20
Development Tracking Report Second Quarter 2019 The Development Tracking Report provides a summary of county-wide residential and commercial development activity for the Second Quarter of 2019 (April 1, 2019 - June 30, 2019). This report details development activity on a quarterly basis to examine current trends and compare these to previous quarters. Purpose April 1, 2019 to June 30, 2019 Office (GFA) Retail (GFA) Other (GFA) Residential: Total (Units) Residential: Multi- Family (Units)* Single Family Detached (Units) Hotel (Rooms) Completions - 74,475 - 443 397 46 - Construction Starts - 85,921 - 125 90 35 - Approvals** - - 358,112 303 303 - 160 Demolitions 5,600 25,876 40,601 81 39 42 - Summary of Development Statistics for 2Q 2019 GFA = Gross Floor Area. GFA is measured in Square Feet. Community Planning, Housing & Development Produced by the Department of Community Planning, Housing and Development (June 2019). *The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes (both single parcel and side-by-side parcel duplexes). **Includes Phased Development Site Plan (PDSP) projects. Trafalgar Flats (FBC): 73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231 residential units, 66,475 SF retail Cherry Hill Apartments (B-R): 93 residential units Approvals 1501 Arlington Blvd.-Best Western Site (SP #233): 48 residential units and 160 hotel rooms 1122 N. Kirkwood Rd.-Washington Blvd. at Kirkwood (SP #450): 255 residential units Education Center (UP): 358,112 SF other Completions Trafalgar Flats (FBC): 8,000 SF retail and 73 residential units Origin: Ballston Quarter Residential (SP #193): 66,475 SF retail, 231 residential units Cherry Hill Apartments (B-R): 93 residential units Demolitions Red Top Cab Service Station (B-R, associated with SP #438): 11,376 SF other East Falls Church Sun Trust Bank (SP #3): 25,876 SF retail Queens Court Apartments (B-R, associated with SP #444): 39 residential units N. Hudson St. Medical Building (B-R, associated with SP #438): 5,600 SF retail USA Motorpol Pentagon Industrial Center Site Plan (B-R, associated with SP #105): 29,225 SF other Construction Starts 2000 Clarendon Blvd. (SP #441): 1,921 SF retail and 90 residential units Central District Retail Phase I (SP #90): 84,000 SF retail Development Summary Highlights 443 residential units were completed, 397 of which were from multi-family or mixed-use projects including Trafalgar Flats, Orgin: Ballston Quarter Residential, and Cherry Hill Apartments. The County Board approved two special exception redevelopment projects at 1501 Arlington Blvd. and 1122 N. Kirkwood Rd. These projects will add 160 hotel rooms and 303 residential units to the County. The County Board approved a special exception use permit for the adaptive reuse of the Education Center, converting administrative space to 500-600 new high school seats at Washington-Liberty High School. Construction started at 2000 Clarendon Blvd., a residential and retail project creating 90 residential units and 1,921 square feet of retail space, and the Central District Retail Phase I in Crystal City, a project creating 84,000 square feet of retail including a movie theater and potential grocery store. SP = Site Plan FBC = Form Based Code PDSP = Phased Development Site Plan B-R = By-Right UP = Use Permit

Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Development Tracking Report Second Quarter 2019

The Development Tracking Report provides a summary of county-wide residential and commercial development activity for the Second Quarter of 2019 (April 1, 2019 - June 30, 2019). This report details development activity on a quarterly basis to examine current trends and compare these to previous quarters.

Purpose

April 1, 2019 to June 30, 2019

Office (GFA) Retail (GFA) Other (GFA) Residential: Total (Units)

Residential: Multi-Family (Units)*

Single Family Detached (Units)

Hotel (Rooms)

Completions - 74,475 - 443 397 46 -Construction Starts - 85,921 - 125 90 35 -

Approvals** - - 358,112 303 303 - 160Demolitions 5,600 25,876 40,601 81 39 42 -

Summary of Development Statistics for 2Q 2019

GFA = Gross Floor Area. GFA is measured in Square Feet.

Community Planning, Housing & Development

Produced by the Department of Community Planning, Housing and Development (June 2019).

*The Multifamily residential unit subtotal includes high rise buildings, garden style buildings, townhouses, and duplexes (both single parcel and side-by-side parcel duplexes).**Includes Phased Development Site Plan (PDSP) projects.

Trafalgar Flats (FBC):73 residential units, 8,000 SF retail

Origin: Ballston Quarter Residential (SP #193):231 residential units, 66,475 SF retail

Cherry Hill Apartments (B-R):93 residential units

Approvals• 1501 Arlington Blvd.-Best Western Site (SP #233): 48 residential units

and 160 hotel rooms• 1122 N. Kirkwood Rd.-Washington Blvd. at Kirkwood (SP #450): 255

residential units• Education Center (UP): 358,112 SF other

Completions• Trafalgar Flats (FBC): 8,000 SF retail and 73 residential units• Origin: Ballston Quarter Residential (SP #193): 66,475 SF retail, 231

residential units• Cherry Hill Apartments (B-R): 93 residential units

Demolitions• Red Top Cab Service Station (B-R, associated with SP #438): 11,376 SF other• East Falls Church Sun Trust Bank (SP #3): 25,876 SF retail• Queens Court Apartments (B-R, associated with SP #444): 39 residential units• N. Hudson St. Medical Building (B-R, associated with SP #438): 5,600 SF retail• USA Motorpol Pentagon Industrial Center Site Plan (B-R, associated with SP

#105): 29,225 SF other

Construction Starts• 2000 Clarendon Blvd. (SP #441): 1,921 SF retail and 90 residential units• Central District Retail Phase I (SP #90): 84,000 SF retail

Development Summary

Highlights• 443 residential units were completed, 397 of which were from multi-family or mixed-use projects including Trafalgar Flats, Orgin: Ballston Quarter

Residential, and Cherry Hill Apartments.

• The County Board approved two special exception redevelopment projects at 1501 Arlington Blvd. and 1122 N. Kirkwood Rd. These projects will add 160 hotel rooms and 303 residential units to the County.

• The County Board approved a special exception use permit for the adaptive reuse of the Education Center, converting administrative space to 500-600 new high school seats at Washington-Liberty High School.

• Construction started at 2000 Clarendon Blvd., a residential and retail project creating 90 residential units and 1,921 square feet of retail space, and the Central District Retail Phase I in Crystal City, a project creating 84,000 square feet of retail including a movie theater and potential grocery store.

