PRIVATE AND NOT FOR PUBLICATION B . R . 3 1 1 1 9 / 5
British Rail
EASTERN REGION N o . 2 6
TEMPORARY SPEED RESTRICTIONSPERMANENT WAY OPERATIONS
SIGNAL ALTERATIONSAPPENDIX INSTRUCTIONS, ETC.
AFFECTING EASTERN REGION TRAINMEN
• WORKING OVER LONDON TRANSPORT
AND SOUTHERN REGION
SATURDAY 29 JUNETO
FRIDAY 5 JULY 1974INCLUSIVE
Trainmen must pay particular attention to works contained in this notice and keep a goodlook-out for hand signals, which will be exhibited at the various localities in accordancewith the Rules and Regulations. Work at places other than those mentioned may be inprogress of which it may not have been possible to give previous notice, and drivers mustbe on the look-out and be prepared to stop or run at reduced speed when and where handsignals may be exhibited.
NOTICE
Supplementary Operations Instructions booklet is being re-issued.ND-22D must be retained and used together with ND-26D until this re-issue dated27 July 1974 is received.
SECTION A
Location of Workat or between
S-2
TEMPORARY SPEED RESTRICTIONS
ION DON TRANSPORT
Temporary speed restrictions may b e.e a s e d o r w i t h d r a w n e a r l i e r t h a n s h o w n. A t t h e s t a rt o f t he s p ee d
restriction, a sign will display figures indicating the maximum permissible speed in miles per hour. Asecond sign will display the letter " I ' to indicate that normal speed may be resumed from that point.
Warning boards are not provided.
Certain signs will not be illuminated when the traction current is switched off.
Lines M i l e a g e S p e e daffected a t or between Re s tr i c ti on Remarks
M. Chs. M. Chs. m . p . h .Kings Cross U p — — — — 1 5 T r a c k w o r k .and Farringdon
SOUTHERN REGION
Warning boards and indicators provided unless otherwise shown.
In the case of items marked * the warning board(s) and indicators will be moved as the work progresses.In the case of items marked t the warning board(s) will be lit by propane gas.
Where two speeds are shown for a restriction e.g. 20 the Rule Book Section T, clause 21.2 applies.40
BALHAM TO GATWICK AIRPORT VIA CRYSTAL PALACENorwood Jn. and D o w n Relief 8 70 9 02 3 0 E x c a v a t i n g .Norwood Fork Jo. a n d Down
LocalNorwood Fork Jn. and U p Local 9 02 8 70 3 0 E a r t h w o r k .Norwood Jn.
Earl eswood and U p Quarry 1 6 76 1 6 57 2 0 T r a c k w o r k .Coulsdon North w o-Horley and D o w n Local 2 6 05 2 6 25 2 0. T r a c k w o r k .Gatwick Airport 4 0
READING (SOLITHCOTE JRI.) TO BASINGSTOKESouthcote Jo. and D o w n 3 8 10 3 8 14 2 0 T r a c k w o r k .Mortimer
BRICKLAYERS ARMS TO CRYSTAL PALACEBricklayers Arms Jri. D o w n and Up 1 60 2 10 2 0 T r a c k w o r k .
....,„ S p u rʻ . . . " vtdayers Arms ..In. D o w n and Up 2 00 2 10 1 5 T r a c k w o r k .
Goods,
S-3SECTION A — TEMPORARY SPEED RESTRICTIONS — continuedLocation of Workat or between
SOUTHERN REGION — continuedBRICKLAYERS ARMS ..IN. TONew Cross Gate andBricklayers Arms JneBricklayers Arms sin.and New Cross Gate
KEW EAST JN. TO EARLEYSyon Lane andWood Lane Crossing
Hounslow andIsleworth
VIRGINIA WATER TO MILLBROOKChertsey andVirginia WaterWoking andBrookwoodWorting Jn. andBasingstoke*Weston andWailers Ash
Linesaffected
CRYSTAL PALACE — continuedUp Through and 2 30Up LocalDown Through 2 10and Down Local
Down
Up
Up
Down Slow
Up Fast
Mileageat or between
M. Chs. M . Chs. m . p . h .
11 61 1 1 63
13 50 1 3 29
22 70 2 2 72
26 30 2 7 75
48 6 4 7 79
Down Passenger 6 0 50 6 1 3 5Loop
SpeedRestriction Re ma rk s
2 05 2 0 T r a c k w o r k .
2 25 2 0 T r a c k w o r k .
20 T r a c k w o r k .Commencing 10 00Thursday 4 July.
40 T r a c k w o r k .Warning board at 14m.7chs.
20
20
20
20
Trackwork.
