g How it Works for Hot & Co ld Lines Ho w i t Wo rks f or Drain Lin es  Leaks? Back Ups? No more pinhole leaks or heavy metals leaching into your water! *Master Lic ensee, U.S. Navy Patent #5,70 7,702 No more scale build up or root intrusion! *U.S. Patents #6,691,741 • #7,216,674 •  #7,849,883  #7,849,883 *Canadian Patents #2,462,853  #2,505,939  Add iti onal Patent s Pend ing 1. Corroded pipes are sand blasted to prepare for rehabilitation. 2. “Shots” of epoxy are then moved through- out the entire piping system. 3. The end result is a protective epoxy barrier between the pipes and water. 1. Blocked and root-intruded pipes are cleaned with a cutting tool. 2. An epoxy impregnated liner is pulled into place and infated with an internal rubber bladder. The liner is left to cure. 3. The bladder is removed, leaving behind a “pipe within a pipe.” 1-800-834-9597 • www.nuowtech.com • info@nuowtech.com Fix Your Pipes From The Inside! Problem Solved, Guaranteed! Less TIME! Less MESS! Less MONEY! Nu Flow Pot able Wat er Epoxy #7000 (a) Nu Flow rb200 and rn220 of System #2000 Lic. #882102 Lic. #M13549 Lic. #0077809 Lic. #2705150029

Dual Tech 2013 Commercial

  • Upload
    nu-flow

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

8/11/2019 Dual Tech 2013 Commercial

http://slidepdf.com/reader/full/dual-tech-2013-commercial 1/2

g

How it Works for Hot & Cold Lines How it Works for Drain Lines

  Leaks? Back Ups?

No more pinhole leaks

or heavy metals leaching

into your water!

*Master Lic ensee, U.S. Navy Patent #5,707,702

No more scale build up

or root intrusion!

*U.S. Patents #6,691,741 • #7,216,674 • #7,849,883 • #7,849,883

*Canadian Patents #2,462,853 • #2,505,939

 Add iti onal Patents Pend ing

1. Corroded pipes

are sand blasted

to prepare for 

rehabilitation.

2. “Shots” of

epoxy are then

moved through-

out the entire

piping system.

3. The end result

is a protective

epoxy barrier 

between the

pipes and water.

1. Blocked and

root-intruded pipes

are cleaned with a

cutting tool.

2. An epoxy

impregnated liner is

pulled into placeand infated with

an internal rubber 

bladder. The liner 

is left to cure.

3. The bladder is

removed, leaving

behind a “pipe

within a pipe.”

1-800-834-9597 • www.nuowtech.com • [email protected]

Fix Your Pipes From The Inside!Problem Solved, Guaranteed! Less TIME! Less MESS! Less MONEY!

Nu Flow Potable Water Epoxy #7000 (a) Nu Flow rb200 and rn220 of System #2000

Lic. #882102

Lic. #M13549

Lic. #0077809

Lic. #2705150029

8/11/2019 Dual Tech 2013 Commercial

http://slidepdf.com/reader/full/dual-tech-2013-commercial 2/2

Nu Flow’s in-place restoration technology has beneted our customers in a wide variety of ways, which includes

dramatic savings in cost, time, inconvenience and destruction when compared to a traditional pipe replacement.

Commercial Property Customers

Location: Greenbelt, Maryland

Situation:Nu Flow was asked to rehabilitate a building’s secondaryheating system to remove it of corrosion and to extend itsuseful life. The carbon steel and copper pipe system consistsof 600 feet of mainline and 130 feet of lateral line pipes.

Solution:Day-to-day operations were not disturbed thanFlow’s trenchless blown-in epoxy coating processpipes in the heating system now have a protectiveprevent pinhole leaks and corrosion.

 Wh er e li fe int er ac ts wit h in fr as t

 

NASA’s Goddard Space Flight Center: Heating System Rehabilitation

Location: New York, New York

Situation:Corrosion in the galvanized piping system that consists ofmore than 400 feet of 6” and 200 feet of 8” potable watermains. The pipes run through the travertine-covered walls,the ceiling in the main lobby and the ceiling in a restaurant.

Solution:Nu Flow rehabilitated the pipe system without destruction tothe building or disrupting the tenants’ normal operations. Ourin-place pipe restoration epoxy coating will protect the watermains from corrosion and other problems.

 Whe re li fe in ter ac ts wit h in fr as tr uc tur e.