SP = Site Plan FBC = Form Based Code PDSP = Phased Development Site Plan B-R = By-Right UP = Use Permit

Page 2: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office

Gros

s Fl

oor

Area

(GF

A)in

Mill

ions

of S

quar

e Fe

et

Retail

Gros

s Fl

oor

Area

(GF

A)in

Squ

are

Feet

Hotel

1Q3Q2Q

2016

1Q 2Q 3Q 4Q 1Q 2Q

20192014

4Q

2015

1Q3Q2Q 4Q 2Q 3Q 4Q 1Q 2Q 3Q

2017

4Q

2018

-200

0

200

400

600

Room

s

Development Tracking Report Second Quarter 2019

Commercial Quarterly Development Trends

Completions Construction Starts Approvals Demolitions Approved PDSP density that has not gone through Final Site Plan (FSP)

***

2016 20192014 2015 2017

1Q3Q2Q 1Q 2Q 3Q 4Q 1Q 2Q4Q1Q3Q2Q 4Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q

2018

-80,000

-40,000

0

40,000

80,000

120,000

*

*Approval of major site plan amendment for Pentagon Centre PDSP. Not shown to scale.**Demolition of Macy’s Home Furnishing Store for Ballston Quarter

*

*Temporary for up to 24 months

**

20162014 2015

2.0

2017

1Q3Q2Q 1Q 2Q 3Q 4Q 1Q 2Q4Q1Q3Q2Q 4Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q

2018 2019

-0.5

0.0

0.5

1.0

1.5

310,000 SF

Page 3: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

1Q3Q2Q

2016

1Q 2Q 3Q 4Q 1Q 2Q

20192014

4Q

2015

1Q3Q2Q 4Q 2Q 3Q 4Q 1Q 2Q 3Q

2017

4Q

2018

-250

0

250

500

750

1000

1250

1500

Residential (Single Family Detached Homes)

-100

-75

-50

-25

0

25

50

75

100

1Q3Q2Q 1Q 2Q 3Q4Q3Q

20161Q 2Q 3Q 4Q 1Q 2Q

2017 20183Q2Q 4Q

201920144Q

20151Q 2Q 4Q

Residential (Total)

Uni

ts

Active Development Applications are currently undergoing special exception County review prior to consideration by the County Board. The list below shows the volume and type of projects currently going through the application process. For the Second Quarter of 2019, the following table includes Site Plan applications that have been accepted and filed or are currently under public review (but not on hold). Development statistics reflect the initial Administrative Regulation 4.1 submission (for Site Plan projects) or 4.1.2 submission (for Form Based Code projects), and they are subject to change throughout the public review process leading up to approval by the County Board.

Active Development Applications

Active Development Applications as of June 30, 2019

Source: Active Development Application information is maintained by the Current Planning and Comprehensive Planning Sections of the Planning Division.

Development Tracking Report Second Quarter 2019

Completions Construction Starts Approvals Demolitions Approved PDSP density that has not gone through Final Site Plan (FSP)

Development Name Area Project Type Office (GFA) Retail (GFA) Other (GFA) Residential Units Hotel Rooms

Harris Teeter Site Ballston SP #72 & 315 Amendment - 83,600 - 700 -

1900 Crystal Drive Crystal City SP #56 Amendment - 45,154 - 790 -

1900 Fort Myer Drive (Holiday Inn) Rosslyn SP #79 Amendment - 13,995 35,870 500 344

Crystal Houses Crystal City SP #13 Amendment - - - 798 -

400 11th St. S. (Verizon Site) Crystal City SP #244 Amendment - 10,653 - 306 -

Key Bridge Marriott Rosslyn SP #53 Amendment - - - 451 446

Metropolitan Park Phases 6 & 7/8 Pentagon City SP #105 Amendment 2,082,566 67,115 - - -

Total 2,082,566 220,517 35,870 3,545 790

Residential Quarterly Development TrendsU

nits

Page 4: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Online Data and Mapping Resources

A map and pictures of development projects are available on the web at http://projects.arlingtonva.us/data-research/

Maps are provided through Arlington County’s GIS mapping application, which allows users to view the location of development activity and click on individual development projects to get detailed data.

Development Tracking Report Third Quarter 2012

About the Department of Community Planning, Housing and Development

The Department of Community Planning, Housing and Development (CPHD) is comprised of six divisions - Planning, Housing, Neighborhood Services, Zoning, Inspection Services, and Business Operations. The dedicated staff in these divisions work hard to envision, plan, maintain, and ensure the safety of Arlington’s built environment, while providing a world-class place to live, work, play and learn for our residents, customers and partners. CPHD staff have the experience, professionalism and expertise to work with our customers and partners to support projects and programs that meet the needs and priorities of the community.

Development Tracking Report Second Quarter 2019

Methodology

Quarterly development tracking reports are generated from County authored Board Reports, County Board minutes, and County data on Certificate of Occupancy (CO) permits, building permits, and demolitions permits.

The approval date is the date the project was approved by the County Board (by-right projects are not approved by the County Board). The Virginia State Legislature has extended the blanket expiration of approved site plans and special exception use permits beyond the terms of most final site plans approved by the County Board, with the most recent extension to July 2020. The construction start date is based on the date the first building permit was approved for the project, and projects are classified as under construction when construction activity commences above grade. Completed projects are those where a CO has been issued. In general, a project is determined to be complete if a Master CO has been issued or if partial certificates of occupancy have been issued for at least 50 percent of the GFA or units in the project. In some cases, projects were determined to be complete or under construction based on site visits by Community Planning, Housing, and Development (CPHD) staff. The demlotion date listed for demolished projects is the date the demolition permit was issued (not the date of actual demolition).

The projects contained in this report are only those that add or subtract new development potential (i.e., residential units, hotel rooms, or gross floor area) to current residential, hotel, office, retail and other space inventories in the County. This report does not include data on alterations or additions to single family attached or detached homes, but does include information on demolition and new construction of such homes.

In addition to the preceding summary, detailed tables showing completions, construction starts, approvals, and demolitions for residential units, office space, retail space, hotel rooms, and other space for the Second Quarter 2019 accompany this document.

The attached tables are divided into four sections:

Data Table Overview

Each section separately reports Major Projects and Single Family Houses. Data are reported for each of Arlington’s Major Planning Areas, Other Planning Areas, and other geographic areas. Major Planning Areas include Rosslyn, Courthouse, Clarendon, Virginia Square, Ballston, Crystal City, Pentagon City, and Columbia Pike. Other Planning Areas and other geographic areas include Nauck, Shirlington, East Falls Church, Lee Highway, and Four Mile Run.

Interactive maps and additional information are available at http://projects.arlingtonva.us/data-research/.

• Site Plan and other Approved Projects• Completed Projects

• Projects Under Construction• Demolitions

If you have any questions or would like additional information, please contact

CPHD at (703) 228-3525.

