC 194 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

Sub:-Opening of Phephna Jn and Yusufpur stations for outward goods traffic.Ref:- N. E Railway’s Rates Circular (Goods) No. 109 /2005.

Vide above referred Circular Phephna station of N.E Railway was opened for Coal and Minerals only.

Now it has been decided to open Phephna Jn. Station (PEP) under Varanasi Division of N.E Railway for all outward goods traffic except POL in half rake, with immediate effect i.e 8.09.2006.

It has also been decided to open Yusufpur station (YFP) under Varanasi division of N.E Railway, for all outward goods traffic except coal and POL Jn full rake with immediate effect i.e 08.09.06 (Authority :CCM/N.E Rly No. C/147/0/3/Pt. IX/TL/RG of date 8/09/2006)(Authority :CCM/NWR No.C .543/7/1 (N.E Rly) of date 12/12/2006) ______________________________________________________________________

Para for SORTRC 195 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

1. Sub:-Change in the name of Company from Sharda Sugar & Industries Ltd. To M/s. Bajaj Hindustan Ltd. Siding.

107

Page 108: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Sharda Sugar & Industries Ltd Siding, Paliakalan served by Paliakalan Railway station of N.E Railway appears at page No. 490 of Chapter –IX of IRCA Alphabetical list of Railway Station in India correct upto March 31st March 1995.

The name of afore said siding has been changed from Sharda sugar & IndustriesLtd. Siding, Paliakalan to M/s. Bajaj Hindustan Ltd. Siding, Paliakalan.Due to change of name of the siding, al inward and outward traffic will be booked in the name of in M/s. Bajaj Hindustan Ltd. Siding, Paliakalan.

(Authority:CCM/NE Rly No. C/19/3/23/Pt.I/RS of date 18/09/2006)

2. Sub:- Opening of Katra Station of Lucknow division for inward coal traffic in train load.

It has been decided to open the KATRA Station (KEA) on Lucknow division of N.E Railway for inward Coal traffic in train load with effect from 01.10.2006 (First Octobewr Two Thousand Six)

(Authority:CCM/NE Rly No. C/147/0/3/PT.IX /Trainload /RG of date 29/09/2006)(Authority :CCM/NWR No.C .543/7/1 (N.E Rly) of date 12/12/2006)______________________________________________________________________

Para for SORTRC 197 (GOODS) of 2006 from NORTH EASTERN RAILWAY

______________________________________________________________________

Sub:- Opening of Tikunia Station (MG) of Lucknow division for inward traffic of Boulder/stone Ballast only in train load.

With immediate effect i.e from 23.10.2006, Tikunia station MG (TQN) of Lucknow

division over N.E Railway is opened for inward Boulder /Stone Ballast traffic in train load.

(Authority :CCM/N.E Rly No. C/147/0/3/PT.IX/Train Load/RG of date 23-10-2006)(Authority :CCM/NWR No.C .543/5/1 (N. Rly) of date 13/12/2006)______________________________________________________________________

Para for SORTRC 173 (GOODS) of 2006 from SOUTHERN RAILWAY

______________________________________________________________________

Sub:-Movement of Iron Ore booked to Stations /Sidings serving Ports.

Chennai Harbour (HOM), Ennore Port (MAS Division), Panambur (PGT Division) on S. Railway are only dealing with inward traffic of Iron Ore meant for Ports. Southern Iron & Steel Co. Ltd siding served by Mecheri Road in S.Railway on Palghat division also deals with Iron Ore traffic (inwards).

(Authority :CCM/S. Rly’s No.C.415/Railway Board/06(FOIS) of dated 14.8.06)(Authority :CCM/NWR No.C .543/9/1 (S.Rly) of date 15/11/2006)

108

Page 109: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

______________________________________________________________________

Para for SORTRC 174 (GOODS) of 2006 from SOUTHERN RAILWAY______________________________________________________________________

Sub:-List of Full rake handling points, Half Rakes handling points and approved two point combinations for booking of rakes of covered wagons like BCX, BCN,BCNA, etc. at train load class rate.

In continuation to SE Rly spl. Rates Circular of even no. dated 5.12..2005 under Sl No. 221 (G)/2005. The lsit of full rake handling points, Half Rake handling points and two point combinations from which rakes of covered wagons like BCX, BCN,BCNA, etc can be booked at trainload class rate on S.Rly are appended below:

Trivandrum Division Full Rake Goods ShedsCode Name of Goods Sheds Siding RemarksCHY Cochin Harbour Yard CKI ChalakudiTrivandrum Division Half Rake Goods ShedsCHTS Cochin Harbour Terminus Madurai Division Half Rake Goods ShedsRJPM Rajapalaiyam Half RakeTiruchchi Prappalli Division Half Rake Goods ShedsHMJ Nidamangalam

II. Two Point Combinations for booking of Rakes of Covered wagons Like BCX,BCN, BCNA, etc. at Trainlad class rate:-

Chennai Division :1. Madras Fertilizers Siding /Tondiarpet Marshalling Yard (TIFS) +Salt Cotaurs (SO)2. Royapuram (RPM) +Salt Cotaurs (SO)3. Coromandel Fertilizers Ltd. Siding Ennore (COF) + Korukkupet Goods Shed

(KOKG)

Tiruchchirappalli Division

1. Madras Cement Ltd, Siding Ichchengadu (ICM) + India Cements Ltd Siding Ichchengadu (ICL)

2. Tiruchchirappalli Goods Yard (TPGY) +Dindigul (DG) (Madras Division )3. Villupuram (VM) +Chinnababusamudram (CBU)4. Thanjavur (TJ) +Kumbakonam (KMU)5. Dalmia Cement Siding Kallakudi Pazhanganatham (KKPS)+ India Cements Ltd.

Siding (ICL)6. Dalmiya Cement Siding, Kallakudi Pazhanganatham (KKPS) + Madras Cements Ltd.

Siding Ichchangadu (ICM)7. Ariyalur (ALU) + India Cements Ltd. Siding Ichchengadu (ICL)8. Ariyalur (ALU)+ Madras Cements Ltd. Siding Ichchengadu (ICL)9. Ariyalur (ALU) +Dalmia Cement siding, Mallakudi Pazhanganatham (KKPS)

109

Page 110: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

10. Trichchirappalli Goods Yard (TPGY) +Erode (ED) (Palghat Division)

Madurai Division :

1. Southern Petrochemicals Industries corporation, Tuticorin (MVMP) +Milvattan (MVI)2. Tuticorin Port Trust (MVTS) +Milavittan (MVN)3. Dindigul (DG) +Tiruchchirappalli Goods Yard (TPGY)(Truchchirappalli Division)

Trivandrum Division

2. The Fertilizers and Chemicals Travancore Ltd. Siding Kalamasser (FCKS) + The Fertilizers and Chemicals Travancore Ltd.Siding Irumpanam(ERIF)

Palghat Division

1. Mangalore Chemicals and Fertilizers Ltd. Siding (PNMC) +Panambur(PNMB)2. Chettinad Cement Siding Virarakkiyam (VRQS) +Chettinad Cement Siding

Palayam(PLMC)3. Malabar Cement Siding Walayar (WACS)+Associated Cement Corporation Siding,

Maddukarai (MDKS)4. Mettupalayam (MTP) +Erode (ED)5. Chettinad Cement Siding, Virarakkiyam (VRQS) +Associated Cement Corporation

siding Madukkarai (MDKS)6. Chettinad Cement siding Virarakkiyam (VRQS) +Malabar Cement Siding Walayar7. Erode (ED) +Tiruchchirappalli Goods Yard (TPGY) (Tiruchchirappalli Division)

(Authority :CCM/S.E Rly’s No.RA.42/5/Pt. XIV of dated 28.7.06)(Authority :CCM/S Rly’s No.C.585/P/Vol.IX of dated 22.11.06)(Authority :CCM/NWR No.C .543/9/1 (S.Rly) of date 14/11/2006______________________________________________________________________

Para for SORTRC 176 (GOODS) of 2006 from SOUTHERN RAILWAY

______________________________________________________________________

1. Sub:-Opening of Morappur (MAP) station for Outward Goods Traffic.

With effect from 13.09.2006 Morappur (MAP) station on JTJ –Sa section over PGT Division is opened for Out ward Goods Traffic in Half Rake and Full Rake loading in through Booking.

(Authority : CCM/S.Rly No. C.37/II/152/ Vol.VI of date 13/09/2006)

2. Sub:- Opening of Angamali for Kaladi on Trivandrum Division for handling half rakes.

With immediate effect Angamali for Kaladi on Trivandrum is opened for half rake handling point for inward and outward in local booking only.

(Authority : CCM/S.Rly No. C.585/I/Vol.VI of date 09/09/2006)(Authority :CCM/NWR No.C .498/6 of date 22/11/2006)

110

Page 111: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

______________________________________________________________________

Para for SORTRC 177 (GOODS) of 2006 from SOUTHERN RAILWAY______________________________________________________________________

1. Sub:- Opening of Thiruvarur (TVR) (BG) station for Half Rake Goods Traffic.

With effect from 28.09.2006, Thiruvarur (TVR) BG station on TJ-TVR section over TPJ Divisiion is opened for all description of Goods traffic for both Inward and Outward in local and through booking for Half Rake only.

(Authority : CCM/S.Rly No. C.37/II/148/Vol.V of date 28/09/2006)

2.Sub: Opening of Mayiladuthurai (MY) (BG) station for Half Rake and Full rake Goods traffic.

With effect from 19.09.2006 Mayilduthurai (MV) BG station on TJ-MV section over TPJ Division is opened for all description of Goods traffic for both Inward and Outward in local and through booking for Half Rake and full Rake.

(Authority : CCM/S.Rly No. C.37/II/148/Vol.V of date 19/09/2006)(Authority :CCM/NWR No.C .498/6 of date 22/11/2006)______________________________________________________________________

Para for SORTRC 187 (GOODS) of 2006 from SOUTHERN RAILWAY

______________________________________________________________________

Sub:- Opening of Tondiarpet Marshalling Yard (TNPM) for Goods traffic in Full Rake on Temporary basis.

With effect from 17-11-2006, Tondiarpet Marshalling Yard (TNPM) on Chennai Division is opened for all description of Goods traffic in Full rake both in Inward and Outward in local booking on temporary basis.