Trackwork.
Trackwork.
Trackwork.Warning board at 60m.15chs.
SECTION B
, TEMPORARY ENGINEERING WORKS
(For details of Signalling or Permanent Way Alterations see Section C)
Where any work involves fixing, removing or repairing of signals, or the protection of the running lineduring renewals, repairs and obstructions. Handsignalmen will be provided by the Engineer to act inaccordance with the Rules and Regulations.
Material may be lying about and disconnections may be made as required.
Unless otherwise shown, work will be carried out as traffic permits.
Although the S notice commences on Saturday of each week, items may be included which are shownto commence on the previous night, and were not available for inclusion in the previous notice.
All concerned must therefore not assume that items shown to commence before the operative date of eachnotice will have been published in the previous one, and on Friday nights must refer to both the currentand following notices.
At or between
SATURDAY 29 JUNEBarbicanSUNDAY 30 JUNEKings Cross andMoorgate(B.R. Boundaries)
Barbican
FactoryFactory ..1n.
Brixton andCambria Jn.
MONDAY i to FRIDAY 5 JULYBarbican D o w n 'TUESDAY 2 to SATURDAY 6 JULYEast of Kings Cross B o t h
S-4
Lines affected R e m a r k s
LONDON TRANSPORT
MOORGATE TO KINGS CROSS (CITY WIDENED LINES) (LONDON TRANSPORT/BRITISH RAILWAYSBOUNDARY)FRIDAY 28 to SUNDAY 30 JUNEEast of Kings Cross B o t h
Down 0 8 00 to 18 00. Cladding structure.
Both 0 9 00 to 17 00. Trackwork,
Down 0 8 00 to 18 00. Removing scaffolding.
All
Down and UpCatford Loop
SOUTHERN REGION
08 00 to 18 00. Cladding structure.
23 00 Fri and Sat to 07 00 Sat and Sun. Repairingbrickwork.
23 00 Tue to Fri to 07 00 Wed to Sat. Repairingbrickwork.
LATCHMERE JN. TO HITHER GREEN VIA NUNHEADDAILY UNTIL FURTHER NOTICEAll signal boxes A l l 0 0 05 to 17 00 (Sun). 00 05 to 05 00 (weekdays).
10 00 to 16 00 (Mon to Fri). S w o r k .All 0 8 00 to 16 30 (each Sunday). S & I work.
00 05 to 17 00 (Sun). 10 00 to 16 00 (Mon).00 05 to 05 00 and 10 00 to 16 00 (The to Fri).S & I work.Demolition of East Brixton station.
S-5SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between
SOUTHERN REGION — continuedLATCHMERE M. TO HITHER GREEN VIA NUNHEAD continuedDAILY UNTIL FURTHER NOTICE — continuedPeckham Rye Station D o w n and Up
New Cross andSt. JohnsNun head
NunheadHither Green
SATURDAY 29 JUNENunhead, St. Johns andParks Bridge Jn.Hither Green andGrove ParkSUNDAY 30 JUNEFactory Jn. andBrixton
Brixton andHerne HillBrixton andDenmark HillPeckham Rye andNunhead
Lewisham andCatford Bridge
Clapham Jn• 'A' andClapham Jn. 'C'Clapham Jn. 'A '
Clapham Jm 'C'
Lines affected
All Lines
All
Down and UpNos.1 to 9 RoadsCripple RoadFeed Road
TUESDAY 2 and WEDNESDAY 3 JULYHither Green and D o w n FastGrove Park B L O CKED
Down and Up Mid-Kentand NunheadDown and Up FastBLOCKED
0035 to 05 20DownB LOCKED00 50 to 05 50Up Fast and Up SlowBLOCKEDAllBLOCKEDDown and UpBLOCKED00 50 to 06 35DownBLOCKED00 05 to 07 00UpBLOCKEDDown and UpBLOCKED
CLAPHAM JN• 'C' TO LATCHMEREDAILY UNTIL FURTHER NOTICEAll signal boxes A l l
47 and 48 Sidings
All
All
Remarks
Station renovations between 5m. 10 chs. and5m. 18chs.Construction of retaining walls and platformdemolition between 51A a n d 53A m . p .
00 05 to 1700 (Sun). 10 00 to 16 00 (Mon).00 05 to 05 00 and 10 00 to 1600 (Tue to Fri).S & I work.Platform work.Trackwork. Crane in use.
00 05 to 05 30. Trackwork between 6 and 7'Arn.p.
0035 to 05 30. Trackwork between 81/2 a n d 91A m . o .
