Maharashtra Industry Trade Investment Facilitation Cell S.N o Name of the Company Location Department Name of the Service Application date Issue description and chronology Decision taken in MAITRI meeting 13-01-2017 Issue Status 1 Luminaz Safety Glass Pvt Ltd. Gut No 62, 63 & 66, Limbe Jalgaon, Gangapur, District - Aurangabad. Collector of Stamps Stamp Duty Waiver on Lease Agreement & Mortgage of Machinery for Bank Loan 19-11-2016 Investor has made an application (Aldj120161700701) on 19th of November 2016 for Stamp Duty Waiver on Registration of Lease Deed & Mortgage of Machinery on Bank Loan with Collector of Stamps, Aurangabad which is still pending for grant of approval. 03-01-2016- Department update: A letter has been sent by collector of stamps, Aurangabad stating that the stamp duty amount comes to 67,15,000 The department to take the decision as per the Industrial policy, if required the department can take inputs from Directorate of Industries Open 2 Mahindra Intertrade C-23/1, Pune Collector of Stamps Stamp Duty Waiver 22.12.2016 Investor has bought the MIDC land in July 2013 in the name of MIL and got the stamp duty waiver at the initial registration from collector of stamps. In December 2013 itself they have decided moved into joint venture and formed new company in the name of MASL and registered the triparty agreement with collector of stamps by paying the stamp duty amounting Rs. 76,46,400/-. Now, Investor has received the demand letter on the name of MIL dated 10th October 2016 from Khed Sub-registrar’s office, that stamp duty of Rs. 32,25,600/- along with 2% monthly interest should deposited. The investor should be entitled for stamp duty as it is a new entity. Directorate of industries is willing to provide inputs on the case. Investor was suggested to appeal under section (53) to IGR Open Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell Page 1 of 52

Minutes of 26th Investor Meeting - 13th January 2017 at

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

1Luminaz SafetyGlass Pvt Ltd.

Gut No 62,63 & 66,LimbeJalgaon,Gangapur,District -Aurangabad.

Collector ofStamps

Stamp DutyWaiver onLeaseAgreement &Mortgage ofMachinery forBank Loan

19-11-2016

Investor has made an application (Aldj120161700701) on 19th ofNovember 2016 for Stamp Duty Waiver on Registration of Lease Deed &Mortgage of Machinery on Bank Loan with Collector of Stamps,Aurangabad which is still pending for grant of approval.03-01-2016- Department update: A letter has been sent by collector ofstamps, Aurangabad stating that the stamp duty amount comes to67,15,000

The department to take thedecision as per the Industrialpolicy, if required thedepartment can take inputs fromDirectorate of Industries

Open

2MahindraIntertrade

C-23/1,Pune

Collector ofStamps

Stamp DutyWaiver

22.12.2016

Investor has bought the MIDC land in July 2013 in the name of MIL andgot the stamp duty waiver at the initial registration from collector ofstamps. In December 2013 itself they have decided moved into jointventure and formed new company in the name of MASL and registered thetriparty agreement with collector of stamps by paying the stamp dutyamounting Rs. 76,46,400/-.Now, Investor has received the demand letter on the name of MIL dated10th October 2016 from Khed Sub-registrar’s office, that stamp duty ofRs. 32,25,600/- along with 2% monthly interest should deposited.

The investor should be entitledfor stamp duty as it is a newentity. Directorate of industriesis willing to provide inputs onthe case. Investor wassuggested to appeal undersection (53) to IGR

Open

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

Page 1 of 52

Page 2: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

3M/s Classic OilLtd.

Plot NumberB-14, MahadMIDC,DistrictRaigad

DirectorateOf Industries

InvestmentPeriodExtension

03-08-2016

Investor has purchased sick unit M/s Classic Oil Ltd. under SpecialAmnesty Scheme from District Industries Centre, Raigad in March 2014.Thereafter, it took almost more than 2 years for them to get the leaseagreement signed from MIDC and to get the power connection for theconstruction purpose. After raising the issue through Aaple Sarkar portal,Investor have been called for Lokshahi meeting dated 4th January 2016under the chairmanship of Hon'ble Chief Minister in which it was minutisedthat the investment period extension to be given to the investor. In thisregards, General Manager, DIC Raigad has written a letter dated 03rdAugust 2016 to Department of Industries (PSI), Mantralya providing hisviews on the case mentioning the amendment in PSI 2013 GR (pointnumber 2-B) which says "If a unit is allotted a plot by MIDC but projectimplementation is delayed due to infrastructure issues like roads,electricity, demarcation, other Govt. issues etc., in such cases theinvestment period will extended only for the units propose to set up inMIDC areas."18.11.2016 - IM decision : The department to provide the comments on thecase to DIC, Raigad at the earliest06-01-2017- Department update: The file has been referred to Stategovernment

The department to look into thematter and update MITRI on thesame

Open

Page 2 of 52

Page 3: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

The unit was given mega project status in 2006 on the basis of proposedinvestment of 1115 Crore. Due to the delay in obtaining land, investor isunable to implement the project within stipulated time frame. Hence askingfor extension up to December 2017 with changed investment amount to520 Crore. Investor has already invested 195 Cr and will invest theremaining amount of 325 Cr by December 2017.07.10.2016 - Investor Update: The company is differing the plan of Megaproject and is going to submit at written application to the PSI and a copyto MAITRI.17-10-2016- Department Update: Investor has raised some quires toindustries dept. vide letter dated 10.10.2016. The quires are stated are,due to some uncertainties such as the aspects in regards to the “1. Roadconnectivity to Dherand Jetty & Terminal, 2. Kasturirangan committee onland use around their project site, 3. Incentives from GoM post GST and 4.Minimum criteria required for qualifying the incentives” the investor hasdeferred the implementation of mega project status for his unit. Investorhas requested updates from the department in regards towards the abovequeries.26-10-2016- Department Update: Under sec, Ind-8, informed MAITRI thatthey need to discuss the aspects vide letter dated 17-10-2016 receivedfrom investor with the higher authorities. Also at presently as Investor’sdecision is deferred, the offer letter for “Mega project status” which wasissued earlier by the department shall be call off. Department to takedecision on the same shortly.02-11-2016- Department Update: Meeting is scheduled between investorand officials to represent the case on 07-11-2016 in ind-8, Mantralaya.15-11-2016- Department Update: Department informed that no one fromcompany's end was present hence meeting did not happened. MAITRIinformed the same to investor. Investor to fix appointment and informshortly.20-12-2016 - SICOM Field visit update: Investor has raised quires vide letterdated 10.10.2016 to ind-8 department. In regards to the same, Ind-8 hasrequested details/remarks from Directorate of Industries vide letter dated29.11.2016. Department to take a call for investor's representation postDoI remarks. Remarks are awaited from DoI. MAITRI team sharedcorrespondence with DoI Nodal officials for further course of action.

4SupremePetrochemicalsLtd

VillageAmdoshi,WagnaniWakan -Roha Road,Taluka -Roha,Raigad,Maharashtra- 402106

DirectorateOf Industries

Mega projectstatus andtimeextension

29-05-2012MAITRI to follow up withDirectorate of Industries forremarks

Open

Page 3 of 52

Page 4: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

5Kirolskar OilEngine

D-1, Kagal-HatkanagaleMIDCKolhapur

EnvironmentDepartment

EnvironmentClearance

04-10-2014

The project falls under category 8(a) B as per EIA notification datedSeptember 2006 basis which the investor has submitted an application forenvironment clearance. But according to new notification fromEnvironment dept. date 18-10-2016 and also the gazette dated 09-12-2016the unit does not require EC. Hence the investor is seeking clarificationson the same.

The department to look into thematter in order to expedite thecase.

Open

6

M/s InternationalCargo Terminalsand InfrastructurePvt Ltd

Survey Nos.13,14,15,16,17,18,19,20,21,22,23,32 and 34VillageKalambusare, TalukaUran,DistrictRaigad

EnvironmentDepartment

CRZconfirmation

22-03-2016

The investor has conducted the survey on 24th January 2016 for thedemarcation of High Tide Line, Low Tide Line and Coastal Regulation Zonewhich was carried out by Institute of Remote Sensing, Anna University,Chennai. Subsequently, application was submitted to Environmentdepartment alongwith supporting documents for confirmation of Coastal Regulation Zone(CRZ) on 22nd March 2016, however they are still awaiting the responsefrom department.16-09-2016- IM decision: The case will be taken up in the next CRZcommittee meeting.29-10-2016- Department Update: The case to be discussed in the CRZmeeting scheduled on 03-11-2016.10.11.2016- Department Update: The MCZMA meeting has beenpostponed

The department to look into thematter and update MITRI on thesame

Open

Page 4 of 52

Page 5: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

7Tata ConsultancyServices Ltd.

AndheriEnvironmentDepartment

EnvironmentClearance

The department to look into thematter and update MITRI on thesame

Open

GOM had identified IT as a key industry and had granted exemption to ITIndustry from any type of Environment Regulations. The investor has aletter from MS, MPCB clarifying the non-applicability of EnvironmentClearance on 23.01.2006. However, as per the amendment dated 1stDecember 2009 by MOEF, the proposed IT Park falls under the Prior ECRequirement Category. Prior to the date of the amendment by MOEF,investor had already received the Plinth Completion Certificate. But a fewchanges in the building plan for Phase II by investor, now he is liable forEnvironment Clearance.Investor has made the application to Environment department in 2014which is still pending with the grant of approval.09.10.2015- department update: The investor has violated the regulationshence the department is seeking clarification from MOEF. If the issueremains unresolved the investor to the called for the December 2015investor meeting07.11.2015- Investor meeting decision: Secretary UDD to direct MunicipalCorporation for further process. The department has shared the copy ofthe letter sent to MOEF on 30.11.2015.14.01.2016- Department update: The project was considered in 34thmeeting of SEAC-2 (20.07.2015 and was referred to Environmentdepartment for further needful pertaining to Violation committed by theinvestor. The environment dept. had issued proposed directions undersection 5 of environment (P) Act, 1986 on 02.12.2015. Personal hearing onthis matter will be extended to the investor before A.C.S (environment)after receiving present status report from MCGM & MPCB.10.03.2016- Env Department update: Personal Hearing in this matter willbe extended to the PP before A.C.S. (Environment) on 16.03.2016. (MOM ofhearing awaited from Joy Thakur)08.07.2016- IM Decision: The file is under process with PS(Environment)05.08.2016- Environment department update: Investor to comply withclarification10-01-2017 Investor Update: The investor has submitted thecompliances letter dated 27-12-2016

17-01-2014

Page 5 of 52

Page 6: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

8INDIA MEGAAGRO ANAJ LTD

ExciseDepartment

Change ofQuota

06-08-2016

The investor has made an application for granting of Molasses licence forincreasing the production and application is still pending with the excisedepartment and the investor has not received any update.18.12.2016- IM Decision: A committee comprising of DIC & District AnimalHusbandry Officer& Excise Superintendent to decide on the grant of quota for molasses Theapplication is under process at District level. The matter will be put up forfinal approval to Excise Commissioner through District Collector.23.12.2016 - IM decision : Department to look into the matter and updateMAITRI about the same05-01-2016- department update: The file is under process with ExciseCommissioner

Change of Quota for Molasseslicence has been approved andhence the case to be closed fromMAITRI as on 13-01-2017

Closed

9KGS Sugar andInfra CorporationLtd.

NashikExciseDepartment

Molasseslicence

The application for Molasses licence is under process with commissioner ofState excise department.10.11.2016- Department Update: The file is under process at Minister ofState Excise

MAITRI to send a mail to Dy.Commissioner, Excise in order tofollow up with Hon'ble Minister

Open

10KGS Sugar andInfra CorporationLtd.

NashikExciseDepartment

Letter ofIntent

The investor is awaiting Letter of Intent for manufacturing Methanol, butthe file is under process with commissioner of State excise department.10.11.2016- Department Update: The file is under process at Minister ofState Excise

MAITRI to send a mail to Dy.Commissioner, Excise in order tofollow up with Hon'ble Minister

Open

Page 6 of 52

Page 7: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

11 Balaji Amines Ltd

PLOT NO. E-7 & 8,CHINCHOLIM.I.D.C., TQ-MOHOL,DIST.SOLAPUR

ForestDepartment

EnvironmentClearance

01-12-2015

Solapur is notified as eco sensitive area due to which the investor needs toobtain the environment clearance from MOEF which is still under processwith the central government14-10-2016 - IM decision: Investor to write a letter to Principal Secretary(Forest) with the copy of the same to PS(I) & DC(I) in order to fix theboundaries of eco sensitive zone. MAITRI to share a draft DO letter onbehalf of DC(I) to be sent to PS(Forest) to expedite the matter. Forestdepartment also to update the investor on the progress of demarcation ofeco sensitive zone16-11-2016- Investor update: Investor to share the copy of the applicationmade to forest department. The investor has also met the DFO, Solapurwho has assured to resolve the case within a months time18-11-2016- IM decision: Initially Great Indian Bird Sanctuary was 8496.44Km2. It was reduced to 1229.24 Km2 in the year 2012, subsequently it wasreduced to 366.73 sq.km. This is distributed in around 1200 land parcels.At present delineation of Eco Sensitive Zone around these number of landparcels is in progress but according to the department, it will take sometime. The department has informed MAITRI to collect the plan from theinvestor in order to check the distance of the plot from the bird sanctuary22-12-2016- Department Update: DCF Solapur will be sending the proposalto CCF Pune for fixing Maldhok Bird Sanctuary boundaries by Jan - 2017.

