18
52 nd RMOC Rolling Mill Operating Committee Meeting Bokaro Steel City Better everyday Elimination of Biting problem in Blooming Mill

Elimination of Biting problem in Blooming Millrmoc.tksranchi.in/rmoc52/Presentations/JSW - SALEM 1.pdf · 2019. 2. 16. · A.JSW Steel Ltd, Salem Works Tamilnadu JSW Salem , part

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

  • 52ndRMOC

    Rolling Mill Operating Committee MeetingBokaro Steel City

    Better everyday

    Elimination of Biting problem in Blooming Mill

  • Better EverydayA. Aerial View of JSW Salem Unit

    JSW SALEM VISIONTo become the preferred supplier of special steel long products for domestic

    and global end users

    2 of 101

    Plant located at Pottaneri, MecheriFrom Salem : 40 KMs towards Metturdam 2 of 17

  • Better EverydayA.JSW Steel Ltd, Salem Works Tamilnadu

    JSW Salem , part of USD 12 Billion JSW Group, is India’s largest integrated special steel plant located in

    Salem Tamilnadu with installed capacity of 1 Million Tonnes Per Annum (MTPA)Salem, Tamilnadu with installed capacity of 1 Million Tonnes Per Annum (MTPA).

    MANAGEMENT SYSTEMS

    ISO ISO OHSAS IATF AS 9100ISO 9001

    ISO 14001

    OHSAS 18001

    IATF 16949

    AS 9100 Rev.D

    ISO - International Organization for Standardization / Technical Specifications

    3 of 101

    OHSAS - Occupational Health and Safety Assessment Series

    AS 9100D - International standard for manufacturers of Aerospace product

    IATF - International Automotive Task Force 3 of 19

  • Better Everyday

    Bill t /Bl 250

    Product Profile based on shape and sizeBillets /Blooms- 250,

    280x370mm,340x400 mm square.Rounds – 180 mm to 310 mm

    As Cast

    Coils - 5.5 to 32 mmRound Bars- 20.5 to 60 mmFlats- 60 x 7 to 101 x 38 mm Hexagon -20.5 and 32.5 mm

    Rolled

    Bar And Rod Mill

    Product

    Round Blooms-60 to 200 mm ɸ *RCS - 55 to 240 mm SquareBlooming

    Mill

    * Round cornered squares (RCS)

    4 of 17

  • Better EverydayJSW Steels Limited, Salem

    Process Flow ChartIRON COMPLEX STEEL MELT SHOP

    PCI*

    Hot

    Iron ore

    CoalCoke

    pple

    r

    Coke Oven plant Hot Metal

    Iron ore fines Sinter

    Wag

    on T

    ip

    Sinter Plant

    Blast Furnace Energy Optimizing Furnace

    Ladle Refining Furnace

    Continuous Casting Machine

    -Bars-Coils

    Annealing

    ROLLING MILLS

    Billets

    Bar and Rod Mill

    -RR *-RCS*

    g-Flats

    Blooms

    CUSTOMERS

    Blooming MillFinal Inspection and Dispatch * -Rolled Round(RR)

    -Round Cornered Square(RCS)-Pulverized Coal Injection(PCI) 5 of 19

  • Better EverydayBLOOMING MILL - ROLLING PROCESS

    Reheating  Descaler Roughing  Finishing  Hot Saw Cooling furnace Descaler Mill Mill Hot Saw Bed

    6 of 19

  • Better EverydayBlooming Mill – Process Flow DiagramReceiving blooms from START gSteel Melt Shop •250 mm x 250 mm RCS•340 mm x 400 mm RCS

