EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 1 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
Index # Record Section or Item Dated
1
Federal Law, Regulation, EPA Guidance
2
Massachusetts Law, Regulation, MassDEP Guidance
3
Massachusetts Environmental Policy Act (MEPA)
4
Draft PSD Permit and Proposed Air Quality Plan Approval
5
Issuance of Draft PSD Permit and PSD Fact Sheet;
Public Comment Period, including Public Hearing
6
Massachusetts Energy Facilities Siting Board (EFSB)
7
Footprint’s Response to Public Comments
& Supplements to PSD Permit Application
8
Final PSD Permit and Final Air Quality Plan Approval
9
Other Permit Decisions
10
Footprint and Tetratech Communications
11
Orders
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 2 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
1 Federal Law, Regulation, EPA Guidance
1-1 EPA Permit Modeling Guidance
http://www.epa.gov/scram001/guidance_permit.htm
Current
1-2 EPA PSD Workshop Manual
http://nepis.epa.gov/Exe/ZyNET.exe/2000Z81A.TXT?ZyActionD=ZyD
ocument&Client=EPA&Index=1976+Thru+1980&Docs=&Query=&Ti
me=&EndTime=&SearchMethod=1&TocRestrict=n&Toc=&TocEntry=
&QField=&QFieldYear=&QFieldMonth=&QFieldDay=&IntQFieldOp
=0&ExtQFieldOp=0&XmlQuery=&File=D%3A%5Czyfiles%5CIndex
%20Data%5C76thru80%5CTxt%5C00000008%5C2000Z81A.txt&User
=ANONYMOUS&Password=anonymous&SortMethod=h%7C-
&MaximumDocuments=1&FuzzyDegree=0&ImageQuality=r75g8/r75g
8/x150y150g16/i425&Display=p%7Cf&DefSeekPage=x&SearchBack=
ZyActionL&Back=ZyActionS&BackDesc=Results%20page&Maximu
mPages=1&ZyEntry=1&SeekPage=x&ZyPURL
10/1980
1-3 EPA Office of Air Quality Planning and Standards Control Cost Manual
Fourth Edition, EPA 450/3-90-006d
01/1990
1-4 EPA New Source Review Work Shop Manual PSD and Nonattainment
Area Permitting (Draft)
http://www.epa.gov/region07/air/nsr/nsrmemos/1990wman.pdf
10/1990
1-5 EPA Office of Air Quality Planning and Standards Control Cost Manual
Sixth Edition, EPA/452/B-02-001
http://www.epa.gov/ttncatc1/dir1/c_allchs.pdf
01/2002
1-6 Output-Based Regulations: A Handbook for Air Regulators
http://www.epa.gov/chp/documents/obr_final_9105.pdf
08/2004
1-7 PSD Permit Application Requirements EPA Region 4
http://www.epa.gov/region4/air/permits/ocspermits/PSDApplicationGui
delinesR4.pdf
02/2010
1-8 Report of the Interagency Task Force on Carbon Capture and Storage
http://www.epa.gov/climatechange/Downloads/ccs/CCS-Task-Force-
Report-2010.pdf
08/2010
1-9 EPA PSD and Title V Permitting Guidance for Greenhouse Gases
http://www.epa.gov/region07/air/nsr/nsrmemos/ghgguid.pdf
03/2011
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 3 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
1-10 Agreement for Delegation of the Federal PSD Program by EPA –
Region 1 to MassDEP
http://www.epa.gov/region1/communities/pdf/Agreement4Delegation.p
df
04/11/2011
1-11 Draft EPA Guidance for PM2.5 Permit Modeling
03/04/2013
1-12 Code of Federal Regulations (PSD of air quality), 40 CFR 52.21
http://www.gpo.gov/fdsys/pkg/CFR-2013-title40-vol3/pdf/CFR-2013-
title40-vol3-sec52-21.pdf
07/01/2013
1-13 Electronic Code of Federal Regulations (PSD of air quality), 40 CFR
52.21
http://www.ecfr.gov/cgi-bin/text-
idx?SID=80d02c8e217db8a454e28f71419f488c&node=40:3.0.1.1.1.1.1.
19&rgn=div8
Current
1-14 Code of Federal Regulations Procedures for Decision Making, 40 CFR
Part 124
http://www.gpo.gov/fdsys/pkg/CFR-2012-title40-vol23/xml/CFR-2012-
title40-vol23-part124.xml
07/01/2012
1-15 Electronic Code of Federal Regulations Procedures for Decision
Making, 40 CFR Part 124
http://www.ecfr.gov/cgi-bin/text-
idx?tpl=/ecfrbrowse/Title40/40cfr124_main_02.tpl
Current
1-16 Circuit Court Decision (Sierra Club v. EPA) on PM2.5 Significant
Impact Levels and (SILs) and Significant Monitoring Concentration
(SMC) - Questions and Answers – EPA Q&A document
03/04/2013
1-17 Federal Register Vol. 79, No. 5, 40 CFR Parts 60, 70, 71, et al.
