EAB Docket No. PSD 14-02 Administrative Record Index April 2014 Massachusetts Department of Environmental Protection Page 1 of 24 Footprint Power Salem Harbor Development LP (MassDEP Application No. NE-12-022, Transmittal No. X254064) Index # Record Section or Item Dated 1 Federal Law, Regulation, EPA Guidance 2 Massachusetts Law, Regulation, MassDEP Guidance 3 Massachusetts Environmental Policy Act (MEPA) 4 Draft PSD Permit and Proposed Air Quality Plan Approval 5 Issuance of Draft PSD Permit and PSD Fact Sheet; Public Comment Period, including Public Hearing 6 Massachusetts Energy Facilities Siting Board (EFSB) 7 Footprint’s Response to Public Comments & Supplements to PSD Permit Application 8 Final PSD Permit and Final Air Quality Plan Approval 9 Other Permit Decisions 10 Footprint and Tetratech Communications 11 Orders

EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 1 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

Index # Record Section or Item Dated

1

Federal Law, Regulation, EPA Guidance

2

Massachusetts Law, Regulation, MassDEP Guidance

3

Massachusetts Environmental Policy Act (MEPA)

4

Draft PSD Permit and Proposed Air Quality Plan Approval

5

Issuance of Draft PSD Permit and PSD Fact Sheet;

Public Comment Period, including Public Hearing

6

Massachusetts Energy Facilities Siting Board (EFSB)

7

Footprint’s Response to Public Comments

& Supplements to PSD Permit Application

8

Final PSD Permit and Final Air Quality Plan Approval

9

Other Permit Decisions

10

Footprint and Tetratech Communications

11

Orders

Page 2: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 2 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

1 Federal Law, Regulation, EPA Guidance

1-1 EPA Permit Modeling Guidance

http://www.epa.gov/scram001/guidance_permit.htm

Current

1-2 EPA PSD Workshop Manual

http://nepis.epa.gov/Exe/ZyNET.exe/2000Z81A.TXT?ZyActionD=ZyD

ocument&Client=EPA&Index=1976+Thru+1980&Docs=&Query=&Ti

me=&EndTime=&SearchMethod=1&TocRestrict=n&Toc=&TocEntry=

&QField=&QFieldYear=&QFieldMonth=&QFieldDay=&IntQFieldOp

=0&ExtQFieldOp=0&XmlQuery=&File=D%3A%5Czyfiles%5CIndex

%20Data%5C76thru80%5CTxt%5C00000008%5C2000Z81A.txt&User

=ANONYMOUS&Password=anonymous&SortMethod=h%7C-

&MaximumDocuments=1&FuzzyDegree=0&ImageQuality=r75g8/r75g

8/x150y150g16/i425&Display=p%7Cf&DefSeekPage=x&SearchBack=

ZyActionL&Back=ZyActionS&BackDesc=Results%20page&Maximu

mPages=1&ZyEntry=1&SeekPage=x&ZyPURL

10/1980

1-3 EPA Office of Air Quality Planning and Standards Control Cost Manual

Fourth Edition, EPA 450/3-90-006d

01/1990

1-4 EPA New Source Review Work Shop Manual PSD and Nonattainment

Area Permitting (Draft)

http://www.epa.gov/region07/air/nsr/nsrmemos/1990wman.pdf

10/1990

1-5 EPA Office of Air Quality Planning and Standards Control Cost Manual

Sixth Edition, EPA/452/B-02-001

http://www.epa.gov/ttncatc1/dir1/c_allchs.pdf

01/2002

1-6 Output-Based Regulations: A Handbook for Air Regulators

http://www.epa.gov/chp/documents/obr_final_9105.pdf

08/2004

1-7 PSD Permit Application Requirements EPA Region 4

http://www.epa.gov/region4/air/permits/ocspermits/PSDApplicationGui

delinesR4.pdf

02/2010

1-8 Report of the Interagency Task Force on Carbon Capture and Storage

http://www.epa.gov/climatechange/Downloads/ccs/CCS-Task-Force-

Report-2010.pdf

08/2010

1-9 EPA PSD and Title V Permitting Guidance for Greenhouse Gases

http://www.epa.gov/region07/air/nsr/nsrmemos/ghgguid.pdf

03/2011

Page 3: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 3 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

1-10 Agreement for Delegation of the Federal PSD Program by EPA –

Region 1 to MassDEP

http://www.epa.gov/region1/communities/pdf/Agreement4Delegation.p

df

04/11/2011

1-11 Draft EPA Guidance for PM2.5 Permit Modeling

03/04/2013

1-12 Code of Federal Regulations (PSD of air quality), 40 CFR 52.21

http://www.gpo.gov/fdsys/pkg/CFR-2013-title40-vol3/pdf/CFR-2013-

title40-vol3-sec52-21.pdf

07/01/2013

1-13 Electronic Code of Federal Regulations (PSD of air quality), 40 CFR

52.21

http://www.ecfr.gov/cgi-bin/text-

idx?SID=80d02c8e217db8a454e28f71419f488c&node=40:3.0.1.1.1.1.1.

19&rgn=div8

Current

1-14 Code of Federal Regulations Procedures for Decision Making, 40 CFR

Part 124

http://www.gpo.gov/fdsys/pkg/CFR-2012-title40-vol23/xml/CFR-2012-

title40-vol23-part124.xml

07/01/2012

1-15 Electronic Code of Federal Regulations Procedures for Decision

Making, 40 CFR Part 124

http://www.ecfr.gov/cgi-bin/text-

idx?tpl=/ecfrbrowse/Title40/40cfr124_main_02.tpl

Current

1-16 Circuit Court Decision (Sierra Club v. EPA) on PM2.5 Significant

Impact Levels and (SILs) and Significant Monitoring Concentration

(SMC) - Questions and Answers – EPA Q&A document

03/04/2013

1-17 Federal Register Vol. 79, No. 5, 40 CFR Parts 60, 70, 71, et al.