Page 5: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Summary of Site Plan and Other ProjectsArlington County, Virginia

Approved (Not Under Construction) As Of 06/30/2019

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanApprovalProject Name Address Date

ROSSLYN

0 48 160 04/23/20191501 Arlington Blvd. - Best Western Site

0 2331501 ARLINGTON BLVD 0

0 249 0 02/25/2017Queen's Court 0 4441801 N QUINN ST 0

45,000 550 200 03/12/2016Rosslyn Plaza PDSP 0 4221001 WILSON BVLD 1,810,173

55,540 274 0 06/14/20141401 Wilson Blvd 0 4291401 WILSON BLVD 513,004

8,688 0 0 07/21/2012Rosslyn Gateway PDSP - FSP (Phase 1 - Office Building)

0 4191901 FT MYER DR 490,056

10,001 133 148 07/21/2012Rosslyn Gateway PDSP - FSP (Phase 1 - Residential/Hotel Building)

0 4191901 FT MYER DR 0

7,687 140 0 07/21/2012Rosslyn Gateway PDSP (Phase 2 - Remaining Allocation)

0 4191901 FT MYER DR 0

2,813,233 126,916 1,394 5080ROSSLYN SUBTOTAL

COURT HOUSE

6,960 0 0 03/14/2015Carr Office Building 0 4352038 WILSON BLVD 188,910

0 188 0 10/15/2011Wakefield Manor 0 4172025 FAIRFAX DR 0

10,000 0 0 11/15/2005NSTA Office Site Plan 0 3821840 WILSON BLVD 107,920

296,830 16,960 188 00COURT HOUSE SUBTOTAL

CLARENDON

3,477 580 0 10/20/2015Red Top Cab Site 0 4381200 N HUDSON ST 0

0 3,477 580 00CLARENDON SUBTOTAL

VIRGINIA SQUARE

16,185 0 0 01/21/20123901 Fairfax Drive 7,311 3863901 FAIRFAX DR 178,131

11,000 0 0 01/01/1994George Mason University - Phase III

183,000 Sp. Ag.3401 FAIRFAX DR 90,000

268,131 27,185 0 0190,311VIRGINIA SQUARE SUBTOTAL

BALLSTON

0 84 0 02/24/201811th and Vermont Residences

0 4471031 N VERMONT ST 0

0 119 0 02/28/2017Ballston Station/Ballston Central United Methodist Church

23,499 4434223 N FAIRFAX DR 0

0 0 0 11/14/2015Macy's Department Store and Office Expansion

0 193701 N GLEBE RD 19,806

Page 1 of 3Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 06/30/2019

Page 6: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanApprovalProject Name Address Date

9,200 237 0 01/21/2006The Spire/Fairmont 0 3314420 FAIRFAX DR 0

19,806 9,200 440 023,499BALLSTON SUBTOTAL

CRYSTAL CITY

0 252 0 11/18/2017Crystal Houses III 0 131900 S EADS ST 0

21,836 308 0 07/15/2017New Century Center Residential

0 4422351 RICHMOND HWY 0

0 0 0 10/15/2011Boeing Site - Phase II 0 400608 S BALL ST 131,338

41,325 0 0 12/18/2007Potomac Yard PDSP - Land Bay C (National Gateway 3-4-5-6)

0 346RICHMOND HWY 1,064,298

1,195,636 63,161 560 00CRYSTAL CITY SUBTOTAL

PENTAGON CITY

10,929 590 0 07/16/2016Pentagon City PDSP (Parcel 3/Metropolitan Park-Phase 6)

0 1051400 S EADS ST 0

15,541 253 0 09/15/2015Pentagon Centre PDSP - Phase 1B (FSP)

0 297719 15TH ST S 0

310,500 0 200 09/15/2015Pentagon Centre PDSP - Phase II and III (Remaining Allocation)

0 2971201 S HAYES 705,700

50,000 0 300 09/21/2013PenPlace (Pentagon City PDSP Parcel 1D - Remaining Allocation)

0 1051197 S FERN ST 1,809,000

23,818 1403 0 09/21/2013Pentagon City PDSP (Parcel 3/Metropolitan Park - Remaining Allocation)

0 1051400 S EADS S 0

2,514,700 410,788 2,246 5000PENTAGON CITY SUBTOTAL

COLUMBIA PIKE

12,997 105 0 06/18/20162400 Columbia Pike 0 FBC/UP2400 COLUMBIA PIKE 0

0 12,997 105 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 27 0 11/18/20176711 Lee Highway (Sun Trust Site)

0 36711 LEE HWY 0

12,200 22 0 07/08/20062515 Lee Hwy 0 UCMUD2515 LEE HWY 0

5,570 12 0 02/25/20064601-4607 Old Dominion Dr

0 UCMUD4601 OLD DOMINION DR 6,272

6,272 17,770 61 00LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 255 0 06/15/20191122 N Kirkwood Road - Washingotn Blvd at Kirkwood

0 4501122 N KIRKWOOD RD 0

0 0 0 05/18/2019Education Center 358,112 UP1426 N QUINCY ST 0

0 160 0 02/23/2019American Legion/APAH 6,750 4493445 WASHINGTON BLVD 0

Page 2 of 3Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 06/30/2019

Page 7: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanApprovalProject Name Address Date

0 0 0 11/27/2018Virginia Hospital Center Expansion

239,086 1771625 N GEORGE MASON DR 0

0 0 0 11/17/2018Reed School Expansion 69,047 UP1644 N MCKINLEY RD 0

0 131 0 04/21/2018Red Cross/Trenton St. Residential

0 4464333 ARLINGTON BLVD 0

0 0 546 0672,995OUTSIDE METRO SUBTOTAL

7,114,608 688,454 6,120 1,008886,805 SUBTOTAL

SINGLE-FAMILY HOUSES

OUTSIDE METRO

0 3 0 02/22/2014Honeysuckle Hills URD 0 URD6122 LEE HIGHWAY 0

0 0 3 00OUTSIDE METRO SUBTOTAL

0 0 3 00SINGLE-FAMILY HOUSES SUBTOTAL

7,114,608 688,454 6,123 1,008ARLINGTON TOTAL 886,805

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 3 of 3Summary of Site Plan and Other Projects Approved (Not Under Construction) As Of 06/30/2019

Page 8: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Projects Under ConstructionArlington County, Virginia

Through 06/30/2019

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanStartProject Name Address Date

ROSSLYN

32,932 553 0 09/30/2018The Highlands (East Building)

0 4451555 WILSON BLVD 0

9,788 331 0 09/30/2018The Highlands (West Building)

0 4451788 N PIERCE ST 0

0 0 0 04/01/2018Wilson School 180,000 UP1601 WILSON BLVD 0

0 42,720 884 0180,000ROSSLYN SUBTOTAL

COURT HOUSE

1,921 90 0 05/05/20192000 Clarendon Blvd 0 4412000 CLARENDON BLVD 0

0 395 0 06/30/2016Gables N. Rolfe St. 0 4321307 N ROLFE ST 0

0 1,921 485 00COURT HOUSE SUBTOTAL

CLARENDON

27,945 0 0 03/01/2019Clarendon Market Common Phase II amendment

0 3392801 CLARENDON BLVD 0

0 27,945 0 00CLARENDON SUBTOTAL

BALLSTON

11,692 330 0 03/01/2019J-Sol 0 464000 FAIRFAX DR 0

68,185 483 0 03/31/2018The Waycroft 0 440750 N GLEBE RD 0

33,400 250 0 03/31/20184040 Wilson Blvd (Founder's Square - North Office)