Standards of Performance for Greenhouse Gas Emissions From New
Stationary Sources (NSPS): Electric Utility Generating Units; Proposed
Rule
http://www.gpo.gov/fdsys/pkg/FR-2014-01-08/pdf/2013-28668.pdf
https://www.federalregister.gov/articles/2014/02/26/2014-
03115/standards-of-performance-for-greenhouse-gas-emissions-from-
new-stationary-sources-electric-utility
01/08/2014
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 4 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
2 Massachusetts Law, Regulation, MassDEP Guidance
2-1 MassDEP Modeling Guidance for Significant Stationary Sources of Air
Pollution
http://www.mass.gov/eea/docs/dep/air/laws/modguid.pdf
06/2011
2-2 MassDEP Best Available Control Technology (BACT) Guidance
http://www.mass.gov/eea/agencies/massdep/air/approvals/best-
available-control-technology-bact.html
06/2011
2-3 Code of Massachusetts Regulations 310 CMR 7.00 Air Pollution
Control Regulations including 310 CMR 7.02 Plan Approval and
Emission Limitations
http://www.mass.gov/eea/agencies/massdep/air/regulations/310-cmr-7-
00-air-pollution-control-regulation.html
Current
2-4 Code of Massachusetts Regulations 310 CMR 7.00: Appendix A
Emission Offsets and Nonattainment Review
http://www.mass.gov/eea/agencies/massdep/air/regulations/310-cmr-7-
00-air-pollution-control-regulation.html
Current
2-5 Massachusetts Environmental Policy Act (MEPA) Regulations
301 CMR 11.00
http://www.env.state.ma.us/mepa/meparegulations.aspx
Current
2-6 Massachusetts General Laws, M.G.L. c. 30, Sections 61-62I
https://malegislature.gov/Laws/GeneralLaws/PartI/TitleIII/Chapter30/Se
ction61
Current
2-7 Massachusetts General Laws, M.G.L. c. 111, Section 142A-J
https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXVI/Chapter111
/Section142A
Current
2-8 Massachusetts General Laws, M.G.L. c. 164, Section 69J1/4
https://malegislature.gov/Laws/GeneralLaws/PartI/TitleXXII/Chapter16
4/Section69J1~4
Current
2-9 Commonwealth of Massachusetts 2012 Air Quality Report
07/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 5 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
3 Massachusetts Environmental Policy Act (MEPA)
3-1 Massachusetts Environmental Policy Act (MEPA) Environmental
Notification Form (ENF)
08/07/2012
3-2 MassDEP Comments on Environmental Notification Form
08/28/2012
3-3 Certificate of the Secretary of Energy and Environmental Affairs on the
Environmental Notification Form
09/07/2012
3-4 Draft Environmental Impact Report (DEIR)
12/18/2012
3-5 MassDEP Comments on Draft Environmental Impact Report
01/18/2013
3-6 Certificate of the Secretary of Energy and Environmental Affairs on the
Draft Environmental Impact Report
01/25/2013
3-7 Final Environmental Impact Report (FEIR)
04/01/2013
3-8 MassDEP Comments on Final Environmental Impact Report
05/13/2013
3-9 Certificate of the Secretary of Energy and Environmental Affairs on the
Final Environmental Impact Report
05/17/2013
3-10 Footprint submittals (revised summary GHG emissions and revised
Draft Section 61 Findings) required by Certificate on the Final
Environmental Impact Report
06/10/2013
4 Draft PSD Permit and Proposed Air Quality Plan Approval
4-1 Footprint’s consultant Tetra Tech (Keith Kennedy) e-mail and
attachment “Air Dispersion Modeling Protocol” sent to MassDEP’s
Stephen Dennis
08/29/2012
4-2 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)
informing commencement of review of protocol
09/13/2012
4-3 MassDEP e-mail from Stephen Dennis to Tetra Tech (Keith Kennedy)
informing of development of nearby sources to include in NAAQS
compliance demonstration and PSD increment consumption calculations
09/20/2012
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 6 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
4-4 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis
regarding discussion on interactive sources for NOx and PM10/PM2.5
10/02/2012
4-5 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)
regarding discussion on interactive sources for NOx and PM10/PM2.5
10/04/2012
4-6 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis
regarding discussion on interactive sources for NOx and PM10/PM2.5
10/05/2012
4-7 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis
regarding question on interactive sources for NOx and PM10/PM2.5
10/23/2012
4-8 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)
regarding NERO looking at Title V sources regarding PM10/PM2.5
emissions
10/23/2012
4-9 Tetra Tech (Ted Guertin) e-mail to MassDEP’s Stephen Dennis
regarding discussion about Stoneham Research Center
10/23/2012
4-10 MassDEP e-mail from Stephen Dennis to Tetra Tech (Ted Guertin)
regarding discussion about Stoneham Research Center
10/23/2012
4-11 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro
regarding more discussion on interactive sources
10/24/2012
4-12 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)
regarding more discussion on interactive sources
10/24/2012
4-13 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)
containing self-reported air emissions data for Peabody Municipal
Light, Marblehead Municipal Wilkens, and Rousselot Peabody
11/06/2012
4-14 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)
containing self-reported air emissions data for Marblehead Municipal
Wilkens
11/09/2012
4-15 Letter from United States Department of the Interior Fish and Wildlife
Service regarding presence of federally listed and/or proposed
endangered or threatened species in relation to proposed project
11/28/2012
4-16 Footprint Comprehensive Plan Application
12/21/2012
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 7 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
4-17 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro and
Stephen Dennis regarding load condition discussion
12/28/2012
4-18 MassDEP e-mail from Cosmo Buttaro to Tetra Tech (George Lipka)
regarding load condition discussion
12/28/2012
4-19 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro
regarding load condition discussion
12/28/2012
4-20 MassDEP e-mail with attachments from Cosmo Buttaro to Tetra Tech
(George Lipka) containing self-reported air emissions data for
Wheelabrator Saugus and GE Lynn
01/04/2013
4-21 Tetra Tech (George Lipka) e-mails (2) to MassDEP’s Cosmo Buttaro