Standards of Performance for Greenhouse Gas Emissions From New

Stationary Sources (NSPS): Electric Utility Generating Units; Proposed

Rule

http://www.gpo.gov/fdsys/pkg/FR-2014-01-08/pdf/2013-28668.pdf

https://www.federalregister.gov/articles/2014/02/26/2014-

03115/standards-of-performance-for-greenhouse-gas-emissions-from-

new-stationary-sources-electric-utility

01/08/2014

Page 4: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 4 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

2 Massachusetts Law, Regulation, MassDEP Guidance

2-1 MassDEP Modeling Guidance for Significant Stationary Sources of Air

Pollution

http://www.mass.gov/eea/docs/dep/air/laws/modguid.pdf

06/2011

2-2 MassDEP Best Available Control Technology (BACT) Guidance

http://www.mass.gov/eea/agencies/massdep/air/approvals/best-

available-control-technology-bact.html

06/2011

2-3 Code of Massachusetts Regulations 310 CMR 7.00 Air Pollution

Control Regulations including 310 CMR 7.02 Plan Approval and

Emission Limitations

http://www.mass.gov/eea/agencies/massdep/air/regulations/310-cmr-7-

00-air-pollution-control-regulation.html

Current

2-4 Code of Massachusetts Regulations 310 CMR 7.00: Appendix A

Emission Offsets and Nonattainment Review

http://www.mass.gov/eea/agencies/massdep/air/regulations/310-cmr-7-

00-air-pollution-control-regulation.html

Current

2-5 Massachusetts Environmental Policy Act (MEPA) Regulations

301 CMR 11.00

http://www.env.state.ma.us/mepa/meparegulations.aspx

Current

2-6 Massachusetts General Laws, M.G.L. c. 30, Sections 61-62I

https://malegislature.gov/Laws/GeneralLaws/PartI/TitleIII/Chapter30/Se

ction61

Current

2-7 Massachusetts General Laws, M.G.L. c. 111, Section 142A-J

https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXVI/Chapter111

/Section142A

Current

2-8 Massachusetts General Laws, M.G.L. c. 164, Section 69J1/4

https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXXII/Chapter16

4/Section69J1~4

Current

2-9 Commonwealth of Massachusetts 2012 Air Quality Report

07/2013

Page 5: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 5 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

3 Massachusetts Environmental Policy Act (MEPA)

3-1 Massachusetts Environmental Policy Act (MEPA) Environmental

Notification Form (ENF)

08/07/2012

3-2 MassDEP Comments on Environmental Notification Form

08/28/2012

3-3 Certificate of the Secretary of Energy and Environmental Affairs on the

Environmental Notification Form

09/07/2012

3-4 Draft Environmental Impact Report (DEIR)

12/18/2012

3-5 MassDEP Comments on Draft Environmental Impact Report

01/18/2013

3-6 Certificate of the Secretary of Energy and Environmental Affairs on the

Draft Environmental Impact Report

01/25/2013

3-7 Final Environmental Impact Report (FEIR)

04/01/2013

3-8 MassDEP Comments on Final Environmental Impact Report

05/13/2013

3-9 Certificate of the Secretary of Energy and Environmental Affairs on the

Final Environmental Impact Report

05/17/2013

3-10 Footprint submittals (revised summary GHG emissions and revised

Draft Section 61 Findings) required by Certificate on the Final

Environmental Impact Report

06/10/2013

4 Draft PSD Permit and Proposed Air Quality Plan Approval

4-1 Footprint’s consultant Tetra Tech (Keith Kennedy) e-mail and

attachment “Air Dispersion Modeling Protocol” sent to MassDEP’s

Stephen Dennis

08/29/2012

4-2 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)

informing commencement of review of protocol

09/13/2012

4-3 MassDEP e-mail from Stephen Dennis to Tetra Tech (Keith Kennedy)

informing of development of nearby sources to include in NAAQS

compliance demonstration and PSD increment consumption calculations

09/20/2012

Page 6: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 6 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

4-4 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis

regarding discussion on interactive sources for NOx and PM10/PM2.5

10/02/2012

4-5 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)

regarding discussion on interactive sources for NOx and PM10/PM2.5

10/04/2012

4-6 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis

regarding discussion on interactive sources for NOx and PM10/PM2.5

10/05/2012

4-7 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis

regarding question on interactive sources for NOx and PM10/PM2.5

10/23/2012

4-8 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)

regarding NERO looking at Title V sources regarding PM10/PM2.5

emissions

10/23/2012

4-9 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis

regarding discussion about Stoneham Research Center

10/23/2012

4-10 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)

regarding discussion about Stoneham Research Center

10/23/2012

4-11 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro

regarding more discussion on interactive sources

10/24/2012

4-12 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)

regarding more discussion on interactive sources

10/24/2012

4-13 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)

containing self-reported air emissions data for Peabody Municipal

Light, Marblehead Municipal Wilkens, and Rousselot Peabody

11/06/2012

4-14 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)

containing self-reported air emissions data for Marblehead Municipal

Wilkens

11/09/2012

4-15 Letter from United States Department of the Interior Fish and Wildlife

Service regarding presence of federally listed and/or proposed

endangered or threatened species in relation to proposed project

11/28/2012

4-16 Footprint Comprehensive Plan Application

12/21/2012

Page 7: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 7 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

