Upload
nu-flow
View
219
Download
0
Embed Size (px)
Citation preview
8/11/2019 Dual Tech 2013 Industrial
http://slidepdf.com/reader/full/dual-tech-2013-industrial 1/2
g
How it Works for Hot & Cold Lines How it Works for Drain Lines
Leaks? Back Ups?
No more pinhole leaks
or heavy metals leaching
into your water!
*Master Lic ensee, U.S. Navy Patent #5,707,702
No more scale build up
or root intrusion!
*U.S. Patents #6,691,741 • #7,216,674 • #7,849,883 • #7,849,883
*Canadian Patents #2,462,853 • #2,505,939
Add iti onal Patents Pend ing
1. Corroded pipes
are sand blasted
to prepare for
rehabilitation.
2. “Shots” of
epoxy are then
moved through-
out the entire
piping system.
3. The end result
is a protective
epoxy barrier
between the
pipes and water.
1. Blocked and
root-intruded pipes
are cleaned with a
cutting tool.
2. An epoxy
impregnated liner is
pulled into placeand infated with
an internal rubber
bladder. The liner
is left to cure.
3. The bladder is
removed, leaving
behind a “pipe
within a pipe.”
1-800-834-9597 • www.nuowtech.com • [email protected]
Fix Your Pipes From The Inside!Problem Solved, Guaranteed! Less TIME! Less MESS! Less MONEY!
Nu Flow Potable Water Epoxy #7000 (a) Nu Flow #2000 Pipe Lining
Lic. #882102
Lic. #M13549
Lic. #0077809
Lic. #2705150029
8/11/2019 Dual Tech 2013 Industrial
http://slidepdf.com/reader/full/dual-tech-2013-industrial 2/2
Nu Flow’s in-place restoration technology has beneted our customers in a wide variety of ways, which includes
dramatic savings in cost, time, inconvenience and destruction when compared to a traditional pipe replacement.
Industrial Property Customers
Situation:200 feet of 8” cast iron sanitary sewer line was failing. Thesanitary system was located deep under oors, foundationsand inside walls. The customer needed a long-term solution.
Solution:Working with general contractor ESGI, Nu Flow was ableto rehabilitate the pipe system using our structural lining,
saving the customer the destructive, time-consuming andcostly option of a re-pipe.
Whe re li fe in te rac ts wit h in fr as tr uc tur e.
.
Anheus er-Busc h Brewery : Sanitar y Sewer Rehabi litat ion
Location: Williamsburg, Virginia
Location: Carlsbad, California
Situation:Copper pipes were accidentally installed as for the EncinaWastewater Authority’s water treatment lab. These gas andcompressed air lines are used for metal analysis, so the pipescan not be made of metal. Since the lab had just been built,
the customer did not want a destructive and disruptive re-pipe.
Solution:Nu Flow’s in-place pipe lining technology provided the idealsolution for the customer. Our technicians used existingaccess points to apply our blown-in epoxy coating to the1/2"-wide compressed air and argon gas lines. This barrier
successfully prevents copper contamination for the lab.
Wh er e li fe in te ra ct s wi th in fr as tru ct ur e.
Encina Wastewater Authority: Compressed Air and Gas Line Rehabilitation
Location: Baja California, Mexico
Situation: A potable ltration line at a liqueed natural gas plantexperienced constant failure and leaks due to the effects
of puried water corrosion. The carbon steel pipes areorganized in a maze-like pattern across the ceilling, which
made them challenging to access.
Solution:Nu Flow cleaned the potable system and then lined it usingour patented blown-in epoxy coating, which created a thin,pr otective coating that will prevent future problems. This
eco-friendly process means less mess, less hassle and lesscost for the customer.
Whe re li fe in ter ac ts wit h in fr as tr uc tur e.
Liquefed Natural Gas Plant: Potable System Rehabilitation
Location: Carlton, Wisconsin
Situation:Part of a 6” diameter drain pipe encased in concrete wasleaking 10 feet under a concrete structure. Breaking throughthe concrete to access the pipe was not an option.
Solution:Nu Flow rehabilitated the leaking pipe with our Pustructural liner and created a seamless pipe insidpipe without disrupting the plant’s normal operaFlow contracted a scuba diver to work at the dischbelow the waterline in Lake Michigan.
Wh er e li fe in te ra cts wi th in fr as tr
Kewaunee Nuclear Power Plant: Underground Drain Rehabilitation
Location: Chattanooga, Tennessee
Situation:The transformer emergency cooling system consists of 8"ductile iron pipes that are underground and embedded inconcrete. This aged system leaked, so this repeat customerknew the pipes had to be xed because a failing emergencycooling water system is unacceptable.
Solution:Nu Flow had the ideal solution for this repeat customeour in-place technology prevented shutting down
station and saved the dam’s integrity. We also workedcustomer’s strict budget and timeline. Our no-dig, Pustructural liner covers all cracks and will prevent future
Wh er e li fe in te ra cts wi th in fr as tr
Raccoon Mountain Pumped-Storage Plant: Cooling Water System Rehabilit
Location: Albuquerque, New Mexico
Situation:500 feet of 6” re suppression lines were experiencingpinhole leaks, tuberculation and ow reduction. The resuppression system consists of ductile and cast iron pipeswith 90-degree elbows and 260 feet underneath nishedconcrete and interlocking pavers.
Solution:Nu Flow rst sandblasted the inside of the pipe sysit of corrosion, then our patented epoxy was blowpipes using our trenchless technology. This left a pprotective coating inside the host pipes, which wfuture corrosion and pinhole leaks.
Wh er e li fe in te ra cts wi th in fr as tr
Sandia National Laboratories: Fire Suppression Main Rehabilitation
Location: San Diego, California
Situation:Sanitary drain line had reduced water ow and backupsbecause of cracking, root intrusions and weakened joints.The system consists of 6” clay pipe connected to 4” PVCpipe, beneath a layer asphalt.
Solution:The pipe is below an entrance to the building, so Nu Flow’strenchless technology prevented disruption to the ofce’snormal operations. Nu Flow cleaned the pipe system,restoring ow, and then installed our structural drain liner toprevent future problems.
Whe re li fe in ter ac ts wit h in fr as tr uc tu re .
General Atomics: Sanitary Drain Line System Rehabilitation
Location: Chula Vista, California
Situation:PVC pipe that carries de-ionized water lines was leaking atpipe joint locations. The pipe system is suspended 15 feet inthe air, surrounded by other pipes and include 4” mainlinesand 2” tie-ins.
Solution:After sandblasting the inside of the pipes to clean andremove build-up, epoxy was applied to cover up leaks andprevent corrosion. Nu Flow’s epoxy solution is estimated tosave the customer about $2,800 per year in maintenanceand repair.
Whe re li fe in ter ac ts wit h in fr as tr uc tu re .
Goodrich Industrial: PVC Potable Water Lines Rehabilitation
Location: Greenbelt, Maryland
Situation:Nu Flow was asked to rehabilitate a building’s secondaryheating system to remove it of corrosion and to extend itsuseful life. The carbon steel and copper pipe system consistsof 600 feet of mainline and 130 feet of lateral line pipes.
Solution:Day-to-day operations were not disturbed thanks to NuFlow’s trenchless blown-in epoxy coating process. The hostpipes in the heating system now have a protective barrier toprevent pinhole leaks and corrosion.
Whe re li fe in ter ac ts wit h in fr as tr uc tu re .
NASA’s Goddard Space Flight Center: Heating System Rehabilitation