inquiring about including GE Lynn in the source interaction cumulative
modeling analysis for PM2.5
01/04/2013
4-22 MassDEP e-mail from Ed Braczyk to Tetra Tech (George Lipka) and
MassDEP’s Cosmo Buttaro regarding including GE Lynn in the source
interaction cumulative modeling analysis for PM2.5
01/04/2013
4-23 MassDEP e-mail from Stephen Dennis to Tetra Tech (George Lipka)
and MassDEP’s Cosmo Buttaro and Ed Braczyk regarding suggested
PSD increment language
01/15/2013
4-24 Footprint letter withdrawing confidential information (Appendix C) of
Comprehensive Plan Application and replacing with a new Appendix C
attached to the letter
01/30/2013
4-25 MassDEP e-mail from Ed Braczyk to EPA – Region 1 (Ida McDonnell
and Donald Dahl) asking for EPA’s opinion on the January 22, 2013
Court of Appeals Decision on PM2.5 SILs and SMC
01/31/2013
4-26 EPA – Region 1 (Donald Dahl) e-mails (2) to MassDEP’s Ed Braczyk
and Marc Wolman regarding response to Ed Braczyk’s question on the
January 22, 2013 Court of Appeals Decision on PM2.5 SILs and SMC
01/31/2013
02/12/2013
4-27 MassDEP e-mail from Ed Braczyk to Footprint’s Attorney Lauren Liss
and consultant Keith Kennedy (Tetra Tech) regarding addressing the
January 22, 2013 Court of Appeals Decision on PM2.5 SILs and SMC in
Footprint’s Application
02/13/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 8 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
4-28 MassDEP letter fulfilling Footprint’s request regarding confidential
information of the Comprehensive Plan Application
02/15/2013
4-29 Footprint Addendum to Comprehensive Plan Application
04/12/2013
4-30 Footprint letters “Notification of Submittal of a PSD Permit
Application” to EPA, U.S. Fish and Wildlife Service, Tribal Historic
Preservation Officer Wampanoag Tribe of Gay Head (Aquinnah), Tribal
Historic Preservation Officer Mashpee Wampanoag Tribe,
Massachusetts Historical Commission, NOAA – National Marine
Fisheries Service, Tribal Environmental Director Wampanoag Tribe of
Gay Head (Aquinnah), Tribal Environmental Director Mashpee
Wampanoag Tribe
04/18/2013
4-31 Footprint Addendum to Comprehensive Plan Application
06/10/2013
4-32 Footprint Addendum to Comprehensive Plan Application
06/18/2013
4-33 Footprint Addendum to Comprehensive Plan Application
08/06/2013
4-34 MassDEP e-mail from Glenn Pacheco to Tetra Tech (George Lipka)
regarding submittal of NH3 accidental release modeling files
08/07/2013
4-35 MassDEP e-mail from Glenn Pacheco to Tetra Tech (George Lipka)
regarding submittal of NH3 accidental release modeling files and
Comprehensive Plan Application supplement history
08/07/2013
4-36 MassDEP e-mail from Glenn Pacheco to Tetra Tech (George Lipka) and
MassDEP’s Cosmo Buttaro confirming receipt of all that is needed to
complete his review
08/09/2013
4-37 MassDEP internal e-mails (3) between Cosmo Buttaro and Tom
Cushing regarding obtaining CO2 emissions for Brockton Power
08/12/2013
08/13/2013
08/14/2013
4-38 MassDEP internal e-mails (2) from Cosmo Buttaro to Marc Simpson
and John Kirzec regarding discussion of PM and CO2/GHG emissions
for Pioneer Valley Energy Center
08/13/2013
4-39 MassDEP internal e-mail from John Kirzec to Cosmo Buttaro regarding
discussion of PM and CO2/GHG emissions for Pioneer Valley Energy
Center
08/14/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 9 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
4-40 Tetra Tech’s George Lipka email to MassDEP’s Cosmo Buttaro
regarding discussion on CO2 and/or GHG emissions for Brockton Power
and Pioneer Valley Energy Center and a corrected version of a
spreadsheet in Application
08/14/2013
4-41 Tetra Tech’s George Lipka email to MassDEP’s Cosmo Buttaro
regarding another correction to spreadsheet in Application
08/19/2013
4-42 MassDEP internal e-mails (2) with attachments from Daniel
Kamieniecki to Cosmo Buttaro regarding CO2 emissions records for
Brockton Power
08/20/2013
4-43 MassDEP’s Tom Cushing email to Tetra Tech’s George Lipka
informing him to contact MassDEP’s Cosmo Buttaro regarding
Brockton Power’s CO2 emissions records
08/20/2013
4-44 MassDEP’s Cosmo Buttaro e-mails (2) with attachments to Tetra Tech
(George Lipka) regarding sending of the CO2 emissions records for
Brockton Power
08/20/2013
4-45 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro
regarding GHG BACT discussion for Pioneer Valley Energy Center
08/20/2013
4-46 Footprint Addendum to Comprehensive Plan Application
08/20/2013
4-47 E-mail from MassDEP’s Susan Ruch to Footprint’s Attorney Lauren
Liss regarding plans for Public Hearing date/location/time and
publishing of Notice of Public Hearing and Public Comment Period
08/27/2013
4-48 E-mail from Tetra Tech (Keith Kennedy) to MassDEP’s Cosmo Buttaro
and Ed Braczyk regarding action items from 08/27/2013 phone call
08/28/2013
4-49 E-mail from MassDEP’s Cosmo Buttaro to Tetra Tech (Keith Kennedy)
regarding clarification to action items from 08/27/2013 phone call
08/28/2013
4-50 MassDEP e-mail from Susan Ruch to Footprint regarding sending of
drafts of Proposed Plan Approval and Draft PSD Permit for review
09/04/2013
4-51 Footprint Addendum to Comprehensive Plan Application
09/04/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 10 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
4-52 EPA – Region 1 e-mail and letter attachment notifying MassDEP of
fulfillment of EPA’s consultation responsibilities under 04/11/2011 PSD
Program Delegation Agreement
09/05/2013
4-53 E-mail from Footprint’s Attorney on behalf of Footprint to MassDEP
regarding comments on draft of Proposed Plan Approval
09/06/2013
4-54 MassDEP memorandum from Glenn Pacheco to James Belsky, Cosmo
Buttaro regarding Review of Air Quality Modeling Contained in
Reports Dated December 21, 2012 and June 10, 2013
09/06/2013
4-55 Tetra Tech (George Lipka) e-mail to MassDEP’s Cosmo Buttaro and Ed
Braczyk regarding comment on Pre-Draft PSD Fact Sheet
09/09/2013
4-56 Footprint Addendum to Comprehensive Plan Application – Report
entitled “Health Risk Assessment for the Salem Harbor Redevelopment
Project”
09/09/2013
5 Issuance of Draft PSD Permit and PSD Fact Sheet;
Public Comment Period, including Public Hearing
5-1 MassDEP email from Susan Ruch to MEPA’s Rick Bourre et al.