4-17 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro and

Stephen Dennis regarding load condition discussion

12/28/2012

4-18 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)

regarding load condition discussion

12/28/2012

4-19 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro

regarding load condition discussion

12/28/2012

4-20 MassDEP e-mail with attachments from Cosmo Buttaro to Tetra Tech

(George Lipka) containing self-reported air emissions data for

Wheelabrator Saugus and GE Lynn

01/04/2013

4-21 Tetra Tech (George Lipka) e-mails (2) to MassDEP’s Cosmo Buttaro

inquiring about including GE Lynn in the source interaction cumulative

modeling analysis for PM2.5

01/04/2013

4-22 MassDEP e-mail from Ed Braczyk to Tetra Tech (George Lipka) and

MassDEP’s Cosmo Buttaro regarding including GE Lynn in the source

interaction cumulative modeling analysis for PM2.5

01/04/2013

4-23 MassDEP e-mail from Stephen Dennis to Tetra Tech (George Lipka)

and MassDEP’s Cosmo Buttaro and Ed Braczyk regarding suggested

PSD increment language

01/15/2013

4-24 Footprint letter withdrawing confidential information (Appendix C) of

Comprehensive Plan Application and replacing with a new Appendix C

attached to the letter

01/30/2013

4-25 MassDEP e-mail from Ed Braczyk to EPA – Region 1 (Ida McDonnell

and Donald Dahl) asking for EPA’s opinion on the January 22, 2013

Court of Appeals Decision on PM2.5 SILs and SMC

01/31/2013

4-26 EPA – Region 1 (Donald Dahl) e-mails (2) to MassDEP’s Ed Braczyk

and Marc Wolman regarding response to Ed Braczyk’s question on the

January 22, 2013 Court of Appeals Decision on PM2.5 SILs and SMC

01/31/2013

02/12/2013

4-27 MassDEP e-mail from Ed Braczyk to Footprint’s Attorney Lauren Liss

and consultant Keith Kennedy (Tetra Tech) regarding addressing the

January 22, 2013 Court of Appeals Decision on PM2.5 SILs and SMC in

Footprint’s Application

02/13/2013

Page 8: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 8 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

4-28 MassDEP letter fulfilling Footprint’s request regarding confidential

information of the Comprehensive Plan Application

02/15/2013

4-29 Footprint Addendum to Comprehensive Plan Application

04/12/2013

4-30 Footprint letters “Notification of Submittal of a PSD Permit

Application” to EPA, U.S. Fish and Wildlife Service, Tribal Historic

Preservation Officer Wampanoag Tribe of Gay Head (Aquinnah), Tribal

Historic Preservation Officer Mashpee Wampanoag Tribe,

Massachusetts Historical Commission, NOAA – National Marine

Fisheries Service, Tribal Environmental Director Wampanoag Tribe of

Gay Head (Aquinnah), Tribal Environmental Director Mashpee

Wampanoag Tribe

04/18/2013

4-31 Footprint Addendum to Comprehensive Plan Application

06/10/2013

4-32 Footprint Addendum to Comprehensive Plan Application

06/18/2013

4-33 Footprint Addendum to Comprehensive Plan Application

08/06/2013

4-34 MassDEP e-mail from Glenn Pacheco to Tetra Tech (George Lipka)

regarding submittal of NH3 accidental release modeling files

08/07/2013

4-35 MassDEP e-mail from Glenn Pacheco to Tetra Tech (George Lipka)

regarding submittal of NH3 accidental release modeling files and

Comprehensive Plan Application supplement history

08/07/2013

4-36 MassDEP e-mail from Glenn Pacheco to Tetra Tech (George Lipka) and

MassDEP’s Cosmo Buttaro confirming receipt of all that is needed to

complete his review

08/09/2013

4-37 MassDEP internal e-mails (3) between Cosmo Buttaro and Tom

Cushing regarding obtaining CO2 emissions for Brockton Power

08/12/2013

08/13/2013

08/14/2013

4-38 MassDEP internal e-mails (2) from Cosmo Buttaro to Marc Simpson

and John Kirzec regarding discussion of PM and CO2/GHG emissions

for Pioneer Valley Energy Center

08/13/2013

4-39 MassDEP internal e-mail from John Kirzec to Cosmo Buttaro regarding

discussion of PM and CO2/GHG emissions for Pioneer Valley Energy

Center

08/14/2013

Page 9: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 9 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

4-40 Tetra Tech’s George Lipka email to MassDEP’s Cosmo Buttaro

regarding discussion on CO2 and/or GHG emissions for Brockton Power

and Pioneer Valley Energy Center and a corrected version of a

spreadsheet in Application

08/14/2013

4-41 Tetra Tech’s George Lipka email to MassDEP’s Cosmo Buttaro

regarding another correction to spreadsheet in Application

08/19/2013

4-42 MassDEP internal e-mails (2) with attachments from Daniel

Kamieniecki to Cosmo Buttaro regarding CO2 emissions records for

Brockton Power

08/20/2013

4-43 MassDEP’s Tom Cushing email to Tetra Tech’s George Lipka

informing him to contact MassDEP’s Cosmo Buttaro regarding

Brockton Power’s CO2 emissions records

08/20/2013

4-44 MassDEP’s Cosmo Buttaro e-mails (2) with attachments to Tetra Tech

(George Lipka) regarding sending of the CO2 emissions records for

Brockton Power

08/20/2013

4-45 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro

regarding GHG BACT discussion for Pioneer Valley Energy Center

08/20/2013

4-46 Footprint Addendum to Comprehensive Plan Application

08/20/2013

4-47 E-mail from MassDEP’s Susan Ruch to Footprint’s Attorney Lauren

Liss regarding plans for Public Hearing date/location/time and

publishing of Notice of Public Hearing and Public Comment Period

08/27/2013

4-48 E-mail from Tetra Tech (Keith Kennedy) to MassDEP’s Cosmo Buttaro

and Ed Braczyk regarding action items from 08/27/2013 phone call

08/28/2013

4-49 E-mail from MassDEP’s Cosmo Buttaro to Tetra Tech (Keith Kennedy)

regarding clarification to action items from 08/27/2013 phone call

08/28/2013

4-50 MassDEP e-mail from Susan Ruch to Footprint regarding sending of

drafts of Proposed Plan Approval and Draft PSD Permit for review

09/04/2013

4-51 Footprint Addendum to Comprehensive Plan Application

09/04/2013

Page 10: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 10 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

