Batch Derivation in Production
Batch Derivation :
Transferring batch characteristics values or batch master fields from the sender batch to thereceiving batch is called “Batch Derivation”.The component batches can pass on their Field values/characteristics values to the manufactured batch.
Scenario :
Minimum value of Manufacturing date and Expiry Date (SLED) of the component materials batches are to be
transferred to header material batch during process order release automatically
Process Flow:• Create BOM and Recipe for Header material - CS01• Create condition records for sender receiver materials - DVCO• Create Process Order - COR1• Do the batch determination for components - COR2• Release the process order - COR2• Check for the batch derivation - MSC3N
Detailed Flow:
Create BOM for header material as shown below....and also create master recipe for the header material....
Now go to transaction DVCO
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:002
Enter the relevant details Material, Plant, usage as shown below and select the derivation event as during
Release of process/production order
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:003
then click on execute
Now click on create button
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:004
add two fields SLED and Date of manufacture as shown below
Drag and Drop these two to Left side materials to create sender and Receivercondition records….
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:005
select the comarative as minimum as shown below for value selection during derivation...
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:006
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:007
Then Save
Now check the batches of the two component materials and values of their Manufacturing date and SLED....
First component is 2160
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:008
Batch S1 with MFG date as 14.08.2013 and SLED as 31.12.2014
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:009
Now check for second component is T-RJ200
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:0010
Batch 1234 with MFG date as 01.07.2013 and SLED as 31.07.2014
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:0011
Now create process order for header material as shown below...
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:0012
Create batch for header material as shown below...
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:0013
save the order
go to change mode
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:0014
Assign the batches to the components manually or through batch determination as shown below.....
Now Release the process order
Batch Derivation in Production
Generated by Jive on 2014-03-29+01:0015
Now save the process order
Now during process order release batch derivation gets triggered and values gets transferred to header batch
automatically...
Now check in the Batch of the header material whether MFG date and SLED are updated as per the
requirement...
MFG date: 01.07.2013 is the minimum of 14.08.2013 (Batch S1 material 2160) and 01.07.2013 (Batch 1234
material T-RJ200)
Shelf Life Exp. Date: 31.07.2013 is the minimum of 31.12.2014 (Batch S1 material 2160) and 31.07.2013
(Batch 1234 material T-RJ200)