re: attached Notice of Public Hearing, Public Comment Period and
Section 61 Findings for publication in 09/11/2013 edition of the
Environmental Monitor
09/03/2013
5-2 MassDEP Cover Letter regarding issuance of attached public comment
documents, including Draft PSD Permit, Draft PSD Fact Sheet and
Proposed Plan Approval
to Footprint and listed cc:’s
09/09/2013
5-3 Draft PSD Permit issued by MassDEP
09/09/2013
5-4 Draft PSD Fact Sheet issued by MassDEP
09/09/2013
5-5 Proposed Plan Approval issued by MassDEP pursuant to state law
09/09/2013
5-6 Notice of Public Hearing and Public Comment Period
published in Salem News and Boston Globe in English, Spanish and
Portuguese
09/10/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 11 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
5-7 Notice of Public Hearing and Public Comment Period
and Notice of Section 61 Findings
published in the Massachusetts Environmental Monitor
http://www.env.state.ma.us/mepa/emonitor.aspx
09/11/2013
5-8 MassDEP e-mail from Cosmo Buttaro and letter with attached issued
documents consisting of Draft PSD Permit, Draft PSD Permit Fact
Sheet, Proposed Air Quality Plan Approval, and Notice of Public
Hearing scheduled for 10/10/2013 and Public Comment Period
beginning on 9/10/2013 and ending on 10/11/2013
to Footprint and listed cc:’s
09/10/2013
5-9 MassDEP e-mail from Susan Ruch informing of the availability on
MassDEP’s website of issued Draft PSD Permit, Draft PSD Permit Fact
Sheet, Proposed Air Quality Plan Approval, and Notice of Public
Hearing scheduled for 10/10/2013 and Public Comment Period
beginning on 9/10/2013 and ending on 10/11/2013
to possible interested persons or entities
Also, mailed a hard copy of the emailed materials (i.e., MassDEP letter,
Draft PSD Permit, Draft PSD Permit Fact Sheet, Proposed Air Quality
Plan Approval, and Notice of Public Hearing) to the following persons
or entities who were involved in prior litigation involving the existing
Salem Harbor Station:
City Solicitor, Salem
Conservation Law Foundation
HealthLink
Wenham Lake Watershed Association
Clean Water Action
MASSPIRG
09/10/2013
5-10 E-mail and attachments from Susan Ruch of MassDEP to Tom Higgins
of MassDEP for posting of 9/9/2013 MassDEP-issued documents on
MassDEP website
09/10/2013
5-11 Notice of Public Hearing and Public Comment Period and Notice of
Section 61 Findings as it appeared in the Boston Globe in English,
Spanish and Portuguese Translation
09/10/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 12 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
5-12 Notice of Public Hearing and Public Comment Period and Notice of
Section 61 Findings as it appeared in the Salem News in English,
Spanish and Portuguese Translation
09/10/2013
5-13 Notice of Public Hearing and Public Comment Period and Notice of
Section 61 Findings as it appeared in the Environmental Monitor in
English
09/11/2013
5-14 MassDEP and Footprint e-mail chain regarding delivery of application
material to Conservation Law Foundation (CLF)
09/13/2013
5-15 MassDEP e-mail from Susan Ruch to Linda Haley regarding MassDEP
webpage link and availability of application and supporting documents
09/18/2013
5-16 MassDEP e-mail and attached letter from Susan Ruch to Linda Haley
confirming delivery of Compact Disc (CD) containing application and
supporting materials via postal mail
09/18/2013
5-17 E-mail from Linda Haley to Susan Ruch confirming receipt of e-mail
pertaining to CD
09/18/2013
5-18 E-mail and attached letter from Shanna Cleveland of Conservation Law
Foundation to Susan Ruch and James Belsky requesting an extension to
Public Comment Period and Public Hearing
09/23/2013
5-19 MassDEP internal e-mail from Susan Ruch to Cosmo Buttaro for file
regarding tweet of Notice of Public Hearing and Public Comment
Period on 9/13/2013
09/27/2013
5-20 Request for extension of public comment period and postponement of
public hearing on behalf of Grassroots Against Another Salem Power
Plant (GASPP) submitted by William E. Dearstyne
09/30/2013
5-21 MassDEP e-mail from Susan Ruch and attached Revised Notice of
Public Hearing and Public Comment Period informing of an extension
of Public Comment Period to 11/1/2013
to possible interested persons or entities
09/30/2013
5-22 CLF’s Shanna Cleveland email acknowledgment thanking MassDEP for
extension of public comment period
09/30/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 13 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
5-23 E-mail reply from Sue Reid, CLF, acknowledging receipt of MassDEP
e-mail from Susan Ruch and attached Revised
Notice of Public Hearing and Public Comment Period informing of an
extension of Public Comment Period to 11/1/2013
09/30/2013
5-24 E-mail to MassDEP Tom Higgins and attached Revised Public Notice in
.pdf and Word formats to be posted on www.mass.gov
09/30/2013
5-25 E-mail with attachments to Richard Bourre et al. at MEPA office re:
Revised Public Notice for publication in the October 9, 2013 edition of
the Environmental Monitor
09/30/2013
5-26 MassDEP e-mail from Cosmo Buttaro and attached Revised Notice of
Public Hearing and Public Comment Period informing of an extension
of Public Comment Period to 11/1/2013
10/01/2013
5-27 Comments e-mailed with attachment by George Pyros of Mitsubishi
Power Systems Americas, Inc.