0 413707 N RANDOLPH 191,300

0 0 175 08/07/2017WhyHotel: Ballston Quarter 0 1934100 WILSON BLVD 0

191,300 113,277 1,063 1750BALLSTON SUBTOTAL

CRYSTAL CITY

84,000 0 0 06/24/2019Central District Retail Phase I

0 901550 CRYSTAL DR 0

0 0 0 03/01/2019Long Bridge Park Aquatics and Fitness Facility (Phase I)

120,420 UP333 LONG BRIDGE DR 0

16,300 0 0 10/26/2018Central District Retail Phase II

0 901770 CRYSTAL DR 10,000

16,503 360 0 10/01/2018The Sur: Potomac Yard - Land Bay D-East

0 3463400 POTOMAC AVE 0

5,015 342 0 03/31/2018The Clark: Potomac Yard - Land Bay D - West

23,906 3463001 RICHMOND HWY 0

Page 1 of 7Projects Under Construction Through 06/30/2019

Page 9: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanStartProject Name Address Date

10,000 121,818 702 0144,326CRYSTAL CITY SUBTOTAL

PENTAGON CITY

10,739 440 0 07/01/2017The Witmer: Pentagon Centre PDSP

0 297710 12TH ST S 0

0 10,739 440 00PENTAGON CITY SUBTOTAL

COLUMBIA PIKE

0 36 0 03/01/2019Axumite Village 0 FBC/UP1100 S HIGHLAND ST 0

0 402 0 08/02/2018The Trove (Wellington Apartments)

0 FBC/UP1201 S RHODES ST 0

81,530 365 0 06/18/2018Columbia Pike Village Centro

0 FBC/UP950 S GEORGE MASON DR 0

8,900 173 0 03/31/2018Gilliam Place 0 FBC/UP3507 COLUMBIA PIKE 0

0 90,430 976 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 0 0 03/25/2019Stratford School Addition 40,000 UP4100 VACATION LN 0

0 0 0 02/21/2019Rivendell School 40,325 UP2410 N KENSINGTON ST 0

0 0 0 080,325LEE HIGHWAY SUBTOTAL

OUTSIDE METRO

0 256 0 03/31/2019The Berkeley 0 4312900 S GLEBE RD 0

0 7 0 03/26/20195713 10th Rd N 05713 10TH RD N 0

0 0 0 02/06/2019Lubber Run Community Center

53,348 B-R300 N PARK DR 0

0 1 0 12/12/20182027 N Dinwiddie St 0 B-R2027 N DINWIDDIE ST 0

0 1 0 12/12/20182023 N Dinwiddie St 02023 N DINWIDDIE ST 0

0 0 0 04/01/2018Alice West Fleet Elementary School

111,350 UP125 S OLD GLEBE RD 0

12,578 0 0 02/21/2017Maserati of Arlington 0 B-R2710 S GLEBE RD 0

0 12,578 265 0164,698OUTSIDE METRO SUBTOTAL

201,300 421,428 4,815 175569,349 SUBTOTAL

SINGLE-FAMILY HOUSES

ROSSLYN

0 12 0 05/02/20181201 N Quinn St 01201 N QUINN ST 0

0 0 12 00ROSSLYN SUBTOTAL

COURT HOUSE

0 1 0 04/17/20192510 16th St N 02510 16TH ST N 0

0 1 0 12/19/20181607 N Bryan St 01607 N BRYAN ST 0

0 1 0 12/30/20132409 Clardendon Blvd 02409 CLARENDON BLVD 0

Page 2 of 7Projects Under Construction Through 06/30/2019

Page 10: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanStartProject Name Address Date

0 0 3 00COURT HOUSE SUBTOTAL

CLARENDON

0 1 0 05/29/20191412 N Hartford St 01412 N HARTFORD ST 0

0 1 0 05/03/20191550 N Danville St 01550 N DANVILLE ST 0

0 1 0 01/07/20191028 N Danville St 01028 N DANVILLE ST 0

0 1 0 08/24/20181410 N Herndon St 01410 N HERNDON ST 0

0 1 0 04/20/20181422 N Herndon St 01422 N HERNDON ST 0

0 1 0 12/07/2016703 N Fillmore St 0703 N FILLMORE ST 0

0 1 0 05/11/20163132 10Th St N 03132 10TH ST N 0

0 0 7 00CLARENDON SUBTOTAL

BALLSTON

0 1 0 02/28/2019601 N Wakefield St 0601 N WAKEFIELD ST 0

0 1 0 11/03/20174704 N Carlin Springs Rd 04704 N CARLIN SPRINGS RD 0

0 1 0 10/31/20174712 N Carlin Springs Rd 04712 N CARLIN SPRINGS RD 0

0 1 0 09/22/2017608 N Vermont St 0608 N VERMONT ST 0

0 0 4 00BALLSTON SUBTOTAL

COLUMBIA PIKE

0 1 0 01/22/20191026 S Rolfe St 01026 S ROLFE ST 0

0 1 0 05/10/20181550 13th St S 01550 13TH ST S 0

0 1 0 12/04/20171624 12th St S 01624 12TH ST S 0

0 1 0 01/30/20171209 S Pierce St 01209 S PIERCE ST 0

0 1 0 11/07/20162701 12Th St S 02701 12TH ST S 0

0 1 0 07/15/20151106 S Highland St 01106 S HIGHLAND ST 0

0 1 0 03/10/20101102 S Queen St 01102 S QUEEN ST 0

0 1 0 05/30/20073507 16th St S 03507 16TH ST S 0

0 0 8 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 1 0 09/18/20182116 N Culpeper St 02116 N CULPEPER ST 0

0 1 0 02/23/20184040 Vacation Ln 04040 VACATION LN 0

0 0 2 00LEE HIGHWAY SUBTOTAL

NAUCK

0 1 0 08/22/20181957 S Kenmore St 01957 S KENMORE ST 0

0 0 1 00NAUCK SUBTOTAL

OUTSIDE METRO

0 1 0 06/30/20193264 N Ohio St 03264 N OHIO ST 0

0 1 0 06/25/20194933 34th St N 04933 34TH ST N 0

0 1 0 06/19/20195601 36th St N 05601 36TH ST N 0

0 1 0 06/13/20191703 N Edison St 01703 N EDISON ST 0

0 1 0 06/13/20192016 N Madison St 02016 N MADISON ST 0

Page 3 of 7Projects Under Construction Through 06/30/2019

Page 11: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 06/10/20192117 N Courthouse Rd 02117 N COURTHOUSE RD 0