The map has been prepareddemarcating the boundaries ofeco sensitive zone for maldhokbird sanctuary. DCF, Solapur tocall a meeting between MLA andMP for their inputs in the case.Hence the case to be put on holdtill the file reaches forestdepartment, Mantralaya.

OnHold

Page 7 of 52

Page 8: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

12Balaji SpecialityChemicals Pvt.Ltd.

PLOT NO. E-8/1,CHINCHOLIM.I.D.C., TQ-MOHOL,DIST.SOLAPUR

ForestDepartment

EnvironmentClearance

15-09-2016

Solapur is notified as eco sensitive area due to which the investor needs toobtain the environment clearance from MOEF which is still under processwith the central government14-10-2016 - IM decision: Investor to write a letter to Principal Secretary(Forest) with the copy of the same to PS(I) & DC(I) in order to fix theboundaries of eco sensitive zone. MAITRI to share a draft DO letter onbehalf of DC(I) to be sent to PS(Forest) to expedite the matter. Forestdepartment also to update the investor on the progress of demarcation ofeco sensitive zone16-11-2016- Investor update: Investor to share the copy of the applicationmade to forest department. The investor has also met the DFO, Solapurwho has assured to resolve the case within a months time18-11-2016- IM decision: Initially Great Indian Bird Sanctuary was 8496.44Km2. It was reduced to 1229.24 Km2 in the year 2012, subsequently it wasreduced to 366.73 sq.km. This is distributed in around 1200 land parcels.At present delineation of Eco Sensitive Zone around these number of landparcels is in progress but according to the department, it will take sometime. The department has informed MAITRI to collect the plan from theinvestor in order to check the distance of the plot from the bird sanctuary22-12-2016- Department Update: DCF Solapur will be sending the proposalto CCF Pune for fixing Maldhok Bird Sanctuary boundaries by Jan - 2017.

The map has been prepareddemarcating the boundaries ofeco sensitive zone for maldhokbird sanctuary. DCF, Solapur tocall a meeting between MLA andMP for their inputs in the case.Hence the case to be put on holdtill the file reaches forestdepartment, Mantralaya.

OnHold

Page 8 of 52

Page 9: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

13Solar IndustriesIndia Ltd.

Chakdoh,Katol

ForestDepartment

Diversion ofForest land

13-04-2013The issue was closed on13.01.2017

Closed

The investor submitted application for diversion of 87.97 Ha of forest landto comply with the safety zone requirement to manufacture defenceexplosives. The proposed forest land is not a part of the wildlife sanctuarynor a wildlife corridor. Some NGO and Wildlife Warden has raisedobjections. Their file is pending for approval with PCCF Nagpur since 20January 2015.August 2015- Update from the department: Proposal under Forest(Conservation) Act for diversion of forest land has been processed forapproval of Govt of Maharashtra. After approval of Govt of Maharashtra,the same will be forwarded to MoEF & CC.23.09.2015- Investor update: File is with Minister (Forest), who will takeviews of the Mr. Bagrodia, MLC (the opponent) in some time16.12.2015- Department update- PCCF report is received however the localMLA (Mr Sunil Kedar) has raised concerns about tiger habitat with MoEF.14.01.2016- Department update-A meeting was held by Forest Minister on16.12.2015 at Nagpur with Mr. Kedar, MLA. It was agreed that restudy (of 7days) will be done by involving Mr. Kedar in the proposed area by cameratrap. Mr. Kedar wanted department to ascertain if company has done anyencroachment on forest land and provide information about cattle kill insaid area. All information’s have been provided on 5/1/2016. However,restudy is yet to be started.29.06.2016- Department update: The re-study is done. the file is submittedto chief secy. The file is sent back to Forest department for queries.

Page 9 of 52

Page 10: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

14 Metlok Pvt Ltd

W-27, MIDCKalmeshwar441 501,Dist. Nagpur

LabourDepartment

Revision ofWages

03-11-2016

The investor, is facing law related issues and threats from RashtriyaChemical Kamgar Sangh and their own employees to revise the wages.15-11-2016- Department Update: The file is under process with Asst.Commissioner, Labour Nagpur18-11-2016 IM decision : A field visit was conducted by labour department,Nagpur on 17-11-2016, report awaited. Once the report is prepared, DC(Industries) to intervene in the case23-12-2016- IM Update : The meeting between AdditionalCommissioner, Labour, Labour Union and the investor is yet toconvened.

The department to look into thematter in order to expedite thecase.

Open

15 Metlok Pvt Ltd

W-27, MIDCKalmeshwar441 501,Dist. Nagpur

LabourDepartment

FactoryLicense

18.10.2014

M/s Metlok Pvt Ltd has a manufacturing facility at W-27 MIDC Kalmeshwar,Dist. Nagpur and the company has made and application for FactoryLicense dated 19/09/2014. The investor has already made paymentstowards the license fee for getting the factory license but has not receivedany communication for the department regarding there application.06-01-2017- Department Update: The said license had been granted tothe unit but awaiting the copy of the same.

The department to look into thematter in order to expedite thecase.

Open

to chief secy. The file is sent back to Forest department for queries.08.07.2016- IM Decision: The file is re-submitted to Chief Secretary forfurther action.12.08.2016-IM decision: File is submitted to Honourable Minister ofForest. Forest Dept. to also call PS (Industries) in the next meeting withHonourable Minister of Forest with regards to this case.16-09-2016- IM decision: The case is under process with Minister (Forest)in order to a take a decision on the same.06-10-2016- RM decision: A meeting between Hon'ble Minister Forest andconcerned MLAs is scheduled on 20th October 2016 to discuss on theissue.25-10-2016- Department update: Since the MLA was not present in themeeting, it was concluded that a NOC from the concerned MLA to befurnished to resolve the issue.18-11-2016-IM decision: The department to put up the proposal for NOCfrom the concerned during Winter Assembly20-12-2016- Department update: The case was taken up in winter assemblyand Hon'ble CM has approved the file and Forest department (State) hasforwarded the file to Central. Hence the case to be closed from MAITRIforum

Page 10 of 52

Page 11: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

16Metlok Pvt Ltd(Expansion)

W-27, MIDCKalmeshwar441 501,Dist. Nagpur

LabourDepartment

FactoryLicense

02.03.2015

M/s Metlok Pvt Ltd has a manufacturing facility at W-27 MIDC Kalmeshwar,Dist. Nagpur and the company has made and application for FactoryLicense dated 27/02/2015 for expansion of there unit II. The investor hasalready made payments towards the license fee for getting the factory withthe required documents.06-01-2017- Department Update: The said license had been granted tothe unit but awaiting the copy of the same.

The department to look into thematter in order to expedite thecase.

Open

17MonsantoHoldings Pvt. Ltd.

Village -Bhivgaon,Tal -DeulgaonRaja,DistrictBuldhana

MaharashtraFire Services

Final FireNOC

10-11-2016Investor has made an application for Final Fire NOC from Maharashtra FireServices on 10th November 2016 which is still pending for grant ofapproval.

The issue was closed on13.01.2017

Closed

18

AdditionalAmbernathManufacturer'sAssociation

PaleAmbernath

MIDCInfrastructure

25-09-2016

The investor has paid the EMD in June 2014 but the infrastructure is yetto be developed by MIDC. Hence in spite of allotment of land no physicalpossession of the land is given by MIDC.13-10-2016- Department Update: There are some issues of locals whostalled infrastructure work. MIDC is planning to start the work under policeprotection.18-11-2016 - IM decision : Investor is requesting for Compensation on EMDpaid and free development period once the infrastructure is made availableto the unit. MIDC to take decision once the matter is discussed in theboard meeting in order to give the compensation to the investor on EMDand with regards to free development period MIDC has agreed to give freeextension to the investor. In the meanwhile, MIDC will start the work underpolice protection.28-11-2016- IM decision: Investor is requesting for Compensation on EMDpaid and free development period once the infrastructure is made availableto the unit. MIDC to take decision once the matter is discussed in theboard meeting in order to give the compensation to the investor on EMDand with regards to free development period MIDC has agreed to give freeextension to the investor. In the meanwhile, MIDC will start the work underpolice protection.23-12-2016 - IM decision : As per the discussion in the meeting MIDC totake up compensation related issue in their board meeting.

MIDC is revising the layout ofPAP plots which will becompleted in next 8-10 days.With regards to providingcompensation to the unit on theEMD paid MIDC to discuss thecase in the upcoming boardmeeting as it is a Policy matter.

Open

Page 11 of 52

Page 12: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

19Ajanta UniversalFabric Ltd

B-177, Karad MIDCTimeExtensionLimit

13-07-2016

The investor has made an application for final fire NOC in 2010 butobtained the same in 2011 in the meanwhile the unit had already enteredinto production for which MIDC levied penalty on the investor. Investorapproached court for waiver of penalty but the decision made by the courtwas that investor to paid 5% of the penalty charged. Due to the delay inobtaining the final fire NOC the investor is requesting free time extensionfor BCC from MIDC which has been declined once. Again the investor ismaking the representation for the same case through MAITRI forumThe file is forwarded to MIDC head office vide inward no. D48163 on dated20.10.201615.11.2016 : Department update: The file is under process with Dy. CEOMIDC18.11.2016 - IM decision : MIDC to examine the delay on NOC for fireapproval and accordingly take decision on the matter23.12.2016 - IM decision : According to the updates given by thedepartment there was no delay in issuing the NOC for fire approval henceBCC extension can't be given without penalty. MAITRI to update theinvestor about the same04-01-2017- Department update: The BCC with penalty has beengranted to the unit which the investor is not accepting

According to MIDC, investorsrequest for free time extensionfor BCC cannot be consideredand hence the case to be closedfrom MAITRI forum as on13-01-2017

Closed

20 Amar Wire Mesh

PLOT NOF77-F78,ADD.ANANDNAGARMIDC,JAMBIVALIGAON,AMBERNATH EAST-421506

MIDCLandallotment

27.02.2014

Investor has initially applied to MIDC to allot the plot no F-78 (4000/1300SQM) at Anand Nagar MIDC, Ambernath on 28.02.2014. Till date theyhaven't received any written reply from MIDC. Hence, investor filed a RTIand found out that their proposal was recommended by RO and sent to HO.But again the file came back to RO stating that industrial plots are notavailable for allotment. Investor has sent many reminder to MIDC butnothing happened till date.23.12.2016 - IM decision : As per the information provided by thedepartment, the allotment for expansion to be done in accordance to thenew policy which is under process as of now03-01-2016- Department Update: The file is under process with Jt. CEO,MIDC.

MIDC to look into the matter andupdate MAITRI on the same.

Open

Page 12 of 52

Page 13: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

22Fine FinishOrganics Pvt. Ltd.

E2, E3,Mahad MIDC

MIDCWaterConnection

16-08-2016

Investor has purchased the plot numbers bearing E2 & E3 in Mahad MIDCthrough auction process from official liquidator, Bombay high court inFebruary 2012. Thereafter investor has faced lot of difficulties to get thename transferred on the said plot from MIDC due to the previous dues onthe plot. However after MAITRI intervention their transfer of plot issue hasgot resolved. Now again when Investor has applied for water connection DyEngineer MIDC, Mahad has issued a letter dated 19th October 2016 askingto make the payment of Rs. 9,31,673/- towards the previous dues.14.12.2016- Department Update: The file is under process with MIDClegal

MIDC to look into the matter andupdate MAITRI on the same.

Open

Investor got possession of plot no. A-74/7 in TTC industrial area on9.12.2004 and applied for Building Plan approval. MIDC asked investor tosubmit "No dues certificate" from NMMC. But during this time a case wasgoing on between Small Scale Entrepreneurs Association (SSEA) & NMMCProperty Tax Department in the High Court & the Supreme court for theNMMC Tax not to be levied on the MIDC land. Hence due to this confusion,investor did not make the Property Tax payment. Investor has finished theconstruction and started commercial production. Investor now has appliedto RO Mahape for time limit extension to obtain Building plan approval andBuilding completion certificate and also Waiver of Marginal Distancewithout any penalty or compounding charges.The case has been forwarded to Dy. Engineer SPA by Area Manager, Mahapefor further processing. However, the matter is still pending.16-09-2016- IM decision: Since the NMMC "No dues Certificate" is notrequired, MIDC has informed the investor to apply for time limit extensionunder Udyog Sanjivani Scheme.15-11-2016- Investor update: But according to the investor he does notqualify for "Udyog Sanjivani". MIDC to update MAITRI on the same28-12-2016- IM decision: Investor to meet CEO, MIDC and producedocuments in order to certify the production date. If required MIDC cantake help of DC(Industries) in certifying the same23-12-2016 -IM decision : MIDC will issue a letter to the investor to removethe illegal encroachment from the marginal distance between the adjoiningplots. Thereafter MIDC will suggest future course of action.06-01-2017- Investor Update: MIDC has issued a letter to investor to clearthe encroachment from Marginal distance.