10/01/2013
5-28 MassDEP internal e-mail from Susan Ruch to Cosmo Buttaro for file
regarding tweet of extension of Public Comment Period to 11/1/2013
10/04/2013
5-29 Comments e-mailed from Elise Desmond
10/05/2013
5-30 10/2/2013 e-mail from Cosmo Buttaro of MassDEP to George Pyros of
Mitsubishi Power Systems Americas, Inc. and his response
10/07/2013
5-31 http://www.env.state.ma.us/mepa/emonitor.aspx
Revised Public Notice extending public comment period to 11/01/2013
10/09/2013
5-32 Attendance sign-in slips filled out by Public Hearing Attendees, except
for those who chose not to sign in
10/10/2013
5-33 Attendance Sheet of Public Hearing Attendees who signed in
10/10/2013
5-34 Script used by Public Hearing Officer Edward Braczyk for conducting
the Public Hearing
10/10/2013
5-35 Cassette tape recordings of Public Hearing
10/10/2013
5-36 Transcript of Public Hearing
10/10/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 14 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
5-37 Statement from SAFE presented at Public Hearing
10/10/2013
5-38 E-mail from Footprint and attached Public Hearing Presentation
10/11/2013
5-39 Comments e-mailed by Robert Wengronowitz
10/14/2013
5-40 Comments e-mailed with attachment by Jeff Brooks
10/14/2013
5-41 CLF’s Shanna Cleveland e-mail to MassDEP’s Ruch re: file review and
Ruch reply e-mail
10/16/2013
5-42 Comments from Jeff Brooks
10/17/2013
5-43 Comments e-mailed by Sonja Cucinotti
10/18/2013
5-44 Comments e-mailed by Claire Ritchie
10/19/2013
5-45 Comments e-mailed by Stan Rogowski
10/20/2013
5-46 Comments e-mailed by Dominic Cucinotti
10/21/2013
5-47 Comments e-mailed by Nancy Ramsden
10/21/2013
5-48 Comments e-mailed by Ken Eisenberg
10/24/2013
5-49 Footprint’s Marcia MacClary e-mail to MassDEP re: attached copies of
legal notices published in the Salem News and the Boston Globe in
English, Spanish and Portuguese
10/26/2013
5-50 MassDEP e-mail from Susan Ruch to Shanna Cleveland of
Conservation Law Foundation regarding delivery of public records
request documents
10/28/2013
5-51 Comments e-mailed by George Economides
10/30/2013
5-52 Comments from EPA
10/30/2013
5-53 Comments from The Salem Partnership
10/30/2013
5-54 E-mail from MassDEP’s Cosmo Buttaro providing copy of modeling
protocol as requested by Jane Bright, HealthLink
10/30/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 15 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
5-55 Comments e-mailed with attachment by Jeff Brooks
11/01/2013
5-56 Comments from Footprint committing to lower PM limits
11/01/2013
5-57 Comments e-mailed by Alison Miller (2 e-mails)
11/01/2013
5-58 Comments e-mailed by Sue Kirby
11/01/2013
5-59 Comments e-mailed with attachment by Healthlink
11/01/2013
5-60 Comments e-mailed addendum by Healthlink
11/01/2013
5-61 Comments e-mailed with attachment “Site Assessment Study of
Potential Land Use Options at the Salem Harbor Station Property” by
Healthlink
11/01/2013
5-62 Comments e-mailed with attachment by Linda Haley
11/01/2013
5-63 Comments e-mailed by William Dearstyne
11/01/2013
5-64 Comments e-mailed with attachments by Conservation Law Foundation
(CLF) and Elizabeth Michaud, Michel Beheshti, Jeff Brooks, Andrea
Celestine, William Dearstyne, Linda Haley, Douglas Haley, HealthLink,
Clean Water Action, Jane Bright, Martha Dansdill, Rosalind Nadeau,
Sue Kirby, 350ma.org, Dorian Williams, Better Futures Project, Jody
Howard, Marlene Faust
11/01/2013
6 Massachusetts Energy Facilities Siting Board (EFSB)
6-1 Energy Facilities Siting Board Tentative Decision
09/30/2013
6-2 Energy Facilities Siting Board Final Decision – Approval to Construct
10/10/2013
7 Footprint’s Response to Public Comments & Supplements to PSD
Permit Application
7-1 Footprint’s response letter to Public Comments received during Public
Comment Period on Draft PSD Permit and Proposed Air Quality Plan
Approval
12/11/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 16 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
7-2 Footprint’s response letter to Public Comments received during Public
Comment Period on Draft PSD Permit and Proposed Air Quality Plan
Approval
01/10/2014
7-3 Footprint’s response letter to Public Comments received during Public
Comment Period on Draft PSD Permit and Proposed Air Quality Plan
Approval
01/16/2014
7-4 E-mail and attachment from Footprint’s consultant George Lipka
containing correction to Page 2 of Footprint’s 1/16/2014 response letter
01/17/2014
7-5 Footprint’s response letter to Public Comments received during Public
Comment Period on Draft PSD Permit and Proposed Air Quality Plan
Approval
01/21/2014
8 Final PSD Permit and Final Air Quality Plan Approval
8-1 MassDEP Cover Letter to Footprint and listed cc:’s
regarding issuance of attached PSD Permit, PSD Fact Sheet, Response
to Comments and state Plan Approval
01/30/2014
8-2 PSD Permit issued by MassDEP
01/30/2014
8-3 PSD Fact Sheet issued by MassDEP
01/30/2014
8-4 Response to Comments
01/30/2014
8-5 Plan Approval issued by MassDEP pursuant to state law
01/30/2014
8-6 MassDEP e-mail from Cosmo Buttaro and attachments consisting of