(Authority: CCM/S..Rly’s No. C.37/II/147/Vol. VI dtd 3.11.06)(Authority :CCM/NWR No.C .498/6 of date 30/11/2006)______________________________________________________________________

Para for SORTRC 192 (GOODS) of 2006 from SOUTHERN RAILWAY

______________________________________________________________________

Sub:- Fixing name and code initial of “MANANTHAVADY” out Agency served by Tellicherry Railway Station.

The correct Name and Spelling in English, Devanagiri Script and Regional Language and code initials approved by GS/IRCA for Mananthavady out Agency Served by Tellicherry Railway Station (PGT Division) is “PAZHASSI”.

111

Page 112: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Name in English Code initials

PAZHASSI Out Agency PAZHDevanagiri Script i"kfj;

(Authority :CCM/S.Rly No. C.219/PGT/Mananthavady /Wayned Dist of date 22/08/2006)(Authority :CCM/NWR No.C .543/9/1 (S Rly) of date 12/12/2006)______________________________________________________________________

Para for SORTRC 193 (GOODS) of 2006 from SOUTHERN RAILWAY

______________________________________________________________________

Sub:-Closure of Tirunelveli- Tiruchendur and Villupuram –Mayiladuthurai section –due to Gauge Conversion.

1. With effect from 01-12-2006 the stations between Tirunelveli Jn (TEN) –Tiruchendure (TCN) MG section on Madurai Division is closed for all description of traffic on account of Gauge Conversion.

2. With effect from 01-12-2006, the stations between Villupuram (VM) –Cuddalore Port Jn (CUPJ) –Mayiladuthurai (MV) MG section on Tiruchchippalli Division is closed for all description of traffic on account of Gauge Conversion.

(Authority :CCM/S.Rly No. C.478/XIV/New Sec/Vol. V of date 2/11/2006)(Authority :CCM/NWR No.C .543/9/1 (S. Rly) of date 12/12/2006) ______________________________________________________________________

Para for SORTRC 178 (GOODS) of 2006 from SOUTH CENTRAL RAILWAY

______________________________________________________________________

Sub:- Revised list of Stations /sidings having full rake /half rake less than half rake handling capacities and two point combination for movement of covered wagons over S.C Railway.

The revised and updated list of stations /sidings having full rake /half rake and less

than half rake handling capacity and the list of two point combinations (other than steel traffic ) for covered wagons on S.C Railway as notified by Operating Branch is given below:

The two point combinations (other than steel traffic ) for covered wagons is given separately for busty season and lean season. The list consists of two point combination of stations for traffic originating from S.C Railway.Busy season is from 1st November to 30th

June and Leasn season is from 1st July to 31st October.

The above mentioned lists are in supersession of all earlier lists in connection with full rake, half rake and less than half rake and two point cominbations (originating traffic) for covered wagons over S.C Railway.

112

Page 113: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

DIVISIONS WISE (SIX DIVISIONS ) LIST OF STATIONS /SIDINGS CAPABLE OF HANDLING FULL/HALF RAKES ON SOUTH CENTRAL RAILWAY

A) SECUNDERABAD DIVISION (Stations/Goods sheds)S.No.

Name of the Station/goods shed

Code Outward Commodities Inward commodities

FULL RAKE1 Jaggayyapet Town JPTN All commodities except

POL, Steel All Commodities except POL,Steel

2 Khammam KMT All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

3 Warangal WL All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

4 Manchiryal MCI All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

5 Peddapalli PDPL All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

6 Karimnagar KRMR All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

7 Wangapalli WP All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

8 Sanathnagar New Goods Complex

SNAG All commodities except Coal

All commodities except Coal

9 Bidar BIDR All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

10 Parlivaijnath PRLI All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

11 Bhadrachalam Road

BDCR All commodities except POL, Steel

All commodities except POL, Steel.

12 Bonakalu BKL All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

13 Tandur TDU All commodities except POL, Steel

All commodities except POL, Steel,

14 Uppal OPL RCR Coal & Coke Nil15 Mandamari MMZ RCR Coal Nil16 Raghavapuram RGPM RCR Coal Nil17 Tadikalapudi TPY RCR Coal NIl18 Charlapalli CHZ All Commodities incl.

edible oil except POL, Steel, coal

All Commodities incl. edible oil except POL, Steel, coal

19 Lingampalli LPI All commodities except POL

All commodities except POL

20 Manikgarh MAGH All commodities except POL,Steel

All commodities except POL,Steel

21 Pandarpavani PRPI Coal Coal22 Kazipet KZJ All commodities except

POLAll commodities except POL

23 Rechni Road RECH Coal Nil

113

Page 114: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

24 Manuguru MUGR All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

25 Pandurangapuram PGP All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

26 Yerrupalem YP All commodities except POL, Steel,Coal

All commodities except POL, Steel,Coal

27 Nagulapalli NPL Molasses Nil28 Chintakani CKN DOLOMITE Nil

HALF RAKE1 Udigir UDGR All commodities except

POL, Steel,CoalAll commodities except POL, Steel,Coal

2 Sirpurkagaznagar SKZR All commodities except POL, Steel,Coal

Timber Waste & Bamboo

LESS THAN HALF RAKE

1 Vikarabad VKB Nil Dept. OilSECUNDERABAD DIVISION (SIDINGS)

Name of the siding Code Outward commodities

Inward commodities

FULL RAKE1 Bharat Petroleum Corpn/Cherlapalli BPCL Nil POL2 LPG siding /Cherlapalli HPCS LPG Gas Tank3 FCI Cherlapalli FCIC Food grains Food grains4 HPCL Gangmeni HPCG POL NIL5 IOC/Sanathnagr(Oil Lay Bay) SIOC NIL POL6 FCI Siding, Sanathnagar FCS Foodgrains Foodgrains7 FCI Siding, Khammam FCIK Foodgrains Foodgrains8 FCI Siding,Kazipet FKSG Foodgrains Foodgrains9 FCI Siding,Gamikuntha FCIJ Foodgrains Foodgrains10 Kesoram Cement

Sdg/RaghavapuramKCCS Cement Clinker &

CoalGypsum &Coal

11 Ultra Tech Cement/Gadchandur UCLG Cement, Clinker Gypsum &Coal12 Manikgarh Cement Gadchandur MGCG Cement, Clinker Gypsum &Coal13 Maratha Cement Works/New

PanderpauniMCNP Cement, Clinker Gypsum &Coal

14 Madras Cements/ Jaggayapet Town MCLJ Cement, Clinker Gypsum &Coal15 Vishnu Cements /Jaggayapet Town VCJ Cement, Clinker Gypsum &Coal16 VSKP Steel Plant Project siding

(Rashtriya Ispat Nigam Ltd)./ Jaggayapet Town

VSPP Lime Stone Gypsum &Coal

17 Associated Cement Company/ MCI MCSG Cement Gypsum &Coal18 Vasavadatta Cements/ Seram VCSG Cement, Clinker Gypsum &Coal19 Rajashree Cements /Malkhed Road RJCS Cement,

Clinker,Loose Cement

Gypsum &Coal

20 Orient Paper Industries Cement Division /Mandmari

OPIM Cement & Clinker Gypsum &Coal

21 Cement Corpn of India /Tandur CCST Cement & Clinker Gypsum &Coal22 Steel Authority of India Ltd Karepalli SAIK Dolomite Nil

114

Page 115: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

23 SAIL Siding/Nagulapalli SAIN NIL Iron & Steel24 Trimulgghery Mily Sdg/

SCMS/SecunderabadSCMS Military Stores Military Stores

25 Ordinance Factory Siding/Shankarpalli

SOFG Defence Item Defence Item

26 RKP-I /Manchiryal LTC Coal Nil27 RKP-II/Mandamari

(Ramakrishnapuram Mines for Singareni Collieries)

SCRM Coal Nil

28 GOSG/Ramagundam(Godavarikhani-I)

GOSG Coal Nil

29 GXSG/Ramagundam (Godavarikhani-6)

GXSG Coal Nil

30 Rudrampur Siding Bhadrachalam RUSG Coal Nil31 CSPS /Manuguru CSPS Coal Nil32 SPSG/Singareni(Struttpit Collieries) SPSG Coal Nil33 Sasti Coal Mines /Sasti (New

Panderpauni)WCF Coal Nil

34 IOCL/Ramagundam (Pvt Sdg for IOCL/HPCL RDM)

IOHR POL POL

35 Kothaguden Thermal Power Station /Served by Gajulagudem

KTPG Coal POL,Coal & Furnace Oil

36 Sirpur Paper Mills/Sirpurkagaznagar SPMG Paper Bamboo cuts coal

37 Shantikhani Sdg. /Bellampalli SHSG Coal Nil38 BHEL Siding/Lingampalli BHEL Machinery Parts Coal and Iron

& Steel39 Flash Butt Welding Plant, Moula Ali FBWB Rails Rails40 NTPC Siding /Ramagundem NTPC Machinery Parts Coal & POL41 Thermal Power House

RamagundemTPAR Nil Coal

42 Maharashtra State Electricity Bd/Parli

MSPS NIL Coal & POL

HALF RAKE1 Hafizpet(PQRS) HFZ PSC Sleeper NIL2 Hyderabad Asbestos Industries

/SanathnagarHYSG Asbestos sheets Cement

LESS THAN HALF RAKE1 Nuclear Fuel Complex Siding Moula

AliNFC Machinery Parts Commodities

Incl Radio active materials except POL Steel, Coal

VIJAYAWADA DIVISON (STATIONM /GOODS SHEDS)FULL RAKE Code Outward commodities Inward commodities

