Upload
sergio-marta-1946
View
245
Download
0
Embed Size (px)
Citation preview
1
D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
Objective “Lean Manufacturing” “M L S – Introduction”
A Better Way to Administer Production
and Control Inventory
www.dhmcons.com
2 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
Is a specialized application for Manufacturing Firms based on “Lean-Manufacturing” concepts His main objective is to Reduce Operational and
Inventory Costs Can administer all the Productive Cycle
(Forecast, Planning, Scheduling, Control, Certification) and Control the Inventory
MLS Introduction What Is
3 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
MLS Introduction Environment
If the company information system is based on Excel or an accounting software with little manufacturing capabilities, “As Long As The Business Does Not Grow” that system is a reasonable tool for handling the manufacturing information But there’s the problem:
How Long Can The Business Stay The Same?
4 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
MLS solution is designed for dynamic, projected companies His technology is based on Microsoft standards and
utilizes PC’s with Windows 7 or XP Robust and agile, MLS is a full manufacturing
solution that supports any type of process (Lean, Discrete, Repetitive and “To-Order’) across a large range of industrial sectors
MLS Introduction Environment
5 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
MLS Introduction Administer your Production "Visually"
Forget About Papers & More Papers Circulating All Over Your Plant
Manufacturing Lean
System Forget About Weekly
Production Planning & Re-planning
Forget About Costs Linked To In Process Inventories
Forget About Never-ending MRP Running
Know In Advance Your Production Capacity
Restrictions
Forget About The Strictly Production Follow-up
6 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
Is a full and on-line solution that follow the “Lean Manufacturing” principles and the “Supply Chain Operations Reference” (SCOR) model which Identify, Focuses and Administers (Granting a Cost Reduction) the Five Key Processes: ° Plan, ° Source, ° Make, ° Deliver, ° Return.
MLS Introduction Powerful and Complete
7 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
MLS Introduction SCOR Model
8 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
“Small – Medium” and eventually the “Big”
Those whose Products are “Manufactured” through a Sequence of “Operations”
MLS Introduction Companies Type That Can Use It
9 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
5’’ => a 10’’
4’’ => a 15’’
(PCT)
6’’ => a 11’’
2’’ => a 2’’
5’’ => a 5’’
“Assembly / Project / Stock”
MLS Introduction Main Production Type That Can Use It
“Operations” Sequence Sample
10 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
“Sequential”
MLS Introduction Main Production Type That Can Use It
“Operations” Sequence Sample
11 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
MLS Introduction Companies Type Sample
01 AERONAUTICS AND AEROSPACE 02 AUTOMOTIVE 03 BATTERIES AND ACCUMULATORS 04 CABLES AND ELECTRIC AND PHONE WIRES 05 CHEMISTRY AND PHARMACOLOGY 06 CLOTHING 07 COLORS, VARNISHES AND ENAMELS 08 CONSTRUCTION AND PUBLIC WORKS 09 COSMETICS 10 ELECTRIC AND ELECTRONIC INSTRUMENTATIONS 11 FOOTWEARS AND SKINS 12 FURNITURES 13 HOME APPLIANCES 14 INDUSTRIAL MACHINERY 15 INSTRUMENTATIONS FOR ILLUMINATION 16 MINERAL WATHERS AND NATURAL OR WITH GAS DRINKS 17 NUTRITIOUS AND RESTORATION 18 SANITARY AND PLUMBING FIXTURES 19 TOYS AND GAMES
12 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
“To Have” Means “To Have” Does Not Means Designed from the User point of view
Simple and User Friendly
Efficient and Efficacy
Only with the Necessary Information
Information in Explicit format
The “Belief” That Guide Our Applications Conditio Sine Qua Non
To Declare to “Have” something doing a Function, >>> Is Not Enough <<<
Designed from the Informatics point of view
That you need a Master Degree