cover letter, Final PSD Permit, and Final Air Quality Plan Approval
to Footprint and listed cc:’s
01/30/2014
8-7 MassDEP e-mail from Cosmo Buttaro and attachment of Final PSD
Permit Fact Sheet
to Footprint and listed cc:’s
01/30/2014
8-8 MassDEP e-mail from Cosmo Buttaro and attachment of MassDEP
Response to Comments (RTC)
to Footprint and listed cc:’s
01/30/2014
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 17 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
8-9 MassDEP e-mail from Susan Ruch and attachments consisting of cover
letter, Final PSD Permit, and Final Air Quality Plan Approval
to interested persons
01/30/2014
8-10 MassDEP e-mail from Susan Ruch and attachment of Final PSD Permit
Fact Sheet
to interested persons
01/30/2014
8-11 MassDEP e-mail from Susan Ruch and attachment of MassDEP
Response to Comments (RTC)
to interested persons
01/30/2014
9 Other Permit Decisions
9-1 Entergy Texas Inc. Lewis Creek Plant, RBLC TX-0544/0545,
PSDTX1091
https://webmail.tceq.texas.gov/gw/webpub/4be957f82aa3bc2f76e7fa112
19651ccbdef0b7/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/364908/O
fficial/HTML/GWContentRoot?action=Document.View&merge=filevie
w&bNoRefresh=1&Item.Attachment.filename=MRT+83784+Entergy+
Texas+%5bconstruction%5d&User.context=4be957f82aa3bc2f76e7fa1
1219651ccbdef0b7&Item.Attachment.type=Document&Item.Attachme
nt.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.i
d=364908&Item.Attachment.Document.version=Official&Item.Attach
ment.allowViewNative=1
05/19/2009
9-2 Pattillo Branch Power Company LLC, RBLC TX-0546, PSDTX1115
https://webmail.tceq.texas.gov/gw/webpub/4be957f82aa3bc2f76e7fa112
19651ccbdef0b7/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/372081/O
fficial/HTML/GWContentRoot?action=Document.View&merge=filevie
w&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+83642+Pati
llo+Branch+Power+%5binitial%5d&User.context=4be957f82aa3bc2f76
e7fa11219651ccbdef0b7&Item.Attachment.type=Document&Item.Atta
chment.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Docu
ment.id=372081&Item.Attachment.Document.version=Official&Item.A
ttachment.allowViewNative=1
06/17/2009
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 18 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
9-3 Lamar Power Partners II LLC, RBLC TX-0547, PSDTX916
https://webmail.tceq.texas.gov/gw/webpub/e3dcb57363cdad80843d96f1
6cbd39fbd3ad4f3/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/424002/
Official/HTML/GWContentRoot?action=Document.View&merge=filev
iew&bNoRefresh=1&Item.Attachment.filename=MRT%2d+38326+La
mar+Power+Partners+LLC+%5bamendment%5d&User.context=e3dcb
57363cdad80843d96f16cbd39fbd3ad4f3&Item.Attachment.type=Docu
ment&Item.Attachment.Library.id=tnrdom3.dms3apo.ansrp01&Item.At
tachment.Document.id=424002&Item.Attachment.Document.version=O
fficial&Item.Attachment.allowViewNative=1
06/22/2009
9-4 Russell City Energy Center PSD Permit - Bay Area Air Quality
Management District PSD Permit No. 15487
02/03/2010
9-5 Panda Sherman Permit Numbers 87225 and PSDTX1198
https://webmail.tceq.texas.gov/gw/webpub/fa877911a24373704cd991ee
e6ba0893e8cd2ec/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/383163/
Official/HTML/GWContentRoot?action=Document.View&merge=filev
iew&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+87225+P
anda+Sherman+Power+LLC&User.context=fa877911a24373704cd991
eee6ba0893e8cd2ec&Item.Attachment.type=Document&Item.Attachme
nt.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.i
d=383163&Item.Attachment.Document.version=Official&Item.Attach
ment.allowViewNative=1
02/03/2010
9-6 Stark Power/Wolf Hollow; Permit Numbers 83638 and PSDTX1110
https://webmail.tceq.texas.gov/gw/webpub/335dccb1bdf82fde57db4595
6275e27b87b584/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/388115/O
fficial/HTML/GWContentRoot?action=Document.View&merge=filevie
w&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+83638+Star
k+Power+%5binitial%5d&User.context=335dccb1bdf82fde57db45956
275e27b87b584&Item.Attachment.type=Document&Item.Attachment.L
ibrary.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.id=3
88115&Item.Attachment.Document.version=Official&Item.Attachment.
allowViewNative=1
03/03/2010
9-7 Victorville 2 Hybrid Power Project (SE 07-02) PSD Permit - EPA
Region 9
03/11/2010
9-8 Live Oaks Power Plant, RBLC GA-0138, Air Quality Permit No.4911-
127-0075-P-02-0
http://airpermit.dnr.state.ga.us/gaairpermits/
04/08/2010
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 19 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
9-9 Pondera Capital Management, King Power Station, RBLC TX-0590,
Permit Numbers 84289 and PSDTX1125
https://webmail.tceq.texas.gov/gw/webpub/884a43698bb9292e4c6e867
11f7be23f77f833f5/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/392874
/Official/HTML/GWContentRoot?action=Document.View&merge=file
view&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+84289+
Pondera+Capital+Management+GP+%5binitial%5d&User.context=884
a43698bb9292e4c6e86711f7be23f77f833f5&Item.Attachment.type=Do
cument&Item.Attachment.Library.id=tnrdom3.dms3apo.ansrp01&Item.