0 1 0 06/07/20193536 N Dinwiddie St 03536 N DINWIDDIE ST 0

0 1 0 06/05/20193401 N Abingdon St 03401 N ABINGDON ST 0

0 1 0 06/03/20193214 1st Rd N 03214 1ST RD N 0

0 1 0 06/02/20196619 29th St N 06619 29TH ST N 0

0 1 0 05/21/20193465 N Emerson St 03465 N EMERSON ST 0

0 1 0 05/21/20195105 23rd Rd N 05105 23RD RD N 0

0 1 0 05/20/2019209 N Edgewood St 0209 N EDGEWOOD ST 0

0 1 0 05/17/20195107 27th Rd N 05107 27TH RD N 0

0 1 0 05/16/20191222 26th Rd S 01222 26TH RD S 0

0 1 0 05/16/20192631 S Arlington Ridge Rd 02631 S ARLINGTON RIDGE RD 0

0 1 0 05/16/20194739 34th Rd N 04739 34TH RD N 0

0 1 0 05/15/20193935 N Upland St 03935 N UPLAND ST 0

0 1 0 05/08/20193001 N Underwood St 03001 N UNDERWOOD ST 0

0 1 0 05/03/20194937 36th St N 04937 36TH ST N 0

0 1 0 04/29/20192612 3rd St N 02612 3RD ST N 0

0 1 0 04/29/20193109 N Toronto St 03109 N TORONTO ST 0

0 1 0 04/25/2019508 N Greenbrier St 0508 N GREENBRIER ST 0

0 1 0 04/24/20197108 27th Rd N 07108 27TH RD N 0

0 1 0 04/23/20194806 25th St N 04806 25TH ST N 0

0 1 0 04/22/20194912 34th Rd N 04912 34TH RD N 0

0 1 0 04/19/20192500 N Powhatan St 02500 N POWHATAN ST 0

0 1 0 04/17/20194421 36th St N 04421 36TH ST N 0

0 1 0 04/16/20195721 5th St N 05721 5TH ST N 0

0 1 0 04/15/20196801 30th Rd N 06801 30TH RD N 0

0 1 0 04/04/20193300 N Pocomoke St 03300 N POCOMOKE ST 0

0 1 0 04/01/20192007 N Inglewood St 02007 N INGLEWOOD ST 0

0 1 0 03/28/20194777 33rd St N 04777 33RD ST N 0

0 1 0 03/21/20193008 20th St S 03008 20TH ST S 0

0 1 0 03/20/2019224 N Nelson St 0224 N NELSON ST 0

0 1 0 03/15/20191106 18th St S 01106 18TH ST S 0

0 1 0 03/15/20193406 N Vermont St 03406 N VERMONT ST 0

0 1 0 03/13/20196047 28th St N 06047 28TH ST N 0

0 1 0 03/12/20192722 N Norwood St 02722 N NORWOOD ST 0

0 1 0 03/11/20191015 21st St S 01015 21ST ST S 0

0 1 0 03/05/20192616 2nd Rd N 02616 2ND RD N 0

0 1 0 03/01/20191423 N Buchanan St 01423 N BUCHANAN ST 0

0 1 0 03/01/20191535 N Randolph St 01535 N RANDOLPH ST 0

0 1 0 03/01/20193507 N Kensington St 03507 N KENSINGTON ST 0

0 1 0 02/27/20195226 Bluemont Dr 05226 BLUEMONT DR 0

0 1 0 02/26/20196125 Williamsburg Blvd 06125 WILLIAMSBURG BLVD 0

0 1 0 02/25/20194101 N Richmond St 04101 N RICHMOND ST 0

0 1 0 02/21/20193010 N Florida St 03010 N FLORIDA ST 0

0 1 0 02/21/20196831 30th Rd N 06831 30TH RD N 0

0 1 0 02/14/20191532 N Randolph St 01532 N RANDOLPH ST 0

0 1 0 02/14/20195222 12Th St N 05222 12TH ST N 0

0 1 0 02/13/20191724 N Barton St 01724 N BARTON ST 0

0 1 0 02/13/20194115 33rd Rd N 04115 33RD RD N 0

0 1 0 02/11/20192312 N Kensington St 02312 N KENSINGTON ST 0

0 1 0 02/11/20193400 N Vermont St 03400 N VERMONT ST 0

Page 4 of 7Projects Under Construction Through 06/30/2019

Page 12: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 02/07/20194731 34th St N 04731 34TH ST N 0