    •310 mm RND

    Cutting in Hot Saws Bundling

    START

    Charging of blooms in to Reheating

    FurnaceRolling in

    Continuous Mill Quality inspectionFurnace

    Despatch

    Heating of blooms (~1240°C) Front end cutting

    •RND – 60 mm to 200 mm

    •RCS – 55 mm to 300 mm

    END

    Descaling Rough rolling in Reversible Mill

    Project taken RCS ROUND7 of 18

  • Better EverydayProcess of Blooming Mill – Hot Rolling

    • The Cast blooms from Steel Melting Shop is Reheated in BF gas fired Reheating Furnace

    • Then the bar is descaled and Rough Rolled in Reversible Mill (Stand #1)g ( )

    • The uneven front end of the rough rolled bar is removed by Gas cutting

    • Then the bar is transferred to Finishing mill, which is an 8 stand continuous mill (Stand #2V to Stand #9H)

    • The bar is rolled to customer required shape and dimensions in the finishing millq p g

    • Hot bars of temperature about 900 °C rolled in series of 4 Vertical and 4 Horizontal stands. Entry and Exit guides are used in each stand to guide the bar work roll groove.

    • The work rolls are made of SG iron and used to for a defined life (based on rolling quantity). Then the work rolls are machined in Lathes to remove the roughness formed on the surface during usage

    • After finishing rolling, the bars are cut into customer required size, cooled and sent for inspection8 of 18

  • Better EverydayProblem and Goal

    Problem Statement:• When the rough rolled bars are fed into the first stand of continuous mill (Stand #2V), the bars are not

    entering into the work roll groove due to slippage. This is called Biting problem. This happens frequentlyentering into the work roll groove due to slippage. This is called Biting problem. This happens frequently when stand #2V is changed.

    • Biting problem in Stand #2V causes delay of 303 minutes/month in average.

    • This leads to production loss of more than 200 MT/Month.

    Goals/Objective(s):R d i d l d t biti bl f 303 i t / th t 50 i t / th• Reducing delays due to biting problem from 303 minutes/month to

  • Better Everyday

    Action Plan

    Counter measures are:Counter measures are:

    • Increasing the First bloom HV Mill entry temperature

    • Introducing Metal coating on Stand #2 Work Rolls

    M dif i bl f t d tti• Modifying bloom front end cutting

    10 of 18

  • Better EverydayImplementation of Actions based on DOE

    S.NO What ? How?

    1 Increasing the First bloom HV Mill t t tBy changing the minimum required t t f fi t bl t 930 °Centry temperature temperature for first blooms to 930 °C

    2 Introducing Metal coating on Stand #2 Work RollsBy procuring metal coating device and coating on the machined rolls in roll shop.

    3 Modifying bloom front end cutting Training the gas cutters and introducing new procedure for front end cuttingy g g new procedure for front end cutting

    11 of 18

  • Better EverydayImplementation of Actions

    Arc Spraying on Work Rollp y g

    Metal Coated Work Roll12 of 18

  • Better EverydayImplementation of action

    Finishing MillMill

    13 of 18

  • Better EverydaySide Effect Verification

    Action : Introducing Metal coating on Stand #2 Work RollsEffect: Roughness in rolled productTest: Visual InspectionTest: Visual Inspection

    Result:Result: Since no roughness found on the rolled bars during trial implementation,

    this action can be implemented14 of 18

  • Better EverydayImplementation of Actions

    Front End Taper CuttingFront End Taper Cutting

    Inference: New cutting shape in front end of the bar is introducedInference: New cutting shape in front end of the bar is introduced

    15 of 18

  • Better Everyday

    Project Results

    350Reduction in Biting Delay

    303

    250

    300h

    150

    200

    nute

    s/m

    onth

    3050

    100

    Min

    30

    0

    50

    Before AfterAchieved Target Linear (Achieved)c e ed a get ea ( c e ed)

    16 of 18

  • Better Everyday

    Conclusion

    • Delays due to biting problem in continuous mill is reduced from 303 minutes / month to 30 minutes/month in average

    • Total time saved – 273 Minutes/month

    17 of 18

  • Better Everyday

    THANK YOU