21Cliff KumarEngineering Pvt.Ltd.

Plot No.-A-74/7 & A-74/8,Khairne,Navi Mumbai

MIDC

Extension oftime limit toobtainBuilding PlanApproval,BCC, Waiverof MarginalDistance

13-03-2006

MAITRI to follow up with theinvestor to remove theencroachment from marginaldistance, if the encroachment isnot removed in a month thanMAITRI to close the issue.

OnHold

Page 13 of 52

Page 14: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

23Givaudan IndiaPvt. Ltd.

Shirpur MIDCPackageScheme ofIncentives

08-09-2016

As per the instruction from Industries Department Investor has made anapplication to avail state incentives under PSI-2013 on 09th September2016 through online. However, in order to avoid a confusion at a laterstage, they want clarification about the eligibility under the PSI 2013 fortheir unit.14-10-2016 - IM decision: Due to unavailability of infrastructure thephysical possession of the plot was obtained in 2015 and henceDirectorate of Industries to refer the case to MIDC. MIDC to reply within 2weeks with the inputs18-11-2016- IM decision: Directorate of Industries to send a letter to MIDCseeking comments on the case19.11.2016: MAITRI has forwarded the issue along with minutes ofmeeting to MIDC in order to provide their inputs. Upon which MIDC hascommented that without the official letter from DI, MIDC would not providethe inputs04-01-2016- MIDC Update: MIDC is working on the inputs to be providedto DOI.

MIDC to share the inputs on thecase shortly

Open

24Indigo Denim Pvt.Ltd.,

Plot No. T-67, MIDCIndustrialArea,Butibori,Tal. &Distt.Nagpur

MIDCRevised planSanction

07-11-2015

The investor has obtained the Building Completion certificated on 3rdSeptember 2015 however a few revision has been made in the earlier planfor which the investor has made an application for revised plan sanctionwhich is under process with the department.14-11-2016- Investor Update: The file is under process with EE, Nagpur12-01-2017- Investor Update: The Revised plan has been issued to the uniton 11-01-2017 and hence the case to be closed in the upcoming investormeeting

The issue was closed on13.01.2017

Closed

25Jay PrecisionProducts IndiaPvt. Ltd.

Plot no. IS5,Mohopada,Patalganga,MIDC

MIDC Local Issues 20-10-2016

MIDC had allotted the land to the investor in Aril 2016 but due to the localissues with the villagers the investor is unable to level the land or evenconstruct the boundary wall till date23.12.2016 : According to the updates by the department the boundarywall work has started05-01-2017- Investor Update: As confirmed by the investor, the boundaryhas be constructed and MAITRI can close the case.

The issue was closed on13.01.2017

Closed

Page 14 of 52

Page 15: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

26Jay PrecisionProducts IndiaPvt. Ltd.

Plot no. IS5,Mohopada,Patalganga,MIDC

MIDCTree CuttingPermission

23-11-2016The investor has made an application for the said approval to MIDC and haspaid the demand note on 16-12-2016 but the approval is still underprocess with the department.

Investor to meet Jt. CEO, MIDCon 17-01-2017 at 4:00 PM tounderstand the issue and Addl.Collector, MAITRI to take theupdate from MIDC in the next 3days.

Open

27 Laurel Wires Ltd

D 62, MIDC,Avdhan,Dhule - 424006

MIDCBCCextension

07-01-2016

Investor has applied to obtain BCC for the plot number D-201 and J23/24but MIDC has asked investor to pay charges of 2,36,000. However, investorhas got the possession of J-23/24 on 03.03.2015 and hence asking MIDCto waive of the charges as the land allotment was delayed by them. Alsoinvestor has received investment period extension due to this reason for 3years.Investor has made fresh representation on 13.03.2016 for considering thefacts01.04.2016- Investor update: MIDC has asked for compliance12.04.2016- MIDC update: MIDC has levied the charges correctly. MIDC willissue the letter post which, MAITRI can close the issue.13.04.2016- IM decision: MIDC to share the letter saying that the chargeslevied are correct - with MAITRI.29.04.2016- Ro MIDC update: RO, Dhule has asked for compliance from theinvestor.31.05.2016- Investor update: Investor has made the compliance05.07.2016- MIDC update: Compliance letter is given to investor on09.06.2016. The investor is yet to comply. The copy of said letter isobtained.15-11-2016- Department Update: The file has been sent to MIDC, RO Pune2 on 08-11-2016. Final permission to be granted to the investor shortly28.11.2016- MIDC Meeting Decision: MIDC will re-examine theapplication made by the investor for free time limit extension for BCC

If industries departmentconsiders investment periodextension than MIDC also shouldconsider free time limitextension for BCC.

Open

Page 15 of 52

Page 16: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

28Mungiengineering

Plot No:- B-12,ChakanIndustrialArea, Phase -II ,Tal-Khed,Dist.- Pune

MIDC

NOC forlayingElectricalPower cable

12-12-2011

The unit was granted conditional NOC by MIDC on 19.01.2012 to lay 22 KVHT cable from 400 KV substation (Plot No. P-10) Phase-III to "MVMLsupplier park" (the mail client of Mungi engineering). According to thisNOC, MIDC did not have possession of land (from point E to F) of approx.350 mtr and thus, midcap did not granted NOC for this stretch. All worksof cable laying is done by the unit except for the said stretch. Investor isrequesting for NOC of 350 mtr land now.28.03.2016- MIDC update: Dy CEO2 to be approach for resolution18.05.2016- MIDC update- DY CEO2 to make the field visit by 20.05.201606-10-2016- RM decision: MAITRI to share the draft DO letter with DC(I) tobe sent to CEO, MIDC on long pending issues with the department.14-10-2016- IM decision: MIDC is in process of acquiring the plot whichwould take 3 months, hence the case to be on hold. The issue to bereviewed in January 2017.

MIDC is in the process of specialacquisition on the plot which isfacing Right of Way issues.

Open

29New Holland Fiat(India) Pvt. Ltd

ChakanMIDC

MIDC33kv PowerSupplyErection

29-11-2016

Investor has paid the demand note issued by MSEDCL for the 33kv powersupply installation on 28th October 2016. Now he is requesting MIDC tocomplete the power erection work by March - 2017 from MIDC.23.12.2016-IM decision : Department to expedite the issue and updateMAITRI about the same

The tendering work is completedan work order is under process.MIDC to write to the ElectionCommission to execute the LOA

Open

30New MeltingCentre

Five starMIDC, Kagal

MIDCBuildingplan approval

28-09-2016

The investor has made an application on 28th September 2016 for buildingplan approval, Provisional Fire, Temporary water Connection & externaldrainage connection etc. through single window clearance of MIDC which isunder process with the department (vide FileNo.SWC/91/521/20160927/417580)

MIDC to issue the demand notefor the said approval

Open

31

Purna AgroCluster andAgricultureImplements

Jalna MIDCLandallotment

Investor has applied for land to RO, Aurangabad but awaiting allotmentfrom MIDC14.12.2016- Department Update: The file is under process with Jt. CEOMIDC23.12.2016 - IM decision : Department to look into the issue and updatedMAITRI about the same04-01-2017- Department update: The land has been offered to the investorin the LAC meeting held on 04-01-2017

The issue was closed on13.01.2017

Closed

Page 16 of 52

Page 17: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

32Royal RaisinCluster

A-19, MIDCBhoom,Osmanabad

MIDCBuilding PlanApproval

15-11-2016

Cluster has made an online application for building plan approval (TrackingID - SWC/145/521/20161115/427916) on 15th November 2016 which isstill pending for grant of approval.10-01-2017- Investor update: Investor has paid the demand note issuedby MIDC, awaiting final approval

MIDC to look into the matter andupdate MAITRI on the same.

Open

33Shree PushkarChemicals &Fertilizers Ltd.

Lote-ParshuramInd Area,

MIDCLandallotment

28-09-2015

The investor has made an application of land for 40000 sq.mtr and hadreceived an offer letter form MIDC on 06-05-2016. The investor hasexcepted the offer letter received from MIDC and has also made a paymenttowards land allotment on 16.05.2016 vide Ref No. NO/MIDC/ROR/Addl.Lote/B-31132/2016, but till date the investor is awaiting the possession ofland and has not received any update from MIDC. The investor is willing tocomply with all the requirements mentioned in the offer letter once theplot is allotted and the lease agreement is completed.

MIDC is reviewing the layoutprepared, will resolve the case in8 days.

Open

34Spak SurfactantsPvt Ltd

Plot No G-2,MIDC, Lote-ParshuramInd Area, Tal-Khed

MIDCWaterConnection

24.11.2016The investor has made an application to MIDC Chiplun for increase in waterconnection from 15mm to 50mm for there unit at Plot No G-2, MIDC Lote-Parshuram Ind Area, Tal-Khed, Dist. Ratnagiri

MIDC to look into the matter andupdate MAITRI on the same.

Open

35 Spices Cluster Jalna MIDCLandallotment

Investor has applied for land to RO, Aurangabad but awaiting allotmentfrom MIDC14.12.2016- Department Update: The file is under process with Jt. CEOMIDC04-01-2017- Department update: The land has been offered to the investorin the LAC meeting held on 04-01-2017

The issue was closed on13.01.2017

Closed

Page 17 of 52

Page 18: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

MIDC to take decision on thecase and intimate investor on thesame

Open

The investor applied BCC time limit extension for plot no. D-85 which is inproduction since 2004. He has produced all relevant documents to provethe production date, yet the RO MIDC is asking for additional documents.According to the investor, if the penalty is levied for time limit extensionthan the project will not be viable.07.11.2015- Investor meeting decision: Dy. CEO MIDC to give a hearing tothe investor on Monday 09.11.2015 at MIDC HO and take a decision on thesame.17.11.2015- Investor update: Investor was asked to apply again at ROoffice, Pune. Investor has applied to the same24.12.2015- Investor update- the investor has applied for BCC on15.12.2015 and has shared the copy to MAITRI04.01.2016 - MIDC update- Investor is asked to comply with certaindocument02.05.2016 Investor update - The investor has already complied with therelevant documents18.05.2016- MIDC update- The file is with Dy CEO230.05.2016- Investor update: Investor has received demand note for BCCextension.08.07.2016- IM Decision: DI to certify the date of production on this plotand communicate the same to MIDC. Investor to provide necessarydocumentation.12.09.2016- Department update: the production date has been certified byDirectorate of industries and MAITRI has forwarded the same to MIDC.30-09-2016- Investor Update: The field Visit has been completed by Jt.Director Industries in order to certify the production date.18-11-2016- IM decision: A field visit was conducted by Jt. Director,Industries(PSI), according to him the unit has obtained 3 plots from MIDC(D- 85, 107, 108) Out of which 107 and 108 is amalgamated and amanufacturing unit is in production but on D-85 the investor has just builta shed and has used it as a store department. The power used at D-85 isalso from plot no. D108 and no additional load has been applied. But theunit is Operating as a manufacture of excisable goods as per the RCobtained from State Excise Department on 18.09.2016. Apart from this,there is no paperwork for the said location. Hence DI is unable to certifythe production date.23.12.2016 - IM decision : MIDC to verify whether the plot was allottedfor storage or production purposes and decide on the application forBCC extension accordingly

36Swarovski Pvt.Ltd.

D-85 and108,M I D CRanjangaonVillage,Koregaon,Shirur,Ranjangaon-412220

MIDCBCCExtension

18-11-2015

Page 18 of 52

Page 19: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

37 Wire FormarsK-26, MIDC,KUPWADSANGLI

MIDCLandAllotment

15-02-2015

Investor presently is in possession of plot number K-26 (1000 m2) inKupwad MIDC area, Sangli. For the expansion purpose Investor had appliedfor 1650 m2 land area on 15th February 2015. As per Investor LACcommittee & planning department of MIDC has approved the applicationhowever confirmation from MMC committee is pending since last 1 year.23.12.2016-IM decision : Department to expedite the issue and updateMAITRI about the same

The issue was closed on13.01.2017

Closed

38ReadymadeGarment Cluster

Amravati MIDCBuilding planApproval

02-01-2017The cluster has made an application for building plan approval andreference no.swc/147/521/20170102/437/077

The department to look into thematter in order to expedite thecase.

Open

39MACCIA UdyoginiFood Cluster Nashik MIDC

Landallotment

The investor has applied for the land in Satpur or Ambad MIDC area withNashik Regional Office which is still pending for the allotment.20-12-2016: Addl. Collector MAITRI has spoken to GM Land, MIDC inorder to expedite the case.

The department to look into thematter in order to expedite thecase.

Open

40National Instituteof SecuritiesMarket

PatalgangaIndustrialArea, RaigadDist.

MIDC Local Issues 22.12.2016

SEBI is establishing NISM I Patalganga Industrial area of Raigad district.MIDC has allotted 70 acres land for the purpose. The local population isinterfering at t he construction site even after paying Rs. 90 lakhs by SEBI,over and above the c compensation paid MIDC to the previous owners. SEBIis asking for intervention for smooth completion of the campusconstruction.

