Creation of a new Heavy Duty dynamic engine test bed from two existing test beds

• Calculations• 3Dmodellingofthetestbed• CivilWorksguidanceschematics• Studies,consultationsandtheirtechnical

adjustment...• CivilWorks• Acoustics• Airflow&Ventilation• Fluids• Electricalengineering• Mechanics• Dynamometer• Standardtestscompliantwithregulations

Services proposed by D2T:

P. 3

STEP 0: OVERALL STUDY OF THE TEST BED

P. 4

STEP 0: OVERALL STUDY OF THE TEST BED

3Dmodellingforeachworkpackages

P. 5

STEP 1: CIVIL WORKS

1.Protectionoftheconstructionareafromdust.

2.Preparationofseismicblockfoundations.

3.Cuttingtheloadbearingwallbetweenthetwocells.

4.Extractionofthecutblocksbyslicesofonetoneach

P. 6

STEP 2: ACOUSTICS

1.Layingofcabletrays2. Installationoftheacousticpanels:

wallsandceilings3. Integrationofthecabletraysinthe

walls4.Finishingworkforopenings

P. 7

STEP 3: SETTING OF THE TEST BED PLATE

1.Preparationofagatewaytoreachthetestbed,tocarrytheload.2.Receiptoftheironframeforreceivingconcrete.3.Settingdecouplingspringboxesat3Hz.4.Frameintendedtoreceivetheconcreteonthespringboxes.Fillingthe

concrete,vibratedconcrete.5. Implementationofthetestbedplate,thenpouringtheresinbetween

thetestbedplateandtheconcrete.

P. 8

STEP 4: FLUIDS IMPLEMENTATION

Cooling

Fueldistribution

P. 9

STEP 5: FLOOR, BLOCK WALLS, FIRE SAFETY

Settingoftheblockpanelsontheexteriorwalls

Firefightingequipment

Raisedpatternplateandduckboards

P. 10

STEP 6: AIR FLOW & VENTILATION

• Doubleflowcellairtreatmentunitwithenergyrecoverybetweenventilationandextraction

• Temperatureconditioningofcombustionair• Humidity

P. 11

STEP 7: ELECTRICAL ENGINEERING

Settingofelectricalcabinets:• Distributioncontrolandsafetycabinet• Ventilationcabinet• Powercabinet,dynamometerdrive.• Connectionandinstallationofthe

dynamometer

P. 12

STEP 8: ELECTRICAL ENGINEERING

Connectionsofsensorsandequipmenttotheengine

P. 13

STEP 9: ELECTRICAL ENGINEERING

Automationinthecontrolroom