4-52 EPA – Region 1 e-mail and letter attachment notifying MassDEP of

fulfillment of EPA’s consultation responsibilities under 04/11/2011 PSD

Program Delegation Agreement

09/05/2013

4-53 E-mail from Footprint’s Attorney on behalf of Footprint to MassDEP

regarding comments on draft of Proposed Plan Approval

09/06/2013

4-54 MassDEP memorandum from Glenn Pacheco to James Belsky, Cosmo

Buttaro regarding Review of Air Quality Modeling Contained in

Reports Dated December 21, 2012 and June 10, 2013

09/06/2013

4-55 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro and Ed

Braczyk regarding comment on Pre-Draft PSD Fact Sheet

09/09/2013

4-56 Footprint Addendum to Comprehensive Plan Application – Report

entitled “Health Risk Assessment for the Salem Harbor Redevelopment

Project”

09/09/2013

5 Issuance of Draft PSD Permit and PSD Fact Sheet;

Public Comment Period, including Public Hearing

5-1 MassDEP email from Susan Ruch to MEPA’s Rick Bourre et al.

re: attached Notice of Public Hearing, Public Comment Period and

Section 61 Findings for publication in 09/11/2013 edition of the

Environmental Monitor

09/03/2013

5-2 MassDEP Cover Letter regarding issuance of attached public comment

documents, including Draft PSD Permit, Draft PSD Fact Sheet and

Proposed Plan Approval

to Footprint and listed cc:’s

09/09/2013

5-3 Draft PSD Permit issued by MassDEP

09/09/2013

5-4 Draft PSD Fact Sheet issued by MassDEP

09/09/2013

5-5 Proposed Plan Approval issued by MassDEP pursuant to state law

09/09/2013

5-6 Notice of Public Hearing and Public Comment Period

published in Salem News and Boston Globe in English, Spanish and

Portuguese

09/10/2013

Page 11: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 11 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

5-7 Notice of Public Hearing and Public Comment Period

and Notice of Section 61 Findings

published in the Massachusetts Environmental Monitor

http://www.env.state.ma.us/mepa/emonitor.aspx

09/11/2013

5-8 MassDEP e-mail from Cosmo Buttaro and letter with attached issued

documents consisting of Draft PSD Permit, Draft PSD Permit Fact

Sheet, Proposed Air Quality Plan Approval, and Notice of Public

Hearing scheduled for 10/10/2013 and Public Comment Period

beginning on 9/10/2013 and ending on 10/11/2013

to Footprint and listed cc:’s

09/10/2013

5-9 MassDEP e-mail from Susan Ruch informing of the availability on

MassDEP’s website of issued Draft PSD Permit, Draft PSD Permit Fact

Sheet, Proposed Air Quality Plan Approval, and Notice of Public

Hearing scheduled for 10/10/2013 and Public Comment Period

beginning on 9/10/2013 and ending on 10/11/2013

to possible interested persons or entities

Also, mailed a hard copy of the emailed materials (i.e., MassDEP letter,

Draft PSD Permit, Draft PSD Permit Fact Sheet, Proposed Air Quality

Plan Approval, and Notice of Public Hearing) to the following persons

or entities who were involved in prior litigation involving the existing

Salem Harbor Station:

City Solicitor, Salem

Conservation Law Foundation

HealthLink

Wenham Lake Watershed Association

Clean Water Action

MASSPIRG

09/10/2013

5-10 E-mail and attachments from Susan Ruch of MassDEP to Tom Higgins

of MassDEP for posting of 9/9/2013 MassDEP-issued documents on

MassDEP website

09/10/2013

5-11 Notice of Public Hearing and Public Comment Period and Notice of

Section 61 Findings as it appeared in the Boston Globe in English,

Spanish and Portuguese Translation

09/10/2013

Page 12: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 12 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

5-12 Notice of Public Hearing and Public Comment Period and Notice of

Section 61 Findings as it appeared in the Salem News in English,

Spanish and Portuguese Translation

09/10/2013

5-13 Notice of Public Hearing and Public Comment Period and Notice of

Section 61 Findings as it appeared in the Environmental Monitor in

English

09/11/2013

5-14 MassDEP and Footprint e-mail chain regarding delivery of application

material to Conservation Law Foundation (CLF)

09/13/2013

5-15 MassDEP e-mail from Susan Ruch to Linda Haley regarding MassDEP

webpage link and availability of application and supporting documents

09/18/2013

5-16 MassDEP e-mail and attached letter from Susan Ruch to Linda Haley

confirming delivery of Compact Disc (CD) containing application and

supporting materials via postal mail

09/18/2013

5-17 E-mail from Linda Haley to Susan Ruch confirming receipt of e-mail

pertaining to CD

09/18/2013

5-18 E-mail and attached letter from Shanna Cleveland of Conservation Law

Foundation to Susan Ruch and James Belsky requesting an extension to

Public Comment Period and Public Hearing

09/23/2013

5-19 MassDEP internal e-mail from Susan Ruch to Cosmo Buttaro for file

regarding tweet of Notice of Public Hearing and Public Comment

Period on 9/13/2013

09/27/2013

5-20 Request for extension of public comment period and postponement of

public hearing on behalf of Grassroots Against Another Salem Power

Plant (GASPP) submitted by William E. Dearstyne

09/30/2013

5-21 MassDEP e-mail from Susan Ruch and attached Revised Notice of

Public Hearing and Public Comment Period informing of an extension

of Public Comment Period to 11/1/2013

to possible interested persons or entities

09/30/2013

5-22 CLF’s Shanna Cleveland email acknowledgment thanking MassDEP for

extension of public comment period

09/30/2013

Page 13: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 13 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