0 1 0 01/30/20193215 N Vermont St 03215 N VERMONT ST 0

0 1 0 01/28/20194011 26th St N 04011 26TH ST N 0

0 1 0 01/28/20194319 17th St N 04319 17TH ST N 0

0 1 0 01/25/20192320 N Vernon St 02320 N VERNON ST 0

0 1 0 01/25/20195016 22nd St N 05016 22ND ST N 0

0 1 0 01/25/2019705 N Barton St 0705 N BARTON ST 0

0 1 0 01/25/2019707 N Barton St 0707 N BARTON ST 0

0 1 0 01/22/20191312 N Quintana St 01312 N QUINTANA ST 0

0 1 0 01/22/20192634 N Richmond St 02634 N RICHMOND ST 0

0 1 0 01/18/20196230 30th St N 06230 30TH ST N 0

0 1 0 01/16/20195612 5th St N 05612 5TH ST N 0

0 1 0 01/11/20192301 S Buchanan St 02301 S BUCHANAN ST 0

0 1 0 01/11/20193616 N Upland St 03616 N UPLAND ST 0

0 1 0 01/10/20195212 32nd St N 05212 32ND ST N 0

0 1 0 01/07/20192817 N Jefferson St 02817 N JEFFERSON ST 0

0 1 0 01/03/20192508 N Ohio St 02508 N OHIO ST 0

0 1 0 01/03/20195800 Little Falls Rd 05800 LITTLE FALLS RD 0

0 1 0 12/31/20184835 Little Falls Rd 04835 LITTLE FALLS RD 0

0 1 0 12/31/20184835 Little Falls Rd 04835 LITTLE FALLS RD 0

0 1 0 12/28/20186204 26th Rd N 06204 26TH RD N 0

0 1 0 12/27/20183616 Roberts Ln 03616 ROBERTS LN 0

0 1 0 12/26/20181420 N Johnson St 01420 N JOHNSON ST 0

0 1 0 12/20/20181142 N Harrison St 01142 N HARRISON ST 0

0 1 0 12/18/20185527 24th St N 05527 24TH ST N 0

0 1 0 12/12/20182914 1st Rd N 02914 1ST RD N 0

0 1 0 11/30/20184115 21st St N 04115 21ST ST N 0

0 1 0 11/21/20181215 N Abingdon St 01215 N ABINGDON ST 0

0 1 0 11/21/20182231 N Vermont St 02231 N VERMONT ST 0

0 1 0 11/19/20183222 20th Rd N 03222 20TH RD N 0

0 1 0 11/16/2018300 N Park Dr 0300 N PARK DR 0

0 1 0 11/09/20184613 Rock Spring Rd 04613 ROCK SPRING RD 0

0 1 0 11/09/2018908 21st St S 0908 21ST ST S 0

0 1 0 11/07/20182739 N Radford St 02739 N RADFORD ST 0

0 1 0 11/05/20181820 N Quantico St 01820 N QUANTICO ST 0

0 1 0 11/05/20182300 N Kensington St 02300 N KENSINGTON ST 0

0 1 0 11/02/20184925 Old Dominion Dr 04925 OLD DOMINION DR 0

0 1 0 10/31/20181206 N Harrison St 01206 N HARRISON ST 0

0 1 0 10/23/20185600 32nd St N 05600 32ND ST N 0

0 1 0 10/17/20182221 N Kentucky St 02221 N KENTUCKY ST 0

0 1 0 10/16/20183174 21St St N 03174 21ST ST N 0

0 1 0 10/15/20184278 38th St N 04278 38TH ST N 0

0 1 0 10/09/20184339 26th St N 04339 26TH ST N 0

0 1 0 10/03/20184345 26th St N 04345 26TH ST N 0

0 1 0 09/26/20182253 N Wakefield St 02253 N WAKEFIELD ST 0

0 1 0 09/26/20184647 38th Pl N 04647 38TH PL N 0

0 1 0 09/26/20186300 28th St N 06300 28TH ST N 0

0 1 0 09/25/20181937 N Emerson St 01937 N EMERSON ST 0

0 1 0 09/25/20184659 34th St N 04659 34TH ST N 0

0 1 0 09/25/2018827 N Barton St 0827 N BARTON ST 0

Page 5 of 7Projects Under Construction Through 06/30/2019

Page 13: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 09/20/20182004 N Greenbrier St 02004 N GREENBRIER ST 0

0 1 0 09/20/20183127 18th St N 03127 18TH ST N 0

0 1 0 09/17/20183207 N Trinidad St 03207 N TRINIDAD ST 0

0 1 0 09/17/2018919 N Cleveland St 0919 N CLEVELAND ST 0

0 1 0 09/14/2018314 N Barton St 0314 N BARTON ST 0

0 1 0 09/14/20185308 31St Rd N 05308 31ST RD N 0

0 1 0 08/31/20184210 25th St N 04210 25TH ST N 0

0 1 0 08/20/2018922 16th St S 0922 16TH ST S 0

0 1 0 08/14/20181717 N Utah St 01717 N UTAH ST 0

0 1 0 08/14/20182021 N Kentucky St 02021 N KENTUCKY ST 0

0 1 0 08/09/20186046 27th St N 06046 27TH ST N 0

0 1 0 07/31/20183165 20th St N 03165 20TH ST N 0

0 1 0 07/27/20185540 32Nd St N 05540 32ND ST N 0

0 1 0 07/12/20181239 N Taylor St 01239 N TAYLOR ST 0

0 1 0 07/11/20186415 19th St N 06415 19TH ST N 0

0 1 0 06/25/2018404 S Illinois St 0404 S ILLINOIS ST 0

0 1 0 06/19/20183839 Military Rd 03839 MILITARY RD 0

0 1 0 06/15/20183871 30th St N 03871 30TH ST N 0

0 1 0 06/12/20183841 Military Rd 03841 MILITARY RD 0

0 1 0 06/11/20181724 N Barton St 01724 N BARTON ST 0

0 1 0 05/23/20182105 N George Mason Dr 02105 N GEORGE MASON DR 0

0 1 0 05/08/20183414 N Emerson St 03414 N EMERSON ST 0

0 1 0 05/07/2018213 N Edgewood St 0213 N EDGEWOOD ST 0

0 1 0 05/03/20182931 S Grant St 02931 S GRANT ST 0

0 1 0 04/10/20184531 40th St N 04531 40TH ST N 0

0 1 0 03/08/20184503 32nd Rd N 04503 32ND RD N 0

0 1 0 02/20/20183081 N Pollard St 03081 N POLLARD ST 0

0 1 0 02/20/20186600 16th St N 06600 16TH ST N 0

0 1 0 01/11/20181700 N Adams St 01700 N ADAMS ST 0

0 1 0 01/08/20184108 N Ridgeview Rd 04108 N RIDGEVIEW RD 0

0 1 0 01/04/20183116 N Nelson St 03116 N NELSON ST 0

0 1 0 12/12/2017118 N Jackson St 0118 N JACKSON ST 0

0 1 0 12/05/20171229 N Stuart St 01229 N STUART ST 0

0 1 0 11/15/20172105 N Emerson St 02105 N EMERSON ST 0

0 2 0 10/30/2017705/707 N Barton St 0 URD705 N BARTON ST 0

0 1 0 10/27/20173882 30th St N 03882 30TH ST N 0

0 1 0 10/06/201726 S Pershing Dr 026 S PERSHING DR 0

0 1 0 09/28/20172014 S Langley St 02014 S LANGLEY ST 0

0 1 0 06/29/2017920 N Quesada St 0920 N QUESADA ST 0

0 1 0 06/05/20174030 18th St S 04030 18TH ST S 0

0 1 0 04/13/2017900 N Harrison St 0900 N HARRISON ST 0

0 1 0 03/22/201728 S Pershing Dr 028 S PERSHING DR 0

0 1 0 01/03/20172428 N Potomac St 02428 N POTOMAC ST 0

0 1 0 11/03/20165502 16Th St N 05502 16TH ST N 0

0 1 0 11/01/20163411 N Woodrow St 03411 N WOODROW ST 0

0 1 0 10/21/20165636 5Th St N 05636 5TH ST N 0

0 1 0 10/05/2016830 22Nd St S 0830 22ND ST S 0

0 1 0 04/26/20163013 N Underwood St 03013 N UNDERWOOD ST 0

0 1 0 04/22/20166213 31st St N 06213 31ST ST N 0

0 1 0 03/02/20165032 25th Rd N 05032 25TH RD N 0

Page 6 of 7Projects Under Construction Through 06/30/2019

Page 14: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanStartProject Name Address Date