The file is under process with JDWater to be taken up in the nextCommittee meeting

Open

41 Meena Sorte

LoteParshuramInd Area,Dist.Ratnagiri

MIDCLandallotment

22.12.2016

The investor had made an application for land allotment at Lote ParshuramDist. Ratnagiri, the investor was issued an offer letter for 2000sqmt on31/07/2014. The file is pending with MIDC (File no. D46261). But investorhas not been allotted the land till date.

All the investors have beencalled for a joint meeting withJt. CEO, MIDC

Open

Page 19 of 52

Page 20: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

42Anshul SpecialtyMolecules Pvt.Ltd.

hatav MIDC,TalukaRoha, Dist.-Raigad.

MPCBAmendmentsin Consent toOperate

23-06-2016

The investor has made an application on 23rd June 2016 for amendmentsin Consent to Operate (reference no. 0000008949) which is under processwith the department.23-12-2016- MPCB Update: The said land is in MIDC Dhatav which fallsunder Eco sensitive area (Western Ghats) which requires environmentclearance. However investor is seeking clarity on the plot beforeapplying for EC.23.12.2016 - IM Update : As per instructions from PS(I), MAITRI to senda letter to Member Secretary, MPCB to request clarification whetherMIDC Dhatav falls under eco sensitive area

Environment department shouldinform the investor whether ECis required to the unit as thenotification with regards to Ecosensitive area was published bythe said department. In the meanwhile MPCB todiscuss the issue in thecommittee meeting and takedecision in next 15 days.

Open

43

Godrej & BoyceMfg. Co. Ltd.(Phase II/ Northblock)

VillageVadval,Tambati, Ta.Khalapur

MPCBConsent toEstablish

12-08-2016

The investor has made an online application for consent to Establish andthe reference number for the same is 0000002352.06-10-2016 - RM decision: The case has been taken up in the CAC meetingand the consent was granted with compliances14-11-2016- Investor Update: The investor had complied with the requireddocuments. The department has issued a few more compliances.18-12-2016- Investor Update: The Compliance has been submitted by theinvestor.23-12-2016- Case was approved in CAC meeting held on 08.07.2016 andit was decided to grant Consent after obtaining reply to the query letterissued by SRO and design details of ETP, APC systems and TAC report.Industry has submitted the TAC data. Same has been submitted toTechnical Appraisal Committee. TAC report is awaited. Once received,consent shall be granted with incorporation of TAC recommendations.

Technical Appraisal Committeereport is received the consentwill be issued to the unit shortly.

Open

44Jindal PolyfilmLtd.

MundegaonTal.IgatpuriDist. Nasik

MPCBConsent toOperate(Renewal)

The investor has made an application for Consent to Operate (Renewal)which is still pending for approval.06-10-2016- RM meeting: Investor to be called for a hearing with MemberSecretary MPCB.14-10-2016- IM decision: The hearing date is yet to be decided. Thedepartment to update MAITRI and investor once the date is decided.23-12-2016 - IM Update: Personal hearing was extended to the industryon 25-11-2016. But since the technical person of the industry had notattended the hearing. Hence the hearing was adjourned. Next date ofpersonal hearing yet to be finalised. MPCB to decide the hearing dateand inform investor and MAITRI about the same

The personal hearing isscheduled on 17-01-2017

Open

Page 20 of 52

Page 21: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

45 Lupin Ltd.

MADC,MihanSpecialEconomicZone,Nagpur

MPCBConsent toEstablish

06-09-2016

According to the investor, the proposed biotechnology facility and itsproducts are falling under the manufacture use, Import, export and storageof Hazardous Microorganisms or cell rule, 1989 and does not requireenvironmental clearance as these products are not covered in the scheduleof the EIA notification dated 14-09-2006 and also as per notification ofMOEF dated 20-09-2006. Hence the investor is directly requesting forConsent to Establish from MPCB.23.12.2016 - IM Update : PS(I) to take up the issue with MemberSecretary, MPCB. If the issue of EC is not sorted out, the PS(I)suggested the investor to look out for land in Additional Butubori if itsuits their requirements

The file is under process withthe department.

Open

46Royal RaisinCluster

A-19, MIDCBhoom,Osmanabad

MPCBConsent toEstablish

04-12-2016

Investor has made an online application on 04th December 2016 forConsent to Establish and also has paid the fees of Rs. 25000 but theconsent is yet to be issued by the department.23.12.2016 - IM Update : Department to expedite the issue and updateMAITRI about the same

The issue was closed on13.01.2017

Closed

47PolygommaIndustries Pvt.Ltd

Plot no 59,ajivali, P.O.Donvat,Khalapur

MPCBCategoryChange

12.12.2016

Industry has applied for change of category from Green to white. Theinvestor has already submitted the application on 13-12-2016 at RO/SRO,Raigad.05-01-2017- Department Update: SRO Raigad 1 has forwarded the saidapplication to HQ(JD Water) for further needful action.

The file is under process , issuewill be placed in the ConsentCategorization committee forsuitable decision

Open

48Jay PrecisionProducts IndiaPvt. Ltd.

Plot no. IS5,Mohopada,Patalganga,MIDC

MSEDCLMoving ofOverheadcable

07-12-2016

MSEDCL has informed the investor to shift the overhead line passingthrough the premise which further goes to the villages at their cost whichis approx. 60 lakhs. According to the investor the overhead line is notbothering the investor and hence not willing to bear the cost.

MIDC should consider the costof shifting the overhead cable.The file is under process with Jt.CEO, MIDC decision to be takenin next 2-3 days. Investor tomeet Jt. CEO, MIDC on 17-01-2017 at 4:00 PM to understandthe issue and Addl. Collector,MAITRI to take the update fromMIDC in the next 3 days.

Open

Page 21 of 52

Page 22: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

49 M L Lamitech

Gut No.98/1 CH,KatangiKala, Gondia

MSEDCLPowerConnection(HT)

10-08-2016

Investor has made an application to superidenting Engineer (MSEDCL),Gondia for the new HT connection for their plot on 10th August 2016,upon which a joint inspection from MSEDCL has been conducted on 25thAugust 2016 along with Testing team Bhandra & Executive EngineerGondia. However application is still pending for the grant of approval.14.12.2016- Department Update: The file has been forwarded to CE, Gondiafor his comments.23.12.2016 - IM decision : According to PS(I) the pending dues ofprevious owner should not be charged from the current owner. Dues ofMSEDCL cannot be attached to the land and should be recovered fromthe security deposit deposited by the first owner. MD, MSEDCL to berequested to attend the next MAITRI investor meeting either on personor through video conference

RD, Nagpur, MSEDCL to takedecision with regards to PDarrears.

Open

50M/s Bauli IndiaBakes & SweetsPvt Ltd.

G-146/1,MIDCBaramati,Pune

MSEDCLPowerConnection

07-03-2016

Investor made an application to Chief Engineer, Baramati for setting up sub-station nearby their plot and providing 5mw power supply by December2016 to start the commercial production. Investor has also met with MIDCCEO for the power supply issue in which they have been informed that landis already allotted to MSEDCL for setting up a sub-station on 27th June2016.16-09-2016- IM decision: MIDC has already released funds to MSEDCL toconstruct the sub station. MSEDCL has assured to finish the constructionof the substation by February 201706-10-2016- RM decision: According to MSEDCL, the funds approved byMIDC is not for building the substation but DC (I) suggested that the costfor the upcoming substation should be born by MSEDCL. Department todiscuss the same with CMD, MSEDCL and get back. But the issues offunding the substation will be taken up in the CM meeting.14-10-2016 - IM decision: A letter has been issued by CEO MIDC to CMD,MSEDCL to carry out the work of the proposed sub station work from thefunds provided for augmentation of sub stations03-11-2016- Department Update: The substation has been approved andthe tendering work is in process14.12.2016: Department Update: The funds from MIDC have not beencredited yet delaying the process23.12.2016 - IM decision : As per the update given by Jt. CEO, MIDC thefile related to transfer of funds to MSEDCL has been forwarded to theChairman, MIDC.

MSEDCL to write to the ElectionCommission to take permissionto execute the LOA.

Open

Page 22 of 52

Page 23: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

Open

The department will resolve thecase in 7 days.

The unit is connected with 33 KV line, but due to frequent power failuresand fluctuations, the productivity of their existing unit is getting affected.The investor has requested to expedite the installation of an alternativelines to ensure uninterrupted power supply.August 2015- Update from department: It is proposed to connect the uniton 220 KV Raymond substation through a new link line of 33 KV. To carryout this work, tender was floated on 1st June 2015 (which received nobids) and refloated on 27th June 2015 (Last date for bid submission 11July 2015). Meanwhile, a revised instruction have been received from HeadOffice to issue Infra - II tenders locally for Nasik (R) Division whichincludes above work.13.01.2016- MSEDCL update- The said work of substation is underprogress. Meanwhile, the power supply is extended to Investor's premisesfrom another feeder.13.04.2016- IM decision: the work is stuck due to right of way issue.MSEDCL to get in touch with Collector20.05.2016- MSEDCL update: Right of way issue has been resolved andwork of erecting the poles for 33 KM HT line is completed. Work ofconductor stringing and Cable laying will be completed within 10 days.30.09.2016- MSEDCL update: ROW problem solved, Total line = 4.5Km.,Line completed = 3Km., work in progress = 1 Km, The work of line cannotbe started due to MUD & Water = 0.5Km., work will be started after clearingof weather. In this in this matter about 0.67 km link line at fag end iscompleted. Total completed line is = 4.0 Km remaining work is taken inhand as due to mud at site work could not carried out.14-11-2016- Investor Update: The investor has informed MAITRI that thepower connection from the alternate source has been disconnected16-11-2016- Department Update: An alternate route corresponding to theencroached corridor of 500 mtrs has been considered by MSEDCL and workof laying poles has started. Work expected to be completed within 20 days20-12-2016- Department Update: Procurement of cables is under process.Work Expected to be completed in 20 days23-12-2016 - IM Update: The work of pending 4 poles to be completedshortly and the entire cable laying work to be completed by 09.01.201712-01-2016- Department Update: Due to delay in procurement of cablesthe work to be completed by next week

51Samsonite SouthAsia Pvt. Ltd.

Igatpuri MSEDCL Power 23-12-2006

Page 23 of 52

Page 24: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

52KGS Sugar andInfra CorporationLtd.

Nashik MSETCL Power

Investor has applied for co-generation and hence for evacuation of powerthe feasibility report as technical requirement from MSTECL is awaitedfrom Nashik07.10.2016 - MOU RM : With regards to co-generation of power, MSETCLwill resolve the issue in 2 weeks18.11.2016 - IM decision : MAITRI to follow up with the department toresolve the case17-11-2016- Investor Update: The file is under with the HO, MSETCL

The department to look into thematter in order to expedite thecase.

Open

53Raymond UcoDenim Pvt. Ltd.

Plot No. C-4Lohara,MIDC, Tal. &Dist.-Yavatmal

MSETCL power 06-04-2015

The substation has beencommissioned on 28-12-2-16,hence the issue was closed in theinvestor meeting held on 13-01-2017.

Closed

A 132 KV EHV substation has been sanctioned by the department but theimplementation work for installation of this substation is progressing at avery slow pace13.08.2015- IM decision: A joint meeting to be organised by DI on 19thAugust 2015 with MSETCL and investor to resolve the issue. Minutes areawaited11.09.2015- Update from department: The supply line to this s/s is comingfrom Yavatmal s/s, where MSETCL is facing a land ROW issue. MSETCL toresolve the matter in consultation with MIDC for survey of the area andunutilised power connections, which can be diverted to Raymond unit fortime being.08.01.2016- Field visit update- the work is pending for two differentsections - 1. some portion of land is falling under forest land 2. someportion of land is encroached. MSETCL has written to Forest departmentand SDO, Revenue for action. According to Exe. Engineer, MSETCL thework will be completed by March 201605.02.2016- Department update: Forest department, Yavatmal has referredthe issue to Dy PCCF Nagpur. The encroachment issue pertaining to SDO isyet to be resolved.24.02.2016- MSETCL update: a conditional NOC from SDO is received andwork is under progress. The file in Forest Dept. is forwarded to Jt Secy(Forest)11.03.2016- Forest Dept. update: For the NOC from Forest department thefile is under process with PCCF. It would take 2-3 months to issue the NOC.08.07.2016- IM Decision: The file is under process with Additional PCCF(Central).

