Distribution List - ER:

1. Head Regulatory Vedanta Limited (erstwhile Sterlite Energy Ltd.) 3rd Floor, Core 6, Scope Complex, Lodhi Road, Delhi Email: [email protected] Ph: 9999313479

2. Principal Chief Engineer cum Secretary Power Department Government of Sikkim Kazi Road, Gangtok, Sikkim

Email: [email protected]; [email protected] Mob: 9733032266

3. AGM (PE-Electrical) NTPC(Darlipalli, North KaranPura, Nabinagar-II) EOC Complex, A-8A, Sec-24, Noida, UP-201301 Email: [email protected] [email protected] Ph: 9650991067

4. Addl. Chief Engineer & In-charge of PTR WBSEDCL Bidyut Bhawan, 7

th Floor,

B Block, DJ Block, Sector II, Salt Lake City, Kolkata – 700 091 Email : [email protected];

[email protected]

5. General Manager Monnet Ispat & Energy Limited 11, Monnet House, Masjid Moth, Grater Kailash, Part-II, New Delhi – 110 048 Email : [email protected]

Mobile : +91 9560509283

6. Executive Director PTC India Limited, 2

nd Floor; NBCC Tower,

15 Bhikaji Cama Place New Delhi – 110 066 Phone : 011-41659136, Email : [email protected]

7. Director & SPV Head Lanco Babandh Power Pvt. Ltd. Plot No. 397, Phase-III Udyog Vihar, Gurgaon-122 016 Phone : 0124-4691101 Mobile : 8800090621 Email : [email protected]

[email protected]

8. Chief Executive Officer Jal Power Corporation Limited A-102, Sector-65 Noida – 201 307 Phone : 0120-4397444 Email : [email protected]

9. Director-Technical Ind-Bharat Energy (Utkal) Limited Plot No. 30-A. Road No:1, Film Nagar Jubilee Hills, Hyderabad-500 033 Mobile: 9717212999 Email : [email protected]

10. Director, Madhya Bharat Power Corporation Ltd 1

st Floor, Vanijya Bhawan,

Devendra Nagar Square, Jail Road, Raipur-492001 Mobile: 9810432623

Phone : 0771- 2214210 Email : [email protected]; [email protected]

[email protected]

11. Director (Commercial) Grid Corporation of Orissa Ltd, (GRIDCO) Jan path, Bhubaneshwar-751022

Email: [email protected]; Mob: 9433035435

12. President, Hydro Gati Infrastructure Limited 14/19/2 Old Delhi Gurgaon Road, Opp. Heera Public School, Samalkha, New Delhi - 110037. Email: [email protected]

13. CEO Essar Power (Jharkhand) Ltd. 2

nd Floor, Essar House,

Mahalaxmi, Mumbai - 400034 Email : [email protected] [email protected];

[email protected]

14. President, Hydro Gati Bhasmey Power Pvt. Ltd. 14/19/2 Old Delhi Gurgaon Road, Opp. Heera Public School, Samalkha, New Delhi - 110037. Email: [email protected]

15. Sr. Manager (Electrical) Orissa Power Generation Corporation Ltd. (OPGC) Zone-A, 7th Floor, Fortune Towers Chandrasekharpur, Bhubaneswar – 751023

16. Director, Sikkim Hydro Power Ventures Ltd, 5th Floor, Orbit Plaza, New Prabhadevi Road, Prabhadevi, Mumbai- 400025

Odisha Ph : 0674-2303765- 66, 09338715428 Fax : 0674-2303755-56 Email : [email protected]; [email protected]

Email: [email protected]; [email protected] Mob: 7709042956

17. Head, Transmission GMR Kamalanga Energy Ltd. Building no. 302, First Floor, New Shakti Bhawan, New Udaan Bhawan Complex, IGI Airport, Delhi-110037 Email: [email protected]

18. Shri Yogendra Kumar, Teesta Urja Limited, 2

nd Floor, Vijaya Building,

17, Barakhambha Road, Cannaught Place, New Delhi – 110001 Phone : 011-46529744 Email: [email protected]

Mob: 9910413388, Ph: 01146529749

19. Vice President Jindal India Thermal Power Limited Plot No: 12, Local Shopping Complex, Sector B-1, Vasant Kunj, New Delhi – 110070 Mob: 8130613563 Email:[email protected]; [email protected]

20. SPV Head, LANCO Teesta Ltd. Plot No. 397, Udyog Vihar – Phase III, Gurgaon – 122016 Email : [email protected] Phone : 0124-4741475 Mobile : 9599934386

21. Managing Director, Shiga Energy Pvt. Ltd. 5

th Floor, DLF Building No. 8

Tower-C, DLF Cyber City, Phase-II Gurgaon – 122002 Phone : 0124-4696300, 4100393, Email : [email protected]

22. Managing Director Dans Energy Pvt. Ltd 5th Floor, DLF Building No. 8 Tower-C, DLF Cyber City, Phase-II Gurgaon – 122002 Phone : 0124-4696300/9873574939 Email : [email protected],

[email protected]

23. CEO Sneha Kinetic Power Projects Pvt. Ltd. Sonam Complex, Jeevan Theng Marg Development Area, Near Little Pixel International School, Gangtok, Sikkim-737 101 Email : [email protected]