Trains on Slow lines.
00 35 to 05 50. Trackwork between 13A a n d 31/ 4 m . p .
Crane in use.
00 50 to 05 30. Trackwork between 3 and 41A m . p .00 50to 06 30- Trackwork between 3 and 5m.p.On track machines in use.
00 05 to 07 00. Trackwork between 5 and 6IA rn.p.
0010 to 0620. Trackwork between 6 and 7Y2m.p.
00 05 to 0530. daily. Trackwor k between 73A a n d
m.p.Trains over Slow line.
00 05 to 17 00 (Sun), 00 05 to 05 00 (Weekdays),10 00 to 15 15 (Mon to Fri). S. & T. work.Altering walking routes and demolition.
00 05 to 05 20 (Mon to Sat), 00 05 to 07 20 (Sun).S. & I. work.
00 05 to 07 20 (Sun), 00 05 to 05 20 (Weekdays).S. & T. work.
S-6SECTION B — TEMPORARY ENGINEERING WORKS — continued
At or between L i n e s affectedSOUTHERN REGION — continuedCLAPHAM JN. 'A' TO LONGHEDGE JN.DAILY UNTIL FURTHER NOTICEAll signal boxes A l l
BRIXTON TO WEST NORWOOD JN.DAILY UNTIL FURTHER NOTICEAll signal boxes A l l
SUNDAY 30 JUNEBrixton andHerne Hill
LATCHMERE JN. TO GLOUCESTER ROAD M. VIA STREATHAM COMMONDAILY UNTIL FURTHER NOTICEAll signal boxes A l l
SelhurstSATURDAY 29 JUNEEast Croydon andWindmill Bridge Jn.SUNDAY 30 JUNEBalham andStreatham Common
Gloucester Road Jn.'TUESDAY 2 to FRIDAYBalharn andWindmill Bridge Jn.
Coulsdon North andMerstham
AllBLOCKED
All
Down ThroughBLOCKED
Down and Up Throughand Through SpursBLOCKEDAll
5 JULY00 15 to 05 00 Tue to ThuDown ThroughBLOCKED00 15 to 05 00Up ThroughBLOCKED00 15 to 04 30Up LocalBLOCKED01 20 to 03 10Wed and ThuDown LocalBLOCKED00 15 to 04 30Down LocalBLOCKED
Down and UpRedhill
Tue only
Wed to Fri.
Fri.only
BALHAM TO GATWICK AIRPORT VIA CRYSTAL PALACEDAILY UNTIL FURTHER NOTICEAll signal boxes A l l
Remarks
00 05 to 17 00(Sun). 00 05 to 05 00(weekdays).10 00 to 15 15(Mon to Fri). S & I work.
00 05 to 17 00(Sun). 00 05 to 05 00(weekdays).10 00 to 16 00(Mon to Fri). S & T work.
00 50 to 05 30. Trackwork between 3 and 41A r n . p .
00 05 to 17 00(Sun). 00 05 to 05 00(weekdays).10 00 to 16 00(Mon to Fri). S & I work.Station renovations.
00 05 to 05 00. Trackwork between 93/4 a n d 1 0 1 / 4 m . p .00 15 to 0630. Trackwork between 5 and53/4 rn.p.
00 05 to 07 00. Trackwork.
00 15 to 05 00 Tue to Thu and 00 15 to 04 30 Fri.Bridgework between 6 and 61/2 m.p. Crane in useon Tulse Hill lines Wed and Thu.
00 05 to 17 00 (Sun). 00 05 to 05 00 (weekdays).10 00 to 16 00 (Mon to Fri). S.& T. work.Falling chalk in Star Bridge Cutting between181/4 and 19m.p.
0-7SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between L i n e s affected
SOUTHERN REGION — continuedBALHAM TO GATWICK AIRPORT VIA CRYSTAL PALACEDAILY UNTIL FURTHER NOTICE — continuedCoulsdon North D o w n and Up Quarryand EarlswoodEarlswood A l l
Gatwick Airport D o w n ThroughDown LoopReversible and
Gatwick Airport A l lFRIDAY 28 JUNE to MONDAY 1 JULYGatwick Airport S u b - S t a t i o n Siding
BLOCKED
FRIDAY 28 to SATURDAY 29 JUNEGatwick Airport D o w n Loop
BLOCKEDGatwick Airport andThree Bridges
SATURDAY 29 JUNEBromley Jn. andCrystal PalaceSouth Croydonand PurleyPurleyCoulsdon North
00 50 to 05 45 SatDown Local,Middle SidingBLOCKED23 55 Fri to 05 45 SatUp LocalBLOCKED
Redhill 'B'Salfords andBalcombe Tunnel „In.Gatwick Airport
Coulsdon North D o w n and Up Quarryand Earlswood B L O C K E DSUNDAY 30 JUNESouth Croydon and D o w n and Up Through,Purley D o w n and Up Branch
Reversible lineBLOCKED
Purley D o w n and UpLoop/BranchesBLOCKED
Purley and D o w n and Up ThroughCoulsdon North B L O C K E DCoulsdon North
UpBLOCKEDDown and Up LocalBLOCKEDAllReedham SidingsBLOCKED
Reedham SidingsBLOCKEDAllAl!