 

MetLife Skyscraper: Potable Water Main Rehabilitation

Location: Downtown Houston, Texas

Situation:This 32-story commercial skyscraper’s roof drain pipes wouldleak into the Houston Tunnel System below the building afterit would rain. The cast iron main is more than 80 years oldand are located below the lobby’s marble oor and the oorsof other businesses. Destruction was not preferred.

Solution:Nu Flow used existing access points to pull our protectivestructural liner into place. This did not cause any destructionto the building, which prevented the closure of any ofces orpart of the Houston Tunnel System. The customer was alsothrilled that our solution was half the cost of a repipe.

 Wh er e li fe in te rac ts wit h in fr as tr uct ur e.

 

Niels Esperson Building: Roof Drain Main Rehabilitation

Location: Downtown San Diego, California

Situation:The waterfront hotel sits at sea level, with its parking structurebelow the hotel. Beneath an 18-inch slab, the hotel’s sanitarydrain line runs below the ocean’s water table The corrosiveocean water ate away at a 70-foot run of 4” cast iron pipe.

Solution: After a traditional spot repair by another companyhotel hired Nu Flow to install our Pull-in-Place, sealiner into the drain system. Our no-dig technologcause unsightly construction, and the retrot liner wthe pipes from the ocean water.

 Wh er e li fe in te ra cts wi th in fr as tr

 

Omni Hotel: Sewer Drain Line Rehabilitation

Location: Reno, Nevada

Situation:The stainless steel potable system, which ranges from 4"to 12" in diameter, for Peppermill’s pools, spas and fountainexperienced pinhole leaks in the welded joints from aggressive

water. The customer searched for a non-invasive pipe liningsolution that would not destroy the newly remodeled building.

Solution:Nu Flow’s blown-in, barrier coating epoxy was the osolution  for the customer. Our technicians rehabpotable water lines using existing access points wdisruption to the customers and employees. Nu only company with technology to line pipes up to 12"

 Whe re li fe in te ra ct s wi th in fr as t

 

Peppermill Hotel & Casino: Potable Water System Rehabilitation

Location: New York, New York

Situation:The 10 roof drains encased in concrete pillars were rotten,had leaks and could have destroyed the historical templefrom within. The roof drains run through 12-story columns inthe middle of the Synagogue.

Solution:Nu Flow’s trenchless technology preserved the historicaltemple and the interior columns, causing minimal disruptionto the temple’s normal operations. Nu Flow’s Pull-in-Placestructural liner created a new pipe within the existing hostpipes, protecting the drain system from future problems.

 Whe re li fe in te ra ct s wi th in fr as tr uc tu re .

 

Temple Emanu-El: Roof Drain Syst em Rehabilitation

Location: Toronto, Ontario

Situation:This posh commercial and residential complex along theLake Ontario coast experienced constant pipe systemfailures. The property’s original HVAC system consistedof galvanized pipes with a glycol coolant. The glycol atethrough the pipes, creating pinhole leaks and ruptures.

Solution:Nu Flow technicians isolated the HVAC pipe system andapplied our barrier coating to the 2,000+ feet of failingpipes using our unique, non-invasive process. Nu Flow’sepoxy coating will protect the pipes and serve as a long-term solution against pinhole leaks and other failures.

 Whe re li fe in ter ac ts wit h in fr as tr uc tu re .

 

Waterclub: HVAC System Rehabilitation

Location: Southern California

Situation: A 14"-diameter drain line that runs beneath a large poolexperienced chronic failures. The customer needed a long-term solution that would keep the pool and surroundinglandscape in tact, as well as cause as little disruption to thetheme park as possible.

Solution:Nu Flow installed our structural liner using our unique andinnovative Pull-in-Place technology. This liner will protect theinside of the pipe line and will prevent leaks. The customerwas so happy with our solution that the company scheduledmore work for us to do in their park.

 Wh er e li fe in te ra cts wi th in fr as tru ct ur e.

 

Southern California Theme Park: Underground Drain Line Rehabilitation

Location: Chula Vista, California

Situation:The aged sanitary branch line below the Target’s food courtexperienced backups and limited fow. This pipe line is locat ed3.5 feet beneath concrete. The pipe line was jetted yearsprior, but the problems still returned. The customer wanted along-term solution that would not disrupt operations.

Solution:Nu Flow rehabilitated the failing pipe without having to moveor unplug any equipment. Our technicians worked while thestore was closed at night, and the food court operatednormally during business hours. Nu Flow’s Pull-in-Placestructural liner was installed to prevent future problems.

 Whe re li fe in ter ac ts wit h in fr as tr uc tu re .

 

Target: Underground Sanitary Branch Line Rehabilitation