1 Akividu AKVD Food grains Foodgrains, Fertilisers & Cement

2 Ammanabrolu ANB Timber Waste & Salt Nil

115

Page 116: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

3 Bhimavaram Jn BVRM Foodgrains,Fertilisers & Cement

Fertilisers & Cement

4 Bikkavolu BVL Foodgrains Fertilisers, Foodgrains & Cement

5 Bayyavaram BVM Cement, Iron Ore & Laterite Iron Ore 6 Chirala CLX Husk , Oil cake, Cotton

seeds & FoodgrainsFertilizers,Food grains

7 Dwarapudi DWP Food grains Fertilisers & Cement8 Eluru EE Food grains & New Gunny

BalesFertilizers, Cement& New Gunny Bales

9 Gudivada Jn GDV Food grains Foodgrains Fertilisers Cement

10 Kakinada Port COA Food grains, Fertilizers, Edible oil,Sugar & Coal

Food grains & Clinker Deoiled cake & Cement

11 Krishna Canal Jn KCC Food grains & Fertilisers Foodgrains fertilizers & Cement

12 Machilipatnam MTM Food grains Foodgrains Fertilisers Cement

13 Nidadavolu NDD Food grains,Sugar Fertilizer & Cement14 Nuzvid NZD Mangoes Molasses &

FoodgrainsFertilizers & Cement

15 Nidamanuru NDM Food grains Coal Fertiliser & Cement

16 Ongole OGL Timber Waste Food grains Fertilizers & Cements17 Padugupadu PGU Food grain Coal Fertilizers &

Cement18 Palakollu PKO Foodgrain Barytes, Fertilizers &

Cement19 Rayanpadu shops RYPS Departmental Wagons Wheel Discs20 Rajahmundry RJY Foodgrains, paper

MulticommodityCoal Fertilizers& Cement

21 Samalkot SLO Foodgrains sugar &Iron Ore Foodgrains,Fertilizers Cement Iron Ore

22 Singarayakonda SKM Timber Waste Nil23 Surareddipalem SDM Granite Nil24 Tadepalligudem TDD Foodgrains,Sugar Foodgrain fertilizers &

Cement25 Tanguturu TNR Timber Waste, Granite Nil26 Tanuku TNKU Foodgrains, sugar Fertilizers & Cement27 Tenali TEL Foodgrain Food grains Fertilizers

& Cement28 Vijayawada Jn BZA Sugar Mulit commodity Fertilizers, Cements &

Multi commodities29 Venkatachalam VKT Iron Ore Loose commodities

Iron ore30 Manubol MBL All commodities except

Steel & POLAll commodities except Steel & POL

31 Ravikampadu RVD Timber waste & Laterite Fertilizers & Cements

116

Page 117: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

32 Rayanpadu RYP Foodgrains & Fertilizers,Cement Sand & Loose Commodity

Food grains, Fertilizer, Cement

33 Bittragunta BTTR Timber Waste Food grains, Fertilizer, Cement

34 Kadiyam KYM All Commodities All Commodities35 Medapadu MPU All Commodities All Commodities36 Kovvur KVR Caustic Soda Lye Nil37 Anakapalli AKP All commodities except

Loose & Crane Consignments

All Commodities except Loose & Crane consignments

HALF RAKE1 Anakapalli AKP Timber Waste, Jaggery,

CementFertilizers & Foodgrains

2 Bhimadolu BMD Food grains & Clay Nil3 Chinnaganjam CJM Salt Nil4 Kavali KVZ Food grains, Timber Waste Fertilizers5 Narsipatnam

RoadNRP Timber Waste Nil

6 Bapatla BPP Military Traffic Military TrafficVIJAYAWADA DIVISION -SIDINGSName of the SidingFULL RAKE

1 NFCL Sdg/Kakinada

NGFS Fertilizers Ammonia & Machinery Parts

2 GFCL/Kakinada PGFC Fertilizers Liquid Ammonia, Phosphoric Acid & Iron Ore

3 KSPL/Kakinada Port

KSLK Coal Edible Oil, Wood Pulp

Iron Ore, clinker, Granite etc

4 FCI/Samalkot FCST Food grains Foodgrains5 FCI/Rajahmundry FCIR Food grains Foodgrains6 FCI/Pennada

agraharamFCPA Food grains Foodgrains

7 FCI/Gudivada FCGV Food grains Foodgrains8 FCI/Nuzvid FCBG Food grains Foodgrains9 IOC/BPC Ltd/

SurareddipalemIOCD POL POL

10 VTPS/Kondapalli TPAK Coal,Machinery Parts & Fly Ash

Coal POL

11 FCI/Venkatachalam FCIT Food grains Food grains12 APSWC/Uppaluru BSAU Food grains Food grains13 APSWC/

NawabupalemSMVR Food grains Food grains

14 Tata Iron & Steel Co. Sdg /Served by Gannavaram

TISM Iron & Steel Iron & Steel

15 ITC Limited. Chirala IT IS Rice, Oil Cake Fertilizers

117

Page 118: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

HALF RAKE1 FCI/Krishna Canal FCGS Food grains Nil2 AS Ltd/Kovvuru ASLS Sugar, Fertilisers,CS Lye Industrial Salt, Sulphur3 AS Ltd/Tanuku JACS Sugar Machinery Parts4 ITC Ltd./Anaparti ITCL Tobacco & Food grains Nil

LESS THAN HALF RAKE1 AP Dairy

Development Corp./Tenali

SDYS Milk Products Milk Products

C) GUNTAKAL DIVISION (STATIONS/GOODS SHEDS)FULL RAKE Code Outward

CommoditiesInward commodities

1 Kondagunta KQA Timber Waste Nil2 Renigunta Jn RU Foodgrains, Fertilizers

& SugarFood grains, Fertilizers & Cement

3 Kodur KOU Barytes Lumps/powder Nil4 Cuddapah HX Barytes, Powder &POL Foodgrains, Fertilizers

Cement & POL5 Rayalacheruvu RLO Lime stone Iron Ore

oreCoal

6 Ananthapur ATP Oil Cake & Cotton Seeds

Foodgrains,Fertilizers & Cement

7 Adoni AD Oil Cake & Cotton Seeds

Foodgrains,Fertilizers & Cement

8 Raichur RC Oil Cake & Cotton Seeds

Foodgrains,Fertilizers & Cement

9 Malkapuram MLK Lime Stone & Granite Foodgrains,Fertilizers & Cement

10 Veerapur VP Iron Ore fines Nil11 Hagari HGI Iron Ore fines Nil12 Tuggali TGL Iron Ore fines Nil13 Tadipatri TU Cement Coal & Laterite14 Guntakal West GTLW Iron ore fines Nil15 Gooty Jn GY Iron ore fines POL16 Yellakaru YLK Nil Coal17 Maddikera MKR Iron ore fines Nil18 Malliyala MYL Iron ore fines Nil19 Bethamcherla BMH Slabs Foodgrains,Fertilizers&

Cement20 Yermaros YS Fly-ash Foodgrains,Fertilizers&

Cement21 Vendodu VDD Foodgrains,Fertilizers

& TimberwasteFoodgrains,Fertilizers& Cement

22 Timmancherla TIM Foodgrains,Fertilizers& Cement

Foodgrains,Fertilizers& Cement

23 Guntakal GTL POL Petrol & Diesel24 Rachagunneri RCG Pig Iron Coal25 Haddinagundu HDD Iron ore fines & Maize coal

HALF RAKE

118

Page 119: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

1 Dronachellam DNC Gypsum Coal & POL2 Yadgir YG Sand Foodgrains,Fertilizers3 Bugganapalli BEY Cement Coal

GUNTAKAL DIVISION (SIDINGS)NAME OF THE SIDINGFull Rake

1 ICL/Yerraguntla CCOI Cement Gypsum,Slag,Coal and Literite

2 ZAC/Yerraguntla MZCY Cement & Clinker Gypsum,Iron Ore fines, Coal, Laterite

3 ICL/Kalamalla ICLS Cement Gypsum,Iron Ore fines, Coal, Laterite

4 Ultra Tech /Jutur UCLJ Cement & Clinker Gypsum,Iron Ore fines, Coal, Laterite

5 RTPP/Muddanur RTPM Coal Coal6 RTPS/Yedulapur KPCC Coal Coal7 Lanco

Industries /RCGPLIR Pig Iron, Iron-ore Fines Iron ore fines & Coal

8 FCI Sdg /Zangalapalli

SCIZ Wheat Rice & Foodgrains

Foodgrains

9 Raichur Oil Siding RPOS POL Petrol & Diesel10 SJK Steel /CLPE SSCC Pig Iron, Iron-ore Fines

& Iron SheetsCoal, Iron Ore Fines,dolomite and Lime stone

11 Bothra Shipping Services/Served by Hagiri Stn

BSGS Iron Ore NIl

HALF RAKE 1 FCI Sdg/

TimmancherlaGVSG Foodgrains Foodgrains

LESS THAN HALF RAKE Mantralayam Road

MALM PSC Sleeper Veg.Oil

D) GUNTUR DIVISION (Stations/Goods Sheds)FULL RAKE

1 Chityala CTYL Foodgrains & Rice Food grains, Fertilizers & Cement

2 Cumbum (40 BCN rakes in two placements 35+5)*

CBM Timber Waste Food grains, Fertilizers & Cement

3 Markapur Road MRK Timber Waste Nil4 Miryalaguda MRGA Foodgrains Foodgrains &

Fertilizers5 Nadikude NDKD Foodgrains Food grains &

Fertilizers

119

Page 120: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

6 Nalgonda NLDA Foodgrains Foodgrains7 Narasaraopet NRT Foodgrains, Lead

concentrateFertilizers

8 Reddipalem REP Multi commodities Foodgrains & Fertilizers

9 Sattenpalli SAP FCI Foodgrains Nil10 Nandyal NDL Foodgrains, Fertilizers

Cement rebookingFoodgrains, Fertilizers

11 Pondugula PDGL Nil Coal12 Donakonda DKD Quartz Nil13 Vishnupuram VNUP Cement & Cllinker Fly Ash & Coal14 Satuluru STUR Timber Waste Nil15 Vinukonda VKN Timber Waste NilLESS THAN HALF RAKE 1 Nallapadu NLPD RMC RMC & POLGUNTUR DIVISION (SIDINGS)

FULL RAKE1 KCP Siding/

Macherla KCPM Cement Gypsum & Coal

2 FCI Siding/ Mirayalaguda

FCIM Foodgrains Foodgrains

3 FCI Siding/ Nalgonda

PFCI Foodgrains Foodgrains

4 CWC Siding/ Namburu

MCWH Foodgrains Foodgrains & Fertilisers

5 Matrix Warehousing Pvt. Ltd Sdg Served by Miryalguda

MWMS Quartz Nil

6 M/s Raasi Cement Sdg Served by VNUP Stn

RCL Cement & Clinker Coal, Fly Ash & Machinery Parts

* Note:-Item No.2 at Cumbum (CBM) full rake 40 BCN is being given in two placements of 35 and 5 as sufficient land for approach road for movement of trucks is not available along side of road -3 track at NDL end.