5-23 E-mail reply from Sue Reid, CLF, acknowledging receipt of MassDEP

e-mail from Susan Ruch and attached Revised

Notice of Public Hearing and Public Comment Period informing of an

extension of Public Comment Period to 11/1/2013

09/30/2013

5-24 E-mail to MassDEP Tom Higgins and attached Revised Public Notice in

.pdf and Word formats to be posted on www.mass.gov

09/30/2013

5-25 E-mail with attachments to Richard Bourre et al. at MEPA office re:

Revised Public Notice for publication in the October 9, 2013 edition of

the Environmental Monitor

09/30/2013

5-26 MassDEP e-mail from Cosmo Buttaro and attached Revised Notice of

Public Hearing and Public Comment Period informing of an extension

of Public Comment Period to 11/1/2013

10/01/2013

5-27 Comments e-mailed with attachment by George Pyros of Mitsubishi

Power Systems Americas, Inc.

10/01/2013

5-28 MassDEP internal e-mail from Susan Ruch to Cosmo Buttaro for file

regarding tweet of extension of Public Comment Period to 11/1/2013

10/04/2013

5-29 Comments e-mailed from Elise Desmond

10/05/2013

5-30 10/2/2013 e-mail from Cosmo Buttaro of MassDEP to George Pyros of

Mitsubishi Power Systems Americas, Inc. and his response

10/07/2013

5-31 http://www.env.state.ma.us/mepa/emonitor.aspx

Revised Public Notice extending public comment period to 11/01/2013

10/09/2013

5-32 Attendance sign-in slips filled out by Public Hearing Attendees, except

for those who chose not to sign in

10/10/2013

5-33 Attendance Sheet of Public Hearing Attendees who signed in

10/10/2013

5-34 Script used by Public Hearing Officer Edward Braczyk for conducting

the Public Hearing

10/10/2013

5-35 Cassette tape recordings of Public Hearing

10/10/2013

5-36 Transcript of Public Hearing

10/10/2013

Page 14: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 14 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

5-37 Statement from SAFE presented at Public Hearing

10/10/2013

5-38 E-mail from Footprint and attached Public Hearing Presentation

10/11/2013

5-39 Comments e-mailed by Robert Wengronowitz

10/14/2013

5-40 Comments e-mailed with attachment by Jeff Brooks

10/14/2013

5-41 CLF’s Shanna Cleveland e-mail to MassDEP’s Ruch re: file review and

Ruch reply e-mail

10/16/2013

5-42 Comments from Jeff Brooks

10/17/2013

5-43 Comments e-mailed by Sonja Cucinotti

10/18/2013

5-44 Comments e-mailed by Claire Ritchie

10/19/2013

5-45 Comments e-mailed by Stan Rogowski

10/20/2013

5-46 Comments e-mailed by Dominic Cucinotti

10/21/2013

5-47 Comments e-mailed by Nancy Ramsden

10/21/2013

5-48 Comments e-mailed by Ken Eisenberg

10/24/2013

5-49 Footprint’s Marcia MacClary e-mail to MassDEP re: attached copies of

legal notices published in the Salem News and the Boston Globe in

English, Spanish and Portuguese

10/26/2013

5-50 MassDEP e-mail from Susan Ruch to Shanna Cleveland of

Conservation Law Foundation regarding delivery of public records

request documents

10/28/2013

5-51 Comments e-mailed by George Economides

10/30/2013

5-52 Comments from EPA

10/30/2013

5-53 Comments from The Salem Partnership

10/30/2013

5-54 E-mail from MassDEP’s Cosmo Buttaro providing copy of modeling

protocol as requested by Jane Bright, HealthLink

10/30/2013

Page 15: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 15 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

5-55 Comments e-mailed with attachment by Jeff Brooks

11/01/2013

5-56 Comments from Footprint committing to lower PM limits

11/01/2013

5-57 Comments e-mailed by Alison Miller (2 e-mails)

11/01/2013

5-58 Comments e-mailed by Sue Kirby

11/01/2013

5-59 Comments e-mailed with attachment by Healthlink

11/01/2013

5-60 Comments e-mailed addendum by Healthlink

11/01/2013

5-61 Comments e-mailed with attachment “Site Assessment Study of

Potential Land Use Options at the Salem Harbor Station Property” by

Healthlink

11/01/2013

5-62 Comments e-mailed with attachment by Linda Haley

11/01/2013

5-63 Comments e-mailed by William Dearstyne

11/01/2013

5-64 Comments e-mailed with attachments by Conservation Law Foundation

(CLF) and Elizabeth Michaud, Michel Beheshti, Jeff Brooks, Andrea

Celestine, William Dearstyne, Linda Haley, Douglas Haley, HealthLink,

Clean Water Action, Jane Bright, Martha Dansdill, Rosalind Nadeau,

Sue Kirby, 350ma.org, Dorian Williams, Better Futures Project, Jody

Howard, Marlene Faust

11/01/2013

6 Massachusetts Energy Facilities Siting Board (EFSB)

6-1 Energy Facilities Siting Board Tentative Decision

09/30/2013

6-2 Energy Facilities Siting Board Final Decision – Approval to Construct

10/10/2013

7 Footprint’s Response to Public Comments & Supplements to PSD

Permit Application

7-1 Footprint’s response letter to Public Comments received during Public

Comment Period on Draft PSD Permit and Proposed Air Quality Plan

Approval

12/11/2013

Page 16: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 16 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