Down LoopBLOCKED
Up Local
Remarks
— continued
Falling chalk in Star Lane Intermediate Cuttingbetween 163/4 a n d 1 7tA m i l
00 05 to 07 00 (Tue to Sat), 00 05 to 16 00 (Sun).Renewing cables.
Footbridge work at 26m. 50 chs. Plant working.Surface of platforms 5 & 6 disturbed.
00 05 to 17 00 (each Sunday). S & I work.
10 00 Fri to 10 00 Mon. Unloading transformersat sub-station between 26m. 44chs0 and 2 61/ 4 m . p .
Crane in use.
23 30 Fri to 07 00 Sat. Delivering transformers tosub-station between 26m. 44chs„ and 26m. Wh s.23 55 Fri to 05 45 Sat. Trackwork between 263/1and 29%m p0 On track machines in use.
01 00 to 05 Oa Trackwork between 93A a n d 9 m , p „00 30 to 05 000 Bridgework and trackwork0
00 05 to 06 000 S, & I . work„08 00 to 17 00, Trackwork between 13% and1 43Am0 p0
00 50 to 06 000 Trackwork between 15 and2 11A rn op •
00 25 to 06 15. Trackwork between 11 and 13'Am.p.
00 20 to 07 Oa Bridgework between 15 and 15%m.p.
00 25 to 06 15. Trackwork between 13% and 1 41A m . p08 00 to 17 Oa Trackwork between 13% a n d 1 43A m. p08 00 to 17 Oa S & T work.02 15 to 02 25. S & I work.
00 05 to 08 00. Delivering transformer to sub-station between 26m. 44chs. and 26m. 54chs.Crane in use.
S-8SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between
Gatwick Airport D o w n LocalBLOCKED
WEDNESDAY 3 to FRIDAY 5 JULYNorwood Jn. and D o w n and Up ThroughSouth Croydon B L O C K E DTHURSDAY 4 and FRIDAY 5 JULYGatwick Airport U p Local
BLOCKED
SOUTH CROY DON TO SELSDON VIA SANDERSTEADDAILY UNTIL FURTHER NOTICEAll signal boxes A l l
SATURDAY 29 JUNESouth Croydon D o w n and Upand Oxted B L O C K E DSUNDAY 30 JUNESelsdon
READING (SOUTHCOTE JIM.) TO BASINGSTOKEDAILY UNTIL FURTHER NOTICEBromley and D o w n and UpBasingstoke 'C'
BRICKLAYERS ARMS TO CRYSTAL PALACEDAILY UNTIL FURTHER NOTICEAll Signal boxes A l l
SATURDAY 29 JUNEBricklayers Arms sin.and Bricklayers ArmsSATURDAY 29 to SUNDAY 30 JUNENew Cross Gate D o w n and Upand Norwood „In. T h r o u g h
BLOCKEDSUNDAY 30 JUNEBricklayers Arms Jn.and Bricklayers Arms/South Bermondsey Jn.
TUESDAY 2 JULYNew Cross Gateand Norwood sin.
Lines affected
All
In and Out Goods
Down and Up SpursIn and Out GoodsUp LocalBLOCKED
Down Local131,0CrErt
Remarks
SOUTHERN REGION — continuedBALHAM TO GATWICK AIRPORT VIA CRYSTAL PALACE — continuedTUESDAY 2 and WEDNESDAY 3 JULYGatwick Airport R e v e r s i b l e
BLOCKEDTUESDAY 2 to FRIDAY 5 JUINCoulsdon North and D o w n and Up QuarryEarlswood B L O C K E D
00 40 to 05 30 daily. Footbridge work between 26m.44chs. and 26m. 54chs.
,41000 30 to 06 20 daily. Bridgework at 19m. 18chs.
and trackwork Friday only. Crane in use Friday only00 40 to 05 30 daily. Footbridge work between 26m.44chs. and 26m. 54chs.
