ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share with landowner Rural (farmland) Bed material: gravel-cobble-sand, incised Pool-riffle-pool regime, slope around 1% Average width 20-30 ft, 10-14 ft tall banks Partially spring fed. High-quality trout stream, not stocked, natural reproduction of Rainbow, Brown, & upstream, Brook Trout

ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Embed Size (px)

Citation preview

Page 1: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY.

• Bank erosion is threatening a farm road• NRCS –Environmental Quality Incentives Program

{EQIP} cost share with landowner • Rural (farmland)• Bed material: gravel-cobble-sand, incised• Pool-riffle-pool regime, slope around 1%• Average width 20-30 ft, 10-14 ft tall banks• Partially spring fed.• High-quality trout stream, not stocked, natural

reproduction of Rainbow, Brown, & upstream, Brook Trout

Page 2: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

LPSTP WITH LIVE

SILTATION & LIVING DIKES

PERPENDICULAR TO FLOW

Page 3: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

LIVE SILTATION

{Willow branches about 1-2 inches in diameter, 6 to 8 ft long, 2/3 in ground, 1/3 out, intermixed with

Silky & Red osier Dogwood that is 4 to 6 ft long}

Page 4: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

FLOW

THE PLAN THE AREA OF

INTEREST

Page 5: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Looking DS @ veg in LPSTP with backfilled bank.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 6: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Looking DS. Dug trench landward of LPSTP.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 7: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Elton Creek near Freedom 7 Bridge, Freedom, NY

Install Live Siltation

Page 8: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Looking DS at installed Live Siltation (willow & dogwood).

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 9: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Live Siltation providing mid & upper bank protection

8 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-derrick-JUNE 13, 2008

Page 10: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

TRANSPLANTING A LARGE CLUMP OF

WILLOW TO USE AS A LIVING DIKE

Multi-stem (20 to 40 stems) bushes approx. 14 to 24 ft tall, transplanted as a single

clump, with roots in trench directly behind the LPSTP. Tops of branches were trimmed

& used as Live Poles (6 to 10 ft long).

Page 11: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Drawing by Robert Shenk, Catt County Soil & Water

THE PLAN – ELTON CREEK DS OF FREEDOM 7 BRIDGE

LIVING DIKE WILLOW BUSH

TRANSPLANTATIONFLOW

LIVE SILTATION

LPSTP

Page 12: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Elton Creek near Freedom 7 Bridge, Freedom, NY

Dig trenches to

receive willow bushes

Page 13: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Looking DS at LPSTP, backfilled bank, & dug trench.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 14: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Elton Creek near Freedom 7 Bridge, Freedom, NY

Transplant large multi-stem Willow Bushes

Page 15: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Looking DS. Transplanting willow bush in trench

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 16: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Elton Creek near Freedom 7 Bridge, Freedom, NY

Then trim long branches from bush & plant as

Willow Poles

Page 17: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Looking DS. Trim willow & plant poles in trench.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 18: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Looking DS. Transplant complete.

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Page 19: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Veg planted on a grid, Live Siltation in front & transplants

Under construction-Elton Creek DS of Freedom 7 Bridge-derrick-Oct 2007

Live Siltation

Willow shrub

transplants &

willow poles

Page 20: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

Jumping ahead,1 growing season & 2 more growing months after completion. From point bar looking @ right bank. This is the 50 ft of Live Siltation & two large willow bush transplants that

took 45 minutes to install.

19 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June. 9, 2009

Live Siltation

LPSTP, Live Siltation, & Living Dikes

Living Dike

Living Dike

Page 21: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 more growing months after completion. From point bar looking @ right bank. This is the 50 ft of Live Siltation & two large willow bush

transplants that took 45 minutes to install. Veg is very robust.

Page 22: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS AFTER PROJECT

COMPLETIONPhotos by Derrick JUNE 15, 2010

FROM THE CHANNEL, WALKING US TO DS

Page 23: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. From top bank looking DS. Stream & all stone is hidden by dense veg.

Page 24: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS @ the apex of the bend. Live Siltation & transplanted willows & dogwood growing well. Nice deep pool to dissipate energy.

Page 25: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Close-up of stacked stone wall with Live Siltation behind & some planted willow & dogwood growing through the stone wall.

Page 26: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS @ good aquatic habitat by stone (deep-shallow-slow-fast-structure-overhanging veg).

Page 27: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking @ the kicker @ the DS end of the deep pool. Note thalweg & willow growth.

Page 28: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking DS @ kicker & robust veg planted on a grid pattern.

Page 29: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Close-up of willow growth behind the LPSTP.

Page 30: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share

32 MONTHS LATER-Elton Cr. DS of Freedom 7 Br.-Derrick-June 15, 2010

2 years & 8 months after completion. Looking @ amazing willow growth in the DS key. Willow was planted up to 14 ft above base

flow water surface elevation, but was planted 4 ft deep & has grown exceptionally well over the last 2+ years.

Downstream key

Page 31: ELTON CREEK, DS OF FREEDOM 7 BRIDGE, FREEDOM, NY. Bank erosion is threatening a farm road NRCS –Environmental Quality Incentives Program {EQIP} cost share