7-2 Footprint’s response letter to Public Comments received during Public

Comment Period on Draft PSD Permit and Proposed Air Quality Plan

Approval

01/10/2014

7-3 Footprint’s response letter to Public Comments received during Public

Comment Period on Draft PSD Permit and Proposed Air Quality Plan

Approval

01/16/2014

7-4 E-mail and attachment from Footprint’s consultant George Lipka

containing correction to Page 2 of Footprint’s 1/16/2014 response letter

01/17/2014

7-5 Footprint’s response letter to Public Comments received during Public

Comment Period on Draft PSD Permit and Proposed Air Quality Plan

Approval

01/21/2014

8 Final PSD Permit and Final Air Quality Plan Approval

8-1 MassDEP Cover Letter to Footprint and listed cc:’s

regarding issuance of attached PSD Permit, PSD Fact Sheet, Response

to Comments and state Plan Approval

01/30/2014

8-2 PSD Permit issued by MassDEP

01/30/2014

8-3 PSD Fact Sheet issued by MassDEP

01/30/2014

8-4 Response to Comments

01/30/2014

8-5 Plan Approval issued by MassDEP pursuant to state law

01/30/2014

8-6 MassDEP e-mail from Cosmo Buttaro and attachments consisting of

cover letter, Final PSD Permit, and Final Air Quality Plan Approval

to Footprint and listed cc:’s

01/30/2014

8-7 MassDEP e-mail from Cosmo Buttaro and attachment of Final PSD

Permit Fact Sheet

to Footprint and listed cc:’s

01/30/2014

8-8 MassDEP e-mail from Cosmo Buttaro and attachment of MassDEP

Response to Comments (RTC)

to Footprint and listed cc:’s

01/30/2014

Page 17: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 17 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

8-9 MassDEP e-mail from Susan Ruch and attachments consisting of cover

letter, Final PSD Permit, and Final Air Quality Plan Approval

to interested persons

01/30/2014

8-10 MassDEP e-mail from Susan Ruch and attachment of Final PSD Permit

Fact Sheet

to interested persons

01/30/2014

8-11 MassDEP e-mail from Susan Ruch and attachment of MassDEP

Response to Comments (RTC)

to interested persons

01/30/2014

9 Other Permit Decisions

9-1 Entergy Texas Inc. Lewis Creek Plant, RBLC TX-0544/0545,

PSDTX1091

https://webmail.tceq.texas.gov/gw/webpub/4be957f82aa3bc2f76e7fa112

19651ccbdef0b7/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/364908/O

fficial/HTML/GWContentRoot?action=Document.View&merge=filevie

w&bNoRefresh=1&Item.Attachment.filename=MRT+83784+Entergy+

Texas+%5bconstruction%5d&User.context=4be957f82aa3bc2f76e7fa1

1219651ccbdef0b7&Item.Attachment.type=Document&Item.Attachme

nt.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.i

d=364908&Item.Attachment.Document.version=Official&Item.Attach

ment.allowViewNative=1

05/19/2009

9-2 Pattillo Branch Power Company LLC, RBLC TX-0546, PSDTX1115

https://webmail.tceq.texas.gov/gw/webpub/4be957f82aa3bc2f76e7fa112

19651ccbdef0b7/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/372081/O

fficial/HTML/GWContentRoot?action=Document.View&merge=filevie

w&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+83642+Pati

llo+Branch+Power+%5binitial%5d&User.context=4be957f82aa3bc2f76

e7fa11219651ccbdef0b7&Item.Attachment.type=Document&Item.Atta

chment.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Docu

ment.id=372081&Item.Attachment.Document.version=Official&Item.A

ttachment.allowViewNative=1

06/17/2009

Page 18: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 18 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

9-3 Lamar Power Partners II LLC, RBLC TX-0547, PSDTX916

https://webmail.tceq.texas.gov/gw/webpub/e3dcb57363cdad80843d96f1

6cbd39fbd3ad4f3/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/424002/

Official/HTML/GWContentRoot?action=Document.View&merge=filev

iew&bNoRefresh=1&Item.Attachment.filename=MRT%2d+38326+La

mar+Power+Partners+LLC+%5bamendment%5d&User.context=e3dcb

57363cdad80843d96f16cbd39fbd3ad4f3&Item.Attachment.type=Docu

ment&Item.Attachment.Library.id=tnrdom3.dms3apo.ansrp01&Item.At

tachment.Document.id=424002&Item.Attachment.Document.version=O

fficial&Item.Attachment.allowViewNative=1

06/22/2009

9-4 Russell City Energy Center PSD Permit - Bay Area Air Quality

Management District PSD Permit No. 15487

02/03/2010

9-5 Panda Sherman Permit Numbers 87225 and PSDTX1198

https://webmail.tceq.texas.gov/gw/webpub/fa877911a24373704cd991ee

e6ba0893e8cd2ec/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/383163/

Official/HTML/GWContentRoot?action=Document.View&merge=filev

iew&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+87225+P

anda+Sherman+Power+LLC&User.context=fa877911a24373704cd991

eee6ba0893e8cd2ec&Item.Attachment.type=Document&Item.Attachme

nt.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.i

d=383163&Item.Attachment.Document.version=Official&Item.Attach

ment.allowViewNative=1

02/03/2010

9-6 Stark Power/Wolf Hollow; Permit Numbers 83638 and PSDTX1110

https://webmail.tceq.texas.gov/gw/webpub/335dccb1bdf82fde57db4595

6275e27b87b584/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/388115/O

fficial/HTML/GWContentRoot?action=Document.View&merge=filevie

w&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+83638+Star

k+Power+%5binitial%5d&User.context=335dccb1bdf82fde57db45956

275e27b87b584&Item.Attachment.type=Document&Item.Attachment.L

ibrary.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.id=3

88115&Item.Attachment.Document.version=Official&Item.Attachment.