Mob: 9958355966

24. Business Head KVK Energy & Infrastructure Pvt. Ltd. Plot No. 484/A, Road No 36, Jubilee Hills, Hyderabad – 500033 Email : [email protected]; [email protected];

[email protected] Phone: 9810257484

25. Sr. Vice President Teestavalley Power Transmission Ltd 2nd Floor, Vijaya Building 17, Barakhamba Road, New Delhi-110001 Email: [email protected] Mob: 9958008265

26. Chief Operating Officer KVK Nilachal Power Pvt Limited 6-3-1109/3, 3

rd Floor, Navabharath Chambers,

Raj Bhavan Road, Somajiguda Hyderabad: 500 082 Contact No: 040 66225111 Email:[email protected]; [email protected] Mob: 8790944466

27. Sr. Manager Nabinagar Power Generation Co. 1

st Floor, Vidyut Bhavan-II,

Bailey Road, Patna-800021 Email: [email protected] Mob: 0612- 2504010

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 1 of 28

Minutes of 13th Joint Co-ordination Committee meeting of Generation Projects granted Connectivity/LTA in Eastern Region (ER) held on 16.06.2017 at POWERGRID, Gurgaon

1. The 13th Joint Co-ordination Committee meeting of generation projects in Eastern Region was held at POWERGRID Office, Gurgaon on 16th June, 2017. The list of participants of the meeting is enclosed at Annexure-I.

2. After welcoming the participants, it was informed that Minutes of the 12th Meeting of the Joint Co-ordination Committee of

generation projects which were granted LTA in Eastern Region held on 27.03.2017, were issued vide letter ref. no.

C/CTU/ER/OA/12JCC dated 09.05.2017. M/s Jal Power Corp. Ltd (JPCL) vide email dated 16.05.2017 informed that they could

not attend the meeting, however, they had submitted the commissioning schedule, which is not reflected in the MOM.

Accordingly, CTU clarified that commissioning schedule of M/s JPCL as per 12th JCC may be read as “U1: Sep’19, U2&3:

Oct’19”. With this modification, minutes were confirmed.

3. It was also emphasized that Joint Coordination Committee meetings were institutionalized by the Hon’ble Central Electricity

Regulatory Commission to enable better coordination of generation and transmission projects in terms of the applicable CERC

Regulations, Detailed Procedure and BPTAs/LTAAs. In this regard, it is also pertinent to mention that the BPTAs/LTAAs

executed with the generation project developers/companies monitored hereunder provides that if any of the developers fail to

construct the generating station/dedicated transmission line or makes an exit or abandons its project, then POWERGRID shall

have the right to collect the transmission charges and/or damages as the case may be in accordance with the CERC

Regulations, Orders etc. Further, as per the BPTAs/LTAAs, the construction phase bank guarantee submitted by the project

developers/LTA customers is also encashable in case of adverse progress of individual generations project(s)/unit(s) assessed

during the Joint Coordination Committee meetings. It was also informed that In light of a number of recent CERC orders, wherein

the Hon’ble Comission has emphasized upon stricter implementation of the various Regulations, Procedures and statutory

Agreements, CTU shall assess the progress of various generation projects and take appropriate actions in terms of the

applicable provisions/clauses of the Regulations/Procedure/Agreements.

4. It was re-iterated that JCC forum has been created for co-ordination purposes to attempt matching of generation schedules with

the associated transmission system and accordingly, the information given by generation developers/applicants is being taken

into cognizance for co-ordination purpose which can be achieved only if the applicant/generation developers provide realistic

schedule & other status of generation project /dedicated line. However, for any substantial issue, it may be kindly submitted

through official correspondence addressed to CTU, by clarifying the nature of issue to be dealt therein, as per the Regulatory

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 2 of 28

framework. It was further informed that some letters are being sent by LTA customers related to relinquishment which are not

clear in the content; therefore it was advised that such communication should strictly follow CERC Regulatory provisions

(Regulation 18) specifically regarding notice, mentioning the relinquishment quantum, date of relinquishment and consent for

payment of applicable relinquishment charges.

5. CTU emphasized that generation developers should ensure completion of their dedicated transmission lines to match with the

commissioning of transmission network in order to prevent bottling up of power. It was further stated that interim arrangements

through LILO of existing lines were provided only as a contingency measure and the generation developers need to implement

the final dedicated transmission system as the matter has been very seriously looked into by Hon’ble CERC in Petition no.

34/MP/2014 & 112/TT/2013.

6. All the LTA customers were advised to clear the consultancy payment liabilities at the earliest towards implementation of bays for termination of dedicated/connectivity lines as deposit work for timely implementation of the same. In case of failure, the generation developers/applicants alone shall be responsible towards any delay in implementation of the bays.

7. CTU informed that recently in number of cases, generation developers have submitted online additional details in respect of Connectivity (CON-4) only when the generation projects are on the verge of commissioning. Thus, a very short period of time is available for processing and issuance of Connection Offer (CON-5) and subsequent signing of Connection Agreement. As per the CERC Connectivity Regulations/ Detailed Procedure, 2009, the CON-4 details are to be furnished to CTU at least 2 (two) years prior to physical interconnection which may be noted by all the applicants.