01 30 to 05 00 daily. Trackwork between 9 and 111/4mi l On track machines in use.
00 05 to 05 20 daily. Footbridgework between26m. 44chs. and 26m. 54chs.
00 05 to 17 00 (Sun). 00 05 to 05 00 (weekdays)10 00 to 16 00 (Mon to Fri). S & I work.
00 05 to 05 30. Trackwork between 111/2 a n d ,2 01A m p .
Off track machines in use.
08 00 to 17 00. S. & T. work.
08 00 to 17 00. Bridgework at 5 03/ 4 m . p . O f f t r a c k
machines in use.
00 05 to 17 00 (Sun), 00 05 to 05 00 (weekdays).10 00 to 16 00 (Mon to Fri). S & I work.
00 05 to 07 30. Trackwork between VA and 21/4m.p.1123 00 Sat to 08 00 Sun. Trackwork between 23/ 4 a n d81/4m-p•
00 05 to 16 00. Trackwork between VA and 21A n i . p .
Crane in use.
00 15 to 05 00. ita(hyvotk betwooti ) % „nd
On track reach no'; in nlje,
SECTION B—TEMPORARY ENGINEERING WORKS—continuedAt or between L i n e s affectedSOUTHERN REGION — continuedKEW EAST JN. TO EARLEYDAILY UNTIL FURTHER NOTICENew Kew Jn.
Barnes and ReadingAll signal boxes betweenEgham and Whitton sin..Sunn ingdal e
Ascot and Bracknell D o w n and UpWokingham A l lSATURDAY 29 JUNEVirginia Water D o w n and Upand Ascot B L O C K E DAscot and D o w n and UpWokingham B L O C K E DSATURDAY 29 and SUNDAY 30 JUNENew Kew Jn. and 0 0 30 to 07 05 SunWhitton Jn. D o w n Hounslow
and Up LoopBLOCKED23 30 Sat to 07 00 SunDown Loop andUp HounslowBLOCKED
SUNDAY 30 JUNEWhitton „in./Hounslow„in. and Staines
Third RoadBLOCKEDDown and UpAll
Down
00 45 to 06 50Down WindsorDown Hounslow and DownBLOCKED01 05 to 06 45UpUp Windsor andUp HounslowBLOCKED
Ascot and D o w n and UpWokingham B L O C K E DWokingham A l l
BLOCKED
VIRGINIA WATER TO MILLBROOKDAILY UNTIL FURTHER NOTICEVirginia Water and D o w n and UpAddlestoneWoking A l lFarnborough and D o w n and Up SlowFleetWinchester U p
Remarks
Preparing for Trackwork between 91/2 m . p . a n d 9 m .
29 chs.S & I work.10 00 to 15 30 (Fri). S & I work.
07 30 to 1630. Down platform work between 26m.67 chs. and 26m. 76 chs.
07 30 to 18 30. Bridgework No.24. Plant in use.S & I work.
00 05 to 05 55. Trackwork between 23% and28% m.p.00 05 to 06 05. Preparing for trackwork atBracknell
23 30 Sat to 07 00 Sun. Trackwork between PA m.o.(Chiswick mileage) and 13m. lOchs. (Twickenhammileage).
00 45 to 06 50. Trackwork and repairs to bridgeNo.50.
00 05 to 07 10. Trackwork at Bracknell between291/4 m.o. and 35m. 70chs. Crane in use.
00 10 to 07 20. Trackwork. On track machines inuse.
S & I work.
00 05 to 07 00 (Tuesdays). S & T work.Removing Bramsholt Halt platforms. Mechanicalplant in use.08 00 to 16 30 (Weekdays). Construction of carpark in former Up Goods Yard. Mechanical plantin use.
S-10SECTION B — TEMPORARY ENGINEERING WORKS — continuedAt or between L i n e s affected
SOUTHERN REGION — continuedVIRGINIA WATER TO MILLBROOK — continuedDAILY UNTIL FURTHER NOTICE — continuedEastleigh West S a l i s b u r y Loopand East
Eastleigh Westand St. DenysMount Pleasant Crossing A l l
Northam „in.Southampton
FRIDAY 28 to SATURDAY 29 JUNEBasingstoke 'A' and U p FastFarnborough B L O C K E D
SATURDAY 29 JUNEWoking ..1n. andBrookwood
SUNDAY 30 JUNEVirginia Water andChertsey
Surbiton (AddlestoneLevel Crossing)Woking and Brookwood
Brookwood andFarnborough
Farnborough andBasingstoke 'A'
Micheldever andWinchester „In.Northam Jn.