allowViewNative=1

03/03/2010

9-7 Victorville 2 Hybrid Power Project (SE 07-02) PSD Permit - EPA

Region 9

03/11/2010

9-8 Live Oaks Power Plant, RBLC GA-0138, Air Quality Permit No.4911-

127-0075-P-02-0

http://airpermit.dnr.state.ga.us/gaairpermits/

04/08/2010

Page 19: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 19 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

9-9 Pondera Capital Management, King Power Station, RBLC TX-0590,

Permit Numbers 84289 and PSDTX1125

https://webmail.tceq.texas.gov/gw/webpub/884a43698bb9292e4c6e867

11f7be23f77f833f5/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/392874

/Official/HTML/GWContentRoot?action=Document.View&merge=file

view&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+84289+

Pondera+Capital+Management+GP+%5binitial%5d&User.context=884

a43698bb9292e4c6e86711f7be23f77f833f5&Item.Attachment.type=Do

cument&Item.Attachment.Library.id=tnrdom3.dms3apo.ansrp01&Item.

Attachment.Document.id=392874&Item.Attachment.Document.version

=Official&Item.Attachment.allowViewNative=1

08/05/2010

9-10 Virginia Electric and Power Company – Warren County Power Station

PSD Permit; Reg. No. 81391

http://www.deq.virginia.gov/Portals/0/DEQ/Air/Permitting/PSDPermits/

81391_Permit.pdf

12/21/2010

9-11 Portland General Electric Carty Plant, Review Report/Permit No. 25-

0016-ST-02

http://www.deq.state.or.us/aq/permit/tv/er/250016PGEBoardman_STD_

RR.pdf

12/29/2010

9-12 Avenal Power Center, LLC PSD Permit SJ-08-01

http://www.epa.gov/region9/air/permit/avenal/Avenal_Permit.pdf

05/27/2011

9-13 Brockton Power, MassDEP Conditional Approval No. 4B08015

07/20/2011

9-14 Entergy Louisiana LLC Ninemile Point Electric Generating Plant,

RBLC TX-0600

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27244

08/16/2011

Page 20: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 20 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

9-15 Thomas C. Ferguson Power Plant, RBLC, TX-0600, PSDTX1244

https://webmail.tceq.texas.gov/gw/webpub/884a43698bb9292e4c6e867

11f7be23f77f833f5/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/417857

/Official/HTML/GWContentRoot?action=Document.View&merge=file

view&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+93938+

Lower+Colorado+River+Authority+%5bLCRA%5d+%5binitial%2c+P

SD%5d&User.context=884a43698bb9292e4c6e86711f7be23f77f833f5

&Item.Attachment.type=Document&Item.Attachment.Library.id=tnrdo

m3.dms3apo.ansrp01&Item.Attachment.Document.id=417857&Item.At

tachment.Document.version=Official&Item.Attachment.allowViewNati

ve=1

09/01/2011

9-16 Palmdale Hybrid Power Project, PSD Permit SE-09-01

http://www.epa.gov/region9/air/permit/palmdale/palmdale-final-permit-

10-2011.pdf

10/18/2011

9-17 Thomas C. Ferguson Power Plant, RBLC TX-0600 (GHG)

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27274

11/10/2011

9-18 Fact Sheet - Pioneer Valley Energy Center; EPA Region 1

http://epa.gov/region1/communities/pdf/PioneerValley/FactSheet.pdf

12/2011

9-19 Pioneer Valley Energy Center; EPA Final PSD Permit Number 052-

042-MA15

http://www.epa.gov/region1/communities/pdf/PioneerValley/PVECFina

lPermitDecisionApril2012.pdf

04/05/2012

9-20 Calhoun Port Authority ES Joslin Power Plant, RBLC TX-0620

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27440

09/12/2012

Page 21: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 21 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

9-21 Calhoun Port Authority ES Joslin Power Plant, Permit Numbers 96336

and PSDTX1256

https://webmail.tceq.texas.gov/gw/webpub/54d4291de52b19ee1ddc571

5535ef5dabdf5d24/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/475785/

Official/HTML/GWContentRoot?action=Document.View&merge=filev

iew&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+96336+C

alhoun+Port+Authority+%5brevision%5d&User.context=54d4291de52

b19ee1ddc5715535ef5dabdf5d24&Item.Attachment.type=Document&It

em.Attachment.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachmen

t.Document.id=475785&Item.Attachment.Document.version=Official&

Item.Attachment.allowViewNative=1 (SUSD Limits)

09/12/2012

9-22 Deer Park Energy Center, RBLC TX-0619, PSDTX979M2

https://webmail.tceq.texas.gov/gw/webpub/12e4ac46210ad60bb4d54eba

bb914c11c0e4/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/444154/Offi

cial/HTML/GWContentRoot?action=Document.View&merge=fileview

&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+45642+Deer

+Park+%5bamend%5d&User.context=12e4ac46210ad60bb4d54ebabb9

14c11c0e4&Item.Attachment.type=Document&Item.Attachment.Librar

y.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.id=44415

4&Item.Attachment.Document.version=Official&Item.Attachment.allo

wViewNative=1 (for H2SO4/SUSD limits)

09/26/2012

9-23 Deer Park Energy Center, RBLC TX-0619

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27388 (for PM limits)

09/26/2012

9-24 Cricket Valley Energy Center, Air State Facility Permit, Permit ID: 3-

1326-00275/00004

http://www.dec.ny.gov/dardata/boss/afs/permits/313260027500004.pdf

09/27/2012

9-25 Moxie Liberty LLC/Asylum Power Plant, RBLC PA-0278

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27461

10/10/2012

9-26 Channel Energy Center, RBLC TX-0618

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.ProcessInfo&f

acility_id=27386&PROCESS_ID=108405 (for PM limits)