Page 24 of 52

Page 25: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

(Central).04.08.2016- Department update: PCCF (State) to comply with relevantdocuments to PCCF (Central)14-10-2016 - IM decision: The Stage 1 approval is done. After thecompliances are done as mentioned in letter (FC-i/MH-33/2016-NGP/917dated 03.10.2016) from MoEF to Revenue & Forest Department,Maharashtra stage -II approval would be provided27-10-2016- Department Update: MSETCL Yavatmal, have uploaded theDemand Note online and are awaiting the approval from the Forest Dept.Nagpur. After the approval, the payment will be made by MSETCL Yavatmaland they will be granted the Working Permission. MSETCL will startworking and the Terms and Conditions and the agreement will be workedupon simultaneously and the Final approval will be given accordingly bythe Forest department (Central)10.11.2016: Department Update: The demand note has been approved byforest department and the payment has been made by MSETCL, Yavatmaland the pole erection work has been started. Expected to be completed byend of December 2016.18.11.2016: IM Update: MSETCL has complied to the stage 1 approval andhas made an application for stage 2 on 27th October 2016. In themeanwhile CCF, Yavatmal had given the permission to MSETCL, Yavatmal toerect poles and the work is in progress23.12.2016 : IM Update - The infrastructure work is in progress fromMSETCL which will be done by January-2017.

Page 25 of 52

Page 26: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

The issue was closed on13.01.2017

Closed

The investor had made an application for HT connection with the totalpower requirement of 7MW against which the department has sanctioned3.5MW and the remaining supply can be released to the unit only aftercommissioning of the 220KV EHV substation at Loni which is underprogress. Currently, since MSEDCL has no additional capacity for this unitand the quality of power supplied from the current feeder is poor theinvestor is facing a major concern in production.08.07.2016- IM Decision: PS (Industries) is having a meeting with energydepartment on 12.07.2016. Investor to attend the same. MAITRI tocoordinate for meeting and inform the investor.12.08.2016-IM decision: Sub station is ready but Pole erection is stuck dueto right of way (37 kms line). The department to look into the matter andupdate MAITRI on the same.The case to be referred for CM's meeting highlighting the Right of wayissues.16-09-2016: IM decision: 64 Poles has to be erected out of whichdepartment has submitted a proposal to SDO, Baramati on 03.08.2016 withregards to ROW problem on location no. 2 & 518-11-2016: IM decision: Addl. Collector, MAITRI to Speak to SDO Baramatiin order to resolve the ROW problem. Also in the next MAITRI investormeeting SDO Baramati to be invited for Video Conferencing.12-12-2016- Department update: Addl. Collector has intervened in thecase, but the concerned SDO was on election Duty. MSETCL officials tomeet the SDO post 20-12-201623-12-2016- IM Update : As per the update provided by SDO during videoconference on 23.12.2016 investor meeting the ROW issue for thesubstation has been resolved. MSETCL will be completing the work byMarch - 201712-01-2017- Department update: The ROW case has been resolved anderection of poles is in progress once it is completed the substation willcommission and hence the issue to be resolved in the upcoming investormeeting

54 Sudarshan Jeans

Loni DevkarMIDC, Tal.Indapur,Dist.- Pune

MSETCLPowerConnection

01-09-2015

Page 26 of 52

Page 27: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

The unit is connected with a 33 KV express feeder even than the unit isfacing a lot of power shutdown and Voltage fluctuation which is impactingthe Machines and production as well.08.07.2016- IM Decision: The power is an issue since 2 years. PS (Ind) willtake up the matter with energy department.16.09.2016- IM Decision: MAITRI to follow up with the department toresolve the case.30.09.2016- MSEDCL Update: Meeting was conducted by CE,Baramati zone,SE, Baramati circle with HT consumers 1) M/s Towell EngineeringInternational LLP 2) M/s Anand Teknow Aids Engg. India Ltd. & 3) M/sSudarshan Jeans Pvt. Ltd. on dated 29.9.16. Steps decided to relief theconsumers: ( i) Carry out the patrolling of line to avoid earth faultinterruptions. (ii) Shifting of 3.11 MVA load of M/s Sudarshan Jeans Pvt,Ltd. on newly erected 33KV feeder emanating from Walchandnagar EHVs/stn, Work will be completed tentatively by 10-15 days. (iii) The load ofM/s Anand Teknow varies from 55A to 2300A for 20 sec, relays at substation are sensitive & tripping occurs. Balancing of load & providingautomatic capacitor bank instead of manually operated capacitor bank willhelp to avid tripping's. d. Augmentation of power transformer at IndapurEHV s/stn from 25MVA to 50 MVA will be completed by Dec-2016.06-10-2016- RM decision: EHV substation work is in progress which will becompleted by February 2017.18.11.2016-IM decision: Addl. Collector, MAITRI to Speak to SDO Baramatiin order to resolve the ROW problem. Also in the next MAITRI investormeeting SDO Baramati to be invited for Video Conferencing12-12-2016- Department update: Addl. Collector has intervened in thecase, but the concerned SDO was on election Duty. MSETCL officials tomeet the SDO post 20-12-201623-12-2016: IM Update - As per the update provided by SDO during videoconference on 23.12.2016 investor meeting the ROW issue for thesubstation has been resolved. MSETCL will be completing the work byMarch - 201712-01-2017- Department update: The ROW case has been resolved anderection of poles is in progress once it is completed the substation willcommission and hence the issue to be resolved in the upcoming investormeeting

55TowellEngineeringInternational LLP

MSETCLPowerConnection

30-04-2016The issue was closed on13.01.2017

Closed

Page 27 of 52

Page 28: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

56 Rice Mill Cluster

Chamorshi,Opposite -ArihantFoodIndustries,Dist.Gadchiroli

NagarPanchayat

Building Planapproval

30-12-2016

The cluster has made an application to Nagar Panchayat for building planapproval.03-01-2017- Addl Collector MAITRI has spoken CEO Nagar Panchayat,Gadchiroli in order to expedite the case.

The department to look into thematter in order to expedite thecase.

Open

57 BHEL

VillageMundipar,TalukaSakoli,Bhandara

PWDLandallotment

22-01-2014MAITRI to follow up with thedepartment to expedite the case.

Open

A land parcel with area 3.94 hectare, belongs to revenue department, whichis allotted to BHEL by MIDC. The same is yet to be handed over to BHEL byRevenue dept.August 2015- Update from department:The said application is being scrutinized and processed by RevenueDepartment.17.08.2015- MAITRI has shared draft letter with DC (Industries) written toPS (Revenue) and DY Sec(Revenue) in order to expedite process-as decidedin Investor meeting dated 13.08.201511.09.2015- Investor meeting decision: The file is put up for scrutiny. Theissue to be resolved within a month.13.01.2015- MIDC update- MIDC has written to SDO revenue for transfer ofsaid land. The proposal is sent for an approval of government14.01.2016- Investor meeting decision: The department to take up theissue on priority and resolve the case at the earliest.17.06.2016- Department update: The file is forwarded to PWD for theirremarks19.08.2016: Department update: PWD head office has sent a letter to theirregional office, Nagpur to get their comments on the said land parcel.22.08.2016 - Department Update: Assistant Engineer, PWD, Nagpur hasrequested report / remarks from Nagpur circle officer (Bhandara) dated25.07.2016 letter vide outward no. 3553.14.09.2016 - Department Update: EE, PWD Bhandara division requested forthe status report from ZP (Bandhkam Bhavan) Bhandara on 03.08.2016

Page 28 of 52

Page 29: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

58

Godrej & BoyceMfg. Co. Ltd.(Phase I/ Southblock)

VillageVadval,Tambati, Ta.Khalapur

PWDApproachroad

24-09-2015

Investor applied for NOC for approach road form Pen-Khopoli road (SH 88)to their unit. The approval of NOC is awaited11.01.2016 - Compliances are done by the unit on 23.12.2015. The file ispending at Pen office, PWD22.02.2016- Field visit update: The file is under process at Alibaug office,PWD.07.04.2016- Field visit update: The file is sent back to Pen office forsignature / compliance of Pen Office.13.08.2016-Department update: The file has been forwarded from Penoffice to Alibaug office30-09-2016- Department Update: The file will be forwarded to EE, PWDAlibaug within a week.14-10-2016- IM decision: A field visit to be conducted by Deputy Director,Mrs. Kharat20-10-2016- Department update: The file is under process at the SE Office,Konkan Bhavan, CBD.16-11-2016- Department update: The file to be put up for signatures of SE,PWD shortly12-12-2016- Department Update: The file has been forwarded to the officeof CE, PWD (Bandhkam Bhavan, Fort) for further processing09-01-2017- Department Update: Queries have been raised by CE PWDoffice. The file has been sent down to EE, PWD, Alibaug office forclarifications

MAITRI to follow up with thedepartment to expedite the case.

Open

the status report from ZP (Bandhkam Bhavan) Bhandara on 03.08.2016letter vide outward no. 4960.19.09.2016- Department Update: File is forwarded to Sub DivisionalEngineer, ZP Bhandara (Sakoli Vibhag) on 17.09.2016. Report from Grampanchayat to ZP is awaited.10.10.2016- Department Update: Zp has sent BhEL's report (file no. "O.No.1480) to EE, ZP division on 03.10.2016 post which file to be sent to PWDBhandara office.21.10.2016 - Department Update: File (ZP report) received at PWD Bhandaradivision. Signatures pending on file further to send report to PWD Nagpurshortly.14-12-2016- Department Update: The file is forwarded to PWD 7,Mantralaya dated 07-12-2016 (outward no. 5080)

Page 29 of 52

Page 30: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

59

Godrej & BoyceMfg. Co. Ltd.(Phase II/ Northblock)

VillageVadval,Tambati, Ta.Khalapur

PWDApproachroad

24-09-2015

Investor applied for NOC for approach road form Pen-Khopoli road (SH 88)to their unit. The approval of NOC is awaited11.01.2016 - Compliances are done by the unit on 23.12.2015.The file ispending at Pen office.22.02.2016- Field visit update: The file is under process at Alibaug office,PWD07.04.2016- Field visit update: The file is sent back to Pen office forsignature / compliance of Pen Office.04.06.2016- Investor update: The compliance is made by the investor.13.08.2016-Department update: The file has been forwarded from Penoffice to Alibaug office30-09-2016- Department Update: The file will be forwarded to EE, PWDAlibaug within a week.14-10-2016- IM decision: A field visit to be conducted by Deputy Director,Mrs. Kharat20-10-2016- Department update: The file is under process at the SE Office,Konkan Bhavan, CBD.16-11-2016- Department update: The file to be put up for signatures of SE,PWD shortly12-12-2016- Department Update: The file has been forwarded to the officeof CE, PWD (Bandhkam Bhavan, Fort) for further processing09-01-2017- Department Update: Queries have been raised by CE PWDoffice. The file has been sent down to EE, PWD, Alibaug office forclarifications

MAITRI to follow up with thedepartment to expedite the case.

Open

60 Gujarat Gas PWDCost ofLaying thepipeline

29-09-2016

The investor has applied for NOC from PWD for laying gas pipeline08-12-2016- Addl. Collector had called the meeting with the investor tounderstand the issue. Addl. Collector has also Spoken to PWD officer inorder to understand the further course of action.05-01-2016- Department Update: As per EE, PWD a proposal to frame apolicy for laying the gas pipeline is under process. Once the policy isformed the NOC will be issued within 15 days.11-01-2017- Addl. Collector, MAITRI has called a meeting with investorto understand the issue.

Open

Page 30 of 52

Page 31: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

61Jay PrecisionProducts IndiaPvt. Ltd.

Plot no. IS5,Mohopada,Patalganga,MIDC

PWD Fee Waiver 07-12-2016

Investor has purchased a plot at Mohopada (Patalganga) MIDC, and forpower the unit was advised to apply for express feeder and is willing tobear the entire cost (approx. 6 crores) for lying the line but the investorhas received a demand note form PWD of 48 lakhs for buying expressfeeder which the investor is not willing to pay, according to him since hisplot is in MIDC and the infrastructure should have been made available tohim by MIDC

MIDC is inspecting if the saidroad the PWD road or not.

Open

62Samartha Opto-ElectropolymerPvt. Ltd.

Survey No.36/ I-B ,NearChinchotiGramPanchayat,Phansapurtarf UmateVillage,Alibaug

RDD

NOC (powerconnection &start ofactivity)

10-04-2015

The investor has purchased the land and building through Auction process(from official liquidator High court, Alibaug) in 2012. As per investor,delayed documents from High court resulted in delayed registration - in2015.The investor has applied to Gram panchayat for its NOC to obtain powerconnection for the unit but till date, it has not been received by the unit.The investor has also sent reminder on 11.02.2016 to gram panchayat inthis regards11.03.2016- IM decision: The case to be presented for the CM meeting.SICOM to visit the gram panchayat to expedite the issues.22-09-2016- Field Visit: A joint meeting to be scheduled between theSarpanch, Investor & RDD, Alibaug.18.11.2016-IM decision: A meeting was held on 17th November 2016 atMAITRI office between Addl. Collector, MAITRI and the investor tounderstand the issue.15-12-2016- Field Visit Update: The case is to be taken up in theupcoming Gram Sabha meeting to be held on 20-12-2016, investor andConcerned BDO to be present for the meeting

MAITRI to follow up with CEO,Zilla Parishad in order to resolvethe case

Open

Page 31 of 52

Page 32: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

Open

The file is under process withsection officer from DivisionalCommissioner office, Pune.Department has asked the statusfrom ZP officials on longpending applications submittedby investor.