Northam sin.
Down and Up
AllAll
Down SlowBLOCKED
Down and UpBLOCKED
All
00 25 to 18 25Down SlowBLOCKED00 25 to 14 25Down FastBLOCKED
Down SlowBLOCKED
Down SlowBLOCKED
Down and UpBLOCKEDDown Through toDown MainDown Through toDown Branch
Remarks
08 00 to 17 00 (except Saturdays). Demolishingair raid shelters. Mechanical plant in use.Installing research equipment.
08 00 to 16 00 (daily). Alteration to level crossingroad traffic lights.S & I work. )1 122 00 to 08 00 (Friday to Saturday).22 00 to 08 00 (Saturday to Sunday).08 00 to 16 00 (Monday to Friday). S & I work.
23 30 Fri to 06 30 Sat. Trackvvork between 411/2and 373A r n .p .
Trains on Slow line.
00 20 to 05 50. Trackwork between 25 and273A rn•p•
Trains on Fast line.
00 20 to 12 20. Trackwork between 233/4 a n d221/4 m.p. Crane in use. (See Section 'C').
Trains terminated.
00 05 to 07 30. S & I work. Crossing barriersmanned.00 25 to 18 25. Trackwork. Crane in use onDown Slow from 00 25 to 07 40 between 25m.2chs. and 28m.p. and from 07 40 to 18 25 between25IA m.o. and 27m. 65chs. and on Down Fast from00 25 to 14 25 between 25m. 2chs. and 28 m.o.From 00 25 to 14 25. Single line working for Downtrains over Up Fast from the Emergency Crossoverat Woking to the Emergency Trailing Crossover atBrookwood.From 00 25 to 14 25. Up trains on Up Slow fromFarnborough to Woking 72 points.From 14 25 Sun to 18 25 Sun Down trains on Fastline from Woking 94 points to Brookwood.00 25 to 07 30. Earthwork and cable layingbetween 2 93A r n . p . a n d 3 2 m. 4 5c h s.
Trains on Fast line.00 40 to 06 30. Trackwork between 37m. 72chs.and 41m. 38chs.Trains on Fast line.01 00 to 07 00. Trackwork between 58m. lOchs.and 6 41A m . p.
07 30 to 12 00. S & I work.
13 00 to 16 30. S & I work.
, 44
S-11SECTION B — TEMPORARY ENGINEERING WORKS — continued
At or between L i n e s affected
SOUTHERN REGION — continuedVIRGINIA WATER TO MILLBROOK continuedFRIDAY 5 JULYVirginia Waterand Chertsey
SUNDAY 30 JUNEGuildford Yard andShalford Jn./Shalford
02 30 to 04 55DownBLOCKED03 25 to 05 10UpBLOCKED
WOKING JUNCTION TO GUILDFORD AND NORTH CAMPDAILY UNTIL FURTHER NOTICEAsh Level Crossing A l l
Down and Up MainDown and Up CobhamDown and Up Ash andPlatforms 2, 3, 4, 5, 6/7and 8BLOCKED
Remarks
02 30 to 05 10. Trackwork between 234 and22/2 m.p.
08 00 to 16 00. Alterations to level crossingroad traffic lights.
01 00 to 06 00. Trackwork and tunnelwork between30% and 311/2 m . p . C r an e in u se .
SECTION CS-12
SIGNALLING AND PERMANENT WAY ALTERATIONS
* Items marked thus w i l l not appear in future issues and a note must be taken of them by al l concerned.
DETAILS OF WORK REFERRED TO IN SECTION B
SUNDAY 30 JUNE — CHERTSEY — New catch points will be provided in the Up Main line 27 yards beforereaching the Up Main Advanced Starting signal, the points being secured out of use until further notice.
(29)
SUNDAY 30 JUNE : HOUNSLOW — The under mentioned connections will be abolished:—Description L o c a t i o n
Trailing crossover between Down andUp lines together with slip points leadingto Up SidingPoints in Up Siding (facing for Down H o u n s l o w Junction side of signal box.direction movements) leading to Downline.Trailing connection in Down line leadingfrom Down Siding.