Attachment.Document.id=392874&Item.Attachment.Document.version
=Official&Item.Attachment.allowViewNative=1
08/05/2010
9-10 Virginia Electric and Power Company – Warren County Power Station
PSD Permit; Reg. No. 81391
http://www.deq.virginia.gov/Portals/0/DEQ/Air/Permitting/PSDPermits/
81391_Permit.pdf
12/21/2010
9-11 Portland General Electric Carty Plant, Review Report/Permit No. 25-
0016-ST-02
http://www.deq.state.or.us/aq/permit/tv/er/250016PGEBoardman_STD_
RR.pdf
12/29/2010
9-12 Avenal Power Center, LLC PSD Permit SJ-08-01
http://www.epa.gov/region9/air/permit/avenal/Avenal_Permit.pdf
05/27/2011
9-13 Brockton Power, MassDEP Conditional Approval No. 4B08015
07/20/2011
9-14 Entergy Louisiana LLC Ninemile Point Electric Generating Plant,
RBLC TX-0600
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27244
08/16/2011
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 20 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
9-15 Thomas C. Ferguson Power Plant, RBLC, TX-0600, PSDTX1244
https://webmail.tceq.texas.gov/gw/webpub/884a43698bb9292e4c6e867
11f7be23f77f833f5/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/417857
/Official/HTML/GWContentRoot?action=Document.View&merge=file
view&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+93938+
Lower+Colorado+River+Authority+%5bLCRA%5d+%5binitial%2c+P
SD%5d&User.context=884a43698bb9292e4c6e86711f7be23f77f833f5
&Item.Attachment.type=Document&Item.Attachment.Library.id=tnrdo
m3.dms3apo.ansrp01&Item.Attachment.Document.id=417857&Item.At
tachment.Document.version=Official&Item.Attachment.allowViewNati
ve=1
09/01/2011
9-16 Palmdale Hybrid Power Project, PSD Permit SE-09-01
http://www.epa.gov/region9/air/permit/palmdale/palmdale-final-permit-
10-2011.pdf
10/18/2011
9-17 Thomas C. Ferguson Power Plant, RBLC TX-0600 (GHG)
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27274
11/10/2011
9-18 Fact Sheet - Pioneer Valley Energy Center; EPA Region 1
http://epa.gov/region1/communities/pdf/PioneerValley/FactSheet.pdf
12/2011
9-19 Pioneer Valley Energy Center; EPA Final PSD Permit Number 052-
042-MA15
http://www.epa.gov/region1/communities/pdf/PioneerValley/PVECFina
lPermitDecisionApril2012.pdf
04/05/2012
9-20 Calhoun Port Authority ES Joslin Power Plant, RBLC TX-0620
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27440
09/12/2012
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 21 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
9-21 Calhoun Port Authority ES Joslin Power Plant, Permit Numbers 96336
and PSDTX1256
https://webmail.tceq.texas.gov/gw/webpub/54d4291de52b19ee1ddc571
5535ef5dabdf5d24/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/475785/
Official/HTML/GWContentRoot?action=Document.View&merge=filev
iew&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+96336+C
alhoun+Port+Authority+%5brevision%5d&User.context=54d4291de52
b19ee1ddc5715535ef5dabdf5d24&Item.Attachment.type=Document&It
em.Attachment.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachmen
t.Document.id=475785&Item.Attachment.Document.version=Official&
Item.Attachment.allowViewNative=1 (SUSD Limits)
09/12/2012
9-22 Deer Park Energy Center, RBLC TX-0619, PSDTX979M2
https://webmail.tceq.texas.gov/gw/webpub/12e4ac46210ad60bb4d54eba
bb914c11c0e4/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/444154/Offi
cial/HTML/GWContentRoot?action=Document.View&merge=fileview
&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+45642+Deer
+Park+%5bamend%5d&User.context=12e4ac46210ad60bb4d54ebabb9
14c11c0e4&Item.Attachment.type=Document&Item.Attachment.Librar
y.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Document.id=44415
4&Item.Attachment.Document.version=Official&Item.Attachment.allo
wViewNative=1 (for H2SO4/SUSD limits)
09/26/2012
9-23 Deer Park Energy Center, RBLC TX-0619
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27388 (for PM limits)
09/26/2012
9-24 Cricket Valley Energy Center, Air State Facility Permit, Permit ID: 3-
1326-00275/00004
http://www.dec.ny.gov/dardata/boss/afs/permits/313260027500004.pdf
09/27/2012
9-25 Moxie Liberty LLC/Asylum Power Plant, RBLC PA-0278
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27461
10/10/2012
9-26 Channel Energy Center, RBLC TX-0618
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.ProcessInfo&f
acility_id=27386&PROCESS_ID=108405 (for PM limits)
10/15/2012
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 22 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
9-27 Channel Energy Center, RBLC TX-0618, PSDTX955M1
https://webmail.tceq.texas.gov/gw/webpub/86885fcef4494f511dde18b0
d929fe7ab41d6225/GWDOC/DREF/tnrdom3.dms3apo.ansrp01/446096
/Official/HTML/GWContentRoot?action=Document.View&merge=file
view&bNoRefresh=1&Item.Attachment.filename=MRT+%2d+42179+