The investor is requesting Gram panchayat Karegaon to issue revised billfor gram panchayat tax based on G.N. of Bombay High court dated3.12.1999.07.11.2015- Investor meeting decision: SICOM to coordinate with RDDregarding same.December 2015- Investor update: the file is pending with CEO, ZP09.12.2015- ZP update- ZP, CEO has instructed Gram panchayat to hold thematters of gram panchayat levied tax quoting a GR issued by the PrincipalSecretary.10.12.2015- Investor update-Investor is requesting MAITRI to approachRDD to direct CEO, ZP. Investor has requested MAITRI to take up hissuggestion on draft MH panchayat taxes and fees (amendment) of7.11.2015.1.1.2016- MAITRI has forwarded unit's suggestions received on28.12.2015 to the PS Industries , DC (I) and PSI for further process. andinformed the investor that MAITRI cannot assist in this issue.07.04.2016- Field visit update: The issue was to be taken up in the ZPboard meeting on 11.04.2016. They are awaiting another notification fromGovernment.06.05.2016- Field visit update: The investor is citing rule-9 of payment andlump sum contribution by factories lieu of taxes, Rules 1961- according towhich- In the event of failure on the part of a Panchayat & the occupier toarrive at an agreement, the matter shall be referred either by the panchayator the occupier to arrive at an agreement, to the State Government throughChief Executive Officer concerned, who shall submit the same after

63Swarovski Pvt.Ltd.

D-108,M I DCRanjangaonVillage,Koregaon,Shirur,Ranjangaon-412220

RDD Tax 21-10-2015

Page 32 of 52

Page 33: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

64 AarnavaRevenueDepartment

NAPermission

23-05-2016

The investor has made an application for NA permission which is underprocess with the department.17.11.2016- Investor Update: Not sure if the investor wants to pursue thecase with MAITRI.12-01-2017- Investor update: The investor does not want tp peruse thecase from MAITRI and hence the case to be closed in the upcominginvestor meeting

The issue was closed on13.01.2017

Closed

65Agri EquipmentCluster

Andersul,Tal - Yevala,Nashik

RevenueDepartment

Land 17-08-2015

The cluster has made an application requesting for land to set up aCommon facility centre from District Collector which is still under processwith the department29-12-2016- Department Update: As per DIC Nashik, RDC Nashik hasapproved the land allotment in principle. The final allotment to beapproved by the collector.10-01-2016: Addl. Collector, MAITRI spoke to RDC, Nashik whoconfirmed that the file is under process with collector for final decision.

MAITRI to follow up with thedepartment to expedite the case.

Open

Chief Executive Officer concerned, who shall submit the same afterobtaining the views of the standing committee of the Zilla Parishad to theState Government for decision through the Commissioner with all thenecessary documents." However, the ZP is not referring the case to RDDand keeping the file on hold20.05.2016- IM decision: The case is referred to RDD on 18.05.2016.Investor to be called for the next MAITRI Meeting.01.08.2016- Investor update: Investor to comply with appeal of entireRanjangaon units facing similar issue - to Divisional Commissioner, RDD.12.08.2016-IM decision: The case to be referred for CM meetinghighlighting the Govt. resolution of gram panchayat taxes issued in 2015.11-11-2016- Investor Update: The investor has complied with DivisionalCommissioner, Pune for his final decision.18-11-2016- IM decision: MAITRI to follow up with the department in orderto resolve the case13.12.2016: Department Update: Investor has complied with requesteddocuments to the Divisional Commissioner, RDD

Page 33 of 52

Page 34: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

66

Alfa Laval IndiaLtd(Relocation &Expansion)

ShirwalRevenueDepartment

Building PlanApproval

13-05-2016

The approval to revised Building Plan Approval is under process withcollector, Satara.14-10-2016 - IM decision: DC(I) has spoken to the collector, Satara withregards to this case and informed the investor to have a meeting withDistrict Collector to speed up the process and update MAITRI about thesame11.11.2016- Investor Update: Investor to submit the blueprints to thedepartment. After submission of documents, approval would be accordedin a weeks time16-11-2016- Investor Update: The investor has submitted the blue prints tothe department on 15-11-2016 and the file is under process with ADTP,Satara20-12-2016: Investor Update- The site inspection to be conducted byTehsildar shortly03-01-2016: The site inspection has been conducted by the Tehsildar andthe final approval is pending from the collector office.23-12-2016 : IM decision : RDC has organised a meeting between Tehsildar,TILR and Investor on 22-12-2016 regarding the issue, it was decided toconduct the survey on 23-12-2016.30-12-2016-Department Update: The survey was conducted on 30-12-2-16 and Tehsildar to submit the report shortly

The department to look into thematter in order to resolve thecase.

Open

Page 34 of 52

Page 35: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

67Alfa Laval IndiaLtd.

Plot No.1,5,6,10 and14, Tal.Khandala,Dist. Satara

RevenueDepartment

measurementof land

30-01-2012

Investor applied to TLR office to obtain original K-Prat of Atitatadi MojaniMo. Ra. No. 1789/10 but received only 1/2 copy. The rest 2/2 copy is notyet received. Investor also require the KaJaPa for previous demarcation(Demarcation dates- 08/07/2011, 11/07/2011, 13/07/2011 for Mo. Ra No.1783, 1781, 1779, 1782, 1778, 1789, 1789/10) as these documents willbe needed for every future approval.31.05.2016- Department update (SLR): It will take 2 weeks as the office isbeing shifted.14.10.2016 - IM Decision: As the Nodal officer for MAITRI was not presentfor the meeting, the issue was not discussed. As discussed in the MAITRImeeting held on 20.05.2016, MAITRI to prepare the list of all the issuesand share it with DC(I) to be sent to PS(Revenue) for further action.11.11.2016- Investor Update: The demand note for the demarcation hasbeen issued and the same has been paid by the investor but thedemarcation is scheduled in February 201720.12.2016-Investor Update : Investor to approach the collector to re-consider the date for land demarcation03.01.2017- Investor Update : The land demarcation will be carried out on03.01.2017 at the plot.23.12.2016 - IM decision: TILR to carry out the land measurement by30.12.2016 and provide K-Prat accordingly.05-01-2016- Department update: The measurement has been carriedout on 30-12-2016 and the K-prat has been issued, hence the issue tobe closed in the upcoming investor meeting.

The issue was closed on13.01.2017

Closed

68Ankur ExtrusionPvt. Ltd.

H. No. 2 & 3VillageSakurli(Sawarpada)Tal.Shahpur,Dist. Thane

RevenueDepartment

NAPermission

08-10-2002

The investor had obtained the building plan approval on 27-09-2002 afterwhich he had made an application for NA permission, but the investor hasnot yet obtained the copy of Sanad. The unit has already entered intoproduction in July 200428-12-2016- Department Update: According to the department, the unitalready has a commercial NA and needs to be amended under section 47 (B)for which the investor has not yet applied due to which MAITRI has closedthe issue at the forum.

The issue was closed on13.01.2017

Closed

Page 35 of 52

Page 36: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

69Avon Tuff GlassPvt. Ltd.

Survey No.201-1,DevichaPada,VillageSonale, Tal.Bhiwandi,Dist. Thane

RevenueDepartment

NAPermission

The said plot has obtained the NA for commercial use, but now theinvestor has made an application to Addl. Collector, Thane requesting NAfor industrial use which is under process with the department16-12-2016- Department Update: The compliance letter has been issued tothe unit28-12-2016- Department Update: According to the department, the unitalready has a commercial NA and needs to be amended under section 47 (B)for which the investor has not yet applied due to which MAITRI has closedthe issue at the forum.

The issue was closed on13.01.2017

Closed

70Bhagirathi RaisinCluster

Kavthe-Mahakal,Dist. Sangli

RevenueDepartment

Building PlanApproval

The cluster has made an application for Building Plan Approval which isunder process with Tehsildar,Sangli18.11.2016 - IM decision : Addl. Collector, MAITRI to look into he matterand resolve the case at the earliest.14.12.2016-Investor Update: Tehsil office has forwarded the file to townplanning for further process27-12-2016- Addl. Collector, MAITRI had co-ordinated with Jt. Director(TP), MAITRI and had spoken to ADTP, Sangli in order to expedite the case.09-01-2016- Investor update: Town Planning, Sangli has referred thefile to Tehsildar in order to issue the demand note for the said approval.

The department to look into thematter in order to resolve thecase.

Open

Page 36 of 52

Page 37: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

Tehsildar office has issued royalty notice to the unit. Investor replied toTehsildar, Ambernath office on 13.01.2016 that they have used soil forlevelling purpose of the same plot and as per the GR no. GKN – 10/0307/P.No 57/KH dated 07.01.2011, Royalty is not applicable in MIDC area if thesame soil is utilized for levelling purpose. Hence Investor has requested tocancel the said notice.11.03.2016- IM decision- MAITRI to draft a DO letter in name of DC (I)written to the Collector (Thane) -with Cc marked to the investor. Tehsildarto verify the facts and Deputy CEO to intervene in the case.09.03.2016: MIDC update: MIDC has written to Tehsildar about nonapplicability of royalty in this case.20.03.2016- Investor update: Investor met Tehsildar as instructed by DC sirbut Tehsildar is asking to approach HO, Ulhasnagar. Investor is requestingfor resolution.13.04.2016- IM decision: MAITRI to follow up the case with Dy CEO, MIDCand Tehsildar office.02.05.2016- Investor update: Investor has appealed at SDO office.20.05.2016- IM decision: MAITRI to draft a DO letter for PS (I) addressed toSecretary (Revenue) for setting an inquiry over Tehsildar forinappropriately charging the royalty.30-09-2016- SDO update: The next hearing to the investor is scheduled inthe first week of October 2016action.02-11-2016- Investor update: The next hearing to the investor is scheduledon 08.11.201609.11.2016- Investor Update: Investor has met the SDO. SDO in turn hasasked for a weeks time to understand the issue, so that she can arrive at aresolution17-12-2016- Department update: A hearing with the Tehsildar has beenscheduled on 21-12-201623.12.2016 - IM decision : Tehsildar, Ambernath has called the investorfor a final hearing along with all the supporting documents to verify theirclaim on 02.01.2017. The investor to update MAITRI on the same after thehearing04-01-2016- Department update: Addl.collector had spoken to theTehsildar upon which a hearing was conducted on the 03-01-2017, finaldecision is awaited from the Tehsildar.

71DigichemIndustries

N-71,ANANDNAGAR,MIDC,AMBERNATH-EAST,DIST-THANE

RevenueDepartment

Royalty 13-01-2016Addl. Collector, MAITRI to speakto the concerned Tehsildar inorder to resolve the case.

Open

Page 37 of 52

Page 38: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

72

Godrej & BoyceMfg. Co Ltd(Dhamni Pumphouse)

VillageDhamni, Tal.Khalapur

RevenueDepartment

NApermission

14-01-2016

Investor to submit the softcopies of the revised drawings toMSRDC post which Addl.Collector, MAITRI to expedite thecase

Open

The investor has submitted the proposal for NA and Building constructionpermission at the Collector Office , Alibaug09.02.2016 - The file has been forwarded to Town Planning Office , PWD,Tehsildar, Zilla Parishad for their NOC from Collector's Office .26.02.2016- Investor update: Investor has shared support documents &applications with MAITRI. DIC has asked report/NOC from TP, PWD, Healthdept. and Tehsildar. TP has asked for compliance on 04.02.2016.03.03.2016- Investor update: Collector has forwarded the file to TP, PWD,Tehsildar and ZP for their NOC29.08.2016 - Investor Update: The collector has obtained NOC from theTehsildar but still awaiting NOC from PWD and Zilla PArishad16-09-2016- IM decision: SDO to look into the matter for the NOC ofMSRDC and resolve the case at the earliest14-10-2016- IM decision: A field visit to be conducted by Deputy Director26-10-2016- Department Update: Site inspection from MSRDC to beconducted shortly.08-11-2016- Department Update: A meeting was convened between theinvestor and the addl. Collector, MAITRI to understand the case.Site inspection conducted by MSRDC on 10-11-2016. Investor has beenasked to submit modified plant drawings post which the NOC shall beprocessed.13.12.2016- Department Update: The site inspection has been done byPWD. NOC to be issued shortly19-12-2016- Field Visit: NOC from Health Department, ZP- The departmenthas issued a compliance letter to the investor. PWD NOC- Site inspectionis completed and the remarks have been sent to PWD circle office Panvel.MSRDC NOC- The soft copy of modified drawings to be issued by landrecords department shortly.23.12.2016 - IM decision : As per the instructions of PS (I) and DC (I) toTehsildar, Raigad over video conference, the tehsildar to look into thematter and resolve the issue within a week02-01-2017- Field Visit Update: As instructed by Addl. Collector, MAITRI ajoint meeting was being convened between Addl. Collector (Raigad),Tehsildar (Raigad), EE (PWD, Panvel), District Health Officer & LandRecords Officer (Raigad). It was concluded in the meeting that NOC fromTehsildar & ZP (Health ) has been obtained and Addl. Collector (Raigad)instructed PWD and MSRDC/ Land records to process the NOC within 2days09-01-2017 - PWD Update: The NOC has been issued. Land RecordsUpdate: TLR has given the hard copies of the revised drawings to theinvestor. Investor to submit the same to MSRDC shortly.