0 1 0 02/26/20163038 N Peary St 03038 N PEARY ST 0

0 1 0 12/11/20153541 N Utah St 03541 N UTAH ST 0

0 1 0 12/04/20152525 N Granada St 02525 N GRANADA ST 0

0 1 0 10/21/20151610 N Monroe St 01610 N MONROE ST 0

0 1 0 10/01/20154807 11th St N 04807 11TH ST N 0

0 1 0 09/16/20155001 34th St N 05001 34TH ST N 0

0 1 0 09/13/20152611 N Marcey Rd 02611 N MARCEY RD 0

0 1 0 09/09/20152700 N Buchanan St 02700 N BUCHANAN ST 0

0 1 0 09/01/20154304 4th St S 04304 4TH ST S 0

0 1 0 08/07/20152413 N Vermont St 02413 N VERMONT ST 0

0 1 0 06/25/2015132 N Fillmore St 0132 N FILLMORE ST 0

0 1 0 06/25/2015132 N Fillmore St 0132 N FILLMORE ST 0

0 1 0 03/16/20153703 N Randolph St 03703 N RANDOLPH ST 0

0 1 0 01/08/2015407 Chain Bridge Rd 0407 CHAIN BRIDGE RD 0

0 1 0 09/24/20144307 37th Rd N 04307 37TH RD N 0

0 1 0 04/29/20142126 N Rolfe St 02126 N ROLFE ST 0

0 1 0 03/27/20142351 N Daniel St 02351 N DANIEL ST 0

0 1 0 12/06/20133121 24th St S 03121 24TH ST S 0

0 1 0 10/04/20133018 N Westmorland St 03018 N WESTMORELAND ST 0

0 1 0 09/06/20132361 N Edgewood St 02361 N EDGEWOOD ST 0

0 1 0 05/30/20132614 Washington Blvd 02614 WASHINGTON BLVD 0

0 1 0 03/14/20113515 14th St N 03515 14TH ST N 0

0 1 0 08/06/20105219 26th St N 05219 26TH ST N 0

0 1 0 11/16/20074007 Vacation Ln 04007 VACATION LN 0

0 1 0 10/31/20071110 18th St S 01110 18TH ST S 0

0 1 0 10/09/20072008 S Monroe St 02008 S MONROE ST 0

0 1 0 06/22/20072507 9th St N 02507 9TH ST N 0

0 0 183 00OUTSIDE METRO SUBTOTAL

0 0 220 00SINGLE-FAMILY HOUSES SUBTOTAL

201,300 421,428 5,035 175ARLINGTON TOTAL 569,349

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 7 of 7Projects Under Construction Through 06/30/2019

Page 15: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Completed ProjectsArlington County, Virginia

04/01/2019 Through 06/30/2019

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanCompletionProject Name Address Date

BALLSTON

66,475 231 0 06/24/2019Origin: Ballston Quarter Residential

0 193700 N RANDOLPH ST 0

0 66,475 231 00BALLSTON SUBTOTAL

COLUMBIA PIKE

8,000 73 0 04/30/2019Trafalgar Flats 0 FBC989 S BUCHANAN ST 0

0 8,000 73 00COLUMBIA PIKE SUBTOTAL

LEE HIGHWAY

0 93 0 05/24/2019Cherry Hill Apartments 0 B-R2120 N MONROE ST 0

0 0 93 00LEE HIGHWAY SUBTOTAL

0 74,475 397 00 SUBTOTAL

SINGLE-FAMILY HOUSES

VIRGINIA SQUARE

0 1 0 06/07/2019520 N Jackson St 0520 N JACKSON ST 0

0 1 0 06/05/20193514 8th St N 03514 8TH ST N 0

0 0 2 00VIRGINIA SQUARE SUBTOTAL

COLUMBIA PIKE

0 1 0 05/13/20193508 8th St S 03508 8TH ST S 0

0 1 0 05/03/2019812 S Veitch St 0812 S VEITCH ST 0

0 1 0 04/22/2019616 S Wayne St 0616 S WAYNE ST 0

0 0 3 00COLUMBIA PIKE SUBTOTAL

OUTSIDE METRO

0 1 0 06/28/20193016 N Florida St 03016 N FLORIDA ST 0

0 1 0 06/28/20193260 N Ohio St 03260 N OHIO ST 0

0 1 0 06/27/20192629 N Richmond St 02629 N RICHMOND ST 0

0 1 0 06/21/20192130 N Thomas St 02130 N THOMAS ST 0

0 1 0 06/21/20193430 N Randolph St 03430 N RANDOLPH ST 0

0 1 0 06/21/20196818 Williamsburg Blvd 06818 WILLIAMSBURG BLVD 0

0 1 0 06/14/20191601 N Stafford St 01601 N STAFFORD ST 0

0 1 0 06/11/20192643 N Rockingham St 02643 N ROCKINGHAM ST 0

0 1 0 06/10/2019934 19th St S 0934 19TH ST S 0

Page 1 of 3Completed Projects 04/01/2019 Through 06/30/2019

Page 16: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanCompletionProject Name Address Date

0 1 0 06/04/20191138 N Harrison St 01138 N HARRISON ST 0

0 1 0 06/03/20193036 N Pollard St 03036 N POLLARD ST 0

0 1 0 05/30/20193000 N Underwood St 03000 N UNDERWOOD ST 0

0 1 0 05/23/20192619 N Ohio St 02619 N OHIO ST 0

0 1 0 05/23/20194508 16th St N 04508 16TH ST N 0

0 1 0 05/22/20192124 S Randolph St 02124 S RANDOLPH ST 0

0 1 0 05/22/20196407 19th St N 06407 19TH ST N 0

0 1 0 05/22/2019856 N Harrison St 0856 N HARRISON ST 0

0 1 0 05/17/20196047 21St St N 06047 21ST ST N 0

0 1 0 05/10/20191826 N Cameron St 01826 N CAMERON ST 0

0 1 0 05/10/20195708 5th St N 05708 5TH ST N 0

0 1 0 05/10/20195710 5th St N 05710 5TH ST N 0

0 1 0 05/09/20196411 19th St N 06411 19TH ST N 0

0 1 0 05/01/20192610 N Upland St 02610 N UPLAND ST 0

0 1 0 04/30/20192322 John Marshall Dr 02322 JOHN MARSHALL DR 0

0 1 0 04/30/20193010 N Roosevelt St 03010 N ROOSEVELT ST 0

0 1 0 04/30/20194715 Dittmar Rd 04715 DITTMAR RD 0

0 1 0 04/30/20195612 Williamsburg Blvd 05612 WILLIAMSBURG BLVD 0

0 1 0 04/29/20192322 N Fillmore St 02322 N FILLMORE ST 0

0 1 0 04/29/20192354 N Quebec St 02354 N QUEBEC ST 0

0 1 0 04/26/20195425 4th St S 05425 4TH ST S 0

0 1 0 04/19/20191005 N Kentucky St 01005 N KENTUCKY ST 0

0 1 0 04/18/20193407 N Potomac St 03407 N POTOMAC ST 0

0 1 0 04/18/20194019 20th St N 04019 20TH ST N 0

0 1 0 04/18/20195117 26th Rd N 05117 26TH RD N 0

0 1 0 04/17/20193206 N George Mason Dr 03206 N GEORGE MASON DR 0

0 1 0 04/11/20194027 25th Rd N 04027 25TH RD N 0

0 1 0 04/09/20192416 N Quantico St 02416 N QUANTICO ST 0

0 1 0 04/08/20191842 N Columbus St 01842 N COLUMBUS ST 0

0 1 0 04/05/20196717 19th St N 06717 19TH ST N 0

0 1 0 04/03/20193312 2nd Rd N 03312 2ND RD N 0

0 1 0 04/03/20193516 N Valley St 03516 N VALLEY ST 0

0 0 41 00OUTSIDE METRO SUBTOTAL

0 0 46 00SINGLE-FAMILY HOUSES SUBTOTAL

Page 2 of 3Completed Projects 04/01/2019 Through 06/30/2019

Page 17: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanCompletionProject Name Address Date