8. All information exchanged, discussions/decisions taken in the JCC meeting shall be subject to the CERC Regulations and

Detailed procedure made therein.

9. It was noted that some of the generation developers/ applicants had been repetitively not attending the JCC Meetings. All such

generation developers/ applicants were requested to attend the future meetings so as to have a better co-ordination.

10. All those generation projects that have achieved COD and their respective dedicated transmission lines have also been

commissioned, may not be required to attend JCC as the coordination work has already been over. Therefore they are not being

called for further JCC meetings (Details of all such generation projects as per Table T1 (i), T1 (ii), T1(iii) & T1(iv)).

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 3 of 28

11. As per the 12th JCC meeting, a no. of LTA customers were requested to sign the Transmission Service Agreement (TSA) at the earliest in accordance with CERC Sharing Regulations. However, none of them have signed TSA till date. It is once again advised that the LTA customers shall sign the TSA at the earliest. List of the generation developers who are yet to sign the TSA is enclosed herewith at Annexure- II.

12. The LTA Customers were requested to update the progress of their generation projects and the discussions are summarised below:

Status of the Generation Projects

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – I (Phase-I IPPs in Odisha & associated Transmission System)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule

(as per 12th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1. Sterlite Energy

Ltd (4x600 MW)

400 0

200 0

200 0

0 0 Nil Commissioned Not attended.

Commissioned.

400kV Sterlite-Jharsuguda Pool D/c

line: completion expected by 30.06.2017

Status sent through mail:

As per 35th ERPC meeting held on 25.02.2017, dedicated line was to be completed by 15.04.2017 and interim LILO was to be opened on 16.04.2017. Subsequently, Member Secretary, ERPC has informed that as per 132nd OCC meeting held on 21.04.2017, the interim LILO is to be opened on 01.07.2017.

Petition No. 003/MP/2016 has been filed before CERC for relinquishment of entire LTA quantum.

2. Monnet Power Company Ltd

900 300 225 225 150 400MW-

West

Not attended:

Not attended: 400kV Monet TPS-

Angul Pool D/c line- Status sent through email.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 4 of 28

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule

(as per 12th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

(2x525 MW) Bengal Project is in abeyance

Project is in abeyance

Matching with generation project

Developer has informed that the commissioning schedule of Unit-I & II as 14 & 18 months from the date on which the site is fully mobilized again. Thus, it is unable to furnish any firm commissioning schedule and it is observed that project is in abeyance since last 33 months.

Necessary actions as per BPTA and CERC Regulations/Procedures are to be taken.

3.

Lanco Babandh

Power Pvt Ltd (2x660 MW)

1600

800

650

950

150

0 0

UP: 424MW Rajasthan: 350 MW

(total-774MW)

Not attended U1: Sep’18 U2: Jan’19

400kV Lanco TPS-Angul Pool D/c line +

3x500MVA ICT at Angul Pool: Commissioning

matching with generation project.

Representative informed that about 60% of the work has been completed.

Dedicated transmission system has not yet been awarded. Consultancy work yet to be awarded. Developer informed that earlier issued Section 68 approval for transmission line has expired and fresh approval is yet to be obtained.

LTA Customer is yet to open LC.

Generation developer has filed Petition No. 38/MP/2016 in Hon’ble

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 5 of 28

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule

(as per 12th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

CERC for keeping its LTA on abeyance on account of alleged force majeure condition.

4.

Ind Barath Energy (Utkal)

Ltd (2x350 MW)

616 266

116

350

0 0

0 500

Tamil Nadu : 500 MW GRIDCO :

81 MW

U1: COD (20.07.16)

(through LILO) U2: Jun’17

(Synchronization)

Not attended. U1: COD (20.07.16)

(through LILO)

U2: Synchronization

& COD expected by Dec, 2017.

400kV Ind Barath-Jharsuguda Pool D/c line: Commissioned

Status sent through mail. Ind Barath informed that LC has been opened for 116 MW though it is not as per CERC Regulations and assured to submit the proper LC by Aug’17.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 6 of 28

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm beneficiary Comm. schedule

(as per 12th

JCC) Comm. schedule (as per 13

th JCC)

Dedicated / Connectivity line & Status

Remarks

NR WR ER

1.

Essar Power (Jharkhand) Ltd. (2x600 MW)

1100 400 400 300

Bihar: 750 MW

Jharkhand: 12% (127

MW)

U-1 : Nov’18

U-2 : Jan’19

U-1 : Nov’18

U-2 : Jan’19

400kV Essar TPS - Jharkhand Pooling Station D/c line (Quad) : Commissioning matching with generation projects

Entire 1100 MW LTOA was relinquished w.e.f. 12.04.2017 subject to directions in Petition No: 21/MP/2017 filed by EPJL for relinquishment of 1100 MW LTOA and payment of applicable relinquishment charges as per CERC directions in Petition No: 92/MP/2015.

2. WBSEDCL (1000 MW State surplus)

1000 600 400 0 Not attended Not attended -

Representative is consistently not attending JCC meeting; status of progress not submitted since 6

th JCC;

WBSEDCL has sought details regarding relinquishment charges for exit from the BPTA vide letter dated 08.05.2017 and clarification has been furnished to the applicant on 25.05.2017 to give proper notice with date of relinquishment in terms of CERC Regulations (18) & acceptance to pay applicable relinquishment charges as per CERC directions in Petition No: 92/MP/2015. Notice/ consent is yet to be received from WBSEDCL.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 7 of 28

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 12

th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line & Status

Remarks NR WR ER

1.