E) HYDERABAD DIVISION (STATIONS/GOODS SHEDS)S.N. Name of

station/goods shed

Code Outward commodities Inward Commodities

FULL RAKE1 Bodhan BDHN Foodgrains, Fertilizers,

Cement & SugarFoodgrains Fertilizers & Cement

2 Balanagai BABR Containers Containers3 Gadwal GWD Foodgrains, Fertilizers Foodgrains,

Fertilizers & Cement

4 Jadcherla JCL Foodgrains, Fertilizers Foodgrains,

120

Page 121: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Fertilizers & Cement

5 Kurnool Town KRNT Foodgrains, Fertilizers & Cement

Foodgrains, Fertilizers & Cement

6 Mahbubnagar MBNR Foodgrains, Fertilizers Foodgrains, Fertilizers & Cement

7 Nizamabad NZB Foodgrains, Fertilizers Foodgrains, Fertilizers & Cement

8 Veldurthi VDI Foodgrains, Fertilizers Foodgrains, Fertilizers & Cement

9 Alampur Road ALPR Foodgrains, Fertilizers Coal & Cement10 Kamareddi KMC Foodgrains,

Fertilizers,Cement & sugarFoodgrains, Fertilizers,Cement

HALF RAKE1 Falaknuma FM Foodgrains, Fertilizers

Cement & V.oilFoodgrains, Fertilizers Cement & V.oil

HYDERABAD DIVISION (SIDINGS)FULL/HALF RAKE

NIL

F) NANDED DIVISON (STATION /GOODS SHEDS)S.N. Name of the

Station/goods shed

Code Outward Commodites Inward Commodities

FULL RAKE1 Adilabad ADB Food grains, Fertilizers &

Cement Food grains,Fertilizers & Cement

2 Aurangabad AWB Food grains, Fertilizers & Cement

Food grains, Fertilizers & Cement

3 Jaina J Food grains, Fertilizers & Cement Sugar & D.Oil cake

Food grains, Fertilizers & Cement

4 Nanded NED Food grains, Fertilizers & Cement

Food grains, Fertilizers & Cement

5 Nagarsole NSL Food grains, Fertilizers & Cement

Food grains, Fertilizers & Cement

6 Lasur LSR Nil Coal (for six months from 27.01.06)

7 Parbhani PBN Foodgrains, Fertilizers, Maize Sugar & D.oil cake

Food grains, Fertilizers & Cement

8 Daulatabad DLB Containers Containers9 Sivni Shivpur (MG) SVW Foodgrains, Fertilizers, Food grains, Fertilizers

121

Page 122: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Cement D.oil cake, Grams & Multicommodities

& Cement

10 Akola (MG) AK Foodgrains, Fertilizers, Cement D.oil cake, Grams & Multicommodities

Food grains, Fertilizers & Cement

11 Akot (MG) AKOT Foodgrains, Fertilizers, Cement D.oil cake, Grams & Multicommodities

Food grains, Fertilizers & Cement

HALF RAKE1 Basmat (MG) BMF Foodgrains , Fertilizers &

Cement Foodgrains , Fertilizers & Cement

2 Khandwa (MG) KNW Foodgrains , Fertilizers & Cement

Foodgrains , Fertilizers & Cement

3 Hingoli HNL D.Oil cake Jowar & Multicommodities

D.Oil cake Jowar & Multicommodities

4 Washim (MG) WHM D.Oil cake Jowar & Multicommodities

D.Oil cake Jowar & Multicommodities

NANDED DIVISION (SIDINGS)FULL/HALF RAKE NIL

LIST OF TWO POINT COMBINATIONS ON S.C RAILWAY

A: BUSY SEASON

S.No. Station Code Station Code Distance Kms

1 ANAKAPALLI AKP + BAYYAVARAM BVM 102 ANAKAPALLI AKP + DWARAPUDI DWP 1483 ANAKAPALLI AKP + SAMALKOT SLO 1174 BHIMADOLU BMD + TEDEPALLI GUDEM TDD 295 BHIMADOLU BMD + ELURU EE 196 BIDAR BIDR + UDGIR UDGR 817 CHIRALA CLX + ONGOLE OGL 508 JALNA J + PARBHANI PBN 1159 JALNA J + AURANGABAD AWB 6210 KAVALI KVZ + PADUGUPADU PGU 4511 KAMAREDDY KMC + NIZAMABAD NZB 5212 KURNOOL

TOWNKRNT + GADWAL GWD 56

13 NANDED NED + NIZAMABAD NZB 12314 PARLI PRLI + UDGIR UDGR 9615 RADDIPALEM REP + NARASARAOPET NRT 5016 BODHAN BDHN + NIZAMABAD NZB 2717 BODHAN BDHN + KAMAREDDY KMC 79

A: LEAN SEASON

S.No. Station Code Station Code Distance Kms

122

Page 123: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

1 ADONI AD + RAICHUR RC 702 VIJAYAWADA BZA + TADEPALLIGUDEM TDD 1083 CHIRALA CLX + TENALI TEL 574 CHITYALA CTYL + NALGONDA NLDA 265 KURNOOL TOWN KRNT + MAHABUBNAGAR MBNR 1316 MIRYALGUDA MRGA + NALGONDA NLDA 387 MIRYALGUDA MRGA + NADIKUDI NDKD 388 NANDED NED + PARBHANI PBN 609 NUZVID NZD + ELURU EE 1910 ONGOLE OGL + PADUGUPADU PGU 11211 ONGOLE OGL + TENALI TEL 10712 PEDDAPALLI PDPL + KARIMNAGAR KRMR 3613 PEDDAPALLI PDPL + MANCHIRYAL MCI 3114 PEDDAPALLI PDPL + WARANGAL WL 8515 PADUGUPADU PGU + RENIGUNTA RU 12216 RAJAHMUNDRY RJY + SAMALKOT SLO 5017 RAJAHMUNDRY RJY + TADEPALLIGUDEM TDD 4218 REDDIPALEM REP + KRISHNACANAL KCC 2519 REDDIPALEM REP + SATTENPALLI SAP 4520 TADEPALLIGUDEM TDD + ELURU EE 4821 TADEPALLIGUDEM TDD + DWARAPUDI DWP 6222 TADEPALLIGUDEM TDD + SAMALKOT SLO 9223 WARANGAL WL + KARIMNAGAR KRMR 12224 WARANGAL WL + KHAMMAM KMT 107

(Authority :CCM/S.C Rly’s No. 474/990/T.L/2006/Vol.SVI/Part of dated 26.9.06)(Authority :CCM/NWR No.C .498/6 of date 28/11/2006)_____________________________________________________________________

Para for SORTRC 196 (GOODS) of 2006 from SOUTH CENTRAL RAILWAY

______________________________________________________________________

1.Sub:-Opening of Pandarapavani station for handling Inward Coal traffic in Trainloads.

With immediate effect i.e from 07th September 2006 (07/09/2006)

Pandarapavani Station on MAGH-GDCR section of Secunderabad division of South Central Railway is opened for handling Inward Coal Traffic in Trainloads.

(Authority:CCM/S.C Rly No. C.473/990/TL/2006/Vol.XVI /part of date 07/09/2006)

2. Sub:- Opening of Haddinagundu Station for handling Outward and Inward Goods traffic in Trainloads.

With immediate effect i.e from 07 September 2006 (07/09/2006) Haddinagundu station on Guntakal –Bellary section of Guntakal division of South Central Railway is opened for handling Outward and Inward goods traffic in Train loads.

(Authority:CCM/NE Rly No. C/473/990/tl/2006/Vol.XVI /Part of date 07/09/2006)

123

Page 124: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

2. Sub:- Opening of Moula-Ali and Kazipet stations for handling inward Steel Traffic in Train Loads.

With immediate effect i.e from 18th September, 2006 (18-9-2006) Moula –Ali Station on VKB –BN section and Kazipet Jn station on SC-KZJ section of Secunderabad division of South Central Railway are opened for handling inward steel traffic in Train loads.

(Authority :CCM/SC Rly No. C.473/990/TL/2006/Vol.XVI/Part. of date 18-09-2006)(Authority :CCM/NWR No.C .543/10/1 (SC Rly) of date 12/12/2006)_________________________________________________________________________

Para for SORTRC 155 (GOODS) of 2006 from SOUTH EASTERN CENTRAL RAILWAY

______________________________________________________________________

Sub:- Inclusion of the Private siding in the Station code list Sec-I &II of SEC Rly in Bilaspur and Nagpur Division.

Railway. As per order of Chief Comml. Manager, South East Central Railway, Bilaspur the following siding may please be included in the Station Code list Sec-I & II of Bilaspur and Nagpur Division over South East Central

AdditionSL No.

Name of the siding Code initial

Numerical code No.

Gauge State Section of via

1 Konika siding of M/s. Mahanadi Coal Fields Ltd. Served by Himgiri

- 14121409 BG ORISSA 4

2 IND SYNERGY LTD.Sdg. Served by KOTARLIA

- 14122526 BG CHATTISGARH 4

3 BHAR VELLI Sdg of M/s Manganese Ore India Ltd. Sdg served by Balaghat

- 14223509 BG MADHYAPRADESH

6

(Authority :Sr.S.O/S.E Rly NO. ST /COM/STN/Code/SECR/606 of date 18.7.06)(Authority :CCM/SE Rly No. RA.42/Misc/86/5 of date 18/8/06) (Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 13.10.2006)_____________________________________________________________________

Para for SORTRC 157 (GOODS) of 2006 from SOUTH EAST CENTRAL RAILWAY

______________________________________________________________________

Sub:- Details of sidings /Goods sheds to handle full rake and half rake over South East Central Railway.

A Copy of detailed list of sidings/ goods shed to handle full rake and half rakes of SEC Railway is given below for information and necessary action.