Channel+Energy+%5bamend%5d&User.context=86885fcef4494f511dd
e18b0d929fe7ab41d6225&Item.Attachment.type=Document&Item.Atta
chment.Library.id=tnrdom3.dms3apo.ansrp01&Item.Attachment.Docu
ment.id=446096&Item.Attachment.Document.version=Official&Item.A
ttachment.allowViewNative=1 (for H2SO4 and auxiliary equipment
limits)
10/15/2012
9-28 Hess Newark Energy Center, PSD Permit PI No. 08857
11/01/2012
9-29 Deer Park Energy Center, RBLC TX-0632(GHG)
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27549
11/29/2012
9-30 St. Joseph Energy Center, LLC; RBLC IN-0158
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27537
12/03/2012
9-31 Garrison Energy Center LLC, Delaware Department of Natural
Resources, APC 2012/0098 Construction (NSPS) (LAER) (PSD)
01/30/2013
9-32 Moxie Energy LLC/Patriot Generation Plant, RBLC PA-0286
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27505
01/31/2013
9-33 Virginia Electric and Power Company – Brunswick County Power
Station PSD Permit; Reg. No. 52404
http://www.deq.virginia.gov/Portals/0/DEQ/Air/Permitting/PSDPermits/
52404_permit.pdf
03/12/2013
9-34 Sunbury Generation LP, RBLC PA-0288
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&f
acility_id=27512
04/01/2013
9-35 Hickory Run Energy Center LLC, RBLC PA-0291
http://cfpub.epa.gov/rblc/index.cfm?action=PermitDetail.FacilityInfo&F
acility_ID=27544
04/23/2013
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 23 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
9-36 Green Energy Partners / Stonewall LLC, PSD Permit; Reg. No. 73826
http://www.deq.virginia.gov/Portals/0/DEQ/Air/Permitting/PSDPermits/
73826_permit.pdf
04/30/2013
9-37 Oregon Clean Energy Center; Ohio EPA – Final Air Pollution Permit to
Install; Permit No. P0110840
http://wwwapp.epa.ohio.gov/dapc/permits_issued/1024326.pdf
06/18/2013
9-38 Idaho Power Company Langley Gulch Power Plant; Idaho Permit to
Construct; Permit No. P-2009.0092
http://www.deq.idaho.gov/media/486885-
idaho_power_langley_gulch_new_plymouth_ptc_permit_0813.pdf
08/14/2013
9-39 Renaissance Power LLC, Michigan Permit to Install 51-13
http://www.deq.state.mi.us/aps/downloads/permits/PubNotice/51-13/51-
13.pdf
11/01/2013
9-40 Renaissance Power LLC, Michigan Michigan Permit to Install 51-13
Response to Comments (RTC) Document
http://www.deq.state.mi.us/aps/downloads/permits/PubNotice/51-13/51-
13RTC.pdf
11/01/2013
9-41 Carroll County Energy Center LLC; Ohio EPA – Final Air Pollution
Permit to Install; Permit No. P0113762
http://wwwapp.epa.ohio.gov/dapc/permits_issued/1068717.pdf
11/05/2013
10 Footprint and Tetratech Communications
10-1 E-mails (2) from Sten Levin, Milton Cat with Emergency Diesel
Generator and Fire Pump emission control pricing
11/25/2013
10-2 E-mail from George Wilson (Footprint) forwarding e-mail from Nick
Ferguson (Cleaver Brooks) with Auxiliary Boiler SCR and burner
pricing.
11/27/2013
10-3 Footprint Combined Cycle Power Project Startup/Shutdown Emission
Estimate GE 107FA.05 (General Electric Company Proprietary
Document)
01/09/2014
EAB Docket No. PSD 14-02 Administrative Record Index – April 2014
Massachusetts Department of Environmental Protection Page 24 of 24
Footprint Power Salem Harbor Development LP
(MassDEP Application No. NE-12-022, Transmittal No. X254064)
11 Orders
11-1 In the Matter of Monroe Electric Generating Plant Entergy Louisiana,
Inc. Proposed Operating Permit Petition No. 6-99-2
-- Order Responding to Petitioner’s Request that the Administrator
Object to Issuance of a State Operating Permit
12 MassDEP website regarding the Footprint Project
12-1 MassDEP’s website includes a webpage for Footprint’s proposed
project re: federal PSD and state air permitting. Note: IT staff changed
the public name of the web link between the initial Press Release and
the issuance Final Permit. The site can be found by searching or at:
http://www.mass.gov/eea/agencies/massdep/air/approvals/footprint.html
The contents include:
- Notice of Public Hearing and Public Comment Period;
- MassDEP Letter of 09/09/2013;
- Draft PSD Permit;
- Draft PSD Fact Sheet;
- Proposed Plan Approval;
- Revised Notice extending public comment period to 11/01/2013;
- the following excerpt:
“If you wish to review Footprint Power Salem Harbor Development
LP's application for these approvals, the appendices/attachments to
that application, and related air modeling files, please contact:
Cosmo Buttaro (978-694-3281)
Environmental Engineer
MassDEP Northeast Regional Office
205B Lowell Street
Wilmington, MA 01887”
The final PSD Permit and related documents were added to the website
on 01/30/2014.
Press releases and Tweets related to the availability of the air permit
public comment drafts are also available on the MassDEP website.
09/10/2013
to present