PTC /Teesta Urja Ltd.

(Teesta-III) (6x200 MW)

1200 840 0 144

Punjab: 340 MW

Haryana: 200 MW

UP: 200 MW Rajasthan: 100 MW

Sikkim: 144 MW

U1-U6: Feb’17 (COD)

U1-U6: Feb’17 (COD)

400kV Teesta III - Kishanganj D/c (Quad) line (being implemented by TPTL): ISTS line upto Rangpo commissioned in Nov’16 and balance portion upto Kishanganj expected to be commissioned by Mar’18.

Representative is to submit copy of PPAs. ISTS line upto Rangpo commissioned in Nov’16 and balance portion upto Kishanganj expected to be commissioned by Mar’18.

2.

Lanco Teesta Hydro Power

Ltd, (Teesta-VI) (4x125 MW)

500 0 500 0 MSEDCL-500 MW

U1: Feb’20 U2: Mar’20 U3: Mar’20 U4: Mar’20

U1: Jul’20 U2: Aug’20 U3: Sep’20 U4: Sep’20

220 kV Teesta VI- Rangpo D/c Twin Moose Conductor line : Mar’20

The representative informed that the project is stalled since Dec’15 due to financial crunch. The developer is in the process of restructuring & in dialogue with various investors to infuse the funds to restart the project and have not succeeded till date. The developer has also approached Sikkim Govt for equity infusion. 54% of the project is completed and it shall take 3 more years after the financial problems are sorted out. Bay work yet to be awarded.

Applicant has informed that they are not in a position to sign TSA till fate of the project is decided.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 8 of 28

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 12

th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line & Status

Remarks NR WR ER

3.

JAL Power Corporation (Rangit-IV) (3x40 MW)

120 16 16 88 WBSEDCL-

72MW

Not attended U1: Feb’21 U2: Mar’21 U3: Mar’21

220kV Rangit IV - New Melli D/c line: expected by Oct’20.

Representative informed that Govt of Sikkim has agreed for infusion of equity. PFC is working on the restructuring of the project and project implementation is likely to re-start in Oct’17.

4.

Madhya Bharat Power

Corpn Ltd. (Rongnichu) (2x48 MW)

96 56 40 0 Nil

Not attended

U1: Nov’18

U2: Dec’18

Not attended.

As per 12th JCC:

220kV Rongnichu-Rangpo D/c Zebra conductor line: Jul’18

The developer neither attended the meeting nor submitted the status update.

The status as per 12th JCC is:

Notice to Proceed (NTP) for main plant is yet to be issued.

Applicant had earlier informed that 80% of the excavation works has been completed.

Applicant is yet to confirm firm timeline for completion of bays at Rangpo S/S & submit status of NIT/Award.

Applicant is again advised to sign TSA at the earliest.

5.

Gati Infrastructure

Ltd (Chuzachen) (2x49.5 MW)

99 99 0 0 Not attended Commissioned.

(May’13)

132kV Chuzachen-Rangpo D/c Zebra Conductor line – Line Complete. Bay works likely to be complete by Dec’17.

Generation Developer had informed that the process of re-tendering is completed for bays at Rangpo by Govt of Sikkim. The contractor has been finalized and the contract is likely to be awarded shortly.

6. Gati

Infrastructure 51 36 15 0

West Bengal : 30 MW

Not attended Uncertain 132 kV Bhasmey- The representative informed that project is presently

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 9 of 28

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 12

th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line & Status

Remarks NR WR ER

Bhasmey Power Pvt.

Ltd. (Bhasmey)

(2x25.5 MW)

Rangpo D/c line – matching with generation project

stalled due to fund constraints. Contractor has stopped working.

Only 36% project work has been completed.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 10 of 28

(Phase-II IPPs in Odisha)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule

(as per 12th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1. NTPC Ltd. (Darlipalli)

(2x800 MW) 793.5 0 0 793.5 0 Nil Not attended

U1: Jun’18

U2: Dec’18

765 kV Darlipalli-Jharsuguda D/c line-

Line completed & charged in May’17

2.

Orissa Power Generation Company

Ltd. (2x660 MW)

600 200 200 0 200 Nil Not attended Not attended

400 kV OPGC-Jharsuguda D/c line with Triple snowbird conductor : (Under

TBCB, monitored by CEA) Jul’17

(As per SPV transfer)

Developer consistently not attending the meeting since 10

th JCC.

Applicant is again advised to sign TSA at the earliest.

3. GRIDCO Ltd

(Darlipalli) 748 0 0 748 0

Odisha: 748 MW

U1: Jun’18 U2: Dec’18 (Darlipalli)

Not attended

U1: Jun’18 U2: Dec’18 (Darlipalli)

765 kV Darlipalli-Jharsuguda D/c line-

Line completed & charged in May’17

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 11 of 28

(Phase-II IPPs in Sikkim)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule (as per 12

th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line & Status

Remarks

NR WR ER SR

1.