Page 38 of 52

Page 39: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

73NIPRO IndiaCorporation PLtd

Plot E-1,KhandalaIndustrialestate -Phase 1

RevenueDepartment

RoyaltyRefund

29-11-2016

The investor has excavated the land and used the soil for levelling purpose.As per the Government resolution the investor had claimed the refund ofRs. 57.60 lacs the royalty amount paid. Out of which partial amount of Rs.30 laks has been refunded to the investor on 30th May 2016. Investor isnow requesting for refund of remaining amount

The department to look into thematter in order to expedite thecase.

Open

74SupremeIndustries Ltd.

JalgaonRevenueDepartment

LandMeasurement

13-05-2016

The investor has submitted an application for land measurement for thereplot 242/2 & 245/2 in MIDC and the investor has also submitted an NOCfrom MIDC for measurement of land. The investor has also paid the chargesfor immediate measurement of the land, but has not received anyacknowledgement for the payment made to the department.18.10.2016 - Investor update : The department has issued a challan copyfor the payment made but still awaiting the measurement of land.10.11.2016- Department Update: The investor has been asked to meet SLR,Jalgaon to sort out the issue.18.11.2016 - IM decision: Addl. Collector, MAITRI to resolve the issue onpriority.10.11.2016- Department Update: With the intervention of Addl. Collector,MAITRI, the investor has been asked to meet SLR, Jalgaon to sort out theissue. Instruction regarding measurements has been given to SLR,accordingly the necessary action has been taken.The real issue in this is that the unit holds land out of MIDC area butadjoining to its MIDC plot. This area comes under the residential zone,where under the R+C the investor has his godowns. Now investor wantsto convert this residential zone land into industrial land for suchchanges resolution of Municipal general body is required

Addl. Collector, MAITRI resolvethe case at the earliest.

Open

75Top worth Urja &metals Ltd.

Marki Mangli-I,Chandrapur

RevenueDepartment

Transfer ofPlot

The investor had bided for a coal mine at Marki Mangli-I which wasauctioned by Ministry of Coal. The investor was a successful bidder for thecoal mine and all the vesting orders and permission for transfer andconsents where issued on 30.09.2015 to the bidder. The investor hadapplied for Gram Panchayat to start the coal mine, but could not start theproduction as he was informed that the matter is still pending for want ofpermission.18.11.2016 - IM decision : Addl. Collector to intervene in the case andresolve the case at the earliest12-01-2016- Investor Update: The investor has obtained the Grampanchayat NOC and hence the case to be closed in the upcoming investormeeting

The issue was closed on13.01.2017

Closed

Page 39 of 52

Page 40: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

76WeavetexTechnology andservices Pvt. Ltd.

Survey No.14,sonalevillage,bhiwandi,Dist. Thane

RevenueDepartment

NAPermission

04-05-2016

The investor has made an application for NA permission for 500 sq.mts.under section 44 (A) which is under process with the department.28-12-2016- Department Update: According to the department, the unitalready has a commercial NA and needs to be amended under section 47 (B)for which the investor has not yet applied due to which MAITRI has closedthe issue at the forum.

The issue was closed on13.01.2017

Closed

77 Rice Mill Cluster

Chamorshi,Opposite -ArihantFoodIndustries,Dist.Gadchiroli

RevenueDepartment

NAPermission

30-12-2016

Cluster has made an application for NA permission under 44-A for thecluster03-01-2017- Addl Collector MAITRI has spoken with Addl Collector Mr.Awhad, Gadchiroli to expedite the case.

The department to look into thematter in order to expedite thecase.

Open

78Stud Craft IndiaPvt Ltd

Gat No.64,VillageRanje, Tal-Bhor

Sales TaxDepartment

C Form 23.11.2016

The investor made the payment towards CST for the year 2010 for April,May, June to the Sales Tax department. However after making the paymenttowards CST which is also reflecting on the department site the investorhas received the 'C' form for year 2013-2014.The Investor had lodged an online complaint on 12.11.2016 throughMahavat Grievance Cell but did not receive any reply.16-11-2016- Dept. Update: The grievance regarding C forms has beenperused & accordingly the concerned Asst Commissioner of Sales Tax hasbeen requested for speedy disposal.16-11-2016- Investor Update: The investor has received a call from AsstCommissioner Sales Tax regarding their issue pertaining to 'C' form andhas assured that the case will be resolved shortly12-01-2016- Department Update: The C form has been issued to theunit and hence the case to be closed in the upcoming investor meeting

The issue was closed on13.01.2017

Closed

Page 40 of 52

Page 41: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

The department to look into thematter in order to resolve thecase.

Open

The investor is requesting credit of Rs 2,14,94,222 taxes paid in excess oftax assessed/ determined in appeals for the Financial Year 2002-03, 2003-04 & 2004-05 either through refund or issue Refund Adjustment Orders20.05.2016- IM decision: Department to provide a list of compliance withthe investor like original chalan, original RAO copies, etc.27.06.2016- Investor update: He is meeting the officials at Sales tax officeat Pune for compliance. He has submitted compliance too. However, Theinvestor does not have acknowledgement of past submissions nor OriginalRAO (refund adjustment order). Without these documents, Sales taxdepartment cannot consider his request.08.07.2016- IM Decision: Refund of 63 lakhs are pending due to want oforiginal RAO. Rest of amount is based on bank challans. The amount basedon bank chalan can be refunded at earliest and with regards to theremaining amount, the department has assured to check the matter.04.08.2016- Department update: The file is under process.09.09.2016- Department Update: Department is verifying that RAOsubmitted for the period 2002-03 to 2014-15 is not used for any periodsince issuance and the challan submitted of Rs 1.25 crore during theAppeal was having overwritten period but the original challan submittedby the investor actually has underwritten period23-12-2016 - IM Update : As per the discussion on video conference theconcerned officer to verify whether the credit of RAO has not been used bythe investor before. The genuineness of the RAO book to be established.Once this is done the decision to be taken within a month.06-01-2016- Department Update: This issue is having financialimplications therefore abundant precaution is required and matter is beingmonitored by Hon. Special Commissioner of Sales Tax (M.S.) along withsenior officials of the Department

79HoneywellAutomation IndiaLimited

PuneSales TaxDepartment

VAT Refund 19-03-2014

Page 41 of 52

Page 42: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

The development plan by PMRDA has two roads passing through unit'splot, inside MIDC. For the said issue, Investor has requested to delete thesetwo roads from the plan. MIDC has provided its comments to PMRDA thatit does not have objection with deletion of the roads. PMRDA to proceedfurther.22.03.2016- PMRDA update: PMRDA has forwarded the proposal to UDDfor next course of action and decision.13.04.2016- IM Decision: Investor to meet Jt Sec on 13.04.2016 and PSUDD. Further, investor was asked to write a note to DC (I) and MAITRI,which is to be forwarded to PS UDD.03.05.2016- Investor has shared the details of issues with DC office, whichis received at MAITRI on 03.05.2016.09.05.2016- Department update: Assistant Town planner, Pune haveforwarded the file with their comments to Under secretary, UDD22.06.2016- Department update: The notification is issued to delete thesaid two roads from the plan - in public domain to invite suggestion/opposition from public at large.08.08.2016- Department update: The file is under process at Townplanning Office, Pune24.08.2016- Department Update: Town planning Office, Pune hasforwarded the file with remarks to UDD, Mantralaya06-10-2016- RM decision: UDD has called report on how the building planwas approved having a DP road in the plot from Executive Engineer, MIDCvide letter dated 29th September 2016. MAITRI to collect the same fromUDD and follow up with MIDC.14-10-2016- IM decision: MAITRI to collect the copy of the letter issued byUDD and share the same with MIDC10.11.2016- Department Update: As per Chief Planner, SPA, MIDC thejustification sought by town planning is still under process28.11.2016-IM Update: MIDC will provide inputs shortly on the letterissued by UDD on 29-09-201623-12-2016 - IM Update : MIDC has provided their remarks on DP roadas requested by UDD. UDD to resolve the issue at the earliest.

80 Force Motors Ltd

Village -Nanekarwadi, adjourningto ChakanMIDC

UDDBuilding planapproval

12-03-2007

The file has been approved bythe Chief Minister and UDD toraise the demand note forconversion of the said land.

Open

Page 42 of 52

Page 43: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

81 Jaggery ClusterKasa-Birsola,Dist. Gondia

UDDNAPermission

The cluster has made an application for NA Permission but awaiting DLRsurvey from the Land records department18.11.2016 - IM decision : Addl. Collector, MAITRI to look into he matterand resolve the case at the earliest14.12.2016: ALL the required NOCs for NA permission has been receivedand sent to tehsil office to put up with RDC04-01-2017- Investor Update: After several follow up with CollectorOffice, Gondia by Addl. Collector, MAITRI the NA permission has beengranted to the investor and the case to be closed in the upcominginvestor meeting.

The issue was closed on13.01.2017

Closed

Open

Director, Town Planning, Punewide letter 04-01-2017submitted their report to Hon.PS UDD mentioning followingpoints:a. The land is situated inresidential zone in Peripheralplan of Akola Regional Plan andtherefore agro based industriesare not permissible thereinb. Modification in Regional planu/s 20 of MR & TP Act isnecessary.c. Applicant can submit theproposal for modification ofconversion of their land fromresidential to industrial zone insanctioned Regional Plan, u/s 20of MR & TP Act, to the ' ProposalScrutiny Committee under thechairmanship of DivisionalCommissioner". As per Govt. inUDD Notification dated06/05/2015, the proposal can besubmitted to the member-secretary of the committee i.e.concerned Joint Director.

82 Madhur Biyani

Survey no.39 of villageShivani,Dist. -Akola.

UDDNAPermission

Investor has purchased above mentioned private agricultural land on 25thAugust 2016 to set up their Agro processing unit for cleaning, filtration,sorting, grading and packing of food grains & pluses which requires morethan 100 HP of electrical connection for immediate operation. However,when investor has applied for NA permission with collector office Akolaunder section 44-A, Town planning department has provided theircomments through a letter dated 07th December 2016 mentioning that thesaid plotfalls under Akola Municipal Corporation which is been declared as R-1 zoneand more than 10 HP of power connection cannot be provided for theindustry.19-12-2016- Investor Update: Town Planning, Akola has to send a proposalto Director Town Planning, Pune04-01-2017- Department Update: Jt. Director, Town Planning hasforwarded the file with his comments to UDD.

Page 43 of 52

Page 44: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

83Manner & SkillInternational Pvt.Ltd

Survey No.30/2, 31/3 &35-1/B,villageKonasSawantwadi

UDDBuilding PlanApproval

22-07-2015

The file is under process withDirector, Town Planning. Furtherthe file will be sent to thegovernment. The process willtake 2-3 months

Open

Survey No. 30/2, 31/3 & 35-1/B at Village Konas Sawantwadi is theancestral land of the investor, on which he want to set up mineral waterplant. The said land is notified as other forest area by town planningdepartment without informing the investor. Forest department does notrecognise this land parcel as other forest area. The investor is facingissues in obtaining the NA permission, Building permission, etc. even withrevised layout plans. His applications are pending at Tehsildar ,Sawantwadi. MAITRI to visit the Tehsildar of Sawantwadi and collect thetourism Map.07.11.2015- investor meeting decision: As the plot is notified as "otherforest zone", the investor will have to apply for the Zone Conversion.MAITRI to share the contact details of Jt. Secretary, UDD, who will guidethe investor in making the application for zone conversion. MAITRI hasshared details on 17.11.2015.01.02.2016- Department update: The proposal for conversion of said land(if slope=<30 degree) to Agriculture-no development land is forwarded toUDD Mantralaya. (So that, unit like manner & skill, if applicable, can applyfor NA permission on the land). The report of contour survey form investorwill be referred in this. As per the department, the procedure ofconversion of land and notification issuance will take 6-8 months.Department asked the investor to meet them18.02.2016- Meeting update: In a meeting of UDD with investor, The entireregion is falling under Kasturi Ranjan committee. But being a greencategory project, he is allowed to put up the project in the region. Theground reality report is forwarded to Hon'ble Minister, UDD.28.04.2016- Field visit update: The file is moved to Hon'ble CM's desk

Page 44 of 52

Page 45: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

28.04.2016- Field visit update: The file is moved to Hon'ble CM's desk21.07.2016- Department update: The compliance letter has been issued tothe investor.09.09.2016-Department Update: UDD has published a notice dt.23.08.2016 u/s 20(3) to add following new proviso in the sanctionedregulation no. 3 of Regional Plan Regulations;a. In case of forest zone having ownership other than Forest departmentand having gradient less than or equal to 300 shall be considered as ifincluded in Agriculture/No Development zone and users therein shall bepermitted.b. Owner shall submit a contour map surveyed by competent agency.Trueness of such contour map shall be certified by Government surveyingagencies(like MRSAC, Survey of India, City Survey)16-09-2016- IM decision: The final notification is awaited regarding plotshaving gradient less than or equal to 30 degree shall be considered as ifincluded in Agriculture/No Development zone.18-11-2016-IM Update: The draft notification is in public domain till 28-11-2016. The final notification is awaited regarding plots having gradientless than or equal to 30 degree shall be considered as if included inAgriculture/No Development zone.