Sophisticated (Synonym Of Complicated)
To Overwhelm the operator with Information
Information that must be Decrypted
The Operator Has Not Time For «Games» – The Operator Must Work
13 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
Directly Convertible Into Money Indirectly Convertible Into Money Reduces / Eliminates In Process Inventories
Eliminates the Weekly Production Schedule
(Man-Hours)
Reduces the Supervision Process Time (Man-Hours)
Reduces / Eliminates Hardware and Software dedicated to the Process Control
Reduces the Manual Inventory Transactions (Man-Hours)
(A Lot of Transactions can be Created Automatically with the Pick-List)
MLS – Why You Must Use It Main Saves Reachable
With The Chameleon *1 Module
Reduces and Speed up the MRP Administration (Less Structure Levels or Structures Totally Flat)
Permits Capturing New Customers (Those that Works with “Variable Demand” / “High-Mix”) where Is Not Feasible to Use the Kanban
Can Coexist without Conflicts with the MRP (They Complements Each Other)
It is possible to connect for example the “Stack Light Tower” easing the “Visual Administration (ANDON)”
*1 This module, give a “Best-In-Class” solution in the Manufacturing World
14 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
Future Past
MRP II (Mass Manufacturing)
2
1 3
Do 10 Move 10 (1’ Per Pce)
A B C
Cycle Time= 30 Min
A B C
Cycle Time= 12 Min
Do 1 Move 1 (1’ Per Pce)
Kanban (Lean Manufacturing)
Chameleon (QRM)
MLS Introduction Toward The Flexible Manufacturing
With The Chameleon Module
15 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
Eliminates the Weekly Production Schedule (Man-Hours)
Reduces the Supervision Process Time (Man-Hours)
Reduces / Eliminates Hardware and Software dedicated to the Process Control
Reduces the Manual Inventory Transactions (Man-Hours)
(A Lot of Transactions can be Created Automatically with the Pick-List)
Reduces and Speed up the MRP Administration (Less Structure Levels or Structures Totally Flat)
Can Coexist without Conflicts with the MRP (They Complements Each Other)
It is possible to connect for example the “Stack Light Tower” easing the “Visual Administration (ANDON)”
Directly Convertible Into Money Indirectly Convertible Into Money With The Kanban Module
MLS – Why You Must Use It Main Saves Reachable
16 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
With The Finite Loading MRP “Automatic” *1
Evidences the Bottle Necks Shows for Each One: Part Number, Day, Quantity, Needed Capacity, Easing the Problem Resolution It is possible to connect for example the “Stack Light Tower” easing the “Visual Administration (ANDON)”
Directly Convertible Into Money Indirectly Convertible Into Money Reduces / Eliminates In Process Inventories
Eliminates the Weekly Production Schedule
(Man-Hours)
Reduces the Supervision Process Time (Man-Hours)
Reduces / Eliminates Hardware and Software dedicated to the Process Control
Reduces the Manual Inventory Transactions (Man-Hours)
(The Transactions can be Created Automatically with the Pick-List)
*1 This module, give a “Best-In-Class” solution in the Manufacturing World
MLS – Why You Must Use It Main Saves Reachable
17 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
Future Past
MRP (Infinite Loading)
Do 10 Move 10 (1’ Per Pce)
A B C
Cycle Time= 30 Min
MRP CF (Finite Loading)
Do 10 Move 10 (1’ Per Pce)
A B C
Cycle Time= 30 Min
Ok Shortings
MRP II (Infinite Loading)
2
1 3
MLS Introduction Toward The Flexible Manufacturing
With The Finite Loading MRP “Automatic”
18 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
At The General Level
Is Truly Easy to Use (Thanks to his Internal Engineering)
Is Implementable in a Short Time (Thanks to his Easy to Use Feature)
Is a Very Economic Solution on the Software Side
Is a Very Economic Solution on the Hardware Side
Directly Convertible Into Money Indirectly Convertible Into Money
MLS – Why You Must Use It Main Saves Reachable
19 D a
t a
&
H
u m
a n
M
a n
a g
e m
e n
t
D H
M
General Menu MLS Introduction