124

Page 125: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

DETAILS OF SIDINGSBILASPUR DIVISION

S.No. Name of Sidings Serving Station

Outward Inward Remarks

1 LOCM I COLLIERY BRJN COAL - FULL RAKE2 LOCM II COLLIERY BRJN COAL - FULL RAKE3 LOCM III COLLIERY BRJN COAL - FULL RAKE4 BOCM I COLLIERY BPH COAL - FULL RAKE5 BOCM II COLLIERY BPH COAL - FULL RAKE6 BOCM III COLLIERY BPH COAL - FULL RAKE7 ORIENT COLLIERY BRJN COAL - HALF RAKE8 SURAKACHHAR

COLLIERYKRDA(B) COAL - FULL RAKE

9 New Kusumunda Colliery No.1

KRBA COAL - FULL RAKE

10 New Kusumunda Colliery No.II

KRBA COAL - FULL RAKE

11 Old Kusumunda Colliery

GAD COAL - FULL RAKE

12 Junadih-I KRBA COAL - FULL RAKE13 Junadih-II KRBA COAL - FULL RAKE14 Junadih-III KRBA COAL - FULL RAKE15 Junadih-IV KRBA COAL - FULL RAKE16 Manikpur Siding (No.II) KRBA COAL - FULL RAKE17 Dipika Colliery Sdg. GAD COAL - FULL RAKE18 Jamuna Open Cast

Colliery HRV COAL - FULL RAKE

19 Govind Colliery KTMA COAL - FULL RAKE20 Rajnagar Colliery BJRI COAL - FULL RAKE21 New Rajnagar Colliery BJRI COAL - FULL RAKE22 WEST JKD COLLIERY BJRI COAL - FULL RAKE23 Bijuri Colliery BJRI COAL - FULL RAKE24 Chirimiri Colliery CHRM COAL - HALF RAKE25 New Chirimiri Ponri Hill

Colliery CHRM COAL - HALF RAKE

26 Korea I & II Colliery (Tiger Hill)

DTL COAL - FULL RAKE

27 DUMAN HILL COLLIERY

DTL COAL - FULL RAKE

28 Katkona Colliery KTO COAL - FULL RAKE29 Kumda Colliery Sdg KJZ COAL - FULL RAKE30 Bhatgaon Colliery KJZ COAL - FULL RAKE31 Churcha Colliery BRJH COAL - FULL RAKE32 Jainagar I &II Colliery BSPR COAL - FULL RAKE33 Burhar Colliery BUH COAL - FULL RAKE34 Amlai Colliery AAL COAL - FULL RAKE35 Nowrozabad Colliery NRZB COAL - FULL RAKE36 SECL Siding ROB COAL - FULL RAKE

125

Page 126: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

37 Amarkantak Terminal Power Station

AAL - I/W FULL RAKE

38 TATA Refractories Ltd. Siding

BPH - I/W FULL RAKE

39 Jindal Steel & Power KDTR O/W I/W FULL RAKE40 Public Siding (Railway) BUA I/W FULL RAKE41 NTPC Siding KRBA O/W I/W FULL RAKE42 MPEB Siding KRBA I/W FULL RAKE43 BALCO Siding KRBA O/W I/W FULL RAKE44 New BALCO Siding KRBA O/W I/W FULL RAKE45 BALCO Captive power

plant GAD - I/W FULL RAKE

46 Lafarage India Pvt Ltd AKT O/W I/W FULL RAKE47 FCI Siding BSP O/W I/W HALF RAKE48 Orient Paper Mill Sdg AAL O/W I/W FULL RAKE49 Hukum Chand Jute

India Sdg.AAL O/W I/W HALF RAKE

50 Sanjay Gandhi Thermal Power Station

MDXR - I/W FULL RAKE

51 Birsinghpur Sdg. (Line No.5)

BRS - I/W HALF RAKE

52 HINDAL CO. SIDING PND O/W I/W HALF RAKE

DETAILS OF SIDINGSRAIPUR DIVISION

S.No. Name of Sidings Serving Station

Outward Inward Remarks

1 Hirri Mines DPH O/W - FULL RAKE2 Lafarge India Pvt. Ltd NPI O/W I/W FULL RAKE3 Ambija Cement

Eastern Ltd.BYT O/W I/W FULL RAKE

4 Ultra Tech Cement Ltd HN O/W I/W FULL RAKE5 Grasim Cement HN O/W I/W FULL RAKE6 Century Cement BKTH O/W I/W FULL RAKE7 NACAST Siding MDH O/W I/W FULL RAKE8 Engineering Siding

(Rly)RSD O/W - FULL RAKE

9 Diesel Loco shed (Railway)

RSD O/W I/W FULL RAKE

10 FCI Siding RSD O/W I/W HALF RAKE11 Bhillai Steel Plant

(SAIL)GFO/BIR O/W I/W FULL RAKE

12 Associated Cement Company /JCW

BIA O/W I/W FULL RAKE

13 Hindustan Steel Ltd BIA - - HALF RAKE14 Bhilai POL siding BIA - I/W FULL RAKE15 Dharamasi Morarji

Chemicals KMI O/W I/W FULL RAKE

126

Page 127: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

16 Dallirajhara Mines (SAIL)

DRZ O/W - FULL RAKE

17 Nandini Mines (SAIL) AWZ O/W - FULL RAKE18 Rajpur Handling &

Infrastructure Pvt. Ltd.HN O/W I/W FULL RAKE

DETAILS OF SIDINGSNAGPUR DIVISION

S.No. Name of Sidings Serving Station

Outward Inward Remarks

1 FCI Siding RJN O/W I/W FULL RAKE2 CSP Siding DGG O/W - HALF RAKE3 Sunflage Siding BRD - I/W FULL RAKE4 Universal Ferro Allied

ChemicalsTMR O/W I/W FULL RAKE

5 Military Siding G O/W - HALF RAKE6 Bharveli Siding BTC O/W - FULL RAKE7 Kandri Coal Siding RTK O/W - FULL RAKE8 BT Siding KAV O/W - FULL RAKE9 Kokradih Thermal

Power (KRDS)KAV - I/W FULL RAKE

10 Kaperkheda Thermal Power Stn (KPKD)

KAV - I/W FULL RAKE

11 Dhumrikhurd Colliery KNHN O/W - FULL RAKE12 Saoner Coal Mines PTS O/W - FULL RAKE13 Sitasaongi siding

(MOIL)GBRI O/W - FULL RAKE

14 South Siding(MOIL) TRDI O/W - FULL RAKE15 Dongribuzurg Siding

(MOIL)DGBZ O/W - FULL RAKE

16 Kodanpara Siding RTK O/W - FULL RAKE17 Duttapahara Siding RTK O/W - FULL RAKE18 Jamrapani Siding TRDT O/W FILL RAKE

M/s. Khandelwal Ferro Alloys & Khandelwal tube Mills Siding

KNHN O/W I/W FULL RAKE

FULL RAKE HANDLING GOODS SHED BILASPUR DIVISION

S.No. Name of Goods Sheds

Station code OUTWARD IN WARD REMARKS

1 Bilaspur BSP O/W I/W FULL RAKE2 Akaltara AKT O/W I/W FULL RAKE3 Akaltara Shunting

NeckAKT O/W - FULL RAKE

4 Baraduar BUA O/W I/W FULL RAKE5 Kharsla KHS O/W I/W FULL RAKE6 Raigarh RIG O/W I/W FULL RAKE

127

Page 128: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

7 Usalapur USL O/W I/W FULL RAKE8 Shahdol SDL O/W I/W FULL RAKE

RAIPUR DIVISION

S.No. Name of Goods Sheds

Station code OUTWARD IN WARD REMARKS

1 Bilha BYL O/W I/W FULL RAKE2 Bhatapara BYT O/W I/W FULL RAKE3 Tilda TLD O/W - FULL RAKE4 Raipur Store Depot RSD O/W I/W FULL RAKE5 Bhilai (SQT) BIA (SQT) - I/W FULL RAKE6 Durg DUG O/W I/W FULL RAKE

NAGPUR DIVISION

S.No. Name of Goods Sheds

Station code OUTWARD IN WARD REMARKS

1 Itwari ITR O/W I/W FULL RAKE2 Kalumna KAV O/W I/W FULL RAKE3 Gondia G O/W I/W FULL RAKE4 Chindwara CWA O/W I/W FULL RAKE5 Rajnandgaon RJN O/W I/W FULL RAKE6 Wadsa WSA O/W I/W FULL RAKE7 Tumsar Road TMR O/W - FULL RAKE8 Arjuni AJU O/W - FULL RAKE9 Kanhan KNHN O/W I/W FULL RAKE10 Balaghat BTC O/W I/W FULL RAKE

HALF RAKE HANDLING GOODS SHEDBILASPUR DIVISION

S.No. Name of Goods Sheds

Station code OUTWARD IN WARD REMARKS

1 Naila NLA - I/W HALF RAKE2 Korba KRBA - I/W HALF RAKE3 Pendra Road PND O/W - HALF RAKE4 Chandia CHD O/W - HALF RAKE5 Bishrampur BSPR O/W I/W HALF RAKE6 Manindragarh MDGR - I/W HALF RAKE

RAIPUR DIVISION

S.No. Name of Goods Sheds

Station code OUTWARD IN WARD REMARKS

1 Balod BXA O/W I/W HALF RAKE

128

Page 129: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

NAGPUR DIVISION

S.No. Name of Goods Sheds

Station code OUTWARD IN WARD REMARKS

1 Tirodi TRDI - - HALF RAKE2 Ramtek RTK - - HALF RAKE3 Amgaon AGN O/W I/W HALF RAKE4 Nagbhir NAB O/W I/W HALF RAKE5 Dongargarh DGG O/W I/W HALF RAKE (Authority :CCM/NE Rly No. C.386/2/37/WR/RCL of date 25/8/06)(Authority :CCM/NWR No.C 543/12/1 (S.E.C Rly) of date 16.10.2006)______________________________________________________________________

Para for SORTRC 158 (GOODS) of 2006 from SOUTH EAST CENTRAL RAILWAY

______________________________________________________________________

Sub:- Re-opening of Kusumkasa station for outward Goods traffic.

With immediate effect Kusumkasa station (Numerical Codes -14322586, Alpha Code –KYS) situated on Durg-Dallirajhara section of Raipur division is re-opened for outward Timber Waste traffic for handling full rake.

(Authority :CCM/N.E Rly No. c.386/2/37/WR/RCL of date 25/8/06)(Authority :CCM/NWR No.C 543/12/1 (SEC Rly) of date 16.10.2006) _________________________________________________________________________

Para for SORTRC 153 (GOODS) of 2006 from SOUTH EASTERN RAILWAY

_________________________________________________________________________

1. Sub:- Loading of full rake at Soro.

As recommended by CFTM /S.E Railway /Garden Reach “SORO” Goods Shed is declared as a full rake point, in outward purely as a temporary measure i.e for Aug. & Sept. 06. The placement of full rake to be ensured in one hook only.