Page 45 of 52

Page 46: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

22-09-2015

With regards to BCCDevelopment Commissioner(Industries) spoke to RDC,Raigad in order to expedite thecase and for Labour CessDevelopment Commissioner(Industries) instructed ADTP,Raigad to resolve the case withina week.

Open84PolygommaIndustries Pvt.Ltd

Plot no 59,AjivaliKhopoli-penroad,

UDDBuildingcompletionCertificate

Investor applied for Building completion Certificate to District Collector,Raigad. A letter was sent by the collector to Tehsildar, Khalapur and Townplanning department asking their comment on 26.10.2015. However, replynot yet received from these two departments.27.05.2016- department update: Town planning department has made fieldvisit. the report is awaited.08.06.2016- Department update: A report from TP dept. is forwarded toTehsildar office.21.07.2016- Department Update: The investor to comply with relevantdocuments02.08.2016- Investor Update: The investor has complied with relevantdocuments and ADTP to do a field visit shortly(date yet to decide).19.08.2016-Investor Update: Investor had received another letter fromCollector, Raigad for few more compliances16-09-2016: IM decision: Investor has submitted the requestedcompliances in MAITRI office, MAITRI to further send it to concerneddepartment to take necessary action.30-09-2016- Field Visit: The Compliance had been submitted to CollectorOffice, Alibaug. The File will be further sent to Town planning office,Alibaug for document verification & site inspection.14.10.2016 - IM Decision: As the Nodal officer for MAITRI was not presentfor the meeting, the issue was not discussed. As discussed in the MAITRImeeting held on 20.05.2016, MAITRI to prepare the list of all the issuesand share it with DC(I) to be sent to PS(Revenue) for further action.18-10-2016- Department Update: Site inspection to be conducted by TownPlanner. Investor to furnish compliances on his architects letter head.10.11.2016- Investor Update: Investor has complied with the requesteddocuments. Department to issue final order shortly.18.11.2016-IM Update: The department to look into the matter andexpedite the case12.12.2016-Investor Update: The investor has been asked to submit 5copies of blueprints to the department. The department has also issuedletter to the investor for paying the labour less15-12-2016- Field Visit Update: Investor has been asked to pay Rs. 12lakhs as 1% labour Welfare cess at collector pos which the order shall beprocessed23-12-2016 - IM decision : PS(I) instructed Tehsildar, Raigad on VideoConference during Investor Meeting to review the demand note sent tothe investor.

Page 46 of 52

Page 47: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

85UdaymudraPrinting ClusterFoundation

Gut No.493, Udgir,Latur

UDDNAPermission

07-05-2016

Cluster has made an application on 07th May 2016 for NA permissionunder 44-A for the their plot Gut No. 493, Udgir, Dist. - Latur at collectoroffice. However Town Planning, Latur has provided their comments forNOC in which they mentioned that the said area comes under "NoDevelopment Zone" hence the NA permission cannot be granted to thecluster.14.12.2016: Addtl Collector MAITRI spoke with ADTP Latur to reconsiderthe NOC23.12.2016 : IM decision : ADTP has been asked to review theapplication for the NA permission10-01-2017- Department Update: The said land is situated at a distanceof 1800 mt. from gaothan and therefore it will considered in Agriculturecum No Development zone. As per the provisions of Standardised DCregulations, the printing press user is not permissible in NoDevelopment zone.

as per the provisions ofStandardised District Collectorregulations the said plot is fallsunder green zone due to whichthe town planning NOC cannotbe granted for NA permission,hence issue was closed in theMAITRI investor meeting held on13-01-2017

Closed

86 Uttam Galva

Satarda,taluka -Sawantwadi,District -Sindhudurg,Maharashtra- 416514

UDDZoneConversion

29-08-2013The department to look into thematter and update MITRI on thesame

Open

Enhancement of Industrial area admeasuring 745 Hectares at villagesSatarda & Satose Taluka - Sawantwadi in the Regional plan of SindhudurgDistrict. The investor was informed that 40 hectares of land was havingremarks from forest department hence, investor requested to delete 40hectares and to issue remaining area as industrial zone -to UDD.13.08.2015- Update from forest department: Forest has sent remarks toUDD on 18th June 2015. File is under process with UDD.12.01.2016- Forest department update- The department has received thefile on 6.01.2016.14.01.2016- Forest department has sent remarks to UDD on 13.01.201611.02.2016- Investor update: Investor is expected to meet UDD on 18/19February 201618.02.2016- Meeting update: In the meeting with UDD, Forest officials,Investor explained that although his land is falling in region under KasturiRanjan committee area, he is starting the project based on approval formMoEF as the unit has applied for it before Kasturi Ranjan committee report/2013. The investor was asked to submit the said approval of MoEF, contoursurvey, Slope analysis of +/-1.5 Mtr.22.02.2016- Investor update- Investor has shared MoEF approval for 1.5 Tplant (Env Clr), expansion project approval (Env Clr), MoEF EAC Committeeapproval.30.03.2016- The file is with UDD. it is yet to be forwarded to Forest dept.21.06.2016- Field visit report- The file is forwarded to forest department.05.07.2016- Field visit report- The file is yet to be forwarded to ForestDepartment

Page 47 of 52

Page 48: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

87Western RubberWorks Pvt. Ltd.

Shiral,Shahpur

UDDNAPermission

26-04-2016

The investor has made an application for NA permission which is underprocess with the department but the town planning department has missedthe approach road is the plan.18.11.2016 : IM decision - Addl. Collector, MAITRI to look into he matterand resolve the case at the earliest14.12.2016- Department Update: The neighbouring plot has obtainedthe BPA without showing the physical approach which was alreadypresent. Now the investor has to submit a revised plan showing the roadwhich is actually present.

The neighbouring plot hasagreed to provide approach roadto the unit for which revision ofBuilding Plan of neighbouringplot is under process with thedepartment.

Open

20.07.2016 - Field visit report: Forest Department has forwarded the file toUDD dated 19.07.2016 with their remarks for 49.92 Ha land. (File no. TPS-1914/CR.107-14/UD-12) However Forest dept. has not given remarks onremaining land under forest zone in sanctioned Regional plan.16-09-2016- IM decision: Jt. Director (UDD) has requested MAITRI toarrange a meeting with the investor to seek clarifications on the issue. Thedepartment to look into the matter to resolve the case at the earliest.06-10-2016- RM decision: As the forest department has commented on thereserved forest but does not recognise the remaining land and without thecomments of forest department UDD will not be able to proceed furtherwith zone conversion. Hence the issue to be highlighted in the CM meeting.18-11-2016-IM decision : According to Urban Development Department, 49hectares of land is private forest, which the investor is willing tosurrender. Hence, the investor has to submit a letter stating the same.2-12-2016-Im decision : Investor has to submit a letter regarding surrenderof 49 Hectares of private forest land. Issue to be reviewed after 2 months02-01-2016- Investor update: The investor has submitted the letterrequesting deletion of 49 Hectares of private forest land

Page 48 of 52

Page 49: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

88

Godrej & BoyceMfg. Co. Ltd.(Phase II/ Northblock)

VillageVadval,Tambati, Ta.Khalapur

WaterResourcesDepartment

Water quotasanction

18-06-2015

The case was discussed in thewater quota sub committeemeeting, awaiting the minutes ofthe meeting (GR)

Open

Investor is seeking permission to take 0.4 MLD water from Patalganga Riverin Dhamni, Ta. Khalapur. He has submitted an application to IrrigationDepartment for grant of approval but awaiting the approval till date. Thesite inspection was done on 8th July 2015 and the file is under scrutinywith sub div office, Karjat.29.09.2015- Update from department: CE, Konkan region Mumbai isintimated the new proposal as per latter dated 21.9.2015.05.10.2015- Update from Investor: The investor had received theCompliance letter on 16th September 2015 and the investor has compliedto the same on 29th September 2015.27.10.2015- WRD update: the file is under process at CE, Konkan region7.12.2015- Department update- File at field level at SDE, Karjat10.12.2015- Investor update- Investor has to make compliance for furtheraction.11.12.2015- Investor update- Investor has shared a new application formreceived from department after 4 months. Investor needs to apply againusing this21.12.2015- Investor update- Investor has applied again to the departmentwith necessary forms and affidavit. The file is with CE, Konkan for process.The investor has revised the requirements to 0.8 MLD water and compliedaccordingly12.01.2016- investor update- The investor has made compliance with thedepartment. The Karjat Office has recommended the same to Kolad regionoffice. the case is now under process at Kolad region office.29.02.2016- Field visit update: The file is under process with ExecutiveEngineer, Irrigation Dept., Fort office, Mumbai

Page 49 of 52

Page 50: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

Engineer, Irrigation Dept., Fort office, Mumbai03.03.2016- field visit update: The file is under process with Asst SectionOfficer, Irrigation Dept., Mantralaya, Mumbai11.03.2016- Department update: The case to be presented in the cabinet bythe end of March 2016.07.04.2016- WRD update: The file is sent back to regional office forqueries.20.05.2016- IM decision: Exe. engg and Secretary (WRD) to be called fornext MAITRI meeting or they may be invited for a separate meeting at PS (I)office. MAITRI to draft a letter for the same23.05.2016- Investor update: Investor has made compliance at KarjatOffice, the file is forwarded to Kolad office on 04,06.2016. The file isunder process with CE Office (WRD, Fort)19.07.2016 - Field Visit update: The file is forwarded from CE office, (Fort)but not yet received by WRD, Mantralaya.12.08.2016-IM Decision: The file is under process with ACS for cabinetnote.06-10-2016- RM decision: A cabinet sub committee is proposed whichwould handle water quota sanction. The committee is yet to be convened.18-11-2016-IM Update: The committee has been convened but the date isyet to be decided.23-12-2016-IM Update : The water quota sub committee meeting isexpected to be convened January - 2017.09-01-2017- Department Update: The water quota sub committee meetinghas been convened, awaiting the minutes of the meeting (GR)

Page 50 of 52

Page 51: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

89Ruchi KagomeFoods India PvtLtd.

WaterResourcesDepartment

WaterSanction

20-04-2016

Investor has applied for the approval of lifting the water from OzherkhedDam with WRD, Nashik as the unit does not have a permanent source ofwater to meet the production requirements. On the above application ChiefEngineer WRD, Nashik had written a letter to Hon’ble Secretary, WRD,Mantralaya with his comments on 20-04-2016 for further approval.However there is no action on the case.16-09-2016- IM decision: The file is under process with Secretary (WaterResources), the department to look into the matter and update the same toMAITRI06-10-2016- RM decision: A cabinet sub committee is proposed whichwould handle water quota sanction. The committee is yet to be convened.The issue to be represented at the CM Meeting.14-10-2016 - IM decision: The water quota sanction would be finalised onlyafter the sub committee is formed. However if the investor wants atemporary connection (1 year), the same can be applied to the waterresources department.18-11-2016- IM decision: The department to look into the matter andupdate MAITRI on the same20-12-2015- Department Update: The file is under process with GodavariMarathwada Mahamandal and the Executive has the power to issue thewater quota

The case to be discussed in theGoverning Council Meetingwhich will be chaired by Hon'bleMinister after which theprocedure for water quotasanction will be finalized

Open

Page 51 of 52

Page 52: Minutes of 26th Investor Meeting - 13th January 2017 at

Maharashtra Industry Trade Investment Facilitation Cell

S.No

Name of theCompany

Location DepartmentName of theService

Applicationdate

Issue description and chronologyDecision taken in MAITRImeeting 13-01-2017

IssueStatus

Minutes of 26th Investor Meeting - 13th January 2017 at Investor Facilitation Cell

90Satara Mega FoodPark

1288/1,1288/2,1490/1 and1490/2Degaon, Tal.& Dist..Satara

WaterResourcesDepartment

Water quotasanction

02-01-2015

The investor is seeking permission to lift water from Urmodi river which isabout 4 kms from the factory site.22.06.2016- WRD update: The file is forwarded to Chief Principal SecretaryFinance08.07.2016- WRD update: It will be taken up in next cabinet12.08.2016-IM decision: The file has been forwarded to the cabinet on19.07.2016The case to be referred for CM's meeting highlighting the process of watersanction (as each file is forwarded to cabinet individually)06-10-2016- RM decision: A cabinet sub committee is proposed whichwould handle water quota sanction. The committee is yet to be convened.The issue to be represented at the CM Meeting.14-10-2016- IM decision: The water quota sanction would be finalised onlyafter the sub committee is formed. However if the investor wants atemporary connection (1 year), the same can be applied to the waterresources department.20-12-2016- Department Update: The file is under process with KrishnaKhore Vikas Mahamandal and the Executive has the power to issue thewater quota

The case to be discussed in theGoverning Council Meetingwhich will be chaired by Hon'bleMinister after which theprocedure for water quotasanction will be finalized

Open

Page 52 of 52