0 74,475 443 0ARLINGTON TOTAL 0

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 3 of 3Completed Projects 04/01/2019 Through 06/30/2019

Page 18: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Summary of DemolitionsArlington County, Virginia

04/01/2019 Through 06/30/2019

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

ROSSLYN

0 39 0 04/05/2019Queens Court Apts 0 B-R1801 N QUINN ST 0

0 0 39 00ROSSLYN SUBTOTAL

CLARENDON

0 0 0 05/03/2019Red Top Cab Service Station

11,376 B-R1200 N HUDSON ST 0

0 0 0 05/03/2019N Hudson St Medical Building

01220 N HUDSON ST 5,600

5,600 0 0 011,376CLARENDON SUBTOTAL

PENTAGON CITY

0 0 0 04/17/2019USA Motorpol Pentagon Industrial Center Site Plan

29,225501 15th ST S 0

0 0 0 029,225PENTAGON CITY SUBTOTAL

EAST FALLS CHURCH

25,876 0 0 06/13/2019East Falls Church Sun Trust Bank

0 36711 LEE HWY 0

0 25,876 0 00EAST FALLS CHURCH SUBTOTAL

5,600 25,876 39 040,601 SUBTOTAL

SINGLE-FAMILY HOUSES

COURT HOUSE

0 1 0 04/25/20192510 16th St N 02510 16TH ST N 0

0 0 1 00COURT HOUSE SUBTOTAL

CLARENDON

0 1 0 06/03/20191412 N Hartford St 01412 N HARTFORD ST 0

0 1 0 05/13/20191550 N Danville St 01550 N DANVILLE ST 0

0 0 2 00CLARENDON SUBTOTAL

COLUMBIA PIKE

0 1 0 04/19/2019616 S Wayne St 0616 S WAYNE ST 0

Page 1 of 3Summary of Demolitions 04/01/2019 Through 06/30/2019

Page 19: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

0 0 1 00COLUMBIA PIKE SUBTOTAL

OUTSIDE METRO

0 1 0 06/27/20192370 N Taylor St 02370 N TAYLOR ST 0

0 1 0 06/24/20194933 34th St N 04933 34TH ST N 0

0 1 0 06/24/20195601 36th St N 05601 36TH ST N 0

0 1 0 06/21/20193935 N Upland St 03935 N UPLAND ST 0

0 1 0 06/19/20194219 Lorcom Ln 04219 LORCOM LN 0

0 1 0 06/19/2019508 N Highland St 0508 N HIGHLAND ST 0

0 1 0 06/17/20192016 N Madison St 02016 N MADISON ST 0

0 1 0 06/10/20196619 29th St N 06619 29TH ST N 0

0 1 0 06/05/20193809 13Th St N 03809 13TH ST N 0

0 1 0 06/04/20193214 1st Rd N 03214 1ST RD N 0

0 1 0 06/03/20192630 S Ives St 02630 S IVES ST 0

0 1 0 05/31/20192117 N Courthouse Rd 02117 N COURTHOUSE RD 0

0 1 0 05/29/201931 N Jackson St 031 N JACKSON ST 0

0 1 0 05/23/20193465 N Emerson St 03465 N EMERSON ST 0

0 1 0 05/22/20195105 23rd Rd N 05105 23RD RD N 0

0 1 0 05/21/20191222 26th Rd S 01222 26TH RD S 0

0 1 0 05/21/20193509 14th St N 03509 14TH ST N 0

0 1 0 05/20/20194937 36th St N 04937 36TH ST N 0

0 1 0 05/17/20195107 27th Rd N 05107 27TH RD N 0

0 1 0 05/16/20194739 34th Rd N 04739 34TH RD N 0

0 1 0 05/15/20191912 N Oakland St 01912 N OAKLAND ST 0

0 1 0 05/10/20192500 N Powhatan St 02500 N POWHATAN ST 0

0 1 0 05/09/20194101 N Richmond St 04101 N RICHMOND ST 0

0 1 0 05/08/20193001 N Underwood St 03001 N UNDERWOOD ST 0

0 1 0 05/03/2019501 S Irving St 0501 S IRVING ST 0

0 1 0 04/30/20194806 25th St N 04806 25TH ST N 0

0 1 0 04/30/20196801 30th Rd N 06801 30TH RD N 0

0 1 0 04/29/20193109 N Toronto St 03109 N TORONTO ST 0

0 1 0 04/29/20197108 27th Rd N 07108 27TH RD N 0

0 1 0 04/25/20192612 3rd St N 02612 3RD ST N 0

0 1 0 04/25/2019508 N Greenbrier St 0508 N GREENBRIER ST 0

0 1 0 04/23/20191711 N Edgewood St 01711 N EDGEWOOD ST 0

0 1 0 04/22/20194912 34th Rd N 04912 34TH RD N 0

0 1 0 04/19/20194421 36th St N 04421 36TH ST N 0

0 1 0 04/19/20194641 13Th St N 04641 13TH ST N 0

0 1 0 04/12/2019805 N Emerson St 0805 N EMERSON ST 0

0 1 0 04/04/20193300 N Pocomoke St 03300 N POCOMOKE ST 0

0 1 0 04/02/20192007 N Inglewood St 02007 N INGLEWOOD ST 0

0 0 38 00OUTSIDE METRO SUBTOTAL

0 0 42 00SINGLE-FAMILY HOUSES SUBTOTAL

Page 2 of 3Summary of Demolitions 04/01/2019 Through 06/30/2019

Page 20: Development Tracking Report Second Quarter 2019arlingtonva.s3.amazonaws.com/wp-content/...73 residential units, 8,000 SF retail Origin: Ballston Quarter Residential (SP #193): 231

Office Retail Residential Hotel

(s.f.) (s.f.) Units RoomsOther*(s.f.) Number**

Site PlanDemolitionProject Name Address Date

5,600 25,876 81 0ARLINGTON TOTAL 40,601

* Includes schools, health care facilities, recreation centers, fire houses, etc.

** Numbers listed refer to the site plan number. Other codes are as follows: B-R = By-right; FBC = Formed Based Code; PROF = Proffer; UP = Use Permit; URD = Unified Residential Development; UCMUD = Unified Commercial Mixed Use Development; and Sp. Ag. = Special Agreement.

Page 3 of 3Summary of Demolitions 04/01/2019 Through 06/30/2019