(Authority :CCM/SE Rly No. RA.41/Rates/1A/G/Pt.IV/5 of date 08.8.06)

2. Sub:- Closing down of Bhutgoria (BTGA) Station in Adra Div of S.E Railway for booking of goods traffic.

With immediate effect Bhutgoria (BTGA) Station of Adra Division of S.E Railway is closed for booking of goods traffic.

(Authority: CCM/SE Rly No. RG.46/1306/ADRA of date 12/09/06)(Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 12.10.2006

129

Page 130: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

_________________________________________________________________________ Para for SORTRC 154 (GOODS) of 2006 from SOUTH EASTERN RAILWAY

_________________________________________________________________________

Sub:- Stations /Sidings serving Ports, on S.E Railway for booking of traffic in Iron Ore.

Vide Board’s Rates Circular No. 69 of 2005 (notified over S.E Rly under Rates circular SL No. -218 (G) /2005 ), classification of Iron Ore booked to ports was revised from class -160 to class-180. Subsequently a corrigendum to this was issued by Board which was notified over S.E Railway vide Spl. Rates Circular SL No. -229(G)/2005 that revised classification 180 of “Iron Ore booked to Ports” will be applicable for “Iron Ore booked to stations /sidings serving Ports.

It was also clarified by Board vide letter No. TCR/1078/2005/5 dt.09.12.2005 (notified vide S.E Rly’s Rates Circular SL No. -236(G)/2005) that rebooking of Iron Ore from stations to Port will not be permissible.

Now, as advised by Board vide letter No. TCR/1078/2005/5 dt 17.05.2006, Zonal Railways are required to jointly notify stations /sidings on their Railway which primarily deals with inward traffic of Iron Ore meant for Ports.

It has already been notified vide S.E Railway’s Spl Rates Circular SL No.127 (G)/2006 that with effect from 20.07.2006 all incoming rakes of coal for TNEB and inward rakes of iron ore meant for Haldia Dock Complex should be booked and charged to HDCB only.

It is therefore, clarified that Iron Ore traffic charged at class 180, at present, and meant for Haldia Dock should be booked to HDCB only which is the point serving the Haldia Port for this purpose.

(Authority:CCM/SE Rly No. RA.47/710 No. 27 & MGP-48/686 /Freight Adjustment of date 04.08.06) (Authority :CCM/NWR No.C 543/11/1 (S.E Rly) of date 13.10.2006) ______________________________________________________________________

Para for SORTRC 183 (GOODS) of 2006 from SOUTH EASTERN RAILWAY

______________________________________________________________________

Sub:- Stations /Sidings capable of handling full rake, Half rake goods shed & two point combinations (covered stock ) on S.E Railway.

An updated list of stations /sidings capable for handling full block rate /half rake and two point combinations for covered stock on South Eastern Railway is given below:

This is in supersession to S.E Rly’s special Rates Circular of even no. of date 09/12/2005 circulated vide this office SORTRC 5 (Goods) of 24/1/2006.

130

Page 131: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

LIST OF FULL RAKE GOODS SHEDS , HALF RAKE GOODS SHED, FULL RAKE SIDINGS, HALF RAKE SIDINGS AND TWO-POINT COMBINATIONS (COVER STOCK) OVER SOUTH EASTERN RAILWAYA. Full Rake Goods Shed.Division Station /Siding Code CommodityADA Adra ADA General Goods, Ore & Inward coal

Bankura BQA General Goods,Bishnupur VSU General Goods,Ore & Inward coalBhaga VAA General Goods & OreBokaro Steel City BKSC General Goods,Chandrakona Road CDGR General Goods,Chaurasi (Served by Ramkanali)

CRS Inward ore traffic

Purilia PRR General Goods,Radhanagar (Served by DMA)

RDR General Goods, & Ore

Rukni RUI General Goods,Ore & Inward Coal & SteelChandil CNI General Goods,Ore & Coal

KGP Balasore BLS General Goods,Jhargram JGM General Goods,Ore Inward coalKalikunda KKQ General Goods,Kharagpur KGP General Goods, (Bagged consignment)Nimpura NMP General Goods, Ore Inward coalPanskura PKU General Goods, Inward coalRupsa ROP General GoodsSankrail Gds. Terminal Yard

SGTY General Goods, & Steel traffic

Shalimar SHM General Goods & Steel traffic Tamluk TMZ Inward stone gritsHaldia Dock Complex

HDCG General Goods, Ore, coal & Steel traffic

HDCB Iron Ore& coal traffic

Gravel Sdg/Dalbhumgarh

DVM All traffic except POL

SORO SORO General Goods,CKP Jharsuguda JSG General Goods, & Steel traffic

Rajgangpur GP General Goods & Inward coalRourkela ROU General Goods & Steel trafficTatanagar TATA General Goods Ore & Inward coal

RNC Hatia H TE General goodsNamkum NKM General goods & POL

B. HALF RAKE GOODS SHEDKGP Khantapara KHF Inward coal

Midnapur MDN General GoodsRNC Tatisilwai TIS General Goods

131

Page 132: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

C. Mineral Siding (Full rake)

Division Station /Siding Pvt./Pub CommodityCKP Banspani Public Outward Ore traffic

Jaroli Public -do-BIL Sdg. Private -do-Jaroli (EMIL) Private -do-Joda East (TISCO/BSPX) Private -do-Joda West (TISCO/BSPX) Private Outward & InwardTISCO Sdg./FMP-BSPX Private Inward & OutwardDeojhar Public Outward Ore trafficNoamandi Public -do-Noamandi (Ropeway Sdg TISCO)

Private -do-

Barajamda Public -do-No.II Sdg. (OMDC)/BJMD Private -do-Thakurani (OMDC)/BJMD Private -do-EIMLSdg/BJMD Private -do-Barbil Public -do-KIW Sdg /Barbil Private Inward & Outward

including coalIISCO Sdg. /MOU Private Outward ore trafficMBR Sdg.(SAIL) served by KMPD

Private -do-

SAIL(Sdg/Kirubure) Private -do-SAIL(Sdg/Rakshi) Private -do-Barsuan Public -do-SAIL(Sdg./Barsuan) Private -do-Bolani (L.No.1) Public -do-Brimitrapur Public Ore & Coal traffic TISCO(Sdg.Sonakhand) Private Outward dolomiteDongaposi Public Ore & Coal trafficNayagarh Public Outward ore trafficBolani Ore Mine Sdg/BYX Private -do-Gua Public -do-IISCO Sdg/Gua Private -do-Bimalgarh Public -do-IISCO Sdg./Birmitrapur Private Outward Lime stoneKarampada Public Outward ore traffic Chandiposi Public Outward & Inward

including coalRangra Public Outward ore traffic

D. INDUSTRIAL SIDING INCLUDING COLLIERY /Washery (Full rake)

Division Station /Siding Pvt/Pub CommodityADRA FCI Sdg/ADA Private Outward& Inward

SAIL Sdg/Bokaro Steel plant -do- -do-Damodar Cement & Slag Ltd MDKD -do- -do-

132

Page 133: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Santaldih Thermal Power Sdg SNTD -do- -do-Bhowrah code Plant served by BCB/JBO -do- OutwardKustar served by Bhaga -do- -do-BJ (Bokaro-Jharia) served by MHQ -do- -do-KKC Main served by KNF-MHQ -do- -do-KKC Link served by KNF -do- -do-Bhojudih Washery served SNTD -do- -do-Sudamdih Washery Served by BJE -do- -do-Munidih Washery served by MHQ -do- -do-Mahuda Washery (Moraldih) -do- -do-Madhuban Washery -do- -do-Bhalatand served by TSBD -do- -do-Jamadoba Washery served by BJE -do- -do-IISCO /Burnpur -do- Inward raw

materialsJhantipahari (JPH) Public Inward/Outward

Ranchi Rajarappa CCL Sdg, Served by MURI Private OutwardINDAL Sdg. served by MURI -do- Outward & InwardINDAL Sdg. served by Lohardaga -do- Outward

Kharagpur TATA Chemicals Ltd., Sdg Durgachawk -do- Inward & OutwardTATA Metaliks Sdg Gokulpur -do- -do-KTPP Sdg. served by MCA -do- InwardHPCL Sdg. Durgachawk -do- OutwardAmbuja Cement Eastern Ldg /ABB -do- Inward & OutwardHPCL/IOC Oil Sdg served BLS Public InwardCONCOR Sdg. served by BLS Private Inward & Outward Hindustan Copper Ltd. Sdg served by Ghatsila

Private -do-

NGRD Sdg. BLS Railways Outward

Division Station /Siding Pvt/Pub CommodityChakradharpur

ACC Sdg, Jhinkpani Private Inward & OutwardOCL Sdg. Rajgangpur -do- -do-ULTRATECH Ltd Sdg Dhutra -do- -do-Lafarage Cement Sdg served by SLJR -do- -do-TISCO Sdg. served by Adityapur -do- -do-SAIL Rourkela Steel Plant -do- -do-BSIL Sdg. served by Manikui -do- -do-TATA Sponge Iron Ltd MMVR -do- -do-FCI Sdg. Jharsuguda -do- -do-POL Sdg Rourkela Public InwardFCI Sdg TATA Private Inward & OutwardM/s. Usha Martin Ltd Pvt Sdg Gamharia

-do- -do-

133

Page 134: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

E. Two Point rakes in covered stock (BCN/BCX) in Outward

Sl.No Permitted combination1 Bankura Chandrakona Road

(Authority : CCM/S.E Rly No. RA.41/Rates /1A/G/Pt.IV/5 of date 26/10/2006)(Authority :CCM/NWR No.C .498/6 of date 29/11/2006) ______________________________________________________________________

Para for SORTRC 202 (GOODS) of 2006 from SOUTH EASTERN RAILWAY

______________________________________________________________________

Sub: Opening of Pvt. Siding to serve m/s. Rashmi Metaliks of Barajamda station.

Please refer to this office circular of even no. of date 30/10/206 wherein the commissioning of the above siding was kept in abeyance till further advice. Now it is notified for information and guidance that the loading will be allowed upto 15 th of November ‘ 06 in the siding.