The following shunting signals will be removed:—Controlling 'Movements L o c a t i O n
From Up Siding to Down line (yellow arm)From Down line to Up Siding or Up line, H o u n s l o w Junction side of the signal box.back along Down line or from Down lineto Down Siding.From Down Siding to Down line (yellow arm)The shunting signal Hounslow Junction side of the signal box, controlling movements from Up line, toDown Line will be disconnected from the signal box but remain to act as a "Limit of Shunt" indicator formovements back along the Up line. ( 2 9 )
DETAILS OF WORK ALREADY CARRIED OUTBRICKLAYERS ARMS JUNCTIONThe trailing crossover between the Down and Up Through lines situated 88 yards New Cross Gate sideof the signal box, formerly secured out of use has been removed.The facing connection in the Down Local line leading to the Down Through line formerly secured out ofuse, has been removed.A new trailing crossover, situated between the Down and Up Through lines has been provided 188 yardsNew Cross Gate side of the signal box.The shunting signals situated 320 yards New Cross Gate side of the signal box and applying to move-ments from the Down Through and Down Local lines to the Up Goods, Up Spur line or Up Through linehave been brought back into use and apply as hitherto. ( 2 8 )
S-13SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS — continuedDETAILS OF WORK ALREADY CARRIED OUT — continuedSHALFORDThe undermentioned semaphore signals have been removed:—Description L o c a t i o nUp Starting S t a t i o n sideBonner repeater for the G u i l d f o rd sideStarting signalUp Advanced Starting G o m s h a l l side(and telephone)A new 2-aspect (red/green) colour light signal (W.Y.3) together with a telephone in direct communicationwith the signal box has been provided 70 yards station side of the signal box. The height of the redaspect is 1 11/ 2 f e e t a b o ve r a il l e ve l .
When this signal displays a green aspect, the Down line is clear as far as Tangley Crossing Down Homesignal.
The Up Home signal (W.Y.2) is now known as the Up Outer Home signal. ( 2 8 )
EASTLEIGH (SHAWFORD)A new 4-lever ground frame electrically released from Eastleigh signal box, together with a telephone indirect communication with that box has been provided close to the Down Fast line on the Eastleigh sideof Shawford Station. The existing facing and trailing crossovers between the Down Fast and Up Main linesformerly secured out of use have been connected to and operated from this new ground frame. ( 2 8 )
BRICKLAYERS ARMS JUNCTION
The facing connection in the Down Through line leading to t h e,D o w n L o c a l L i n e , s i t u a t e d 2 5 2 y a r d s , N e w
Cross Gate side of the signal box, has been repositioned 23 yards nearer to New Cross Gate. ( 2 7 )
CHERISH
The undermentioned connections have been put out of use, the points being secured in the normalposition pending abolition.
Description L o c a t i o nTrailing crossover between A d d l e s t o n e sideDown and Up Main lines.Trailing points in the Up A d d l e s t o n e sideMain line leading from UpSiding East, together withsiding trap points.Trailing connection in Up A d d l e s t o n e sideMain line leading from UpSiding East (controlledfrom Ground Frame 'B').
The undermentioned shunting signals have been removed:—Controlling Movements L o c a t i o nFrom Up Main line to DownMain line, back along UpMain line or from Up Mainline to Up Siding East.Back along Up Main lineFrom Down Main to UpMain line.
Station side
Station sideAdd lestone side
5-14SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS — continuedDETAILS OF WORK ALREADY CARRIED OUT — continuedCHERTSEY continued
Controlling Movements L o c a t i o nFrom Up Siding East to A d d i e s t o n e sideUp Main line.From Up Siding East to Up A d d lestone sideMain line (yellow arm).From Up Main line to Up A d d l e s t o n e sideSiding East (controlledfrom Ground Frame 'B').
Ground Frame 'B' and the associated telephone has been abolished.
***BETWEEN GUILDFORD AND WOKING
The Top (Yellow) aspect of the undermentioned Up line automatic signals has been brought into use.Signal No. L o c a t i o nW.A. 197 B e t w e e n Guildford and WorplesdonW.A. 195 JW.A. 193 A t WorplesdonW.A. 191
***HITHER GREEN
The following disc-typeapply as hitherto;—Controlling MovementsAlong Up Spur
From Arrival Road to Up Spur
Between Worplesdon and Woking
acting as a limit of shunt indicator for movements(27)
shunting signals have been replaced by position-light draw-ahead signals whichLocation83 yards Lee side of the signalmain aspects of signal P9).69 yards Grove Park side of thethe main aspects of signal P10)
box (situated beneath the
signal box (situated,beneath(26)
(27)
CHERTSEY GROUND FRAME 'A'The trailing crossover between Down and Up Main lines, Virginia Water side of the Ground Frame, formerlysecured out of use, has been brought into use.The following new shunting signals have been provided:—
Controlling Movements L o c a t i o nFrom Down Main to S t a t i o n sideUp Main lineFrom Up Main to V i r g i n i a Water sideDown Main line
The shunting signal, station side of the ground frame,back on the down main line has been removed.