Shiga Energy Pvt. Ltd.

(Tashiding) (2x48.5 MW)

97 48.5 48.5 0 0 NIL

U1&2: Dry commissioning completed in

Dec’16

U1&2: Dry commissioning completed

in Dec’16

220kV Tashiding -Legship D/c line – completed in

Dec’16

COD of the project is waiting on account of non-commissioning of Legship - New Melli and bays at New Melli (under scope of Govt. of Sikkim), which is expected by Aug’17.

2.

Sneha Kinetic Power Projects Ltd

(Dikchu) (2x48 MW)

96 0

48 0

48 0

0 0 Nil U1&2: Mar’17

U1&2: Mar’17

(commissioned)

132 kV Dikchu- Dikchu Pool D/c Moose

conductor/ HTLS line :

400kV Interim arrangement through LILO of one ckt of Teesta-III to

Rangpo D/c line at Dikchu (being implemented by M/s Sneha Kinetic) –

Ready for commissioning

132 kV Dikchu- Dikchu Pool D/c line to be expedited.

Granted LTA was withdrawn/ revoked as the applicant failed to sign LTAA.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 12 of 28

Other Generation Projects – Granted LTA

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm

beneficiary

Comm. schedule

(as per 12th

JCC)

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line & Status

Remarks

NR WR ER SR

1 Nabinagar-II (3x660 MW)

1866.15 196.98

0 1529.

21 0

Bihar: 1463.23 MW Jharkhand: 56.55 MW

Sikkim: 9.43 MW

UP: 196.98 MW

Not attended U1: Aug’17 U2: Feb’18 U3: Aug’18

400 kV Nabinagar II-Gaya D/c line: Dec’17

400 kV Nabinagar II-

Patna D/c line: June’19

Best efforts shall be made by POWERGRID for early commissioning of 400 kV Nabinagar-II-Gaya D/c line to match with Unit-I commissioning.

2

NTPC Ltd (North

Karanpura) (3x660 MW)

1856.25 0 0 1577.

81 0

Bihar: 645 MW

Jharkhand: 468.75 MW

Odisha: 371.25 WB :

92.81 MW

Not attended U1: Feb’19 U2: Aug’19 U3: Feb’20

400 kV North Karanpura – Chandwa (Jharkhand) Pooling Station D/c line (Quad): Sep’17 (As per SPV transfer) (Under TBCB, monitored by CEA)

3.

Sikkim Hydro Power

Ventures Ltd- (2x33 MW)

66 40 26 0 0 NIL Not attended U1: Dec’19

U2: Jan’20

132 kV Rangit II – Legship Pool D/c line

(along with 2 nos. of 132 kV line bays at legship pool): Matching with generation project

TSA and LTA Agreement not signed by Govt of Sikkim. CEA may take up the matter with Govt of Sikkim and facilitate signing of the necessary agreements at the earliest.

4.

K V K Nilachal

Power Pvt. Ltd

(3x350 MW)

560 140 140 140 140 Odisha:

25% (263 MW app)

Not attended Not attended

LILO of one ckt of 400kV Baripada- Mendhasal

D/c line – matching with Gen. Proj

The developer neither attended the meeting nor submitted the status update.

The status as per 10th

JCC is as below:

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 13 of 28

Applicant had earlier informed that PIL has been disposed of in favor of Generation developer. However, work could not be taken up on account of tying up of finances.

Applicant to sign TSA at the earliest.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 14 of 28

List of Generation Projects for which coordination not required in view of commissioning of projects along with the dedicated lines, or relinquishment of LTA

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – I

(Phase-I IPPs in Odisha & associated Transmission System) Table T 1 (i)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum (MW)

Target Beneficiaries Firm beneficiary

Last updated schedule

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1.

GMR Kamalanga Energy Ltd (3x350 MW)

800

647

600

540

387

0

0

260

200 0

300-Haryana 260 - Bihar

8th JCC:

Project and dedicated line commissioned

400kV GMR TPS-Angul Pool D/c (Quad) line-commissioned in Dec’14;

GMR TPS- Meramundali 400 kV S/c - commissioned in Mar’15

Petition No: 41/MP/2016 for relinquishment filed before CERC & the matter is under adjudication.

Meanwhile, GMR had applied for fresh LTA for change in region of 260 MW, which has been granted subject to payment of relinquishment charges for change in region.

LTA quantum reduced from 800 MW to 647 MW on account of relinquishment by GMR as per letter dated 21.06.2016 with consent for payment of relinquishment charges as per CERC decision in Petition No. 92/MP/2015.

2.

Navabharat Power Pvt.

Ltd

(3x350 MW)

720 465 255 0 0 8

th JCC:

Project Abandoned

400kV Navbharat

TPS-Angul Pool D/c line: Abandoned

Developer has applied for relinquishment and CERC vide order dated 12.04.2017 in Petition No: 317/MP/2013 has decided

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 15 of 28

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum (MW)

Target Beneficiaries Firm beneficiary

Last updated schedule

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

that the relinquishment charges shall be as per Petition No: 92/MP/2015. Applicant was advised to sign TSA at the earliest

3.