10/15/2012

Page 22: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 22 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

9-27 Channel Energy Center, RBLC TX-0618, PSDTX955M1

https://webmail.tceq.texas.gov/gw/webpub/86885fcef4494f511dde18b0

d929fe7ab41d6225/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/446096

/Official/HTML/GWContentRoot?action=Document.View&merge=file

view&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+42179+

Channel+Energy+%5bamend%5d&User.context=86885fcef4494f511dd

e18b0d929fe7ab41d6225&Item.Attachment.type=Document&Item.Atta

chment.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Docu

ment.id=446096&Item.Attachment.Document.version=Official&Item.A

ttachment.allowViewNative=1 (for H2SO4 and auxiliary equipment

limits)

10/15/2012

9-28 Hess Newark Energy Center, PSD Permit PI No. 08857

11/01/2012

9-29 Deer Park Energy Center, RBLC TX-0632(GHG)

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27549

11/29/2012

9-30 St. Joseph Energy Center, LLC; RBLC IN-0158

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27537

12/03/2012

9-31 Garrison Energy Center LLC, Delaware Department of Natural

Resources, APC 2012/0098 Construction (NSPS) (LAER) (PSD)

01/30/2013

9-32 Moxie Energy LLC/Patriot Generation Plant, RBLC PA-0286

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27505

01/31/2013

9-33 Virginia Electric and Power Company – Brunswick County Power

Station PSD Permit; Reg. No. 52404

http://www.deq.virginia.gov/Portals/0/DEQ/Air/Permitting/PSDPermits/

52404_permit.pdf

03/12/2013

9-34 Sunbury Generation LP, RBLC PA-0288

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f

acility_id=27512

04/01/2013

9-35 Hickory Run Energy Center LLC, RBLC PA-0291

http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&F

acility_ID=27544

04/23/2013

Page 23: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 23 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

9-36 Green Energy Partners / Stonewall LLC, PSD Permit; Reg. No. 73826

http://www.deq.virginia.gov/Portals/0/DEQ/Air/Permitting/PSDPermits/

73826_permit.pdf

04/30/2013

9-37 Oregon Clean Energy Center; Ohio EPA – Final Air Pollution Permit to

Install; Permit No. P0110840

http://wwwapp.epa.ohio.gov/dapc/permits_issued/1024326.pdf

06/18/2013

9-38 Idaho Power Company Langley Gulch Power Plant; Idaho Permit to

Construct; Permit No. P-2009.0092

http://www.deq.idaho.gov/media/486885-

idaho_power_langley_gulch_new_plymouth_ptc_permit_0813.pdf

08/14/2013

9-39 Renaissance Power LLC, Michigan Permit to Install 51-13

http://www.deq.state.mi.us/aps/downloads/permits/PubNotice/51-13/51-

13.pdf

11/01/2013

9-40 Renaissance Power LLC, Michigan Michigan Permit to Install 51-13

Response to Comments (RTC) Document

http://www.deq.state.mi.us/aps/downloads/permits/PubNotice/51-13/51-

13RTC.pdf

11/01/2013

9-41 Carroll County Energy Center LLC; Ohio EPA – Final Air Pollution

Permit to Install; Permit No. P0113762

http://wwwapp.epa.ohio.gov/dapc/permits_issued/1068717.pdf

11/05/2013

10 Footprint and Tetratech Communications

10-1 E-mails (2) from Sten Levin, Milton Cat with Emergency Diesel

Generator and Fire Pump emission control pricing

11/25/2013

10-2 E-mail from George Wilson (Footprint) forwarding e-mail from Nick

Ferguson (Cleaver Brooks) with Auxiliary Boiler SCR and burner

pricing.

11/27/2013

10-3 Footprint Combined Cycle Power Project Startup/Shutdown Emission

Estimate GE 107FA.05 (General Electric Company Proprietary

Document)

01/09/2014

Page 24: EAB Docket No. PSD 14-02 Administrative Record Index ...yosemite.epa.gov/oa/eab_web_docket.nsf/Attachments By...EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

EAB Docket No. PSD 14-02 Administrative Record Index – April 2014

Massachusetts Department of Environmental Protection Page 24 of 24

Footprint Power Salem Harbor Development LP

(MassDEP Application No. NE-12-022, Transmittal No. X254064)

11 Orders

11-1 In the Matter of Monroe Electric Generating Plant Entergy Louisiana,

Inc. Proposed Operating Permit Petition No. 6-99-2

-- Order Responding to Petitioner’s Request that the Administrator

Object to Issuance of a State Operating Permit

12 MassDEP website regarding the Footprint Project

12-1 MassDEP’s website includes a webpage for Footprint’s proposed

project re: federal PSD and state air permitting. Note: IT staff changed

the public name of the web link between the initial Press Release and

the issuance Final Permit. The site can be found by searching or at:

http://www.mass.gov/eea/agencies/massdep/air/approvals/footprint.html

The contents include:

- Notice of Public Hearing and Public Comment Period;

- MassDEP Letter of 09/09/2013;

- Draft PSD Permit;

- Draft PSD Fact Sheet;

- Proposed Plan Approval;

- Revised Notice extending public comment period to 11/01/2013;

- the following excerpt:

“If you wish to review Footprint Power Salem Harbor Development

LP's application for these approvals, the appendices/attachments to

that application, and related air modeling files, please contact:

Cosmo Buttaro (978-694-3281)

Environmental Engineer

MassDEP Northeast Regional Office

205B Lowell Street

Wilmington, MA 01887”

The final PSD Permit and related documents were added to the website

on 01/30/2014.

Press releases and Tweets related to the availability of the air permit

public comment drafts are also available on the MassDEP website.

09/10/2013

to present