BRICKLAYERS ARMS JUNCTION
The trailing crossover between the Down and Up Through lines situated 88 yards New Cross Gate side ofthe signal box has been secured out of use pending removal. The facing connection in the Down Localline leading to the Down Through line has been secured out of use pending removal.The associated position 4 route indicator on signal F54 has been taken out of use. The shunting signalssituated 320 yards New Cross Gate side ot the signal box and applying to movements from the DownThrough and Down Local lines to the Up Goods line, Up Spur line or Up Through line have been put outof use. ( 2 7 )
(26)
S-15SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS — continuedDETAILS OF WORK ALREADY CARRIED OUT — continued
**ADVANCE WARNING INDICATIONSAdvance Warning Indicators, as described in Clause 9 of the instructions shown on Page 72 of theGeneral Appendix under the heading Permanent Speed Restrictions, Indicator Signs have been installedand relate to the following permanent speed restrictions:—
RestrictionLine
Location D o w n u pWOKING TO GUILDFORDWoking 2 0 T h r o u g h junction 1 6 0 9 yards
A B.R. A.W.S. permanent magnet will be providedapproximately 200 yards before reaching the above-mentionedwarning indicator.
Guildford 3 0 B e t w e e n station and 1 8 0 7 yardsnorth face of tunnel
(Note: In addition a vertical illuminated arrow indicationwill be provided beneath the 30m.p.h. warning indicator).
KEW EAST M. TO EARLEYStaines 4 0
Staines
BracknellBracknellWokinghamWokingham
VIRGINIA WATER TO MILLBROOKWest Byfleet 6 0 T h r o u g h station 21m.
(Slow) 4 6 c h s . to 21m. 65chs.Woking
Worting
Eastleigh
East leigh
Northam sin.Redbridge
Junction
40
20
Over curve between1 83Am .p . and station/
191/4m.p. (Windsor line)40 O v e r curve between
19m. 58chs. Egham sideof Thames overbridgeand 1 91/2 m . p.
40 T h r o u g h stationThrough station
30 T h r o u g h stationThrough junction
15 O v e r reverse curve at(Slow) j u n c t i o n with Guildford
line(Note: In addition a vertical illuminated arrow indication will beprovided beneath the 15m.p.h. advance warning indicator).
Distance of Indicatorfrom Commencementof Restriction
1463 yards
1413 yards
1430 yards1970 yards1576 yards2067 yards
1200 yards
1690 yards
60 O v e r curve and through 1 1 8 8 yardsconnection to fast andslow lines
60 B e t w e e n 73m. 42chs. and 1260 yards(Fast) 7 3 m . 50chs.
(Note: In addition a right hand illuminated arrow indication will beprovided beneath the 60m.p.h advance warning indicator).
60 B e t w e e n 73m. 50chs. and 1672 yards(Fast) 7 3 m. 42chs.
15 O v e r curve50 B e t w e e n London end of
station and countryend of Totton station
2033 yards1922 yards
S-16SECTION C — SIGNALLING AND PERMANENT WAY ALTERATIONS —DETAILS OF WORK ALREADY CARRIED OUT — continued
4**FARNCOMBE AND BETWEEN FARNCOMBE AND GUILDFORD
The undermentioned 3-aspect Up line signal have been renewed asyellow aspect being temporarily obliterated.The height of the Red aspect remains as hitherto.
Signal No. L o c a t i o nIn 23 F a r n c o m b eWA 405 1 B e t w e e n Farncombe111X6 5 a n d Guildford. ( 2 6 )
SECTION D
Page 66BRICKLAYERS ARMS TO CRYSTAL PALACEBricklayers Arms ..In.
Delete: -
Add:-
Amend:-
_YORK ,, 25 JUNE, 1974
MO/45/S
NILE SIG. NOTICE S NO. —
continued
4-aspect signals, the top bracket
GENERAL INSTRUCTIONS AND NOTICES*A' Items marked thus w i l l not appear in future issues and a note must be taken of them by al l concerned
* D e n o t e s new or amended item.
ALERATIONS TO "INSTRUCTIONS AFFECTING EASTERN REGION TRAINMEN WHEN WORKINGOVER OTHER REGIONS LINES IN THE LONDON AREA"
40 - Through connectionthrough line.
25 - Through connectionDown Through
25 - Through connectionlocal line.
A copy of this notice must be supplied to all Drivers, Guards, Signalmen and others concerned.
local t o
Up Through to
through to(30D)
F.J.BURGECHIEF OPERATING MANAGER