The other terms and condition as notified vide this office circular of even no. of date 16/10/2006 will remain un-altered.

This has the approval of General Manager/GRC.

S E Railway letter of even no. of date 16./10/2006 is reproduced below:

Sub: opening of the private siding to served M/s. Rashmi Metaliks Ltd. of Barajamda Station.

It is notified for information and guidance of all concerned that the private siding to serve Ms. Rashmi Metaliks Ltd. at Barajamda Station is opened for inward and outward booking of goods traffic in rake loads only and initial rate of siding charge leviable for such traffic on per trip basis with effect from the actual date of traffic started moving over the siding is as under

When worked by Diesel Train Engine.

Rs. 12,282 /- (Rupees Twelve Thousand Two Hundred Eighty Two ) only.

The above quoted rate of siding charge will be levied in addition to the freight charges to/from the serving station i.e Barajamda Station. The siding is based on single engine working cost. In case of more than ne engine is required to work the siding, the rate should be multiplied by the actual number of engines deployed and the siding charges should be levied accordingly. When traffic is booked to this siding necessary remarks on RRs and Invoices “ for delivery at M/s. Rashmi Metaliks Ltd at BJMD ‘ siding” should be endorsed. Siding charge should be collected locally by the serving station i.e Barajamda. No supplementary charge is leviable on siding charges. This will take with immediate effect.

(Authority :CCM/SER No.C RG.46/4379 of date 10/11/2006)(Authority :CCM/NWR No.C .543/11/1 (S.E. Rly) of date 19/12/2006)

134

Page 135: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

______________________________________________________________________ Para for SORTRC 206 (GOODS) of 2006 from SOUTH EASTERN RAILWAY

______________________________________________________________________

Sub:-Opening of Contai Road station (CNT) in KGP Division of S.E. Railway as a half –rake point for inward traffic.

Ref:- S.E Rly’s Spl Rates Circular notified under SL No. 185(G)/2006 dated 26.10.2006 circulated vide SORTRC 183(Goods) of 2006 dated 30-11-2006.

With effect from 20.10.2003 Contai Road station over KGP Division has been reopened for booking of inward traffic in stone chips /ballast in rake load only vide S.E Rly’s office letter no.RG.46/1306/KGP dated 20.1.2003.

Now it is notified with the approval of competent authority that Contai Road station (CNT) is to be treated as a half rake point for general goods traffic .

Accordingly the name of Contai Road Station (CNT) is to be included in the proper place of the list already notified vide S.E Rly’s Circular quoted uinder reference.

This is effective from 04.12.2006 (Fourth December Two Thousand Six.)

(Authority: CCM/S.E Rly No. RA.41/Rates/IA/?G/Pt.IV/4 of date 11.12.2006) (Authority :CCM/NWR No.C .498/6 of date 29/12/2006) _________________________________________________________________________

Para for SORTRC 162 (GOODS) of 2006 from SOUTH WESTERN RAILWAY

_________________________________________________________________________

Sub:- Notification of station under Freight Forwarder Scheme in traditional empty flow directions.

With immediate effect Bellary (BAY) & Hubli (UBL) stations of Hubli Divisions are opened for handling traffic under Freight Forwarder Scheme in traditional empty flow directions under Cargo Aggregation scheme.

(Authority :CCM/SW Rly No.206/TL/06 (Freight Incentive Scheme) dt. 25.9.2006) (Authority :CCM/NWR No.C 543/13/1 (SW. Rly) of date 30.10.2006) ______________________________________________________________________

Para for SORTRC 163 (GOODS) of 2006 from SOUTH WESTERN RAILWAY

______________________________________________________________________

Sub:- Opening of Masarahalli (MSS) station for outward goods traffic. With immediate effect Masarahalli (MSS) Station on MYS division has been opened

for handling goods traffic in trainloads only.

(Authority :CCM/N.E Rly No. C-386/2/32/Pt-I/SECR/rcl dt. 11.7.2006)(Authority :CCM/NWR No.C 543/7/1 (N.E Rly) of date 31.10.2006)

135

Page 136: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

______________________________________________________________________ Para for SORTRC 188 (GOODS) of 2006 from SOUTH WESTERN RAILWAY

______________________________________________________________________

1. Sub: Opening of Kalem (KM ) Station of Hubli Division for Cargo Aggregation Schemes

With immediate effect Kalem (KM) station of Hubli Division is opened for handling traffic under Cargo Aggregation schemes.

(Authority: CCM/S.W Rly’s No C.206/TL/06 (Freight Incentive Scheme) dtd 29.09.06)

2. Sub:- Opening of Somalapuram (SLM) station for outward goods traffic.

With immediate effect Somalapuram (SLM) station situated between Bellary-Rayadurg section of Hubli division is opened for outward goods traffic in trainloads only in covered wagons.

(Authority: CCM/S.W Rly’s No C.206/TL/Vol III of date 12.10.06) (Authority :CCM/NWR No.C .543/13/1 (SW Rly) of date 6/12/2006______________________________________________________________________

Para for SORTRC 189 (GOODS) of 2006 from SOUTH WESTERN RAILWAY

______________________________________________________________________

1. Sub:-Allotment of Alphabetical Code and Numerical Code for new siding M/s. MSPL –AHB served by Kariganuru Railway Station.

The allotment of Alphabetical Code and Numerical Code to New Siding M/s. MSPL-AHB siding is as under:

SL.No. Name of the Station New Numerical Code

Alpha Code Division

1 M/s. MSPL-AHB siding served by Kariganuru Railway Station

15129967 MAKU UBL

(Authority: CCM/S.W Rly’s No C.490/UBL/MSPL/KGW dtd 12.10.06)

3. Sub:- Opening of Belgaum (BGM), Bellary (BAY) and Munirabad (MRB) stations of Hubli Division for Cargo Aggregation Schemes.

With effect from 07.10.2006 Belgaum(BGM), Bellary (BAY) and Munirabad (MRB) stations of Hubli Division is opened for handling traffic under Cargo Aggregation Schemes.

(Authority: CCM/S.W Rly’s No C.206/TL/06 (Freight Incentive Scheme dtd 11.10.06) (Authority :CCM/NWR No.C .543/13/1 (SW Rly) of date 6/12/2006)

136

Page 137: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

______________________________________________________________________

Para for SORTRC 200 (GOODS) of 2006 from SOUTH WEST RAILWAY______________________________________________________________________

1. Sub: Extension of Round – the clock working hours of Swamihalli hours of Swamihalli (SMLI) station.

Further to this office SORTRC 128 of date 20/09/2006, wherein Swamihallli (SMLI) station over Hubli division of S.W Railway was opened for round the the clock working hours for 03 months w.e.f 26.08.2006 to 25.11.2006 is extend for a further period of 06 months i.e. upto 24.05.2007.

(Authority: CCM/SW Rly No. C.37/Goods Shed Working Works of date 20.11.2006)

2. Sub: Allotment of Alphabetical Code and Numerical code for new Siding M/s. BIOP-served by Bellary Railway station.

Further to S.W Rly’s Commercial Circular Goods No. 25/2006 Rate Advice No. 3 of 2006, the allotment of Alphabetical Code and Numerical Code to New Siding M/s. BIOP siding served by Bellary is as under.

Sl No. Name of the Station New Numerical Code

Alpha Code Division

1 Bellary Iron Ore Private Limited Siding served by Bellary

15129867 BIOP UBL

(Authority :CCM/S.W Rly No. C.490/UBL/BIOP/BAY of date 13.11.2006)

3. Sub: Opening of Hosur (HSRA) Station for goods traffic.

Please refer to S.W Rly’s commercial Circular No.69 /2006 where in HSRA statin was opened for both outward & inward goods traffic for a period of three months w.e.f 14.06.2006, Now it is decided to open Hosur (HSRA) station between Bangalore –Dharmapuri (BG) Section of Bangalore Division for both outward & inward traffic in Train load and wagon load on permanent basis.

(Authority :CCM/S.W Rly’s no. C.206/TL/05/Vol.III of date 17.11.2006)(Authority :CCM/NWR No.C .543/13/1 (S.W Rly) of date 14/12/2006) ______________________________________________________________________

Para for SORTRC 203 (GOODS) of 2006 from SOUTH WESTERN RAILWAY

______________________________________________________________________

Sub:-Updated list of station /sidings capable of handling full rake /half rake and two originating points over S.W Rly

137

Page 138: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

An updated list of station/sidings capable of handling full rake/half rake and combination of two originating points of Goods Traffic on South Western Railway is given below.

LIST OF STATIONS /SIDINGS CAPABLE OF HANDLING FULL RAKE AND HALF RAKE ON SOUTH WESTERN RAILWAY

FULL RAKE HANDLING STATIONSDiv S.

NoStation name Station

Code Inward/Outward

Commodity

UBL 1 Ugarkhurd UGR Both All commodities except POL & crane consignments

2 Raybag RBG Both -do-3 Belgaum BGM Both -do-4 Desur DUR Both Container traffic only5 Gunji GNJ Both All Commodities Except POL &

crane consignments6 Amargol AGL Inward I.ore only7 Hubli UBL Both All Commodities Except POL

& crane consignments8 Gadag GDG Both -do-9 Koppal KBL Both -do-10 Munirabad MRB Both -do-11 Hospet HPT Both -do-12 Kariganuru KGW Outward I.ore only13 Papinayakanahalli PKL Outward I.ore only14 Bayaluvoaddigeri BYO Outward I.ore only15 Toranagallu TNGL Outward I.ore only16 Bellary Cantt BYC Outward I.ore only17 Bellary BAY Both All commodities Except POL &

crane consignments18 Vyasankeri VYS Outward I.ore only19 Ramagad RMGD Outward I.ore only20 Yeshwanth Nagar YTG Outward I.ore only21 Swamihalli SMLI Outward I.ore only22 Banihatti BNHT Both I.ore only23 Ranjitpura RNJP Outward I.ore only24 Tinaighat TGT Inward I.ore only25 Castlerock CLR Both For one year from 14.05.06 to

13.05.07 For fertilizer only.26 Kalem KM Both Inward Ore & Outward

container27 Sanvordem SVM Inward Ore only28 Vasco-Da-Gama VSG Both All Commodities except crane

consignments29 Bijapur BJP Both All Commodities except POL &

crane consignments30 Daroji DAJ Outward For 6 months from 01.09.06

138

Page 139: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

(Only covered wagons)

Inward coal and coke

31 Somalapuram SLM Outward All Commodities except POL & crane consignments

MYS 1 Mysore New goods terminal

MNGT Both All Commodities Except POL & crane consignments.

