7th International

Conference and Exhibition

on Mass Mining

Development of the Ore Handling System

at the Grasberg Block Cave (GBC) Mine,

Indonesia

FREEPORT IN INDONESIA Grasberg Open Pit 4,285 m

Big Gossan

Kucing

Liar

DOZ-ESZ

DMLZ

Ertsberg East Skarn

System

AB Tunnels

Grasberg Block Cave

GRASBERG BLOCK CAVE MINE

Reserve 1,019 Mt @ 0.98% Cu,

0.77 g/t Au

2,404 Draw Points

Mining Rate: 160 Ktpd

Primary Mine Access via 6-km AB

Tunnels

Service Shaft for men and

materials

Rail Haulage to a 3 Crushers

Complex

GBC ORE HANDLING SYSTEM

Animation courtesy of PTFI

GBC ORE HANDLING SYSTEM

GBC ORE HANDLING SYSTEM

2730L CRUSHER LEVEL

2,000t COARSE OREBIN

LOADING CHUTE

APRON FEEDER ROCK BREAKER

GYRATORY CRUSHER

STOCK PILE

2760L HAULAGE LEVEL 20 m3 DUMP RAIL CARS 601 UNLOADING STATION

2700L CONVEYOR LEVEL

601 CONVEYOR

612 TRANSFER 601 TRANSFER

613 TRANSFER

GRS 70 CONVEYOR

GRS 71 CONVEYOR

BIN

2730L CRUSHER LEVEL

2,000t COARSE OREBIN

LOADING CHUTE

APRON FEEDER ROCK BREAKER

GYRATORY CRUSHER

STOCK PILE

2760L HAULAGE LEVEL 20 m3 DUMP RAIL CARS 601 UNLOADING STATION

2700L CONVEYOR LEVEL

601 CONVEYOR

612 TRANSFER 601 TRANSFER

613 TRANSFER

GRS 70 CONVEYOR

GRS 71 CONVEYOR

BIN

GBC ORE HANDLING SYSTEM

2010 - 2014

HAULAGE LEVEL DEVELOPMENT 2015 2016 Initial Production 2017

N

601 Unloading

Station

150 m

Rail Loop

Started in 2010

Long single heading

Horseshoe Profile

Ground Support

HAULAGE LEVEL DEVELOPMENT

601 Unloading

Station

150 m

N

602 Unloading

Station

603 Unloading

Station

Peak Production 2023

HAULAGE LEVEL DEVELOPMENT

GBC ORE HANDLING SYSTEM

2730L CRUSHER LEVEL

2,000t COARSE OREBIN

LOADING CHUTE

APRON FEEDER ROCK BREAKER

GYRATORY CRUSHER

STOCK PILE

2760L HAULAGE LEVEL 20 m3 DUMP RAIL CARS 601 UNLOADING STATION

2700L CONVEYOR LEVEL

601 CONVEYOR

612 TRANSFER 601 TRANSFER

613 TRANSFER

GRS 70 CONVEYOR

GRS 71 CONVEYOR

BIN

CRUSHER LEVEL DEVELOPMENT Initial Production (2017)

GBC Ramp

150 m

601 Crusher

Package

N

Main Chamber

Crusher

Pocket

45 m

601 CRUSHER PACKAGE Coarse

Ore Bin

N

CRUSHER LEVEL DEVELOPMENT Peak Production (2023)

GBC Ramp

150 m

601 Crusher

Package

602 Crusher

Package 603 Crusher

Package

N

CRUSHER LEVEL DEVELOPMENT

GBC ORE HANDLING SYSTEM

2730L CRUSHER LEVEL

2,000t COARSE OREBIN

LOADING CHUTE

APRON FEEDER ROCK BREAKER

GYRATORY CRUSHER

STOCK PILE

2760L HAULAGE LEVEL 20 m3 DUMP RAIL CARS 601 UNLOADING STATION

2700L CONVEYOR LEVEL

601 CONVEYOR

612 TRANSFER 601 TRANSFER

613 TRANSFER

GRS 70 CONVEYOR

GRS 71 CONVEYOR

BIN

2010 - 2014 2015

CONVEYOR LEVEL DEVELOPMENT

150 m

2016 Initial Production 2017 601 Crusher

Package

N

602 Transfer

603 Transfer

615 Transfer

611 Transfer

612

Transfer

613

Transfer

GVD 8 Connection

Conveyor Drift Profile 150 m

CONVEYOR LEVEL DEVELOPMENT N 601 Crusher

Package

N

602 Transfer

603 Transfer

615 Transfer

611 Transfer

612

Transfer

613

Transfer 150 m

Peak Production 2023

616

Transfer

617

Transfer

SUMMARY

88 km To initial production in 2017

GBC EXCAVATION

42%

58% OTHER MINE LEVEL

ORE HANDLING LEVEL

GBC OREHANDLING

EXCAVATION

36% 64%

TO BE EXCAVATED

COMPLETED

Multiple Resources

Critical Path

THANK YOU