Jindal India Thermal

Power Ltd (2x600 MW)

1044 0

834 0

210 0

0 0 Commissioned

400kV Jindal TPS-Angul Pool D/c line

1st Ckt)- Commissioned

Gen. developer vide letter dated 26.12.2016 confirmed that Section-68 has been applied to CEA & four parties for survey work have been finalized for the 2

nd dedicated line.

Applicant informed that placement of order is expected shortly.

Petition No: 55/MP/2015 filed in CERC for relinquishment of entire LTA quantum. Order is reserved.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 16 of 28

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)

Table T 1 (ii)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm beneficiary

Last updated schedule

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1.

Adhunik Power & Natural

Resources Limited

(2x270 MW)

450

200

50 200

100

0

100

Tamil Nadu: 100 MW &

West Bengal: 100 MW;

(Operational)

8th JCC:

Project and dedicated line commissioned

400kV Adhunik TPS-Jamshedpur D/c line-

Commissioned

Applicant has filed a petition No: 167/MP/2016 before CERC for relinquishment for 250 MW (NR: 200 MW, WR: 50 MW) of LTA and return of BG for 450 MW.

LTA for 100 MW to Tamil Nadu & 100 MW to West Bengal operational.

2.

Corporate Power Limited

Ph-I (2x270 MW)

480 240 240 0 0 Special JCC: Project

uncertain

400kV Corporate TPS-Jharkhand Pooling Station D/c line: Not taken up

Developer had earlier confirmed in the Special JCC that project is uncertain due to de-allocation of Coal Blocks and requested for relinquishment of LTA.

Matter is sub-judice.

3.

Corporate Power Limited

Ph-II (2x270 MW)

480 240 240 0 0

Special JCC: Project

uncertain

400kV Corporate TPS -Ranchi D/c line: Not taken up

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 17 of 28

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)

Table T 1 (iii)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries

Firm beneficiary

Comm. schedule (as per 13

th

JCC)

Dedicated / Connectivity line & Status

Remarks NR WR ER SR

1

DANS Energy Pvt.

Ltd. (Jorethang)

(2x48)

96 48 48 0 0 Commissioned 220kV Jorethang - New Melli D/c line- commissioned in Nov’16

SPS has been implemented and testing is under progress.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 18 of 28

(Phase-II IPPs in Odisha) Table T 1 (iv)

Sl. No.

LTOA / LTA Applicant

LTOA/LTA Quantum

(MW)

Target Beneficiaries Firm beneficiary

Last updated schedule

Dedicated / Connectivity line &

Status Remarks

NR WR ER SR

1.

GMR Kamalanga Energy Ltd

(1x350 MW)

220 0 220 0 0 Nil Abandoned

400kV GMR TPS-Angul Pool D/c (Quad) line

with bays at both ends: Commissioned

The project is abandoned and the matter is already before CERC in Petition No: 137/MP/16.

2. Sterlite

Energy Ltd (4x600 MW)

1000 400 0

400 0

200 0

0 Nil Commissioned

400kV Sterlite-Jharsuguda Pool 2

nd

D/c line: Requirement to be reviewed in the next ER Connectivity /LTA meeting.

Petition No: 303/MP/2015 filed in CERC for relinquishment of entire LTA quantum.

The generation developer was advised to implement the 1

st 400 kV D/C dedicated

line and remove the interim arrangement at the earliest.

Applicant informed that feasibility report for 2

nd line

has been received from the consultant and the report would be shared with CEA/CTU.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 19 of 28

Status of the Associated Transmission System

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – I (Phase-I IPPs in Odisha & associated Transmission System)

All the elements of HCPTC-I have been commissioned. The details of elements are as follows:

Transmission System under the Scope of POWERGRID:

Transmission System for Phase-1 generation projects in Odisha - Part-A

Sl. No.

Scope of Transmission System

1 765kV Angul Pooling Station – Jharsuguda Pooling Station 2xS/c line

2 LILO of 400kV Rourkela – Raigarh D/c at Jharsuguda Pooling station

3 LILO of 400kV Meramundali – Jeypore S/c line at Angul pooling station

4 LILO of 400kV one ckt of Talcher - Meramundali D/c line at Angul pooling station

5 Establishment of 2x1500 MVA, 765/400kV Pooling Station at Jharsuguda

6 Establishment of 4x1500MVA, 765/400kV Pooling Station at Angul

Transmission System for Phase-1 generation projects in Odisha - Part-B

Sl. No.

Scope of Transmission System

1 Establishment of 765kV switching station at Dharamjaygarh / near Korba

2 LILO of 765kV Ranchi – WR Pooling near Sipat S/c line at Dharamjaygarh / near Korba

3 765kV Jharsuguda Pooling Station – Dharamjaygarh / near Korba (WR) D/c

4 Establishment of 765/400kV Pooling Station at Jabalpur

5 765kV Dharamjaygarh / near Korba – Jabalpur Pooling Station D/c line

6 400 kV Jabalpur Pooling Station – Jabalpur D/c (high capacity) line

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 20 of 28

Transmission System for Phase-1 generation projects in Odisha - Part-C

Sl. No.

Scope of Transmission System

1 765kV Jabalpur Pooling Station – Bina D/c line

2 765kV Bina – Gwalior S/c (3rd circuit)

3 765kV Gwalior - Jaipur S/c line (2nd circuit)

4 765kV Jaipur - Bhiwani S/c line (1st circuit)

Transmission System under the Scope of Private Sector:

Sl. No.