2 Hassan HAS Both -do-3 Shimoga Town SMET Both -do-4 Davangere DVG Both -do-5 Ammasandra AMSA Both -do-6 Banasandra BSN Outward Iron Ore7 Sasalu SLU Outward Iron Ore 8 Amritpura AMC Outward Auto traffic

SBC 1 Satellite goods Terminal

SGWF Both All Commodities Except POL & crane consignments

2 Bangarpet BWT Both -do-3 Baiyyappanhalli BYPL Both All Commodities except POL4 Tumkur TK Both All Commodities Except POL &

crane consignments5 Maddur MAD Both -do-6 Mandya MYA Both -do-7 Dharmapuri DPJ Both -do-8 Hosur HSRA Both All Commodities Except POL &

crane consignments.9 Bidadi BID Outward Only for Auto Mobile Vehicle

LIST OF FULL RAKE HANDLING SIDINGSDiv S.

NoStation/Sdg name

Served By

Outward /Inward

Commodity

UBL 1 Oil Sdg. Desur DUR Inward POL only2 Oil Sdg. Navalur NVU Inward POL Only3 Oil Sdg.Bijapur BJP Inward POL only4 ZIL Sdg

SankavaLSKVL Both Fertilizer Traffic Only

5 Costi Sdg-Kalem KM Inward I.Ore only6 WCPM Sdg

AmbewadiAVA Both Inward coal & timber waste,

Outward Paper7 FCI Sdg. Hublli UBl Both F.C. I rakes only8 FCI Sdg. BYC BYC Both FCI rakes only9 JSW Sdg.

ToranagalluTNGL Both Coal fines only.

10 Fomento Sdg YTG

YTG Outward I.Ore Only

11 SDMG Sdg. YTG YTG Outward M Ore Only12 Marmagao

Harbour MRH Outward Coal

13 M/s. MSPL Pvt. Siding

KGW Outward Iron Ore

139

Page 140: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

14 M/s. BIOP Pvt. Siding

BAY Outward Iron Ore

MYS 1 Kumarapattnam Sdg.

HRR Inward Coal

2 Mysore Cement Sdg. AMSA

AMSA Inward Coal ,Slag, coke

3 VISL Sdg. BDVT BDVT Both Coal, Slag, Coke, Coke Breeze

4 MPM Sdg.BDVT BDVT Inward Coal5 Oil Sdg MNGT MNGT Inward POL Only6 Oil Sdg. HAS HAS Outward POL Only

SBC 1 FCI Sdg KJM KJM Both FCI rakes Only2 FCI Sdg. WFD WFD Both FCI rakes only3 Concor Sdg. ICD ICD Both Container Traffic Only4 KEB Sdg. YNK YNK Inward Oil Only5 Oil/LPG Sdg DKN DKN Inward Oil & LPG Only6 BSD Sdg.DBU DBU Inward

/OutwardCement only

7 SAIL Sdg. /Tata Steel Siding CSDR

CSDR Both Iron & Steel only

List of Stations capable of handling Half rakeDiv S.

NoStation name Served

ByOutward /Inward

Commodity

UBL 1 Ghatprabha GPB Both All Commodities Except POL & crane consignments

2 Chikodi Road CKR Both -do-MYS 1 Harihar Road HRR Both All Commodities Except POL &

crane consignments2 Chitradurg CTA Both All Commodities Except POL &

crane consignments3 Haveri HVR Both -do-4 Ranibennur RNR Both -do-5 Chalgeri CLI Outward -do-6 Tiptur TTR Outward -do-7 Bageshpura BGPA Outward Wood waste only8 Kadur DRU Both All Commodities Except POL &

crane consignments9 Masarahalli MSS Outward -do-

SBC 1 Malur MLO Both All Commodities Except POL & crane consignments

2 Anekal AEK Both -do-3 Kolar KQZ Both -do-4 Dodballapur DBU Both -do-5 Hosur HSRA Both Automobilie loading

List of Sidings Capable of Handling Half RakeDiv S. Station name Station Outward / Commodity

140

Page 141: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

No code Inward SBC 1 Coramandal

Siding COLS Both All commodities Except POL &

crane consignments2 BNCB Siding

VimanpuraVMN Both -do-

3 RWF Siding YNK YNK Both -do-

List of Two Point Combination of Stations for Outward Traffic In Train load loaded in BCXC,BCN & BCNA Div S.No. Station Names Code CommodityUBL 1 Raybag+Ghatprabha RBG+GPB Other than POL & crane

consignments2 Gadag + Koppal GDG+KBL -do-

MYS 1 Harihar +Davangere HRR+DVG Other than POL & crane consginements

2 Harihar Ranibennur HRR+RNR -do-3 Harihar +Haveri HRR +HVR -do-4 Haveri +Ranibennur HVR +RNR -do-5 Haveri +Davangere HVR+RNR -do-6 Ranibennur +Davangere RNR +DVG -do-7 Kadur +Shimoga Town DRU SMET -do-8 Kadur+ Hassan DRU+HAS -do-9 Kadur +Chitradurg DRU +CTA -do-10 Chitradurg+Davangere CTA +DVG -do-11 Harihar +Chitradurg HRR +CTA -do-12 Shimoga Town

+BageshpuraSMET +BGPA

-do-

SBC 1 Maddur +Mandya MAD +MYA Other than steel consignment2 Mysore new goods

terminal +MaddurMNGT +MAD

-do-

3 Tumkur +_White field TK +WFD -do-

(Authority :CCM/SWR No.C .206/TL/05 Vol.III of date 30/11/2006)(Authority :CCM/NWR No.C .498/6 of date 19/12/2006)_________________________________________________________________________

Para for SORTRC 150 (GOODS) of 2006 from WESTERN RAILWAY

______________________________________________________________________

Sub:- List of full/Half rake of Goods Shed and Sidings on Western Railway.Ref: W.Rly’s Rates Circular (Goods) No. 121 of 2006.

Attention is invited to the above referred circular on the subject cited above. Mangliagaon and Meghnagar Goods Shed situated over Ratlam Division of Western Railway are now notified for Iron/Steel, Crane consignment also w.e.f 8.3.2006.

(Authority: CCM/W.Rly No. C.386/2/37/WR/RCL of date 28/08/2006)(Authority :CCM/NWR No.C 543/14/1 (W. Rly) of date 10.10.2006)

141

Page 142: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Para for SORTRC 151 (GOODS) of 2006 from WESTERN RAILWAY

________________________________________________________________________

1.Sub:-Closure of Neemach-MG, Jaora-MG and Ratlam-MG station for Outward and Inward Goods traffic.

With effect from 1-10-2006, it has been decided to close Neemach (NMH)-MG, Jaora (JAO)-MG and Ratlam (MG) stations situated over Neemach –Ratlam section of Ratlam Division of Western Railway for Outward and Inward Goods traffic for gauge conversion.

(Authority CCM/W.Rly No. C.498/1/8 Vol.III of date 25.9.06)

2.Sub:-Opening of Champaner Road station for outward Goods traffic

With immediate effect 29.9.2006, it has been decided to open Champaner Road Station situated over Vadodara-Godhra section of Vadodara division of Western Railway for outward Goods Traffic.

(Authority CCM/W.Rly No. C.498/1/7 Vol.III of date 29.9.06)(Authority :CCM/NWR No.C 543/14/1 (W. Rly) of date 10.10.2006) ______________________________________________________________________

Para for SORTRC 201 (GOODS) of 2006 from WEST CENTRAL RAILWAY

______________________________________________________________________

Sub: Allotment of Alpha code and Numerical code to sidings on WCR.

New Alpha and Numerical code for sidings of WCR and civil district codes of new district of Madhya Pradesh and Rajasthan (Chapter VII of IRCA Alphabetical List of Stations) have been received from IRCA and Statistical Branch WCR.

The new alpha code and numerical code of stations are as under:S.No. Zone Divn Siding Full Name Alfa code Numerical code1 WC BPL IOC Siding Jhujharpur IOCE 161234632 WC BPL IOC Siding Nishatpura IOSN 161234643 WC BPL CONCOR Siding Mandideept CCMP 161234654 WC BPL HEG Siding Mandideep HEGM 161234625 WC JBP IOC Siding Narioli IONI 162234776 WC JBP S.N. Sunderson & Co. Siding SNSM 162234787 WC JBP N.M. Dubash Siding Mehgaon NMDM 162234798 WC JBP N.M Dubash Siding Jukehi NMDJ 162234809 WC JBP IOC Siding Satna IOSA 1622348110 WC JBP POL Siding New Katni Junction PONK 16223482

The new civil district codes allotted are as under:

S.No MADHYA PRADESH Code No. S.No Rajasthan Code no.1 ASHOK NAGAR 82-D 1 BARAN 226 –A

142

Page 143: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

2 SHIVPURI 121 2 BHILWARA 2883 BHOPAL 85-A 3 CHITTORGARH 2314 HARDA 97-A 4 BUNDI 230-A5 GWALIOR 97 5 BAL 224-A6 REWA 114 6 KAROLI 238-A7 KATNI 101-A 7 JHALAWAR 2368 SIDHI 121-A

(Authority :CCM/WCR No.C .WCR/HQ/GC-237/TMS/Pol of date 17/11/2006)(Authority :CCM/NWR No.C .543/15/1 (W.C Rly) of date 18/12/2006)

143

Page 144: ENQUIRY - North Western Railway / Indian Railways Portal  · Web viewNo Subject & Authority Page No. THROUGH RATE CIRCULAR (COACHING) 12 Reorganization of MG services - gauge conversion

Note: If the staff have any doubt about the meaning of any item or are uncertain of the correct method of applying any rate or fare notified herein, immediate reference should be made to the Chief Commercial Manager, North Western Railway, Jaipur

KEEP ALL YOUR TARIFFS, RATE BOOKS, etc UP – TODATE

PRADEEP BHATNAGARChief Commercial Manager

Jaipur, 31st December,2006

Prepared and Compiled by: 1. Shakti Bali, Chief Rate Inspector, CCM Office2. Ram Snehi Gupta, Senior Rate Inspector, CCM Office

144