Scope of Transmission System

1 Establishment of 2x1500MVA, 765/400kV Bhopal Pooling Station

2 765kV Jabalpur Pool – Bhopal – Indore S/c

3 400kV Bhopal New substation – Bhopal (M.P.) D/c (high capacity)

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 21 of 28

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – II (Phase-I IPPs in Jharkhand & associated Transmission System)

All the elements of HCPTC-II have been commissioned. The details of elements are as follows:

Transmission System under the Scope of POWERGRID:

Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-1

Sl. No.

Scope of Transmission System

1 Establishment of 400kV GIS Pooling Station (Jharkhand Pool) near Essar and Corporate generation projects.

2 400 kV Ranchi - Gaya D/c (Quad) line via pooling station proposed near Essar / Corporate generation projects

Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-A-2

Sl. No.

Scope of Transmission System

1 Ranchi New (765/400kV S/s) - Dharamjaygarh / near Korba 765kV S/c

2 2x1500 MVA, 765/400 kV New GIS substation at Varanasi

3 Gaya - Varanasi 765kV S/c

4 Varanasi - Balia 765 kV S/c line

Transmission System for Phase-I Generation Projects in Jharkhand & West Bengal : Part-B

Sl. No.

Scope of Transmission System

1 New 2x1500 MVA, 765/400 kV substation at Kanpur

2 Varanasi – Kanpur 765 kV D/c

3 Kanpur – Jhatikra 765 kV S/c

4 Kanpur (765/400kV) – Kanpur (Existing) 400kV D/C (Quad)

5

400kV connectivity for new 765/400kV S/s at Varanasi

Varanasi – Sarnath (UPPCL) 400kV D/c (quad)

LILO of Sasaram – Allahabad 400kV line at Varanasi

Opening of LILO of one ckt of Sasaram – Allahabad 400kV D/c

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 22 of 28

line at Sarnath

Transmission System under the Scope of Private Sector:

Sl. No.

Scope of Transmission System

1 Dharamjaygarh – Jabalpur 765kV D/C line (2nd

line)

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 23 of 28

HIGH CAPACITY POWER TRANSMISSION CORRIDOR – III (Phase-I IPPs in Sikkim)

Transmission System under the Scope of POWERGRID:

Transfer of power from generation projects in Sikkim to NR/WR

Sl No

Scope of Transmission System Status

(as per 12th JCC) Status

(as per 13th JCC) Remarks

1 Establishment of New 2x500 MVA, 400/220 kV sub-station at Kishanganj Commissioned Commissioned

2 LILO of New Siliguri – New Purnea 400kV D/c line (quad) at Kishanganj Commissioned Commissioned

3 LILO of Siliguri – Dalkhola 220kV D/c line at Kishanganj Commissioned Commissioned

4 Establishment of 16x105MVA, 1 ph, 400/220kV and 3x100MVA 220/132kV, Gas Insulated Substation at Rangpo

Commissioned Commissioned

5 Establishment of 220kV Gas Insulated switching station at New Melli Commissioned Commissioned

6 LILO of Teesta III – Kishanganj 400kV D/c line (quad, Teesta III – Kishanganj 400kV D/c line under JV route) at Rangpo (with Twin HTLS)

1st LILO commissioned in

Nov’16.

1st LILO commissioned in

Nov’16.

One ckt. LILO completed and commissioned in Nov’16. 2nd LILO has already been taken up as a separate project under part B1 of the scheme.

7 Rangpo – New Melli 220kV D/c line (with Single HTLS conductor) Commissioned Commissioned

8 LILO of Gangtok – Rangit 132 kV S/c line & Gangtok- Melli 132 kV S/c line at Rangpo

Commissioned Commissioned

9 LILO of Teesta V – Siliguri 400kV D/c line at Rangpo Commissioned Commissioned

10 Kishanganj – Patna 400kV D/c (quad) line Commissioned Commissioned

Transmission System under the Scope of TPTL (ISTS licensee):

Sl. No.

Scope of Transmission System Status (as per 12

th JCC)

Status (as per 13

th JCC)

Remarks

1 Teesta III – Kishanganj 400kV D/c (Quad) line

Line upto Rangpo S/S Commissioned in Nov’16.

Balance portion upto Kishanganj S/S- Mar’18

Line upto Rangpo S/S (except Dikchu – Rangpo section) Commissioned in Nov’16.

Balance portion upto Kishanganj S/S-

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 24 of 28

Mar’18

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 25 of 28

Status of other Associated Transmission System Phase-II IPPs in Odisha & associated Transmission System

Transmission System under the Scope of POWERGRID:

Sl. No.

Scope of Transmission System Status (as per 12th

JCC)

Status (as per 13th

JCC)

Remarks

1 Angul-Jharsuguda (Sundargarh)-Dharamjaygarh 765 kV D/c (2nd

) line Dec’17 Mar’18

2 Addition of 2x1500MVA, 765/400 kV ICTs at Jharsuguda (Sundargarh) Apr’19 Apr’19

4 Split bus arrangement at 400 kV and 765 kV bus at Jharsuguda (Sundargarh) substations.

Apr’19 Apr’19

5 LILO of both circuits of Rourkela-Raigarh 400 kV D/c (2

nd) at Jharsuguda

(Sundergarh) substation Apr’19 Apr’19

Transmission System under the Scope of TBCB:

Sl. No.

Scope of Transmission System Status (as per 12th

JCC)

Status (as per 13th

JCC)

Remarks

1 Jharsuguda (Sundargarh) – Raipur Pool 765 kV D/c

Aug’19 (As per SPV

transfer)

Aug’19 (As per SPV

transfer)

TBCB line is being monitored by CEA. However, POWERGRID will make the best effort to prepone the commissioning of bays and reactors by Oct’18.

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 26 of 28

Status of other Associated Transmission System

(North Karanpura)

Transmission System under the Scope of TBCB:

Sl. No.

Scope of Transmission System Status (as per 12th

JCC)

Status (as per 13th

JCC)

Remarks

1 400 kV North Karanpura – Gaya D/c line with quad moose conductor

Sep’19 (As per SPV

transfer)

Sep’19 (As per SPV

transfer)

TBCB line is being monitored by CEA.

2 400 kV North Karanpura – Chandwa (Jharkhand) Pooling Station D/c line with quad moose conductor

Sep’17 (As per SPV

transfer)

Sep’17 (As per SPV

transfer)

TBCB line is being monitored by CEA.

Transmission System under the Scope of POWERGRID:

Sl. No.

Scope of Transmission System Status (as per 12th

JCC)

Status (as per 13th

JCC)

Remarks

1 2 no 400 kV D/c line bays at Gaya for termination of North Karanpura-Gaya 400 kV D/c line

Sep’19 Sep’19 Completion of bays extension work matching with completion of TBCB line.

2 2 nos of 400 kV D/c line bays at under construction Chandwa (Jharkhand) Pooling Station for termination of North Karanpura – Chandwa 400 kV D/c line

Sep’17 Sep’17

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 27 of 28

Annexure-I List of Participants in the 13th Joint Co-ordination committee Meeting of IPPs granted LTA in ER held on 16.06.2017

Sl No

Name Designation Organisation Email

1 Suveen Vyas DGM (PP&M) NTPC [email protected]

2 D S Basik Manager Sikkim Hydro Power Ventures Limited [email protected]

3 Ajay Kumar Sr Manager (Commercial) Essar Power (Jharkhand) Ltd [email protected]

4 Kishore K Singh Sr GM Gail Infra [email protected]

5 Anshuman Gothwal Manager Gati Infra [email protected]

6 M K Sharma MD JPCL [email protected]

7 R S Chadha Sr VP (T) JPCL [email protected]

8 Nukala Kishore Manager DANS Group [email protected]

9 Vinod Verma AGM Greenco Group (Sneha Kinetics) [email protected]

10 K C Agrawal Sr VP PTC India Ltd [email protected]

11 Jitendra Verma Manager Lanco Teesta Hydro Power Ltd [email protected]

12 Gawar Prasad Dy Manager Lanco Babandh Power Ltd [email protected]

13 N N Murty Raju ED Lanco Babandh Power Ltd [email protected]

14 Aman Senior Engineer Teesta Urja Ltd [email protected]

15 Varun Dayal Asstt Manager Teestavalley Power Transmission Ltd [email protected]

16 Dilip Rozekar AGM (CTU-Plg) POWERGRID [email protected]

17 Jyoti Prasad DGM (CTU-Plg-Law) POWERGRID [email protected]

18 Rajesh Verma CM (CTU-Plg) POWERGRID [email protected]

19 Laxmi Kant Manager (CTU-Plg) POWERGRID [email protected]

20 Shyam Sundar Goyal Sr Engineer (CTU-Plg) POWERGRID [email protected]

21 Swapnil Verma Officer (CTU-Plg) POWERGRID [email protected]

22 Dwaipayan Sen Engineer (CTU-Plg) POWERGRID [email protected]

23 Himanshi Engineer (CTU-Plg) POWERGRID [email protected]

Minutes of 13th

JCC of Eastern Region held on 16.06.2017

Page 28 of 28

Annexure-II

The following applicants/DICs are requested to sign the Transmission Service Agreement

Sl. No. LTOA / LTA Applicant

LTOA/ LTA Quantum

(MW)

Target Beneficiaries

NR WR ER SR

1. Essar Power (Jharkhand) Ltd.

(2x600 MW) 1100 400 400 300 0

2. Lanco Teesta Hydro Power Ltd,

(Teesta-VI) (4x125 MW) 500 0 500 0 0

3. Madhya Bharat Power Corpn Ltd.

(Rongnichu) (2x48 MW) 96 56 40 0 0

4. Orissa Power Generation Company

Ltd. 600 200 200 0 200

5. Monnet Power Company Ltd 900 300 225 225 150

6. KVK Nilachal Power Pvt. Ltd 560 140 140 140 140

7. Navbharat Power Pvt. Ltd 720 465 255 0 0

8. Sterlite Energy Ltd 400 200 200 0 0

9. Gati Infrastructure Ltd (Bhasmey) 51 36 15 0 0

Sl. No. Name of the DIC Remarks

1 Energy & Power Dept, Govt of Sikkim TSA not signed